DESIGN
Site Layout Plan
Site Layout Plan Site Layout Plan
a. Architectural
Design Architectural
Architectural Detailing Architectural Detailing
Detailing
Earthquake Resistant Earthquake Resistant Earthquake Resistant
b. Structural & Structural Detailing Structural Detailing Structural Detailing
MEP Design Plumbing and Plumbing and Plumbing and
I Electrical drawing Electrical drawing Electrical drawing
Furniture Layout Furniture Layout Furniture Layout
Hardscape & Hardscape &
Landscape Landscape
c. Additionals Rain Water Harvesting Rain Water Harvesting
Heating Ventilation
Heating Ventilation
and Air Conditioning
and Air Conditioning
provisions
CIVIL WORKS
Slab shuttering MS Slab shuttering Film Slab shuttering Film
II
plates faced plywood faced plywood
Column
and Beams
Column and Beams :
: Plywood a. Formwork Column and Beams :
Plywood sheets
sheets Plywood sheets
attached to MS
attached attached to MS frames
frames
to timber
frames
Fe 415 grade
Fe 500 grade Fe 500 grade
Brands: Trishul,
Kamdhenu, Brands: Trishul, Brand : TATA steel,
b.Reinforc
Pushpak,Shakti,e Vizag, JSW, Welspun. Vizag, JSW, SAIL
ement
quivalent
steel
MS binding wire
GI binding wire GI binding wire
Concrete cover
PVC cover blocks PVC cover blocks
blocks
M25 Designed
c. Concrete M25 Designed Mix M25 Designed Mix
Mix
OPC 53 G for OPC 53 G for
d. Cement OPC 53 G for Concrete
Concrete Concrete
Brands: Brands: Chettinad, Brands: Chettinad,
Chettinad, Bharthi, Ultratech, Bharthi, Ultratech,
Bharthi, ACC,Birla Super ACC,Birla Super
ACC,Equivalent
PPC (Portland
Pozzolana PPC (Portland PPC (Portland
Cement) for Pozzolana Cement) Pozzolana Cement) for
masonry, Plaster for masonry, Plaster masonry, Plaster for
for Tiling for Tiling Tiling
Yes. All our customers get customized cost for home construction as per their requirements. You
can Contact us for an appointment to get a detailed quote for your house construction.
The unit rate provided in the house construction packages are based on buildup area (per sq.ft.)
For example if you choose silver package specification and the total build up area (BUA) is 1500
sq.ft., then the total cost of your construction would be = 1500 X 1299 = Rs. 19,48,500/- only
Similarly, if you choose specifications Premium package (Platinum ) and the total build up area is
1500 sq.ft., then the total cost of Platinum home package would be = 1500 X 2399 = Rs.
35,23,500 only .
Built up Area is the total area of construction to be done. Builtup area = Total area of Slab to be
constructed + Total ground floor area (Plinth Area)
Note:
1. If Ground Floor has parking area, then the built up area for parking is considered 70% only.
Example: If you are constructing a G+2 building with ground floor parking and with a floor area of
1000 Sq.ft. each, then the buildup area would be
Buildup area = 1000 * 0.7 (For Parking) + 1000 (For First Floor) + 1000 (For Second Floor) = 2700
Sq.ft.
The home package price complete turnkey construction solutions which includes architectural,
structural & Services drawings, procurement of materials as per individual package
specifications/brands and labor cost for entire construction.
Grills,Marble sills,External development like Compound Wall, Driveways, Building Gate and
External beautification.
Shall be quoted separately as the design of external development is freezed and agreed.
All statutory (government & local bodies) required to carry out or Laisoning Costs
Bore well, Lift, Electrical fittings (Fans, blubs etc.) and State Electricity Board Meter.
Individual Items shall be quoted as a separate rate quote as per customer request.
No, there are no hidden costs. All costs for transportation/ material delivery, drawing plans,
structural and services design etc. are included in the package cost.
The average time is 5-6 months for a 1000 sq.ft. Build up area house. The timeline varies and can
be mutually agreed as per the customer’s planned cash flow.
Payments terms are linked to progress of construction, evenly spread across construction period.
On signing of contract (as advance) : 10% (Recoverable in next four stage of payment)
Upon delivery of steel and cement at site(Plinth and upto first floor): 10% – 2.5*%
Note: Normal wear and tear due to usage is excluded from Home warranty.
Set up Water and Electricity: Single point water and electricity supply to be provided at Plot.
Apply for statutory approvals/Building Permit (if not included in Happho deliverables).
Quality control is overseen internally by in-house team, our general contractors, structural
designers and architects firm.
Offering warranty on executed job I to reaffirm our commitment to customer satisfaction and is an
affirmation of our faith in our execution quality and materials selection.
Yes. Although staying closely involved is clearly easier when you live in town, you can manage the
project remotely with Happho Turnkey construction services.
Once the floor plan has been designed, the only decisions left to make are the colors, fixtures,
finishes.
A Plan on making a trip to town for a couple of days, although they are a busy two days, making
those decisions keeps us on schedule. If traveling is not an option, the best approach is to make
selections our website www.happho.com.
A periodic update on construction progress and budget will be shared with our customer.