Sunteți pe pagina 1din 5

Sr.

No Required Registers for S/S Qty


1 33KV hourly readings Scada 3 No's
2 220KV hourly readings Scada 3 No's
3 TRC register 3 No's
4 Shift log book 5 No's
5 Work Permit Book 3 No's
6 Daily inspection Register 3 No's
7 Battery maintenance Register 2 No's
8 3 hrs ABT MFM raedings register 2 No's
1
2
3
4
5
6
7
8
9
10
Night shift work
Check battery room, ACDB room, PLCC room, 220KV & 33KV control rooms for any abnormality.
Switch off all yard lights & roam in whole substation for any red hot spots or sparking
Check all control room doors & control panel doors are closed or not
Check all the documents in the locker-1 are as per list or not
Check & compare feeder wise total import & export of TRC meter, ABT meter, TVM meter
Checking of all readings at 12:00Am are correct or not
Check min/Max values of all parameters
Check the readings are updated in the system correctly or not
Prepare Hourly load chart of Trafo-1 & Trafo-2
Visual inspection of 220KV & 33KV yard early morning for normal operation
220KV EARTH PIT MAINTENANCE WORK-24/11/2014
Sr.No Equipment Earth Pit No Status
1 220KV Line-1 R-Phase 1 Ok
2 220KV Line-1 Y-Phase 2 Ok
3 220KV Line-1 B-Phase 3 Ok
4 220KV Line-2 R-Phase 4 Ok
5 220KV Line-2 Y-Phase 5 Ok
6 220KV Line-2 B-Phase 6 Ok
7 220KV side fencing(near tarfo-2 bay) 7 Ok
8 220KV Phaltan R PH CC 8 Ok
9 220KV Phaltan B PH CC 9 Ok
10 220KV Lonand R PH CC 10 Ok
11 220KV Lonand Y PH CC 11 Ok
12 220KV side fencing(near TBC bay) 12 Ok
13 Lighting Tower near TBC bay 13 Nuts & Bolts are rusted need to replace
14 Lighting Tower near Trafo-2 bay 14 Ok
15 Lighting Tower near trafo-2 15 Ok
16 Trafo-2 HV body earthing 16 Ok
17 Trafo-2 HV neutral earthing 17 Ok
18 Trafo-2 LV neutral earthing 21 Ok
19 Trafo-2 LV body earthing 22 Ok
20 Trafo-2 HV side LA R-Phase 18 Ok
21 Trafo-2 HV side LA Y-Phase 19 Ok
22 Trafo-2 HV side LA B-Phase 20 Ok
23 Trafo-1 HV side LA R-Phase 29 Ok
24 Trafo-1 HV side LA Y-Phase 30 Ok
25 Trafo-1 HV side LA B-Phase 31 Ok
26 Trafo-1 HV body earthing 27 Ok
27 Trafo-1 HV neutral earthing 28 Ok
28 Trafo-1 LV neutral earthing 32 Ok
29 Trafo-1 LV body earthing 33 Ok
30 220KV bay control room-1 25 Ok
31 220KV bay control room-1 26 Ok
32 220KV bay control room-2 23 Ok
33 220KV bay control room-2 24 Ok
34 Supporting structure(HV side trafo-1 bay) 34 Ok
35 220KV Bus-A R-Ph-PT 35 Ok
36 220KV Bus-A Y-Ph-PT 36 Ok
37 220KV Bus-A B-Ph-PT 37 Ok
38 220KV Bus-B R-Ph-PT 38 Ok
39 220KV Bus-B Y-Ph-PT 39 Ok
40 220KV Bus-B B-Ph-PT 40 Ok

33KV EARTH PIT MAINTENANCE WORK


Sr.No Equipment Earth Pit No Remark
41 Feeder-1 main meter 55 Ok
42 Feeder-1 check meter 56 Ok
43 Feeder-2 main meter 57 Ok
44 Feeder-2 check meter 58 Ok
45 Feeder-3 main meter 59 Ok
46 Feeder-3 check meter 60 Ok
47 Feeder-4 main meter 61 Ok
48 Feeder-4 check meter 62 Ok
49 Feeder-5 main meter 80 Ok
50 Feeder-5 check meter 81 Ok
51 Feeder-6 main meter 78 Ok
52 Feeder-6 check meter 79 Ok
53 Feeder-7 main meter 76 Ok
54 Feeder-7 check meter 77 Ok
55 Feeder-8 main meter 75 Ok
56 Feeder-8 check meter 74 Nuts & Bolts are rusted need to replace
57 Aux.Trans. 1 neutral earthing 46 Nuts & Bolts are rusted need to replace
58 Aux.Trans. 2 neutral earthing 69 Ok
59 Aux.Trans 1 Body earthing 47 Ok
60 Aux.Trans 2 Body earthing 68 Ok
61 43 Nuts & Bolts are rusted need to replace
33KV ROOM 1
62 63 Ok
63 64 Ok
33KV ROOM 2
64 65 Ok
65 41 Ok
LV 1 Structure
66 42 Ok
67 70 Ok
LV 2 Structure
68 71 Ok
69 44 Ok
LV 1 P.T Structure
70 45 Nuts & Bolts are rusted need to replace
71 66 Ok
LV 2 P.T Structure
72 67 Ok
73 33 KV Bus-A Structure 48 Ok
74 33 KV Bus-B Structure 73 Ok
75 33KV fencing near feeder-8 72 Ok
76 49 Ok
77 50 Ok
78 51 Ok
PLCC room
79 52 Ok
80 53 Ok
81 54 Ok
82 82 Ok
SCADA room
83 83 Ok

S-ar putea să vă placă și