Placing the crane for Collapse of crane Injury to personnel. PTW and Lifts instruction in place to ensure:
operation Damage to adjacent Check floor level evenness/enough space for out-riggers.
equipment. Use of proper outriggers base/sole plates.
Rupture of pipe Out riggers fully extended.
and/or equipment. No oil leakage from the outer riggers.
Fire and/or explosion Proper site inspection before starting the operation. Soft
soil
Lifting over live line and Falling on live line Fire or Explosion and PTW and Lifts instruction in place to ensure:
supports damage to the existing Avoid lifting over live line or equipment wherever possible.
installations. Tie two taglines on the unloading pipes to control swing.
Injury to personnel. Check the condition of the lifting tools and tackles before
each use.
Lifting over liver lines, double up the slings and tackles.
Stopping lifting maneuver when wind speed exceeds 32
km/h (20 mph)
Avoid leaving suspended load un-attended.
Emergency and rescue plan in place before starting job.
Induction of workers with alarms, emergency procedures,
evacuation routes and assembly points in place.