SN Description

1 Survey, Design and Layout Plan for Sharing / Existing Site


CME Site Survey for Sharing / Existing Site (Include Site Drawing)
Existing Tower / Building / CME Facilities Analysis
- Analysis Strengthened
- Hammer Test

2 Civil Work
Level 1
a. Demolish/dismantle
1. Mechanical Shaft
Demolish/dismantle toilet room wall
Demolish/dismantle back side of toilet room wall (for door shaft)
Demolish/dismantle false ceiling and refine of ceiling
2. Staircase
Demolish/dismentle concrete contruction of stair

b. Wall and Partition


1. refine mechanical shaft room wall
2. mechanical shaft door
3. Panel room Partition

4. Electrical Shaft Partition

5. Electronic Shaft Partition

6. Generator Foundation
7. Tangky Foundation

Level 2
a. Demolish/dismantle and refinement
1. Mechanical Shaft
Demolish/dismantle toilet room wall
Demolish/dismantle false ceiling
Coring
Concrete construction of stair hole and refine 2nd floor with ceramic
Floor water proofing / epoxy
2. Staircase
Demolish/Dismantle concrete construction of stair
3. Loading Unloading
Demolish/Dismantle wall (for loading unloading access)
4. Panel Room
Demolish/Dismantle wall (for panel room access)
Coring Electrical Shaft
Coring Electronic Shaft
5. NOC Room
Demolish/Dismantle wall (for NOC & Office access)

b. Wall and Partition


1. Mechanical Shaft
Refine mechanical shaft room wall
Mechanical Shaft Door
2. Loading Unloading
Rolling door/Folding Gate
3. Server Room Area
Two side Gypsum fireted partition with Glasswool (Battery room & Stair)
Two side Gypsum fireted partition with Glasswool (Battery room & Ramp)
Double glass door (main gate from loading to server) (a)
Tempered Glass (beside the door glass) (a)
Tempered Glass (on the glass door) (a)
Two side Gypsum fireted partition with Glasswool (Top Glass Door Support) (a)
Strengnes Bottom Glass Door (a)
Single glass door (access to Battery room) (b)
Tempered Glass (on the glass door) (b)
Strengnes Bottom Glass Door (b)
Glass Partition Battery Room & PAC Room
Glass Support Partition Battery Room & PAC Room (Top)
Strengnes Bottom Glass Partition Battery Room & PAC Room
Double glass door (access PAC Room to server) (c)
Tempered Glass (on the glass door) (c)
Tempered Glass partition PAC Room & Server Room
Two side Gypsum fireted partition with Glasswool (Top Glass Support)
Strengnes Bottom Glass
Single glass door (server room to NOC room) (d)
Tempered Glass (on the glass door) (d)
Tempered Glass partition PAC Room & Server Room
Two side Gypsum fireted partition with Glasswool (Top Glass Support)
Strengnes Bottom Glass
Single glass door (NOC room to office) (d)
Floor Step
Raise flor

Perforated Raise flor


Ramp
Double cup tile lifter
3. Panel Room
Panel room partition
Electrical Shaft Partition

Electronic Shaft Partition

Level 3
a. Demolish/dismantle
1. Mechanical Shaft
Demolish/dismantle toilet room wall
Demolish/dismantle false ceiling
Coring
Concrete construction of stair hole and refine 2nd floor with ceramic
Floor water proofing / epoxy
2. Panel Room
Demolish/Dismantle wall (for panel room access)
Coring Electrical Shaft
Coring Electronic Shaft

b. Wall and Partition


1. Mechanical Shaft
Refine mechanical shaft room wall
Mechanical Shaft Door
2. Panel Room
Panel room partition

Electrical Shaft Partition

Electronic Shaft Partition

Roof Top
Demolish/dismantle and refinement
Floor Strengthened
Floor water proofing

Wall and Partition


Floor coring
Plumbing Shaft

Door
FEP (Feeder Entry Plate)

3 Air Conditioner Work


3.1 Precision Air Conditioner
3.1.1 PAC Total Capacity 30KW (2N) Complete with outdoor condensor unit

3.1.2 Material Installation & Accessories of PAC Unit

3.1.3 Test Comisioning

3.2 Confort Aircond (AC Split)

4 Fire System
4.1 Addressable Fire Suppression
4.1.1 Battery Room : 2m x 2,5m x 3,6m = 18m3

Discharge Nozzle (Room & Raised Floor)


4.1.2 Fire Suppression Detection System
4.1.3 Material Installation & Labor

4.2 Addressable Fire Suppression


4.2.1 Server Room : 4m x 6m x 3,6m = 86m3

Discharge Nozzle (Room & Raised Floor)


4.2.2 Fire Suppression Detection System

4.2.3 Material Installation & Labor


4.3 Fire Tubing System
4.3.1 Tabung Kapasitas 3 KG

4.3.2 SUPPORT MATERIAL

4.4 APAR (Fire Portable System)


4.4.1 Tabung Kapasitas 2 KG

4.4.1 SUPPORT MATERIAL

5 Electrical
5.1 UPS

5.2 Genset

5.3 Rectifier

5.4 PLN

5.5 Panel
5.5.1 Junction Box from KWH PLN

5.5.2 Junction Box from Genset


5.5.3 LVMDP (A and B)

5.5.4 Output Rectifier (DCPDB)

5.5.5 Output UPS Panel (PDU UPS)

5.5.6 Data Center Utility Panel


5.6 Cable (use big four local cable)
Power cable from DG to (Junction panel, LVMPD#A and B); NYY 1 x (4C x 35mm 2) + E (NYA
Power cable from KWH to (Junction Panel, LVMPD#A and B); NYY 1 x (4C x 35mm 2) + E (NY
Power Cabel from LVMDP to Rectifier #A; NYY 1 x (4C x 16mm2) + E (NYY 10mm2)
Power Cable from LVMDP to Rectifier #B; NYY 1 x (4C x 16mm2) + E (NYY 10mm2)
Power Cable from LVMDP to UPS Panel#A; NYY 1 x (4C x 16mm 2) + E (NYY 10mm2)
Power Cable from LVMDP to UPS Panel#B; NYY 1 x (4C x 16mm 2) + E (NYY 10mm2)
Power Cable from LVMDP to Data Center Utility Panel#A; NYY 1 x (4C x 16mm 2) + E (NYY 1
Power Cable from LVMDP to Data Center Utility Panel#B; NYY 1 x (4C x 16mm 2) + E (NYY
DC Cable from Rectifier #A ke Rectifier Panel #A (output Cable)
DC Cable from Rectifier #A ke Rectifier Panel #B (output Cable)
DC Cable from Rectifier Panel #A to IT Rack-DC Equipment, 2 x NYAF 120 mm2
DC Cable from Rectifier Panel #B to IT Rack-DC Equipment, 2 x NYAF 120 mm2
Input/Output Power Cable From/to UPS #A From/To UPS Panel #A, NYY 2 x (4C x 16mm2) +
Input/Output Power Cable From/to UPS #B From/To UPS Panel #B, NYY 2 x (4C x 16mm2) +
Power Cable from UPS Panel #A to IT Rack; NYY 1 x (3C x 6mm2)
Power Cable from UPS Panel #B to IT Rack; NYY 1 x (3C x 6mm2)
Power Cable from Data Center Utility panel #A to PAC, NYY 2 x (3C x 6mm2)
Power Cable from Data Center Utility panel #B to PAC, NYY 2 x (3C x 6mm2)
Power Cable from Data Center Utility panel #A to AC Split, NYY 2 x (3C x 2,5 mm2)
Power Cable from Data Center Utility panel #B to AC Split, NYY 2 x (3C x 2,5 mm2)
Power cable to FSS Panel, NYY 1 x (3C x 4 mm2) Incl Conduit
Power Cable to Access control Panel, NYY 1 x (3C x 4 mm2) incl Conduit
Power Cable from LVMDP to Genset, NYY 1 x (3C x 4mm2) incl conduit
Power Cable to CCTV control Panel, NYY 1 x (3C x 4 mm2) incl Conduit

5.7 Cable Tray

5.8 Lamp, Switch and power outlet


5.8.1 Panel Room
5.8.1 a
5.8.1 b
5.8.1 c
5.8.1 d
5.8.1 e
5.8.2 Server Room
5.8.2 a
5.8.2 b
5.8.2.c
5.8.2 d
5.8.2 e
5.8.3 NOC Room
5.8.3 a
5.8.3 b
5.8.3.c
5.8.3 d
5.8.3 e
5.8.4 PAC Room
5.8.4 a
5.8.4 b
5.8.4.c
5.8.4 d
5.8.4 e
5.8.5 Battery Room
5.8.5 a
5.8.5 b
5.8.5.c
5.8.5 d
5.8.5 e
5.8.6 Loading Area
5.8.6 a
5.8.6 b
5.8.6.c
5.8.6 d
5.8.6 e

5.9 Grounding
5.9.1
5.9.2
5.9.3

6 Security System and Monitoring


6.1 CCTV
6.1.1
6.1.2
6.1.3
6.1.4

6.2 Access System


6.2.1
6.2.2.
6.2.2
6.2.2.
6.2.3
6.2.2.

6.3 EMS (ENVIRONMENTAL MONITORING SYSTEM)


6.3.1
6.3.2
6.3.3
6.3.4
6.3.5
7 Rack
IT Rack for AC and DC Requirement, 42 U, 600 x1200 mm, incl Power
7.1 Distribution panel comlete with male female connector 32A/1 phase; 2 unit per
7.2 rack, V-A Display, European/Indosia
Cold Containment ceiling and ceilingtype plugfor FSS connection
control
7.3 Containment door

8 Others
8.1 Table and Chair Furniture
8.2 Cupboard for tools, spare part, etc
8.3 Project management and Ducumentation
8.4 Preventive Maintenance 4 x within 1 Year
Description Qty

Survey, Design and Layout Plan for Sharing / Existing Site


CME Site Survey for Sharing / Existing Site (Include Site Drawing) Lot
Existing Tower / Building / CME Facilities Analysis Lot
- Analysis Strengthened
- Hammer Test

Civil Work
Level 1
Demolish/dismantle
Mechanical Shaft
Demolish/dismantle toilet room wall m2
Demolish/dismantle back side of toilet room wall (for door shaft) m2
Demolish/dismantle false ceiling and refine of ceiling m2
Staircase
Demolish/dismentle concrete contruction of stair m2

Wall and Partition


refine mechanical shaft room wall 4.05
mechanical shaft door 1
Panel room Partition
Two layer Gypsum fireted partition with Termal insulation 8.109
Two side Gypsum fireted partition with Glasswool 15.55
Panel room door 1
Electrical Shaft Partition
Two side Gypsum fireted partition with Glasswool 25.2
Electrical Shaft door 1
Electronic Shaft Partition
Two side Gypsum fireted partition with Glasswool 25.2
Electronic Shaft door 1
Generator Foundation 31.36
Tangky Foundation 31.36

Level 2
Demolish/dismantle and refinement
Mechanical Shaft
Demolish/dismantle toilet room wall 5.76
Demolish/dismantle false ceiling 2.328
Coring 0.9
Concrete construction of stair hole and refine 2nd floor with ceramic lot
Floor water proofing / epoxy lot
Staircase
Demolish/Dismantle concrete construction of stair 4.1
Loading Unloading
Demolish/Dismantle wall (for loading unloading access) 4.75
Panel Room
Demolish/Dismantle wall (for panel room access) 2.016
Coring Electrical Shaft 0.323
Coring Electronic Shaft 0.36
NOC Room
Demolish/Dismantle wall (for NOC & Office access) 2.016

Wall and Partition


Mechanical Shaft
Refine mechanical shaft room wall 2.851
Mechanical Shaft Door 1
Loading Unloading
Rolling door/Folding Gate 1
Server Room Area
Two side Gypsum fireted partition with Glasswool (Battery room & Stair) 7.92
Two side Gypsum fireted partition with Glasswool (Battery room & Ramp) 4.522
Double glass door (main gate from loading to server) (a) 1
Tempered Glass (beside the door glass) (a) 2
Tempered Glass (on the glass door) (a) 0.74
Two side Gypsum fireted partition with Glasswool (Top Glass Door Support) (a) 1.44
Strengnes Bottom Glass Door (a) 0.54
Single glass door (access to Battery room) (b) 1
Tempered Glass (on the glass door) (b) 0.381
Strengnes Bottom Glass Door (b) 0.286
Glass Partition Battery Room & PAC Room 5.25
Glass Support Partition Battery Room & PAC Room (Top) 1.68
Strengnes Bottom Glass Partition Battery Room & PAC Room 0.63
Double glass door (access PAC Room to server) (c) 1
Tempered Glass (on the glass door) (c) 0.74
Tempered Glass partition PAC Room & Server Room 5.6
Two side Gypsum fireted partition with Glasswool (Top Glass Support) 2.96
Strengnes Bottom Glass 1.11
Single glass door (server room to NOC room) (d) 1
Tempered Glass (on the glass door) (d) 0.74
Tempered Glass partition PAC Room & Server Room 3.925
Two side Gypsum fireted partition with Glasswool (Top Glass Support) 2
Strengnes Bottom Glass 0.75
Single glass door (NOC room to office) (d) 1
Floor Step 2
Raise flor 48

Perforated Raise flor 8


Ramp 1
Double cup tile lifter 2
Panel Room
Panel room partition
Two side Gypsum fireted partition with Glasswool 19.55
Two layer Gypsum fireted partition with Termal insulation 8.109
Panel room door 1
Electrical Shaft Partition
Two side Gypsum fireted partition with Glasswool 4.815
Electrical Shaft door 1
Firestop shaft 0.323
Electronic Shaft Partition
Two side Gypsum fireted partition with Glasswool 2.295
Electronic Shaft door 1
Firestop shaft 0.36

Level 3
Demolish/dismantle
Mechanical Shaft
Demolish/dismantle toilet room wall 5.76
Demolish/dismantle false ceiling 2.328
Coring 0.9
Concrete construction of stair hole and refine 2nd floor with ceramic lot
Floor water proofing / epoxy lot
Panel Room
Demolish/Dismantle wall (for panel room access) 2.016
Coring Electrical Shaft 0.323
Coring Electronic Shaft 0.36

Wall and Partition


Mechanical Shaft
Refine mechanical shaft room wall 2.851
Mechanical Shaft Door 1
Panel Room
Panel room partition
Two side Gypsum fireted partition with Glasswool 14.94
Two layer Gypsum fireted partition with Termal insulation 8.109
Panel room door 1
Electrical Shaft Partition
Two side Gypsum fireted partition with Glasswool 4.815
Electrical Shaft door 1
Firestop shaft 0.323
Electronic Shaft Partition
Two side Gypsum fireted partition with Glasswool 2.295
Electronic Shaft door 1
Firestop shaft 0.36

Roof Top
Demolish/dismantle and refinement
Floor Strengthened 1
Floor water proofing 1

Wall and Partition


Floor coring 0.9
Plumbing Shaft 2.851

Door
FEP (Feeder Entry Plate) 1

Air Conditioner Work


Precision Air Conditioner
PAC Total Capacity 30KW (2N) Complete with outdoor condensor unit 2
- Cooling Capacity Sensible 30 KW At.22. degC 50 %RH, with 35 deg Cambinet temp
- Type : Air Cooled System, Down Flow
- Refrigrant : R-407C / R-410
- Compresor : Dual Circuit Scroll
- Jenis Kipas : Sentrifugal Fan
- Include Control panel & Ethernet Card (SNMP)
- Include Control Cooling, Dehumidity, Reheating & Filtration
- Include Water Detection
-Communication Card (Modbus/SNMP)
-Sequencing system
-Shutdown by Fire System
Material Installation & Accessories of PAC Unit 2
- Include pipe refrigrant and support (tray pipe refrigrant + cover)
- Include base plate Indoor & Outdoor Unit, + plenum (pengarah udara)
- Include electrical indoor to outdoor control cable and sequenscing cable between PAC
Test Comisioning 2
- Start Up & Testing Commissioning
-Installation labor cost

Confort Aircond (AC Split)


AC Split 1 PK incl pipe, refrigerant and bracket (2N) 2
AC Split 2 PK incl pipe, refrigerant and bracket (2N) 6

AC Split 2 PK incl pipe, refrigerant and bracket (2N) Shutdown by Fire System 4

Fire System
Addressable Fire Suppression
Battery Room : 2m x 2,5m x 3,6m = 18m3
-Cylinder Cap 16 Ltr C/w valve, P. Gauge
-Clean Agent FM 200 = 11 Kg (Dupont)
-Solenoid Release Device Electric
-Manual Actuator
-Cylinder Bracket Cap 16 Ltr
-Discharge Pressure Switch
-Discharge Hose
Discharge Nozzle (Room & Raised Floor)
Fire Suppression Detection System
-Photoelectric Smoke Detector Adress
-Alarm Bell
-Horn c/w Stobe Light
-Manual Release + Abort Switch
-Evacuate Sign Lamp
-Gas Discharge Sign Lamp
-Releasing Module
-Control Module
-Monitor Module
-Relay Module
-Junction Box
Material Installation & Labor
-Cable Twisted Shielded AWG 18
-Cable Power NYA 2 x 1,5 mm
-PVC High Impact Conduit
-Fitting Class 300 PSI, Hanger & Support
-Blacksteel Seamless pipe SCH-40 Red Paint
-Labor Installation
-Testing & Commissioning

Addressable Fire Suppression


Server Room : 4m x 6m x 3,6m = 86m3
-Cylinder Cap 52 Ltr C/w valve, P. Gauge
-Clean Agent FM 200 = 49 Kg (Dupont)
-Solenoid Release Device Electric
-Manual Actuator
-Cylinder Bracket Cap 52 Ltr
-Discharge Pressure Switch
-Discharge Hose
Discharge Nozzle (Room & Raised Floor)
Fire Suppression Detection System
-Photoelectric Smoke Detector Adress
-Alarm Bell
-Horn c/w Stobe Light
-Manual Release + Abort Switch
-Evacuate Sign Lamp
-Gas Discharge Sign Lamp
-Releasing Module
-Control Module
-Monitor Module
-Relay Module
-Junction Box
-Panel MCFA
Material Installation & Labor
-Cable Twisted Shielded AWG 18
-Cable Power NYA 2 x 1,5 mm
-PVC High Impact Conduit
-Fitting Class 300 PSI, Hanger & Support
-Blacksteel Seamless pipe SCH-40 Red Paint
-Labor Installation
-Testing & Commissioning

Fire Tubing System


Tabung Kapasitas 3 KG 6
-Pipe Tubing Luas Proteksi 2 m2
-Isi Gas FM 200 (Dupont)
-Sesuai Standar NAF P/ IV - Kelas ABC
SUPPORT MATERIAL
-Support Material & Accessories 1
-Installation 1

APAR (Fire Portable System)


Tabung Kapasitas 2 KG 6
-Isi Gas FM 200 (Dupont)
-Sesuai Standar NAF P/ IV - Kelas ABC
SUPPORT MATERIAL
-Support Material & Accessories 1
-Installation 1

Electrical
UPS 2
Operational at 380/400 V or 220 / 230 Volt ; 50 Hz
Capacity Requirement: 10 KVA
Can be parrallel / upgrade to 20 KVA
Battery VRLA / VLA; 12 Volt per block; back up time 30 mnt @ 8 KVA
communication card (Modbus/SNMP)

Genset 1
Standby Capacity 75KVA, Silent type model
Install with AMF/automatic Main Failure start system
Include with 20 - 50 Liter Diesel Fuel
Complete with 7 Days fuel tank, fuel pump or gravitation system and pipe installation

Rectifier 2
Capacity 10 KVA / 200 A
Operational 48 Volt
Battery VRLA / VLA ; back up time 60 mnt at 8 KVA

PLN 1
Upgrade from 2200 VA to 53000 VA

Panel
Junction Box from KWH PLN 1
Box Panel with updect and floor support
MCCB 125A/4P
Pilot Lamp Indicator c/w fuses

Junction Box from Genset 1


Box Panel with updect and floor support
MCCB 125A/4P
Pilot Lamp Indicator c/w fuses

LVMDP (A and B) 2
Box Panel with updeck and floor support
MCCB - ATS 125 A/4P, manual atomatic selector, pusth botton operational, Lighting indicator
3 units - MCB 10A/1P for AMF feed
1 set - Digital Power meter c/w CT, fuses and modbus
6 set - Pilot lamp Indikator incoming power c/w fuses
1 set - Indikator ATS Position
Distribution / Output
MCCB for UPS Panel
MCCB for Mechanical
MCCB for Building and Spare
MCCB for Rectifier
1 set - Arrester 100 KA
Others: CU Bar, internal Wiring, bar isolation and supporting material

Output Rectifier (DCPDB) 2


Box Panel with updeck and floor support
1 units - MCCB 40-100A/4P
1 set - Digital Power meter c/w CT, fuses and modbus
3 set - Pilot lamp Indikator incoming power c/w fuses
Distribution / Output
10 units - MCB 100A/1P
30 Units - MCB 63A/1P
Others: CU Bar, internal Wiring, bar isolation and supporting material

Output UPS Panel (PDU UPS) 2


Box Panel with updeck and floor support
MCB/MCCB Input UPS dan bypass
1 set - Digital Power meter c/w CT, fuses and modbus
3 set - Pilot lamp Indikator incoming power c/w fuses
Distribution / Output
MCCB
MCB
1 unit - Arrester 50 KA

Data Center Utility Panel 1


Box Panel with updeck and floor support
MCCB
1 set - Digital Power meter c/w CT, fuses and modbus
3 set - Pilot lamp Indikator incoming power c/w fuses
Distribution / Output
MCB
MCB
Cable (use big four local cable)
Power cable from DG to (Junction panel, LVMPD#A and B); NYY 1 x (4C x 35mm 2) + E (NYA 16mm2)
Power cable from KWH to (Junction Panel, LVMPD#A and B); NYY 1 x (4C x 35mm 2) + E (NYA 16mm2)
Power Cabel from LVMDP to Rectifier #A; NYY 1 x (4C x 16mm 2) + E (NYY 10mm2)
Power Cable from LVMDP to Rectifier #B; NYY 1 x (4C x 16mm 2) + E (NYY 10mm2)
Power Cable from LVMDP to UPS Panel#A; NYY 1 x (4C x 16mm 2) + E (NYY 10mm2)
Power Cable from LVMDP to UPS Panel#B; NYY 1 x (4C x 16mm 2) + E (NYY 10mm2)
Power Cable from LVMDP to Data Center Utility Panel#A; NYY 1 x (4C x 16mm 2) + E (NYY 10mm2)
Power Cable from LVMDP to Data Center Utility Panel#B; NYY 1 x (4C x 16mm 2) + E (NYY 10mm2)
DC Cable from Rectifier #A ke Rectifier Panel #A (output Cable)
DC Cable from Rectifier #A ke Rectifier Panel #B (output Cable)
DC Cable from Rectifier Panel #A to IT Rack-DC Equipment, 2 x NYAF 120 mm2
DC Cable from Rectifier Panel #B to IT Rack-DC Equipment, 2 x NYAF 120 mm2
Input/Output Power Cable From/to UPS #A From/To UPS Panel #A, NYY 2 x (4C x 16mm2) + E (NYY 10
Input/Output Power Cable From/to UPS #B From/To UPS Panel #B, NYY 2 x (4C x 16mm2) + E (NYY 10
Power Cable from UPS Panel #A to IT Rack; NYY 1 x (3C x 6mm2)
Power Cable from UPS Panel #B to IT Rack; NYY 1 x (3C x 6mm2)
Power Cable from Data Center Utility panel #A to PAC, NYY 2 x (3C x 6mm2)
Power Cable from Data Center Utility panel #B to PAC, NYY 2 x (3C x 6mm2)
Power Cable from Data Center Utility panel #A to AC Split, NYY 2 x (3C x 2,5 mm2)
Power Cable from Data Center Utility panel #B to AC Split, NYY 2 x (3C x 2,5 mm2)
Power cable to FSS Panel, NYY 1 x (3C x 4 mm2) Incl Conduit
Power Cable to Access control Panel, NYY 1 x (3C x 4 mm2) incl Conduit
Power Cable from LVMDP to Genset, NYY 1 x (3C x 4mm2) incl conduit
Power Cable to CCTV control Panel, NYY 1 x (3C x 4 mm2) incl Conduit

Cable Tray
Power Cable tray 400 x 100 mm for AC power
Power Cable tray 400 x 100 mm for DC power
Basket tray / cablofil 300 x 100 mm for Data Cable
Cable runner for Optic cable

Lamp, Switch and power outlet


Panel Room
LED Lighting Unit 2 x 16 watt c/w armature
LED Lighting Unit 2 x 16 watt c/w armature and 30 mnt battery back up for
Emergency
Lighting Power Switch c/w inbow/outbow bracket
Power Outlet c/w inbow/outbow bracket
Installation, incl Cable, Conduit, and supporting material
Server Room
LED Lighting Unit 2 x 16 watt c/w armature
LED Lighting Unit 2 x 16 watt c/w armature and 30 mnt battery back up for
Emergency
Lighting Power Switch c/w inbow/outbow bracket
Power Outlet c/w inbow/outbow bracket
Installation, incl Cable, Conduit, and supporting material
NOC Room
LED Lighting Unit 2 x 16 watt c/w armature
LED Lighting Unit 2 x 16 watt c/w armature and 30 mnt battery back up for
Emergency
Lighting Power Switch c/w inbow/outbow bracket
Power Outlet c/w inbow/outbow bracket
Installation, incl Cable, Conduit, and supporting material
PAC Room
LED Lighting Unit 2 x 16 watt c/w armature
LED Lighting Unit 2 x 16 watt c/w armature and 30 mnt battery back up for
Emergency
Lighting Power Switch c/w inbow/outbow bracket
Power Outlet c/w inbow/outbow bracket
Installation, incl Cable, Conduit, and supporting material
Battery Room
LED Lighting Unit 2 x 16 watt c/w armature
LED Lighting Unit 2 x 16 watt c/w armature and 30 mnt battery back up for
Emergency
Lighting Power Switch c/w inbow/outbow bracket
Power Outlet c/w inbow/outbow bracket
Installation, incl Cable, Conduit, and supporting material
Loading Area
LED Lighting Unit 2 x 16 watt c/w armature
LED Lighting Unit 2 x 16 watt c/w armature and 30 mnt battery back up for
Emergency
Lighting Power Switch c/w inbow/outbow bracket
Power Outlet c/w inbow/outbow bracket
Installation, incl Cable, Conduit, and supporting material

Grounding
Grounding Point, Incl grounding pit, Grounding root, BC Cable, Busbar
1
25x3x150 mm, and accesories
Grounding Busbar 25x3x200 mm, c/w isolator and support 1
NYA 1x16 mm for Grounding Cable from grounding point to grounding busbar a 1

Security System and Monitoring


CCTV Set
NVR, support ut to 32 Channel 1
TV Monitor 32 Inch 1
Dome Camera, 2 MP with IR Led 10
Installation, Incl Cable data, conduit, Camera Support and setting 1

Access System 5
Access Control Panel incl Battery Back up 1
Finger Print Reader 5
Magnetic Lock 5
Emergency Break Glass 5
Smart Card 10
installation 1

EMS (ENVIRONMENTAL MONITORING SYSTEM) 1


EMS Server and Monitor 1
Software Liscense 1
2 unit - Temp / Humidity sensor, Water Leak System 1
Data Concentrator panel 1
Installation and setting 1
Rack
IT Rack for AC and DC Requirement, 42 U, 600 x1200 mm, incl Power
Distribution panel comlete with male female connector 32A/1 phase; 2 unit per 8
rack, V-A Display, European/Indosia
Cold Containment ceiling and ceilingtype plugfor FSS connection
control 1
Containment door 2

Others
Table and Chair Furniture 3
Cupboard for tools, spare part, etc 3
Project management and Ducumentation 2
Preventive Maintenance 4 x within 1 Year 1
Price
Qty
Unit Total

1
1

5.76
0.3
2.32

6.56


set



set


set


set




1
1





set

set



set
sheet



set





set




set




set
step

pcs
set
set



set


set


set




1
1




set



set


set


set

lot
lot


set

Unit

sys

tween PAC
sys

Unit
unit

unit
unit

lot
lot

unit

lot
lot

set

set

nstallation

set

lot

set

set
set

ighting indicator

set

set

set
2
) + E (NYA 16mm2)
m 2) + E (NYA 16mm2)

+ E (NYY 10mm2)
) + E (NYY 10mm2)

x 16mm2) + E (NYY 10mm2)


x 16mm2) + E (NYY 10mm2)
lot
lot
lot

1
unit
unit
unit
lot

set
set
set
set
set
pcs
lot

set
set
set
lot
set
lot
unit
set
set

set
set
set
lot
Remarks/Spesifikasi

For Genset Cable ladder

Hebel
Steel (500mm x 500mm x 20mm)

GRC + Glaswool
GRC + Glaswool
Metal door 900x2100 mm complete with door frame, door closer, glass window, key

GRC + Glasswool
Steel (0,45m x 0,5m)

GRC + Glasswool
Steel (0,45m x 0,5m)
Concrete file K250
Concrete file K250
Hebel
Steel (500mm x 500mm x 20mm)

Steel 2 x (0,9m x 2,5m)

GRC + Glasswool
GRC + Glasswool
tempered glass 12mm (0,9m x 2,1m) + (0,5m x 2,1m)
tempered glass 12mm
tempered glass 12mm
GRC + Glasswool
Hebel
tempered glass 12mm (0,9m x 2,1m)
tempered glass 12mm
Hebel
tempered glass 12mm
GRC + Glasswool
Hebel
tempered glass 12mm (0,9m x 2,1m) + (0,5m x 2,1m)
tempered glass 12mm
tempered glass 12mm
GRC + Glasswool
Hebel
tempered glass 12mm (0,9m x 2,1m)
tempered glass 12mm
tempered glass 12mm
GRC + Glasswool
Hebel
tempered glass 12mm
Floor Step Support + Raised Floor
Calsium sulphate 600x600x300mm, water proof, fire proof, antisepsis and
sound insulation
include; Insulation sheet class 0 thickness 1 inch; finshed with allumunium foil
Ventilation rate of panel from 30% - 45%, Calsium sulphate
elbow triangle (180m² Larg, 14°Angular, 1,75m Wide)

GRC + Glasswool
GRC + Glasswool
Metal door 900x2100 mm complete with door frame, door closer, glass window, key

GRC + Glasswool
steel (0,45m x 0,5m)

GRC + Glasswool
steel (0,45m x 0,5m)

Hebel
steel (0,5m x0,5m)

GRC + Glasswool
GRC + Glasswool
Metal door 900x2100 mm complete with door frame, door closer, glass window, key

GRC + Glasswool
steel (0,45m x 0,5m)

GRC + Glasswool
steel (0,45m x 0,5m)

PAC Room / Server Room


Hebel

steel (0,5m x0,5m)

Rendundant (NOC Room)


Rendundant ( 2 unit at Panel room 1st floor)
Rendundant ( 2 unit at Panel room 2nd floor)
Rendundant ( 2 unit at Panel room 3th floor)
Rendundant (2 on and 2 standby) untuk battery room
-2 for Junction Box at 1st floor
-2 for Main Panel at 1st floor
-2 for Distribution Panel at 2nd floor

-1 for panel room at 1st floor; at 2nd floor; at 3th floor


-1 for PAC Room at 2nd floor
-1 for Loading area at 2nd floor
-1 for NOC Room at 2nd floor