53‐ What’s the maximu um backfill laayer thicknesss: 

 150 
 500 
 750 
 400 
54‐ Calculate force on C
CD 

55‐ Wall wiith height 5m
m and inclineed 30◦ and ɣ = 19 KN/m3, calculate acctive pressurre 

56‐ Calculate max. mom
ment 
 
 Max. moment at point looad L 
 
 
 

57‐ Calculate shear at p
point P 
 Shear at point p = reacti on at roller h
hinge 

 
ng an event in Katara, whhat’s the firstt step? 
58‐ Initiatin
 Project charrter. 
59‐ Gives foormula  ( e e * f = V2 / R))  Given M
Min. R, V and f 
 Use formula a directly 
60‐ Gives innformation aabout foundaations (no. of repeated fo oundations,  dimension o of 
each tyype) and ask about form w work 
 Calculate pe erimeter of eeach foundattion and multiple by repeeated numbe er 
 Then multip ple by depth  of each foun ndation 
61‐ You aree a supplier tto Governmeent of Qatar, they pay for you to buy  an item, you u 
decided d to buy morre than they  need to save e time in future, what’s tthis theory? 
62‐ Watt‐Hour? 
 Energy electtricity 
 Power electricity  
 Charge electtricity 
63‐ To convvert from incch to cm 
 Multiple by 2.54. 
64‐ Plastic m
movement in n concrete 
 Settlement 
 Shrinkage 
 All of the abbove  
65‐ Foundaation is restinng on soil witth two layerss, loose sand
d then soft cllay, how to ttreat 
with this two layerss to support ffoundation?? 

 Loose sand b by vibro commpaction 
 Soft clay by modified dy namic comp paction 
66‐ What’s the value en
ngineer? 
 Reduce scop pe 
 Reduce quality 
 Select best vvalue for leasst cost 
67‐ Given ccompression formula on  pile with all given, reque
est: tension oon pile? 

68‐ Calculate active earrth pressure  (Ph = K ɣ h)  Given ɣ, h


h and ω 
 K = (1 – sin ωω)/ (1+ sin ω
ω) 
69‐ Consoliidation proceess: 
 Saturated sa and 
 Saturated clay 
 Dry clay 
70‐ Wastewater treatment process: 
 Primary Treatment 
 Screening 
 Grit (sand) removal 
 Primary Sedimentation 

 Secondary Treatment 
 Biological treatment 
 Final Sedimentation 

 Tertiary Treatment 
 Filtration 
 Disinfection 
71‐ Normal Portland cements type? 
 Type 1 
 Type 2 
 Type 3 
 Type 4 
72‐ Engineering company made a soil report to design foundations, cost of foundation 
is 25000$, boss asked to reduce it to 20000$, what should we do? 
 Make again soil tests 
 Redesign foundation to meet soil report and take into consideration 
standards. 
73‐ w/c in specify case? Decrease w/c to increase strength. 
 .3 
 .35 
 .45 
 .5 
74‐ select one it’s not important in concrete mixture: 
 strength 28 days 
 settlement time 
 “another 2 choices but I don’t remember what they are?” one of them 
75‐ Calculate strenth on steel, formula given and all data given  formula in american 
system and choices by internation system  calculate then transform from lb to KN 

 10 KN = 2248.09 lb 
76‐ PVC pipe min. cover? 
 3 ft 
 3.6 ft 
 4 ft 
 4.5 ft 
77‐ Gives you compression formula with all data to calculate compression on pile and 
want tension on pile: 
 Tension on pile concrete = 10% of compression 
Exxam Question
ns – 30 Novem
mber 2015 

1‐ Co
ontractor has bbeen hired to cconstruct a ste eel structure w
weighing 200 to
on.  The contractor used Crew
w (1) 
fo
or the construcction. What is tthe cost differe
ence if he usedd Crew (2) 

Crew 1 (production rate 2 ton/hr) 
2 Foremen n 
2 Welders 
4 Labors 
 
Crew 2 (production rate 1.5 ton/hr) 
1 Foreman n 
1 Welder 
5 Labors 
 
Prices: 
Foreman: 2 200$/hr 
Welder: 1220 $/hr 
Labour:  50
0$/hr 
 
 
2‐ Affter issuing thee tender docum
ment to the bid dders. The Clieent has requestted to include extra work intto the 
co
ontractor scope. These extra work will be titled: 
 Addendum 
 Extra work  
 Variation order 
 
 
 
3‐ Co oncrete section given the ste
eel bars sizing aand spacing, if  the steel sizing is increased (given the new

size), what is the
e new spacing. 
 
4‐ What is the max
W ximum deflectiion and slope aat the free endd of the followiing cantilever bbeam: 

 
5‐ Moment Diagra
M m 

 
6‐ Caalculate the maximum mome
ent for the following: 
 

 
 
 
7‐ Prroject manage ement is ideallyy suited excep
pt 
 Accountability 
 Flexibility 
 In
nnovation 
 Sp
peed 
 Reepeatability 
8‐ Sttopping Sight D
Distance Questtion 
9‐ Horizontal Curve
e Question 
uper‐elevation Question 
10‐ Su
11‐ Watt‐Hour (Ene
W rgy Electricity)) 
12‐ Question based 
Q on the below::  
 
or the structure shown, whatt load combinaation should bee used to desiggn the structurre to resist 
13‐ Fo
ovverturning of FFooting A? 

 
 
14‐ Simple beam carrying distibuted load, location for zero sheear and deflecttion. 
 
Sherif Fawzy Exam 

Q1: Reverse Planning is used to determine  
 Activity Early Start 
 Activity Early Finish  
 Critical Path 
Q2: Questions about Concrete Mixture: 
 Water Cement Ratio effect on concrete 
 AD to reduce shrinkage and Setting time 
 
Q3:  AD is added to concrete to: 
 Increase Workability  
 Increase Strength  
 Decrease W/C Ratio  
Q4: Simple beam, choose the correct shear Diagram 

Q5: Traffic given 230 vehicle/mile and speed 60 mph. What is the capacity vehicle/hr 

Q6: line connecting points with the same level 
 Contour  
 
Q7: What is the first step when starting a new project with KATARA 
 Project Charter 
Q8: Concrete cube is thrown into the water (given dimensions and density). 
What is the pressure on the bed (Ib/ft2) 

Q9: STP test 
Q10: Question about friction angle range for soil samples (Sand & Clay) 

Q11: Strain Units 
 Unitless 
Q12: Impact of the W/C ratio on the following: 

 Concrete strength  
 Workability 
 Cracks 
 Bleeding 
 

Q13: Truss is affected by seismic load and this load caused a displacement to the truss. Question about a specific 
member is this truss and if it is under: 

 Tension  
 Compression 
 
Q14: Given
n D and h, calcculate pressure
e and velocity
 