Ing. Alejandro González Bolaños
Cédula 1-1354-0240
CFIA: IC-24424
SETENA: CI-337-16
Correo electrónico: alegonb88@gmail.com
i
ÍNDICE DE CONTENIDOS
I. Introducción ....................................................................................................................................................... 1
II. Ubicación y extensión del acueducto ............................................................................................................... 2
III. Infraestructura actual del acueducto ................................................................................................................ 4
III.1. Fuentes de abastecimiento ........................................................................................................................... 4
III.1.1. Cantidad de agua ................................................................................................................................... 4
III.1.2. Calidad de agua ..................................................................................................................................... 4
III.2. Tuberías ......................................................................................................................................................... 5
III.2.1. Tuberías de impulsión ........................................................................................................................... 5
III.2.2. Tuberías de conducción/distribución .................................................................................................... 5
III.2.3. Tuberías de distribución ........................................................................................................................ 6
III.2.4. Tuberías de conducción ........................................................................................................................ 6
III.3. Tanques de almacenamiento ........................................................................................................................ 6
III.4. Equipo de bombeo en Caseta de Bombeo .................................................................................................. 6
IV. Balance hídrico para el escenario actual ......................................................................................................... 7
IV.1. Demanda actual del sistema ........................................................................................................................ 7
IV.1.1. Servicios atendidos ............................................................................................................................... 7
IV.1.2. Densidad poblacional ............................................................................................................................ 7
IV.1.3. Consumo promedio por habitante ........................................................................................................ 7
IV.1.4. Agua no contabilizada ........................................................................................................................... 7
IV.1.5. Demanda promedio del sistema .........................................................................................................10
IV.1.6. Demanda máxima diaria del sistema .................................................................................................10
IV.1.7. Demanda máxima horaria del sistema ...............................................................................................11
IV.2. Producción del sistema ...............................................................................................................................11
IV.3. Balance hídrico ............................................................................................................................................12
IV.4. Análisis volumétrico.....................................................................................................................................12
IV.4.1. Volumen requerido para combatir incendios .....................................................................................12
IV.4.2. Volumen requerido para regulación diaria .........................................................................................12
IV.4.3. Volumen requerido para abastecer el sistema durante interrupciones ............................................12
IV.4.4. Volumen total requerido ......................................................................................................................13
V. Análisis hidráulico para el escenario actual – sin proyecto ..........................................................................13
V.1. Metodología ..................................................................................................................................................13
V.2. Criterios de aceptación ................................................................................................................................14
ii
V.3. Modelo ..........................................................................................................................................................14
V.4. Resultados ....................................................................................................................................................15
V.4.1. Escenario estático – caso actual, sin proyecto ...................................................................................16
V.4.2. Escenario máximo horario – caso actual, sin proyecto ......................................................................17
VI. Proyecto por desarrollar ..................................................................................................................................18
VI.1. Tipo de proyecto ..........................................................................................................................................18
VI.2. Ubicación de proyecto.................................................................................................................................18
VI.3. Diseño de sitio de proyecto ........................................................................................................................18
VI.4. Demanda de agua potable asociada a proyecto .......................................................................................19
VI.5. Análisis hidráulico para escenario actual – con proyecto .........................................................................20
VI.5.1. Escenario estático – caso actual, con proyecto. ..............................................................................20
VI.5.2. Escenario máximo horario – caso actual, con proyecto...................................................................22
VII. Mejoras propuestas ....................................................................................................................................23
VIII. Balance hídrico para el escenario futuro ...................................................................................................24
VIII.1. Demanda futura del sistema .....................................................................................................................24
VIII.1.1. Servicios por atender ........................................................................................................................24
VIII.1.2. Densidad poblacional ........................................................................................................................25
VIII.1.3. Consumo promedio por habitante ....................................................................................................25
VIII.1.4. Agua no contabilizada .......................................................................................................................25
VIII.1.5. Demanda promedio del sistema .......................................................................................................25
VIII.1.6. Demanda máxima diaria del sistema ...............................................................................................25
VIII.1.7. Demanda máxima horaria del sistema .............................................................................................26
VIII.2. Producción del sistema .............................................................................................................................26
VIII.3. Balance hídrico ..........................................................................................................................................26
VIII.4. Análisis volumétrico ..................................................................................................................................26
IX. Análisis hidráulico para el escenario futuro ...................................................................................................28
IX.1. Modelo .........................................................................................................................................................28
IX.2. Resultados ...................................................................................................................................................28
IX.2.1. Escenario estático ...............................................................................................................................28
IX.2.2. Escenario máximo horario ..................................................................................................................30
X. Presupuesto de obras .....................................................................................................................................31
XI. Conclusiones ...................................................................................................................................................32
XI.1. Conclusión principal ....................................................................................................................................32
XI.2. Conclusiones secundarias ..........................................................................................................................32
XII. Bibliografía...................................................................................................................................................33
iii
XIII. Anexos .........................................................................................................................................................34
iv
ÍNDICE DE CUADROS
Cuadro 1. Cantidad de agua según estudio. ............................................................................................................ 4
Cuadro 2. Calidad de agua. ....................................................................................................................................... 5
Cuadro 3. Desglose de la producción de agua potable en un acueducto. ............................................................. 8
Cuadro 4. Consumo promedio de la ASADA, escenario actual. ...........................................................................10
Cuadro 5. Demanda promedio de la ASADA, escenario actual. ...........................................................................10
Cuadro 6. Demanda máxima diaria de la ASADA, escenario actual. ...................................................................11
Cuadro 7. Demanda máxima horaria de la ASADA, escenario actual. .................................................................11
Cuadro 8. Consumo promedio para proyecto residencial por desarrollar. ...........................................................19
Cuadro 9. Demanda promedio para proyecto residencial por desarrollar. ...........................................................20
Cuadro 10. Demanda máxima diaria para proyecto residencial por desarrollar. .................................................20
Cuadro 11. Demanda máxima horaria para proyecto residencial por desarrollar. ...............................................20
Cuadro 12. Servicios por atender - año 2038, ASADA La Arena. .........................................................................24
Cuadro 13. Consumo promedio de la ASADA, escenario futuro (sin incluir Proyecto La Arena). ......................25
Cuadro 14. Demanda promedio de la ASADA, escenario futuro (sin incluir Proyecto La Arena). ......................25
Cuadro 15. Demanda máxima diaria de la ASADA, escenario futuro (sin incluir Proyecto La Arena). ..............25
Cuadro 16. Demanda máxima horaria de la ASADA, escenario futuro (sin incluir Proyecto La Arena). ............26
Cuadro 17. Presupuesto de obras...........................................................................................................................31
Cuadro 18. Resumen de resultados - nodos de la red - caso actual – escenario estático, sin proyecto. ..........34
Cuadro 19. Resumen de resultados - tuberías de la red - caso actual – escenario estático, sin proyecto. .......37
Cuadro 20. Resumen de resultados - nodos de la red - caso actual – consumo máximo horario, sin proyecto.
...................................................................................................................................................................................40
Cuadro 21. Resumen de resultados - tuberías de la red - caso actual – escenario estático, sin proyecto. .......43
Cuadro 22. Resumen de resultados - nodos de la red - caso actual - escenario estático, con proyecto. ..........46
Cuadro 23. Resumen de resultados - tuberías de la red - caso actual - escenario estático, con proyecto........49
Cuadro 24. Resumen de resultados - nodos de la red - caso actual – consumo máximo horario, con proyecto.
...................................................................................................................................................................................52
Cuadro 25. Resumen de resultados - tuberías de la red - caso actual – consumo máximo horario, con proyecto.
...................................................................................................................................................................................55
Cuadro 26. Resumen de resultados - nodos de la red - caso futuro – escenario estático, con proyecto...........58
Cuadro 27. Resumen de resultados - tuberías de la red - caso futuro – escenario estático, con proyecto. ......61
Cuadro 28. Resumen de resultados - nodos de la red - caso futuro – consumo máximo horario, con proyecto.
...................................................................................................................................................................................64
Cuadro 29. Resumen de resultados - tuberías de la red - caso futuro – consumo máximo horario, con proyecto.
...................................................................................................................................................................................68
v
ÍNDICE DE FIGURAS
Figura 1. Ubicación de ASADA y proyecto La Arena sobre imagen satelital Google Earth. ................................. 2
Figura 2. Ubicación del Proyecto La Arena en hoja cartográfica Naranjo 1:50,000............................................... 3
Figura 3. ANC en Costa Rica para Acueductos Operados por AyA. ...................................................................... 9
Figura 4. Modelo del acueducto - caso actual. .......................................................................................................15
Figura 5. Modelo de caso estático, caso actual......................................................................................................16
Figura 6. Modelo de consumo máximo horario, caso actual, sin proyecto. ..........................................................17
Figura 7. Diseño de sitio – Proyecto La Arena. ......................................................................................................19
Figura 8. Salida gráfica - caso actual, escenario estático, con proyecto. .............................................................21
Figura 9. Salida gráfica - caso actual, escenario máximo horario, con proyecto. ................................................22
Figura 10. Mejoras propuestas. ...............................................................................................................................23
Figura 11. Modelo de escenario estático, caso futuro............................................................................................29
Figura 12. Modelo de consumo máximo horario, caso futuro. ...............................................................................30
vi
I. INTRODUCCIÓN
En el presente estudio, se realiza un análisis de las condiciones hídricas e hidráulicas del cantón de Grecia,
específicamente del acueducto La Arena, administrado por la ASADA La Arena. El objetivo de este análisis es
determinar si el nuevo proyecto residencial, denominado “Proyecto La Arena”, se puede abastecer
satisfactoriamente de este acueducto.
El trabajo desarrollado tiene cuatro aristas principales: el componente topográfico, utilizado para realizar el
análisis hidráulico, el análisis de campo realizado para ubicar, identificar y caracterizar los elementos existentes
del acueducto, la revisión de información técnica y normativa de apoyo y los análisis hídricos e hidráulicos
correspondientes.
Como insumos básicos para este trabajo, se utilizan los informes realizados por Geotec (2014), ICEA (2011),
UCR (2017) y UNA (2009), reportes de aforos y pruebas de calidad de agua de las fuentes de abastecimiento,
características básicas del acueducto existente e información general sobre el proyecto residencial por
desarrollar, así como el levantamiento topográfico aportado por el desarrollador.
1
II. UBICACIÓN Y EXTENSIÓN DEL ACUEDUCTO
El acueducto se ubica en los distritos de Tacares y San José, cantón de Grecia, provincia de Alajuela. El
acueducto se extiende a lo largo de 5.0km sobre vías públicas nacionales y municipales, además de 1.65km a
través de propiedades privadas. Los elementos indicados en la Figura 1 fueron levantados en campo y
georreferenciados por parte del desarrollador.
Figura 1. Ubicación de ASADA y proyecto La Arena sobre imagen satelital Google Earth.
En la Figura 2, se muestra la ubicación del Proyecto La Arena sobre la hoja cartográfica Naranjo 1:50,000
del Instituto Geográfico Nacional (IGN). De acuerdo con esta figura, el proyecto se ubica en las coordenadas
[504600 – 227150] de la hoja cartográfica.
2
Figura 2. Ubicación del Proyecto La Arena en hoja cartográfica Naranjo 1:50,000.
3
III. INFRAESTRUCTURA ACTUAL DEL ACUEDUCTO
A continuación, se discuten las características de las fuentes de abastecimiento del acueducto, de sus
tuberías, tanques y sistemas de bombeo.
Con base en la información del cuadro anterior, se asignan las siguientes producciones a cada una de las
fuentes del sistema analizado, utilizando las menores mediciones disponibles:
Naciente Oviedo: 14.73 lps.
Naciente Rodríguez: 5.93 lps.
Manantial Ojo de Agua: 7.93 lps
Total disponible: 28.56 lps
Considerando la información disponible, se desestima la necesidad de realizar nuevos aforos en el sistema
El agua que se capta de la Naciente Los Rodríguez se clora, por medio de pastillas, en la propia
captación.
El agua que se capta de la Naciente Los Oviedo se clora, por medio de pastillas, en el tanque #2.
El agua que se capta del manantial Ojo de Agua se clora, por medio de un sistema de goteo, en el sitio
de la Caseta de Bombeo.
4
En el Cuadro 2, se resume la información sobre calidad de agua realizada en los cuatro informes elaborados
anteriormente por otras consultorías;
Cuadro 2. Calidad de agua.
III.2. Tuberías
Se subdividen las tuberías en cuatro apartados: de impulsión, de conducción/distribución, de distribución y
de conducción.
5
longitud en PVC SDR 26 con diámetro nominal de 3”. Cota de inicio: 1032m (Tanque 1 y Tanque
2), cota final: 1015m (Tanque El Guayabal); diferencia de elevaciones entre inicio y fin: 65m.
6
IV. BALANCE HÍDRICO PARA EL ESCENARIO ACTUAL
En el presente capítulo, se realiza un balance hídrico para la ASADA de La Arena, para determinar si, en la
actualidad, existe un superávit o un déficit de agua.
7
Según metodología IWWA, el total de agua entrante es igual al consumo autorizado (resaltado en
azul) más las pérdidas de agua (resaltado en rojo), según se muestra en el Cuadro 3:
Cuadro 3. Desglose de la producción de agua potable en un acueducto.
8
Figura 3. ANC en Costa Rica para Acueductos Operados por AyA.
IFAM (2010), en su estudio Anexo 9, parte del Programa de Agua Potable y Saneamiento para el
Nivel Subnacional, se enfoca en estimar un valor de ANC real, basándose en las pérdidas técnicas
inevitables del acueducto. El estudio desarrolla la siguiente ecuación, la cual se considera válida
siempre y cuando la densidad de conexiones 𝑁𝑐 ⁄𝐿 > 20.0;
18 ∙ 𝐿 𝐿𝑎
𝑃𝑇𝐼 = ( + 0.80 ∙ 𝑁𝑐 + 25 ∙ ) ∙ 𝑃 [𝑒𝑐. 1]
𝑁𝐶 𝑁𝑐
En donde:
𝑃𝑇𝐼: Pérdidas técnicas inevitables [litros/día]
𝐿: Longitud total de la red [km].
𝑁𝑐 : Número de conexiones de la red [conexiones].
𝐿𝑎 : Longitud de acometidas [km].
𝑃: Presión media del sistema [m.c.a.].
Para el acueducto en cuestión, sustituyendo las variables de la ecuación 1 con la información del
presente informe:
18 ∙ 6.5 10
𝑃𝑇𝐼 = ( + 0.80 ∙ 564 + 25 ∙ ) ∙ 25 = 0.2 + 451 + 0.4 = 452 𝑙𝑝𝑑
564 564
Se obtiene entonces que las pérdidas técnicas inevitables del acueducto son del orden de los 452
litros por día (0.005 lps), cifra despreciable con respecto a los requerimientos de agua potable del
acueducto.
Considerando además la reducida extensión del acueducto y la cantidad de previstas existente, se
propone, de manera conservadora, utilizar un factor de ANC igual al 20% de la producción total del
acueducto, para la situación actual.
9
IV.1.5. Demanda promedio del sistema
La demanda promedio del sistema se calcula según la ecuación 2:
𝐶𝑝𝑟𝑜𝑚
𝐷𝑝𝑟𝑜𝑚 = [𝑒𝑐. 2]
1 − 𝑃𝐴𝑁𝐶
En donde:
El consumo promedio de la ASADA, para el escenario actual, corresponde a 6.65 litros por
segundo. Conociendo el consumo promedio y el ANC, se calcula la demanda promedio de agua
potable (ver Cuadro 5).
Consumo
Agua no contabilizada Demanda promedio Demanda promedio
promedio
Cprom PANC Dprom Dprom
[lps] [%] [lps] [m3/d]
6.65 20.0% 8.31 718.25
En donde:
10
𝐹𝑀𝐷 : Factor máximo diario de consumo [adim]. Valor igual a 1.20 cuando no se tenga
información específica del sistema (AyA, 2017).
𝐷𝑀𝐷 : Demanda máxima diaria de agua potable del sistema [lps].
La demanda máxima diaria de la ASADA, según calculado en el Cuadro 6, corresponde a 9.64 litros
por segundo. Esta cifra equivale a un requerimiento hídrico de 833 metros cúbicos diarios (1.48 metros
cúbicos por servicio).
En donde:
𝐹𝑀𝐻 : Factor máximo horario de consumo [adim]. Valor igual a 1.80 cuando no se tenga
información específica del sistema (AyA, 2017).
𝐷𝑀𝐻 : Demanda máxima horaria de agua potable del sistema [lps].
11
Naciente Oviedo: 14.73 lps.
Naciente Rodríguez: 5.93 lps.
Manantial Ojo de Agua: 7.93 lps
Total disponible: 28.56 lps
12
IV.4.4. Volumen total requerido
El volumen total requerido por el tanque es la suma de los tres volúmenes estipulados
anteriormente; es decir:
En donde:
𝑉𝑅𝑒𝑞 : Volumen total requerido de almacenamiento [m3].
𝑉𝐼𝑛𝑐 : Volumen requerido para combatir incendios [m3].
𝑉𝑅𝑒𝑔 : Volumen requerido para regulación diaria [m3].
𝑉𝐼𝑛𝑡 : Volumen requerido para abastecer el sistema durante interrupciones [m3].
Para este caso,
El volumen de regulación equivale a 101 m3: demanda promedio diaria de 718 m3/d, según la
sección IV.1.5, multiplicado por un factor igual a 14%.
El volumen de interrupciones equivale a 120 m3: demanda promedio diaria de 718 m3/d, según
la sección IV.1.5, multiplicado por un coeficiente de 4h/24h.
Para incendios, se utiliza un volumen de 22 m3 (referirse a sección IV.4.2.).
El volumen total requerido es la suma de los tres anteriores: 101 + 120 + 22 = 243m3.
Este volumen requerido de 243 m3 es mayor que los 149 m3 existentes. Por lo tanto, las
condiciones actuales de almacenamiento no son satisfactorias. Cabe resaltar que este requerimiento
estimado de 243 m3 es conservador, ya que se supone que incluso la población ubicada aguas arriba
de los tanques #1 y #2 se abastecen de tanques.
De eliminar esta población de los requerimientos de almacenamiento, los requerimientos de
almacenamiento son sustancialmente menores: (79 m3 de regulación + 95 m3 de interrupciones + 22
m3 de incendios = 196 m3).
De acuerdo con los dos párrafos anteriores, en cualquiera de los dos escenarios, el volumen
existente de almacenamiento no es apropiado para los requerimientos actuales del sistema.
V.1. Metodología
Se utiliza la topografía aportada por el desarrollador para crear la superficie digital del terreno en el software
Autodesk Civil 3D. Para la modelación hidráulica, se utiliza el software de licencia libre EPAnet 2.0.
13
V.2. Criterios de aceptación
Los criterios de aceptación o no-aceptación se realizan con base en normativa AyA:
Velocidades de flujo menores a 3.0 m/s en las tuberías de distribución.
Presión máxima de 70.0 mca en previstas domiciliares.
Presión mínima de 10.0 mca en previstas domiciliares.
Presión máxima de 90.0 mca en tubería de distribución (considerando un factor de reducción de 0.8
de la presión de trabajo de la tubería PVC SDR 26).
V.3. Modelo
Se distribuyen los consumos del sistema de acuerdo con la distribución porcentual de servicios indicada en
el estudio de Geotec (2014, tabla 2.1). De acuerdo con este informe, la distribución de servicios obedece a la
siguiente proporción:
+ Guayabal: 36%
+ Central: 31%
+ Norte: 21%
+ Grecia: 12%
+ Total: 100%
En la Figura 4, se muestra la elevación de los nodos y los diámetros de tubería utilizados para este escenario,
así como la nomenclatura de todos los nodos del sistema.
14
Figura 4. Modelo del acueducto - caso actual.
V.4. Resultados
En las figuras Figura 6 y Figura 5 se imprimen los resultados visuales del análisis hidráulico realizado para
los escenarios “máximo horario” y “estático”, respectivamente. La memoria de cálculo se incluye en el capítulo
Anexos, en los cuadros [Cuadro 18 a Cuadro 21].
15
V.4.1. Escenario estático – caso actual, sin proyecto
Prácticamente todo el acueducto presenta presiones satisfactorias; únicamente los sectores Guayabal-sur y
Central-sur presenta presiones superiores a lo recomendado, mientras que las zonas cercanas a las nacientes
Rodríguez y Oviedo presentan presiones bajas.
16
V.4.2. Escenario máximo horario – caso actual, sin proyecto
La red presenta presiones bajas en los sectores Norte, Central y Grecia; incluso, algunas presentan valores
de presión inferior a cero, lo que es señal de las tuberías existentes no se encuentran en capacidad de trasegar
el caudal solicitado por cada uno de esos nodos. Por otra parte, el acueducto presenta presiones altas en el
sector Guayabal sur.
17
VI. PROYECTO POR DESARROLLAR
A continuación, se realiza una síntesis del proyecto residencial por desarrollar; se detalla la categorización
de proyecto bajo el cual se tramitará, se aporta su plano catastrado y se presenta el masterplan (diseño de
sitio). Por último, se detallan los requerimientos hídricos de este proyecto.
18
Figura 7. Diseño de sitio – Proyecto La Arena.
19
Cuadro 9. Demanda promedio para proyecto residencial por desarrollar.
Utilizando el mismo factor de consumo máximo diario (FMD) del apartado IV.1.6, se obtiene la demanda
máxima diaria esperada para el proyecto residencial por desarrollar. Nuevamente, se utiliza la ecuación 3 para
calcular la DMD. De acuerdo con el Cuadro 10, la demanda máxima diaria del Proyecto La Arena corresponde
a 0.38 lps (32.50 m3/d).
Cuadro 10. Demanda máxima diaria para proyecto residencial por desarrollar.
El cálculo de la demanda máxima horaria se presenta en el Cuadro 11. Para este cuadro, se utilizan los
mismos factores de demanda que para el resto del acueducto. Para el Proyecto La Arena, la demanda máxima
horaria corresponde a 0.53 lps.
Cuadro 11. Demanda máxima horaria para proyecto residencial por desarrollar.
20
Figura 8. Salida gráfica - caso actual, escenario estático, con proyecto.
21
VI.5.2. Escenario máximo horario – caso actual, con proyecto.
Los resultados de este escenario se presentan en los cuadros [Cuadro 24 - Cuadro 25] y la salida gráfica en
la Figura 9. Las condiciones se mantienen, para efectos prácticos, idénticos que para el caso “sin proyecto”.
Figura 9. Salida gráfica - caso actual, escenario máximo horario, con proyecto.
22
VII. MEJORAS PROPUESTAS
Con base en la infraestructura existente (sección III), los resultados del escenario actual (secciones IV y V)
y del escenario propuesto (secciones VIII y IX), se propone la construcción de:
Una tubería nueva, que inicia en la entrada de la tubería proveniente de los tanques 1 y 2 al tanque
Guayabal, para conectar con el proyecto La Arena. Por lo tanto, se propone únicamente la instalación
de 130m de tubería PVC SDR 26, hasta el acceso principal del Proyecto La Arena, donde se construirá
una derivación hacia el proyecto, según se muestra en la siguiente figura esquemática;
Instalación de 47m3 de almacenamiento, contiguo a los tanques Tanque #1 y Tanque #2, para
abastecimiento de los sectores Grecia y Central.
Instalación de 59m3 de almacenamiento, contiguo al tanque Guayabal, para abastecimiento del
sector Guayabal.
23
VIII. BALANCE HÍDRICO PARA EL ESCENARIO FUTURO
Se procede a calcular, para el escenario futuro -analizado a veinte años plazo-, el balance hídrico del
acueducto.
24
VIII.1.2. Densidad poblacional
A pesar de que se espera una densidad poblacional en detrimento (INEC, 2011), de manera
conservadora se mantiene la densidad poblacional utilizada en el apartado IV.1.2.
Consumo individual
Servicios por atender Densidad poblacional Consumo promedio
promedio
N ρ Ci Cprom
[#] [hab/serv] [litros/hab/d] [lps]
719.0 3.60 283.00 8.48
El consumo promedio de la ASADA, más aquel consumo promedio del Proyecto La Arena (p.19) es
de: 8.48 + 0.26 = 8.74 lps.
La demanda promedio de la ASADA (sin incluir la del Proyecto La Arena), se calcula con base en
la ecuación 2 (ver Cuadro 14).
Cuadro 14. Demanda promedio de la ASADA, escenario futuro (sin incluir Proyecto La Arena).
La demanda promedio de la ASADA, más aquella demanda promedio del proyecto La Arena (p.19)
es de: 10.60 + 0.32 = 10.92 lps (944 m3/d).
25
Cprom FMD PANC Dprom DMD
[lps] [adim] [%] [lps] [lps]
8.48 1.20 20.0% 10.60 12.29
La demanda máxima diaria de la ASADA, más aquella demanda máxima diaria del Proyecto La
Arena (p.19) es de: 12.29 + 0.38 = 12.67 lps (1,094 m3/d).
La demanda máxima horaria de la ASADA, más aquella demanda máxima diaria del Proyecto La
Arena (p.19) es de: 17.38 + 0.53 = 17.91 lps.
26
vigente, es necesario instalar 103 metros cúbicos adicionales de almacenamiento: 252 𝑚 3 (𝑟𝑒𝑞𝑢𝑒𝑟𝑖𝑑𝑜𝑠) −
149 𝑚 3 (𝑑𝑖𝑠𝑝𝑜𝑛𝑖𝑏𝑙𝑒𝑠) = 103 𝑚 3 (𝑝𝑜𝑟 𝑖𝑛𝑠𝑡𝑎𝑙𝑎𝑟).
Distribuyendo este volumen proporcionalmente a las zonas de presión de cada tanque:
El sector Central y el sector Grecia (abastecidos por los tanques #1 y #2), requieren de 137 metros
cúbicos de almacenamiento, cuando actualmente dispone de 90 m3. Por lo tanto, es necesario
aumentar el almacenamiento para estos dos sectores en 47 m3.
El remanente, debe ser agregado a la zona de presión del tanque Guayabal, el cual actualmente
cuenta con un almacenamiento de 59 metros cúbicos. Por lo tanto, es necesario agregar 44 m3 a
los 59 m3 existentes del tanque Guayabal, para cumplir con el volumen requerido de
almacenamiento, el cual deberá sumar 103 m3.
Implementando las mejoras propuestas en la sección VII, se solventaría este déficit de almacenamiento.
27
IX. ANÁLISIS HIDRÁULICO PARA EL ESCENARIO FUTURO
Utilizando la información de las demandas calculadas en el capítulo VIII.1. Demanda futura del sistema, la
infraestructura existente comentada en el capítulo III y las mejoras propuestas indicadas en el capítulo VII.
IX.1. Modelo
Se utiliza el mismo modelo de la sección V.3., con la única diferencia de la inclusión de una nueva tubería
de 130m de longitud para abastecer el proyecto La Arena.
IX.2. Resultados
En las figuras Figura 12 y Figura 11, se imprimen los resultados visuales del análisis hidráulico realizado
para los escenarios “estático” y “máximo horario”, respectivamente. La memoria de cálculo se incluye en el
capítulo Anexos, en los cuadros [Cuadro 26 a Cuadro 29].
28
Figura 11. Modelo de escenario estático, caso futuro.
29
IX.2.2. Escenario máximo horario
Similar al análisis desarrollado para el “caso actual”, la red nuevamente presenta presiones bajas en los
sectores Norte, Central y Grecia; incluso, algunas presentan valores de presión inferior a cero, lo que es señal
de las tuberías existentes no se encuentran en capacidad de trasegar el caudal solicitado por cada uno de esos
nodos. Por otra parte, el acueducto presenta presiones altas en el sector Guayabal sur. El proyecto La Arena
presenta presiones ligeramente superiores a los 10 m.c.a.
30
X. PRESUPUESTO DE OBRAS
El presupuesto de obras corresponde a las obras indicadas en la sección VII.
31
XI. CONCLUSIONES
Se enumeran las principales conclusiones obtenidas del estudio.
32
XII. BIBLIOGRAFÍA
American Water Works Association (2012). IWWA/AWWA Water Audit Method. Denver, Colorado.
Asociación administradora del acueducto La Arena (2018). Reporte de facturación del año 2017.
Contraloría General de la República (2012). Informe No. DFOE-AE-IF-08-2012: Informe sobre la
Auditoría Operativa Acerca de la Eficacia y Eficiencia del Instituto Costarricense de Acueductos y
Alcantarillados para Garantizar la Prestación del Servicio de Abastecimiento de Agua Potable.
Diario La Gaceta, edición No.84 del 03 de mayo de 2005. Decreto No. 32327 -S. Reglamento para la
Calidad del Agua Potable.
Epypsa (2010). Anexo 2: Criterios de Diseño. Parte del Programa de Agua Potable y Saneamiento
para el Nivel Subnacional (CR‐T1034).
Geotec (2014). Estudio integral del acueducto de La Arena para análisis de dotación para proyecto
de lotificación de finca.
Icea (2011). Estudio de evaluación y diseño sistema de agua potable acueducto La Arena de Grecia,
sector El Guayabal para abastecer proyecto de 11 lotes.
IFAM (2010). Anexo 9: Componente Control y Reducción de Pérdidas de Agua Potable. Parte del
Programa de Agua Potable y Saneamiento para el Nivel Subnacional.
Instituto Costarricense de Acueductos y Alcantarillados. Criterios para la revisión de estudios técnicos.
Ingeniería de sistemas en operación.
Instituto Nacional de Estadísticas y Censos (2011). Censo nacional.
Instituto Costarricense de Acueductos y Alcantarillados. Volumen IV: Especificaciones Técnicas
Generales del Instituto Costarricense de Acueductos y Alcantarillados.
Instituto Costarricense de Acueductos y Alcantarillados (2001). Oficio No 2001 -248: Normas de
diseño de agua potable y no autorización para el uso de tuberías de PVC-SDR-41.
National Risk Management Research Laboratory, Office of Research and Development (2000).
Epanet 2 User Manual. Cincinnati, Ohio.
Universidad de Costa Rica (2017). ASADA La Arena, informe de aforos realizados en distintas
nacientes.
Universidad Nacional (2009). Elaboración cartográfica del acueducto de La Arena, Grecia, para la
ASADA.
33
XIII. ANEXOS
Cuadro 18. Resumen de resultados - nodos de la red - caso actual – escenario estático, sin proyecto.
34
Junc n51 1,028.2 0.000 1,032.1 3.9
Junc n52 929.2 0.000 1,036.4 107.2
Junc n53 1,028.9 0.000 1,032.2 3.3
Junc n54 1,028.9 0.000 1,032.0 3.1
Junc n55 1,028.7 0.000 1,032.0 3.2
Junc n56 1,028.7 0.000 1,031.9 3.1
Junc n57 938.6 0.000 1,028.8 90.2
Junc n58 1,012.0 0.000 1,015.3 3.3
Junc n59 961.9 0.000 1,028.9 67.0
Junc n60 982.8 0.000 1,015.0 32.2
Junc n61 990.0 0.000 1,015.0 25.0
Junc n62 988.1 0.000 1,015.0 26.9
Junc n63 990.0 0.000 1,015.0 25.0
Junc n64 989.5 0.000 1,015.0 25.5
Junc n65 990.0 0.000 1,015.0 25.0
Junc n66 993.1 0.000 1,015.0 21.9
Junc n67 1,011.1 0.000 1,015.0 3.9
Junc n68 993.8 0.000 1,015.0 21.2
Junc n69 993.5 0.000 1,015.0 21.5
Junc n70 995.5 0.000 1,015.0 19.5
Junc n71 994.9 0.000 1,015.0 20.1
Junc n72 955.2 0.000 1,015.0 59.8
Junc n73 951.7 0.000 1,015.0 63.3
Junc n74 948.9 0.000 1,015.0 66.1
Junc n75 944.5 0.000 1,015.0 70.5
Junc n76 930.6 0.000 1,015.0 84.4
Junc n77 923.0 0.000 1,015.0 92.0
Junc n78 933.3 0.000 1,015.0 81.7
Junc n79 935.0 0.000 1,015.0 80.0
Junc n80 942.4 0.000 1,015.0 72.6
Junc n81 946.8 0.000 1,015.0 68.2
Junc n82 960.1 0.000 1,015.0 54.9
Junc n83 981.3 0.000 1,029.6 48.3
Junc n84 966.3 0.000 1,029.6 63.3
Junc n85 959.6 0.000 1,029.6 70.0
Junc n86 959.0 0.000 1,029.6 70.6
Junc n87 956.3 0.000 1,029.6 73.3
Junc n88 948.8 0.000 1,029.6 80.8
Junc n89 948.6 0.000 1,029.6 81.0
Junc n90 950.9 0.000 1,029.6 78.6
Junc n91 956.8 0.000 1,029.6 72.7
Junc n92 958.3 0.000 1,029.6 71.3
Junc n93 954.3 0.000 1,029.6 75.3
Junc n94 912.1 0.000 1,015.0 102.9
Junc n95 905.3 0.000 1,015.0 109.7
Junc n96 987.6 0.000 1,030.0 42.4
Junc n97 991.0 0.000 1,029.9 38.9
Junc n98 986.3 0.000 1,029.7 43.4
Junc n99 967.6 0.000 1,029.2 61.6
Junc n100 970.6 0.000 1,029.1 58.5
Junc n101 968.8 0.000 1,029.0 60.3
Junc n102 963.9 0.000 1,029.0 65.1
Junc n103 977.2 0.000 1,029.0 51.8
Junc n104 983.1 0.000 1,030.0 46.9
Junc n105 985.9 0.000 1,030.0 44.2
Junc n106 964.3 0.000 1,030.0 65.7
Junc n107 980.9 0.000 1,030.0 49.2
35
Junc n108 980.5 0.000 1,030.0 49.6
Junc n109 982.0 0.000 1,030.0 48.0
Junc n110 983.0 0.000 1,030.0 47.1
Junc n111 982.5 0.000 1,030.0 47.5
Junc n112 1,028.1 0.000 1,032.0 3.9
Junc n113 1,020.2 0.000 1,031.2 11.0
Junc n114 984.4 0.000 1,030.0 45.7
Junc n115 978.8 0.000 1,030.0 51.2
Junc n116 981.8 0.000 1,030.0 48.2
Junc n117 988.0 0.000 1,030.0 42.1
Junc n118 989.7 0.000 1,030.0 40.4
Junc n119 985.2 0.000 1,030.0 44.9
Junc n120 970.4 0.000 1,030.0 59.7
Junc n121 972.3 0.000 1,030.0 57.8
Junc n122 981.3 0.000 1,030.0 48.8
Junc n123 980.3 0.000 1,030.0 49.8
Resvr Nac_R 1,103.0 -5.660 1,103.0 0.0
Resvr Nac_O 1,109.0 -5.110 1,109.0 0.0
Resvr Caseta_Bombeo 927.0 38.120 927.0 0.0
Resvr Nac_G 986.0 -46.370 986.0 0.0
Tank Tank_G 1,014.0 9.360 1,015.0 1.0
Tank Tank_1 1,031.0 4.950 1,032.0 1.0
Tank Tank_2 1,031.0 4.700 1,032.0 1.0
36
Cuadro 19. Resumen de resultados - tuberías de la red - caso actual – escenario estático, sin proyecto.
37
Pipe p54 90.1 100 0.002 -2.74 0.35 0.023
Pipe p56 139.4 100 0.002 0 0 0
Pipe p57 131.8 100 0.002 0 0 0
Pipe p58 40.1 100 0.002 0 0 0
Pipe p59 41.36 100 0.002 0 0 0
Pipe p60 19.92 100 0.002 0 0 0
Pipe p61 43.05 100 0.002 0 0 0
Pipe p62 301.2 100 0.002 0 0 0
Pipe p63 126 100 0.002 0 0 0
Pipe p64 44.44 100 0.002 0 0 0
Pipe p65 69.22 100 0.002 0 0 0
Pipe p66 102.6 100 0.002 0 0 0
Pipe p67 372.6 100 0.002 0 0 0
Pipe p68 57.79 100 0.002 0 0 0
Pipe p69 59.3 100 0.002 0 0 0
Pipe p70 35.24 100 0.002 0 0 0
Pipe p71 165.9 100 0.002 0 0 0
Pipe p72 62.25 100 0.002 0 0 0
Pipe p73 142.1 100 0.002 0 0 0
Pipe p74 59.16 100 0.002 0 0 0
Pipe p75 69.82 100 0.002 0 0 0
Pipe p76 44.36 100 0.002 0 0 0
Pipe p77 109.6 100 0.002 0 0 0
Pipe p78 263.9 100 0.002 0 0 0
Pipe p79 256 100 0.002 0 0 0
Pipe p80 52.02 100 0.002 0 0 0
Pipe p81 36.71 100 0.002 0 0 0
Pipe p82 137.5 100 0.002 0 0 0
Pipe p83 128 100 0.002 0 0 0
Pipe p84 77.63 100 0.002 0 0 0
Pipe p85 53.96 100 0.002 0 0 0
Pipe p86 63.99 100 0.002 0 0 0
Pipe p87 48.3 100 0.002 0 0 0
Pipe p88 93.16 100 0.002 0 0 0
Pipe p89 76.81 100 0.002 0 0 0
Pipe p90 82.45 100 0.002 2.74 0.35 0.023
Pipe p91 148.62 100 0.002 2.74 0.35 0.023
Pipe p92 108.5 100 0.002 2.74 0.35 0.023
Pipe p93 248.3 100 0.002 2.74 0.35 0.023
Pipe p94 78.26 100 0.002 2.74 0.35 0.023
Pipe p95 42.89 100 0.002 2.74 0.35 0.023
Pipe p96 44.88 100 0.002 2.74 0.35 0.023
Pipe p97 80.05 100 0.002 0 0 0
Pipe p99 90.25 75 0.002 0 0 0
Pipe p100 129.51 75 0.002 0 0 1.543
Pipe p101 145.5 75 0.002 0 0 0
Pipe p102 93.51 75 0.002 0 0 0
Pipe p103 58.24 75 0.002 0 0 0
Pipe p104 34.13 75 0.002 0 0 0
Pipe p105 148.6 75 0.002 0 0 1.166
Pipe p106 29.04 75 0.002 0 0 0
Pipe p107 137.2 75 0.002 2.74 0.62 0.021
Pipe p108 213.1 75 0.002 2.74 0.62 0.021
Pipe p109 87.71 75 0.002 0 0 0
Pipe p110 40.69 75 0.002 0 0 0
Pipe p111 39.89 75 0.002 0 0 0
Pipe p112 47.64 75 0.002 0 0 0
38
Pipe p113 51.68 75 0.002 0 0 0
Pipe p114 31.45 75 0.002 0 0 0
Pipe p115 121.4 75 0.002 0 0 0
Pipe p116 128 75 0.002 0 0 0
Pipe p117 44.41 75 0.002 0 0 0
Pipe p118 85.66 75 0.002 0 0 0
Pipe p119 176.5 75 0.002 0 0 0
Pipe 1 33.73 75 0.002 5.66 1.28 0.018
Pipe 2 1000 75 0.002 5.11 1.16 0.019
Pipe 4 20.86 100 0.002 9.36 1.19 0.017
Pipe 5 27.96 100 0.002 0 0 0
Pipe 6 6.28 75 0.002 5.11 1.16 0.019
Pipe 7 7.29 75 0.002 5.66 1.28 0.018
Pipe 8 10.28 100 0.002 -4.28 0.54 0.021
Pipe 9 11.73 100 0.002 -3.97 0.51 0.021
Pipe 10 11.73 100 0.002 3.66 0.47 0.021
Pipe 12 29.09 100 0.002 1.33 0.17 0.027
Pipe 13 26.17 100 0.002 1.41 0.18 0.027
Pipe 14 17.03 100 0.002 2.96 0.38 0.022
Pipe 15 7.93 150 0.002 46.37 2.62 0.014
Pipe 16 20.39 100 0.002 46.37 5.9 0.013
Pipe 17 24.19 100 0.002 -2.74 0.35 0.023
Pump Bomba #N/A #N/A #N/A 8.25 0 0
39
Cuadro 20. Resumen de resultados - nodos de la red - caso actual – consumo máximo horario, sin proyecto.
40
Junc n49 1,017.8 0.070 1,034.3 16.6
Junc n50 1,019.3 0.070 1,033.3 14.0
Junc n51 1,028.2 0.000 1,032.1 3.9
Junc n52 929.2 0.200 1,036.2 107.0
Junc n53 1,028.9 0.000 1,032.2 3.3
Junc n54 1,028.9 0.000 1,032.0 3.1
Junc n55 1,028.7 0.000 1,032.0 3.2
Junc n56 1,028.7 0.000 1,031.8 3.0
Junc n57 938.6 0.200 1,026.2 87.6
Junc n58 1,012.0 0.170 1,015.2 3.2
Junc n59 961.9 0.200 1,026.2 64.3
Junc n60 982.8 0.170 1,013.8 30.9
Junc n61 990.0 0.170 1,013.8 23.8
Junc n62 988.1 0.170 1,013.8 25.6
Junc n63 990.0 0.170 1,013.8 23.8
Junc n64 989.5 0.170 1,013.8 24.3
Junc n65 990.0 0.170 1,013.9 23.9
Junc n66 993.1 0.170 1,014.0 20.9
Junc n67 1,011.1 0.170 1,014.9 3.8
Junc n68 993.8 0.170 1,013.9 20.0
Junc n69 993.5 0.170 1,013.8 20.3
Junc n70 995.5 0.170 1,013.8 18.3
Junc n71 994.9 0.170 1,013.8 19.0
Junc n72 955.2 0.170 1,013.4 58.2
Junc n73 951.7 0.170 1,013.3 61.6
Junc n74 948.9 0.170 1,013.3 64.4
Junc n75 944.5 0.170 1,013.3 68.8
Junc n76 930.6 0.170 1,013.2 82.6
Junc n77 923.0 0.170 1,013.2 90.2
Junc n78 933.3 0.170 1,013.1 79.8
Junc n79 935.0 0.170 1,013.1 78.1
Junc n80 942.4 0.170 1,013.1 70.7
Junc n81 946.8 0.170 1,013.1 66.3
Junc n82 960.1 0.170 1,013.1 53.0
Junc n83 981.3 0.200 1,026.2 44.9
Junc n84 966.3 0.200 1,026.0 59.7
Junc n85 959.6 0.200 1,025.9 66.3
Junc n86 959.0 0.200 1,025.8 66.8
Junc n87 956.3 0.200 1,025.8 69.5
Junc n88 948.8 0.200 1,025.8 77.0
Junc n89 948.6 0.200 1,025.7 77.1
Junc n90 950.9 0.200 1,025.7 74.8
Junc n91 956.8 0.200 1,025.7 68.9
Junc n92 958.3 0.200 1,025.7 67.4
Junc n93 954.3 0.200 1,025.7 71.4
Junc n94 912.1 0.170 1,013.2 101.0
Junc n95 905.3 0.170 1,013.1 107.9
Junc n96 987.6 0.080 1,026.8 39.2
Junc n97 991.0 0.200 1,026.6 35.6
Junc n98 986.3 0.200 1,026.4 40.1
Junc n99 967.6 0.200 1,026.2 58.7
Junc n100 970.6 0.200 1,026.2 55.7
41
Junc n101 968.8 0.200 1,026.2 57.4
Junc n102 963.9 0.200 1,026.2 62.3
Junc n103 977.2 0.170 1,026.2 49.0
Junc n104 983.1 0.080 1,026.7 43.6
Junc n105 985.9 0.080 1,026.7 40.9
Junc n106 964.3 0.080 1,026.7 62.4
Junc n107 980.9 0.080 1,026.7 45.8
Junc n108 980.5 0.080 1,026.7 46.2
Junc n109 982.0 0.080 1,026.7 44.7
Junc n110 983.0 0.080 1,026.7 43.7
Junc n111 982.5 0.080 1,026.7 44.2
Junc n112 1,028.1 0.000 1,032.0 3.8
Junc n113 1,020.2 0.080 1,029.9 9.7
Junc n114 984.4 0.080 1,026.7 42.4
Junc n115 978.8 0.080 1,026.7 47.9
Junc n116 981.8 0.080 1,026.7 44.8
Junc n117 988.0 0.080 1,026.6 38.7
Junc n118 989.7 0.080 1,026.6 37.0
Junc n119 985.2 0.080 1,026.6 41.5
Junc n120 970.4 0.080 1,026.6 56.2
Junc n121 972.3 0.080 1,026.6 54.3
Junc n122 981.3 0.080 1,026.6 45.3
Junc n123 980.3 0.080 1,026.6 46.3
Junc Proyecto 1,005.0 0.170 1,014.7 10.7
Resvr Nac_R 1,103.0 -6.390 1,103.0 0.0
Resvr Nac_O 1,109.0 -5.610 1,109.0 0.0
Resvr Caseta_Bombeo 927.0 37.900 927.0 0.0
Resvr Nac_G 986.0 -46.370 986.0 0.0
Tank Tank_G 1,014.0 3.630 1,015.0 1.0
Tank Tank_1 1,031.0 1.710 1,032.0 1.0
Tank Tank_2 1,031.0 1.520 1,032.0 1.0
42
Cuadro 21. Resumen de resultados - tuberías de la red - caso actual – escenario estático, sin proyecto.
43
Pipe p49 415.16 100 0.002 8.06 1.03 0.018
Pipe p50 16.64 100 0.002 8.06 1.03 0.018
Pipe p51 16.4 100 0.002 9.2 1.17 0.017
Pipe p52 451.53 100 0.002 9.2 1.17 0.017
Pipe p53 268.6 75 0.002 8.35 1.89 0.017
Pipe p54 90.1 100 0.002 0.64 0.08 0.033
Pipe p56 139.4 100 0.002 -0.17 0.02 0.03
Pipe p57 131.8 100 0.002 -0.35 0.04 0.04
Pipe p58 40.1 100 0.002 -0.52 0.07 0.035
Pipe p59 41.36 100 0.002 -2.97 0.38 0.022
Pipe p60 19.92 100 0.002 -3.15 0.4 0.022
Pipe p61 43.05 100 0.002 -4.03 0.51 0.021
Pipe p63 126 100 0.002 0.7 0.09 0.032
Pipe p64 44.44 100 0.002 0.52 0.07 0.035
Pipe p65 69.22 100 0.002 0.35 0.04 0.039
Pipe p66 102.6 100 0.002 0.17 0.02 0.032
Pipe p67 372.6 100 0.002 2.27 0.29 0.024
Pipe p68 57.79 100 0.002 2.1 0.27 0.024
Pipe p69 59.3 100 0.002 1.92 0.25 0.025
Pipe p70 35.24 100 0.002 1.75 0.22 0.025
Pipe p71 165.9 100 0.002 1.57 0.2 0.026
Pipe p72 62.25 100 0.002 1.4 0.18 0.027
Pipe p73 142.1 100 0.002 0.88 0.11 0.03
Pipe p74 59.16 100 0.002 0.7 0.09 0.032
Pipe p75 69.82 100 0.002 0.52 0.07 0.035
Pipe p76 44.36 100 0.002 0.35 0.04 0.038
Pipe p77 109.6 100 0.002 0.17 0.02 0.032
Pipe p78 263.9 100 0.002 2.02 0.26 0.024
Pipe p79 256 100 0.002 1.82 0.23 0.025
Pipe p80 52.02 100 0.002 1.62 0.21 0.026
Pipe p81 36.71 100 0.002 1.41 0.18 0.027
Pipe p82 137.5 100 0.002 1.21 0.15 0.028
Pipe p83 128 100 0.002 1.01 0.13 0.029
Pipe p84 77.63 100 0.002 0.81 0.1 0.031
Pipe p85 53.96 100 0.002 0.61 0.08 0.034
Pipe p86 63.99 100 0.002 0.4 0.05 0.038
Pipe p87 48.3 100 0.002 0.2 0.03 0.027
Pipe p88 93.16 100 0.002 0.35 0.04 0.039
Pipe p89 76.81 100 0.002 0.17 0.02 0.027
Pipe p90 82.45 100 0.002 3.17 0.4 0.022
Pipe p91 148.62 100 0.002 2.97 0.38 0.022
Pipe p92 108.5 100 0.002 2.76 0.35 0.023
Pipe p93 248.3 100 0.002 0.54 0.07 0.035
Pipe p94 78.26 100 0.002 0.34 0.04 0.04
Pipe p95 42.89 100 0.002 0.14 0.02 0.033
Pipe p96 44.88 100 0.002 -0.06 0.01 0.048
Pipe p97 80.05 100 0.002 0.17 0.02 0.029
Pipe p99 90.25 75 0.002 -0.54 0.12 0.032
Pipe p100 129.51 75 0.002 -0.62 0.14 0.031
Pipe p101 145.5 75 0.002 -0.08 0.02 0.047
Pipe p102 93.51 75 0.002 -0.16 0.04 0.03
Pipe p103 58.24 75 0.002 -0.24 0.06 0.041
44
Pipe p104 34.13 75 0.002 -0.32 0.07 0.037
Pipe p105 148.6 75 0.002 0.13 0.03 0.03
Pipe p106 29.04 75 0.002 0.05 0.01 0.085
Pipe p107 137.2 75 0.002 4.79 1.08 0.019
Pipe p108 213.1 75 0.002 4.71 1.07 0.019
Pipe p109 87.71 75 0.002 0.84 0.19 0.028
Pipe p110 40.69 75 0.002 0.76 0.17 0.029
Pipe p111 39.89 75 0.002 0.73 0.17 0.029
Pipe p112 47.64 75 0.002 0.65 0.15 0.03
Pipe p113 51.68 75 0.002 0.57 0.13 0.032
Pipe p114 31.45 75 0.002 0.49 0.11 0.033
Pipe p115 121.4 75 0.002 0.41 0.09 0.035
Pipe p116 128 75 0.002 0.32 0.07 0.037
Pipe p117 44.41 75 0.002 0.24 0.06 0.04
Pipe p118 85.66 75 0.002 0.16 0.04 0.03
Pipe p119 176.5 75 0.002 0.08 0.02 0.048
Pipe 1 33.73 75 0.002 6.39 1.45 0.018
Pipe 2 1000 75 0.002 5.61 1.27 0.018
Pipe 4 20.86 100 0.002 8.18 1.04 0.018
Pipe 5 27.96 100 0.002 4.55 0.58 0.02
Pipe 6 6.28 75 0.002 4.22 0.95 0.019
Pipe 7 7.29 75 0.002 4.93 1.12 0.019
Pipe 8 10.28 100 0.002 -4.18 0.53 0.021
Pipe 9 11.73 100 0.002 -3.88 0.49 0.021
Pipe 10 11.73 100 0.002 5.08 0.65 0.02
Pipe 12 29.09 100 0.002 2.32 0.3 0.024
Pipe 13 26.17 100 0.002 2.47 0.31 0.023
Pipe 14 17.03 100 0.002 4.12 0.52 0.021
Pipe 15 7.93 150 0.002 46.17 2.61 0.014
Pipe 16 20.39 100 0.002 46.37 5.9 0.013
Pipe 17 24.19 100 0.002 0.44 0.06 0.038
Pipe 3 63.96 100 0.002 4.38 0.56 0.02
Pipe 11 236.92 100 0.002 4.2 0.53 0.021
Pump Bomba #N/A #N/A #N/A 8.26 0 0
45
Cuadro 22. Resumen de resultados - nodos de la red - caso actual - escenario estático, con proyecto.
46
Junc n49 1,017.8 0.000 1,035.2 17.5
Junc n50 1,019.3 0.000 1,033.8 14.5
Junc n51 1,028.2 0.000 1,032.1 3.9
Junc n52 929.2 0.000 1,036.4 107.2
Junc n53 1,028.9 0.000 1,032.2 3.3
Junc n54 1,028.9 0.000 1,032.0 3.1
Junc n55 1,028.7 0.000 1,032.0 3.2
Junc n56 1,028.7 0.000 1,031.9 3.1
Junc n57 938.6 0.000 1,028.8 90.2
Junc n58 1,012.0 0.000 1,015.3 3.3
Junc n59 961.9 0.000 1,028.9 67.0
Junc n60 982.8 0.000 1,015.0 32.2
Junc n61 990.0 0.000 1,015.0 25.0
Junc n62 988.1 0.000 1,015.0 26.9
Junc n63 990.0 0.000 1,015.0 25.0
Junc n64 989.5 0.000 1,015.0 25.5
Junc n65 990.0 0.000 1,015.0 25.0
Junc n66 993.1 0.000 1,015.0 21.9
Junc n67 1,011.1 0.000 1,015.0 3.9
Junc n68 993.8 0.000 1,015.0 21.2
Junc n69 993.5 0.000 1,015.0 21.5
Junc n70 995.5 0.000 1,015.0 19.5
Junc n71 994.9 0.000 1,015.0 20.1
Junc n72 955.2 0.000 1,015.0 59.8
Junc n73 951.7 0.000 1,015.0 63.3
Junc n74 948.9 0.000 1,015.0 66.1
Junc n75 944.5 0.000 1,015.0 70.5
Junc n76 930.6 0.000 1,015.0 84.4
Junc n77 923.0 0.000 1,015.0 92.0
Junc n78 933.3 0.000 1,015.0 81.7
Junc n79 935.0 0.000 1,015.0 80.0
Junc n80 942.4 0.000 1,015.0 72.6
Junc n81 946.8 0.000 1,015.0 68.2
Junc n82 960.1 0.000 1,015.0 54.9
Junc n83 981.3 0.000 1,029.6 48.3
Junc n84 966.3 0.000 1,029.6 63.3
Junc n85 959.6 0.000 1,029.6 70.0
Junc n86 959.0 0.000 1,029.6 70.6
Junc n87 956.3 0.000 1,029.6 73.3
Junc n88 948.8 0.000 1,029.6 80.8
Junc n89 948.6 0.000 1,029.6 81.0
Junc n90 950.9 0.000 1,029.6 78.6
Junc n91 956.8 0.000 1,029.6 72.7
Junc n92 958.3 0.000 1,029.6 71.3
Junc n93 954.3 0.000 1,029.6 75.3
Junc n94 912.1 0.000 1,015.0 102.9
Junc n95 905.3 0.000 1,015.0 109.7
Junc n96 987.6 0.000 1,030.0 42.4
Junc n97 991.0 0.000 1,029.9 38.9
Junc n98 986.3 0.000 1,029.7 43.4
Junc n99 967.6 0.000 1,029.2 61.6
Junc n100 970.6 0.000 1,029.1 58.5
47
Junc n101 968.8 0.000 1,029.0 60.2
Junc n102 963.9 0.000 1,029.0 65.1
Junc n103 977.2 0.000 1,029.0 51.8
Junc n104 983.1 0.000 1,030.0 46.9
Junc n105 985.9 0.000 1,030.0 44.2
Junc n106 964.3 0.000 1,030.0 65.7
Junc n107 980.9 0.000 1,030.0 49.2
Junc n108 980.5 0.000 1,030.0 49.6
Junc n109 982.0 0.000 1,030.0 48.0
Junc n110 983.0 0.000 1,030.0 47.1
Junc n111 982.5 0.000 1,030.0 47.5
Junc n112 1,028.1 0.000 1,032.0 3.9
Junc n113 1,020.2 0.000 1,031.2 11.0
Junc n114 984.4 0.000 1,030.0 45.7
Junc n115 978.8 0.000 1,030.0 51.2
Junc n116 981.8 0.000 1,030.0 48.2
Junc n117 988.0 0.000 1,030.0 42.1
Junc n118 989.7 0.000 1,030.0 40.4
Junc n119 985.2 0.000 1,030.0 44.9
Junc n120 970.4 0.000 1,030.0 59.7
Junc n121 972.3 0.000 1,030.0 57.8
Junc n122 981.3 0.000 1,030.0 48.8
Junc n123 980.3 0.000 1,030.0 49.8
Junc Proyecto 1,005.0 0.000 1,015.0 11.0
Resvr Nac_R 1,103.0 -5.660 1,103.0 0.0
Resvr Nac_O 1,109.0 -5.110 1,109.0 0.0
Resvr Caseta_Bombeo 927.0 38.120 927.0 0.0
Resvr Nac_G 986.0 -46.370 986.0 0.0
Tank Tank_G 1,014.0 9.360 1,015.0 1.0
Tank Tank_1 1,031.0 4.950 1,032.0 1.0
Tank Tank_2 1,031.0 4.700 1,032.0 1.0
Tank Tank_2 1,031.0 4.700 1,032.0 1.0
48
Cuadro 23. Resumen de resultados - tuberías de la red - caso actual - escenario estático, con proyecto.
49
Pipe p49 415.16 100 0.002 8.25 1.05 0.018
Pipe p50 16.64 100 0.002 8.25 1.05 0.018
Pipe p51 16.4 100 0.002 6.62 0.84 0.019
Pipe p52 451.53 100 0.002 6.62 0.84 0.019
Pipe p53 268.6 75 0.002 9.36 2.12 0.017
Pipe p54 90.1 100 0.002 -2.74 0.35 0.023
Pipe p56 139.4 100 0.002 0 0 0
Pipe p57 131.8 100 0.002 0 0 0
Pipe p58 40.1 100 0.002 0 0 0
Pipe p59 41.36 100 0.002 0 0 0
Pipe p60 19.92 100 0.002 0 0 0
Pipe p61 43.05 100 0.002 0 0 0
Pipe p63 126 100 0.002 0 0 0
Pipe p64 44.44 100 0.002 0 0 0
Pipe p65 69.22 100 0.002 0 0 0
Pipe p66 102.6 100 0.002 0 0 0
Pipe p67 372.6 100 0.002 0 0 0
Pipe p68 57.79 100 0.002 0 0 0
Pipe p69 59.3 100 0.002 0 0 0
Pipe p70 35.24 100 0.002 0 0 0
Pipe p71 165.9 100 0.002 0 0 0
Pipe p72 62.25 100 0.002 0 0 0
Pipe p73 142.1 100 0.002 0 0 0
Pipe p74 59.16 100 0.002 0 0 0
Pipe p75 69.82 100 0.002 0 0 0
Pipe p76 44.36 100 0.002 0 0 0
Pipe p77 109.6 100 0.002 0 0 0
Pipe p78 263.9 100 0.002 0 0 0
Pipe p79 256 100 0.002 0 0 0
Pipe p80 52.02 100 0.002 0 0 0
Pipe p81 36.71 100 0.002 0 0 0
Pipe p82 137.5 100 0.002 0 0 0
Pipe p83 128 100 0.002 0 0 0
Pipe p84 77.63 100 0.002 0 0 0
Pipe p85 53.96 100 0.002 0 0 0
Pipe p86 63.99 100 0.002 0 0 0
Pipe p87 48.3 100 0.002 0 0 0
Pipe p88 93.16 100 0.002 0 0 0
Pipe p89 76.81 100 0.002 0 0 0
Pipe p90 82.45 100 0.002 2.74 0.35 0.023
Pipe p91 148.62 100 0.002 2.74 0.35 0.023
Pipe p92 108.5 100 0.002 2.74 0.35 0.023
Pipe p93 248.3 100 0.002 2.74 0.35 0.023
Pipe p94 78.26 100 0.002 2.74 0.35 0.023
Pipe p95 42.89 100 0.002 2.74 0.35 0.023
Pipe p96 44.88 100 0.002 2.74 0.35 0.023
Pipe p97 80.05 100 0.002 0 0 0
Pipe p99 90.25 75 0.002 0 0 0
Pipe p100 129.51 75 0.002 0 0 0
Pipe p101 145.5 75 0.002 0 0 0
Pipe p102 93.51 75 0.002 0 0 0
Pipe p103 58.24 75 0.002 0 0 0
50
Pipe p104 34.13 75 0.002 0 0 0
Pipe p105 148.6 75 0.002 0 0 0
Pipe p106 29.04 75 0.002 0 0 0
Pipe p107 137.2 75 0.002 2.74 0.62 0.021
Pipe p108 213.1 75 0.002 2.74 0.62 0.021
Pipe p109 87.71 75 0.002 0 0 0
Pipe p110 40.69 75 0.002 0 0 0
Pipe p111 39.89 75 0.002 0 0 0
Pipe p112 47.64 75 0.002 0 0 0
Pipe p113 51.68 75 0.002 0 0 0
Pipe p114 31.45 75 0.002 0 0 0
Pipe p115 121.4 75 0.002 0 0 0
Pipe p116 128 75 0.002 0 0 0
Pipe p117 44.41 75 0.002 0 0 0
Pipe p118 85.66 75 0.002 0 0 0
Pipe p119 176.5 75 0.002 0 0 0
Pipe 1 33.73 75 0.002 5.66 1.28 0.018
Pipe 2 1000 75 0.002 5.11 1.16 0.019
Pipe 4 20.86 100 0.002 9.36 1.19 0.017
Pipe 5 27.96 100 0.002 0 0 0
Pipe 6 6.28 75 0.002 5.11 1.16 0.019
Pipe 7 7.29 75 0.002 5.66 1.28 0.018
Pipe 8 10.28 100 0.002 -4.28 0.54 0.021
Pipe 9 11.73 100 0.002 -3.97 0.51 0.021
Pipe 10 11.73 100 0.002 3.66 0.47 0.021
Pipe 12 29.09 100 0.002 1.33 0.17 0.027
Pipe 13 26.17 100 0.002 1.41 0.18 0.027
Pipe 14 17.03 100 0.002 2.96 0.38 0.022
Pipe 15 7.93 150 0.002 46.37 2.62 0.014
Pipe 16 20.39 100 0.002 46.37 5.9 0.013
Pipe 17 24.19 100 0.002 -2.74 0.35 0.023
Pipe 3 63.96 100 0.002 0 0 0
Pipe 11 236.92 100 0.002 0 0 0
Pump Bomba #N/A #N/A #N/A 8.25 0 0
51
Cuadro 24. Resumen de resultados - nodos de la red - caso actual – consumo máximo horario, con proyecto.
52
Junc n49 1,017.8 0.070 1,034.3 16.6
Junc n50 1,019.3 0.070 1,033.3 14.0
Junc n51 1,028.2 0.000 1,032.1 3.9
Junc n52 929.2 0.200 1,036.2 107.0
Junc n53 1,028.9 0.000 1,032.2 3.3
Junc n54 1,028.9 0.000 1,032.0 3.1
Junc n55 1,028.7 0.000 1,032.0 3.2
Junc n56 1,028.7 0.000 1,031.8 3.0
Junc n57 938.6 0.200 1,026.2 87.6
Junc n58 1,012.0 0.170 1,015.2 3.2
Junc n59 961.9 0.200 1,026.2 64.3
Junc n60 982.8 0.170 1,013.7 30.9
Junc n61 990.0 0.170 1,013.7 23.7
Junc n62 988.1 0.170 1,013.7 25.6
Junc n63 990.0 0.170 1,013.7 23.7
Junc n64 989.5 0.170 1,013.8 24.2
Junc n65 990.0 0.170 1,013.8 23.8
Junc n66 993.1 0.170 1,013.9 20.8
Junc n67 1,011.1 0.170 1,014.9 3.8
Junc n68 993.8 0.170 1,013.8 20.0
Junc n69 993.5 0.170 1,013.8 20.3
Junc n70 995.5 0.170 1,013.8 18.2
Junc n71 994.9 0.170 1,013.8 18.9
Junc n72 955.2 0.170 1,013.3 58.1
Junc n73 951.7 0.170 1,013.3 61.6
Junc n74 948.9 0.170 1,013.2 64.3
Junc n75 944.5 0.170 1,013.2 68.7
Junc n76 930.6 0.170 1,013.1 82.5
Junc n77 923.0 0.170 1,013.1 90.1
Junc n78 933.3 0.170 1,013.1 79.8
Junc n79 935.0 0.170 1,013.1 78.0
Junc n80 942.4 0.170 1,013.0 70.7
Junc n81 946.8 0.170 1,013.0 66.2
Junc n82 960.1 0.170 1,013.0 52.9
Junc n83 981.3 0.200 1,026.2 44.9
Junc n84 966.3 0.200 1,026.0 59.7
Junc n85 959.6 0.200 1,025.9 66.3
Junc n86 959.0 0.200 1,025.8 66.8
Junc n87 956.3 0.200 1,025.8 69.5
Junc n88 948.8 0.200 1,025.8 77.0
Junc n89 948.6 0.200 1,025.7 77.1
Junc n90 950.9 0.200 1,025.7 74.8
Junc n91 956.8 0.200 1,025.7 68.9
Junc n92 958.3 0.200 1,025.7 67.4
Junc n93 954.3 0.200 1,025.7 71.4
Junc n94 912.1 0.170 1,013.1 100.9
Junc n95 905.3 0.170 1,013.1 107.8
Junc n96 987.6 0.080 1,026.8 39.2
Junc n97 991.0 0.200 1,026.6 35.6
Junc n98 986.3 0.200 1,026.4 40.1
Junc n99 967.6 0.200 1,026.2 58.7
Junc n100 970.6 0.200 1,026.2 55.7
53
Junc n101 968.8 0.200 1,026.2 57.4
Junc n102 963.9 0.200 1,026.2 62.3
Junc n103 977.2 0.170 1,026.2 49.0
Junc n104 983.1 0.080 1,026.7 43.6
Junc n105 985.9 0.080 1,026.7 40.9
Junc n106 964.3 0.080 1,026.7 62.4
Junc n107 980.9 0.080 1,026.7 45.8
Junc n108 980.5 0.080 1,026.7 46.2
Junc n109 982.0 0.080 1,026.7 44.7
Junc n110 983.0 0.080 1,026.7 43.7
Junc n111 982.5 0.080 1,026.7 44.2
Junc n112 1,028.1 0.000 1,032.0 3.8
Junc n113 1,020.2 0.080 1,029.9 9.7
Junc n114 984.4 0.080 1,026.7 42.4
Junc n115 978.8 0.080 1,026.7 47.9
Junc n116 981.8 0.080 1,026.7 44.8
Junc n117 988.0 0.080 1,026.6 38.7
Junc n118 989.7 0.080 1,026.6 37.0
Junc n119 985.2 0.080 1,026.6 41.5
Junc n120 970.4 0.080 1,026.6 56.2
Junc n121 972.3 0.080 1,026.6 54.3
Junc n122 981.3 0.080 1,026.6 45.3
Junc n123 980.3 0.080 1,026.6 46.3
Junc Proyecto 1,005.0 0.700 1,014.6 10.6
Resvr Nac_R 1,103.0 -6.390 1,103.0 0.0
Resvr Nac_O 1,109.0 -5.610 1,109.0 0.0
Resvr Caseta_Bombeo 927.0 37.900 927.0 0.0
Resvr Nac_G 986.0 -46.370 986.0 0.0
Tank Tank_G 1,014.0 3.100 1,015.0 1.0
Tank Tank_1 1,031.0 1.710 1,032.0 1.0
Tank Tank_2 1,031.0 1.520 1,032.0 1.0
54
Cuadro 25. Resumen de resultados - tuberías de la red - caso actual – consumo máximo horario, con proyecto.
55
Pipe p49 415.16 100 0.002 8.06 1.03 0.018
Pipe p50 16.64 100 0.002 8.06 1.03 0.018
Pipe p51 16.4 100 0.002 9.2 1.17 0.017
Pipe p52 451.53 100 0.002 9.2 1.17 0.017
Pipe p53 268.6 75 0.002 8.35 1.89 0.017
Pipe p54 90.1 100 0.002 0.64 0.08 0.033
Pipe p56 139.4 100 0.002 -0.17 0.02 0.03
Pipe p57 131.8 100 0.002 -0.35 0.04 0.04
Pipe p58 40.1 100 0.002 -0.52 0.07 0.034
Pipe p59 41.36 100 0.002 -2.97 0.38 0.022
Pipe p60 19.92 100 0.002 -3.15 0.4 0.022
Pipe p61 43.05 100 0.002 -4.03 0.51 0.021
Pipe p63 126 100 0.002 0.7 0.09 0.032
Pipe p64 44.44 100 0.002 0.52 0.07 0.035
Pipe p65 69.22 100 0.002 0.35 0.04 0.039
Pipe p66 102.6 100 0.002 0.17 0.02 0.029
Pipe p67 372.6 100 0.002 2.27 0.29 0.024
Pipe p68 57.79 100 0.002 2.1 0.27 0.024
Pipe p69 59.3 100 0.002 1.92 0.25 0.025
Pipe p70 35.24 100 0.002 1.75 0.22 0.025
Pipe p71 165.9 100 0.002 1.57 0.2 0.026
Pipe p72 62.25 100 0.002 1.4 0.18 0.027
Pipe p73 142.1 100 0.002 0.88 0.11 0.03
Pipe p74 59.16 100 0.002 0.7 0.09 0.032
Pipe p75 69.82 100 0.002 0.52 0.07 0.035
Pipe p76 44.36 100 0.002 0.35 0.04 0.04
Pipe p77 109.6 100 0.002 0.17 0.02 0.03
Pipe p78 263.9 100 0.002 2.02 0.26 0.024
Pipe p79 256 100 0.002 1.82 0.23 0.025
Pipe p80 52.02 100 0.002 1.62 0.21 0.026
Pipe p81 36.71 100 0.002 1.41 0.18 0.027
Pipe p82 137.5 100 0.002 1.21 0.15 0.028
Pipe p83 128 100 0.002 1.01 0.13 0.029
Pipe p84 77.63 100 0.002 0.81 0.1 0.031
Pipe p85 53.96 100 0.002 0.61 0.08 0.034
Pipe p86 63.99 100 0.002 0.4 0.05 0.038
Pipe p87 48.3 100 0.002 0.2 0.03 0.027
Pipe p88 93.16 100 0.002 0.35 0.04 0.039
Pipe p89 76.81 100 0.002 0.17 0.02 0.031
Pipe p90 82.45 100 0.002 3.17 0.4 0.022
Pipe p91 148.62 100 0.002 2.97 0.38 0.022
Pipe p92 108.5 100 0.002 2.76 0.35 0.023
Pipe p93 248.3 100 0.002 0.54 0.07 0.035
Pipe p94 78.26 100 0.002 0.34 0.04 0.04
Pipe p95 42.89 100 0.002 0.14 0.02 0.033
Pipe p96 44.88 100 0.002 -0.06 0.01 0.048
Pipe p97 80.05 100 0.002 0.17 0.02 0.029
Pipe p99 90.25 75 0.002 -0.54 0.12 0.032
Pipe p100 129.51 75 0.002 -0.62 0.14 0.031
Pipe p101 145.5 75 0.002 -0.08 0.02 0.047
Pipe p102 93.51 75 0.002 -0.16 0.04 0.03
Pipe p103 58.24 75 0.002 -0.24 0.06 0.041
56
Pipe p104 34.13 75 0.002 -0.32 0.07 0.037
Pipe p105 148.6 75 0.002 0.13 0.03 0.03
Pipe p106 29.04 75 0.002 0.05 0.01 0.085
Pipe p107 137.2 75 0.002 4.79 1.08 0.019
Pipe p108 213.1 75 0.002 4.71 1.07 0.019
Pipe p109 87.71 75 0.002 0.84 0.19 0.028
Pipe p110 40.69 75 0.002 0.76 0.17 0.029
Pipe p111 39.89 75 0.002 0.73 0.17 0.029
Pipe p112 47.64 75 0.002 0.65 0.15 0.03
Pipe p113 51.68 75 0.002 0.57 0.13 0.032
Pipe p114 31.45 75 0.002 0.49 0.11 0.033
Pipe p115 121.4 75 0.002 0.41 0.09 0.035
Pipe p116 128 75 0.002 0.32 0.07 0.037
Pipe p117 44.41 75 0.002 0.24 0.06 0.04
Pipe p118 85.66 75 0.002 0.16 0.04 0.03
Pipe p119 176.5 75 0.002 0.08 0.02 0.048
Pipe 1 33.73 75 0.002 6.39 1.45 0.018
Pipe 2 1000 75 0.002 5.61 1.27 0.018
Pipe 4 20.86 100 0.002 8.18 1.04 0.018
Pipe 5 27.96 100 0.002 5.08 0.65 0.02
Pipe 6 6.28 75 0.002 4.22 0.95 0.019
Pipe 7 7.29 75 0.002 4.93 1.12 0.019
Pipe 8 10.28 100 0.002 -4.18 0.53 0.021
Pipe 9 11.73 100 0.002 -3.88 0.49 0.021
Pipe 10 11.73 100 0.002 5.08 0.65 0.02
Pipe 12 29.09 100 0.002 2.32 0.3 0.024
Pipe 13 26.17 100 0.002 2.47 0.31 0.023
Pipe 14 17.03 100 0.002 4.12 0.52 0.021
Pipe 15 7.93 150 0.002 46.17 2.61 0.014
Pipe 16 20.39 100 0.002 46.37 5.9 0.013
Pipe 17 24.19 100 0.002 0.44 0.06 0.038
Pipe 3 63.96 100 0.002 4.91 0.62 0.02
Pipe 11 236.92 100 0.002 4.2 0.53 0.021
Pump Bomba #N/A #N/A #N/A 8.26 0 0
57
Cuadro 26. Resumen de resultados - nodos de la red - caso futuro – escenario estático, con proyecto.
58
Junc n49 1,017.8 0.000 1,035.2 17.5
Junc n50 1,019.3 0.000 1,033.8 14.5
Junc n51 1,028.2 0.000 1,032.1 3.9
Junc n52 929.2 0.000 1,036.4 107.2
Junc n53 1,028.9 0.000 1,032.2 3.3
Junc n54 1,028.9 0.000 1,032.0 3.1
Junc n55 1,028.7 0.000 1,032.0 3.2
Junc n56 1,028.7 0.000 1,031.9 3.1
Junc n57 938.6 0.000 1,028.7 90.1
Junc n58 1,012.0 0.000 1,015.3 3.3
Junc n59 961.9 0.000 1,028.8 66.9
Junc n60 982.8 0.000 1,015.0 32.2
Junc n61 990.0 0.000 1,015.0 25.0
Junc n62 988.1 0.000 1,015.0 26.9
Junc n63 990.0 0.000 1,015.0 25.0
Junc n64 989.5 0.000 1,015.0 25.5
Junc n65 990.0 0.000 1,015.0 25.0
Junc n66 993.1 0.000 1,015.0 21.9
Junc n67 1,011.1 0.000 1,015.0 3.9
Junc n68 993.8 0.000 1,015.0 21.2
Junc n69 993.5 0.000 1,015.0 21.5
Junc n70 995.5 0.000 1,015.0 19.5
Junc n71 994.9 0.000 1,015.0 20.1
Junc n72 955.2 0.000 1,015.0 59.8
Junc n73 951.7 0.000 1,015.0 63.3
Junc n74 948.9 0.000 1,015.0 66.1
Junc n75 944.5 0.000 1,015.0 70.5
Junc n76 930.6 0.000 1,015.0 84.4
Junc n77 923.0 0.000 1,015.0 92.0
Junc n78 933.3 0.000 1,015.0 81.7
Junc n79 935.0 0.000 1,015.0 80.0
Junc n80 942.4 0.000 1,015.0 72.6
Junc n81 946.8 0.000 1,015.0 68.2
Junc n82 960.1 0.000 1,015.0 54.9
Junc n83 981.3 0.000 1,029.5 48.2
Junc n84 966.3 0.000 1,029.5 63.2
Junc n85 959.6 0.000 1,029.5 69.9
Junc n86 959.0 0.000 1,029.5 70.5
Junc n87 956.3 0.000 1,029.5 73.2
Junc n88 948.8 0.000 1,029.5 80.7
Junc n89 948.6 0.000 1,029.5 80.9
Junc n90 950.9 0.000 1,029.5 78.5
Junc n91 956.8 0.000 1,029.5 72.7
Junc n92 958.3 0.000 1,029.5 71.2
Junc n93 954.3 0.000 1,029.5 75.2
Junc n94 912.1 0.000 1,015.0 102.9
Junc n95 905.3 0.000 1,015.0 109.7
Junc n96 987.6 0.000 1,030.0 42.4
Junc n97 991.0 0.000 1,029.9 38.9
Junc n98 986.3 0.000 1,029.6 43.4
Junc n99 967.6 0.000 1,029.1 61.6
Junc n100 970.6 0.000 1,029.0 58.4
59
Junc n101 968.8 0.000 1,028.9 60.2
Junc n102 963.9 0.000 1,028.9 65.0
Junc n103 977.2 0.000 1,028.9 51.7
Junc n104 983.1 0.000 1,030.0 46.8
Junc n105 985.9 0.000 1,030.0 44.1
Junc n106 964.3 0.000 1,030.0 65.6
Junc n107 980.9 0.000 1,030.0 49.1
Junc n108 980.5 0.000 1,030.0 49.5
Junc n109 982.0 0.000 1,030.0 48.0
Junc n110 983.0 0.000 1,030.0 47.0
Junc n111 982.5 0.000 1,030.0 47.5
Junc n112 1,028.1 0.000 1,032.0 3.9
Junc n113 1,020.2 0.000 1,031.2 11.0
Junc n114 984.4 0.000 1,030.0 45.6
Junc n115 978.8 0.000 1,030.0 51.2
Junc n116 981.8 0.000 1,030.0 48.1
Junc n117 988.0 0.000 1,030.0 42.0
Junc n118 989.7 0.000 1,030.0 40.3
Junc n119 985.2 0.000 1,030.0 44.8
Junc n120 970.4 0.000 1,030.0 59.6
Junc n121 972.3 0.000 1,030.0 57.7
Junc n122 981.3 0.000 1,030.0 48.7
Junc n123 980.3 0.000 1,030.0 49.7
Junc nodx 1,005.0 0.000 1,015.0 10.0
Junc 1 1,012.0 0.000 1,016.3 4.3
Junc Proyecto_LA_ARENA 1,005.0 0.000 1,016.3 11.3
Junc 3 1,005.0 0.000 1,016.3 11.3
Resvr Nac_R 1,103.0 -5.660 1,103.0 0.0
Resvr Nac_O 1,109.0 -5.110 1,109.0 0.0
Resvr Caseta_Bombeo 927.0 38.120 927.0 0.0
Resvr Nac_G 986.0 -46.370 986.0 0.0
Tank Tank_G 1,014.0 9.520 1,015.0 1.0
Tank Tank_1 1,031.0 4.860 1,032.0 1.0
Tank Tank_2 1,031.0 4.630 1,032.0 1.0
60
Cuadro 27. Resumen de resultados - tuberías de la red - caso futuro – escenario estático, con proyecto.
61
Pipe p49 415.16 100 0.002 8.25 1.05 0.018
Pipe p50 16.64 100 0.002 8.25 1.05 0.018
Pipe p51 16.4 100 0.002 6.73 0.86 0.019
Pipe p52 451.53 100 0.002 6.73 0.86 0.019
Pipe p54 90.1 100 0.002 -2.79 0.36 0.023
Pipe p56 139.4 100 0.002 0 0 0
Pipe p57 131.8 100 0.002 0 0 0
Pipe p58 40.1 100 0.002 0 0 0
Pipe p59 41.36 100 0.002 0 0 0
Pipe p60 19.92 100 0.002 0 0 0
Pipe p61 43.05 100 0.002 0 0 0
Pipe p63 126 100 0.002 0 0 0
Pipe p64 44.44 100 0.002 0 0 0
Pipe p65 69.22 100 0.002 0 0 0
Pipe p66 102.6 100 0.002 0 0 0
Pipe p67 372.6 100 0.002 0 0 0
Pipe p68 57.79 100 0.002 0 0 0
Pipe p69 59.3 100 0.002 0 0 0
Pipe p70 35.24 100 0.002 0 0 0
Pipe p71 165.9 100 0.002 0 0 0
Pipe p72 62.25 100 0.002 0 0 0
Pipe p73 142.1 100 0.002 0 0 0
Pipe p74 59.16 100 0.002 0 0 0
Pipe p75 69.82 100 0.002 0 0 0
Pipe p76 44.36 100 0.002 0 0 0
Pipe p77 109.6 100 0.002 0 0 0
Pipe p78 263.9 100 0.002 0 0 0
Pipe p79 256 100 0.002 0 0 0
Pipe p80 52.02 100 0.002 0 0 0
Pipe p81 36.71 100 0.002 0 0 0
Pipe p82 137.5 100 0.002 0 0 0
Pipe p83 128 100 0.002 0 0 0
Pipe p84 77.63 100 0.002 0 0 0
Pipe p85 53.96 100 0.002 0 0 0
Pipe p86 63.99 100 0.002 0 0 0
Pipe p87 48.3 100 0.002 0 0 0
Pipe p88 93.16 100 0.002 0 0 0
Pipe p89 76.81 100 0.002 0 0 0
Pipe p90 82.45 100 0.002 2.79 0.36 0.023
Pipe p91 148.62 100 0.002 2.79 0.36 0.023
Pipe p92 108.5 100 0.002 2.79 0.36 0.023
Pipe p93 248.3 100 0.002 2.79 0.36 0.023
Pipe p94 78.26 100 0.002 2.79 0.36 0.023
Pipe p95 42.89 100 0.002 2.79 0.36 0.023
Pipe p96 44.88 100 0.002 2.79 0.36 0.023
Pipe p97 80.05 100 0.002 0 0 0
Pipe p99 90.25 75 0.002 0 0 0
Pipe p100 129.51 75 0.002 0 0 0
Pipe p101 145.5 75 0.002 0 0 0
Pipe p102 93.51 75 0.002 0 0 0
Pipe p103 58.24 75 0.002 0 0 0
Pipe p104 34.13 75 0.002 0 0 0
62
Pipe p105 148.6 75 0.002 0 0 0
Pipe p106 29.04 75 0.002 0 0 0
Pipe p107 137.2 75 0.002 2.79 0.63 0.021
Pipe p108 213.1 75 0.002 2.79 0.63 0.021
Pipe p109 87.71 75 0.002 0 0 0
Pipe p110 40.69 75 0.002 0 0 0
Pipe p111 39.89 75 0.002 0 0 0
Pipe p112 47.64 75 0.002 0 0 0
Pipe p113 51.68 75 0.002 0 0 0
Pipe p114 31.45 75 0.002 0 0 0
Pipe p115 121.4 75 0.002 0 0 0
Pipe p116 128 75 0.002 0 0 0
Pipe p117 44.41 75 0.002 0 0 0
Pipe p118 85.66 75 0.002 0 0 0
Pipe p119 176.5 75 0.002 0 0 0
Pipe 1 33.73 75 0.002 5.66 1.28 0.018
Pipe 2 1000 75 0.002 5.11 1.16 0.019
Pipe 4 20.86 100 0.002 9.52 1.21 0.017
Pipe 5 27.96 100 0.002 0 0 0
Pipe 6 6.28 75 0.002 5.11 1.16 0.019
Pipe 7 7.29 75 0.002 5.66 1.28 0.018
Pipe 8 10.28 100 0.002 -4.28 0.54 0.021
Pipe 9 11.73 100 0.002 -3.97 0.51 0.021
Pipe 10 11.73 100 0.002 3.72 0.47 0.021
Pipe 12 29.09 100 0.002 1.35 0.17 0.027
Pipe 13 26.17 100 0.002 1.44 0.18 0.026
Pipe 14 17.03 100 0.002 3.01 0.38 0.022
Pipe 15 7.93 150 0.002 46.37 2.62 0.014
Pipe 16 20.39 100 0.002 46.37 5.9 0.013
Pipe 17 24.19 100 0.002 -2.79 0.36 0.023
Pipe 3 63.96 100 0.002 0 0 0
Pipe 11 236.92 100 0.002 0 0 0
Pipe 18 238.58 75 0.002 9.52 2.16 0.016
Pipe 19 19.82 75 0.002 9.52 2.16 0.016
Pipe 20 130 100 0.002 0 0 0
Pipe 21 15 100 0.002 0 0 0
Pump Bomba #N/A #N/A #N/A 8.25 0 0
63
Cuadro 28. Resumen de resultados - nodos de la red - caso futuro – consumo máximo horario, con proyecto.
64
Junc n43 1,025.7 0.090 1,048.3 22.6
Junc n44 1,007.7 0.090 1,044.6 36.9
Junc n45 990.2 0.090 1,041.9 51.7
Junc n46 981.9 0.090 1,040.9 59.0
Junc n47 995.2 0.090 1,038.4 43.2
Junc n48 998.6 0.090 1,037.4 38.8
Junc n49 1,017.8 0.090 1,034.1 16.3
Junc n50 1,019.3 0.090 1,033.1 13.9
Junc n51 1,028.2 0.000 1,032.1 3.8
Junc n52 929.2 0.260 1,036.2 107.0
Junc n53 1,028.9 0.000 1,032.2 3.3
Junc n54 1,028.9 0.000 1,032.0 3.1
Junc n55 1,028.7 0.000 1,031.9 3.2
Junc n56 1,028.7 0.000 1,031.7 3.0
Junc n57 938.6 0.260 1,025.3 86.6
Junc n58 1,012.0 0.220 1,015.2 3.2
Junc n59 961.9 0.260 1,025.2 63.3
Junc n60 982.8 0.220 1,013.0 30.1
Junc n61 990.0 0.220 1,013.0 23.0
Junc n62 988.1 0.220 1,013.0 24.9
Junc n63 990.0 0.220 1,013.0 23.0
Junc n64 989.5 0.220 1,013.1 23.5
Junc n65 990.0 0.220 1,013.1 23.2
Junc n66 993.1 0.220 1,013.3 20.2
Junc n67 1,011.1 0.220 1,014.8 3.7
Junc n68 993.8 0.220 1,013.1 19.3
Junc n69 993.5 0.220 1,013.1 19.6
Junc n70 995.5 0.220 1,013.1 17.6
Junc n71 994.9 0.220 1,013.1 18.2
Junc n72 955.2 0.220 1,012.4 57.2
Junc n73 951.7 0.220 1,012.3 60.6
Junc n74 948.9 0.220 1,012.3 63.3
Junc n75 944.5 0.220 1,012.2 67.7
Junc n76 930.6 0.220 1,012.1 81.5
Junc n77 923.0 0.220 1,012.1 89.1
Junc n78 933.3 0.220 1,012.0 78.7
Junc n79 935.0 0.220 1,012.0 77.0
Junc n80 942.4 0.220 1,012.0 69.6
Junc n81 946.8 0.220 1,012.0 65.2
Junc n82 960.1 0.220 1,012.0 51.8
Junc n83 981.3 0.260 1,025.2 43.9
Junc n84 966.3 0.260 1,024.8 58.5
Junc n85 959.6 0.260 1,024.6 65.0
Junc n86 959.0 0.260 1,024.5 65.5
Junc n87 956.3 0.260 1,024.5 68.2
65
Junc n88 948.8 0.260 1,024.4 75.7
Junc n89 948.6 0.260 1,024.4 75.8
Junc n90 950.9 0.260 1,024.4 73.4
Junc n91 956.8 0.260 1,024.4 67.5
Junc n92 958.3 0.260 1,024.4 66.1
Junc n93 954.3 0.260 1,024.4 70.0
Junc n94 912.1 0.220 1,012.0 99.9
Junc n95 905.3 0.220 1,012.0 106.8
Junc n96 987.6 0.100 1,025.7 38.1
Junc n97 991.0 0.260 1,025.6 34.6
Junc n98 986.3 0.260 1,025.3 39.1
Junc n99 967.6 0.260 1,025.2 57.6
Junc n100 970.6 0.260 1,025.2 54.6
Junc n101 968.8 0.260 1,025.2 56.4
Junc n102 963.9 0.260 1,025.2 61.3
Junc n103 977.2 0.220 1,025.2 48.0
Junc n104 983.1 0.100 1,025.6 42.5
Junc n105 985.9 0.100 1,025.6 39.8
Junc n106 964.3 0.100 1,025.6 61.2
Junc n107 980.9 0.100 1,025.6 44.7
Junc n108 980.5 0.100 1,025.6 45.1
Junc n109 982.0 0.100 1,025.6 43.6
Junc n110 983.0 0.100 1,025.6 42.6
Junc n111 982.5 0.100 1,025.6 43.1
Junc n112 1,028.1 0.000 1,032.0 3.8
Junc n113 1,020.2 0.100 1,029.5 9.3
Junc n114 984.4 0.100 1,025.6 41.3
Junc n115 978.8 0.100 1,025.6 46.8
Junc n116 981.8 0.100 1,025.5 43.7
Junc n117 988.0 0.100 1,025.5 37.5
Junc n118 989.7 0.100 1,025.5 35.8
Junc n119 985.2 0.100 1,025.5 40.3
Junc n120 970.4 0.100 1,025.4 55.1
Junc n121 972.3 0.100 1,025.4 53.1
Junc n122 981.3 0.100 1,025.4 44.1
Junc n123 980.3 0.100 1,025.4 45.2
Junc nodx 1,005.0 0.900 1,014.4 104
Junc 1 1,012.0 0.000 1,015.8 3.9
Junc Proyecto_LA_ARENA 1,005.0 0.680 1,015.8 10.8
Junc 3 1,005.0 0.000 1,015.8 10.8
Resvr Nac_R 1,103.0 -6.590 1,103.0 0.0
Resvr Nac_O 1,109.0 -5.740 1,109.0 0.0
Resvr Caseta_Bombeo 927.0 37.840 927.0 0.0
Resvr Nac_G 986.0 -46.370 986.0 0.0
Tank Tank_G 1,014.0 0.800 1,015.0 1.0
66
Tank Tank_1 1,031.0 0.770 1,032.0 1.0
Tank Tank_2 1,031.0 0.590 1,032.0 1.0
67
Cuadro 29. Resumen de resultados - tuberías de la red - caso futuro – consumo máximo horario, con proyecto.
68
Pipe p43 74.89 75 0.002 4.43 1 0.019
Pipe p44 197.5 75 0.002 4.34 0.98 0.019
Pipe p45 78.33 75 0.002 4.25 0.96 0.019
Pipe p46 285.9 75 0.002 4.16 0.94 0.019
Pipe p47 85.77 75 0.002 4.06 0.92 0.02
Pipe p48 99.24 75 0.002 3.97 0.9 0.02
Pipe p49 415.16 100 0.002 8.01 1.02 0.018
Pipe p50 16.64 100 0.002 8.01 1.02 0.018
Pipe p51 16.4 100 0.002 10.04 1.28 0.017
Pipe p52 451.53 100 0.002 10.04 1.28 0.017
Pipe p54 90.1 100 0.002 1.61 0.2 0.026
Pipe p56 139.4 100 0.002 -0.22 0.03 0.03
Pipe p57 131.8 100 0.002 -0.45 0.06 0.037
Pipe p58 40.1 100 0.002 -0.67 0.09 0.033
Pipe p59 41.36 100 0.002 -3.79 0.48 0.021
Pipe p60 19.92 100 0.002 -4.02 0.51 0.021
Pipe p61 43.05 100 0.002 -5.13 0.65 0.02
Pipe p63 126 100 0.002 0.89 0.11 0.03
Pipe p64 44.44 100 0.002 0.67 0.09 0.033
Pipe p65 69.22 100 0.002 0.45 0.06 0.037
Pipe p66 102.6 100 0.002 0.22 0.03 0.032
Pipe p67 372.6 100 0.002 2.9 0.37 0.022
Pipe p68 57.79 100 0.002 2.68 0.34 0.023
Pipe p69 59.3 100 0.002 2.45 0.31 0.023
Pipe p70 35.24 100 0.002 2.23 0.28 0.024
Pipe p71 165.9 100 0.002 2.01 0.26 0.024
Pipe p72 62.25 100 0.002 1.78 0.23 0.025
Pipe p73 142.1 100 0.002 1.12 0.14 0.028
Pipe p74 59.16 100 0.002 0.89 0.11 0.03
Pipe p75 69.82 100 0.002 0.67 0.09 0.033
Pipe p76 44.36 100 0.002 0.45 0.06 0.037
Pipe p77 109.6 100 0.002 0.22 0.03 0.031
Pipe p78 263.9 100 0.002 2.58 0.33 0.023
Pipe p79 256 100 0.002 2.32 0.3 0.024
Pipe p80 52.02 100 0.002 2.06 0.26 0.024
Pipe p81 36.71 100 0.002 1.8 0.23 0.025
Pipe p82 137.5 100 0.002 1.55 0.2 0.026
Pipe p83 128 100 0.002 1.29 0.16 0.027
Pipe p84 77.63 100 0.002 1.03 0.13 0.029
Pipe p85 53.96 100 0.002 0.77 0.1 0.031
Pipe p86 63.99 100 0.002 0.52 0.07 0.035
Pipe p87 48.3 100 0.002 0.26 0.03 0.034
Pipe p88 93.16 100 0.002 0.45 0.06 0.037
Pipe p89 76.81 100 0.002 0.22 0.03 0.031
Pipe p90 82.45 100 0.002 3.25 0.41 0.022
69
Pipe p91 148.62 100 0.002 2.99 0.38 0.022
Pipe p92 108.5 100 0.002 2.74 0.35 0.023
Pipe p93 248.3 100 0.002 -0.1 0.01 0.051
Pipe p94 78.26 100 0.002 -0.35 0.05 0.04
Pipe p95 42.89 100 0.002 -0.61 0.08 0.034
Pipe p96 44.88 100 0.002 -0.87 0.11 0.03
Pipe p97 80.05 100 0.002 0.22 0.03 0.032
Pipe p99 90.25 75 0.002 -0.68 0.15 0.03
Pipe p100 129.51 75 0.002 -0.79 0.18 0.029
Pipe p101 145.5 75 0.002 -0.1 0.02 0.037
Pipe p102 93.51 75 0.002 -0.21 0.05 0.038
Pipe p103 58.24 75 0.002 -0.31 0.07 0.037
Pipe p104 34.13 75 0.002 -0.41 0.09 0.035
Pipe p105 148.6 75 0.002 0.17 0.04 0.031
Pipe p106 29.04 75 0.002 0.06 0.01 0.052
Pipe p107 137.2 75 0.002 5.32 1.2 0.018
Pipe p108 213.1 75 0.002 5.21 1.18 0.019
Pipe p109 87.71 75 0.002 1.07 0.24 0.027
Pipe p110 40.69 75 0.002 0.97 0.22 0.027
Pipe p111 39.89 75 0.002 0.93 0.21 0.028
Pipe p112 47.64 75 0.002 0.83 0.19 0.028
Pipe p113 51.68 75 0.002 0.72 0.16 0.03
Pipe p114 31.45 75 0.002 0.62 0.14 0.031
Pipe p115 121.4 75 0.002 0.52 0.12 0.032
Pipe p116 128 75 0.002 0.41 0.09 0.034
Pipe p117 44.41 75 0.002 0.31 0.07 0.038
Pipe p118 85.66 75 0.002 0.21 0.05 0.038
Pipe p119 176.5 75 0.002 0.1 0.02 0.037
Pipe 1 33.73 75 0.002 6.59 1.49 0.018
Pipe 2 1000 75 0.002 5.74 1.3 0.018
Pipe 4 20.86 100 0.002 7.27 0.93 0.018
Pipe 5 27.96 100 0.002 6.48 0.82 0.019
Pipe 6 6.28 75 0.002 3.97 0.9 0.02
Pipe 7 7.29 75 0.002 4.73 1.07 0.019
Pipe 8 10.28 100 0.002 -4.15 0.53 0.021
Pipe 9 11.73 100 0.002 -3.86 0.49 0.021
Pipe 10 11.73 100 0.002 5.54 0.71 0.019
Pipe 12 29.09 100 0.002 2.58 0.33 0.023
Pipe 13 26.17 100 0.002 2.74 0.35 0.023
Pipe 14 17.03 100 0.002 4.5 0.57 0.02
Pipe 15 7.93 150 0.002 46.11 2.61 0.014
Pipe 16 20.39 100 0.002 46.37 5.9 0.013
Pipe 17 24.19 100 0.002 1.35 0.17 0.027
Pipe 3 63.96 100 0.002 6.25 0.8 0.019
Pipe 11 236.92 100 0.002 5.36 0.68 0.02
70
Pipe 18 238.58 75 0.002 8.17 1.85 0.017
Pipe 19 19.82 75 0.002 7.5 1.7 0.017
Pipe 20 130 100 0.002 0.68 0.09 0.032
Pipe 21 15 100 0.002 0.68 0.09 0.033
Pump Bomba #N/A #N/A #N/A 8.27 0 0
71
Fotografía 1. Rotulación en sitio de naciente.
72
Fotografía 2. Naciente Los Oviedo (1).
73
Fotografía 3. Naciente Los Oviedo (2).
74
Fotografía 4. Naciente Los Rodríguez (1).
75
Fotografía 5. Tanque #1.
76
Fotografía 6. Tanque #2.
77
Fotografía 7. Tanque Guayabal (1).
78
Fotografía 8. Tanque Guayabal (2).
79
Fotografía 9. Tanque Guayabal (3).
80