TECHNICAL STUDY
This chapter covers the technical data, information and details needed prior to the
proposed design. It discusses the specific data that presents a more technical and in-depth
analysis of the design project. Also included in this chapter are the constraints in terms of
environmental, safety, project and other theoretical approaches and basis used in the
An outline of field and laboratory methods involving both simple and complex
techniques that were accomplished for site characterization are necessary to formulate
geotechnical study for the engineering design of the proposed type of project. This
includes evaluation of the site for idealized condition and its implication with physical
and engineering realities that are influential in proper selection and construction of any
The survey data of the project location are provided on Table 1 presenting the site
Table 1
Lot Bearing of the Site
Line Bearing Distance
1–2 N 03°25’31” W 134.9003
2–3 N 69°28’00” W 32.2838
3–4 N 71°39’27” W 51.3192
4–5 N 05°08’00” W 121.5259
5–1 N 80°23’00” W 82.9231
Proposed Development Plan of Multi-Purpose Chapter II: Technical Study
Convention Center in Brgy. Tawiran,
Calapan City, Oriental Mindoro
Marasigan, D. F., Politico, R. T. T., Soquiat, S. S.
The whole project covers an area of 10,000 square meters. The estimated net floor
area of the convention center is 3,494.15 square meters. Figure 5 below shows the
According to Calapan ecological profile, Barangay Tawiran has a soil type of San
Manuel Silt Loam. San Manuel Silt Loam’s surface soil is coarse granular and
mellow when moist. The boundary with the lower layer is diffuse. The subsoil is
pale brown silt loam to fine sandy loam with yellowish brown streaks; slightly
compact.
9
Proposed Development Plan of Multi-Purpose Chapter II: Technical Study
Convention Center in Brgy. Tawiran,
Calapan City, Oriental Mindoro
Marasigan, D. F., Politico, R. T. T., Soquiat, S. S.
Considering the type of soil in Barangay Tawiran, the allowable bearing capacity
office building in Barangay Tawiran, the allowable or safe bearing resistance is based
on shear failure control taking into consideration the absence of groundwater level
conceptually in the figure below. For narrowing footing widths, the allowable bearing
10
Proposed Development Plan of Multi-Purpose Chapter II: Technical Study
Convention Center in Brgy. Tawiran,
Calapan City, Oriental Mindoro
Marasigan, D. F., Politico, R. T. T., Soquiat, S. S.
Based on the investigation report under shear failure and load-settlement criteria,
the recommended allowable bearing capacity and other strength parameters for general
condition is intended for shallow foundation to provide sufficient margin of safety with
allowable bearing capacity for certain footing depths and other strength parametes to
be considered.
Table 2
Allowable Bearing Capacity and Other Strength Parameters
Vertical
Modulus
Allowable Unit Weight Shear Strength of
Footing Bearing Subgrade
Depth, Capacity, Reaction
m kPa (psf) Moist Angle of Cohesion,
kN/m3 submerged Friction, su kPa MPa/m
ø (deg) (psf)
Above Unsuitable - 15 8 1
3m
> 3.0 m 40 (840) - 16 14 2
However, greater rigidity can be attained by using deep foundation either driven or
bored pile. This may require conducting preliminary load testing prior to construction
11
Proposed Development Plan of Multi-Purpose Chapter II: Technical Study
Convention Center in Brgy. Tawiran,
Calapan City, Oriental Mindoro
Marasigan, D. F., Politico, R. T. T., Soquiat, S. S.
B. Nature of Services
functions. Spaces are provided for conventions, sports and recreational activities. It is
designed to be flexible and complex in order to maximize the benefit of the public.
With different athletic facility design, the city aims to become the center of sports
events specifically of basketball, volleyball, badminton, sepak takraw, loan tennis, and
even swimming competitions. The proposed project will provide opportunity to many
sports aspirants from Calapan and other towns within the province of Oriental Mindoro.
The ability to cordon off spaces, provide flexibility to host different types of events
and still facilitate flow, security and visibility is critical. With that matter, the Calapan
Convention Center will be managed by the city government. It will be open for public
use in any day and will not only accommodate, but will actually enhance the experience
C. Potential Users
are ultimately the potential users and tourists of the city. The project does not only offer
but to all the people and visitors of the Oriental Mindoro province.
Different athletes will be the main users of the facility. Within the development
plan are other courts for sports events like badminton, sepak takraw, volleyball, and
loan tennis. A swimming track and a grandstand are also designed for water sports
12
Proposed Development Plan of Multi-Purpose Chapter II: Technical Study
Convention Center in Brgy. Tawiran,
Calapan City, Oriental Mindoro
Marasigan, D. F., Politico, R. T. T., Soquiat, S. S.
competitions. Likewise, such facility will also be used for conventions, meetings, and
concerts.
Implementation of the proposed project in Calapan would not only bring back the
life of sports competitions and recreational activities but would also boost the economy
of tourism. Besides, the project would be an addition to the picturesque beauty of the
D. Environmental Constraints
There are constraints in every working environment and the construction industry
The project location is an agricultural land and does not have trees to be cut for site
high level of dust and noise pollution mainly produced by heavy equipment and other
machinery. To prevent these, the site is dampen with water and the other parts are
screened to control the dust from spreading. Preventing environmental damage will
13
Proposed Development Plan of Multi-Purpose Chapter II: Technical Study
Convention Center in Brgy. Tawiran,
Calapan City, Oriental Mindoro
Marasigan, D. F., Politico, R. T. T., Soquiat, S. S.
E. Safety Constraints
economic growth. As the employment in the industry continuous to grow, so does the
need to protect more construction workers from hazards present in a construction site.
According to In-Ju Kim (2017), the construction industry is one of the most hazardous
and accident-prone working environment and is one of the highest risk businesses as
far as its activities are concerned. Construction site injuries can be among the most
lethal injuries and taking steps to prevent accidents is the most effective way.
access risk and take practical measures to protect, ensure safety and health of their
worker and minimize risk by means of continuous surveillance, and monitor where
Most construction site injuries can be traced to just a handful of causes. Accidents
may be caused of exhaustion, trips and falls, falling objects and machinery failure.
exposure to these risk factors is a good way to start with regard to accident prevention.
Tawiran, Calapan City, Oriental Mindoro, handling and transport of materials and
equipment are highly considered. Implementation of safety policy, use of safety items
14
Proposed Development Plan of Multi-Purpose Chapter II: Technical Study
Convention Center in Brgy. Tawiran,
Calapan City, Oriental Mindoro
Marasigan, D. F., Politico, R. T. T., Soquiat, S. S.
and gears, training on safety measures and accident prevention methods, ensuring safe
Before entering the construction site, workers are required to have their Personal
Protective Equipment (PPE). These are to be supplied to all workers and even to
personnel who visits the site. PPE may include helmet, safety glasses, protective
gloves, safety vests, proper clothing, face shield, safety footwear, and safety harness.
Health and safety training also promotes safety awareness on construction site. It is
required for a construction site to provide temporary facilities and services including
utilities, construction and support facilities, security, and protection. For security and
protection, proper signs and barricades must be provided on the site to prevent people
from wandering onto the construction site and possibly get hurt by falling debris.
must be addressed to all workers. First aid services and provisions for medical care
shall be made available by the employer for every employee. Health and safety policy
includes fire protection policy in sites. Emergency plan and procedures must be
F. Project Constraints
15
Proposed Development Plan of Multi-Purpose Chapter II: Technical Study
Convention Center in Brgy. Tawiran,
Calapan City, Oriental Mindoro
Marasigan, D. F., Politico, R. T. T., Soquiat, S. S.
describe the relationship between your objectives and the methods of achieving them.
However, there can be situations that we are unaware of the existence of these
constraints and just tend to put more emphasis on the project goals. Constraints should
be identified and described in as much detail as possible during the early stages of a
project goals. It is the environment and the limitations of the system which dictates the
solutions (Stein 1997). Identifying and removing constraints from bottleneck activities
project management. Each project has its own goals and tasks to be completed at a time
specified. Since the project is a local government project, minimum budget is expected.
However, work procedures must be finished according to the work timeline and
resources.
Type A as influenced by Central Mindoro Fault and Aglubang River Fault on the
southwest to south proximity of Mindoro Island; and Lubang Fault on the northwest-
north area. Likewise, the province of Oriental Mindoro is part of the active Marikina
Fault Valley and Western Philippine Fault, earthquake belts, which the Philippine
major earth movement or tremor anytime (Mahusay, J., 2011). In November 1994, an
intensity 7 earthquake struck the City of Calapan and Baco town that resulted to deaths
Norwegian Agency for Development Cooperation (NORAD) it appears that the city of
16
Proposed Development Plan of Multi-Purpose Chapter II: Technical Study
Convention Center in Brgy. Tawiran,
Calapan City, Oriental Mindoro
Marasigan, D. F., Politico, R. T. T., Soquiat, S. S.
Calapan, towns of Baco and Naujan were already a low-land surface that further tilted
According to a Mines and Geosciences Bureau (MGB) report, the uniform shifting
of the major river systems at the eastern half of Mindoro Island could be a consequence
Island. The southern end on Manila Trench cuts through the southern end of Mindoro
Island and this geologic feature may be connected to the presence of a thrust faulting
at the southern tip of the island province. This thrust fault may have caused southern
margin of the island to rise thus, tipping island to the northerly direction resulting to
the dipping of the northern coastline where Barangay Tawiran, Calapan City is located.
The MGB report proves that the city of Calapan has a low elevation of lands and is
vulnerable to flooding. Table 3 shows that broad alluvial plain is dominant within the
city with a percentage of 76.02. These areas are level to gently sloping (0% to 3% slope)
and ranges from 3 to 15 meters in elevation. It is composed of clay, silt, sand, gravel
and cobbles deposited from the highlands by rivers and streams. The town is
surrounded by rivers like Mag-asawang Tubig, Pangalaan and Bucayao River. Hence,
the risk of perennial flooding in the city is high due to huge river basin and high alluvial
plain.
17
Proposed Development Plan of Multi-Purpose Chapter II: Technical Study
Convention Center in Brgy. Tawiran,
Calapan City, Oriental Mindoro
Marasigan, D. F., Politico, R. T. T., Soquiat, S. S.
Table 3
Hydrological Properties
03 Beach ridge Level to nearly level, 0 Very rapid infiltration 424 1.88
and swales to 3 mts. Elevation and permeability rate,
moderately well-
drained to poorly
drained
Construction of a convention facility along the area may bring a lot of concern.
There may be large amount of soil embankment to be used since the sloping ranges
18
Proposed Development Plan of Multi-Purpose Chapter II: Technical Study
Convention Center in Brgy. Tawiran,
Calapan City, Oriental Mindoro
Marasigan, D. F., Politico, R. T. T., Soquiat, S. S.
With an allotted area of 10, 000 square meters, challenges also lies in constructing
and maximizing the space for the proposed project. The city government aims to use
the project not only for conventions and meeting events but also to hold different sports
competitions. Based on the site development plan, a basketball, badminton, lawn tennis
court, and a swimming track are also included in the proposed design. Designing these
would be a concern because the allotted area may seem to be small for a convention
center or sports complex. The researchers are challenged to maximize the area for best
accommodation and to come up with the best design while incorporating civil
engineering techniques.