2 Civil Work
Level 1
a. Demolish/dismantle
1. Mechanical Shaft
Demolish/dismantle toilet room wall
Demolish/dismantle back side of toilet room wall (for door shaft)
Demolish/dismantle false ceiling and refine of ceiling
2. Staircase
Demolish/dismentle concrete contruction of stair
6. Generator Foundation
7. Tangky Foundation
Level 2
a. Demolish/dismantle and refinement
1. Mechanical Shaft
Demolish/dismantle toilet room wall
Demolish/dismantle false ceiling
Coring
Concrete construction of stair hole and refine 2nd floor with ceramic
Floor water proofing / epoxy
2. Staircase
Demolish/Dismantle concrete construction of stair
3. Loading Unloading
Demolish/Dismantle wall (for loading unloading access)
4. Panel Room
Demolish/Dismantle wall (for panel room access)
Coring Electrical Shaft
Coring Electronic Shaft
5. NOC Room
Demolish/Dismantle wall (for NOC & Office access)
Level 3
a. Demolish/dismantle
1. Mechanical Shaft
Demolish/dismantle toilet room wall
Demolish/dismantle false ceiling
Coring
Concrete construction of stair hole and refine 2nd floor with ceramic
Floor water proofing / epoxy
2. Panel Room
Demolish/Dismantle wall (for panel room access)
Coring Electrical Shaft
Coring Electronic Shaft
Roof Top
Demolish/dismantle and refinement
Floor Strengthened
Floor water proofing
Door
FEP (Feeder Entry Plate)
4 Fire System
4.1 Addressable Fire Suppression
4.1.1 Battery Room : 2m x 2,5m x 3,6m = 18m3
5 Electrical
5.1 UPS
5.2 Genset
5.3 Rectifier
5.4 PLN
5.5 Panel
5.5.1 Junction Box from KWH PLN
5.9 Grounding
5.9.1
5.9.2
5.9.3
8 Others
8.1 Table and Chair Furniture
8.2 Cupboard for tools, spare part, etc
8.3 Project management and Ducumentation
8.4 Preventive Maintenance 4 x within 1 Year
Description Qty
Civil Work
Level 1
Demolish/dismantle
Mechanical Shaft
Demolish/dismantle toilet room wall m2
Demolish/dismantle back side of toilet room wall (for door shaft) m2
Demolish/dismantle false ceiling and refine of ceiling m2
Staircase
Demolish/dismentle concrete contruction of stair m2
Level 2
Demolish/dismantle and refinement
Mechanical Shaft
Demolish/dismantle toilet room wall 5.76
Demolish/dismantle false ceiling 2.328
Coring 0.9
Concrete construction of stair hole and refine 2nd floor with ceramic lot
Floor water proofing / epoxy lot
Staircase
Demolish/Dismantle concrete construction of stair 4.1
Loading Unloading
Demolish/Dismantle wall (for loading unloading access) 4.75
Panel Room
Demolish/Dismantle wall (for panel room access) 2.016
Coring Electrical Shaft 0.323
Coring Electronic Shaft 0.36
NOC Room
Demolish/Dismantle wall (for NOC & Office access) 2.016
Level 3
Demolish/dismantle
Mechanical Shaft
Demolish/dismantle toilet room wall 5.76
Demolish/dismantle false ceiling 2.328
Coring 0.9
Concrete construction of stair hole and refine 2nd floor with ceramic lot
Floor water proofing / epoxy lot
Panel Room
Demolish/Dismantle wall (for panel room access) 2.016
Coring Electrical Shaft 0.323
Coring Electronic Shaft 0.36
Roof Top
Demolish/dismantle and refinement
Floor Strengthened 1
Floor water proofing 1
Door
FEP (Feeder Entry Plate) 1
AC Split 2 PK incl pipe, refrigerant and bracket (2N) Shutdown by Fire System 4
Fire System
Addressable Fire Suppression
Battery Room : 2m x 2,5m x 3,6m = 18m3
-Cylinder Cap 16 Ltr C/w valve, P. Gauge
-Clean Agent FM 200 = 11 Kg (Dupont)
-Solenoid Release Device Electric
-Manual Actuator
-Cylinder Bracket Cap 16 Ltr
-Discharge Pressure Switch
-Discharge Hose
Discharge Nozzle (Room & Raised Floor)
Fire Suppression Detection System
-Photoelectric Smoke Detector Adress
-Alarm Bell
-Horn c/w Stobe Light
-Manual Release + Abort Switch
-Evacuate Sign Lamp
-Gas Discharge Sign Lamp
-Releasing Module
-Control Module
-Monitor Module
-Relay Module
-Junction Box
Material Installation & Labor
-Cable Twisted Shielded AWG 18
-Cable Power NYA 2 x 1,5 mm
-PVC High Impact Conduit
-Fitting Class 300 PSI, Hanger & Support
-Blacksteel Seamless pipe SCH-40 Red Paint
-Labor Installation
-Testing & Commissioning
Electrical
UPS 2
Operational at 380/400 V or 220 / 230 Volt ; 50 Hz
Capacity Requirement: 10 KVA
Can be parrallel / upgrade to 20 KVA
Battery VRLA / VLA; 12 Volt per block; back up time 30 mnt @ 8 KVA
communication card (Modbus/SNMP)
Genset 1
Standby Capacity 75KVA, Silent type model
Install with AMF/automatic Main Failure start system
Include with 20 - 50 Liter Diesel Fuel
Complete with 7 Days fuel tank, fuel pump or gravitation system and pipe installation
Rectifier 2
Capacity 10 KVA / 200 A
Operational 48 Volt
Battery VRLA / VLA ; back up time 60 mnt at 8 KVA
PLN 1
Upgrade from 2200 VA to 53000 VA
Panel
Junction Box from KWH PLN 1
Box Panel with updect and floor support
MCCB 125A/4P
Pilot Lamp Indicator c/w fuses
LVMDP (A and B) 2
Box Panel with updeck and floor support
MCCB - ATS 125 A/4P, manual atomatic selector, pusth botton operational, Lighting indicator
3 units - MCB 10A/1P for AMF feed
1 set - Digital Power meter c/w CT, fuses and modbus
6 set - Pilot lamp Indikator incoming power c/w fuses
1 set - Indikator ATS Position
Distribution / Output
MCCB for UPS Panel
MCCB for Mechanical
MCCB for Building and Spare
MCCB for Rectifier
1 set - Arrester 100 KA
Others: CU Bar, internal Wiring, bar isolation and supporting material
Cable Tray
Power Cable tray 400 x 100 mm for AC power
Power Cable tray 400 x 100 mm for DC power
Basket tray / cablofil 300 x 100 mm for Data Cable
Cable runner for Optic cable
Grounding
Grounding Point, Incl grounding pit, Grounding root, BC Cable, Busbar
1
25x3x150 mm, and accesories
Grounding Busbar 25x3x200 mm, c/w isolator and support 1
NYA 1x16 mm for Grounding Cable from grounding point to grounding busbar a 1
Access System 5
Access Control Panel incl Battery Back up 1
Finger Print Reader 5
Magnetic Lock 5
Emergency Break Glass 5
Smart Card 10
installation 1
Others
Table and Chair Furniture 3
Cupboard for tools, spare part, etc 3
Project management and Ducumentation 2
Preventive Maintenance 4 x within 1 Year 1
Price
Qty
Unit Total
1
1
5.76
0.3
2.32
6.56
m²
set
m²
m²
set
m²
set
m²
set
m³
m³
m²
m²
m²
1
1
m²
m²
m²
m²
m²
m²
m²
set
set
m²
m²
set
sheet
m²
m²
m²
set
m²
m²
m²
m²
m²
set
m²
m²
m²
m²
set
m²
m²
m²
m²
set
step
m²
pcs
set
set
m²
m²
set
m²
set
m²
m²
set
m²
m²
m²
m²
1
1
m²
m²
m²
m²
set
m²
m²
set
m²
set
m²
m²
set
m²
lot
lot
m²
m²
set
Unit
sys
tween PAC
sys
Unit
unit
unit
unit
lot
lot
unit
lot
lot
set
set
nstallation
set
lot
set
set
set
ighting indicator
set
set
set
2
) + E (NYA 16mm2)
m 2) + E (NYA 16mm2)
+ E (NYY 10mm2)
) + E (NYY 10mm2)
1
unit
unit
unit
lot
set
set
set
set
set
pcs
lot
set
set
set
lot
set
lot
unit
set
set
set
set
set
lot
Remarks/Spesifikasi
Hebel
Steel (500mm x 500mm x 20mm)
GRC + Glaswool
GRC + Glaswool
Metal door 900x2100 mm complete with door frame, door closer, glass window, key
GRC + Glasswool
Steel (0,45m x 0,5m)
GRC + Glasswool
Steel (0,45m x 0,5m)
Concrete file K250
Concrete file K250
Hebel
Steel (500mm x 500mm x 20mm)
GRC + Glasswool
GRC + Glasswool
tempered glass 12mm (0,9m x 2,1m) + (0,5m x 2,1m)
tempered glass 12mm
tempered glass 12mm
GRC + Glasswool
Hebel
tempered glass 12mm (0,9m x 2,1m)
tempered glass 12mm
Hebel
tempered glass 12mm
GRC + Glasswool
Hebel
tempered glass 12mm (0,9m x 2,1m) + (0,5m x 2,1m)
tempered glass 12mm
tempered glass 12mm
GRC + Glasswool
Hebel
tempered glass 12mm (0,9m x 2,1m)
tempered glass 12mm
tempered glass 12mm
GRC + Glasswool
Hebel
tempered glass 12mm
Floor Step Support + Raised Floor
Calsium sulphate 600x600x300mm, water proof, fire proof, antisepsis and
sound insulation
include; Insulation sheet class 0 thickness 1 inch; finshed with allumunium foil
Ventilation rate of panel from 30% - 45%, Calsium sulphate
elbow triangle (180m² Larg, 14°Angular, 1,75m Wide)
GRC + Glasswool
GRC + Glasswool
Metal door 900x2100 mm complete with door frame, door closer, glass window, key
GRC + Glasswool
steel (0,45m x 0,5m)
GRC + Glasswool
steel (0,45m x 0,5m)
Hebel
steel (0,5m x0,5m)
GRC + Glasswool
GRC + Glasswool
Metal door 900x2100 mm complete with door frame, door closer, glass window, key
GRC + Glasswool
steel (0,45m x 0,5m)
GRC + Glasswool
steel (0,45m x 0,5m)