GEODETIC ENGINEERS OF THE PHILIPPINES, INC.

National Capital Region


100-H EL-AL Bldg., Quezon Avenue, Quezon City * Telefax No/s:
415-2799; 3g5-9572
e-mail address: gep_ncr@yahoo. com

ANNEX A
-/ SUMMARY OF GEP.NCR
'll
\\' / GEODETIC ENGINEERING SERVICES RATES
l-N
i- \,
cY 2015-2016
l' PERSONNEL, EQUIPMENT AND RENTAL COSTS
'r- '/'
A. Salary/Wages of Geodetic Engineer and Personnel for Office (Monthly) and
) Field/Proiect (Net Daily Rates)
rJ r
Although base on DBM's Manual of Position and Compensations, the monthly rates or salary
grades used here are adjusted higher than what is normally stated in the Manual since this will be
used by private practitioners.
\

LeveUPosition*
(Professional Geodetic
Engineers)

62,670.00 ! 2,089.00

Sr. Geodetic Engineer


Project Manager (SGE- s8,028.00 | 1.934.00 6,802.00

Geodetic Engineer
Project Manager (GE-PM) 53,730.00 6,015.00

Geodetic Engineer V
5,642.00

1,422.00 | Z.A

1,219.00 600.00 i 3,769.00

Geodetic Engineer ll i
(Project Geodetic i 31,351.00 3,1 13.00

Geodetic Engineer I
(Entry Level/Newly Board 2,320.00

*Alofe: Above Rates for Geodetic Engineers


are applicabte to Large Suruey Corporation or project
llanagement Office. Kindly rcfer to Policy Guidelines on Satary and Wages for Start-up.s, Sole
Proprietors or Small Suruey Companies.

President Vice President Executive Secretary Treasurer


Tel # (0917) 3159145 Tel # (0916) 3434156 Tel # (0919) 4Ur426 Tel # (0917) s1s1865
FieldlProiect Rates
\\1, Daily
AiJ \t
,')r
(.----')t I
Job
Level
LeveUPosition
(Non-Licensed
Geodetic Engineer)
Rates
(PHP)
NEDA
Multiplier
Billing
Rate
Allowance
(PHP)
Total
Amount

\t
(1 montt = (PHP) (PHP)
iP.,,q,ii::i 3{l days)
Sr. Survey
Gartographer
1tL (Engineering Graduate 23,044.00 768.00 2.5 1,920 400.00 2,320.00
or with appropriate
( training and experience)
Assistant Geodetic
Engineer
12 19,940.00 665.00 2.2 1,463 400.00 1,863.00
(Geodetic Engineering
Graduate)
\ Sr. Survey GADTGIS
Operator
10 (Engineering Graduate 17,255.00 575.00 2.2 1,265 300.00 1,565.00
or with appropriate
traininq and experience)
Geodetic Engineering
Technicianl
lnstrument Man
{0 (Engineering Graduate 17,255"00 575.00 2.2 1,265 300.00 1,565.00
with appropriate training
and experience)
CAD/GIS Operator
(4yrs College Graduate
8 14,931.00 498.00 2.4 996 200.00 1,196.00
with appropriate training
and experience)

Survey Researcher
8 14,931.00 498.00 2.4 996 200.00 1,196.00
(4yrs College Graduate)

Geodetic Engineering
Trainee
8 (4*- 5* year Geodetic 14,931.00 498.00 1.8 896 200.00 1,096.00 /-\
Engineering Students/ \
OJTs)
Geodetic Engineering
8 Aide (Chainmen, 14,931.00 498.00 1.8 896 200.00 1,096.00
Rodmen)

n7 Driver (Field Based) 13,890.00 463_00 1.5 695 200.00 895.00

r Laborer (local hired)** 13,890.00 463.00 1.5 695 200.00 895.00

vary depending on local minimum wage rate in project site

N
President Vice President Executive Secretary Treasurer
Tel # (0917) 3159145 Tel # (0916) 334156 Tel # (Glrg) 4171426 Tel # {0917) 5151865
B. Equipment Rentals/Costs

Daily
Rates
Equipment NEDA
(PHP)
ilultiplier Total Amount (PHP)
(l month=
30 davsl
Total Station w/ Accessories
(standard package)
r Extra prism/range pole with spirit
level 3,500.00 1.0 3,500.00
r Extra Battery (lnstrumenURadios)
. Mini prism and mini ranoe oole
GPS - Single Frequency Pair 7,500.00 1.0 7,500.00
GPS - Dual Frequency Pair 15,000.00 1.0 15,000.00
Echo Sounder 10,000.00 1.0 10,000.00
Precise Levell Rotating Level
2,500.00 1.0 2,500.00
- Digital or Analog
Automatic Level - Digital or Analog 1,000.00 1.0 1,000.00

Details of NEDA
Advanced Equipmenf* Total Amount (PHP)
Go$ls {PHP} tultiplier
Unmanned Aerial Vehicle (UAV) 100,000/ flight 1.0 100,000/ flight

Drone {vertical takeoff) 5,000/hour 1.0 5,000/hour

Terrestrial Laser Scanner (TLS) 20,000/ station 1.0 20,000/ station

Mobile Mapping Scanner, L|DAR 10.000/kilometer 1.0 10,000/kilometer

Ground Penetrating Radar {GPR) 150,000/day 1.0 150,000/day

** covers
acquisition of data only

President Vice President Executive Secretary Treasurer


Tel # (0917) 3159145 Tel # (0916) 343156 rel # (0919) 4171426 Tel # (0917) s151865
C. Other Project Costs and Rentals

Items RatelCostslcomputations

Survey Vehicle RentaUCost Php3,000.001day

Boat RentaUcost Php5,000.00 / day

---/ Project Office Rental/Cost Php30,000.00/ month


NI
\, Field Officel Staff Quarters
Rental/Cost Php20,000.001 month
\t
\
\\
Travel Cost (Sea, Land & plane) x days of travel
itobilization/ Demobilization Cost plus Survey Parg/s' Billing Rates or
\)
1A% of the Project Cost whichever is higher

Supplies {Monuments, Stakes etc} 10o/o of Project Cost


Miscellaneous Expensesl Clea ring
Cost SVo of Labor Cost

Gontingency 5o/o af Total Project Cost

Taxes l2YoVAf and other government taxes

Profit 20o/a oI Totral Project Cost

Area with Peace and Order lAYo of Total Project Cost (Hazard Pay) & additionat
Problems 10% ot Contract Price (Security Pay)

President Vice President Executive Secretary Treasurer


Tel # ({X117) 3159145 Tel # (0916) 334156 Tel # (0919) 4U1426 Tel # (0917) 515186s
RELOCATION' ORIGINAU RE€URVEY VERIFICATION SURVEYS
'
A. Relocation Survey per LoU Title

0 10 2A 30 40 50 60
< 0.5 20,000
0.5-1.0 30,000 109,000 178,000 238,000 291,000 336,000 385,000
2 38,000 116,000 184,000 244,000 296,000 341,000 389,000
3 46,000 123,000 190,000 250,000 301,000 346,000 393,000
4 54.000 130,000 196,000 256,000 306,000 351,000 397,000
5 62,000 137,000 202,000 256,000 306,000 356,000 401,000
6 70,000 144,000 208,000 262,000 311,000 361,000 405,000
7 78,000 151,000 214,000 268,000 316,000 366,000 409,000
I 86,000 158,000 220,000 274,OOO 321,000 371,000 413,000
I 94,000 165,000 226,000 280.000 326,000 376,000 417,000
10 102,000 172,000 232,OOA 286,000 331,000 381,000 421,000

For area in excess of 70 hectares, add Php4,NN.00/hectare.

Residential Add 50o/o to the above


costs
Commercial Add 150o/o to the
above costs
lndustrial Add 120% to the
above costs
Agricultural Same as above costs lncluding fishponds
lnstitutional lncluding educational, charitable
Same as above costs
institutions
lncluding military & mineral
Government Reservations Same as above costs reservations, national and natural
parks
Add 50% to the above
Forcshore Lands
costs
Forestlands Add 50% to the above lncluding rnangrove areas,
costs marshlands & watershed
Add 50% to the above
Protected Areas
costs
to the above
Ancestrar Domainstlands ff$.**
tixed Use Add 150o/o to the
above costs
Ihrb does not include verification and apprcval fees. Subject to govemment faxes sucfi
as l2YoVAT.

President Vice President Executive Secretary Treasurer


Tel # (0917) 3rs9145 Tel # (0916) 3434156 Tel * (0919) 4171426 Tel # (0917) 51s1865
B. Original Survey per LoU Re-survey per LoU Tifle

< 0.5 40,000


0.5-1.0 60,000 218,000 356,000 476,000 582,000 672,000 770,000
2 76.000 232,AAO 368,000 488,000 592,000 682,000 778,000
3 92,000 246,000 380,000 500,000 602,000 692,000 786,000
4 108,000 260,000 392,000 512,000 612,000 702,000 794,000
5 124,AAO 274,OAA 404,000 512,000 612,000 712,000 802,000
(
\r\t 6 140,000 288,000 416,000 524,000 622,000 722,040 810,000
\ 7 156,000 302,000 428,000 536,000 632,000 732,000 818,000
8 172,OOO 316,000 440,000 548,000 642,000 742,OOO 826,000
U I 188,000 330,000 452,000 560,000 652,000 752,000 834,000
{0 204,000 344,000 464,000 572,O00 662,000 762,OA0 842,000

For area in excess of 70 hectares, add Php8,NW.g0lhectare.

' , ,'.i
':,'ffital" " ,;."-.g$ffH1t+ffi1,::i,:,-'ii,:'.,,,-,,#i;1n1,,',',+**a**i:;.r "" .. . 11...:. l';'i i;:i' ;
- 1"-:- .;1.;'":-i*1:.,:*,.. 1: .:-'

Residential Add 50% to the above costs


Commercial Add 150% to the above costs
lndustrial Add 12Vo/o to the above costs
Agricuttural Same as above costs lncluding fishponds
lnstitutional lncluding educational, charitable
Same as above costs
institutions
lncluding military & mineral
Govemment Reservations Same as above costs reservations, national and natural
parks
Foreshore Lands Add 50% to the above costs
Forestlands Add 50% to the above costs lncluding mangrove areas,
marshlands & watershed
Protected Areas Add 50% to the above costs
Ancestral DomainslLands Add 50% to the above costs
illixed Use Add 150% to the above costs

does not include verification and appraval fees. SubJ'ect to government taxes such
VAT.

President Vice President Executive Secretary Treasurer


Tel # (0917) 315914s Tel # (0916) 34341s6 Tel s (0919) 4u1426 Tel # (0917) s1s186s
G. Verification Survey per LoU Title
--
,\" 0 10 2A 30 40 50 60
,AN
t-_\'l
< 0.5 50,000
75,000 272.500
0.5-1.0 445,000 595,000 727,50Q 840,000 962,s00
1\ 95,000 290,000 460,000 610,000
2 740,000 852,500 972,500
3 115,000 307,500 475,000 625,000 752,500 865,000 982,500
4 135,000 325,000 490,000 640,000 765,000 877,500 992,500
5 155,000 342,500 505,000 640,000 765,000 890,000 1,002,500
.J 6 175,000 360,000 520,000 6s5,000 777,500 902,500 1,012,500
7 195,000 377,500 535,000 670,000 790,000 915,000 1,022,500
\ I 215,000 395,000 550,000 685,000 802,500 927,500 1,032,500
9 235,000 412,504 565,000 700,000 815,000 940,000 1,042,500
\ 10 255,000 430,000 580,000 715,000 827,500 952,500 1,052,500

For area in excess of 7O hectares, add Php10,(No.(N/hectare.

Residential Add 50% to the above costs


Commercial Add 150% to the above costs
lndustrial Add 12Aolo to the above costs
Agricultural Same as above costs lncluding fishponds
lnstitutional lncluding educational, charitable
Same as above costs
institutions
lncluding military & mineral
Government Reservations Same as above costs reservations, national and natural
parks
Foreshore Lands Add 50% to the above costs
Forestlands lncluding mangrove areas,
Add 50% to the above costs
marshlands & watershed
Protected Areas Add 50% to the above costs
Ancestral DomainslLands Add 50% to the above costs
Mixed Use Add 150% to the above costs

Ihis does not include verification and approval fees. Subject to govemment faxes such

(N per Court Appearance.

President Vice President Executive Secretary Treasurer


Tel # (0917) 315914s Tel # (0916) 34347ft Tel # (0919) 417t426 Tel # (09u) 5151865
ilt. SUBDIVISION SURVEYS

?\ A. Residential Subdivision Projects


v\

,\',tl l

l/^\l-\>-
l/-\ v I

t-'\
1't
/
I
4
'ltl 2ta i Php20,000 Php8,500/lot i ln excess of 2 lots
\t\\
,,,
5to9 Php+s,500 Php7,000/lot ln excess of 5 lots

10 to 19 Php5,000/lot ln excess of 10 lots

t__20 to 29 Php120,500 Php4,800/lot ln excess of 20 lots

|
I

30to39 Php178,500 ln excess of 30 lots

40 to 49 Php221,500 i plus ln excess of 40 lots

50 to 99 Php259,500 Php3,300/lot i ln excess of 50 lots


100 to 199 i Php424,500 ! Otus ln excess of 100 lots

200 to 299 i Php704,500 i plus Php2,600/lot ln excess of 200 tots

300 to 399 Php964,500 plus i Php2,400/lot In excess of 300 lots

400 to 499 Php1,204,500 Php2,200/lot ln excess of 400 lots

500 to 999 Php1,424,500


! nlus ln excess of 500lots

1000 & up Php2.42a,500 lptus ienpt,400ilot ln excess of 1000lots

The above cosfs do not include the inspection, verification and approval fees; and subject to
governmenl faxes such as 12% VAT.

The reguired activities prior to subdivision are as follows:

Technical Research
Rel ocati o n/Verifi c ati o n S u rvey
As-built Suwey, if necessary

President Vice President Execubve Secretary Treasurer


Tel # (0917) 3159145 Tel # (0916) 34341s6 rei # (0919) 4171426 rel # (09u) 515186s
B. Agricultural Subdivision Proiecb

\
NO. OF
HECTARES FEES
1 to3 Php15,000 plus Php4,500 in excess of 3 hectare
3to10 Php46,000 plus Php4,000 in excess of 10 hectares
10 to 20 Php86,000 plus Php3,500 in excess of 20 hectares
20 to 30 Php121,000 plus Php3,000 in excess of 30 hectares
30 to 40 Php151,000 plus Php2,500 in excess of 40 hectares
50 to 100 Php276,000 plus Php2,000 in excess of 50 hectares
100 & up Php276,000 plus Php2.000 in excess of 100 hectares

V The abave costs do not include the inspection, verification and approval fees; and subject to
govemmenf faxes such as 12% VAT.

The required activities prior to subdivision are as follows.,

\ 1. TechnicalResearch
2. Relocation/Verification Survey
3. As-built Suwey, if necessary

C. Private and Government lnstitutional Subdivision Projects


NO, OF
FEES
LOTS
1 to9 Php70,000 plus Php6,500 in excess of 2 hectare
10 to 19 Php135,000 plus Php6,000 in excess of 10 hectares
20 to 29 Php195,000 plus Php5,500 in excess of 20 hectares
30 to 39 Php250,000 plus Php5,000 in excess of 30 hectares
40 to 49 Php300,000 plus Php4,500 in excess of 40 hectares \d
50 to 99 Php545,000 plus Php+,OOO in excess of 50 hectares N_,,--r
100 & up Php545,000 plus Php3,500 in excess of 100 hectares

The above cosfs do not iinclude the inspection, verification and approval fees; and subject to
faxes such as 12% VAT.
N)
required activities prior to subdivision are as follows..

1. TechnicalResearch
2. Relocation/Verification Suruey
3. Structural Suruey, if necessary
1. As-built Suruey, if n*essary

President Vice President Executive Secretary Treasurer


Tel # ({)9r7) 3159145 Tel # (0916) 34341fi Tel # (0919) 4171426 Tel # (0917) s15l86s
tv. ENGINEERING SURVEYS

A. Topographic Surveys

Gost per Hectare


Gontour
lnterval First I heetare Succeeding up Succeeding up ln excess to 20
or less to {0 hectares to 20 hectares hectares
0.5 meter Php50.000 Php30,000 Php20.000 Php15,000
1.0 meter Php45,000 Php25,000 Php15,000 Php10.000
2.0 meter Php40.000 Php20,000 Php10,000 Php8,000
5.0 meter Php35,000 Php15,000 Php8,000 Php6,000

For Slope over 18o/o, add 50% of the Total Cost. SuD.lbcf to govemmenf faxes such as
V 12% VAT.

Relocation Survey and Technical Research Required.

Proposed additional activities with topographic surveys:


o Connection to National Bench Mark - MSL
\ . Structural / As-built Survey, if necessary
. Tree Tagging and Geo-tagging

B. Structural/Facilities/Utilities Surveys
Structures/
Facilitiesl Utilities Details of Costing
Php2,000 per structure (footprint only) regardless of dimension
1. For Residential,
for a minimum of 20 structures;
Commercial&
lndustrialAbove
plus Php{,500 per structurc regardless of dimension in excess
Ground Facilities
of 20 structures.

,$
2. For Residential,
Commercial&
Php500,000 per hectare using Ground Penetrating Radar (GPR).
lndustrial Below

\1 Io.
Ground Utilities
3. Trees including
information

,or" Hote/
PhpSOO per tree including information on diameter and other details,

Php3,000 per bore hole/ test pit for a minimum of 5 points;


v\
l-
/ Test Pit
plus the cost of verification of boundaries and of the
mobilization/demobilization.
Php5,000 per pier location;
5. Pier Locations plus the cost of project control establishment and of the

w
mobilization/demobilization.

Subject to govemmenttaxes such as 12% VAT.

President Vice President Exeoftive Secretary Treasurer


Tel # (0917) 3159145 Tel # {0916) 3434155 Td $ (0919) 4171426 Tel # (0917) 5151865
c. Route surveys (Road, Transmission Lines, Pipelines & Railway)

Gost per Kilometer in Php


Activities Iletailed
Engineering Survey Feasibility Study
2Om interual
5&n interual
Road Survey
Centerline Alignment
40,000 25,000

Parcellary Survey*
RuralArea w/ LMS approvaU 30m 180,000 180,000
ROW limit
Vertical ControU Profile
Leveling 30,000 15,000
Cross-Section
15-25m on each side of the 40,000 20,000
centerline at
Road Survey + Vertical Gontrol
/ Profile Leveling + Cross- 80,000 40,000
Section (Sewice Package/KM)

*For Parcdlary Suruey of Urban


Area, add 2f/o of the Totat Cost

Survey Details of Gosting

Phplfl),000 for the first site;


plus Php80,000 per site for succeeding sites up to 5 sites;
plus Php70,000 per site for succeeding sites up to 20 sites.
Bridge Site/
For river survey and new alignment such as inside forest, the
Water Crossing
cost for clearing shall be added
Survey
For a maximum 50m river width.

Not including establishment of Horizontal and Vertical Control.

Above Surueys are subject to govemment taxes such as 12% VAT.

President Vice President Executive Secrebry Treasurer


Tel # (0917) 315914s rel # (0916) 3F.34tft Tel # (819) 4171426 Tel # (0917) 5r5186s
D. Hydrographic Surveys

Subject to govemment taxes such as 12% VAT.

E. Establishment of Geodetic and Project Gontrol Points

Activity Ileteils of Costtoqg


:rEstablishment of Php20,Ofil per point inclusive of monument placement as
1'Geodetic Gontrol Points per NAMRIA Standards
:Establ ishment of Proiect
Php15,000 per point inclusive of monument placement
I Gontrol Points

f r
.tLr"'iJGt to govemmenttaxessuch as 12% vAT.

F. Vertical Gontroll Differential Levelling


Php{0,000.00 per kilorneter, This is subject to govemment taxes such as 12o/oVAT.

President Vice Prsident Executive Secrebry Treasurer


Tel * (Gt17) 3159145 Tel * (0916) 334156 Tel * (@19) 4171426 Tel # (@17) 5151865
V. OTHER SURVEY SERVICES
,,/,
.l
r
A. Mineral Land Surveys
/\t/ Iletails of Gosting
'f.)/\/
- General tineral
land Survey
Php200,000 per lleridional block up to 5 Blocks,
plus Phpl50,000 per teridional block for succeeding blocks
Mineral land
t Php300,000 per ileridional block
Survey for Coal

8{ hectares.
J.',\ Note that One (1) Meridional block is equivalent to approximately

For other mining survey fees, the MGEI approved rates shall apply. The above costs do not
include the cost of relocation survey and verification and approval fees; and subject to
government taxes such as 12o/oYAT.

B. Memorial Park
Php360.00 per lot or 1o/o of the selling cost, whichever is higher. Subject to govemment
taxes such as 12o/oYAT.

C. Consulting Services

Php5,000 per court appearane;


Gourt Appearance
transportation expenses
Joint Survey as Client Observer Php5,000 per day of Survey;
(For third party SurveyV DENR Survey) plus transportation expenses

Joint Survey with Orn Survey Team Php20,000 per day of Survey;
(A Survey Team = lnstrument man & two (2) inclusive of mobilization/
Survey Aides) demobilization costs
Php1,000 per hour (office based)
Minimum of four (4) hours
Consultation Fee (per meeting) lf outside office, add
transportation & representation
e

Retainer for a Survey Team


(A Survey Team = lnstrument man & two (2) Refer to ltem l-A, l-B & lC.
Survey Aides)

All are subiect to government taxes such as I2oloYAT.

President Vice President Executive Secretary Treasurer


Tel # (0917) 3159145 Tel # (0916) 334156 Tel # (0919) 4u1426 rel # (0917) 5r5186s
D. Titling Service/ Property Registration Fees

,/^ For 1 to 4 Lots, the approximate fee is Php20,000.00. Otherwise, the approximate fee is
,(\
II 50% of the total subdivision cost.

Titling fees a/so applies to NHA projects. Sub.pcf to govemment taxes such as 12% VAT.

eN,,'
E. Certification of Geodetic Engineer for CAAP's Height Limitation and Height
Clearance Permit Applications

Structurc Details of Costing

I ( Buildings
Php30,000 per corner minimum of four (4) pointsicorners of
building.;
a

plus Php25,000 per succeeding corner


Fence Php 25,000 per corner minimum of four (4) comers
\\ Tower Antenna
(self-supported or not) Php120,000 per center of the antenna
Series of Electrical
Php25,000 per Posts/Pylons minimum of five (S) posts/pylons
PosUPylons

Subject to government taxes such as 12a/o YAT. Services and docurnents to be rendered
and prepared by a Geodetic Engineer:

For Application for Height Limitation:

Geodetic Coordinates WGS44 Datum) and True Ground Elevation in meters above
mean sea level / Orthometric Height of the site (poinUs of the proposed structure nearest
to the runway). lf the data is from the GPS, the height will be referred with the application
of the EGM2008 geoid model.

b. Copy of Reference Elevation - AMSL I Orthometric Height from known control station of
Bureau of Coast and Geodetic Survey (BCGS) / National Mapping and
I nformation Authority (NAM RIA).

copy of Horizontal control Reference using wcss4 coordinates


Latitude/Longitude from known control station of BCGS/NAMRIA.

d. Location Plan with Vicinity ilap, indicating the Geodetic Position and Elevation of the
proposed site, signed and sealed by a Geodetic Engineer.

Copy of the original field notes, traverse computations and GPS processing notes
including raw data (total station data should be in ASCI format and RINEX format in
GPS), signed and sealed by a Geodetic Engineer.

ln addition, if the proposed site is within the two (2)-km radius of the nearest runway end,
indicate the true ground elevation at the nearest point of the runway and the distances

President Vice President Executive Secretary Treasurer


Tel # (0917) 3r5914s Tel # (m16) 3434156 Tel # (0919) 4171426 Tel # (0917) s1s1855
For Height Clearance Pernrit Application.

a. Elevation Plan of the Proposed Structure (Note: lf in case, the proposed structure is to
be installed/constructed atop of an existing structure, include the height of the existing
structure).

b. All Requirements for Application for Height Limitation

F. Gartography I ttllapping Services

J 1. UAV Mapping Services

Php 3,000 per hectare minimum of 100 hectares includes processing. Subject to
govemment taxes such as 12o/oYAT.
{

2. Mobile and Static Laser tlapping Services

Activity Details of Gosting


Static Laser Services Php100,000 per point, includes processing
ilobile Laser Services Php50,000 per kilometer, includes processing

Subject to government taxes such as 12a/oYAT.

3. Location Plan with Vicinity Map

Residential Php5,000.00 per plan/sheet


Agricultural Php7, 500. 00 per plan/sheet
Phpl 0,000. 00 per plan/sheet
Not for titling. This is subject to govemment taxes such as 12o/aVAT.

4. Digitized Map/Raster Data

Php70,000.00 per Map sheeURaster


Php150,000 per Map sheeVRaster
Php250,000.00 per Map sheeURaster

President Mce President ExeoJtive Secrebry Treasurer


Tel # (il'u) 315914s Tel # (0916) 334156 Tel f (0919) 4171426 Tel # (0917) 515186s
output Formats: DwG, DXF (AutocAD), DGN (tnterGraph), GEN (Arctnfo), MDB
(ArcGlS), SHP (ArcView), MIF (Maplnfo), TOp (Credo), CSy.

Above costs may increase depending on the condition and load of the rasters/
maps and the processing requirements.

This is subject to govemment taxes such as 1Zo/oVAT.

5. Specialty Map ProjecE

tlaps Gosting
. ,A4 Size/ 8.5" x 11'= Php 1,000.00
with Satellite lmage Add Php100.00
Standard Maps
(Map of a pafticular area at any
o A3 Size or 11" x17" = Php 1,500.00
scale and standard labeling.
with Satellite lmage Add Php200.00
\ Satellite image can be used for
additionalcost)
. A0 Size or 36" x 48" = Php 3,000.00
with Satellite lmage Add Php 500.00

o Custom Size = Price is based on size.


Customize tlaps
(it may include data Cost of Standard Maps
manipulation and analyticat plus Hourly Rate of Survey Cartographer
datal
% cost of the Standard/Customized Maps.
Electronic Maps
(for e-mail only) Available file formats are GlF, JPG, PDF, or
TIFF.

The above cost shall prevail provided that the data of area to be mapped is
available.

For area with no available map/rasterlsatellite image, the cost of acquisition


and/or digitization shall be added.

Tax lllapping Services

Approximate Cocting

Survey Team for Tax Mapping


(A Survey Team = Geodetic Php2,500 per hour minimum of t hour per
Engineer/ lnstrument rnan & site/property/lot
two (2) Survey Aides)

Preident Vice President Executive Secretary Treasurer


Tel # (09ui 3159145 Tel # (0916) 3434156 Tel # {0919) 41714?6 Tel # (iP17) 5151865
G. Spatial lnformation Sysbm and lmplementation
/,n s

/\t' ,\/ 1. Total Proiect Gost is composed


Total Cost of SIS Activities:
of Total Cost of Base Mapping Activities plus

rry 2. The required Base Happing Activities prior to SIS Development and
lmplementation are:
o Technical Research
. RelocationA/erificationSurvey
e As-Built Survey
o Structural Survey
\/V I . Acquisition of Map lmage or Raster
o Digitizing and Encoding of Map Data/Raster Data
{t.. 3. The SIS Development and lmplementation activities and costing are as follows:

U SIS Process Costing


System Development
(includes planning, Php 500,000.00 per lnformation System or
technicalresearch and Purpose (ex. Disaster Risk Assessment
developmenf of GiS System, Tax Mapping System, Real Property
platform base on client's Assessment System, Crime Detection System)
reouirement)
System lmplementation
and Customization 30% of the Total SIS Cost
(includes sysfem trial and [or (Cost of System Development i 0.60) x 0.30]
troubleshooting)
System Deployment
and Operations 10% of the Total SIS Cost
(incl udes implementation [or (Cost of System Development / 0.60) x 0.10]
of final system)

Hourly Rates of Geodetic Engineers/ GIS


Technology Transfer Operators
and Supporl (includes r For training - minimum of 40 hours (or
users' trainings with
five (5) days)
manual and afrersales
support) . For Support - minimum of two (2) hours
per Assistance

4. There is an additional cost for acquisition of GIS Software. Moreover, the above
costs may increase depending on the condition and load of the data, the
processing and the system requirements.

President Vice hesident ftecutive Secretary Treasurer


Tel # ((x,I4 3159145 Tel # (0916) 3434156 Tei # ($r9) 4171426 Tel # (0917) 515186s
H. Photogrammetry and Remote Sensing/lmage processing

1. Aerial Photography Acquisition and Processing


,,1tt t
i1d' I Type of tap Gosting
\-/ Php 3,0fi) per hectare minimum of 100 hectares includes
'/ Aerial Digital Camera processing and printing of Photos.

Subject to govemment taxes such as 12o/oVAT


Php 4,000 per hectare minimum of 100 hectares includes,
LiDAR processing and printing of Photos.
l'. /
u^ Subject to govemment taxes such as 12o/oYAT
'I The required Base Mapping Activities (at additional costs) prior to Aerial Photography
Acquisition:
r Technical Research
\ o RelocationA/erificationSurvey
. Flight planning and GCP surveys

Aerial Phoio/lmage Processing and Mapping (at additional costs) includes:


. ScanninglDigitizing
. Aero-triangulation
. planimetric mapping
. Digitalelevation and terrain modelling (DEM/DTM)
. Map editing
. Digital orthophoto mosaics
Please refer to proposed rates on Satellite lmage Processing for minimum costing.

2. Satellite lmage Processing

Process Gosting
lmage Rectification and
Php100,000.00 per Satellite lmage
Restoration
lmage Enhancement and
Php150,000.00 per Satellite lmage
Specialized analysis

lnformation extraction Refer to ltem F.4 or "Digitized Map/Raster Data"

Above cosf does not include acquisition of satellite images. subJ'ecf to


governmenf faxes such as 12% VAT

N
President Vice President Executive Secretary Treasurer
Tel # (0917) 315914s Tel # (0916) 34Y7% Tei * (0919) 4171426 Tel # (0917) s1s1865