PROYECTO: AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS EN LA I.E. CRUZ PAMPA, EN EL CASERÍO DE CRUZ PAMPA, DISTRITO DE ANGASMARCA, PROVINCIA DE SANTIAGO DE CHUCO – LA LIBERTAD”
ENTIDAD MUNICIPALIDAD DISTRITAL DE ANGASMARCA MONTO INVERSION s/. : 811,690.12
DIST. ANGASMARCA
PROV: SANTIAGO DE CHUCO
FECHA: 17-Dec-14 Residente de Obra : Ing. OSCAR O. REYES FLORES Supervisor de Obra : Ing. VICTOR COBADIS ROMERO RIVEROS
03.03.04 FALSO PISO DE CONCRETO E=3" F'C=140 kg/cm2 / INCL. DURMIENTES m2 51.15 44.28 2,264.92 0.00 0.00 0.00 0.00 0.00 0.00 51.15 2,264.92 0.00%
03.03.05 CONCRETO EN CUNETAS FC 175KG/CM2 m3 4.03 282.60 1,138.88 0.00 0.00 0.00 0.00 0.00 0.00 4.03 1,138.88 0.00%
03.03.06 ENCOFRADO DE CUNETAS m2 19.34 42.88 829.30 0.00 0.00 0.00 0.00 0.00 0.00 19.34 829.30 0.00%
3.04 OBRAS DE CONCRETO ARMADO ESTRUCTURAL
3.04.01 ZAPATAS
03.04.01.01 CONCRETO EN ZAPATAS F'C=210 KG/CM2 m3 7.38 431.54 3,184.77 0.00 0.00 0.00 0.00 0.00 0.00 7.38 3,184.77 0.00%
03.04.01.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 213.28 6.34 1,352.20 0.00 0.00 0.00 0.00 0.00 0.00 213.28 1,352.20 0.00%
3.04.02 VIGAS DE CIMENTACION
03.04.02.01 CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2 m3 2.14 448.93 960.71 0.00 0.00 0.00 0.00 0.00 0.00 2.14 960.71 0.00%
03.04.02.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 158.10 6.34 1,002.35 0.00 0.00 0.00 0.00 0.00 0.00 158.10 1,002.35 0.00%
03.04.02.03 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACION m2 17.10 71.64 1,225.04 0.00 0.00 0.00 0.00 0.00 0.00 17.10 1,225.04 0.00%
3.04.03 SOBRECIMIENTO ARMADO
03.04.03.01 ACERO FY=4200 KG/CM2 GRADO 60 kg 158.10 6.34 1,002.35 0.00 0.00 0.00 0.00 0.00 0.00 158.10 1,002.35 0.00%
3.04.04 COLUMNAS
03.04.04.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 2.13 541.94 1,154.33 0.00 0.00 0.00 0.00 0.00 0.00 2.13 1,154.33 0.00%
03.04.04.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 507.51 6.34 3,217.61 0.00 0.00 0.00 0.00 0.00 0.00 507.51 3,217.61 0.00%
03.04.04.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 24.65 67.12 1,654.51 0.00 0.00 0.00 0.00 0.00 0.00 24.65 1,654.51 0.00%
3.04.05 VIGAS
03.04.05.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 3.37 454.60 1,532.00 0.00 0.00 0.00 0.00 0.00 0.00 3.37 1,532.00 0.00%
03.04.05.02 ACERO fy=4200 kg/cm2 GRADO 60 kg 597.24 6.42 3,834.28 0.00 0.00 0.00 0.00 0.00 0.00 597.24 3,834.28 0.00%
03.04.05.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 28.09 78.23 2,197.48 0.00 0.00 0.00 0.00 0.00 0.00 28.09 2,197.48 0.00%
3.04.06 COLUMNETAS DE AMARRE
03.04.06.01 CONCRETO EN COLUMNETAS DE AMARRE F'C=175 KG/CM2 m3 0.55 470.02 258.51 0.00 0.00 0.00 0.00 0.00 0.00 0.55 258.51 0.00%
03.04.06.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 71.75 6.34 454.90 0.00 0.00 0.00 0.00 0.00 0.00 71.75 454.90 0.00%
03.04.06.03 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS DE AMARRE m2 7.36 37.04 272.61 0.00 0.00 0.00 0.00 0.00 0.00 7.36 272.61 0.00%
3.04.07 VIGUETAS DE AMARRE
03.04.07.01 CONCRETO EN VIGUETAS DE AMARRE F'C=175 KG/CM2 m3 0.88 407.54 358.64 0.00 0.00 0.00 0.00 0.00 0.00 0.88 358.64 0.00%
03.04.07.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 64.90 6.34 411.47 0.00 0.00 0.00 0.00 0.00 0.00 64.90 411.47 0.00%
03.04.07.03 ENCOFRADO Y DESENCOFRADO EN VIGUETAS DE AMARRE m2 8.81 37.04 326.32 0.00 0.00 0.00 0.00 0.00 0.00 8.81 326.32 0.00%
3.05 ESTRUCTURAS DE MADERA (TIJERALES)
03.04.01 TIJERAL DE MADERA SEGUN DISEÑO UND 3.00 2,331.08 6,993.24 0.00 0.00 0.00 0.00 0.00 0.00 3.00 6,993.24 0.00%
03.04.02 CORREAS DE MADERA TORNILLO DE 2"x3". UND 12.00 302.09 3,625.08 0.00 0.00 0.00 0.00 0.00 0.00 12.00 3,625.08 0.00%
03.04.03 ANCLAJE DE TIJERAL DE MADERA UND 6.00 1,004.25 6,025.50 0.00 0.00 0.00 0.00 0.00 0.00 6.00 6,025.50 0.00%
03.04.04 COBERTURA ARTICULADA TIPO TEJA ANDINA m2 89.10 51.94 4,627.85 0.00 0.00 0.00 0.00 0.00 0.00 89.10 4,627.85 0.00%
03.04.05 CUMBRERA ARTICULADA TIPO TEJA ANDINA m 9.90 41.13 407.19 0.00 0.00 0.00 0.00 0.00 0.00 9.90 407.19 0.00%
3.06 PRUEBAS DE LABORATORIO
03.06.01 UND 18.00 42.02 756.36 0.00 0.00 0.00 0.00 0.00 0.00 18.00 756.36 0.00%
PRUEBA DE CONTROL DE CALIDAD DE CONCRETO (PRUEBA A LA
COMPRESION)
4.00 ESTRUCTURAS-CERCO PERIMETRICO
4.01 OBRAS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO MANUAL m2 208.21 2.47 514.28 208.21 514.28 0.00 0.00 208.21 514.28 0.00 0.00 100.00%
04.01.02 TRAZO NIVELACION Y REPLANTEO PRELIMINAR m2 208.21 4.11 855.74 208.21 855.74 0.00 0.00 208.21 855.74 0.00 0.00 100.00%
04.01.03 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 208.21 8.19 1,705.24 80.00 655.20 128.21 1,050.04 208.21 1,705.24 0.00 0.00 100.00%
4.02 MOVIMIENTO DE TIERRAS
04.02.01 m3 182.99 28.10 5,142.02 43.00 1,208.30 139.99 3,933.72 182.99 5,142.02 0.00 0.00 100.00%
EXCAVACION PARA CIMIENTOS HASTA 0.70M DE PROFUNDIDAD EN
TERRENO NORMAL
04.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPO LIVIANO m3 157.36 17.36 2,731.77 0.00 0.00 157.36 2,731.77 157.36 2,731.77 0.00 0.00 100.00%
04.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=30M m3 33.79 18.73 632.89 0.00 0.00 33.79 632.89 33.79 632.89 0.00 0.00 100.00%
4.03 OBRAS DE CONCRETO SIMPLE
04.03.01 SOLADOS CONCRETO C:H -1:10, E=4" PARA ZAPATAS m2 208.21 34.43 7,168.67 0.00 0.00 208.21 7,168.67 208.21 7,168.67 0.00 0.00 100.00%
04.03.02 CONCRETO PARA CIMIENTOS CORRIDOS C:H-1:10 + 30% P.G. m3 145.75 232.29 33,856.27 0.00 0.00 145.75 33,856.27 145.75 33,856.27 0.00 0.00 100.00%
04.03.03 CONCRETO PARA SOBRECIMIENTOS C:H-1:8 + 25%P.M. m3 37.23 307.69 11,455.30 0.00 0.00 37.23 11,455.30 37.23 11,455.30 0.00 0.00 100.00%
04.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS H=50CM. m2 496.44 76.38 37,918.09 0.00 0.00 496.44 37,918.09 496.44 37,918.09 0.00 0.00 100.00%
4.04 OBRAS DE CONCRETO ARMADO
4.04.01 SOBRECIMIENTO ARMADO
04.04.01.01 ACERO FY=4200 KG/CM2 GRADO 60 kg 1,930.97 6.34 12,242.35 0.00 0.00 1,930.97 12,242.35 1,930.97 12,242.35 0.00 0.00 100.00%
4.04.02 COLUMNAS
04.04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 9.45 497.51 4,701.47 0.00 0.00 7.56 3,761.18 7.56 3,761.18 1.89 940.29 80.00%
04.04.02.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 1,510.20 6.34 9,574.67 0.00 0.00 1,510.20 9,574.67 1,510.20 9,574.67 0.00 0.00 100.00%
04.04.02.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 126.00 67.12 8,457.12 0.00 0.00 100.80 6,765.70 100.80 6,765.70 25.20 1,691.42 80.00%
4.04.03 VIGAS
04.04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 87.36 497.51 43,462.47 0.00 0.00 52.42 26,077.48 52.42 26,077.48 34.94 17,384.99 60.00%
04.04.03.02 ACERO fy=4200 kg/cm2 GRADO 60 kg 1,573.61 6.42 10,102.58 0.00 0.00 944.17 6,061.55 944.17 6,061.55 629.44 4,041.03 60.00%
04.04.03.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 173.51 78.23 13,573.69 0.00 0.00 104.11 8,144.21 104.11 8,144.21 69.40 5,429.47 60.00%
5.00 FLETE TERRESTRE
5.01 FLETE TERRESTRE TRUJILLO A CRUZ PAMPA kg 111,307.41 0.15 16,696.11 44,522.96 6,678.44 66,784.45 10,017.67 111,307.41 16,696.11 0.00 0.00 100.00%
1.00 ARQUITECTURA- 01 AULA
1.01 MUROS Y TABIQUES DE ALBAÑILERIA
01.01.01 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA JUN m2 116.61 61.24 7,141.20 42.68 2,613.72 60.00 3,674.40 102.68 6,288.12 13.93 853.07 88.05%
1.02 REVOQUES ENLUCIDOS Y MOLDURAS
01.02.01 TARRAJEO EN MUROS EXTERIORES CON C:A 1:5 E = 1.50cm m2 98.74 39.64 3,914.05 0.00 0.00 0.00 0.00 0.00 0.00 98.74 3,914.05 0.00%
01.02.02 TARRAJEO EN MUROS INTERIORES CON C:A 1:5 E = 1.50cm m2 125.65 35.98 4,520.89 0.00 0.00 0.00 0.00 0.00 0.00 125.65 4,520.89 0.00%
01.02.03 TARRAJEO EN COLUMNAS CON C:A 1:5 E = 1.50cm m2 55.04 32.12 1,767.88 0.00 0.00 0.00 0.00 0.00 0.00 55.04 1,767.88 0.00%
01.02.04 TARRAJEO EN VIGAS CON C:A 1:5 E = 1.50cm m2 66.62 47.33 3,153.12 0.00 0.00 0.00 0.00 0.00 0.00 66.62 3,153.12 0.00%
01.02.05 TARRAJEO DE ESCALERAS m2 23.78 34.20 813.28 0.00 0.00 0.00 0.00 0.00 0.00 23.78 813.28 0.00%
01.02.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m 13.09 14.06 184.05 0.00 0.00 0.00 0.00 0.00 0.00 13.09 184.05 0.00%
01.02.07 BRUÑAS 1" m 158.15 1.25 197.69 0.00 0.00 0.00 0.00 0.00 0.00 158.15 197.69 0.00%
1.03 CIELORRASOS
CIELORRASO DE TRIPLAY DE 4.00mm ENTRAMADO DE MADERA TORNILLO
129.74
01.03.01 DE 2" x 2" x 10´ m2 52.88 6,860.65 0.00 0.00 0.00 0.00 0.00 0.00 129.74 6,860.65 0.00%
01.03.02 FRISO DE MADERA TORNILLO DE 1" x 8" x 10´ m2 7.54 24.45 184.35 0.00 0.00 0.00 0.00 0.00 0.00 7.54 184.35 0.00%
1.04 PISOS Y PAVIMENTOS
01.04.01 PISO DE CONCRETO E=4", PULIDO, BRUÑADO Y COLOREADO m2 112.25 40.73 4,571.94 0.00 0.00 0.00 0.00 0.00 0.00 112.25 4,571.94 0.00%
1.05 ZOCALOS Y CONTRAZOCALOS
01.05.01 74.09 12.35 915.01 0.00 0.00 0.00 0.00 0.00 0.00 74.09 915.01 0.00%
ZOCALO DE CEMENTO S/COLOREAR H= 30cm PULIDO E= 2.00cm MEZCLA 1:5
C:A m
1.06 CARPINTERIA DE MADERA
01.06.01 PUERTA APANELADA DE MADERA TORNILLO S.D INC. INSTALACION UND 2.00 754.00 1,508.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,508.00 0.00%
01.06.02 TICERO DE MADERA CEDRO (L=3.10m) BARNIZADO UND 2.00 70.00 140.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 140.00 0.00%
1.07 CARPINTERIA METALICA
01.07.01 VENTANAS DE ALUMINIO SEGUN DISEÑ0 m2 23.32 198.55 4,630.19 0.00 0.00 0.00 0.00 0.00 0.00 23.32 4,630.19 0.00%
01.07.02 REJILLA METALICA FIJA UND 2.00 112.98 225.96 0.00 0.00 0.00 0.00 0.00 0.00 2.00 225.96 0.00%
01.07.03 PASAMANO DE ACERO TUBO DE 2" m 22.00 96.79 2,129.38 0.00 0.00 0.00 0.00 0.00 0.00 22.00 2,129.38 0.00%
01.07.04 CANTONERA PARA ESCALERA SEGUN PLANOS m 25.00 20.95 523.75 0.00 0.00 0.00 0.00 0.00 0.00 25.00 523.75 0.00%
1.08 CERRAJERIA
01.08.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" PZA 6.00 29.55 177.30 0.00 0.00 0.00 0.00 0.00 0.00 6.00 177.30 0.00%
01.08.02 CHAPA DE PARCHE DE TRES GOLPES PZA 2.00 88.20 176.40 0.00 0.00 0.00 0.00 0.00 0.00 2.00 176.40 0.00%
1.09 VIDRIOS, CRISTALES Y SIMILARES
01.09.01 VIDRIO SEMIDOBLE TRANSPARENTE p2 363.53 5.46 1,984.87 0.00 0.00 0.00 0.00 0.00 0.00 363.53 1,984.87 0.00%
1.10 PINTURA
01.10.01 PINTURA LATEX EN MUROS EXTERIORES C/LATEX LAVABLE m2 98.74 10.32 1,019.00 0.00 0.00 0.00 0.00 0.00 0.00 98.74 1,019.00 0.00%
01.10.02 PINTURA LATEX EN MUROS INTERIORES C/LATEX LAVABLE m2 137.27 7.19 986.97 0.00 0.00 0.00 0.00 0.00 0.00 137.27 986.97 0.00%
01.10.03 PINTURA EN COLUMNAS C/LATEX LAVABLE m2 55.04 8.52 468.94 0.00 0.00 0.00 0.00 0.00 0.00 55.04 468.94 0.00%
01.10.04 PINTURA EN VIGAS C/LATEX LAVABLE m2 66.62 8.79 585.59 0.00 0.00 0.00 0.00 0.00 0.00 66.62 585.59 0.00%
01.10.05 PINTURA EN DERRAMES C/LATEX LAVABLE m 13.09 2.18 28.54 0.00 0.00 0.00 0.00 0.00 0.00 13.09 28.54 0.00%
01.10.06 PINTURA OLEO MATE EN CIELORRASO DE TRIPLAY m2 129.74 9.77 1,267.56 0.00 0.00 0.00 0.00 0.00 0.00 129.74 1,267.56 0.00%
01.10.07 PINTURA EN PIZARRA m2 7.40 12.77 94.50 0.00 0.00 0.00 0.00 0.00 0.00 7.40 94.50 0.00%
01.10.08 PINTURA EN FRISO DE MADERA m2 7.34 12.62 92.63 0.00 0.00 0.00 0.00 0.00 0.00 7.34 92.63 0.00%
01.10.09 PINTURA ESMALTE EN ZOCALO DE CEMENTO H= 30cm EXTERIOR m 74.09 5.66 419.35 0.00 0.00 0.00 0.00 0.00 0.00 74.09 419.35 0.00%
01.10.10 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 5.20 16.18 84.14 0.00 0.00 0.00 0.00 0.00 0.00 5.20 84.14 0.00%
01.10.11 PINTURA ESMALTE EN BRUÑAS DE 1" m 158.15 2.86 452.31 0.00 0.00 0.00 0.00 0.00 0.00 158.15 452.31 0.00%
1.11 VARIOS
01.11.11 JUNTAS SISMICA 1" m 4.46 5.00 22.30 0.00 0.00 0.00 0.00 0.00 0.00 4.46 22.30 0.00%
1.12 SISTEMA DE AGUA FRIA
1.12.01 TUBERIAS Y ACCESORIOS
01.12.01.01 RED DE DERIVACION PVC SAL PARA DESAGUE PLUVIAL DE 3" m 24.05 16.31 392.26 0.00 0.00 0.00 0.00 0.00 0.00 24.05 392.26 0.00%
01.12.01.02 CODO PVC-SAP 3" * 90 UND 7.00 13.20 92.40 0.00 0.00 0.00 0.00 0.00 0.00 7.00 92.40 0.00%
01.12.01.03 CANALETA SEMICIRCULAR GALVANIZADA DE e=1/27" m 39.22 16.46 645.56 0.00 0.00 0.00 0.00 0.00 0.00 39.22 645.56 0.00%
01.12.01.04 SOPORTE DE CANALETA UND 25.00 3.89 97.25 0.00 0.00 0.00 0.00 0.00 0.00 25.00 97.25 0.00%
01.12.01.05 ABRAZADERA PARA CANALETA UND 13.00 19.54 254.02 0.00 0.00 0.00 0.00 0.00 0.00 13.00 254.02 0.00%
01.12.01.06 ENCOFRADO Y DESENCOFRADO EN FALSA COLUMNA m2 9.79 37.04 362.62 0.00 0.00 0.00 0.00 0.00 0.00 9.79 362.62 0.00%
01.12.01.07 CONCRETO EN FALSALSA COLUMNA FC 140KG/CM2 m3 0.67 393.71 263.79 0.00 0.00 0.00 0.00 0.00 0.00 0.67 263.79 0.00%
01.12.01.08 TARRAJEO EN FALSA COLUMNA C:A 1:5 E=1.50cm m2 8.14 28.92 235.41 0.00 0.00 0.00 0.00 0.00 0.00 8.14 235.41 0.00%
01.12.01.09 PINTURA EN FALSA COLUMNA m2 8.14 8.52 69.35 0.00 0.00 0.00 0.00 0.00 0.00 8.14 69.35 0.00%
2.00 ARQUITECTURA- ADMINISTRACION
2.01 MUROS Y TABIQUES DE ALBAÑILERIA
02.01.01 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE CABEZA J m2 38.57 104.35 4,024.78 0.00 0.00 0.00 0.00 0.00 0.00 38.57 4,024.78 0.00%
02.01.02 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA JUN m2 20.77 61.24 1,271.95 0.00 0.00 0.00 0.00 0.00 0.00 20.77 1,271.95 0.00%
2.02 REVOQUES ENLUCIDOS Y MOLDURAS
02.02.01 TARRAJEO EN MUROS EXTERIORES CON C:A 1:5 E = 1.50cm m2 58.30 39.64 2,311.01 0.00 0.00 0.00 0.00 0.00 0.00 58.30 2,311.01 0.00%
02.02.02 TARRAJEO EN MUROS INTERIORES CON C:A 1:5 E = 1.50cm m2 61.21 35.98 2,202.34 0.00 0.00 0.00 0.00 0.00 0.00 61.21 2,202.34 0.00%
02.02.03 TARRAJEO EN COLUMNAS CON C:A 1:5 E = 1.50cm m2 10.37 32.12 333.08 0.00 0.00 0.00 0.00 0.00 0.00 10.37 333.08 0.00%
02.02.04 TARRAJEO EN VIGAS CON C:A 1:5 E = 1.50cm m2 25.90 47.33 1,225.85 0.00 0.00 0.00 0.00 0.00 0.00 25.90 1,225.85 0.00%
02.02.05 TARRAJEO EN PESTAÑAS CON C:A 1:5 E = 1.50cm m2 8.05 47.33 381.01 0.00 0.00 0.00 0.00 0.00 0.00 8.05 381.01 0.00%
02.02.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m 33.80 14.06 475.23 0.00 0.00 0.00 0.00 0.00 0.00 33.80 475.23 0.00%
02.02.07 FROTACHADO EN CUNETAS CON C:A 1:5 E = 1.50cm CON IMPERMEABILIZANT m2 36.51 32.88 1,200.45 0.00 0.00 0.00 0.00 0.00 0.00 36.51 1,200.45 0.00%
02.02.08 BRUÑAS DE 1/2" m 263.22 1.25 329.03 0.00 0.00 0.00 0.00 0.00 0.00 263.22 329.03 0.00%
02.02.09 BRUÑAS 3/4" m 50.98 1.25 63.73 0.00 0.00 0.00 0.00 0.00 0.00 50.98 63.73 0.00%
2.03 CIELORRASO
02.03.01 m2 81.83 52.88 4,327.17 0.00 0.00 0.00 0.00 0.00 0.00 81.83 4,327.17 0.00%
CIELORRASO DE TRIPLAY DE 4.00mm ENTRAMADO DE MADERA TORNILLO
DE 2" x 2" x 10´
02.03.02 FRISO DE MADERA TORNILLO DE 1" x 8" x 10´ m2 5.84 24.45 142.79 0.00 0.00 0.00 0.00 0.00 0.00 5.84 142.79 0.00%
2.04 PISOS Y PAVIMENTOS
02.04.01 PISO MACHIEMBRADO m2 66.00 38.11 2,515.26 0.00 0.00 0.00 0.00 0.00 0.00 66.00 2,515.26 0.00%
02.04.02 VEREDA DE CONCRETO f'c= 175 kg/cm2 H=0.10M m2 34.21 57.94 1,982.13 0.00 0.00 0.00 0.00 0.00 0.00 34.21 1,982.13 0.00%
02.04.03 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 4.81 76.38 367.39 0.00 0.00 0.00 0.00 0.00 0.00 4.81 367.39 0.00%
2.05 ZOCALOS Y CONTRAZOCALOS
02.05.01 ZOCALO DE CEMENTO S/COLOREAR H= 30cm PULIDO E= 2.00cm MEZCLA 1:5 C m 30.51 12.35 376.80 0.00 0.00 0.00 0.00 0.00 0.00 30.51 376.80 0.00%
02.05.02 CONTRAZOCALO DE MADERA CEDRO DE 4" RODON 1" m 28.23 79.85 2,254.17 0.00 0.00 0.00 0.00 0.00 0.00 28.23 2,254.17 0.00%
2.06 CARPINTERIA DE MADERA
02.06.01 PUERTA APANELADA DE MADERA TORNILLO S.D INC. INSTALACION UND 1.00 754.00 754.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 754.00 0.00%
02.06.02 PUERTA CONTRAPLACADA DE MADERA TORNILLO SEGUN DISEÑO INCL. INST UND 2.00 380.00 760.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 760.00 0.00%
02.06.03 TABIQUERIA DE MELAMINE DE 1" m2 22.50 183.03 4,118.18 0.00 0.00 0.00 0.00 0.00 0.00 22.50 4,118.18 0.00%
2.07 CARPINTERIA METALICA
02.07.01 VENTANAS DE ALUMINIO SEGUN DISEÑ0 m2 6.32 198.55 1,254.84 0.00 0.00 0.00 0.00 0.00 0.00 6.32 1,254.84 0.00%
02.07.02 REJILLA METALICA FIJA UND 1.00 112.98 112.98 0.00 0.00 0.00 0.00 0.00 0.00 1.00 112.98 0.00%
2.08 CERRAJERIA
02.08.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" pza 10.00 29.55 295.50 0.00 0.00 0.00 0.00 0.00 0.00 10.00 295.50 0.00%
02.08.02 CHAPA DE PARCHE DE TRES GOLPES pza 3.00 88.20 264.60 0.00 0.00 0.00 0.00 0.00 0.00 3.00 264.60 0.00%
02.08.03 MANIJA DE BRONCE DE 4" PARA PUERTAS pza 3.00 64.25 192.75 0.00 0.00 0.00 0.00 0.00 0.00 3.00 192.75 0.00%
2.09 VIDRIOS, CRISTALES Y SIMILARES
02.09.01 VIDRIO SEMIDOBLE TRANSPARENTE p2 88.58 5.46 483.65 0.00 0.00 0.00 0.00 0.00 0.00 88.58 483.65 0.00%
2.10 PINTURA
02.10.01 PINTURA LATEX EN MUROS EXTERIORES C/LATEX LAVABLE m2 58.30 10.32 601.66 0.00 0.00 0.00 0.00 0.00 0.00 58.30 601.66 0.00%
02.10.02 PINTURA LATEX EN MUROS INTERIORES C/LATEX LAVABLE m2 61.21 7.19 440.10 0.00 0.00 0.00 0.00 0.00 0.00 61.21 440.10 0.00%
02.10.03 PINTURA EN COLUMNAS C/LATEX LAVABLE m2 10.37 8.52 88.35 0.00 0.00 0.00 0.00 0.00 0.00 10.37 88.35 0.00%
02.10.04 PINTURA EN COLUMNETAS C/LATEX LAVABLE m2 3.12 8.52 26.58 0.00 0.00 0.00 0.00 0.00 0.00 3.12 26.58 0.00%
02.10.05 PINTURA EN VIGAS C/LATEX LAVABLE m2 25.90 8.79 227.66 0.00 0.00 0.00 0.00 0.00 0.00 25.90 227.66 0.00%
02.10.06 PINTURA EN PESTAÑAS C/LATEX LAVABLE m2 8.05 8.79 70.76 0.00 0.00 0.00 0.00 0.00 0.00 8.05 70.76 0.00%
02.10.07 PINTURA EN DERRAMES C/LATEX LAVABLE m 40.20 2.18 87.64 0.00 0.00 0.00 0.00 0.00 0.00 40.20 87.64 0.00%
02.10.08 PINTURA OLEO MATE EN CIELORRASO DE TRIPLAY m2 77.79 9.77 760.01 0.00 0.00 0.00 0.00 0.00 0.00 77.79 760.01 0.00%
02.10.09 PINTURA EN FRISO DE MADERA m2 3.90 12.62 49.22 0.00 0.00 0.00 0.00 0.00 0.00 3.90 49.22 0.00%
02.10.10 PINTURA ESMALTE EN ZOCALO DE CEMENTO H= 30cm EXTERIOR m 30.51 5.66 172.69 0.00 0.00 0.00 0.00 0.00 0.00 30.51 172.69 0.00%
02.10.11 PINTURA BARNIZ EN CONTRAZOCALO DE MADERA DE CEDRO 4" CON RODON m 28.23 16.18 456.76 0.00 0.00 0.00 0.00 0.00 0.00 28.23 456.76 0.00%
02.10.12 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 10.20 16.18 165.04 0.00 0.00 0.00 0.00 0.00 0.00 10.20 165.04 0.00%
02.10.13 PINTURA ESMALTE EN BRUÑAS 1/2" m 263.22 2.86 752.81 0.00 0.00 0.00 0.00 0.00 0.00 263.22 752.81 0.00%
02.10.14 PINTURA ESMALTE EN BRUÑAS DE MUROS EXTERIORES 3/4" m 50.98 2.86 145.80 0.00 0.00 0.00 0.00 0.00 0.00 50.98 145.80 0.00%
2.11 VARIOS
02.11.01 JUNTAS DE DILATACION m 7.10 5.00 35.50 0.00 0.00 0.00 0.00 0.00 0.00 7.10 35.50 0.00%
02.11.02 JUNTAS SISMICA 1" m 18.55 5.00 92.75 0.00 0.00 0.00 0.00 0.00 0.00 18.55 92.75 0.00%
2.12 SISTEMA DE AGUA FRIA
2.12.01 TUBERIAS Y ACCESORIOS
02.12.01.01 RED DE DERIVACION PVC SAL PARA DESAGUE PLUVIAL DE 3" m 22.00 16.31 358.82 0.00 0.00 0.00 0.00 0.00 0.00 22.00 358.82 0.00%
02.12.01.02 CODO PVC-SAP 3" * 90 und 12.00 13.20 158.40 0.00 0.00 0.00 0.00 0.00 0.00 12.00 158.40 0.00%
02.12.01.03 CANALETA SEMICIRCULAR GALVANIZADA DE e=1/27" m 19.50 16.46 320.97 0.00 0.00 0.00 0.00 0.00 0.00 19.50 320.97 0.00%
02.12.01.04 SOPORTE DE CANALETA und 16.00 3.89 62.24 0.00 0.00 0.00 0.00 0.00 0.00 16.00 62.24 0.00%
02.12.01.05 ABRAZADERA PARA CANALETA und 20.00 19.54 390.80 0.00 0.00 0.00 0.00 0.00 0.00 20.00 390.80 0.00%
02.12.01.06 ENCOFRADO Y DESENCOFRADO EN FALSA COLUMNA m2 4.95 37.04 183.35 0.00 0.00 0.00 0.00 0.00 0.00 4.95 183.35 0.00%
02.12.01.07 CONCRETO EN FALSALSA COLUMNA FC 140KG/CM2 m3 0.34 393.71 133.86 0.00 0.00 0.00 0.00 0.00 0.00 0.34 133.86 0.00%
02.12.01.08 TARRAJEO EN FALSA COLUMNA C:A 1:5 E=1.50cm m2 4.95 28.92 143.15 0.00 0.00 0.00 0.00 0.00 0.00 4.95 143.15 0.00%
02.12.01.09 PINTURA EN FALSA COLUMNA m3 4.95 8.52 42.17 0.00 0.00 0.00 0.00 0.00 0.00 4.95 42.17 0.00%
3.00 ARQUITECTURA- CERCO PERIMETRICO
3.01 MUROS Y TABIQUES DE ALBAÑILERIA
03.01.01 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA JUN m2 787.5 61.24 48,226.50 0.00 0.00 472.50 28,935.90 472.50 28,935.90 315.00 19,290.60 60.00%
3.02 REVOQUES ENLUCIDOS
03.02.01 TARRAJEO EN MUROS EXTERIORES CON C:A 1:5 E = 1.50cm m2 496.44 39.64 19,678.88 0.00 0.00 0.00 0.00 0.00 0.00 496.44 19,678.88 0.00%
03.02.02 TARRAJEO EN COLUMNAS CON C:A 1:5 E = 1.50cm m2 126.00 32.12 4,047.12 0.00 0.00 0.00 0.00 0.00 0.00 126.00 4,047.12 0.00%
03.02.03 TARRAJEO EN VIGAS CON C:A 1:5 E = 1.50cm m2 225.56 47.33 10,675.75 0.00 0.00 0.00 0.00 0.00 0.00 225.56 10,675.75 0.00%
3.03 CARPINTERIA METALICA
03.03.01 PORTON METALICO 3.50m x 3.00m und 1.00 3,500.00 3,500.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 3,500.00 0.00%
3.04 PINTURA
03.04.01 PINTURA EN COLUMNAS C/LATEX LAVABLE m2 126.00 8.52 1,073.52 0.00 0.00 0.00 0.00 0.00 0.00 126.00 1,073.52 0.00%
03.04.02 PINTURA EN VIGAS C/LATEX LAVABLE m2 225.56 8.79 1,982.67 0.00 0.00 0.00 0.00 0.00 0.00 225.56 1,982.67 0.00%
3.05 VARIOS
03.05.01 JUNTAS DE DILATACION m 630.00 5.00 3,150.00 0.00 0.00 0.00 0.00 0.00 0.00 630.00 3,150.00 0.00%
4.00 FLETE TERRESTRE
4.01 FLETE TERRESTRE TRUJILLO A CRUZ PAMPA kg 173,674.98 0.15 26,051.25 34,735.00 5,210.25 138,939.98 20,841.00 173,674.98 26,051.25 0.00 0.00 100.00%
5.00 EQUIPAMIENTO Y MOBILIARIO
5.01 MOBILIARIO DE COLEGIO (ESCRITORIOS,CARPETAS,COMPUTADORAS) glb 1.00 5,000.00 5,000.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 5,000.00 0.00%
1.00 INSTALACIONES ELECTRICAS - 01 AULA
1.01 SISTEMA ELECTRICO
1.01.01 SALIDA DE TECHO PARA CENTRO DE LUZ pto 10.00 63.96 639.60 0.00 0.00 0.00 0.00 0.00 0.00 10.00 639.60 0.00%
1.01.02 SALIDA DE TECHO PARA SPOT LIGHT pto 4.00 54.26 217.04 0.00 0.00 0.00 0.00 0.00 0.00 4.00 217.04 0.00%
1.01.03 SALIDA DE PARED PARA INTERRUPTOR SIMPLE pto 2.00 47.00 94.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 94.00 0.00%
1.01.04 SALIDA DE PARED PARA INTERRUPTOR DOBLE pto 2.00 46.89 93.78 0.00 0.00 0.00 0.00 0.00 0.00 2.00 93.78 0.00%
1.01.05 SALIDA DE PARED PARA TOMACORRIENTE SIMPLE CON PUESTA A TIERRA pto 8.00 45.81 366.48 0.00 0.00 0.00 0.00 0.00 0.00 8.00 366.48 0.00%
1.02 CANALIZACIONES, TUBERIAS Y/O CABLES
1.02.01 TUBERIAS EMPOTRADAS Y/O VISIBLES
1.02.01.01 TUBERIA PVC SEL D=20mm (3/4") m 109.13 3.58 390.69 0.00 0.00 0.00 0.00 0.00 0.00 109.13 390.69 0.00%
1.02.02 CABLES ELECTRICOS
1.02.02.01 CABLE ELECTRICO TW DE 2 x 4mm2 m 148.00 2.87 424.76 0.00 0.00 0.00 0.00 0.00 0.00 148.00 424.76 0.00%
1.02.02.02 CABLE ELECTRICO TW 2 x 2.5mm2 m 70.26 2.24 157.38 0.00 0.00 0.00 0.00 0.00 0.00 70.26 157.38 0.00%
1.03 TABLEROS, LLAVES, CUCHILLAS Y CAJAS
1.03.01 TABLERO DE DISTRIBUCION
1.03.01.01 TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA DE 3 CIRCUITOS und 2.00 249.30 498.60 0.00 0.00 0.00 0.00 0.00 0.00 2.00 498.60 0.00%
1.04 ARTEFACTOS ELECTRICOS
1.04.01 FLUORESCENTE RECTO 2 X 40 W INCLUYE EQUIPO Y PANTALLA und 8.00 107.37 858.96 0.00 0.00 0.00 0.00 0.00 0.00 8.00 858.96 0.00%
1.04.02 SPOT LIGHT und 2.00 41.40 82.80 0.00 0.00 0.00 0.00 0.00 0.00 2.00 82.80 0.00%
2.00 INSTALACIONES ELECTRICAS - ADMINISTRACION
2.01 SISTEMA ELECTRICO
2.01.01 SALIDA DE TECHO PARA CENTRO DE LUZ pto 4.00 63.96 255.84 0.00 0.00 0.00 0.00 0.00 0.00 4.00 255.84 0.00%
2.01.02 SALIDA DE TECHO PARA SPOT LIGHT pto 1.00 54.26 54.26 0.00 0.00 0.00 0.00 0.00 0.00 1.00 54.26 0.00%
2.01.03 SALIDA DE PARED PARA INTERRUPTOR SIMPLE pto 3.00 47.00 141.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 141.00 0.00%
2.01.04 SALIDA DE PARED PARA INTERRUPTOR DOBLE pto 1.00 46.89 46.89 0.00 0.00 0.00 0.00 0.00 0.00 1.00 46.89 0.00%
2.01.05 SALIDA DE PARED PARA TOMACORRIENTE SIMPLE CON PUESTA A TIERRA pto 6.00 45.81 274.86 0.00 0.00 0.00 0.00 0.00 0.00 6.00 274.86 0.00%
2.02 CANALIZACIONES, TUBERIAS Y/O CABLES
2.02.01 TUBERIAS EMPOTRADAS Y/O VISIBLES
2.02.01.01 TUBERIA PVC SEL D=20mm (3/4") m 42.25 3.58 151.26 0.00 0.00 0.00 0.00 0.00 0.00 42.25 151.26 0.00%
2.02.02 CABLES ELECTRICOS
2.02.02.01 CABLE ELECTRICO TW DE 2 x 4mm2 m 50.21 2.87 144.10 0.00 0.00 0.00 0.00 0.00 0.00 50.21 144.10 0.00%
2.02.02.02 CABLE ELECTRICO TW 2 x 2.5mm2 m 52.44 2.24 117.47 0.00 0.00 0.00 0.00 0.00 0.00 52.44 117.47 0.00%
2.03 TABLEROS, LLAVES, CUCHILLAS Y CAJAS
2.03.01 TABLERO DE DISTRIBUCION
2.03.01.01 TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA DE 3 CIRCUITOS und 1.00 249.30 249.30 0.00 0.00 0.00 0.00 0.00 0.00 1.00 249.30 0.00%
2.03.02 CAJA DE PASO 0.00 0.00
2.03.02.01 CAJA DE PASE F.G. 4" x 4" x 2" und 2.00 24.03 48.06 0.00 0.00 0.00 0.00 0.00 0.00 2.00 48.06 0.00%
2.04 ARTEFACTOS ELECTRICOS 0.00 0.00
2.04.01 FLUORESCENTE RECTO 2 X 40 W INCLUYE EQUIPO Y PANTALLA und 4.00 107.37 429.48 0.00 0.00 0.00 0.00 0.00 0.00 4.00 429.48 0.00%
2.04.02 SPOT LIGHT und 1.00 41.40 41.40 0.00 0.00 0.00 0.00 0.00 0.00 1.00 41.40 0.00%
3.00 FLETE TERRESTRE
3.01 FLETE TERRESTRE TRUJILLO A CRUZ PAMPA kg 248.61 0.15 37.29 0.00 0.00 0.00 0.00 0.00 0.00 248.61 37.29 0.00%
COSTO TOTAL DIRECTO 603,397.35 268,296.26 298,243.20 305,154.08 49.43%
GASTOS GENERALES 9% 54,305.76 24,146.66 26,841.89 27,463.87
UTILIDAD 5% 30,169.87 13,414.81 14,912.16 15,257.70
SUB TOTAL 687,872.98 305,857.74 339,997.25 347,875.65
IGV 18% 123,817.14 55,054.39 61,199.50 62,617.62
TOTAL S/, 811,690.12 360,912.13 401,196.75 410,493.27
Avance por mes 360,912.13
Avance acumulado 401,196.75
% DE AVANCE EJECUTADO POR MES 44.46%
% DE AVANCE PROGRAMADO POR MES 37.82%
% DE AVANCE EJECUTADO ACUMULADO 49.43%
% DE AVANCE PROGRAMADO ACUMULADO 42.20%
CRONOGRAMA VALORIZADO PROGRAMADO
AMPLIACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E. CRUZ PAMPA EN EL CASERIO DE CRUZ PAMPA, DISTRITO DE ANGASMARCA, PROVINCIA DE SANTIAGO DE CHUCO – LA LIBERTAD
OBRA
MESES
N° PARTIDAS MONTO DEL 26/11/14 DEL 01/12/14 AL DEL 01/01/15 AL DEL 01/02/15 AL DEL 01/03/15 AL
AL 30/11/14 31/12/14 31/01/15 28/02/15 25/03/15
ESTRUCTURAS
01 OBRAS PROVISIONALES 3,285.31 100%
3,285.31
02 ESTRUCTURAS AULAS
2.01 OBRAS PRELIMINARES 2,313.72 100%
2,313.72
5,722.75
4 OBRAS DE CONCRETO ARMADO
6,665.11 9,997.67
20,378.55
2,771.95
836.36
1,868.59
17,359.76 26,039.65
168.08 168.08
3,782.25
3,817.10
7,753.19
4,536.97
3,188.10
1,002.35
6,026.45
986.02
1,096.43
21,678.86
378.18 378.18
3,075.26
4,253.34 4,253.34
63,278.83 27,119.50
8,569.65 3,672.71
15,913.28 6,819.98
46,997.12 20,141.62
5,008.83 11,687.28
ARQUITECTURA
1.00 ARQUITECTURA - 01 AULA
1.01 MUROS Y TABIQUES DE ALBAÑILERIA 7141.2 25% 75%
1,785.30 5,355.90
14,550.96
7,045.00
4,571.94
915.01
1,648.00
7,509.28
353.70
1,984.87
5,499.53
22.30
1.12 SISTEMA DE AGUA DE LLUVIA 2,412.66 100%
2,412.66
5,296.73
4,260.87 4,260.87
2,234.98 2,234.98
4,864.78
MESES
N° PARTIDAS MONTO DEL 26/11/14 DEL 01/12/14 AL DEL 01/01/15 AL DEL 01/03/15 AL
AL 30/11/14 31/12/14 31/01/15 25/03/15
2,630.97
2.06 CARPINTERIA EN MADERA 5,632.18 100%
5,632.18
1,367.82
752.85
483.65
4,045.08
2.10 VARIOS
2.10.01 JUNTAS DE DILATACION 35.5 100%
35.50
92.75
24,113.25 24,113.25
34,401.75
3,500.00
3,056.19
3,150.00
13,025.63 13,025.63
5.00 EQUIPAMIENTO Y MOBILIARIO 5,000.00 100%
5,000.00
3,824.09
1,953.92
37.29
COSTO DIRECTO 603,397.35 26,386.9 228,222.0 182,449.8 126,114.4 40,224.3
0.09 GASTOS GENERALES (9% ) 54,305.76 2,374.82 20,539.98 16,420.48 11,350.30 3,620.18
UTILIDAD (5%) 30,169.87 1,319.34 11,411.10 9,122.49 6,305.72 2,011.21
SUB TOTAL 687,872.98 30,081.04 260,173.10 207,992.75 143,770.41 45,855.67
0.18 IGV (18 % ) 123,817.14 5,414.59 46,831.16 37,438.70 25,878.67 8,254.02
VALOR REFERENCIAL 811,690.12 35,495.62 307,004.26 245,431.45 169,649.08 54,109.69
AVANCE PROGRAMADO POR MES 811,690.12 35,495.62 307,004.26 245,431.45 169,649.08 54,109.69
% DE AVANCE PROGRAMADO POR MES 4.37% 37.82% 30.24% 20.90% 6.67%
AVANCE PROGRAMADO ACUMULADO 35,495.62 342,499.89 587,931.34 757,580.42 811,690.12
% DE AVANCE PROGRAMADO ACUMULADO 100.00% 4.37% 42.20% 72.43% 93.33% 100.00%
120 DIAS CALENDARIOS
TOTAL
3,285.31
2,313.72
5,722.75
16,662.78
20,378.55
2,771.95
836.36
1,868.59
43,399.41
336.16
3,782.25
3,817.10
7,753.19
4,536.97
3,188.10
1,002.35
6,026.45
7,563.76
986.02
1,096.43
21,678.86
756.36
3,075.26
8,506.68
90,398.33
12,242.35
22,733.26
67,138.74
16,696.11
7,141.20
14,550.96
7,045.00
4,571.94
915.01
1,648.00
7,509.28
353.70
1,984.87
5,499.53
22.30
2,412.66
5,296.73
8,521.73
4,469.96
4,864.78
TOTAL
2,630.97
5,632.18
1,367.82
752.85
483.65
4,045.08
35.50
92.75
1,793.76
48,226.50
34,401.75
3,500.00
3,056.19
3,150.00
26,051.25
5,000.00
3,824.09
1,953.92
37.29
603,397.35
54,305.76
30,169.87
687,872.98
123,817.14
811,690.12
811,690.12
100%
------------
========
CURVA "S"
CRONOGRAMA DE AVANCE POR MES PROGRAMADO VS EJECUTADO PORCENTAJE DE AVANCE POR MES PROGRAMADO VS EJECUTADO
AVANCE POR MES PROGRAMADO VS EJECUTADO PORCENTAJE DE AVANCE POR MES PROGRAMADO VS EJECUTADO
400,000.00 50%
40%
307,004.26 38%
300,000.00
35%
250,000.00
30%
20%
150,000.00
15%
100,000.00
10%
50,000.00
40,284.65
35,495.62 5% 5%
4%
0.00 0.00 0% 0%
EL 26 Nov. Al 30 Nov. Al 31 Dic. EL 26 Nov. Al 30 Nov. Al 31 Dic.
CRONOGRAMA DE AVANCES ACUMULADOS PROGRAMADO VS EJECUTADO PORCENTAJE DE AVANCE ACUMULADO PROGRAMADO VS EJECUTADO
811,690.12
800,000.00
757,580.42 100% 100%
700,000.00 93%
600,000.00 80%
587,931.34
72%
500,000.00
AVANCE PROGRAMADO PORCENTAJE PROGRAMADO
60%
AVANCE EJECUTADO PORCENTAJE EJECUTADO
400,000.00 401,196.75
49%
342,499.89
42%
300,000.00 40%
200,000.00
20%
100,000.00
40,284.65 5%
4%
35,495.62
0% 0%
0.00 0.00
EL 26 Nov. Al 30 Nov. Al 31 Dic. AL 31 Ene. Al 28 Feb. Al 25 Mar.
EL 26 Nov. Al 30 Nov. Al 31 Dic. AL 31 Ene. Al 28 Feb. Al 25 Mar.
CONTROL DE METRADOS EJECUTADOS
PROYECTO:
AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS EN LA I.E. CRUZ PAMPA, EN EL CASERÍO DE CRUZ PAMPA, DISTRITO DE
ANGASMARCA, PROVINCIA DE SANTIAGO DE CHUCO – LA LIBERTAD”
ENTIDAD: MUNICIPALIDAD DISTRITAL DE ANGASMARCA
UBICACIÓN: LA LIBERTAD - SANTIAGO DE CHUCO - ANGASMARCA - COLPA SECA
FECHA: 17-Dec-14
EJECUTADA: CONTRATISTAS GENERALES VELVAL S.A.C.
RESIDENTE : Ing. OSCAR O. REYES FLORES
SUPERVISOR : Ing. VICTOR C. ROMERO RIVEROS
PRESUPUESTADO
PART.
Nº SUB
DESCRIPCION UNID. METRAD. C.U.
TOTAL
2.0.0 DESCUENTOS
2.1.0 AMORTIZACIÓN DEL ADELANTO DIRECTO
2.1.1 AMORTIZACIÓN DEL ADELANTO DIRECTO 0
2.3.0 AMORTIZACIÓN DEL ADELANTO DE MATERIALES
2.3.1 AMORTIZACIÓN DEL ADELANTO DE MATERIALES 0
2.4.0 DEDUCCIÓN QUE NO CORRESPONDE ADELANTO DIRECTO
2.4.1 DEDUCCIÓN QUE NO CORRESPONDE ADELANTO DIRECTO 0
2.5.0 DEDUCCIÓN QUE NO CORRESPONDE ADELANTO DE MATERIALES
2.5.1 DEDUCCIÓN QUE NO CORRESPONDE ADELANTO DE MATERIALES 0
VALORIZACION N° 01
ANTERIOR
METRAD.
78.33
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
80.00
43.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
44,522.96
42.68
0.00
34,735.00
, DISTRITO DE
VALORIZACION N° 02
PROYECTO: AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS EN LA I.E. CRUZ PAMPA, EN EL CASERÍO DE CRUZ PAMPA, DISTRITO DE ANGASMARCA, PROVINCIA DE SANTIAGO DE CHUCO – LA LIBERTAD”
ENTIDAD MUNICIPALIDAD DISTRITAL DE ANGASMARCA MONTO INVERSION s/. : 811,690.12
DIST. ANGASMARCA
PROV: SANTIAGO DE CHUCO
FECHA: 17-Dec-14 Residente de Obra : Ing. OSCAR O. REYES FLORES Supervisor de Obra : Ing. VICTOR COBADIS ROMERO RIVEROS
03.03.04 FALSO PISO DE CONCRETO E=3" F'C=140 kg/cm2 / INCL. DURMIENTES m2 51.15 44.28 2,264.92 0.00 0.00 0.00 0.00 0.00 0.00 51.15 2,264.92 0.00%
03.03.05 CONCRETO EN CUNETAS FC 175KG/CM2 m3 4.03 282.60 1,138.88 0.00 0.00 0.00 0.00 0.00 0.00 4.03 1,138.88 0.00%
03.03.06 ENCOFRADO DE CUNETAS m2 19.34 42.88 829.30 0.00 0.00 0.00 0.00 0.00 0.00 19.34 829.30 0.00%
3.04 OBRAS DE CONCRETO ARMADO ESTRUCTURAL
3.04.01 ZAPATAS
03.04.01.01 CONCRETO EN ZAPATAS F'C=210 KG/CM2 m3 7.38 431.54 3,184.77 0.00 0.00 0.00 0.00 0.00 0.00 7.38 3,184.77 0.00%
03.04.01.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 213.28 6.34 1,352.20 0.00 0.00 0.00 0.00 0.00 0.00 213.28 1,352.20 0.00%
3.04.02 VIGAS DE CIMENTACION
03.04.02.01 CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2 m3 2.14 448.93 960.71 0.00 0.00 0.00 0.00 0.00 0.00 2.14 960.71 0.00%
03.04.02.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 158.10 6.34 1,002.35 0.00 0.00 0.00 0.00 0.00 0.00 158.10 1,002.35 0.00%
03.04.02.03 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACION m2 17.10 71.64 1,225.04 0.00 0.00 0.00 0.00 0.00 0.00 17.10 1,225.04 0.00%
3.04.03 SOBRECIMIENTO ARMADO
03.04.03.01 ACERO FY=4200 KG/CM2 GRADO 60 kg 158.10 6.34 1,002.35 0.00 0.00 0.00 0.00 0.00 0.00 158.10 1,002.35 0.00%
3.04.04 COLUMNAS
03.04.04.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 2.13 541.94 1,154.33 0.00 0.00 0.00 0.00 0.00 0.00 2.13 1,154.33 0.00%
03.04.04.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 507.51 6.34 3,217.61 0.00 0.00 0.00 0.00 0.00 0.00 507.51 3,217.61 0.00%
03.04.04.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 24.65 67.12 1,654.51 0.00 0.00 0.00 0.00 0.00 0.00 24.65 1,654.51 0.00%
3.04.05 VIGAS
03.04.05.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 3.37 454.60 1,532.00 0.00 0.00 0.00 0.00 0.00 0.00 3.37 1,532.00 0.00%
03.04.05.02 ACERO fy=4200 kg/cm2 GRADO 60 kg 597.24 6.42 3,834.28 0.00 0.00 0.00 0.00 0.00 0.00 597.24 3,834.28 0.00%
03.04.05.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 28.09 78.23 2,197.48 0.00 0.00 0.00 0.00 0.00 0.00 28.09 2,197.48 0.00%
3.04.06 COLUMNETAS DE AMARRE
03.04.06.01 CONCRETO EN COLUMNETAS DE AMARRE F'C=175 KG/CM2 m3 0.55 470.02 258.51 0.00 0.00 0.00 0.00 0.00 0.00 0.55 258.51 0.00%
03.04.06.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 71.75 6.34 454.90 0.00 0.00 0.00 0.00 0.00 0.00 71.75 454.90 0.00%
03.04.06.03 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS DE AMARRE m2 7.36 37.04 272.61 0.00 0.00 0.00 0.00 0.00 0.00 7.36 272.61 0.00%
3.04.07 VIGUETAS DE AMARRE
03.04.07.01 CONCRETO EN VIGUETAS DE AMARRE F'C=175 KG/CM2 m3 0.88 407.54 358.64 0.00 0.00 0.00 0.00 0.00 0.00 0.88 358.64 0.00%
03.04.07.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 64.90 6.34 411.47 0.00 0.00 0.00 0.00 0.00 0.00 64.90 411.47 0.00%
03.04.07.03 ENCOFRADO Y DESENCOFRADO EN VIGUETAS DE AMARRE m2 8.81 37.04 326.32 0.00 0.00 0.00 0.00 0.00 0.00 8.81 326.32 0.00%
3.05 ESTRUCTURAS DE MADERA (TIJERALES)
03.04.01 TIJERAL DE MADERA SEGUN DISEÑO UND 3.00 2,331.08 6,993.24 0.00 0.00 0.00 0.00 0.00 0.00 3.00 6,993.24 0.00%
03.04.02 CORREAS DE MADERA TORNILLO DE 2"x3". UND 12.00 302.09 3,625.08 0.00 0.00 0.00 0.00 0.00 0.00 12.00 3,625.08 0.00%
03.04.03 ANCLAJE DE TIJERAL DE MADERA UND 6.00 1,004.25 6,025.50 0.00 0.00 0.00 0.00 0.00 0.00 6.00 6,025.50 0.00%
03.04.04 COBERTURA ARTICULADA TIPO TEJA ANDINA m2 89.10 51.94 4,627.85 0.00 0.00 0.00 0.00 0.00 0.00 89.10 4,627.85 0.00%
03.04.05 CUMBRERA ARTICULADA TIPO TEJA ANDINA m 9.90 41.13 407.19 0.00 0.00 0.00 0.00 0.00 0.00 9.90 407.19 0.00%
3.06 PRUEBAS DE LABORATORIO
03.06.01 UND 18.00 42.02 756.36 0.00 0.00 0.00 0.00 0.00 0.00 18.00 756.36 0.00%
PRUEBA DE CONTROL DE CALIDAD DE CONCRETO (PRUEBA A LA
COMPRESION)
4.00 ESTRUCTURAS-CERCO PERIMETRICO
4.01 OBRAS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO MANUAL m2 208.21 2.47 514.28 208.21 514.28 0.00 0.00 208.21 514.28 0.00 0.00 100.00%
04.01.02 TRAZO NIVELACION Y REPLANTEO PRELIMINAR m2 208.21 4.11 855.74 208.21 855.74 0.00 0.00 208.21 855.74 0.00 0.00 100.00%
04.01.03 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 208.21 8.19 1,705.24 80.00 655.20 128.21 1,050.04 208.21 1,705.24 0.00 0.00 100.00%
4.02 MOVIMIENTO DE TIERRAS
04.02.01 m3 182.99 28.10 5,142.02 43.00 1,208.30 139.99 3,933.72 182.99 5,142.02 0.00 0.00 100.00%
EXCAVACION PARA CIMIENTOS HASTA 0.70M DE PROFUNDIDAD EN
TERRENO NORMAL
04.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPO LIVIANO m3 157.36 17.36 2,731.77 0.00 0.00 157.36 2,731.77 157.36 2,731.77 0.00 0.00 100.00%
04.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=30M m3 33.79 18.73 632.89 0.00 0.00 33.79 632.89 33.79 632.89 0.00 0.00 100.00%
4.03 OBRAS DE CONCRETO SIMPLE
04.03.01 SOLADOS CONCRETO C:H -1:10, E=4" PARA ZAPATAS m2 208.21 34.43 7,168.67 0.00 0.00 208.21 7,168.67 208.21 7,168.67 0.00 0.00 100.00%
04.03.02 CONCRETO PARA CIMIENTOS CORRIDOS C:H-1:10 + 30% P.G. m3 145.75 232.29 33,856.27 0.00 0.00 145.75 33,856.27 145.75 33,856.27 0.00 0.00 100.00%
04.03.03 CONCRETO PARA SOBRECIMIENTOS C:H-1:8 + 25%P.M. m3 37.23 307.69 11,455.30 0.00 0.00 37.23 11,455.30 37.23 11,455.30 0.00 0.00 100.00%
04.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS H=50CM. m2 496.44 76.38 37,918.09 0.00 0.00 496.44 37,918.09 496.44 37,918.09 0.00 0.00 100.00%
4.04 OBRAS DE CONCRETO ARMADO
4.04.01 SOBRECIMIENTO ARMADO
04.04.01.01 ACERO FY=4200 KG/CM2 GRADO 60 kg 1,930.97 6.34 12,242.35 0.00 0.00 1,930.97 12,242.35 1,930.97 12,242.35 0.00 0.00 100.00%
4.04.02 COLUMNAS
04.04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 9.45 497.51 4,701.47 0.00 0.00 7.56 3,761.18 7.56 3,761.18 1.89 940.29 80.00%
04.04.02.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 1,510.20 6.34 9,574.67 0.00 0.00 1,510.20 9,574.67 1,510.20 9,574.67 0.00 0.00 100.00%
04.04.02.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 126.00 67.12 8,457.12 0.00 0.00 100.80 6,765.70 100.80 6,765.70 25.20 1,691.42 80.00%
4.04.03 VIGAS
04.04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 87.36 497.51 43,462.47 0.00 0.00 52.42 26,077.48 52.42 26,077.48 34.94 17,384.99 60.00%
04.04.03.02 ACERO fy=4200 kg/cm2 GRADO 60 kg 1,573.61 6.42 10,102.58 0.00 0.00 944.17 6,061.55 944.17 6,061.55 629.44 4,041.03 60.00%
04.04.03.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 173.51 78.23 13,573.69 0.00 0.00 104.11 8,144.21 104.11 8,144.21 69.40 5,429.47 60.00%
5.00 FLETE TERRESTRE
5.01 FLETE TERRESTRE TRUJILLO A CRUZ PAMPA kg 111,307.41 0.15 16,696.11 44,522.96 6,678.44 66,784.45 10,017.67 111,307.41 16,696.11 0.00 0.00 100.00%
214,844.97
GASTOS GENERALES 9% 0.00 19,336.05 0.00 0.00
UTILIDAD 5% 0.00 10,742.25 0.00 0.00
SUB TOTAL 0.00 244,923.26 0.00 0.00
1.00 ARQUITECTURA- 01 AULA
1.01 MUROS Y TABIQUES DE ALBAÑILERIA
01.01.01 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA JUN m2 116.61 61.24 7,141.20 42.68 2,613.72 60.00 3,674.40 102.68 6,288.12 13.93 853.07 88.05%
1.02 REVOQUES ENLUCIDOS Y MOLDURAS
01.02.01 TARRAJEO EN MUROS EXTERIORES CON C:A 1:5 E = 1.50cm m2 98.74 39.64 3,914.05 0.00 0.00 0.00 0.00 0.00 0.00 98.74 3,914.05 0.00%
01.02.02 TARRAJEO EN MUROS INTERIORES CON C:A 1:5 E = 1.50cm m2 125.65 35.98 4,520.89 0.00 0.00 0.00 0.00 0.00 0.00 125.65 4,520.89 0.00%
01.02.03 TARRAJEO EN COLUMNAS CON C:A 1:5 E = 1.50cm m2 55.04 32.12 1,767.88 0.00 0.00 0.00 0.00 0.00 0.00 55.04 1,767.88 0.00%
01.02.04 TARRAJEO EN VIGAS CON C:A 1:5 E = 1.50cm m2 66.62 47.33 3,153.12 0.00 0.00 0.00 0.00 0.00 0.00 66.62 3,153.12 0.00%
01.02.05 TARRAJEO DE ESCALERAS m2 23.78 34.20 813.28 0.00 0.00 0.00 0.00 0.00 0.00 23.78 813.28 0.00%
01.02.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m 13.09 14.06 184.05 0.00 0.00 0.00 0.00 0.00 0.00 13.09 184.05 0.00%
01.02.07 BRUÑAS 1" m 158.15 1.25 197.69 0.00 0.00 0.00 0.00 0.00 0.00 158.15 197.69 0.00%
1.03 CIELORRASOS
CIELORRASO DE TRIPLAY DE 4.00mm ENTRAMADO DE MADERA TORNILLO
129.74
01.03.01 DE 2" x 2" x 10´ m2 52.88 6,860.65 0.00 0.00 0.00 0.00 0.00 0.00 129.74 6,860.65 0.00%
01.03.02 FRISO DE MADERA TORNILLO DE 1" x 8" x 10´ m2 7.54 24.45 184.35 0.00 0.00 0.00 0.00 0.00 0.00 7.54 184.35 0.00%
1.04 PISOS Y PAVIMENTOS
01.04.01 PISO DE CONCRETO E=4", PULIDO, BRUÑADO Y COLOREADO m2 112.25 40.73 4,571.94 0.00 0.00 0.00 0.00 0.00 0.00 112.25 4,571.94 0.00%
1.05 ZOCALOS Y CONTRAZOCALOS
01.05.01 74.09 12.35 915.01 0.00 0.00 0.00 0.00 0.00 0.00 74.09 915.01 0.00%
ZOCALO DE CEMENTO S/COLOREAR H= 30cm PULIDO E= 2.00cm MEZCLA 1:5
C:A m
1.06 CARPINTERIA DE MADERA
01.06.01 PUERTA APANELADA DE MADERA TORNILLO S.D INC. INSTALACION UND 2.00 754.00 1,508.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,508.00 0.00%
01.06.02 TICERO DE MADERA CEDRO (L=3.10m) BARNIZADO UND 2.00 70.00 140.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 140.00 0.00%
1.07 CARPINTERIA METALICA
01.07.01 VENTANAS DE ALUMINIO SEGUN DISEÑ0 m2 23.32 198.55 4,630.19 0.00 0.00 0.00 0.00 0.00 0.00 23.32 4,630.19 0.00%
01.07.02 REJILLA METALICA FIJA UND 2.00 112.98 225.96 0.00 0.00 0.00 0.00 0.00 0.00 2.00 225.96 0.00%
01.07.03 PASAMANO DE ACERO TUBO DE 2" m 22.00 96.79 2,129.38 0.00 0.00 0.00 0.00 0.00 0.00 22.00 2,129.38 0.00%
01.07.04 CANTONERA PARA ESCALERA SEGUN PLANOS m 25.00 20.95 523.75 0.00 0.00 0.00 0.00 0.00 0.00 25.00 523.75 0.00%
1.08 CERRAJERIA
01.08.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" PZA 6.00 29.55 177.30 0.00 0.00 0.00 0.00 0.00 0.00 6.00 177.30 0.00%
01.08.02 CHAPA DE PARCHE DE TRES GOLPES PZA 2.00 88.20 176.40 0.00 0.00 0.00 0.00 0.00 0.00 2.00 176.40 0.00%
1.09 VIDRIOS, CRISTALES Y SIMILARES
01.09.01 VIDRIO SEMIDOBLE TRANSPARENTE p2 363.53 5.46 1,984.87 0.00 0.00 0.00 0.00 0.00 0.00 363.53 1,984.87 0.00%
1.10 PINTURA
01.10.01 PINTURA LATEX EN MUROS EXTERIORES C/LATEX LAVABLE m2 98.74 10.32 1,019.00 0.00 0.00 0.00 0.00 0.00 0.00 98.74 1,019.00 0.00%
01.10.02 PINTURA LATEX EN MUROS INTERIORES C/LATEX LAVABLE m2 137.27 7.19 986.97 0.00 0.00 0.00 0.00 0.00 0.00 137.27 986.97 0.00%
01.10.03 PINTURA EN COLUMNAS C/LATEX LAVABLE m2 55.04 8.52 468.94 0.00 0.00 0.00 0.00 0.00 0.00 55.04 468.94 0.00%
01.10.04 PINTURA EN VIGAS C/LATEX LAVABLE m2 66.62 8.79 585.59 0.00 0.00 0.00 0.00 0.00 0.00 66.62 585.59 0.00%
01.10.05 PINTURA EN DERRAMES C/LATEX LAVABLE m 13.09 2.18 28.54 0.00 0.00 0.00 0.00 0.00 0.00 13.09 28.54 0.00%
01.10.06 PINTURA OLEO MATE EN CIELORRASO DE TRIPLAY m2 129.74 9.77 1,267.56 0.00 0.00 0.00 0.00 0.00 0.00 129.74 1,267.56 0.00%
01.10.07 PINTURA EN PIZARRA m2 7.40 12.77 94.50 0.00 0.00 0.00 0.00 0.00 0.00 7.40 94.50 0.00%
01.10.08 PINTURA EN FRISO DE MADERA m2 7.34 12.62 92.63 0.00 0.00 0.00 0.00 0.00 0.00 7.34 92.63 0.00%
01.10.09 PINTURA ESMALTE EN ZOCALO DE CEMENTO H= 30cm EXTERIOR m 74.09 5.66 419.35 0.00 0.00 0.00 0.00 0.00 0.00 74.09 419.35 0.00%
01.10.10 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 5.20 16.18 84.14 0.00 0.00 0.00 0.00 0.00 0.00 5.20 84.14 0.00%
01.10.11 PINTURA ESMALTE EN BRUÑAS DE 1" m 158.15 2.86 452.31 0.00 0.00 0.00 0.00 0.00 0.00 158.15 452.31 0.00%
1.11 VARIOS
01.11.11 JUNTAS SISMICA 1" m 4.46 5.00 22.30 0.00 0.00 0.00 0.00 0.00 0.00 4.46 22.30 0.00%
1.12 SISTEMA DE AGUA FRIA
1.12.01 TUBERIAS Y ACCESORIOS
01.12.01.01 RED DE DERIVACION PVC SAL PARA DESAGUE PLUVIAL DE 3" m 24.05 16.31 392.26 0.00 0.00 0.00 0.00 0.00 0.00 24.05 392.26 0.00%
01.12.01.02 CODO PVC-SAP 3" * 90 UND 7.00 13.20 92.40 0.00 0.00 0.00 0.00 0.00 0.00 7.00 92.40 0.00%
01.12.01.03 CANALETA SEMICIRCULAR GALVANIZADA DE e=1/27" m 39.22 16.46 645.56 0.00 0.00 0.00 0.00 0.00 0.00 39.22 645.56 0.00%
01.12.01.04 SOPORTE DE CANALETA UND 25.00 3.89 97.25 0.00 0.00 0.00 0.00 0.00 0.00 25.00 97.25 0.00%
01.12.01.05 ABRAZADERA PARA CANALETA UND 13.00 19.54 254.02 0.00 0.00 0.00 0.00 0.00 0.00 13.00 254.02 0.00%
01.12.01.06 ENCOFRADO Y DESENCOFRADO EN FALSA COLUMNA m2 9.79 37.04 362.62 0.00 0.00 0.00 0.00 0.00 0.00 9.79 362.62 0.00%
01.12.01.07 CONCRETO EN FALSALSA COLUMNA FC 140KG/CM2 m3 0.67 393.71 263.79 0.00 0.00 0.00 0.00 0.00 0.00 0.67 263.79 0.00%
01.12.01.08 TARRAJEO EN FALSA COLUMNA C:A 1:5 E=1.50cm m2 8.14 28.92 235.41 0.00 0.00 0.00 0.00 0.00 0.00 8.14 235.41 0.00%
01.12.01.09 PINTURA EN FALSA COLUMNA m2 8.14 8.52 69.35 0.00 0.00 0.00 0.00 0.00 0.00 8.14 69.35 0.00%
2.00 ARQUITECTURA- ADMINISTRACION
2.01 MUROS Y TABIQUES DE ALBAÑILERIA
02.01.01 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE CABEZA J m2 38.57 104.35 4,024.78 0.00 0.00 0.00 0.00 0.00 0.00 38.57 4,024.78 0.00%
02.01.02 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA JUN m2 20.77 61.24 1,271.95 0.00 0.00 0.00 0.00 0.00 0.00 20.77 1,271.95 0.00%
2.02 REVOQUES ENLUCIDOS Y MOLDURAS
02.02.01 TARRAJEO EN MUROS EXTERIORES CON C:A 1:5 E = 1.50cm m2 58.30 39.64 2,311.01 0.00 0.00 0.00 0.00 0.00 0.00 58.30 2,311.01 0.00%
02.02.02 TARRAJEO EN MUROS INTERIORES CON C:A 1:5 E = 1.50cm m2 61.21 35.98 2,202.34 0.00 0.00 0.00 0.00 0.00 0.00 61.21 2,202.34 0.00%
02.02.03 TARRAJEO EN COLUMNAS CON C:A 1:5 E = 1.50cm m2 10.37 32.12 333.08 0.00 0.00 0.00 0.00 0.00 0.00 10.37 333.08 0.00%
02.02.04 TARRAJEO EN VIGAS CON C:A 1:5 E = 1.50cm m2 25.90 47.33 1,225.85 0.00 0.00 0.00 0.00 0.00 0.00 25.90 1,225.85 0.00%
02.02.05 TARRAJEO EN PESTAÑAS CON C:A 1:5 E = 1.50cm m2 8.05 47.33 381.01 0.00 0.00 0.00 0.00 0.00 0.00 8.05 381.01 0.00%
02.02.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m 33.80 14.06 475.23 0.00 0.00 0.00 0.00 0.00 0.00 33.80 475.23 0.00%
02.02.07 FROTACHADO EN CUNETAS CON C:A 1:5 E = 1.50cm CON IMPERMEABILIZANT m2 36.51 32.88 1,200.45 0.00 0.00 0.00 0.00 0.00 0.00 36.51 1,200.45 0.00%
02.02.08 BRUÑAS DE 1/2" m 263.22 1.25 329.03 0.00 0.00 0.00 0.00 0.00 0.00 263.22 329.03 0.00%
02.02.09 BRUÑAS 3/4" m 50.98 1.25 63.73 0.00 0.00 0.00 0.00 0.00 0.00 50.98 63.73 0.00%
2.03 CIELORRASO
02.03.01 m2 81.83 52.88 4,327.17 0.00 0.00 0.00 0.00 0.00 0.00 81.83 4,327.17 0.00%
CIELORRASO DE TRIPLAY DE 4.00mm ENTRAMADO DE MADERA TORNILLO
DE 2" x 2" x 10´
02.03.02 FRISO DE MADERA TORNILLO DE 1" x 8" x 10´ m2 5.84 24.45 142.79 0.00 0.00 0.00 0.00 0.00 0.00 5.84 142.79 0.00%
2.04 PISOS Y PAVIMENTOS
02.04.01 PISO MACHIEMBRADO m2 66.00 38.11 2,515.26 0.00 0.00 0.00 0.00 0.00 0.00 66.00 2,515.26 0.00%
02.04.02 VEREDA DE CONCRETO f'c= 175 kg/cm2 H=0.10M m2 34.21 57.94 1,982.13 0.00 0.00 0.00 0.00 0.00 0.00 34.21 1,982.13 0.00%
02.04.03 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 4.81 76.38 367.39 0.00 0.00 0.00 0.00 0.00 0.00 4.81 367.39 0.00%
2.05 ZOCALOS Y CONTRAZOCALOS
02.05.01 ZOCALO DE CEMENTO S/COLOREAR H= 30cm PULIDO E= 2.00cm MEZCLA 1:5 C m 30.51 12.35 376.80 0.00 0.00 0.00 0.00 0.00 0.00 30.51 376.80 0.00%
02.05.02 CONTRAZOCALO DE MADERA CEDRO DE 4" RODON 1" m 28.23 79.85 2,254.17 0.00 0.00 0.00 0.00 0.00 0.00 28.23 2,254.17 0.00%
2.06 CARPINTERIA DE MADERA
02.06.01 PUERTA APANELADA DE MADERA TORNILLO S.D INC. INSTALACION UND 1.00 754.00 754.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 754.00 0.00%
02.06.02 PUERTA CONTRAPLACADA DE MADERA TORNILLO SEGUN DISEÑO INCL. INST UND 2.00 380.00 760.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 760.00 0.00%
02.06.03 TABIQUERIA DE MELAMINE DE 1" m2 22.50 183.03 4,118.18 0.00 0.00 0.00 0.00 0.00 0.00 22.50 4,118.18 0.00%
2.07 CARPINTERIA METALICA
02.07.01 VENTANAS DE ALUMINIO SEGUN DISEÑ0 m2 6.32 198.55 1,254.84 0.00 0.00 0.00 0.00 0.00 0.00 6.32 1,254.84 0.00%
02.07.02 REJILLA METALICA FIJA UND 1.00 112.98 112.98 0.00 0.00 0.00 0.00 0.00 0.00 1.00 112.98 0.00%
2.08 CERRAJERIA
02.08.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" pza 10.00 29.55 295.50 0.00 0.00 0.00 0.00 0.00 0.00 10.00 295.50 0.00%
02.08.02 CHAPA DE PARCHE DE TRES GOLPES pza 3.00 88.20 264.60 0.00 0.00 0.00 0.00 0.00 0.00 3.00 264.60 0.00%
02.08.03 MANIJA DE BRONCE DE 4" PARA PUERTAS pza 3.00 64.25 192.75 0.00 0.00 0.00 0.00 0.00 0.00 3.00 192.75 0.00%
2.09 VIDRIOS, CRISTALES Y SIMILARES
02.09.01 VIDRIO SEMIDOBLE TRANSPARENTE p2 88.58 5.46 483.65 0.00 0.00 0.00 0.00 0.00 0.00 88.58 483.65 0.00%
2.10 PINTURA
02.10.01 PINTURA LATEX EN MUROS EXTERIORES C/LATEX LAVABLE m2 58.30 10.32 601.66 0.00 0.00 0.00 0.00 0.00 0.00 58.30 601.66 0.00%
02.10.02 PINTURA LATEX EN MUROS INTERIORES C/LATEX LAVABLE m2 61.21 7.19 440.10 0.00 0.00 0.00 0.00 0.00 0.00 61.21 440.10 0.00%
02.10.03 PINTURA EN COLUMNAS C/LATEX LAVABLE m2 10.37 8.52 88.35 0.00 0.00 0.00 0.00 0.00 0.00 10.37 88.35 0.00%
02.10.04 PINTURA EN COLUMNETAS C/LATEX LAVABLE m2 3.12 8.52 26.58 0.00 0.00 0.00 0.00 0.00 0.00 3.12 26.58 0.00%
02.10.05 PINTURA EN VIGAS C/LATEX LAVABLE m2 25.90 8.79 227.66 0.00 0.00 0.00 0.00 0.00 0.00 25.90 227.66 0.00%
02.10.06 PINTURA EN PESTAÑAS C/LATEX LAVABLE m2 8.05 8.79 70.76 0.00 0.00 0.00 0.00 0.00 0.00 8.05 70.76 0.00%
02.10.07 PINTURA EN DERRAMES C/LATEX LAVABLE m 40.20 2.18 87.64 0.00 0.00 0.00 0.00 0.00 0.00 40.20 87.64 0.00%
02.10.08 PINTURA OLEO MATE EN CIELORRASO DE TRIPLAY m2 77.79 9.77 760.01 0.00 0.00 0.00 0.00 0.00 0.00 77.79 760.01 0.00%
02.10.09 PINTURA EN FRISO DE MADERA m2 3.90 12.62 49.22 0.00 0.00 0.00 0.00 0.00 0.00 3.90 49.22 0.00%
02.10.10 PINTURA ESMALTE EN ZOCALO DE CEMENTO H= 30cm EXTERIOR m 30.51 5.66 172.69 0.00 0.00 0.00 0.00 0.00 0.00 30.51 172.69 0.00%
02.10.11 PINTURA BARNIZ EN CONTRAZOCALO DE MADERA DE CEDRO 4" CON RODON m 28.23 16.18 456.76 0.00 0.00 0.00 0.00 0.00 0.00 28.23 456.76 0.00%
02.10.12 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 10.20 16.18 165.04 0.00 0.00 0.00 0.00 0.00 0.00 10.20 165.04 0.00%
02.10.13 PINTURA ESMALTE EN BRUÑAS 1/2" m 263.22 2.86 752.81 0.00 0.00 0.00 0.00 0.00 0.00 263.22 752.81 0.00%
02.10.14 PINTURA ESMALTE EN BRUÑAS DE MUROS EXTERIORES 3/4" m 50.98 2.86 145.80 0.00 0.00 0.00 0.00 0.00 0.00 50.98 145.80 0.00%
2.11 VARIOS
02.11.01 JUNTAS DE DILATACION m 7.10 5.00 35.50 0.00 0.00 0.00 0.00 0.00 0.00 7.10 35.50 0.00%
02.11.02 JUNTAS SISMICA 1" m 18.55 5.00 92.75 0.00 0.00 0.00 0.00 0.00 0.00 18.55 92.75 0.00%
2.12 SISTEMA DE AGUA FRIA
2.12.01 TUBERIAS Y ACCESORIOS
02.12.01.01 RED DE DERIVACION PVC SAL PARA DESAGUE PLUVIAL DE 3" m 22.00 16.31 358.82 0.00 0.00 0.00 0.00 0.00 0.00 22.00 358.82 0.00%
02.12.01.02 CODO PVC-SAP 3" * 90 und 12.00 13.20 158.40 0.00 0.00 0.00 0.00 0.00 0.00 12.00 158.40 0.00%
02.12.01.03 CANALETA SEMICIRCULAR GALVANIZADA DE e=1/27" m 19.50 16.46 320.97 0.00 0.00 0.00 0.00 0.00 0.00 19.50 320.97 0.00%
02.12.01.04 SOPORTE DE CANALETA und 16.00 3.89 62.24 0.00 0.00 0.00 0.00 0.00 0.00 16.00 62.24 0.00%
02.12.01.05 ABRAZADERA PARA CANALETA und 20.00 19.54 390.80 0.00 0.00 0.00 0.00 0.00 0.00 20.00 390.80 0.00%
02.12.01.06 ENCOFRADO Y DESENCOFRADO EN FALSA COLUMNA m2 4.95 37.04 183.35 0.00 0.00 0.00 0.00 0.00 0.00 4.95 183.35 0.00%
02.12.01.07 CONCRETO EN FALSALSA COLUMNA FC 140KG/CM2 m3 0.34 393.71 133.86 0.00 0.00 0.00 0.00 0.00 0.00 0.34 133.86 0.00%
02.12.01.08 TARRAJEO EN FALSA COLUMNA C:A 1:5 E=1.50cm m2 4.95 28.92 143.15 0.00 0.00 0.00 0.00 0.00 0.00 4.95 143.15 0.00%
02.12.01.09 PINTURA EN FALSA COLUMNA m3 4.95 8.52 42.17 0.00 0.00 0.00 0.00 0.00 0.00 4.95 42.17 0.00%
3.00 ARQUITECTURA- CERCO PERIMETRICO
3.01 MUROS Y TABIQUES DE ALBAÑILERIA
03.01.01 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA JUN m2 787.5 61.24 48,226.50 0.00 0.00 472.50 28,935.90 472.50 28,935.90 315.00 19,290.60 60.00%
3.02 REVOQUES ENLUCIDOS
03.02.01 TARRAJEO EN MUROS EXTERIORES CON C:A 1:5 E = 1.50cm m2 496.44 39.64 19,678.88 0.00 0.00 0.00 0.00 0.00 0.00 496.44 19,678.88 0.00%
03.02.02 TARRAJEO EN COLUMNAS CON C:A 1:5 E = 1.50cm m2 126.00 32.12 4,047.12 0.00 0.00 0.00 0.00 0.00 0.00 126.00 4,047.12 0.00%
03.02.03 TARRAJEO EN VIGAS CON C:A 1:5 E = 1.50cm m2 225.56 47.33 10,675.75 0.00 0.00 0.00 0.00 0.00 0.00 225.56 10,675.75 0.00%
3.03 CARPINTERIA METALICA
03.03.01 PORTON METALICO 3.50m x 3.00m und 1.00 3,500.00 3,500.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 3,500.00 0.00%
3.04 PINTURA
03.04.01 PINTURA EN COLUMNAS C/LATEX LAVABLE m2 126.00 8.52 1,073.52 0.00 0.00 0.00 0.00 0.00 0.00 126.00 1,073.52 0.00%
03.04.02 PINTURA EN VIGAS C/LATEX LAVABLE m2 225.56 8.79 1,982.67 0.00 0.00 0.00 0.00 0.00 0.00 225.56 1,982.67 0.00%
3.05 VARIOS
03.05.01 JUNTAS DE DILATACION m 630.00 5.00 3,150.00 0.00 0.00 0.00 0.00 0.00 0.00 630.00 3,150.00 0.00%
4.00 FLETE TERRESTRE
4.01 FLETE TERRESTRE TRUJILLO A CRUZ PAMPA kg 173,674.98 0.15 26,051.25 34,735.00 5,210.25 138,939.98 20,841.00 173,674.98 26,051.25 0.00 0.00 100.00%
5.00 EQUIPAMIENTO Y MOBILIARIO
5.01 MOBILIARIO DE COLEGIO (ESCRITORIOS,CARPETAS,COMPUTADORAS) glb 1.00 5,000.00 5,000.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 5,000.00 0.00%
53,451.30
GASTOS GENERALES 9% 0.00 4,810.62 0.00 0.00
UTILIDAD 5% 0.00 2,672.56 0.00 0.00
SUB TOTAL 0.00 60,934.48 0.00 0.00
1.00 INSTALACIONES ELECTRICAS - 01 AULA
1.01 SISTEMA ELECTRICO
1.01.01 SALIDA DE TECHO PARA CENTRO DE LUZ pto 10.00 63.96 639.60 0.00 0.00 0.00 0.00 0.00 0.00 10.00 639.60 0.00%
1.01.02 SALIDA DE TECHO PARA SPOT LIGHT pto 4.00 54.26 217.04 0.00 0.00 0.00 0.00 0.00 0.00 4.00 217.04 0.00%
1.01.03 SALIDA DE PARED PARA INTERRUPTOR SIMPLE pto 2.00 47.00 94.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 94.00 0.00%
1.01.04 SALIDA DE PARED PARA INTERRUPTOR DOBLE pto 2.00 46.89 93.78 0.00 0.00 0.00 0.00 0.00 0.00 2.00 93.78 0.00%
1.01.05 SALIDA DE PARED PARA TOMACORRIENTE SIMPLE CON PUESTA A TIERRA pto 8.00 45.81 366.48 0.00 0.00 0.00 0.00 0.00 0.00 8.00 366.48 0.00%
1.02 CANALIZACIONES, TUBERIAS Y/O CABLES
1.02.01 TUBERIAS EMPOTRADAS Y/O VISIBLES
1.02.01.01 TUBERIA PVC SEL D=20mm (3/4") m 109.13 3.58 390.69 0.00 0.00 0.00 0.00 0.00 0.00 109.13 390.69 0.00%
1.02.02 CABLES ELECTRICOS
1.02.02.01 CABLE ELECTRICO TW DE 2 x 4mm2 m 148.00 2.87 424.76 0.00 0.00 0.00 0.00 0.00 0.00 148.00 424.76 0.00%
1.02.02.02 CABLE ELECTRICO TW 2 x 2.5mm2 m 70.26 2.24 157.38 0.00 0.00 0.00 0.00 0.00 0.00 70.26 157.38 0.00%
1.03 TABLEROS, LLAVES, CUCHILLAS Y CAJAS
1.03.01 TABLERO DE DISTRIBUCION
1.03.01.01 TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA DE 3 CIRCUITOS und 2.00 249.30 498.60 0.00 0.00 0.00 0.00 0.00 0.00 2.00 498.60 0.00%
1.04 ARTEFACTOS ELECTRICOS
1.04.01 FLUORESCENTE RECTO 2 X 40 W INCLUYE EQUIPO Y PANTALLA und 8.00 107.37 858.96 0.00 0.00 0.00 0.00 0.00 0.00 8.00 858.96 0.00%
1.04.02 SPOT LIGHT und 2.00 41.40 82.80 0.00 0.00 0.00 0.00 0.00 0.00 2.00 82.80 0.00%
2.00 INSTALACIONES ELECTRICAS - ADMINISTRACION
2.01 SISTEMA ELECTRICO
2.01.01 SALIDA DE TECHO PARA CENTRO DE LUZ pto 4.00 63.96 255.84 0.00 0.00 0.00 0.00 0.00 0.00 4.00 255.84 0.00%
2.01.02 SALIDA DE TECHO PARA SPOT LIGHT pto 1.00 54.26 54.26 0.00 0.00 0.00 0.00 0.00 0.00 1.00 54.26 0.00%
2.01.03 SALIDA DE PARED PARA INTERRUPTOR SIMPLE pto 3.00 47.00 141.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 141.00 0.00%
2.01.04 SALIDA DE PARED PARA INTERRUPTOR DOBLE pto 1.00 46.89 46.89 0.00 0.00 0.00 0.00 0.00 0.00 1.00 46.89 0.00%
2.01.05 SALIDA DE PARED PARA TOMACORRIENTE SIMPLE CON PUESTA A TIERRA pto 6.00 45.81 274.86 0.00 0.00 0.00 0.00 0.00 0.00 6.00 274.86 0.00%
2.02 CANALIZACIONES, TUBERIAS Y/O CABLES
2.02.01 TUBERIAS EMPOTRADAS Y/O VISIBLES
2.02.01.01 TUBERIA PVC SEL D=20mm (3/4") m 42.25 3.58 151.26 0.00 0.00 0.00 0.00 0.00 0.00 42.25 151.26 0.00%
2.02.02 CABLES ELECTRICOS
2.02.02.01 CABLE ELECTRICO TW DE 2 x 4mm2 m 50.21 2.87 144.10 0.00 0.00 0.00 0.00 0.00 0.00 50.21 144.10 0.00%
2.02.02.02 CABLE ELECTRICO TW 2 x 2.5mm2 m 52.44 2.24 117.47 0.00 0.00 0.00 0.00 0.00 0.00 52.44 117.47 0.00%
2.03 TABLEROS, LLAVES, CUCHILLAS Y CAJAS
2.03.01 TABLERO DE DISTRIBUCION
2.03.01.01 TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA DE 3 CIRCUITOS und 1.00 249.30 249.30 0.00 0.00 0.00 0.00 0.00 0.00 1.00 249.30 0.00%
2.03.02 CAJA DE PASO 0.00 0.00
2.03.02.01 CAJA DE PASE F.G. 4" x 4" x 2" und 2.00 24.03 48.06 0.00 0.00 0.00 0.00 0.00 0.00 2.00 48.06 0.00%
2.04 ARTEFACTOS ELECTRICOS 0.00 0.00
2.04.01 FLUORESCENTE RECTO 2 X 40 W INCLUYE EQUIPO Y PANTALLA und 4.00 107.37 429.48 0.00 0.00 0.00 0.00 0.00 0.00 4.00 429.48 0.00%
2.04.02 SPOT LIGHT und 1.00 41.40 41.40 0.00 0.00 0.00 0.00 0.00 0.00 1.00 41.40 0.00%
3.00 FLETE TERRESTRE
3.01 FLETE TERRESTRE TRUJILLO A CRUZ PAMPA kg 248.61 0.15 37.29 0.00 0.00 0.00 0.00 0.00 0.00 248.61 37.29 0.00%
0.00
GASTOS GENERALES 9% 0.00 0.00 0.00 0.00
UTILIDAD 5% 0.00 0.00 0.00 0.00
SUB TOTAL 0.00 0.00 0.00 0.00
COSTO TOTAL DIRECTO 603,397.35 268,296.26 298,243.20 305,154.08 49.43%
GASTOS GENERALES 9% 54,305.76 24,146.66 26,841.89 27,463.87
UTILIDAD 5% 30,169.87 13,414.81 14,912.16 15,257.70
SUB TOTAL 687,872.98 305,857.74 339,997.25 347,875.65
IGV 18% 123,817.14 55,054.39 61,199.50 62,617.62
TOTAL S/, 811,690.12 360,912.13 401,196.75 410,493.27
Avance por mes 360,912.13
Avance acumulado 401,196.75
% DE AVANCE EJECUTADO POR MES 44.46%
% DE AVANCE PROGRAMADO POR MES 37.82%
% DE AVANCE EJECUTADO ACUMULADO 49.43%
% DE AVANCE PROGRAMADO ACUMULADO 42.20%