Document No.

:
CUSTOMER: BP Angola Job No.

LOCATION: Angola- Block 31NE 074WAF AG-350-PS-0001


Rev. Sheet
PROJECT: FPSO’s Programme – PSVM I02 1 of 14

Gas Dehydration System & TEG Regeneration


Triune TRIUNE Job No. 9471
Package Functional Specification

GAS DEHYDRATION SYSTEM & TEG REGENERATION


PACKAGE FUNCTIONAL SPECIFICATION

I02 10.10.06 Revised & Issued for IDC SHV SKG RSB

I01 11.09.06 Issued for IDC SHV SKG RSB

Rev. Date Issue Description Prepared Verified Approved Client


by by by Approval

This document is the property of Saipem S.p.A. who will safeguard its rights according to the civil and penal provisions of the Law.
Document No.:
CUSTOMER: BP Angola Job No.

LOCATION: Angola- Block 31NE 074WAF AG-350-PS-0001


Rev. Sheet
PROJECT: FPSO’s Programme – PSVM I02 2 of 14

Gas Dehydration System & TEG Regeneration


Triune TRIUNE Job No. 9471
Package Functional Specification

REVISION HISTORY

REVISION REVISED CHAPTERS REVISION DESCRIPTION REASON FOR REVISION

I01 Issued for IDC

I02 Revised & Issued for IDC

This document is the property of Saipem S.p.A. who will safeguard its rights according to the civil and penal provisions of the Law.
Document No.:
CUSTOMER: BP Angola Job No.

LOCATION: Angola- Block 31NE 074WAF AG-350-PS-0001


Rev. Sheet
PROJECT: FPSO’s Programme – PSVM I02 3 of 14

Gas Dehydration System & TEG Regeneration


Triune TRIUNE Job No. 9471
Package Functional Specification

TABLE OF CONTENTS

1 INTRODUCTION............................................................................................................0

1.1 SCOPE....................................................................................................................................0
1.2 REFERENCE DOCUMENTS........................................................................................................0

2 SCOPE OF SUPPLY......................................................................................................0

3 PROCESS DESCRIPTION............................................................................................0

3.1 PROCESS DESIGN PARAMETERS....................................................................................0

4 PROCESS DATA............................................................................................................0

4.1 CHARACTERISTICS OF FEED TO THE INLET OF FILTER SEPARATOR...........................................0


4.2 MOLE COMPOSITION OF FEED TO THE INLET OF FILTER SEPARATOR........................................0

5 REQUESTED PERFORMANCE....................................................................................0

6 AMBIENT DESIGN CONDITIONS.................................................................................0

7 OTHERS REQUIREMENTS........................................................................................12

7.1 MATERIALS...........................................................................................................................12
7.2 CODES AND STANDARDS.......................................................................................................12
7.3 GENERAL NOTES..................................................................................................................12

8 REQUESTED DATA.......................................................................................................0

This document is the property of Saipem S.p.A. who will safeguard its rights according to the civil and penal provisions of the Law.
Document No.:
CUSTOMER: BP Angola Job No.

LOCATION: Angola- Block 31NE 074WAF AG-350-PS-0001


Rev. Sheet
PROJECT: FPSO’s Programme – PSVM I02 4 of 14

Gas Dehydration System & TEG Regeneration


Triune TRIUNE Job No. 9471
Package Functional Specification

1 INTRODUCTION
1.1 Scope
Scope of the document is to provide technical requirements for the supply of the Gas Dehydration and TEG
Regeneration Package to be installed on the PSVM Floating Production Storage and Offloading Unit (FPSO)
that will be located in Block 31 NE offshore Angola.
More in detail, the unit is composed of:

Gas Dehydration System:

 Filter Separator V-32001 (1x100%)


 Glycol Contactor V-32002 (1x100%)
 Gas/Glycol Heat Exchanger X-32001 (1x100%)

TEG Regeneration System:

 Reflux Condenser
 Cold Rich / Lean Glycol Exchanger
 Rich Glycol Flash Drum
 Glycol Solid Filters
 Glycol Charcoal Filter
 Hot Rich / Lean Glycol Exchanger
 Still Column
 Glycol Reboiler with Thyristor Panel
 Stripping Column
 Glycol Surge Drum
 Glycol Circulation Pumps
 TEG Make-up & Drain Tank
 Glycol Transfer Pump
 Condenser & Recovery Vessel for Glycol Reboiler Off-gas

The Glycol Dehydration & Regeneration package shall be supplied in two skids Gas Filtration Skid (Z-
32001)and Glycol Contactor, Gas/ Glycol heat exchanger & TEG Regeneration System Skid (Z-32002) , as
shown in PFD No. AG-320-PD-0001, self-contained with required accessories ready for operation on
connection to suction, discharge and utility piping and electrical connections.

Equipment and material provided shall be suitable for the specified ambient conditions in Tropical, Marine,
Salt laden and Corrosive environment.

The provision of this specification shall in no way be considered a limiting clause of relieving Vendor of any
of his obligations to deliver adequate equipment within the specified limits and guarantees. Moreover, the
Unit will be designed and constructed in order to guarantee the maximum operating reliability and the
operating flexibility without any effect on the quality and capacity of the products.

Vendor has the option to propose alternatives to the requests stated in this specification, provided that the
performances and reliability of the supplied items are not adversely affected.

This document is the property of Saipem S.p.A. who will safeguard its rights according to the civil and penal provisions of the Law.
Document No.:
CUSTOMER: BP Angola Job No.

LOCATION: Angola- Block 31NE 074WAF AG-350-PS-0001


Rev. Sheet
PROJECT: FPSO’s Programme – PSVM I02 5 of 14

Gas Dehydration System & TEG Regeneration


Triune TRIUNE Job No. 9471
Package Functional Specification

Proposed changes shall be described in detail by Vendor during Project phase and any related advantage
and/or saving highlighted for evaluation.

1.2 Reference Documents

1. PFD “Gas Dehydration & TEG Regeneration Package” Doc. No. AG-320-PD-0001
2. “FPSO Production Facilities Guidelines” Doc. No. ANG-B31-NE-FAC-033-A1
3. “Guidance on Industry Standard for Glycol Dehydration and Regeneration Skid” Doc. No. GIS 60-303
4. “Guidance on Practice for Glycol Dehydration and Regeneration” Doc. No. GP 60-35
5. “PSVM Facilities Supplementary FEED Basis of Design” Doc. No. ANG-B31-NE-FAC-039-A1

2 SCOPE OF SUPPLY

The scope of supply is as follows:

Gas Filtration Skid (Z-32001):

 Gas Filter Separator ( V-32001)


 Auxilliary such as control valves, shut down valves, pressure safety valves (PSVs), local mounted
instruments, manual valves, piping, fittings and so on.

Glycol Contactor, Gas/ Glycol heat exchanger & TEG Regeneration System Skid (Z-32002):

 Glycol Contactor with all required internals


 Gas/ Glycol heat exchanger
 Vessel with all required internals for TEG Regeneration System
 Pumps & Exchangers
 Electric equipments ( electric motors, transformers, control panels )
 Ancillary equipment provided inside TEG Regeneration Package Units Battery Limits (B.L.’s) as:
controllers, control valves, self actuated valves, shut down valves (SDV’s), pressure safety valves
(PSV’s), instruments both local and board mounted, manual valves, piping, fittings and so on.
 Local electric/control panel including local shut-down, remote shut-down signals (process and
emergency shut-down) and indication of equipment status.(All wiring to be terminated at Junction box).
 Interconnecting piping between TEG Regeneration system and Dehydration column and Gas/ Glycol
heat exchanger.

This document is the property of Saipem S.p.A. who will safeguard its rights according to the civil and penal provisions of the Law.
Document No.:
CUSTOMER: BP Angola Job No.

LOCATION: Angola- Block 31NE 074WAF AG-350-PS-0001


Rev. Sheet
PROJECT: FPSO’s Programme – PSVM I02 6 of 14

Gas Dehydration System & TEG Regeneration


Triune TRIUNE Job No. 9471
Package Functional Specification

3 PROCESS DESCRIPTION
Refer to Ref. 1: PFD “Gas Dehydration & TEG Regeneration Package” Doc. No. AG-320-PD-0001

Wet gas from the M.P. Compressor 2 nd stage Discharge Coolers and liquid from H.P. Compressor 2 nd Stage
Suction K.O.D.s are collected and routed to the Filter Separator V-32001 (1x100%), where entrained and/or
condensed liquid is removed. Condensate from Filter Separator is routed to M.P. Compressor 2 nd Stage
Suction K.O.D.s (supplied by others). The Filter Separator will be provided with suitable internals to minimize
liquid entrainment in the outlet gas stream. Downstream of the Filter Separator, gas enters the Glycol
Contactor V-32002 (1x100%), an absorption column where it is contacted with a lean TEG solution. The
Glycol Contactor is provided with a demister to minimize TEG losses. Finally dehydrated gas enters the
Gas / Glycol Heat Exchanger (X-32001) where Lean TEG solution is cooled down (temperature approach of
glycol and gas inlet to Glycol Contactor is of 8.3 oC). Dehydrated slightly superheated gas is routed to the
H.P. Compressor 1st Stage Suction K.O.D.s.

Rich TEG from the Glycol Contactor is routed under level control to the TEG Regeneration Package. Rich
TEG is first preheated in the Reflux Condenser against condensing vapours and in the Cold Rich / Lean
Glycol Exchanger against the regenerated lean glycol. Then it is flashed in the Rich Glycol Flash Drum, a
three-phase separator where TEG degassing and light hydrocarbon fraction separation is carried out. From
the flash drum, rich TEG under level control enters first the Glycol Solid Filters, then the Glycol Charcoal
Filter to remove any solid particle and hydrocarbon traces. Finally rich TEG enters the Hot Rich / Lean Glycol
Exchanger where it is heated against regenerated lean glycol prior to entering the Still Column; the latter is a
packed type column where water vapours are removed and TEG regenerated to the required specification.
The Glycol Reboiler, electric heater type, provides the heat required for the regeneration process.

The Stripping gas used would achieve the required lean TEG purity (> 99.1% by weight). Fuel Gas is used
as Stripping gas and is taken from fuel gas system. The Stripping Column will be located between the Glycol
Reboiler and the Glycol Surge Drum. Lean TEG from the Stripping Column is routed to the Hot Rich / Lean
Glycol Exchanger and Cold Rich / Lean Glycol Exchanger for heat recovery and then to the Glycol Surge
Drum. Lean TEG is pumped by the Glycol Circulation Pumps to the Gas / Glycol Heat Exchanger prior to
entering the Glycol Contactor.

TEG Make-up & Drain Tank will provide Lean TEG make-up due to operating losses; at the same time it is
sized to accommodate the TEG inventory in case of Dehydration system maintenance. The Glycol Transfer
Pump will be used to transfer lean TEG from the Make-up and Drain tank to the Glycol Surge Drum.

Downstream the Filter Separator, a by-pass line is provided to allow for continuous production also when the
Gas Dehydration System is down; in such a case, to avoid hydrate formation, methanol injection is
envisaged.

The gas composition contains aromatics, which are absorbed by the glycol and emitted as vapour from the
reboiler stripping column causing a hazard to platform personnel when it emerges from the atmospheric
vent. As the aromatic compounds are at trace level, it may be sufficient to include a condenser and recovery
vessel for the reboiler off-gas in the TEG regeneration unit.

Vendor to ensure that aromatics do not act as poison to charcoal filters.

This document is the property of Saipem S.p.A. who will safeguard its rights according to the civil and penal provisions of the Law.
Document No.:
CUSTOMER: BP Angola Job No.

LOCATION: Angola- Block 31NE 074WAF AG-350-PS-0001


Rev. Sheet
PROJECT: FPSO’s Programme – PSVM I02 7 of 14

Gas Dehydration System & TEG Regeneration


Triune TRIUNE Job No. 9471
Package Functional Specification

3.1 PROCESS DESIGN PARAMETERS

- Overall pressure drop for the gas from inlet of the Filter Separator to the Gas/ Glycol Exchanger outlet
shall not exceed 2.4 bar.
- The maximum allowable pressure drop across various equipment individually shall be as follows:
a) Filter Separator : 1.37 bar (dirty conditions)
0.35 bar (clean)
b) Glycol Contactor : 0.35 bar
c) Gas/ Glycol Exchanger : 0.68 bar

3. - The following clauses in the document “Guidance on Industry Standard for Glycol Dehydration and
Regeneration Skid” Doc. No. GIS 60-303 are specifically to be taken into consideration :
- Clauses 8.3 (a), 8.3(c), 8.4(e), 8.4(j), 8.5(a), 8.5(b), 8.5(c), 8.5(d), 8.6(b), 8.6(g), 8.7(h), 8.8(a), 8.8(d)
and 8.9(b)

4 PROCESS DATA

In the following tables are listed the process specification of the stream fed to the Filter Separator taking into
account ten different cases:
1 Case I: Max Oil Min Temp – Yr 3 operating- 65 deg.C
2 Case II: Max Gas Min Temp – Yr 6 operating- 65 deg.C
3 Case III: Max Water Min Temp – Yr 19 operating- 65 deg.C
4 Case IV: Max Oil Max Temp – Yr 3 operating- 65 deg.C
5 Case V: Max Gas Max Temp – Yr 6 operating- 65 deg.C
6 Case VI: Max Water Max Temp – Yr 19 operating- 65 deg.C
7 Case VII: Max Oil Min Temp – Yr 3 operating - 90 deg.C
8 Case VIII: Max Gas Max Temp – Yr 6 operating - 90 deg.C
9 Case IX: Max Water Min Temp – Yr 19 operating - 90 deg.C
10 Case X: Max Water Max Temp – Yr 19 operating - 90 deg.C

4.1 Characteristics Of Feed to the Inlet of Filter separator

CHARACTERISTICS Case I Case II Case III


Vapour Fraction 0.9992 0.9992 0.9992
Operating Temperature °C 35 35 35
Operating Pressure barA 127.5 127.5 127.5
Design Temperature °C 90 90 90
Design Pressure barG 86 86 86
Flow rate kg/hr 247500 / 247400/ 267300 / 156100 / 156000/
Total / Vapour / Liquid 168.3 267100 / 181.3 107.9
Viscosity @ Top & Pop cP
0.01836/ 0.7185 0.01837 / 0.7185 0.0180 / 0.7185
Vapour / Liquid

This document is the property of Saipem S.p.A. who will safeguard its rights according to the civil and penal provisions of the Law.
Document No.:
CUSTOMER: BP Angola Job No.

LOCATION: Angola- Block 31NE 074WAF AG-350-PS-0001


Rev. Sheet
PROJECT: FPSO’s Programme – PSVM I02 8 of 14

Gas Dehydration System & TEG Regeneration


Triune TRIUNE Job No. 9471
Package Functional Specification

Liquid Surface Tension


70.36 70.36 70.36
Dyne/cm
Density @ Top & Pop kg/m3 147.2 / 145.9/ 147.7 / 146.3/ 143.2 / 141.8/
Overall / Vapour / Liquid 1004 1004 1004

CHARACTERISTICS Case IV Case V Case VI


Vapour Fraction 0.9992 0.9992 0.9992
Operating Temperature °C 35 35 35
Operating Pressure barA 127.5 127.5 127.5
Design Temperature °C 90 90 90
Design Pressure barG 86 86 86
Flow rate kg/hr 248500 / 248300/ 268200 / 156800 /
Total / Vapour / Liquid 168.4 268000 / 168.3 156700 / 107.8
Viscosity @ Top & Pop cP
0.01841/0.7185 0.01843 / 0.7185 0.01816 / 0.7185
Vapour / Liquid
Liquid Surface Tension
70.36 70.36 70.36
Dyne/cm
Density @ Top & Pop kg/m3 148.0/ 146.6/ 148.5/ 147.1/ 144.5/ 143.1 /
Overall / Vapour / Liquid 1004 1004 1004

CHARACTERISTICS Case VII Case VIII Case IX Case X


Vapour Fraction 0.9992 0.9992 0.9992 0.9992
Operating Temperature
35 35 35 35
°C
OperatingPressure barA 127.5 127.5 127.5 127.5
DesignTemperature °C 90 90 90 90
Design Pressure barG 86 86 86 86
Flow rate kg/hr 156900 /
248100 / 269200 / 156200 /
Total / Vapour / Liquid 156800 /
247900/ 168.3 269000 / 181.3 156100 / 107.8
107.8
Viscosity @ Top & Pop cP 0.01839 / 0.01848 / 0.01809 / 0.01817 /
Vapour / Liquid 0.7185 0.7185 0.7185 0.7185
Liquid Surface Tension
70.36 70.36 70.36 70.36
Dyne/cm
Density @ Top & Pop kg/m3 147.7/ 146.3 / 149.3/ 147.9/ 143.5/ 142.1/ 144.6/ 143.2/
Overall / Vapour / Liquid 1004 1004 1004 1004

This document is the property of Saipem S.p.A. who will safeguard its rights according to the civil and penal provisions of the Law.
Document No.:
CUSTOMER: BP Angola Job No.

LOCATION: Angola- Block 31NE 074WAF AG-350-PS-0001


Rev. Sheet
PROJECT: FPSO’s Programme – PSVM I02 9 of 14

Gas Dehydration System & TEG Regeneration


Triune TRIUNE Job No. 9471
Package Functional Specification

4.2 Mole Composition of Feed to the Inlet of Filter Separator

COMPONENTS CASE I CASE II CASE III CASE IV CASE V


CARBON DIOXIDE 2.54 2.78 2.76 2.54 2.78
NITROGEN 0.28 0.29 0.29 0.28 0.29
METHANE 84.41 84.12 84.85 84.29 84.01
ETHANE 3.24 3.25 3.25 3.24 3.25
PROPANE 4.32 4.47 4.41 4.33 4.47
I-BUTANE 1.04 1.05 0.98 1.05 1.06
N-BUTANE 2.13 2.12 1.91 2.16 2.15
I-PENTANE 0.73 0.68 0.53 0.75 0.7
N-PENTANE 0.69 0.64 0.48 0.71 0.66
FC6 0.41 0.39 0.31 0.44 0.42
BENZENE 0.01 0.01 0.01 0.01 0.01
TOLUENE 0.01 0.01 0.01 0.01 0.01
XYLENES 0.00 0.00 0.00 0.00 0.00
C7-C12 0.03 0.03 0.05 0.03 0.03
WATER 0.15 0.15 0.15 0.15 0.15
HYDROGEN SULPHIDE 0.02 0.02 0.02 0.02 0.02
TOTAL 100 100 100 100 100
MOLECULAR WEIGHT 20.91 20.96 20.61 20.95 21.02

COMPONENTS CASE VI CASE VII CASE VIII CASE IX CASE X


CARBON DIOXIDE 2.76 2.54 2.78 2.77 2.77
NITROGEN 0.29 0.28 0.29 0.29 0.29
METHANE 84.67 84.34 83.88 84.80 84.66
ETHANE 3.22 3.24 3.24 3.23 3.22
PROPANE 4.39 4.33 4.48 4.41 4.39
I-BUTANE 0.99 1.05 1.07 0.98 0.99
N-BUTANE 1.96 2.14 2.19 1.93 1.96
I-PENTANE 0.58 0.74 0.73 0.54 0.58
N-PENTANE 0.54 0.7 0.69 0.49 0.54
FC6 0.36 0.43 0.43 0.31 0.36
BENZENE 0.01 0.01 0.01 0.01 0.01
TOLUENE 0.01 0.01 0.01 0.01 0.01
XYLENES 0.00 0.00 0.00 0.00 0.00
C7-C12 0.04 0.03 0.03 0.05 0.04

This document is the property of Saipem S.p.A. who will safeguard its rights according to the civil and penal provisions of the Law.
Document No.:
CUSTOMER: BP Angola Job No.

LOCATION: Angola- Block 31NE 074WAF AG-350-PS-0001


Rev. Sheet
PROJECT: FPSO’s Programme – PSVM I02 10 of 14

Gas Dehydration System & TEG Regeneration


Triune TRIUNE Job No. 9471
Package Functional Specification

WATER 0.15 0.15 0.15 0.15 0.15


HYDROGEN SULPHIDE 0.02 0.02 0.02 0.02 0.02
TOTAL 100 100 100 100 100
MOLECULAR WEIGHT 20.72 20.95 21.06 20.64 20.72

This document is the property of Saipem S.p.A. who will safeguard its rights according to the civil and penal provisions of the Law.
Document No.:
CUSTOMER: BP Angola Job No.

LOCATION: Angola- Block 31NE 074WAF AG-350-PS-0001


Rev. Sheet
PROJECT: FPSO’s Programme – PSVM I02 11 of 14

Gas Dehydration System & TEG Regeneration


Triune TRIUNE Job No. 9471
Package Functional Specification

5 REQUESTED PERFORMANCE

Guaranteed performances of the following parameters is required:

Water Content of Dehydrated Gas 25 ppm by volume (1.2 lb/MMSCF)

TEG carry over Max 0.1 gal/MMSCF


Overall gas pressure drop available across inlet to To be guaranteed
Filter Separator and outlet from Gas/Glycol Heat
Exchanger

6 AMBIENT DESIGN CONDITIONS

The equipment would be installed in hot and humid marine environment.

Ambient air temperature : 17 deg.C min.


35 deg.C max.

This document is the property of Saipem S.p.A. who will safeguard its rights according to the civil and penal provisions of the Law.
Document No.:
CUSTOMER: BP Angola Job No.

LOCATION: Angola- Block 31NE 074WAF AG-350-PS-0001


Rev. Sheet
PROJECT: FPSO’s Programme – PSVM I02 12 of 14

Gas Dehydration System & TEG Regeneration


Triune TRIUNE Job No. 9471
Package Functional Specification

7 OTHERS REQUIREMENTS

7.1 Materials
Suggested / proposed materials are the following:

Filter Separator V-32001


Shell: C.S. + AISI 316L internal cladding (In accordance with NACE MR0175 / ISO 15156 requirements)
Internals: SS316L

Glycol Contactor V-32002


Shell: C.S. + AISI 316L internal cladding at the bottom up to the packing support ring (In accordance with
NACE MR0175 / ISO 15156 requirements)
Internals: SS 316L

Gas / Glycol Heat Exchanger X-32001


Shell: CS with 3 mm C.A.
Tubes: CS

Vendor to confirm / modify above listed materials & to provide MOC for the equipments in the TEG
Regeneration Package.

7.2 Codes and Standards


-Pressure vessels will be designed according to the ASME VIII Div. 1.
-Heat exchangers will be designed according to API 660 and TEMA R.
-Pumps will be designed according to API 674 or API 610.
-Pressure safety valves will be designed according to API RP 520 part 1 and 2.
-Section 2 of Topside Standards ANG-B31-NE-FAC-043-A1, Process & Process Safety Systems S02 Rev
A01.

7.3 General Notes

a) Wherever there is a mismatch between the Functional Specification & the Reference Documents, the
data mentioned in the Functional Specification has to be considered.
b) Environmental data are reported in reference document 4. “PSVM Facilities Supplementary FEED Basis
of Design” Doc. No. ANG-B31-NE-FAC-039-A1 and also in “Block 31 Metocean Criteria Study” by Fugro
GEOS (Reference No. C50231/2765/R1)
c) Vendor shall design the equipments for the full range of process conditions as specified in the process
data.
d) Vendor shall supply Glycol Reboiler complete with Thyristor controlled electric heater and relevant
control panel.
e) Vendor shall provide junction boxes for the supplied power cables. Wiring and cable trays shall be
provided by others.
f) Power cabling to electric heater, if any, and starters and power cabling for electric motors shall be
supplied by others.
g) Vendor shall advice Chemical (Antifoam etc.) injection requirement and location of injection points for the
unit.
h) Vendor shall provide all required structural support frames, access ladders, platforms, overhead hoisting
beams for removal of covers and internals.

This document is the property of Saipem S.p.A. who will safeguard its rights according to the civil and penal provisions of the Law.
Document No.:
CUSTOMER: BP Angola Job No.

LOCATION: Angola- Block 31NE 074WAF AG-350-PS-0001


Rev. Sheet
PROJECT: FPSO’s Programme – PSVM I02 13 of 14

Gas Dehydration System & TEG Regeneration


Triune TRIUNE Job No. 9471
Package Functional Specification

i) All required instrumentations, control valves, pressure safety valves, piping and fittings required for the
proper operation and preservation of the TEG Regeneration Package shall be included.
j) Nozzles shall be provided to allow easy drainage in case of prolonged shutdown periods.
k) Vendor is required to point out required vents, purging connections and any device required for easy
maintenance of the equipment.
l) The Equipment, TEG Regeneration Package Unit and relevant control panels will be located in off shore
environment hazardous area (Class 1 div. 2 gas II A).
m) The unit shall be suitable for installation on FPSO steel deck module and it shall be designed to
withstand ship motions (value will be provided later).

This document is the property of Saipem S.p.A. who will safeguard its rights according to the civil and penal provisions of the Law.
Document No.:
CUSTOMER: BP Angola Job No.

LOCATION: Angola- Block 31NE 074WAF AG-350-PS-0001


Rev. Sheet
PROJECT: FPSO’s Programme – PSVM I02 14 of 14

Gas Dehydration System & TEG Regeneration


Triune TRIUNE Job No. 9471
Package Functional Specification

8 REQUESTED DATA

Following data and documents are requested as a minimum, according to the information given in this
specification:
1. Dimensions of each equipment
2. Weights of each equipment in empty conditions, during operation and during hydraulic test
3. Delivery time
4. Power Consumption & Power factor of each electric equipment
5. A sized sketch showing all connections (one for each equipment)
6. Details of Gas Dehydration System and TEG Regeneration Package including PFD, P&ID,
Equipment Datasheet, Operation and Control Philosophy.
7. Utility Consumption Summary
8. Vendor to advise chemical (antifoam etc.) injection requirement and location of injection for the unit
9. Skid footprint

This document is the property of Saipem S.p.A. who will safeguard its rights according to the civil and penal provisions of the Law.