The document describes the maintenance of earth pits at a substation. It lists 84 earth pits across various equipment in the 220kV and 33kV yards and control rooms. For each pit, it specifies the equipment, identification number, and status (mostly "Ok") with a few needing repairs like replacing rusted nuts and bolts. The inspection found most earth pits to be in working order with only minor repairs required on some pits.
The document describes the maintenance of earth pits at a substation. It lists 84 earth pits across various equipment in the 220kV and 33kV yards and control rooms. For each pit, it specifies the equipment, identification number, and status (mostly "Ok") with a few needing repairs like replacing rusted nuts and bolts. The inspection found most earth pits to be in working order with only minor repairs required on some pits.
The document describes the maintenance of earth pits at a substation. It lists 84 earth pits across various equipment in the 220kV and 33kV yards and control rooms. For each pit, it specifies the equipment, identification number, and status (mostly "Ok") with a few needing repairs like replacing rusted nuts and bolts. The inspection found most earth pits to be in working order with only minor repairs required on some pits.
1 33KV hourly readings Scada 3 No's 2 220KV hourly readings Scada 3 No's 3 TRC register 3 No's 4 Shift log book 5 No's 5 Work Permit Book 3 No's 6 Daily inspection Register 3 No's 7 Battery maintenance Register 2 No's 8 3 hrs ABT MFM raedings register 2 No's 1 2 3 4 5 6 7 8 9 10 Night shift work Check battery room, ACDB room, PLCC room, 220KV & 33KV control rooms for any abnormality. Switch off all yard lights & roam in whole substation for any red hot spots or sparking Check all control room doors & control panel doors are closed or not Check all the documents in the locker-1 are as per list or not Check & compare feeder wise total import & export of TRC meter, ABT meter, TVM meter Checking of all readings at 12:00Am are correct or not Check min/Max values of all parameters Check the readings are updated in the system correctly or not Prepare Hourly load chart of Trafo-1 & Trafo-2 Visual inspection of 220KV & 33KV yard early morning for normal operation 220KV EARTH PIT MAINTENANCE WORK-24/11/2014 Sr.No Equipment Earth Pit No Status 1 220KV Line-1 R-Phase 1 Ok 2 220KV Line-1 Y-Phase 2 Ok 3 220KV Line-1 B-Phase 3 Ok 4 220KV Line-2 R-Phase 4 Ok 5 220KV Line-2 Y-Phase 5 Ok 6 220KV Line-2 B-Phase 6 Ok 7 220KV side fencing(near tarfo-2 bay) 7 Ok 8 220KV Phaltan R PH CC 8 Ok 9 220KV Phaltan B PH CC 9 Ok 10 220KV Lonand R PH CC 10 Ok 11 220KV Lonand Y PH CC 11 Ok 12 220KV side fencing(near TBC bay) 12 Ok 13 Lighting Tower near TBC bay 13 Nuts & Bolts are rusted need to replace 14 Lighting Tower near Trafo-2 bay 14 Ok 15 Lighting Tower near trafo-2 15 Ok 16 Trafo-2 HV body earthing 16 Ok 17 Trafo-2 HV neutral earthing 17 Ok 18 Trafo-2 LV neutral earthing 21 Ok 19 Trafo-2 LV body earthing 22 Ok 20 Trafo-2 HV side LA R-Phase 18 Ok 21 Trafo-2 HV side LA Y-Phase 19 Ok 22 Trafo-2 HV side LA B-Phase 20 Ok 23 Trafo-1 HV side LA R-Phase 29 Ok 24 Trafo-1 HV side LA Y-Phase 30 Ok 25 Trafo-1 HV side LA B-Phase 31 Ok 26 Trafo-1 HV body earthing 27 Ok 27 Trafo-1 HV neutral earthing 28 Ok 28 Trafo-1 LV neutral earthing 32 Ok 29 Trafo-1 LV body earthing 33 Ok 30 220KV bay control room-1 25 Ok 31 220KV bay control room-1 26 Ok 32 220KV bay control room-2 23 Ok 33 220KV bay control room-2 24 Ok 34 Supporting structure(HV side trafo-1 bay) 34 Ok 35 220KV Bus-A R-Ph-PT 35 Ok 36 220KV Bus-A Y-Ph-PT 36 Ok 37 220KV Bus-A B-Ph-PT 37 Ok 38 220KV Bus-B R-Ph-PT 38 Ok 39 220KV Bus-B Y-Ph-PT 39 Ok 40 220KV Bus-B B-Ph-PT 40 Ok
33KV EARTH PIT MAINTENANCE WORK
Sr.No Equipment Earth Pit No Remark 41 Feeder-1 main meter 55 Ok 42 Feeder-1 check meter 56 Ok 43 Feeder-2 main meter 57 Ok 44 Feeder-2 check meter 58 Ok 45 Feeder-3 main meter 59 Ok 46 Feeder-3 check meter 60 Ok 47 Feeder-4 main meter 61 Ok 48 Feeder-4 check meter 62 Ok 49 Feeder-5 main meter 80 Ok 50 Feeder-5 check meter 81 Ok 51 Feeder-6 main meter 78 Ok 52 Feeder-6 check meter 79 Ok 53 Feeder-7 main meter 76 Ok 54 Feeder-7 check meter 77 Ok 55 Feeder-8 main meter 75 Ok 56 Feeder-8 check meter 74 Nuts & Bolts are rusted need to replace 57 Aux.Trans. 1 neutral earthing 46 Nuts & Bolts are rusted need to replace 58 Aux.Trans. 2 neutral earthing 69 Ok 59 Aux.Trans 1 Body earthing 47 Ok 60 Aux.Trans 2 Body earthing 68 Ok 61 43 Nuts & Bolts are rusted need to replace 33KV ROOM 1 62 63 Ok 63 64 Ok 33KV ROOM 2 64 65 Ok 65 41 Ok LV 1 Structure 66 42 Ok 67 70 Ok LV 2 Structure 68 71 Ok 69 44 Ok LV 1 P.T Structure 70 45 Nuts & Bolts are rusted need to replace 71 66 Ok LV 2 P.T Structure 72 67 Ok 73 33 KV Bus-A Structure 48 Ok 74 33 KV Bus-B Structure 73 Ok 75 33KV fencing near feeder-8 72 Ok 76 49 Ok 77 50 Ok 78 51 Ok PLCC room 79 52 Ok 80 53 Ok 81 54 Ok 82 82 Ok SCADA room 83 83 Ok