54‐ Calculate force on C
CD
55‐ Wall wiith height 5m
m and inclineed 30◦ and ɣ = 19 KN/m3, calculate acctive pressurre
56‐ Calculate max. mom
ment
Max. moment at point looad L
57‐ Calculate shear at p
point P
Shear at point p = reacti on at roller h
hinge
ng an event in Katara, whhat’s the firstt step?
58‐ Initiatin
Project charrter.
59‐ Gives foormula ( e e * f = V2 / R)) Given M
Min. R, V and f
Use formula a directly
60‐ Gives innformation aabout foundaations (no. of repeated fo oundations, dimension o of
each tyype) and ask about form w work
Calculate pe erimeter of eeach foundattion and multiple by repeeated numbe er
Then multip ple by depth of each foun ndation
61‐ You aree a supplier tto Governmeent of Qatar, they pay for you to buy an item, you u
decided d to buy morre than they need to save e time in future, what’s tthis theory?
62‐ Watt‐Hour?
Energy electtricity
Power electricity
Charge electtricity
63‐ To convvert from incch to cm
Multiple by 2.54.
64‐ Plastic m
movement in n concrete
Settlement
Shrinkage
All of the abbove
65‐ Foundaation is restinng on soil witth two layerss, loose sand
d then soft cllay, how to ttreat
with this two layerss to support ffoundation??
Loose sand b by vibro commpaction
Soft clay by modified dy namic comp paction
66‐ What’s the value en
ngineer?
Reduce scop pe
Reduce quality
Select best vvalue for leasst cost
67‐ Given ccompression formula on pile with all given, reque
est: tension oon pile?
Secondary Treatment
Biological treatment
Final Sedimentation
Tertiary Treatment
Filtration
Disinfection
71‐ Normal Portland cements type?
Type 1
Type 2
Type 3
Type 4
72‐ Engineering company made a soil report to design foundations, cost of foundation
is 25000$, boss asked to reduce it to 20000$, what should we do?
Make again soil tests
Redesign foundation to meet soil report and take into consideration
standards.
73‐ w/c in specify case? Decrease w/c to increase strength.
.3
.35
.45
.5
74‐ select one it’s not important in concrete mixture:
strength 28 days
settlement time
“another 2 choices but I don’t remember what they are?” one of them
75‐ Calculate strenth on steel, formula given and all data given formula in american
system and choices by internation system calculate then transform from lb to KN
10 KN = 2248.09 lb
76‐ PVC pipe min. cover?
3 ft
3.6 ft
4 ft
4.5 ft
77‐ Gives you compression formula with all data to calculate compression on pile and
want tension on pile:
Tension on pile concrete = 10% of compression
Exxam Question
ns – 30 Novem
mber 2015
1‐ Co
ontractor has bbeen hired to cconstruct a ste eel structure w
weighing 200 to
on. The contractor used Crew
w (1)
fo
or the construcction. What is tthe cost differe
ence if he usedd Crew (2)
Crew 1 (production rate 2 ton/hr)
2 Foremen n
2 Welders
4 Labors
Crew 2 (production rate 1.5 ton/hr)
1 Foreman n
1 Welder
5 Labors
Prices:
Foreman: 2 200$/hr
Welder: 1220 $/hr
Labour: 50
0$/hr
2‐ Affter issuing thee tender docum
ment to the bid dders. The Clieent has requestted to include extra work intto the
co
ontractor scope. These extra work will be titled:
Addendum
Extra work
Variation order
3‐ Co oncrete section given the ste
eel bars sizing aand spacing, if the steel sizing is increased (given the new
w
size), what is the
e new spacing.
4‐ What is the max
W ximum deflectiion and slope aat the free endd of the followiing cantilever bbeam:
5‐ Moment Diagra
M m
6‐ Caalculate the maximum mome
ent for the following:
7‐ Prroject manage ement is ideallyy suited excep
pt
Accountability
Flexibility
In
nnovation
Sp
peed
Reepeatability
8‐ Sttopping Sight D
Distance Questtion
9‐ Horizontal Curve
e Question
uper‐elevation Question
10‐ Su
11‐ Watt‐Hour (Ene
W rgy Electricity))
12‐ Question based
Q on the below::
or the structure shown, whatt load combinaation should bee used to desiggn the structurre to resist
13‐ Fo
ovverturning of FFooting A?
14‐ Simple beam carrying distibuted load, location for zero sheear and deflecttion.
Sherif Fawzy Exam
Q1: Reverse Planning is used to determine
Activity Early Start
Activity Early Finish
Critical Path
Q2: Questions about Concrete Mixture:
Water Cement Ratio effect on concrete
AD to reduce shrinkage and Setting time
Q3: AD is added to concrete to:
Increase Workability
Increase Strength
Decrease W/C Ratio
Q4: Simple beam, choose the correct shear Diagram
Q5: Traffic given 230 vehicle/mile and speed 60 mph. What is the capacity vehicle/hr
Q6: line connecting points with the same level
Contour
Q7: What is the first step when starting a new project with KATARA
Project Charter
Q8: Concrete cube is thrown into the water (given dimensions and density).
What is the pressure on the bed (Ib/ft2)
Q9: STP test
Q10: Question about friction angle range for soil samples (Sand & Clay)
Q11: Strain Units
Unitless
Q12: Impact of the W/C ratio on the following:
Concrete strength
Workability
Cracks
Bleeding
Q13: Truss is affected by seismic load and this load caused a displacement to the truss. Question about a specific
member is this truss and if it is under:
Tension
Compression
Q14: Given
n D and h, calcculate pressure
e and velocity