PT.

PLN (Persero)
FORMULIR IZIN KERJA UMUM/
UPP KITRING KBB 4 GENERAL WORK PERMIT FORM

Safety Management System Doc. No : Rev. No :


Page 1 of 3 Date Rev :

Nomor izin/ ( Nomor ini diisi oleh pemilik proyek/perwakilan / This number filled by project
/GWP/PB/F-HSE/20
Permit Number owner/representative)

Tanggal pengajuan/
Date submissions
URAIAN PEKERJAAN*/
WORK DESCRIPTION*
Nama pekerjaan/
Work name
No.SPK/Kontrak/Memo
No.WO/Contract/Memo
Departemen / Devisi
Department / Devision
Instansi / Nama perusahaan
Phone.
Instance / Company name
Nama manager proyek/
Phone.
Project manager name
Area / Lokasi kerja
Area/ work location
Lama pekerjaan/
............. Hari/Days ............................................... Sampai / to ................................................
Duration work days
Waktu Kerja Per Hari/
............. Jam/Hours .......................... Sampai / to .................................
Working time per day
Nama pengawas lapangan/
Phone.
Field Supervisor name
Jumlah pekerja/
............. Orang/Person
Total of workers
 Peralatan tangan / Hand  Alat berat/Alat angkat /  Mesin berputar/Bergerak /
tools Heavy equipment/Lifting Machine spinning / moving
 Truk/Trailer / Trailer/Truck equipment  Peralatan Listrik / Electric
PERALATAN YANG  Bucket/Keranjang orang /  Kompresor / Compressor Equipment
DIGUNAKAN/ Man baskets/Bucket  Pompa portable / Portable  Welding machine / Welding
EQUIPMENT USED  Perancah / Scaffolding pump machine/Pressure cylinder
 Vakum / Vacuum  Alat Pengetesan / Tester  Lain-lain/Other .................
 Genset / Generator equipment ..........................................
 Pengaduk / Mixer

JENIS DAN KLASIFIKASI PEKERJAAN*


TYPE AND CLASSIFICATION OF JOB*
 Bekerja dibawah kabel listrik / Daerah  Bekerja di ketinggian >2 Mtr / Working  Penggalian / Excavation
bertegangan listrik tinggi / Works under at height >2 Mtr  Fabrikasi / Fabrication
power line / High-voltage electrical  Konstruksi / Construction  Pemancangan / Piling
area  Inspeksi / Pengecekan / Inspection /  Pengecatan/Sandblasting/
 Pemasangan / Perakitan komponen Checking Painting/Sandblasting
listrik / Installation / Assembling of  Radiografi / Radiography  Transportasi/Pengepakan/
electrical components  Ruang terbatas / Confined space Transportation / Packaging
 Instrumentasi / Instrumentation  Pengelasan/Kerja panas / Welding/Hot  Perawatan/Reparasi/
 Penyambungan / Supply Connection work Repair/Maintenance
 Tali-temali & Pengangkatan / Rigging &  Pengujian/Komisioning / Testing /  Kerja tambahan/lembur/
Lifting Commissioning Work additional/Overtime
 Isolasi / Isolation  Penanganan Limbah Kimia (B3) /  Lain-lain / Other ..........................
 Perpipaan / Piping Chemical Waste Treatment (Hazard ....................................................
Material)

*Harap data dan keterangan pada formulir ini diisi secara manual/Please the data and details on this form are filled manually
PT. PLN (Persero) FORMULIR IZIN KERJA UMUM/
UPP KITRING KBB 4 GENERAL WORK PERMIT FORM

Safety Management System Doc. No : Rev. No :


Page 2 of 3 Date Rev :

TINDAKAN PENCEGAHAN SEBELUM & SETELAH BEKERJA* /


PREVENTIVE ACTION BEFORE & AFTER WORK*
 Proteksi/Perangkat anti jatuh /  Sertifikat kompetensi / Certificate of  Sertifikat alat / Equipment certificate
Protection/Anti fall device competence  Tali pengaman / Pegangan tangan /
 Pemadam api / Fire extinguisher  Mengikuti syarat HIRAC / JSA / Safety ropes / Handrail
 Selimut penghambat api/Percikan / Fire Following HIRAC / JSA requirements  Pagar / Barikade / Fences / Barricades
blancket / Spark  Memasang rambu keselamatan /  Orang yg menerima/memberi aba-aba /
 Pelantar / Platform Peringatan / Pelabelan / Install safety Signalman
 Tangga / Ladders signs / Warning / Labeling  Lain-lain/Other ..............................
 Terpal / Penutup / Tarpaulins / Cover  Pembersihan / Housekeeping ......................................................

TINDAKAN KESELAMATAN YANG LAIN DIPERLUKAN*/


OTHER SAFETY MEASURES ARE REQUIRED*

Harap mengikuti / Please follow:


 UU No. 1 Tahun 1970 / Law of Indonesian Republic Number 1/1970
 Peraturan : Menteri, Presiden dan pemerintah daerah / Regulations: Ministers, Presidents and local governments
 Metode kerja aman & HIRAC/JSA / Safe working methods & HIRAC / JSA
 SOP dan aturan proyek yang diberlakukan / Applicable standards operating procedure and project rules
 Dokumen Kontrak/ Surat keputusan / Contract Document/ Decree
 Standar indonesia atau standar internasional yang diberlakukan / Indonesian standards or international standards are enforced

Instruksi lainnya / Other instruction :

ALAT PELINDUNG DIRI YANG WAJIB DIGUNAKAN*/


PERSONAL PROTECTIVE EQUIPMENT THAT MUST BE USED*
 Helm / Helmet  Sarung tangan katun / Cotton gloves  Pelindung tubuh / Full body harness
 Kacamata / Safety Glasses  Sarung tangan karet / Rubber gloves  Rompi keselamatan / Safety Vest
 Sepatu Pelindung / Safety shoes  Masker / Mask  Cap pengelasan / Welding cap
 Sepatu Karet / Rubber boots  Respirator / Self Contained Breathing  Celemek / Apron
 Pelindung pendengaran/ Hearing Apparatus (SCBA)  Lain-lain/Other ...........................
protector / Ear Plug / Ear muff  Seragam penuh / Wearpack
LAMPIRAN / DOKUMEN YANG HARUS DISAMPAIKAN*/
ATTACHMENTS / DOCUMENTS TO BE SUBMITTED*
 Prosedur Uji Inspeksi / ITP (Inspection  Metode Kerja / SOP / Work  Data lembaran bahan berbahaya /
Test Procedure) methode/SOP MSDS
 Gambar Kerja / Work drawing  Spesifikasi : Produk/peralatan /  Dokumen lainnya (jika diminta) / other
 Identifikasi penilaian & pengontrolan Specifications: Product / equipment document (if requested)
bahaya/ HIRAC/JSA
Catatan / Note : Seluruh kelengkapan dokumen akan diperiksa oleh pemilik / perwakilan proyek / All documents will be checked by
the project owner / representative

*Harap data dan keterangan pada formulir ini diisi secara manual/Please the data and details on this form are filled manually
PT. PLN (Persero) FORMULIR IZIN KERJA UMUM/
UPP KITRING KBB 4 GENERAL WORK PERMIT FORM

Safety Management System Doc. No : Rev. No :


Page 3 of 3 Date Rev :

PERSETUJUAN PEKERJAAN*/
APPROVAL OF WORK*
Pemohon Izin Kerja/
Work Permit Applicant
Pemilik / Perwakilan Proyek,
Project owner / representative

( .......................................... )
Field Supervisior
Diperiksa oleh/
Checked by,

( .......................................... ) ( ................................ ) ( ................................ )


HSE Officer - Contractor HSE Rep – PLN UPP KITRING KBB 4
Date : Date : Date : Date :

Pastikan Petugas K3 dari perusahaan/kontraktor yang mengajukan izin kerja memeriksa terlebih dahulu seluruh kelengkapan dokumen
sebelum diajukan ke pemilik/perwakilan proyek / Ensure the Occupational Safety Officer of the company/contractor applying for a work
permit shall first check all the completeness of the documents before submitting to the project owner / representative

PENYELESAIAN PEKERJAAN*/
WORK COMPLETION*
Pekerjaan telah selesai pada Disampaikan Oleh/ PLNE Supervision Construction/
tanggal / Work completed on : Submitted By : PLN UPP KITRING KBB 4
Date :

Time:
Name & Sign: Date : Name & Sign : Date :

Tembusan / Copies :
- Penanggung jawab pekerjaan/ Person in charge of work
- Supervision Construction (HSE)
- PLN UPP KITRING KBB 4

*Harap data dan keterangan pada formulir ini diisi secara manual/Please the data and details on this form are filled manually