1-Dec-18
Prepare untuk Preservasi
boiler sampling 10.3 50.08 490 51 86 ppb
16:55 feed water 7.52 0.88 50 19 -
1-Dec-18 boiler bagian atas 10.45 55.27 870 235 49
boiler bagian bawah 10.35 51.77 750 216 20 Preservasi
22:45 feed water 7.44 1.66 10 9 -
Boiler sampling 10.46 60.04 220 1600 265
22-Dec-18 22:00
Boiler level indicator 10.12 62.4 7000 1750 176 Preservasi
22:00 Boiler level indicator 10.49 62.71 722 1045 195
24-Dec-18 preservasi
Boiler Drain 6.35 3.62 102 58 -
3:20 Feed water 8.13 2.27 16 16 -
Boiler sampling 10.45 48.45 297 86 -
Boiler drain 10.43 52.12 294 630 -
5:30 feed water 7.71 1.97 13 13 -
Boiler sampling 10.35 39.94 327 63 -
25-Dec-18 After Flushing prepare for run
boiler drain 10.34 46.11 363 136 -
9:50 feed water 7.15 0.57 0 14 -
Boiler level indicator 10.37 39.86 1038/1048 47 -
boiler drain 10.35 39.86 37 54 -
14:00 Boiler level indikator 10.32 39.56 129 62
Status / Keterangan
in
in
in
t
t
tion ammonia
in
in
in
in
in
in
in
in
Preservasi
Preservasi
Preservasi
Preservasi
Preservasi
preservasi