Sunteți pe pagina 1din 6

Wind Load Analysis

𝑅𝐻𝐸 + 𝑅𝐸 8.5 + 6
Mean Roof Height = = = 7.25 m
2 2

2.5
tan𝜃 = 4
𝜃 = 32.005o

 P.1-6; Table 103-1

Occupancy Category: IV – Standard Occupancy

 P.2-38; Figure 207A.5-1A to 5-10

V = 250 km/hr
V = 69.44 m/s

 P.2-42

Kd = 0.85

 P.2-47

Kzt = 1

 P.2-67; Section 207B.32

qz = 0.613 Kz Kzt Kd V2
qz = 0.613 (Kz) (1) (0.85) (69.44)2
qz = 2512.4581 Kz

 P.2-68; Section 207B4.1

P = q GCp – qi GCpi; Pa (N/m2)

 P.2-55; Section 207A.9.1

G = 0.85

Use qi = qh

Use q = 2512.4581 Kz
 P.2-42; Section 207A.7.3

Exposure Category = D

 qi = 2512.4581 Kz

 P.2-68; Table 207B.3-1

Kz = use hmean

h Kz
6 1.08
7.25 Kz
7.5 1.12

6−7.25 1.08−𝐾
𝑧
= 1.08−1.12
6−7.5

Kz = 1.113

qi = 2512.4581 Kz
qi = 2512.4581 (1.113)
qi = 2796.366 Pa

 P = q (0.85) (Cp) – (2796.366) (±0.18)


P = 0.85 q Cp ± 503.346

 Solving P for each face of the building

i. Windward Roof; use q = qh = qi

(Cp is in P.2-74)

@ 𝜃 = 32.005o
ℎ 7.25
= = 0.906
𝐿 8
h/L Cp
o
30 32.005o 35o
0.5 -0.2 X1 -0.2
0.2 X2 0.3
0.906 A1 Cp1 B1
A2 Cp2 B2
≥10 -0.3 Y1 -0.2
0.2 Y2 0.2

(For 30o – Vertical Direction)

0.5−0.906 −0.2−𝐴1
= −0.2−(−0.3) ≈ A1 = -0.204
0.5−10

0.5−0.906 0.2−𝐴2
= 0.2−0.2 ≈ A2 = 0.2
0.5−10

(For 35o – Vertical Direction)

0.5−0.906 −0.2−𝐵1
= −0.2−(−0.2) ≈ B1 = -0.2
0.5−10

0.5−0.906 0.3−𝐵2
= 0.3−0.2 ≈ B2 = 0.279
0.5−10

(For 0.5 – Horizontal Direction)

300 − 32.005𝑜 −0.2−𝑋1


= −0.2−(−0.2) ≈ X1 = -0.2
300 − 35𝑜

300 − 32.005𝑜 0.2−𝑋2


= 0.2−0.3 ≈ X2 = 0.2401
300 − 35𝑜

(For ≥10 – Horizontal Direction)

300 − 32.005𝑜 −0.3−𝑌1


= −0.3−(−0.2) ≈ Y1 = -0.2599
300 − 35𝑜

300 − 32.005𝑜 0.2−𝑌2


= 0.2−0.2 ≈ Y2 = 0.2
300 − 35𝑜

(For 0.906 – Horizontal Direction)

300 − 32.005𝑜 −0.204−𝐶𝑝1


= −0.204−(−0.2) ≈ Cp1 = -0.202
300 − 35𝑜

300 − 32.005𝑜 0.2−𝐶𝑝2


= 0.2−0.279 ≈ Cp2 = 0.232
300 − 35𝑜
 Using +GCpi; Using Cp = -0.202

P = 0.85 q Cp + 503.346
P = 0.85 (2796.366) (-0.202) + 503.346
P = 23.21 Pa

 Using -GCpi; Using Cp = -0.202

P = 0.85 q Cp - 503.346
P = 0.85 (2796.366) (-0.202) − 503.346
P = -983.482 Pa

 Using +GCpi; Using Cp = 0.232

P = 0.85 q Cp + 503.346
P = 0.85 (2796.366) (0.232) + 503.346
P = 1054.789 Pa

 Using -GCpi; Using Cp = 0.232

P = 0.85 q Cp - 503.346
P = 0.85 (2796.366) (0.232) − 503.346
P = 48.097 Pa

ii. Leeward Roof; use q = qh = qi

h/L Cp
≥20o
0.5 -0.6
0.906 Cp
≥10 -0.6

0.5−0.906 −0.6−𝐶𝑝
= −0.6−(−0.6) ≈ Cp = -0.6
0.5−10

 Using +GCpi; Using Cp = -0.6

P = 0.85 q Cp + 503.346
P = 0.85 (2796.366) (-0.6) + 503.346
P = -922.801 Pa

 Using -GCpi; Using Cp = -0.6

P = 0.85 q Cp - 503.346
P = 0.85 (2796.366) (-0.6) − 503.346
P = -1929.493 Pa
iii. Windward Wall
Cp is in P.2-74
Cp = 0.8

L=8m
B=7m L/B = 1.143

Use q = qz = 2512.4581 Kz

(Use all values)


hmean = 7.25 m

(Use only up to “7.5”)

 Using +GCpi; Using Kz = 1.03 for h = 0 – 4.5

P = 0.85 q Cp + 503.346
P = 0.85 (2512.4581) (1.03) (0.8) + 503.346
P = 2263.072 Pa

 Using +GCpi; Using Kz = 1.08 for h = 6

P = 0.85 q Cp + 503.346
P = 0.85 (2512.4581) (1.08) (0.8) + 503.346
P = 2348.495 Pa

 Using +GCpi; Using Kz = 1.12 for h = 7.5

P = 0.85 q Cp + 503.346
P = 0.85 (2512.4581) (1.12) (0.8) + 503.346
P = 2416.834 Pa

 Using -GCpi; Using Kz = 1.03 for h = 0 – 4.5

P = 0.85 q Cp - 503.346
P = 0.85 (2512.4581) (1.03) (0.8) - 503.346
P = 1256.380 Pa

 Using -GCpi; Using Kz = 1.08 for h = 6

P = 0.85 q Cp - 503.346
P = 0.85 (2512.4581) (1.08) (0.8) - 503.346
P = 1341.803 Pa

 Using -GCpi; Using Kz = 1.12 for h = 7.5


P = 0.85 q Cp - 503.346
P = 0.85 (2512.4581) (1.12) (0.8) - 503.346
P = 1410.142 Pa

iv. Leeward Wall

Cp is in P.2-74

L=8m
B=7m L/B = 1.143

L/B Cp
0-1 -0.5
1.143 Cp
2 -0.3

1−1.143 −0.5−𝐶𝑝
= −0.5−(−0.3) ≈ Cp = -0.4714
1−2

Use q = qh = qi
qi = 2796.366 Pa

 Using +GCpi

P = 0.85 q Cp + 503.346
P = 0.85 (2796.366) (-0.4714) + 503.346
P = -617.130 Pa

 Using -GCpi

P = 0.85 q Cp - 503.346
P = 0.85 (2796.366) (-0.4714) - 503.346
P = -1623.822 Pa