Sunteți pe pagina 1din 9

3.

0 RESULT

Based on our observation the table 1 show the result of Hiracs element of Carding machines proces, table 2 for Ringframe machine process and
table 3 Drawframe Machine Process

HIRACS FORM
Company : University Tun Hussein Onn Conducted by : 1. Nur Farah Hanis bt Sharif
Process / location : Lab Spinning 2. Nur Hanis bt Othman Ali
Approved by : Prof Madya Dr. Abdul Date : from 18th March 2019 3. Nur Izzati bt Ibrahim
Mutalib b. Leman to 19th March 2019
(Name , designation ) 4. Nur Aini bt Halim

Date 18th March 2019 Review Date : 20th March 2019


Types of machine / Carding Machine Process
process

1. Hazard identification 2. Risk analysis 3. Risk control

No Work activity Hazard Which can Existing risk Likelihood Severity Risk Recommend PIC (Due
. cause / effect control control date / status )
(if any) measures
1 Turn on the power Electric Injury from PPE 4 1 1 Adhere the Hanis
supply shock electric shock SOP
2 Raw material is - - - Adhere the Farah
opened by hand and SOP
Effect of Lungs injury PPE
spread evenly on
fiber cotton
feed apron
3 Use the handle to - - PPE - - - Adhere the Izzati
combine doffer SOP
cylinder & doffer
comb
4 Press start button - - - - - - Adhere the Aini
SOP

5 Carded material is PPE 1 2 1 Adhere the Hanis


removed from the SOP and use
Effect fiber Effect
doffer cylinder by PPE
cotton respiration
the doffer comb
system-lung
forms a web which
is wound fall width
into take uo drum

Table 1 : Carding Machine Process


HIRACS FORM
Company : University Tun Hussein Conducted by : 1. Nur Farah Hanis Binti Sharif
Onn
(Name ,designation) 2. Nur Hanis Binti Othman Ali
Location Lab Spinning
Date : from 18th March 2019 3. Nur Izzati Binti Ibrahim
Approved by : Prof Madya Dr. Abdul to 19th March 2019
4. Nuraini Binti Abdul Halim
Mutalib bin Leman
(Name , designation )
Date 18th March 2019 Review Date : 20th March 2019
Types of machine / Ringframe Machine Process
process

4. Hazard identification 5. Risk analysis 6. Risk control

No Work activity Hazard Which can cause / Existing Likelihood Severity Risk Recommend PIC (Due
. effect risk control control date / status )
measures
(if any)
1 Turn on the Electric Injury from PPE 4 1 1 Adhere the Farah
power supply shock electric shock SOP
2 Attached silver _ _ PPE _ _ _ Adhere the Aini
at the drum SOP
drive
3 Tuck in the _ _ PPE _ _ _ Adhere the Hanis
silver from top SOP
to the bottom
roller
4 Tight the roller _ _ PPE _ _ _ Adhere the Hanis
weighting arm SOP
5 Run the Effect fiber Effect respiration PPE 1 2 1 Adhere the Izzati
machine cotton system SOP
momentarily
tuck in the yarn
from the bobbin
through ring at
spindle
6 Press the start PPE 4 1 1 Adhere the Farah
button on the SOP
Electric Injured effect
machine and
shock from the electric
the yarn was
produce

Table 2 : Ringframe Machine Process


HIRACS FORM
Company : University Tun Hussein Onn Conducted by : 1. Nur Hanis binti Othman
Ali
Process / location : Spinning Laboratory (Name ,designation)
Approved by : Prof. Madya Dr. Abdul Date : from 18th March 2019 2. Nur Farah Hanis binti
Mutalib bin Leman to 19th March 2019 Sharif
(Name , designation )
3. Nur Aini binti Abd Halim
4. Nur Izzati binti Ibrahim
Date 18th March 2019 Review Date : 20th March 2019
Process/ machine : Drawframe Machine Process

7. Hazard identification 8. Risk analysis 9. Risk control

No Work activity Hazard Which can cause / Existing Likelihood Severity Risk Recommend PIC (Due
. effect risk control control date / status )
measures
(if any)
1 Turn on power Electric Injury from PPE 4 1 4 Adhere the Izzati
supply shock electric shock SOP
2 The carded - - PPE - - - Adhere the Aini
material from SOP
the drum is
attached to the
drafting
3 Loosen the - - PPE - - - Adhere the Izzati
hook weight to SOP
install the
carded material
under the top
roller
4 Use the hand to Effect Lungs injury PPE 1 2 2 Adhere the Aini
insert cotton from SOP
sample into the cotton
trumpet to get fiber
the sliver
5 The sliver from Effect Lungs injury PPE 1 2 2 Adhere the Izzati
the trumpet is from SOP
rolled at the cotton
take up drum fiber
6 Switch off Electric Injury from PPE 4 1 4 Adhere the Aini
machine at shock electric shock SOP
control box and
power supply

Table 3 : Drawframe Machine Process