Sunteți pe pagina 1din 32

SINGLE USE FORMWORK SYSTEM UP TO 700 MM HEIGHT

modulo the evolution of the crawl space

• VENTILATED CRAWL SPACE


• HIGH LOAD-BEARING CAPACITY
• LOGISTICAL ADVANTAGES

w w w . g e o p l a s t . i t
BUILDING
2

MODULO
VISION
Humans have always felt the need to live in comfortable houses, experimenting. since the beginning, construction meth-
ods to separate the buildings from the ground: Neolithic pile dwellings answered this precise need.
Ancient Romans built elevated floorings to improve air circulation under their houses, eliminating rising damp and at
the same time heating the rooms of the upper floors. Today, ventilated foundations are still the best solution to eliminate
Radon Gas, a carcinogenic and very harmful gas which is naturally present in the subsoil.
Geoplast has improved these ancient methods in order to allow you to live in healthier and safer buildings.

ANCIENT METHODS FOR NEW NEEDS:


HISTORY TAUGHT US HOW TO BUILD WHILE PROTECTING OUR HEALTH

Geoplast S.p.A. in Green Building Council Italy,


Not only we transform our ideas into innovative and successful prod- The Network for Green Building.
ucts: we are committed also to the study and selection of the most suit-
able materials in order to guarantee high quality and respect of the envi-
ronment.

Polypropylene (PP) is a recyclable material that can be obtained from plas-


tic waste regeneration.

Solid and strong, very resistant to both breaking loads and abrasions: re-
generated polypropylene is a chemically inert material, neutral to the en-
vironment and non-pollutant when in contact with ground or water.

www.geoplast.it
MODULO | CONCEPT
3

MODULO
SINGLE USE
FORMWORK FOR:
the creation of ventilated foundations. with a slab and a series of pillars placed at a
MODULO is a single use formwork that elim- fixed distance. Such a structure permits a uni-
inates rising damp and RADON GAS, that form stress distribution all over the surface,
naturally exists in the soil in most parts of thus producing an excellent static and dy-
the world. MODULO allows the construction namic load-bearing capacity.
of a reinforced concrete structure provided

APPLICATIONS
VENTILATED CRAWL COMPENSATION OF VENTILATED
SPACE SLAB LEVEL ROOFS
LIGHTENING OF SLABS GREEN ROOF GEOPLAST HOUSING
WALKWAYS SYSTEM
TECHNICAL VOID SPACE
FRIDGE CELLS STORMWATER
FILLING OF SLABS AND MANAGEMENT
FOUNDATIONS
ACOUSTIC INSULATION RESTORATION AEROBIC
MINIMODULO INTERVENTIONS STABILIZATION SYSTEMS
www.geoplast.it
BUILDING
4

MODULO
ADVANTAGES

Modular and single use formwork system for ventilated crawl spaces for the
creation of a physical barrier between the ground and the building

stackable light high load


Unmatched logistical
By far it is the lightest
bearing
advantages when transporting
filling solution; the total weight of Countless pillars, arches and
and storing. At a height of
the cross section is approximately domes create the highest load
50 cm, conventional filling
equal to the thickness of the bearing structure
requires 50 trucks of filling in
upper slab
comparison to only 1 truck of
MODULO.

void space fast savings


The void space created under When compared with MODULO system allows
MODULO allows an easy traditional systems, savings compared to the use
installation of electrical as well it guarantees a faster of traditional inert materials,
as mechanical systems. The installation up to the 80% especially in terms of transport
void space is also perfect for (in respect to the use of the and installation
ventilating damp and RADON traditional inert materials)
GAS away from the building

www.geoplast.it
MODULO | TECHINICAL DATA
5

A SUMMARY OF THE
TECHNICAL DATA
MINI MULTI
MODULO MODULO MODULO
50/58 50/71 71
50/58

50/71

71
50/58 50/71 71
H

ACCESSORIES FOR
VENTILATED FOUNDATIONS
GEOBLOCK GEOBLOCK
MODULO MULTIMODULO
13/70

HEIGHT HEIGHT
from 13 to 70 cm from 13 to 40 cm
13/40

WEIGHT PCS. WEIGHT PCS.


from 0,55 to 4,29 kg from 0,37 to 0,98 kg
www.geoplast.it
BUILDING
6

THE EXTENSION GEOBLOCK

GEOBLOCK
The combination of MODULO adjustable product, adaptable
and GEOBLOCK allows the to any worksite situation and
creation of a monolithic slab available for every MODULO
without the risk of cracks or height.
breakage. The extension is an 
WHAT ARE THE ADVANTAGES?

A
STRUCTURAL CONTINUITY
single pour of crawl space and
foundation beams

B
SAFETY IN THE WORKSITE
It is possible to walk over the formwork, espe-
cially along the perimeter, as there is always a
complete element
C
ELIMINATION OF THE DOUBLE FORMWORK
thanks to GEOBLOCK the beams does not
need to be formed internally

D
COMPENSATION ADJUSTABILITY
the depth of GEOBLOCK extension can be
modified

E
NO CUTTING OF THE FORMWORK
the distances can be compensated without
cutting the formwork

cutting no cutting

The planning
GEOPLAST offers a plan- rate counting of the pieces
ning service on the basis of and a detailed installation
a DWG analysis of the foun- scheme.
dation, in order to obtain a
graphic file with an accu-

www.geoplast.it
MODULO | GEOBLOCK
7

SINGLE
CONCRETE POUR
The possibility to pour at the same tive advantages thanks to GEOB-
time the crawl space slab and the LOCK, which works as a side cap of
foundation beams avoids the ne- the formwork. Moreover, the single
cessity of installing, pouring and pour produces a higher resistance
dismantling the formwork for the for the fragile coupling point be-
foundation beams: the construc- tween the beam and the slab.
tion operations will be reduced to a
single pour, with various cost-effec-

4
5

1
3
2

1 Lean concrete

2 MODULO formwork

3 GEOBLOCK

4 Wire Mesh
5 Concrete slab
www.geoplast.it
BUILDING
8

ISSUES CAUSED BY
RADON GAS

The origin of Radon in our houses


WHAT IS IT?
RADON is an odourless buildings, especially in
and colourless radioactive ground floors. In these ar- 19% Soil
Well Water
gas that can be found in eas, RADON can reach External Air
variable quantities in the high concentration levels, 9% Building Materials
Public water system
Earth’s crust. The main hus could create very seri-
source of environmental ous health hazards. This
68%
emission of this gas is the problem could be easily 3%
soil itself. Radon tends prevented if considered at 1%
to accumulate in closed, the planning stage of the
unventilated rooms of building.
Source: ©Bob’s Radon Mitigation

RISING
Where does it come from?
The soil is a heterogeneous mixture sation, fungi and mold, as well as
of solid elements, air and water. the possibility of deterioration of
The last one is the most subject to the timber elements of the struc-

damp fluctuation, due to meteoric and


groundwater contribution, evapo-
ration and deep percolation. Water
ture. The direct contact with the
ground causes rising damp issues
to people and buildings. Rising
can cause serious issues when in damp is the most common type of
contact with a traditional founda- humidity and can be found both in
tion: infiltrations, cold, humid and old and new buildings.
unhealthy environments, conden-

www.geoplast.it
BUILDING | NO RADON GAS
9

RISKS FOR
YOUR HEALTH

W.H.O. RADON is the second cause


of lung cancer after cigarette
smoking. The World Health Or-
World Health ganization supports this state-
Organization ment and classifies RADON
GAS as one of the most carcino-
genic and harmful substances
for humans.

DAMP
What are the consequences?
STATIC DAMAGES: the salts that can be found in the building material and in the soil
melt down in the water. They rise up to the upper layer of the wall and increase their vol-
ume up to 12 times. The plaster will start to come off and the entire structure will deterio-
rate
AESTHETICAL DAMAGES: damp spots or marks, mould, paint that splits apart, deterio-
ration of the structures and of the wooden furniture

HEALTH DAMAGES: the mould feeds on rising damp and releases harmful spores,
moreover the places become unhealthy and cold facilitating deaseases and physical
discomfort
www.geoplast.it
BUILDING
10

THE VENTILATED
CRAWL SPACE
WHY?
It is possible to defend and natural air circulation health. GEOPLAST sug-
ourselves against RA- between the ground level gests a specific system for
DON GAS and rising and the ground floor. A the creation of a ventilat-
damp that are all caused properly ventilated crawl ed crawl space: MODULO
due to direct contact with space avoids contact SYSTEM.
the ground; VENTILATED of the building with the
FOUNDATION. This in- ground, creates an “EMP-
novative yet simple solu- TY SPACE” with many
tion guarantees uniform benefits to the building’s

The history
Even the ancient Romans understood that the direct contact with the ground was not healthy:
in fact, they built crawl spaces in order to eliminate rising damp from the building while heating
their houses.
The concept of VENTILATED FOUNDATION, synonymous with healthy houses, developed in
this way.

ADVANTAGES
RADON GAS MITIGATION BARRIER GROUND/FLOORING
RISING DAMP ELIMINATION NO MOULD
www.geoplast.it
MODULO | APPLICATIONS
11

HOW IS IT CREATED?
In order to improve the ventila- be placed with:
tion of the foundation created - INLET: colder side (NORTH or
with MODULO, it would be use- EAST) and close to the ground
ful to take advantage of the level (~50 cm)
CHIMNEY EFFECT. For a proper
ventilation, the system should - OUTLET: warmer side (SOUTH or
be oriented from North to South WEST) and in an higher position
or where not possible, from East (usually at the height of the inter-
to West. The greater the differ- floor, if possible).
ence in height, the greater the
air draught. The inlet pipes must

NORTH
(colder side)
To guarantee a uniform air circulation, all the ar-
eas must be connected together even when inter-
rupted by foundation beam or kerbs. GEOBLOCK
extensions need to be perforated in order to insert
the pipe into the element to connect the crawl space
with the outside. The connection must be made
SOUTH with worksite PVC pipes.
(warmer side)

The air flow can be obtained sion net. The pipe with the low-
creating holes of 80/120 mm er inlet must reach half of the
diameter over the perimetral formwork in order to guarantee
beams, every 3,50/4,00 m, an efficient air channeling and
provided with the PVC pipe to generate a chimney effect.
connection and external stain-
less steel grids with anti-intru-

SOUTHERN
SIDE

NORTHERN
SIDE

The chimney effect


The chimney effect is a natu- is possible to take advantage
ral phenomenon generated of this effect to improve the
within ventilated areas con- ventilation of a crawl space,
nected with the outside and thus creating the ideal air cir-
it is produced by pressure dif- culation for the elimination
ferences. These differences of rising damp and the dis-
are caused by the air density persion of Radon Gas in the
and the fluids temperature. It atmosphere.
www.geoplast.it
BUILDING
12

LIGHTENING
OF SLABS

Thickness of the
slab reduced
MODULO is also a lightening
system that can offer many
ond, there are savings both
in terms of time, labour and
Simplified logistics
benefits. First, it is particularly material costs, because the Heat insulation
useful in multi-storey build-
ings as the total structure
amount of concrete and steel
used is highly reduced. Final-
Crack prevention
becomes lighter with MOD- ly, thanks to the creation of
ULO system. This lightness a void space in multi-storey
reduces the thickness of the buildings, MODULO ensures
slab, as well as the total load noise reduction, heat insu-
of the structure burdening on lation and an higher living
pillars and foundations. Sec- comfort.

Flooring set

Insulation layer

Wire mesh

Concrete pour

Slab
MODULO
www.geoplast.it
MODULO | APPLICATIONS
13

TECHNICAL
VOID SPACE

Void space for the


passage of technical installation
With MODULO it is pos-
sible to raise the level of
pipes can be laid before
or after the construction
High energy efficiency
the floor and also create and the maintenance High load bearing surface
a structural void space
that allows the passage
is not invasive. Moreo-
ver, the implementation
Easy to install systems
of electrical, heating, can be done both in new
ventilation, air condi- and renovated build-
tioning and plumbing ings. The surface is con-
systems. This space al- tinuous unlike modular
lows an easy and eco- raised floors and has a
nomic functioning of very high load bearing
the building. Cables and capacity.

Insulation Layer

Flooring set
Wire mesh

Concrete
pour

MODULO www.geoplast.it
BUILDING
14

FILLING OF
SLABS AND
FOUNDATIONS

The best
filling system
Thanks to its logistical
advantages and light-
est since the extra load of
the filling is only the con-
Quick installation
ness, MODULO is the crete that comes on top Economical advantages
best filling system. In of the system. Moreover,
comparison with tradi- when used on the roof of Time and material savings
tional filling materials a building, it lightens the
(such as: sand, gravel, entire structure, favour-
etc...), MODULO is light- ing also ventilation.

Facilities
Flooring set
Wire mesh
Insulation Layer
Concrete pour

MODULO and GEOBLOCK


www.geoplast.it
MODULO | APPLICATIONS
15

ACOUSTIC INSULATION
MINIMODULO

Modulo H6
application example
Thanks to MODULO H6,
Geoplast manages to reduce
sector, a Prime Minister’s
Decree, dated 5/12/97, on
Acoustic insulation
the slab noise impact up to 10 the “passive acoustic requi- Soundproofing power
dB compared to what would
happen in the same building
sites for the buildings”, was
published.  The decree de-
Reduction of the noise impact
without MODULO. fines the reverberation time,
Curve of the experimental values without the employment of MODULO H6

The law disposal, n° 447 dat- the apparent soundproofing


Curve of the experimental values with the employment of MODULO H6

ed 26/10/95, on noise pol- power of the partition walls,


lution establishes the basic the standardized sound-
principles for the safeguard proofing of the facade and
Interval between the frequencies of reference (ISO 717-2)

of the outdoor and indoor the standard level of slabs


settings.As for the building noise impact.
Standard level (dB)
Curve of the reference values (ISO 717-2)

NEW FLOOR
MINIMODULO

EXISTING FLOOR
Frequency f (Hz)

www.geoplast.it
BUILDING
16

COMPENSATION OF
SLAB LEVEL

An alternative to the
traditional inert filling systems
Thanks to its high ver-
satility MODULO can be
perfect solution. It fills
the gap between differ-
Simplified logistics
used as an alternative to ent levels without adding High lightening
the traditional inert fill- extra weight on the entire
ing systems. In the of- structure. Labour savings
fices where the spaces
are divided in different
levels, MODULO is the

Insulation layer

Flooring set
Facilities screed

Concrete pour

Wire mesh

MODULO and GEOBLOCK

www.geoplast.it
MODULO | APPLICATIONS
17

GREEN ROOF
WALKWAYS

Walkways to cross
the green areas
Green areas have al-
ways been an addition-
of green roof had to be
introduced. Green roofs
Load weight reduction
al value in our cities. need walkways to cross high load bearing capacity
In small areas where
there is not enough
the green areas as it
happens in our gardens
Quick to install
space to use, different and MODULO large
levels solutions had to range of heights are the
be taken into consid- best solution.
erationso, the concept

Reinforced concrete slab Paving

Earth filler

MODULO and GEOBLOCK


MINIMODULO

www.geoplast.it
BUILDING
18

FRIDGE
CELLS

Fresh products,
stored in safe environments
In warehouses and fridge
cells the cold reaches
effective and safe solu-
tion to this problem is the
No frost heaving
the ground, lowering its building of a ventilated High load-bearing capacity
temperature to below foundation between the
0°C. This produces the ground and the build- Technical void space
freezing of the soil, thus ing, in order to eliminate
increasing the water vol- moisture infiltrations
ume and causing cracks completely.
and deformations of the
floor. The most cost-

Flooring set

Insulation layer

Wire mesh

Concrete pour

MODULO and GEOBLOCK


www.geoplast.it
MODULO | APPLICATIONS
19

RESTORATION
INTERVENTIONS

The innovative
ventilated crawl space
MINIMODULO system is
very useful in renovation in-
thickness, thus avoiding
loss of useful height. More-
Reduced thickness
terventions, as it allows the over, in difficult to access Moisture elimination
creation of ventilated floors areas, like historical cen-
with mini technical void tres, it simplifies logistics Downstream intervention
spaces suitable for hydrau- and transport as it is space-
lic pipes and electrical in- saving and easy to handle.
stallations. The products’s
heights range permits to
intervene also with reduced

Flooring set
Facilities

Wire mesh

Concrete pour

MINIMODULO
www.geoplast.it
BUILDING
20

VENTILATED
ROOFS

Thermal comfort
with ventilated roofs
Recently the construction transmission and thermal
world has increasingly fo- shock. This system cools
Condensation effect elimination
cused on the planning of down the roof and walls Ventilation in both directions
high energy-efficient build- during summer and warms
ings with high environmen- them during winter. The Reduced weight of the elements
tal comfort: this is possible form of the element and the
also through the ventilation short-distanced feet allow
of roofs and walls. MINI- the creation of a ventilation
MODULO is ideal for the cre- chamber in both directions.
ation of ventilated surfaces
designed to reduce heat

Wire mesh

Installation screed
Waterproof sheath Flooring set

Waterproof sheath
Concrete pour
Insulation layer

MINIMODULO Slab

www.geoplast.it
MODULO | APPLICATIONS
21

GEOPLAST
HOUSING SYSTEM

High productivity
low-cost houses
MODULO is particularly only weakness is the neces-
suitable for the creation of sity to create a ventilated
Costs reduction
pre-fabricated “low cost foundation in order to ther- Healthy and safe house
houses”. This is a particu- mally insulate the house.
larly easy and fast system The ventilation created with Fast construction
that improves life quality by MODULO eliminates rising
separating the floor from the damp protecting and seal-
ground thanks to innova- ing the timber frame.
tive construction methods.
MODULO can be a winning
solution also with last gen-
eration timber lodges: their

www.geoplast.it
BUILDING
22

STORMWATER
MANAGEMENT

Creation of storage tanks


with reduced height
MODULO allows the crea-
tion of rainwater storage
hydraulic system of a cer-
tain area. The wide range of
Reduced digging depth
and lamination tanks with a heights and the system re- Good storage capacity
reduced height and a large sistance allow the creation
surface. This is the ideal so- of storage ponds adaptable High load-bearing capacity
lution when the groundwa- to any situation.
ter is close to the ground-
level or during urban
requalification interven-
tions that could modify the

Flooring set

Wire mesh
Concrete pour

Pump
MODULO and GEOBLOCK

www.geoplast.it
MODULO | APPLICATIONS
23

AEROBIC
STABILIZATION
SYSTEMS

Optimal treatment
of organic waste
MODULO allows the crea-
tion of a perforated floor-
has an high resistance to
loads, allowing the transit of
Uniform air diffusion
ing, with a uniform distribu- the machinery for the load Quick and easy installation
tion of the holes all over the
surface. This facilitates a
and unload of the material
or for the waste mechanic
High resistance to loads
uniform diffusion of the air treatment.
within the waste, in order
to optimize the process and
optain an high quality final-
product. MODULO structure

Flooring set

Gravel
Inspection channel Weak concrete

BIOMODULO + GEOBLOCK www.geoplast.it


BUILDING
24

DIMENSIONS OF
MODULO H3/H60
Size Weight Concrete
Consum. Packaging size m2 no. pcs.
Height cm kg m3/m2 m3/m2 per pallet per pallet
3 50 x 50 0,76 0,004 120 x 102 x H220 180 720
6 50 x 50 0,99 0,009 120 x 102 x H220 180 720

9 58 x 58 1,11 0,010 120 x 120 x H240 240 720

13 50 x 50 1,17 0,028 102 x 102 x H235 90 360

15 50 x 50 1,18 0,030 102 x 102 x H240 90 360

17 50 x 50 1,35 0,035 102 x 102 x H235 90 360

20 50 x 50 1,38 0,037 102 x 102 x H240 90 360

25 50 x 50 1,40 0,038 102 x 102 x H235 90 360

27 50 x 50 1,44 0,040 102 x 102 x H235 75 300

30 50 x 50 1,55 0,044 102 x 102 x H240 75 300

35 50 x 50 1,61 0,052 107 x 107 x H230 75 300

40 50 x 50 1,78 0,056 107 x 107 x H230 75 300

45 71 x71 2,97 0,064 151 x 151 x H230 150 300

50 71 x71 3,50 0,076 151 x 151 x H230 150 300

55 71 x71 3,55 0,078 151 x 151 x H225 120 240

60 71 x71 4,05 0,079 153 x 153 x H230 120 240


MODULO | DIMENSIONAL TABLE
25

DIMENSIONS OF
MODULO H65/H70
Size Weight Concrete
Consum. Packaging Size m2 no.pcs
Height cm kg m3/m2 m3/m2 per pallet per pallet

65 71 x71 4,25 0,084 153 x 153 x H230 120 240

70 71 x71 4,10 0,083 153 x 153 x H240 120 240

DIMENSIONS OF
MULTIMODULO H13/H40 Concrete
Size Weight Consum. Packaging Size m2 no. pcs.
Height cm kg m3/m2 m3/m2 per pallet per pallet

13 71 x71 2,14 0,020 151 x 151 x H225 180 360

15 71 x71 2,19 0,027 151 x 151 x H225 180 360

17 71 x71 2,24 0,028 151 x 151 x H226 180 360

20 71 x71 2,45 0,032 151 x 151 x H250 150 300

25 71 x71 2,62 0,033 151 x 151 x H235 180 360

27 71 x71 2,59 0,035 151 x 151 x H235 180 360

30 71 x71 2,99 0,042 151 x 151 x H250 150 300

35 71 x71 2,73 0,045 151 x 151 x H240 180 360

40 71 x71 3,19 0,050 151 x 151 x H265 150 300


www.geoplast.it
BUILDING
26

GEOBLOCK
GEOBLOCK MODULO* GEOBLOCK MULTIMODULO*
GEOBLOCK Min Ext. Packaging size GEOBLOCK Min Ext. Packaging size
Modulo No. pcs. Multimodulo No. pcs.
Max (cm) (cm) Max (cm) (cm)

H13 3,5 - 25 110 x 110 x H180 500 H13 2,4 - 23 120 x100 x H110 500

H15 3,5 - 25 110 x 100 x H180 500 H15 2,4 - 23 110 x 93 x H110 500

H17 3,5 - 25 110 x 120 x H190 500 H17 2,4 - 23 121 x 93 x H110 500

H20 3,5 - 25 110 x 120 x H195 500 H20 2,4 - 23,5 110 x 97 x H120 500

H25 3,5 - 25 110 x 120 x H195 500 H25 2,4 - 24 122 x 100 x H120 500

H27 3,5 - 25 115 x 120 x H200 500 H27 2,4 - 24,5 120 x 102 x H130 500

H30 3,5 - 25 115 x 120 x H200 500 H30 2,4 - 25 120 x 102 x H130 500

H35 3,5 - 26 115 x 120 x H210 500 H35 2,4 - 25 124x 103 x H140 500

H40 3,5 - 26 120 x 130 x H210 500 H40 2,4 - 26 125 x 107 x H140 500

*pitch: 3,5 cm
H45 3,5 - 36 100 x 120 x H220 200

H50 3,5 - 37 100 x 120 x H225 200 ACCESSORIES OF


H55 3,5 - 39 106 x 120 x H230 200
MULTIMODULO SYSTEM
H60 3,5 - 38 106x 120 x H240 200 fermagetto in
plastic
H65 3,5 - 39 110 x 120 x H240 200
paperboard
Side closure element for
H70 3,5 - 39 110 x 120 x H245 200 MULTIMODULO heights from 13 to 40 cm
*pitch: 3,5 cm

ACCESSORIES OF MODULO SYSTEM


fermagetto modulo This element prevents the intrusion of concrete in the crawl space. It
*ring
retaining for
is available for MODULO heights from 13 to 40 cm

MODULO H65 e H70


fermagetto in plastic
paperboard
Side closure element for MODULO heights from 45 to 70 cm
www.geoplast.it
MODULO | LOAD TABLE
27

LOAD
TABLES
MINIMODULO
LOAD THICKNESS WIRE MESH THICKNESS THICKNESS GROUND
(Kg/m2) of the slab lean concrete gravel pressure
(cm) (mm) (cm) (cm) (Kg/cm2)

500 5 Ø5/25x25 5 0,21


1,000 5 Ø6/20x20 5 0,42
2,500 5 Ø6/20x20 5 1,06
50 cm
/5 8 5,000 5 Ø8/20x20 10 0,76
8c /5
m 50
10,000 6 Ø10/20x20 5 10 0,77
> 10,000 To evaluate each case, please contact Geoplast Technical Department

MODULO 50 x 50
THICKNESS THICKNESS THICKNESS GROUND
LOAD of the slab WIRE MESH lean concrete
(Kg/m2) gravel pressure
(mm) (cm) (Kg/cm2)
(cm) (cm)

500 5 Ø5/25x25 5 0,29


1,000 5 Ø6/20x20 5 0,58
2,500 5 Ø8/20x20 10 0,72
50 5,000 7 Ø8/20x20 5 10 0,90
cm
cm
50
10,000 6 Ø10/20x20 5 15 1,10
> 10,000 To evaluate each case, please contact Geoplast Technical Department

MODULO 71 x 71
Entità di carico
LOAD
(Kg/m2)
THICKNESS
of the slab
WIRE MESH
(mm)
THICKNESS
lean concret
THICKNESS
gravel
GROUND
pressure
(perm. acc.) (Kg/m )
2 (cm) (cm) (cm) (Kg/cm2)

500 5 Ø5/25x25 5 0,42


200 - 500
1,000 6 Ø6/20x20 5 0,85
500 - 1000
2,500 7 Ø8/20x20 10 1,14
1000 - 2500
5,000 8 Ø8/20x20 5 10 1,42
71
cm
71
cm 2500 - 5000
8,000 10 Ø10/20x20 5 15 1,35
5000 - 10000
> 10,000 To evaluate each case, please contact Geoplast Technical Department
> 10000

MULTIMODULO
THICKNESS WIRE MESH THICKNESS THICKNESS GROUND
LOAD of the slab lean concret gravel pressure
(Kg/m2) (mm)
(cm) (cm) (cm) (Kg/cm2)

500 5 Ø5/25x25 5 0,21


1,000 5 Ø6/20x20 5 0,41
2,500 5 Ø6/20x20 5 1,03
71 c cm 5,000 6 Ø8/20x20 10 0,85
m 71
10,000 8 Ø8/20x20 5 15 1,07
> 10,000 To evaluate each case, please contact Geoplast Technical Department

www.geoplast.it
BUILDING
28

MODULO + GEOBLOCK
INSTALLATION

1 PREPARATION 2 FACILITIES 3 FORMWORK


Creation of a laying surface with lean concrete Installation of the pipes to place them into the Installation of MODULO formwork following
and ins tallation of the external formwork and perimetral ventilation holes and then place of the instructions, from right to left as marked in
the reinforcements of the perimetral beams. the possible channeling systems for the pipes. the formwork, without any cutting.

4 GEOBLOCK 5 REINFORCEMENT 6 SINGLE POUR


Installation of GEOBLOCK to get closer to the Installation of the load distribution mesh on Pour of the beams and the foundation slabs.
reinforcements of the foundation: in this way MODULO formwork and connect it to the Follow the instruction in order to pour correctly.
GEOBLOCK permits the shuttering of the foundation beams reinforcement.
beams.

1st ROW

MODULO formwork system must be


installed FROM RIGHT TO LEFT AND 2nd ROW
FROM TOP TO BOTTOM, keeping the
molded arrows pointing towards and to
the left.
It is essential to verify the correct anchor- 3rd ROW
ing of the feet!

www.geoplast.it
MODULO | CONCRETE POURING
29

CONCRETE
POURING
After having installed some MOD- an excessive pressure. The pour
ULO elements, it is possible to walk should be performed by first fill-
on the formwork, being careful to ing partially the feet and then the
walk only in proximity of the pil- upper part of MODULO, not vice-
lars and not directly over the dome. versa. Pour only after the place of
Once the distribution welded wire the welded mesh and after having
mesh is placed, the whole surface verified the correct installation of
is walkable. In the case of pumped the formwork.
concrete, keep the pump outlet at
a maximal distance of 20 cm from
the formwork, in order to avoid

Stage 1 Stage 2 Stage 3


Partially fill MODULO feet Partially fill all kerbs and foundation beams Complete the pour of the feet, kerbs and
foundation beams

DURING SUNNY DAYS WITH


TEMPERATURES OF ABOUT
30°C, IT IS RECOMMENDED
TO POUR IN THE COOLEST
HOURS OR TO SOAK THE
FORMWORK

www.geoplast.it
BUILDING
30

DESIGN &
ASSISTANCE
From predimensioning to load tests
Our technical unit is at your complete disposal .

5
OUR STRENGTHS ARE: MODULO

FEASIBILITY ANALYSIS

27
PREDIMENSIONING OF THE STRUCTURES

ASSISTANCE DURING THE EXECUTIVE DESIGN

ANALISI F.E.M.
The F.E.M. analysis (Finite solid body behaviour: that
Element  Method) allows means that the system is
the study of structures not subjected to bending
built with MODULO sys- nor torsional strains.
tem. The research shows
that the system’s leg has a

Study results
SOLID BEHAVIOUR
X 10-2 REDUCED SYSTEM DEFORMATION
26
DOES NOT NEED REINFORCEMENT FEET
0

-26

-52

-78

-104 N/mm2

Tension stress diagram

Prove di carico
Geoplast esegue sui pro- alcuni prodotti sono stati
Inquadra il simbolo col tuo
dotti della gamma MODU- effettuati test da parte di smartphone per scaricare
LO costanti e rigorosi test enti certificatori terzi, i quali il documento.

e controlli interni in grado hanno rilasciato certificati


di garantire un elevato con i valori di compressione
controllo della qualità. Su ottenuti.

www.geoplast.it
MODULO | CASE HISTORY
31

CASE
HISTORY

Ciudad de las artes y las ciencias Modulo


Spain Geoblock

Morocco Mall Multimodulo


Morocco

Adnan Menderes Airport Modulo


Turkish Geoblock
www.geoplast.it
GEOPLAST S.p.A.

rev.000 - 07/2015
35010 Grantorto PD - Italia - Via Martiri della Libertà, 6/8
tel +39 049 9490289 - fax +39 049 9494028
e-mail: geoplast@geoplast.it - www.geoplast.it

S-ar putea să vă placă și