Activity
Activity code: Activity Description: Quantity Duration
: (days)

Work Package Site:


A Site Clearance 3
B Marking. 2
Work Package no.2: Building structure : cellar
A1 Excuvation 5116.64 40
B1 PCC 29.14 9
C1 Footings 116.58 12
D1 Columns up to plinth beam 11.57 12
E1 Plinth beam 62.36703 13
F1 columns 28.93 12
G1 Concrete bed 181.90 6
H1 Retaining wall 140.86488 8
I1 Half stair case 1.08 3
J1 Slab & Ramp & Beams 296.95 21
K1 Half stair case 2 1.08 3
L1 Plastering 501.38 7
M1 Flooring 56.4885
Work Package no. 2:Building Structure: stilt
A2 Columns 28.93 13
B2 Half Staircase (1) 1.08 3
C2 Slabs and Beams 226.99 20
D2 Half Staicase (2) 1.08 3
E2 plastering (columns,beams,slab) 1323.61 10
F2 flooring 56.4885
Work Package no. 3:Building structure :First Floor
A3 Columns 22.25 12
B3 Half Staircase (1) 1.08 3
C3 Slabs and Beams 165.90 23
D3 Half Staircase (2) 1.08 3
Brick work with door and windows 30
opening 273.50
E3
F3 Plastering (1st Coat) 3598.52 27
G3 Electric ( Metal Boxes) 15
H3 Plumbing (Pipelines) 15
I3 Plastering (2nd Coat) 3598.52 23
J3 Primer 3598.52 7
K3 Electrical Wiring and Switch boards 4
L3 Painting (internal ) 3598.52 8
M3 Door Frames and Shutters 2
N3 Flooring 24
O3 plumbing fixtures 2
Work Package no. Building structure :second
4: Floor
A4 Columns 22.25 12
B4 Half Staircase (1) 1.08 3
C4 Slabs and Beams 165.90 23
D4 Half Staicase (2) 1.08 3
Brick work with door and windows 30
E4 opening 273.50
F4 Plastering (1st Coat) 3598.52 27
G4 Electric ( Metal Boxes) 15
H4 Plumbing (Pipelines) 15
I4 Plastering (2nd Coat) 3598.52 23
J4 Primer 3598.52 7
K4 Electrical Wiring and Switch boards 4
L4 Painting (internal and External) 3598.52 8
M4 Door Frames and Shutters 2
N4 Flooring 24
O4 plumbing fixtures 2
Work Package no. Building structure :Third
A5 Columns 22.25 12
B5 Half Staircase (1) 1.08 3
C5 Slabs and Beams 165.90 23
D5 Half Staircase (2) 1.08 3
Brick work with door and windows 30
opening 273.50
E5
F5 Plastering (1st Coat) 3598.52 27
G5 Electric ( Metal Boxes) 15
H5 Plumbing (Pipelines) 15
I5 Plastering (2nd Coat) 3598.52 23
J5 Primer 3598.52 7
K5 Electrical Wiring and Switch boards 4
L5 Painting (internal and External) 3598.52 8
M5 Door Frames and Shutters 2
N5 Flooring 24
O5 plumbing fixtures 2
Work Package no. Building structure:Fourth
A6 Columns 22.25 12
B6 Half Staircase (1) 1.08 3
C6 Slabs and Beams 165.90 23
D6 Half Staircase (2) 1.08 3
Brick work with door and windows 30
E6 opening 273.50
F6 Plastering (1st Coat) 3598.52 27
G6 Electric ( Metal Boxes) 15
H6 Plumbing (Pipelines) 15
I6 Plastering (2nd Coat) 3598.52 23
J6 Primer 3598.52 7
K6 Electrical Wiring and Switch boards 4
L6 Painting (internal and External) 3598.52 8
M6 Door Frames and Shutters 2
N6 Flooring 24
O6 plumbing fixtures 2
Work Pakcage no. Building Structure: Fifth
A7 Columns 22.25 12
B7 Half Staircase (1) 1.08 3
C7 Slabs and Beams 165.90 23
D7 Half Staircase (2) 1.08 3
E7 Brick work with door and windows 30
opening 273.50
F7 Plastering (1st Coat) 3598.52 27
G7 Electric ( Metal Boxes) 15
H7 Plumbing (Pipelines) 15
I7 Plastering (2nd Coat) 3598.52 23
J7 Primer 3598.52 7
K7 Electrical Wiring and Switch boards 4
L7 Painting (internal and External) 3598.52 8
M7 Door Frames and Shutters 2
N7 Flooring 24
O7 plumbing fixtures 2
Work package no. 8Services:
A8 Lifts
B8 External plastering coat 1 4602.64
C8 External plastering coat 2 4602.64
D8 External primer 4602.64
E8 Elevation (four sides)
F8 external painting 4602.64
G8 Landscaping 1320
H8 drive ways
I8 compound wall 286.488
J8 transformer
H8 septic tank
labour

WED
Preceeding

THU
TUE

SAT
FRI
Succeeding Activity:
Activty (s):
Wome
Man Mason Equipment
n

DAY-1

DAY-2

DAY-3

DAY-4

DAY-5
- B
A C

B B1
A1 C1
B1 D1
C1 E1
D1 F1
E1 G1
F1 H1
G1 A2,I1
H1 J1
I1 K1
J1 L1
D1 M1
L1

I1,J1 B2
A2 C2
B2 D2
C2 E2,A3
D2 F2
D1

C2,D2 B3
A3 C3
B3 D3
C3 E3,A4
D3 F3

E3 G3
F3 H3
G3 I3
H3 J3
I3 K3
J3 L3
K3 M3
L3 N3
M3 O3
N3
D3 B4
A4 C4
B4 D4
C4 E4,A5
D4 F4

E4 G4
F4 H4
G4 I4
H4 J4
I4 K4
J4 L4
K4 M4
L4 N4
M4 O4
N4

D4 B5
A5 C5
B5 D5
C5 E5,A6
D5 F5

E5 G5
F5 H5
G5 I5
H5 J5
I5 K5
J5 L5
K5 M5
L5 N5
M5 O5
N5

D5 B6
A6 C6
B6 D6
C6 E6,A7
D6 F6

E6 G6
F6 H6
G6 I6
H6 J6
I6 K6
J6 L6
K6 M6
L6 N6
M6 O6
N6

D6 B7
A7 C7
B7 D7
C7 E7,A8
D7 F7

E7 G7
F7 H7
G7 I7
H7 J7
I7 K7
J7 L7
K7 M7
L7 N7
M7 O7
N7

M7 B8

A8 C8

B8 D8
C8 E8
D8 F8
E8 G8
F8
DAY-6 SUN
DAY-7 MON
DAY-8 TUE
DAY-9 WED
DAY-10 THU
DAY-11 FRI
DAY-12 SAT
DAY-13 SUN
DAY-14 MON
DAY-15 TUE
DAY-16 WED
DAY-17 THU
January ,2019

DAY-18 FRI
DAY-19 SAT
3

DAY-20 SUN
DAY-21 MON
DAY-22 TUE
DAY-23 WED
DAY-24 THU
DAY-25 FRI
DAY-26 SAT
DAY-27 SUN
DAY-28 MON
DAY-29 TUE
DAY-30 WED
DAY-31 THU
DAY-1 FRI
DAY-2 SAT
DAY-3 SUN
DAY-4 MON
DAY-5 TUE
DAY-6 WED
DAY-7 THU
DAY-8 FRI
DAY-9 SAT
DAY-10 SUN
DAY-11 MON
DAY-12 TUE
DAY-13 WED
DAY-14 THU
DAY-15 FRI
DAY-16
February ,2019

SAT
DAY-17 SUN
DAY-18 MON
DAY-19 TUE
DAY-20 WED
DAY-21 THU
DAY-22 FRI
DAY-23 SAT
DAY-24 SUN
DAY-25 MON
DAY-26 TUE
DAY-27 WED
DAY-28 THU
DAY-1 FRI
DAY-2 SAT
DAY-3 SUN
DAY-4 MON
DAY-5 TUE
DAY-6 WED
DAY-7 THU
DAY-8 FRI
DAY-9 SAT
DAY-10 SUN
DAY-11 MON
DAY-12 TUE
DAY-13 WED
DAY-14 THU
DAY-15 FRI
DAY-16 SAT
DAY-17 SUN
March ,2019

DAY-18 MON
DAY-19 TUE
DAY-20 WED
DAY-21 THU
DAY-22 FRI
DAY-23 SAT
DAY-24 SUN
DAY-25 MON
DAY-26 TUE
DAY-27 WED
DAY-28 THU
DAY-29 FRI
DAY-30 SAT
DAY-31 SUN
DAY-1 MON
DAY-2 TUE
DAY-3 WED
DAY-4 THU
DAY-5 FRI
DAY-6 SAT
DAY-7 SUN
DAY-8 MON
DAY-9 TUE
DAY-10 WED
DAY-11 THU
DAY-12 FRI
DAY-13 SAT
DAY-14 SUN
DAY-15 MON
April ,2019
DAY-16 TUE
April ,2019
DAY-17 WED
DAY-18 THU
DAY-19 FRI
DAY-20 SAT
DAY-21 SUN
DAY-22 MON
DAY-23 TUE
DAY-24 WED
DAY-25 THU
DAY-26 FRI
DAY-27 SAT
DAY-28 SUN
DAY-29 MON
DAY-30 TUE
DAY-1 WED
DAY-2 THU
DAY-3 FRI
DAY-4 SAT
DAY-5 SUN
DAY-6 MON
DAY-7 TUE
DAY-8 WED
DAY-9 THU
DAY-10 FRI
DAY-11 SAT
DAY-12 SUN
DAY-13 MON
DAY-14 TUE
DAY-15 WED
DAY-16 THU
DAY-17
May ,2019

FRI
DAY-18 SAT
DAY-19 SUN
DAY-20 MON
DAY-21 TUE
DAY-22 WED
DAY-23 THU
DAY-24 FRI
DAY-25 SAT
DAY-26 SUN
DAY-27 MON
DAY-28 TUE
DAY-29 WED
DAY-30 THU
DAY-31 FRI
DAY-1 SAT
DAY-2 SUN
DAY-3 MON
DAY-4 TUE
DAY-5 WED
DAY-6 THU
DAY-7 FRI
DAY-8 SAT
DAY-9 SUN
DAY-10 MON
DAY-11 TUE
DAY-12 WED
DAY-13 THU
DAY-14 FRI
DAY-15 SAT
DAY-16 SUN
June ,2019

DAY-17 MON
DAY-18 TUE
DAY-19 WED
DAY-20 THU
DAY-21 FRI
DAY-22 SAT
DAY-23 SUN
DAY-24 MON
DAY-25 TUE
DAY-26 WED
DAY-27 THU
DAY-28 FRI
DAY-29 SAT
DAY-30 SUN
DAY-1 MON
DAY-2 TUE
DAY-3 WED
DAY-4 THU
DAY-5 FRI
DAY-6 SAT
DAY-7 SUN
DAY-8 MON
DAY-9 TUE
DAY-10 WED
DAY-11 THU
DAY-12 FRI
DAY-13 SAT
DAY-14 SUN
DAY-15 MON
DAY-16 TUE
DAY-17
July ,2019

WED
DAY-18 THU
DAY-19 FRI
DAY-20 SAT
DAY-21 SUN
DAY-22 MON
DAY-23 TUE
DAY-24 WED
DAY-25 THU
DAY-26 FRI
DAY-27 SAT
DAY-28 SUN
DAY-29 MON
DAY-30 TUE
DAY-31 WED
DAY-1 THU
DAY-2 FRI
DAY-3 SAT
DAY-4 SUN
DAY-5 MON
DAY-6 TUE
DAY-7 WED
DAY-8 THU
DAY-9 FRI
DAY-10 SAT
DAY-11 SUN
DAY-12 MON
DAY-13 TUE
DAY-14 WED
DAY-15 THU
DAY-16 FRI
DAY-17 SAT
August ,2019

DAY-18 SUN
t ,2019
DAY-19 MON
DAY-20 TUE
DAY-21 WED
DAY-22 THU
DAY-23 FRI
DAY-24 SAT
DAY-25 SUN
DAY-26 MON
DAY-27 TUE
DAY-28 WED
DAY-29 THU
DAY-30 FRI
DAY-31 SAT
DAY-1 SUN
DAY-2 MON
DAY-3 TUE
DAY-4 WED
DAY-5 THU
DAY-6 FRI
DAY-7 SAT
DAY-8 SUN
DAY-9 MON
DAY-10 TUE
DAY-11 WED
DAY-12 THU
Septem
DAY-13 FRI
DAY-14 SAT
DAY-15 SUN
DAY-16 MON
DAY-17 TUE
September ,2019

DAY-18 WED
DAY-19 THU
DAY-20 FRI
DAY-21 SAT
DAY-22 SUN
DAY-23 MON
DAY-24 TUE
DAY-25 WED
DAY-26 THU
DAY-27 FRI
DAY-28 SAT
DAY-29 SUN
DAY-30 MON
DAY-1 TUE
DAY-2 WED
DAY-3 THU
DAY-4 FRI
DAY-5 SAT
DAY-6 SUN
DAY-7 MON
DAY-8 TUE
DAY-9 WED
DAY-10 THU
DAY-11 FRI
DAY-12 SAT
DAY-13 SUN
DAY-14 MON
DAY-15 TUE
DAY-16 WED
DAY-17 THU
October ,2019

DAY-18 FRI
DAY-19 SAT
DAY-20 SUN
DAY-21 MON
DAY-22 TUE
DAY-23 WED
DAY-24 THU
DAY-25 FRI
DAY-26 SAT
DAY-27 SUN
DAY-28 MON
DAY-29 TUE
DAY-30 WED
DAY-31 THU
DAY-1 FRI
DAY-2 SAT
DAY-3 SUN
DAY-4 MON
DAY-5 TUE
DAY-6 WED
DAY-7 THU
DAY-8 FRI
DAY-9 SAT
DAY-10 SUN
DAY-11 MON
DAY-12 TUE
DAY-13 WED
DAY-14 THU
DAY-15 FRI
DAY-16 SAT
DAY-17
November ,2019

SUN
DAY-18 MON
DAY-19 TUE
DAY-20 WED
DAY-21 THU
DAY-22 FRI
DAY-23 SAT
DAY-24 SUN
DAY-25 MON
DAY-26 TUE
DAY-27 WED
DAY-28 THU
DAY-29 FRI
DAY-30 SAT
DAY-1 SUN
DAY-2 MON
DAY-3 TUE
DAY-4 WED
DAY-5 THU
DAY-6 FRI
DAY-7 SAT
DAY-8 SUN
DAY-9 MON
DAY-10 TUE
DAY-11 WED
DAY-12 THU
DAY-13 FRI
DAY-14 SAT
DAY-15 SUN
DAY-16 MON
DAY-17 TUE
December ,2019

DAY-18 WED
DAY-19 THU
DAY-20 FRI
DAY-21 SAT
DAY-22 SUN
DAY-23 MON
DAY-24 TUE
DAY-25 WED
DAY-26 THU
DAY-27 FRI
DAY-28 SAT
DAY-29 SUN
DAY-30 MON
DAY-31 TUE
DAY-1 WED
DAY-2 THU
DAY-3 FRI
DAY-4 SAT
DAY-5 SUN
DAY-6 MON
DAY-7 TUE
DAY-8 WED
DAY-9 THU
DAY-10 FRI
DAY-11 SAT
DAY-12 SUN
DAY-13 MON
DAY-14 TUE
DAY-15 WED
January ,
DAY-16 THU
DAY-17 FRI
DAY-18
SAT
DAY-19
January ,2020

SUN
DAY-20
MON
DAY-21
TUE
DAY-22
WED
DAY-23
THU
DAY-24
FRI
DAY-25
SAT
DAY-26
SUN
DAY-27
MON
DAY-28
TUE
DAY-29
WED
DAY-30
THU
DAY-31
FRI
DAY-1
SAT
DAY-2
SUN
DAY-3
MON
DAY-4
TUE
DAY-5
WED
DAY-6
THU
DAY-7
FRI
DAY-8
SAT
DAY-9
SUN
DAY-10
MON
DAY-11
TUE
DAY-12
WED
DAY-13
THU
DAY-14
FRI
DAY-15
SAT
DAY-16
SUN
February ,2020

DAY-17
MON
DAY-18
TUE
DAY-19
WED
DAY-20
THU
DAY-21
FRI
DAY-22
SAT
DAY-23
SUN
DAY-24
MON
DAY-25
TUE
DAY-26
WED
DAY-27
THU
DAY-28
FRI
DAY-29
SAT
DAY-1
SUN
DAY-2
MON
DAY-3
TUE
DAY-4
WED
DAY-5
THU
DAY-6
FRI
DAY-7
SAT
DAY-8
SUN
DAY-9
MON
DAY-10
TUE
DAY-11
WED
DAY-12
THU
DAY-13
FRI
DAY-14
SAT
DAY-15
SUN
March ,2020
DAY-16
MON
DAY-17
March ,2020

TUE
DAY-18
WED
DAY-19
THU
DAY-20
FRI
DAY-21
SAT
DAY-22
SUN
DAY-23
MON
DAY-24
TUE
DAY-25
WED
DAY-26
THU
DAY-27
FRI
DAY-28
SAT
DAY-29
SUN
DAY-30
MON
DAY-31
TUE
DAY-1
WED
DAY-2
THU
DAY-3
FRI
DAY-4
SAT
DAY-5
SUN
DAY-6
MON
DAY-7
TUE
DAY-8
WED
DAY-9
THU
DAY-10
FRI
DAY-11
SAT
DAY-12
SUN
DAY-13
MON
DAY-14
TUE
DAY-15
WED
DAY-16
THU
April ,2020

DAY-17
FRI
DAY-18
SAT
DAY-19
SUN
DAY-20
MON
DAY-21
TUE
DAY-22
WED
DAY-23
THU
DAY-24
FRI
DAY-25
SAT
DAY-26
SUN
DAY-27
MON
DAY-28
TUE
DAY-29
WED
DAY-30
THU
DAY-1
FRI
DAY-2
SAT
DAY-3
SUN
DAY-4
MON
DAY-5
TUE
DAY-6
WED
DAY-7
THU
DAY-8
FRI
DAY-9
SAT
DAY-10
SUN
DAY-11
MON
DAY-12
TUE
M
DAY-13
WED
DAY-14
THU
DAY-15
FRI
DAY-16
SAT
May ,2020

DAY-17
SUN
DAY-18
MON
DAY-19
TUE
DAY-20
WED
DAY-21
THU
DAY-22
FRI
DAY-23
SAT
DAY-24
SUN
DAY-25
MON
DAY-26
TUE
DAY-27
WED
DAY-28
THU
DAY-29
FRI
DAY-30
SAT
DAY-31
SUN
DAY-1
MON
DAY-2
TUE
DAY-3
WED
DAY-4
THU
DAY-5
FRI
DAY-6
SAT
DAY-7
SUN
DAY-8
MON
DAY-9
TUE
DAY-10
WED
DAY-11
THU
DAY-12
FRI
DAY-13
SAT
DAY-14
SUN
DAY-15
MON
DAY-16
TUE
DAY-17
WED
DAY-18
THU
DAY-19
FRI
DAY-20
SAT
DAY-21
SUN
DAY-22
MON
DAY-23
TUE
DAY-24
WED
DAY-25
THU
DAY-26
FRI
DAY-27
SAT
DAY-28
SUN
DAY-29
MON

DAY-30
TUE

WED

THU
FRI

SAT

SUN

MON
DETAILED ESTIMATION
ITEM
NO DESCRIPTION No.s LENGTH (in M)
1 APARTMENT CELLAR
Earth work excavation and depasting soil in initial lead and lift in b.c.Soils, red earth and ordina
2
complete
For cellar 34.81

For Footings
F1 22 1.80
F2 52 1.80
F3 (lift) 1 2.33

total

3
P.C.C. in (1:4:8) to use 40 mm metal including the cost off conveyance of all materials
charges etc
For Footings
F1 22 1.50
F2 52 1.50
F3 (stair case) 1 2.93
total 75

4 R.C.C. (1:2:4) to use 40 mm metal including the cost and conveyance of all materials and
For Footings etc
F1 22 1.50
F2 52 1.50
F3 (lift) 1 2.93
total

5 COLUMNS
granite metal (Coarse aggregate) from approved quarry including cost and conveyance of all m
cement, fine aggregate (Sand),coarse aggregate, water etc., to site and seigniorage charges on
COLUMNS UPTO PLINTH BEAM
C1 78 0.23

COLUMNS CELLAR & STILT


C1 78 0.23
NO OF FLOORS 2

FLOOR COLUMS
C 60 0.23
NO OF FLOORS 5

STAIRCASE AND LIFT HEADROOM


C 8 0.23

total
6 REFILLING
Refilling with excavated soils or other than expansive soils in foundations and plinth in 150 mm l
watering and consolidation according to standard specifications, cost and conveyence of all m
total labour charges as directed complete for finished item of work

7 PLINTH BEAM

Vibrated reinforced cement concrete(VRCC) corresponding to M230 grade as per IS 456 equ
aggregates: coarse aggregate) using 20mm size (SS5) graded machine crushed hard granite m
including cost and conveyance of all materials like cement, fine aggregate (Sand),coarse aggreg
on all materials including centering, shuttering, machine mixing, laying concrete, vibrating, lift c
of steel and its fabrication charges for finished item of

PB1 18 0.23
PB2 9 0.23
PB3 1 0.23
PB4 2 0.23
PB5 6 0.23
PB6 6 0.23
PB7 6 0.23
PB8 4 4.65
PB9 2 1.43
PB10 1 3.12
PB11 20 4.50
PB12 2 2.80
PB13 14 4.88
PB14 2 3.00
PB15 7 4.93
PB16 6 5.35
PB17 2 4.88
PB18 2 7.73
PB19 4 0.23
PB20 2 0.23
PB21 2 0.23
PB22 2 0.23
PB23 2 0.23
PB24 4 0.23
TOTAL

NO OF FLOORS 2

8 Retaining wall
Vibrated reinforced cement concrete(VRCC) corresponding to M230 grade as per IS 456 equivale
prop: mix (Cement: fine aggregates: coarse aggregate) using 20mm size (SS5) graded machine
granite metal (Coarse aggregate) from approved quarry including cost and conveyance of all m
cement, fine aggregate (Sand),coarse aggregate, water etc., to site and seigniorage charges on
including centering, shuttering, machine mixing, laying concrete, vibrating, lift charges curing e
but excluding cost of steel and its fabrication charges for finished item of work

W1 2 45.58
W2 2 32.94
TOTAL

9 Roof Beams

Vibrated reinforced cement concrete(VRCC) corresponding to M230 grade as per IS 456 equivalen
coarse aggregate) using 20mm size (SS5) graded machine crushed hard granite metal (Coarse aggr
conveyance of all materials like cement, fine aggregate (Sand),coarse aggregate, water etc., to site a
centering, shuttering, machine mixing, laying concrete, vibrating, lift charges curing etc., comple
charges for finished item of work

RB1 18 0.23
RB2 9 0.23
RB3 1 0.23
RB4 2 0.23
RB5 6 0.23
RB6 6 0.23
RB7 6 0.23
RB8 4 4.65
RB9 2 1.43
RB10 1 3.12
RB11 20 4.50
RB12 2 2.80
RB13 14 4.88
RB14 2 3.00
RB15 4 1.42
RB16 2 1.50
TOTAL
No of floors 6
Stair case head room
RB15 2 4.07
RB16 2 0.23

Lift head room


RB17 2 1.43
RB18 2 0.23
total
10 Cellar & stiltcrushed
machine slabhard granite metal (Coarse aggregate) from approved quarry includin
conveyance of all materials like cement, fine aggregate (Sand),coarse aggregate, water et
seigniorage charges on all materials including centering,
S1 2 shuttering,
4.93 machine mixing, lay
S2 2 5.37
S3 6 4.88
S4 6 4.48
S5 1 4.93
S6 1 5.37
S7 3 4.88
S8 3 4.48
S9 1 4.93
S10 1 4.93
S11 1 4.93
S12 1 5.37
S13 1 4.88
S14 1 4.88
S15 1 5.37
S16 1 4.88
S17 1 4.48
S18 1 7.73
S19 2 4.88
S20 2 4.50
S21 2 4.88
S22 2 4.50
S23 2 4.88
S24 2 4.50
total
no of floors 2
11 Floor and roof slab
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregat
aggregate, water etc., to site and seigniorage charges on all materials including centering, shuttering, machin
S1 6 4.88
S2 6 4.50
S3 3 4.88
S4 3 4.50
S5 1 4.88
S6 1 4.50
S7 2 4.88
S8 2 4.50
S9 2 4.88
S10 2 4.50
S11 2 4.88
S12 2 4.50
TOTAL

NO of floors 7

12 BRICK
sand) WALL
using second class bricks from approved source having minimum crushing strength o
including cost and conveyance of all materials like cement, sand, bricks, water etc., to s
seigniorage
2 BHK charges on all materials and all incidental and operational, labour charges, like m
EXTERIOR WALL
W1 2 9.61
W2 2 0.23
INTERIOR WALL
w1 1 0.15
w2 1 4.50
w3 1 0.15
w4 1 4.27
w5 1 0.15
w6 1 2.14
w7 1 0.15
w8 1 3.65
w9 1 0.15
w10 1 1.65

Deduction
Doors
D1 1 1.50
D2 1 1.20
D3 3 0.90
D4 2 0.75
WINDOWS
W1 7 1.50
Ventilator
V1 2 0.50

Door lintels
D1 1 1.50
D2 1 1.20
D3 3 0.90
D4 2 0.75

Window lintels
W1 7 1.50

Ventilator lintels
V1 2 0.50

Window sills
W1 7 1.50

Railing 1 0.23

total brick wall


no of flats 2
no of floors 5
cement, sand, water etc., to site and cost of seigniorage charges on all materia
13
operational, incidental charges and all labour charges for mixing mortar, finishing,
EXTERIOR WALL
W1 4 9.61
W2 4 0.02
INTERIOR WALL
w1 2 0.02
w2 2 4.50
w3 2 0.02
w4 2 4.27
w5 2 0.02
w6 2 2.14
w7 2 0.02
w8 2 3.65
w9 2 0.02
w10 2 1.65

Deduction
Doors
D1 1 1.50
D2 1 1.20
D3 3 0.90
D4 2 0.75
WINDOWS
W1 7 1.50
Ventilator
V1 2 0.50
Railing 1 0.02

total plastering
no of flats 2
no of floors 5

PAINTING
faces of newwalls of approved colour as per manufacturers specification including cost and co
14
materials to site and labour charges such as preparing the wall, applying primary coat etc., c
EXTERIOR WALL
W1 4 9.61
W2 4 0.02
INTERIOR WALL
w1 2 0.02
w2 2 4.50
w3 2 0.02
w4 2 4.27
w5 2 0.02
w6 2 2.14
w7 2 0.02
w8 2 3.65
w9 2 0.02
w10 2 1.65
Deduction
Doors
D1 1 1.50
D2 1 1.20
D3 3 0.90
D4 2 0.75
WINDOWS
W1 7 1.50
Ventilator
V1 2 0.50
Railing 1 0.02

total plastering
no of flats 2
no of floors 5

15 Flooring
marble tiles
total flat area 1 9.15

deduction
washroom 1 1 3.50
washroom 2 1 2.00

no of flats 2
no of floors 5

bed of crushed
VERTIFIED TILES dust to required level and slope including cost and conveyance of a
and water to work site and all operational, incidental, labour charges such as mix
laying, grinding,
washroom 1 rubbing, polishing, acid wash, lift
1 charges curing
2.00 etc., complete for
doddling
w1 2 2.00
w2 2 1.50
washroom 2 1 1.50
doddling
w1 2 2.00
w2 2 1.50

no of flats 2
no of floors 5

kitchen
over 12dadooing
mm. CM (1:5) prop. thick base coat and neat cement paste at the rate of 3.3 kgs. per sqm. and joi
cement paste mixed with pigment of matching shade, including seignorage ,cost and conveyance of all ma
from approved sources to work site and all operational,incidental,
w1 1 labour charges
2.83such as mixing mortar, f
w2 1 3.84
kitchen granite platform
G1 1 2.83
G2 1 3.84

16 Liintels and sill


materials like cement, fine aggregate and coarse aggregate water etc to site cost at seigniorage and all
materials including centering shuttering, machine mix laying concrete vibrations, curing etc complete for
Door lintels
D1 1 1.50
D2 1 1.20
D3 3 0.90
D4 2 0.75

Window lintels
W1 7 1.50

Ventilator lintels
V1 2 0.50

Window sills
W1 7 1.50

no of flats 2
no of floors 5

cement, fine aggregate and coarse aggregate water etc to site cost at seigniorage and all mater
18
centering shuttering, machine mix laying concrete vibrations, curing etc complete for finished ite
W1 7 1.50
no of flats 2
no of floors 5

3 BHK FLAT
19 BRICK MASONRY
strength of 40 kg/sq.cm including cost and conveyance of all materials like cement,
water etc., to site, cost of seigniorage charges on all materials and all incidental and
Exterior walls
W1 1 9.61
W2 2 0.23
W3 1 9.61
Interior walls
w1 1 4.50
w2 1 0.15
w3 1 0.15
w4 1 4.51
w5 1 0.15
w6 1 6.70
w7 2 0.15
w8 1 4.65
w9 1 0.15
w10 1 3.65
w11 2 0.15
Lift
W1 2 0.23
W2 1 1.20

NO OF FLOORS 8

Stair case
W1 2 5.09
W2 1 0.23

NO OF FLOORS 8
total
Deductions
Doors
D1 1 1.50
D2 1 1.20
D3 4 0.90
D4 4 0.75

Doors lintels
D1 1 1.50
D2 1 1.20
D3 4 0.90
D4 4 0.75

Windows
W1 7 1.50

Windows lintels 7 1.50

Windows sill 7 1.50

Ventilator
V1 3 0.50

Ventilator lintels 3 0.50

Railing
R1 1 2.32

no of flats 3
no of floors 5

20 Plastering
top coat of 3mm thick in CM(1:4) prop with dubara sponge finishing including cost & con
materials and water to work site seigniorage and all operational, incidental, labour charg
scaffolding,
Exterior walls mixing mortor, lift charges, curing etc complete for finished item of work as per
W1 4 9.61
W2 4 0.02
Interior walls
w1 2 4.50
w2 2 0.02
w3 2 0.02
w4 2 4.51
w5 2 0.02
w6 2 6.70
w7 4 0.02
w8 2 4.65
w9 2 0.02
w10 2 3.65
w11 4 0.02

NO OF FLATS 3
NO OF FLOORS 5

Deductions
Doors
D1 1 1.50
D2 1 1.20
D3 4 0.90
D4 4 0.75
Windows
W1 8 1.50
Ventilator
v1 3 0.50
Railing
r1 2 2.32

no of flats 3
no of floors 5

TOTAL INTERNAL PLASTERING WITH DEDUCTION FOR ALL 3BHK

21 PAINTING
two coats over primary coat of white cement (total 2 coats) including cost and conveyance of all material
including cost of brushes, scaffolding charges, lift charges etc., and all labour charges curing etc., comp
Exterior walls
W1 4 9.61
W2 4 0.02
Interior walls
w1 2 4.50
w2 2 0.02
w3 2 0.02
w4 2 4.51
w5 2 0.02
w6 2 6.70
w7 4 0.02
w8 2 4.65
w9 2 0.02
w10 2 3.65
w11 4 0.02

NO OF FLATS 3
NO OF FLOORS 5

Deductions
Doors
D1 1 1.50
D2 1 1.20
D3 4 0.90
D4 4 0.75
Windows
W1 8 1.50
Ventilator
v1 3 0.50
Railing
r1 2 2.32

no of flats 3
no of floors 5

TOTAL INTERNAL PAINTING WITH DEDUCTION


FOR ALL 3BHK

22 FLOORING
Marble tiles
total flat area 1 9.61

Deductions
Toilet 1 1 1.50
Toilet 2 1 1.50
Toilet 3 1 1.65
SUM

Total area ( for flat )

Total area for all flats 15


VERTIFIED TILES
dust to required level and slope including cost and conveyance of all materials and water to wo
operational, incidental, labour charges such as mixing mortar, laying, grinding, rubbing, polishin
Washroom 1 1 1.50
Doddling
w1 4 1.50
Washroom 2 1 1.80
Doddling
w1 2 1.50
w2 2 1.80

Washroom 3 1 1.65
Doddling
w1 2 1.65
w2 2 1.80
total-
nof of flats 3
No of floors 5

kitchen
over 12dadooing
mm. CM (1:5) prop. thick base coat and neat cement paste at the rate of 3.3 kgs. per sqm. and joi
cement paste mixed with pigment of matching shade, including seignorage ,cost and conveyance of all ma
from approved sources to work site and all operational,incidental,
w1 1 labour charges
3.07such as mixing mortar, f
w2 1 3.84

kitchen granite platform


G1 1 3.07
G2 1 3.84

23 Liintels
SS108 withandnecessary
sill reinforcement including cost and conveyance of all materials like cement, fine aggre
aggregate water etc to site cost at seigniorage and all materials including centering shuttering, machin
concrete
Door lintels vibrations, curing etc complete for finished item of work but excluding cost of steel at its for fi
D1 1 1.50
D2 1 1.20
D3 3 0.90
D4 4 0.75

Window lintels
W1 8 1.50

Ventilator lintels
V1 3 0.50

Window sills
W1 8 1.50
total
no of flats 3
no of floors 5

24 CHAJJAS
cement, fine aggregate and coarse aggregate water etc to site cost at seigniorage and all mater
centering shuttering, machine mix laying concrete vibrations, curing etc complete for finished ite
W 8 1.50
no of flats 3
no of floors 5

Brick for corridors


W1 1 3.50
W2 1 2.93
no fo floors 5
Brick for parapet wall
w1 5 9.61
w2 4 16.98
w3 4 3.00
w4 1 20.76
w5 1 32.35
w6 3 13.26
Total

25 Plastering
(1:3) withfor corridors
dubara & parapet
sponge wall-internal
finishing including cost and conveyance of all materials like cement, sa
to site and cost of seigniorage charges on all materials and all operational, incidental charges a
charges
26 Corridor for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves
W1 1 3.50
W2 1 2.93

no fo floors 5
27 parapet wall
w1 5 9.61
w2 4 16.98
w3 4 3.00
w4 1 20.76
w5 1 32.35
w6 3 13.26
w7 1 2.63
Total plastering
28 CEILING PLASTERING
prop with dubara sponge finishing including cost & conveyance of materials and water to work site seig
operational, incidental, labour charges such as scaffolding, mixing mortor, lift charges, curing etc compl
2BHK 2
3BHK 3
Corridor 1

no of floors 5
cellar and stilt 2
duct space plastering
d1 1
d2 3
lift head room 1
stair case head room 1
total

29 EXTERNAL PLASTERING
(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sa
to site and cost of seigniorage charges on all materials and all operational, incidental charges a
charges for mixing mortar, finishing, scaffolding, lift charges,
w1 6 curing, including
9.61 cutting grooves
w2 4 16.98
w3 4 3.00
w4 1 20.76
w5 1 32.35
w6 3 13.26
w7 5 4.73
total
Deduction

Wiindows
W1 33 1.50
No of floors 5

Ventilators
V1 13 0.50
No of floors 5

Doors
D1 8 1.50
No of floors 5
corridors
W1 1 3.50
W2 1 2.93
W3 4 3.00
W4 1 1.79

No of floors 5
total deduction

total external plastering

30 EXTERNAL PAINTING
appropriate primer of approved brand making 3-coats in all to give an even shade after thoroughly brushin
remove all dirt and remains of loose powedered materials, including all operational, incidental charges in
w1 6 9.61
w2 4 16.98
w3 4 3.00
w4 1 20.76
w5 1 32.35
w6 3 13.26
w7 5 4.73
sum
Deduction

Wiindows
W1 33 1.50
No of floors 5

Ventilators
V1 13 0.50
No of floors 5

Doors
D1 8 1.50
No of floors 5

corridors
W1 1 3.50
W2 1 2.93
W3 4 3.00
W4 1 1.79

No of floors 5
total deduction

total external painting

31 Supply and fixing of doors and windows including transportation & labor charges
Doors
D1 90 0.75
D2 65 0.90
D3 25 1.50
D4 25 1.20
Ventiators
V1 65 0.45

Windows
W1 190 1.50

Compound wall
w1 1 54.41
w2 1 67.09
w3 1 67.30
w4 1 76.00
w5 1 15.80
w6 1 30.80
total
MATION
WIDTH (in
DEPTH (in M) QUANTITY
M)

oils, red earth and ordinary gravel etc.


32.35 4.15 4673.33

2.40 1.60 152.06


1.80 1.60 269.57
3.30 2.82 21.68
CUM 443.31

TOTAL 5116.64

eyance of all materials and labor

2.10 0.15 10.40


1.50 0.15 17.55
2.73 0.15 1.20
TOTAL 29.14

ce of all materials and labor charges

2.10 0.60 41.58


1.50 0.60 70.20
2.73 0.60 4.80
TOTAL 116.58

and conveyance of all materials like


seigniorage charges on all materials

0.43 1.50 11.57


TOTAL 11.57

0.43 3.75 28.93


57.86
TOTAL 57.86

0.43 3.75 22.25

TOTAL 111.26

0.43 2.5 1.98

182.67
s and plinth in 150 mm layers including
and conveyence of all materials and
d item of work 286.019505

0 grade as per IS 456 equivalent to (1:1.5:3) prop: mix (Cement: fine


crushed hard granite metal (Coarse aggregate) from approved quarry
ate (Sand),coarse aggregate, water etc., to site and seigniorage charges
concrete, vibrating, lift charges curing etc., complete but excluding cost
rges for finished item of work

6.00 0.45 11.178


5.71 0.45 5.318865
1.34 0.45 0.13869
0.80 0.45 0.1656
3.65 0.45 2.26665
4.45 0.45 2.76345
3.60 0.45 2.2356
0.23 0.45 1.9251
0.23 0.45 0.29601
0.23 0.45 0.32292
0.23 0.45 9.315
0.23 0.45 0.5796
0.23 0.45 7.07112
0.23 0.45 0.621
0.23 0.45 3.571785
0.23 0.45 3.32235
0.23 0.45 1.01016
0.23 0.45 1.60011
6.43 0.45 2.66202
6.14 0.45 1.27098
4.02 0.45 0.83214
4.88 0.45 1.01016
5.90 0.45 1.2213
4.03 0.45 1.66842
62.36703

124.73406
de as per IS 456 equivalent to (1:1.5:3)
e (SS5) graded machine crushed hard
and conveyance of all materials like
seigniorage charges on all materials
ting, lift charges curing etc., complete
r finished item of work

0.23 3.9 81.77052


0.23 3.9 59.09436
140.86488

e as per IS 456 equivalent to (1:1.5:3) prop: mix (Cement: fine aggregates:


ranite metal (Coarse aggregate) from approved quarry including cost and
egate, water etc., to site and seigniorage charges on all materials including
arges curing etc., complete but excluding cost of steel and its fabrication
hed item of work

6.00 0.45 11.18


5.71 0.45 5.32
1.34 0.45 0.14
0.80 0.45 0.17
3.65 0.45 2.27
4.45 0.45 2.76
3.60 0.45 2.24
0.23 0.45 1.93
0.23 0.45 0.30
0.23 0.45 0.32
0.23 0.45 9.32
0.23 0.45 0.58
0.23 0.45 7.07
0.23 0.45 0.62
0.23 0.45 0.59
0.23 0.45 0.31
45.10
270.57591

0.23 0.45 0.84


3.00 0.45 0.62

0.23 0.45 0.30


1.23 0.45 0.25
272.59
proved quarry including cost and
rse aggregate, water etc., to site and
g, machine mixing,
6.43 laying concrete,
0.15 9.51
6.43 0.15 10.36
6.43 0.15 28.24
6.43 0.15 25.93
6.14 0.15 4.54
6.14 0.15 4.95
6.14 0.15 13.48
6.14 0.15 12.38
4.02 0.15 2.97
4.88 0.15 3.61
4.03 0.15 2.98
8.90 0.15 7.17
3.00 0.15 2.20
5.90 0.15 4.32
4.03 0.15 3.25
4.03 0.15 2.95
3.00 0.15 2.02
4.03 0.15 4.67
4.02 0.15 5.89
4.02 0.15 5.43
4.88 0.15 7.14
4.88 0.15 6.59
4.03 0.15 5.90
4.03 0.15 5.44
181.90
363.80

s like cement, fine aggregate (Sand),coarse


ntering, shuttering, machine mixing, laying
6.43 0.15 28.24056
6.43 0.15 26.0415
6.14 0.15 13.48344
6.14 0.15 12.4335
3.00 0.15 2.196
3.00 0.15 2.025
4.02 0.15 5.88528
4.02 0.15 5.427
4.88 0.15 7.14432
4.88 0.15 6.588
4.03 0.15 5.89992
4.03 0.15 5.4405
120.80502

845.63514

um crushing strength of 40 kg/sq.cm


bricks, water etc., to site, cost of
al, labour charges, like mixing cement
0.23 3.90 17.24
13.03 3.90 23.38

4.12 3.90 2.41


0.15 3.90 2.63
4.73 3.90 2.77
0.15 3.90 2.50
2.15 3.90 1.26
0.15 3.90 1.25
3.95 3.90 2.31
0.15 3.90 2.14
1.65 3.90 0.97
0.15 3.90 0.97
total 59.81

0.23 2.10 0.72


0.23 2.10 0.58
0.15 2.10 0.85
0.15 2.10 0.47

0.23 1.00 2.42

0.23 0.45 0.10

0.23 0.15 0.05


0.23 0.15 0.04
0.15 0.15 0.06
0.15 0.15 0.03

0.23 0.15 0.36

0.23 0.15 0.03

0.23 0.15 0.36

4.17 3.90 3.74


total 9.83
total sum 49.98
99.95
499.77
harges on all materials and all
ing mortar, finishing, scaffolding,

0.02 3.90 149.92


13.03 3.90 203.27

4.12 3.90 32.14


0.02 3.90 35.10
4.73 3.90 36.89
0.02 3.90 33.31
2.15 3.90 16.77
0.02 3.90 16.69
3.95 3.90 30.81
0.02 3.90 28.47
1.65 3.90 12.87
0.02 3.90 12.87
total 609.10

0.02 2.10 3.15


0.02 2.10 2.52
0.02 2.10 5.67
0.02 2.10 3.15

0.02 1.00 10.50

0.02 0.45 0.45


4.17 3.90 16.26
total 41.70
total sum 567.40
1134.80
5673.99

on including cost and conveyance of


ying primary coat etc., complete for

0.02 3.90 149.92


13.03 3.90 203.27

4.12 3.90 32.14


0.02 3.90 35.10
4.73 3.90 36.89
0.02 3.90 33.31
2.15 3.90 16.77
0.02 3.90 16.69
3.95 3.90 30.81
0.02 3.90 28.47
1.65 3.90 12.87
0.02 3.90 12.87
total 609.10
0.02 2.10 3.15
0.02 2.10 2.52
0.02 2.10 5.67
0.02 2.10 3.15

0.02 1.00 10.50

0.02 0.45 0.45


4.17 3.90 16.26
total 41.70
total sum 567.40
1134.80
5673.99

12.80 0.05 117.12

3.80 0.05 13.30


1.50 0.05 3.00
total 16.30
total sum 100.82
201.64
1008.20

and conveyance of all materials


charges such as mixing mortar,
ng etc., complete
1.50 for finished
0.05 item 3.00

0.05 1.80 7.20


0.05 1.80 5.40
1.50 0.05 2.25

0.05 1.80 7.20


0.05 1.80 5.40
total 30.45
60.90
304.50

of 3.3 kgs. per sqm. and jointed with white


t and conveyance of all materials and water
es such as mixing0.05
mortar, fixing in0.60
position,
0.05 0.60
0.02 0.45
0.02 0.45

st at seigniorage and all


s, curing etc complete for

0.23 0.15 0.05


0.23 0.15 0.04
0.15 0.15 0.06
0.15 0.15 0.03

0.23 0.15 0.36

0.23 0.15 0.03

0.23 0.15 0.36


0.95
1.89
9.47

eigniorage and all materials including


complete for finished item of work but
0.60 0.15 0.95
1.89
9.45

aterials like cement, sand, bricks,


and all incidental and operational,
0.23 3.75 8.29
17.23 3.75 29.72
0.23 3.75

0.15 3.75 2.53


4.15 3.75 2.33
4.73 3.75 2.66
0.15 3.75 2.54
7.92 3.75 4.46
0.15 3.75 3.77
1.80 3.75 2.03
0.15 3.75 2.62
3.95 3.75 2.22
0.15 3.75 2.05
1.50 3.75 1.69
total 66.90

0.80 3.75 1.38


0.23 3.75 1.04
2.42
19.32

0.23 3.75 8.78


2.77 1.70 1.08
9.86
0.00
86.22

0.23 2.10 0.72


0.23 2.10 0.58
0.15 2.10 1.13
0.15 2.10 0.95

0.23 0.15 0.05


0.23 0.15 0.04
0.15 0.15 0.08
0.15 0.15 0.07

0.23 1.00 2.42

0.23 0.15 0.36

0.23 0.15 0.36

0.23 0.45 0.16

0.23 0.15 0.05

273.50
0.23 3.90 2.08
total 9.05 0.7
total sum 57.85
173.54
867.72

ng including cost & conveyance of


ncidental, labour charges such as
hed item of work as per SS No.901 &
0.02 3.90 149.92
17.23 3.90 268.79

0.02 3.90 35.10


4.15 3.90 32.37
4.73 3.90 36.89
0.02 3.90 35.18
7.92 3.90 61.78
0.02 3.90 52.26
1.80 3.90 28.08
0.02 3.90 36.27
3.95 3.90 30.81
0.02 3.90 28.47
1.50 3.90 23.40
total 819.31
2457.94
12289.68

0.02 2.10 3.15


0.02 2.10 2.52
0.02 2.10 7.56
0.02 2.10 6.30

0.02 1.00 12.00


0.00
0.02 0.45 0.68

0.02 3.90 18.10


total 50.30

150.90
754.52

11535.17

conveyance of all materials, water to site,


charges curing etc., complete for finished

0.02 3.90 149.92


17.23 3.90 268.79

0.02 3.90 35.10


4.15 3.90 32.37
4.73 3.90 36.89
0.02 3.90 35.18
7.92 3.90 61.78
0.02 3.90 52.26
1.80 3.90 28.08
0.02 3.90 36.27
3.95 3.90 30.81
0.02 3.90 28.47
1.50 3.90 23.40
total 819.31
2457.94
12289.68

0.02 2.10 3.15


0.02 2.10 2.52
0.02 2.10 7.56
0.02 2.10 6.30

0.02 1.00 12.00


0.00
0.02 0.45 0.68

0.02 3.90 18.10


total 50.30

150.90
754.52

11535.17

16.98 0.05 163.18

1.50 0.05 2.25


1.80 0.05 2.70
1.80 0.05 2.97
7.92

155.26

2328.87

aterials and water to work site and all


rinding, rubbing, polishing, acid wash,
1.50 0.05 2.25

0.05 1.80 10.80


1.80 0.05 3.24

0.05 1.80 5.40


0.05 1.80 6.48

1.80 0.05 2.97

0.05 1.80 5.94


0.05 1.80 6.48
43.56
130.68
653.40

of 3.3 kgs. per sqm. and jointed with white


t and conveyance of all materials and water
es such as mixing0.05
mortar, fixing in0.60
position, 1.84
0.05 0.60 2.30

0.02 0.45 1.38


0.02 0.45 1.73

ials like cement, fine aggregate and coarse


entering shuttering, machine mix laying
ng cost of steel at its for finished item of
0.23 0.15 0.05
0.23 0.15 0.04
0.15 0.15 0.06
0.15 0.15 0.07

0.23 0.15 0.41

0.23 0.15 0.05

0.23 0.15 0.41


1.10
3.30
16.52

eigniorage and all materials including


complete for finished item of work but
0.60 0.15 1.08
3.24
16.20

0.23 0.90 0.72


0.23 0.90 0.61
3.03

0.15 0.90 6.49


0.15 0.90 9.17
0.15 0.90 1.62
0.15 0.90 2.80
0.15 0.90 4.37
0.15 0.90 5.37
total 32.85

materials like cement, sand, water etc.,


onal, incidental charges and all labour
cluding cutting grooves as directed by
0.02 0.90 3.15
0.02 0.90 2.64
5.79
28.94

0.02 0.90 43.25


0.02 0.90 61.13
0.02 0.90 10.80
0.02 0.90 18.68
0.02 0.90 29.12
0.02 0.90 35.80
0.02 0.90 2.37
201.14

and water to work site seigniorage and all


charges, curing etc complete for finished
117.06 234.12
153.26 459.78
75.05 75.05
768.95
3844.75
1,126.88 2253.76

130.56 130.56
50.94 152.82
2.76 2.76
17.17 17.17
sum 6401.82

materials like cement, sand, water etc.,


onal, incidental charges and all labour
cluding cutting 0.02
grooves as directed
21.10 by 1216.63
0.02 21.10 1433.11
0.02 21.10 253.20
0.02 21.10 438.04
0.02 21.10 682.59
0.02 21.10 839.36
0.02 20.10 475.37
5338.28

0.02 1.00 49.50


247.50

0.02 0.45 2.93


14.63

0.02 2.10 25.20


126.00

0.02 2.90 10.15


0.02 2.90 8.50
0.02 3.90 46.80
0.02 3.90 6.98
72.43
362.14
735.64

4602.64

de after thoroughly brushing the surface to


onal, incidental charges including cost of
0.02 21.10 1216.63
0.02 21.10 1433.11
0.02 21.10 253.20
0.02 21.10 438.04
0.02 21.10 682.59
0.02 21.10 839.36
0.02 20.10 475.37
5338.28

0.02 1.00 49.50


247.50

0.02 0.45 2.93


14.63

0.02 2.10 25.20


126.00
0.02 2.90 10.15
0.02 2.90 8.50
0.02 3.90 46.80
0.02 3.90 6.98
72.43
362.14
735.64

4602.64

ortation & labor charges

2.10 90
2.10 65
2.10 25
2.10 25

0.50 65

1.30 190

0.23 4 50.0572
0.23 4 61.7228
0.23 4 61.916
0.23 4 69.92
0.23 4 14.536
0.23 4 28.336
286.488
39.071256

#NAME?

390.71256
DETAILED ESTIMATION
ITEM LENGT WIDTH
NO DESCRIPTION No.s
H (in M) (in M)
1 APARTMENT CELLAR
Earth work excavation and depasting soil in initial lead and lift in b.c.Soils, red earth and
2
ordinary gravel etc. complete
For cellar 34.81 32.35

For Footings
F1 22 1.80 2.40
F2 52 1.80 1.80
F3 (lift) 1 2.33 3.30

total

3
P.C.C. in (1:4:8) to use 40 mm metal including the cost off conveyance of all materials
and labor charges etc

For Footings
F1 22 1.50 2.10
F2 52 1.50 1.50
F3 (stair case) 1 2.93 2.73
total

4 R.C.C. (1:2:4) to use 40 mm metal including the cost and conveyance of all materials
For Footings and labor charges etc
F1 22 1.50 2.10
F2 52 1.50 1.50
F3 (lift) 1 2.93 2.73
total

5 COLUMNS
(SS5) graded machine crushed hard granite metal (Coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (Sand),coarse
aggregate,UPTO
COLUMNS water PLINTH
etc., to site and seigniorage charges on all materials including centering,
BEAM
C1 78 0.23 0.43

COLUMNS CELLAR & STILT


C1 78 0.23 0.43
NO OF FLOORS 2

FLOOR COLUMS
C 60 0.23 0.43
NO OF FLOORS 5
STAIRCASE AND LIFT HEADROOM
C 8 0.23 0.43

total

6 REFILLING
mm layers including watering and consolidation according to standard specifications, cost
and conveyence of all materials and labour charges as directed complete for finished item of
total

7 PLINTH BEAM
crushed hard granite metal (Coarse aggregate) from approved quarry including cost and convey
all materials like cement, fine aggregate (Sand),coarse aggregate, water etc., to site and seigni
charges on all materials including centering, shuttering, machine mixing, laying concrete, vibra
PB1 18 0.23 6.00
PB2 9 0.23 5.71
PB3 1 0.23 1.34
PB4 2 0.23 0.80
PB5 6 0.23 3.65
PB6 6 0.23 4.45
PB7 6 0.23 3.60
PB8 4 4.65 0.23
PB9 2 1.43 0.23
PB10 1 3.12 0.23
PB11 20 4.50 0.23
PB12 2 2.80 0.23
PB13 14 4.88 0.23
PB14 2 3.00 0.23
PB15 7 4.93 0.23
PB16 6 5.35 0.23
PB17 2 4.88 0.23
PB18 2 7.73 0.23
PB19 4 0.23 6.43
PB20 2 0.23 6.14
PB21 2 0.23 4.02
PB22 2 0.23 4.88
PB23 2 0.23 5.90
PB24 4 0.23 4.03
TOTAL

NO OF FLOORS 2

8 Retaining wall machine crushed hard granite metal (Coarse aggregate) from approved quarry
(SS5) graded
including cost and conveyance of all materials like cement, fine aggregate (Sand),coarse
W1aggregate, water etc., to site and seigniorage charges on all materials
2 including
45.58 0.23centering,
W2 2 32.94 0.23
TOTAL

RAMP
S1 1 39.05 5.77
S2 1 9.29 13.55
9 Roof Beams
crushed hard granite metal (Coarse aggregate) from approved quarry including cost and conveyan
materials like cement, fine aggregate (Sand),coarse aggregate, water etc., to site and seigniorage ch
RB1 18 0.23 6.00
RB2 9 0.23 5.71
RB3 1 0.23 1.34
RB4 2 0.23 0.80
RB5 6 0.23 3.65
RB6 6 0.23 4.45
RB7 6 0.23 3.60
RB8 4 4.65 0.23
RB9 2 1.43 0.23
RB10 1 3.12 0.23
RB11 20 4.50 0.23
RB12 2 2.80 0.23
RB13 14 4.88 0.23
RB14 2 3.00 0.23
RB15 4 1.42 0.23
RB16 2 1.50 0.23
TOTAL
No of floors 6
Stair case head room
RB15 2 4.07 0.23
RB16 2 0.23 3.00

Lift head room


RB17 2 1.43 0.23
RB18 2 0.23 1.23
total

10 Cellar & stilt slab


from approved quarry including cost and conveyance of all materials like cement, fine
aggregate (Sand),coarse aggregate, water etc., to site and seigniorage charges on all
S1 2 4.93 6.43
S2 2 5.37 6.43
S3 6 4.88 6.43
S4 6 4.48 6.43
S5 1 4.93 6.14
S6 1 5.37 6.14
S7 3 4.88 6.14
S8 3 4.48 6.14
S9 1 4.93 4.02
S10 1 4.93 4.88
S11 1 4.93 4.03
S12 1 5.37 8.90
S13 1 4.88 3.00
S14 1 4.88 5.90
S15 1 5.37 4.03
S16 1 4.88 4.03
S17 1 4.48 3.00
S18 1 7.73 4.03
S19 2 4.88 4.02
S20 2 4.50 4.02
S21 2 4.88 4.88
S22 2 4.50 4.88
S23 2 4.88 4.03
S24 2 4.50 4.03
total
no of floors 2
11 Floor and roof
crushed hardslab
granite metal (Coarse aggregate) from approved quarry including cost and conveyance of
all materials like cement, fine aggregate (Sand),coarse aggregate, water etc., to site and seigniorage
charges on all materials including centering, shuttering, machine mixing,
S1 6 laying
4.88concrete,
6.43vibrating, lift
S2 6 4.50 6.43
S3 3 4.88 6.14
S4 3 4.50 6.14
S5 1 4.88 3.00
S6 1 4.50 3.00
S7 2 4.88 4.02
S8 2 4.50 4.02
S9 2 4.88 4.88
S10 2 4.50 4.88
S11 2 4.88 4.03
S12 2 4.50 4.03
TOTAL

NO of floors 7

12 BRICK WALL
crushing strength of 40 kg/sq.cm including cost and conveyance of all materials like
cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and
2 BHK
EXTERIOR WALL
W1 2 9.61 0.23
W2 2 0.23 13.03
INTERIOR WALL
w1 1 0.15 4.12
w2 1 4.50 0.15
w3 1 0.15 4.73
w4 1 4.27 0.15
w5 1 0.15 2.15
w6 1 2.14 0.15
w7 1 0.15 3.95
w8 1 3.65 0.15
w9 1 0.15 1.65
w10 1 1.65 0.15

Deduction
Doors
D1 1 1.50 0.23
D2 1 1.20 0.23
D3 3 0.90 0.15
D4 2 0.75 0.15
WINDOWS
W1 7 1.50 0.23
Ventilator
V1 2 0.50 0.23

Door lintels
D1 1 1.50 0.23
D2 1 1.20 0.23
D3 3 0.90 0.15
D4 2 0.75 0.15

Window lintels
W1 7 1.50 0.23

Ventilator lintels
V1 2 0.50 0.23

Window sills
W1 7 1.50 0.23

Railing 1 0.23 4.17

total brick wall


no of flats 2
no of floors 5

conveyance of all materials like cement, sand, water etc., to site and cost of
13 seigniorage charges on all materials and all operational, incidental charges and
all labour
EXTERIOR charges for mixing mortar, finishing, scaffolding, lift charges, curing,
WALL
W1 4 9.61 0.02
W2 4 0.02 13.03
INTERIOR WALL
w1 2 0.02 4.12
w2 2 4.50 0.02
w3 2 0.02 4.73
w4 2 4.27 0.02
w5 2 0.02 2.15
w6 2 2.14 0.02
w7 2 0.02 3.95
w8 2 3.65 0.02
w9 2 0.02 1.65
w10 2 1.65 0.02

Deduction
Doors
D1 1 1.50 0.02
D2 1 1.20 0.02
D3 3 0.90 0.02
D4 2 0.75 0.02
WINDOWS
W1 7 1.50 0.02
Ventilator
V1 2 0.50 0.02
Railing 1 0.02 4.17

total plastering
no of flats 2
no of floors 5

PAINTING
finish to interior faces of newwalls of approved colour as per manufacturers specification
14
including cost and conveyance of materials to site and labour charges such as preparing the
EXTERIOR WALL
W1 4 9.61 0.02
W2 4 0.02 13.03
INTERIOR WALL
w1 2 0.02 4.12
w2 2 4.50 0.02
w3 2 0.02 4.73
w4 2 4.27 0.02
w5 2 0.02 2.15
w6 2 2.14 0.02
w7 2 0.02 3.95
w8 2 3.65 0.02
w9 2 0.02 1.65
w10 2 1.65 0.02

Deduction
Doors
D1 1 1.50 0.02
D2 1 1.20 0.02
D3 3 0.90 0.02
D4 2 0.75 0.02
WINDOWS
W1 7 1.50 0.02
Ventilator
V1 2 0.50 0.02
Railing 1 0.02 4.17

total plastering
no of flats 2
no of floors 5

15 Flooring
marble tiles
total flat area 1 9.15 12.80

deduction
washroom 1 1 3.50 3.80
washroom 2 1 2.00 1.50

no of flats 2
no of floors 5

shade over
VERTIFIED TILESa bed of crushed dust to required level and slope including cost and
conveyance of all materials and water to work site and all operational, incidental,
labour 1charges such as mixing mortar, laying, grinding,
washroom 1 rubbing,
2.00 polishing,
1.50 acid
doddling
w1 2 2.00 0.05
w2 2 1.50 0.05
washroom 2 1 1.50 1.50
doddling
w1 2 2.00 0.05
w2 2 1.50 0.05

no of flats 2
no of floors 5

kitchen dadooing
of 3.3 kgs. per sqm. and jointed with white cement paste mixed with pigment of matching shade,
including seignorage ,cost and conveyance of all materials and water from approved sources to work
w1 1 2.83 0.05
w2 1 3.84 0.05

kitchen granite platform


G1 1 2.83 0.02
G2 1 3.84 0.02

16 Liintels and sillof all materials like cement, fine aggregate and coarse aggregate water etc to
conveyance
site cost at seigniorage and all materials including centering shuttering, machine mix laying
concrete
Door lintelsvibrations, curing etc complete for finished item of work but excluding cost of steel
D1 1 1.50 0.23
D2 1 1.20 0.23
D3 3 0.90 0.15
D4 2 0.75 0.15

Window lintels
W1 7 1.50 0.23

Ventilator lintels
V1 2 0.50 0.23

Window sills
W1 7 1.50 0.23
no of flats 2
no of floors 5

site cost at seigniorage and all materials including centering shuttering, machine mix laying
18
concrete vibrations, curing etc complete for finished item of work but excluding cost of steel
W1 7 1.50 0.60
no of flats 2
no of floors 5

3 BHK FLAT
19 BRICK
havingMASONRY
minimum crushing strength of 40 kg/sq.cm including cost and conveyance
of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage
charges
Exterior walls on all materials and all incidental and operational, labour
charges, like
W1 1 9.61 0.23
W2 2 0.23 17.23
W3 1 9.61 0.23
Interior walls
w1 1 4.50 0.15
w2 1 0.15 4.15
w3 1 0.15 4.73
w4 1 4.51 0.15
w5 1 0.15 7.92
w6 1 6.70 0.15
w7 2 0.15 1.80
w8 1 4.65 0.15
w9 1 0.15 3.95
w10 1 3.65 0.15
w11 2 0.15 1.50

Lift
W1 2 0.23 0.80
W2 1 1.20 0.23

NO OF FLOORS 8

Stair case
W1 2 5.09 0.23
W2 1 0.23 2.77

NO OF FLOORS 8
total
Deductions
Doors
D1 1 1.50 0.23
D2 1 1.20 0.23
D3 4 0.90 0.15
D4 4 0.75 0.15
Doors lintels
D1 1 1.50 0.23
D2 1 1.20 0.23
D3 4 0.90 0.15
D4 4 0.75 0.15

Windows
W1 7 1.50 0.23

Windows lintels 7 1.50 0.23

Windows sill 7 1.50 0.23

Ventilator
V1 3 0.50 0.23

Ventilator lintels 3 0.50 0.23

Railing
R1 1 2.32 0.23

no of flats 3
no of floors 5

20 Plastering
CM(1:5) prop & top coat of 3mm thick in CM(1:4) prop with dubara sponge finishing
including cost & conveyance of materials and water to work site seigniorage and all
operational,
Exterior walls incidental, labour charges such as scaffolding, mixing mortor, lift charges,
W1 4 9.61 0.02
W2 4 0.02 17.23
Interior walls
w1 2 4.50 0.02
w2 2 0.02 4.15
w3 2 0.02 4.73
w4 2 4.51 0.02
w5 2 0.02 7.92
w6 2 6.70 0.02
w7 4 0.02 1.80
w8 2 4.65 0.02
w9 2 0.02 3.95
w10 2 3.65 0.02
w11 4 0.02 1.50

NO OF FLATS 3
NO OF FLOORS 5
Deductions
Doors
D1 1 1.50 0.02
D2 1 1.20 0.02
D3 4 0.90 0.02
D4 4 0.75 0.02
Windows
W1 8 1.50 0.02
Ventilator
v1 3 0.50 0.02
Railing
r1 2 2.32 0.02

no of flats 3
no of floors 5

TOTAL INTERNAL PLASTERING WITH DEDUCTION FOR ALL 3BHK

21 PAINTING
external walls in two coats over primary coat of white cement (total 2 coats) including cost and
conveyance of all materials, water to site, including cost of brushes, scaffolding charges, lift charges
Exterior walls
W1 4 9.61 0.02
W2 4 0.02 17.23
Interior walls
w1 2 4.50 0.02
w2 2 0.02 4.15
w3 2 0.02 4.73
w4 2 4.51 0.02
w5 2 0.02 7.92
w6 2 6.70 0.02
w7 4 0.02 1.80
w8 2 4.65 0.02
w9 2 0.02 3.95
w10 2 3.65 0.02
w11 4 0.02 1.50

NO OF FLATS 3
NO OF FLOORS 5

Deductions
Doors
D1 1 1.50 0.02
D2 1 1.20 0.02
D3 4 0.90 0.02
D4 4 0.75 0.02
Windows
W1 8 1.50 0.02
Ventilator
v1 3 0.50 0.02
Railing
r1 2 2.32 0.02

no of flats 3
no of floors 5

TOTAL INTERNAL PAINTING WITH DEDUCTION FOR ALL 3BHK

22 FLOORING
Marble tiles
total flat area 1 9.61 16.98

Deductions
Toilet 1 1 1.50 1.50
Toilet 2 1 1.50 1.80
Toilet 3 1 1.65 1.80
SUM

Total area ( for flat )

Total area for all flats 15


VERTIFIED TILES
bed of crushed dust to required level and slope including cost and conveyance of all materials
and water to work site and all operational, incidental, labour charges such as mixing mortar,
laying, grinding,
Washroom 1 rubbing, polishing, acid wash, lift charges curing
1 etc., complete
1.50 1.50for finished
Doddling
w1 4 1.50 0.05

Washroom 2 1 1.80 1.80


Doddling
w1 2 1.50 0.05
w2 2 1.80 0.05

Washroom 3 1 1.65 1.80


Doddling
w1 2 1.65 0.05
w2 2 1.80 0.05
total-
nof of flats 3
No of floors 5

kitchen dadooing
of 3.3 kgs. per sqm. and jointed with white cement paste mixed with pigment of matching shade,
including seignorage ,cost and conveyance of all materials and water from approved sources to work
w1 1 3.07 0.05
w2 1 3.84 0.05

kitchen granite platform


G1 1 3.07 0.02
G2 1 3.84 0.02
23 Liintels and sill
materials like cement, fine aggregate and coarse aggregate water etc to site cost at seigniorage and all
materials including centering shuttering, machine mix laying concrete vibrations, curing etc complete
Door lintels
D1 1 1.50 0.23
D2 1 1.20 0.23
D3 3 0.90 0.15
D4 4 0.75 0.15

Window lintels
W1 8 1.50 0.23

Ventilator lintels
V1 3 0.50 0.23

Window sills
W1 8 1.50 0.23
total
no of flats 3
no of floors 5

24 CHAJJAS
site cost at seigniorage and all materials including centering shuttering, machine mix laying
concrete vibrations, curing etc complete for finished item of work but excluding cost of steel
W 8 1.50 0.60
no of flats 3
no of floors 5

Brick for corridors


W1 1 3.50 0.23
W2 1 2.93 0.23
no fo floors 5
Brick for parapet wall
w1 5 9.61 0.15
w2 4 16.98 0.15
w3 4 3.00 0.15
w4 1 20.76 0.15
w5 1 32.35 0.15
w6 3 13.26 0.15
Total

25 Plastering for corridors & parapet wall-internal


materials like cement, sand, water etc., to site and cost of seigniorage charges on all materials
and all operational, incidental charges and all labour charges for mixing mortar, finishing,
26 Corridor
W1 1 3.50 0.02
W2 1 2.93 0.02

no fo floors 5
27 parapet wall
w1 5 9.61 0.02
w2 4 16.98 0.02
w3 4 3.00 0.02
w4 1 20.76 0.02
w5 1 32.35 0.02
w6 3 13.26 0.02
w7 1 2.63 0.02
Total plastering
28 CEILING PLASTERING
3mm thick in CM(1:4) prop with dubara sponge finishing including cost & conveyance of materials and
water to work site seigniorage and all operational, incidental, labour charges such as scaffolding,
2BHK 2
3BHK 3
Corridor 1

no of floors 5
cellar and stilt 2
duct space plastering
d1 1
d2 3
lift head room 1
stair case head room 1
total

29 EXTERNAL PLASTERING
materials like cement, sand, water etc., to site and cost of seigniorage charges on all materials
and all operational, incidental charges and all labour charges for mixing mortar, finishing,
w1 6 9.61 0.02
w2 4 16.98 0.02
w3 4 3.00 0.02
w4 1 20.76 0.02
w5 1 32.35 0.02
w6 3 13.26 0.02
w7 5 4.73 0.02
total
Deduction

Wiindows
W1 33 1.50 0.02
No of floors 5

Ventilators
V1 13 0.50 0.02
No of floors 5

Doors
D1 8 1.50 0.02
No of floors 5
corridors
W1 1 3.50 0.02
W2 1 2.93 0.02
W3 4 3.00 0.02
W4 1 1.79 0.02
No of floors 5
total deduction

total external plastering

30 EXTERNAL PAINTING
over the base coat of appropriate primer of approved brand making 3-coats in all to give an even shade
after thoroughly brushing the surface to remove all dirt and remains of loose powedered materials,
w1 including all operational, incidental charges including cost of brushes
6 and9.61
all labour0.02
charges etc.,
w2 4 16.98 0.02
w3 4 3.00 0.02
w4 1 20.76 0.02
w5 1 32.35 0.02
w6 3 13.26 0.02
w7 5 4.73 0.02
sum
Deduction

Wiindows
W1 33 1.50 0.02
No of floors 5

Ventilators
V1 13 0.50 0.02
No of floors 5

Doors
D1 8 1.50 0.02
No of floors 5

corridors
W1 1 3.50 0.02
W2 1 2.93 0.02
W3 4 3.00 0.02
W4 1 1.79 0.02

No of floors 5
total deduction

total external painting

31 Supply and fixing of doors and windows including transportation & labor charges
Doors
D1 90 0.75 2.10
D2 65 0.90 2.10
D3 25 1.50 2.10
D4 25 1.20 2.10
Ventiators
V1 65 0.45 0.50
Windows
W1 190 1.50 1.30

Compound wall
w1 1 54.41 0.23
w2 1 67.09 0.23
w3 1 67.30 0.23
w4 1 76.00 0.23
w5 1 15.80 0.23
w6 1 30.80 0.23
total
DEPTH QUANTIT
(in M) Y

ls, red earth and


4.15 4673.33

1.60 152.06
1.60 269.57
2.82 21.68
CUM 443.31

TOTAL 5116.64

e of all materials

0.15 10.40
0.15 17.55
0.15 1.20
TOTAL 29.14

e of all materials

0.60 41.58
0.60 70.20
0.60 4.80
TOTAL 116.58

m approved quarry
te (Sand),coarse
luding centering,
1.50 11.57
TOTAL 11.57

3.75 28.93
57.86
TOTAL 57.86

3.75 22.25

TOTAL 111.26
2.5 1.98

182.67

ecifications, cost
or finished item of
286.019505

uding cost and conveyance of


etc., to site and seigniorage
aying concrete, vibrating, lift
0.45 11.178
0.45 5.318865
0.45 0.13869
0.45 0.1656
0.45 2.26665
0.45 2.76345
0.45 2.2356
0.45 1.9251
0.45 0.29601
0.45 0.32292
0.45 9.315
0.45 0.5796
0.45 7.07112
0.45 0.621
0.45 3.571785
0.45 3.32235
0.45 1.01016
0.45 1.60011
0.45 2.66202
0.45 1.27098
0.45 0.83214
0.45 1.01016
0.45 1.2213
0.45 1.66842
62.36703

124.73406

m approved quarry
te (Sand),coarse
luding centering,
3.9 81.77052
3.9 59.09436
140.86488

0.15 33.797775
0.15 18.881925
52.6797
ding cost and conveyance of all
ite and seigniorage charges on
0.45 11.18
0.45 5.32
0.45 0.14
0.45 0.17
0.45 2.27
0.45 2.76
0.45 2.24
0.45 1.93
0.45 0.30
0.45 0.32
0.45 9.32
0.45 0.58
0.45 7.07
0.45 0.62
0.45 0.59
0.45 0.31
45.10
270.57591

0.45 0.84
0.45 0.62

0.45 0.30
0.45 0.25
272.59

like cement, fine


ge charges on all
0.15 9.51
0.15 10.36
0.15 28.24
0.15 25.93
0.15 4.54
0.15 4.95
0.15 13.48
0.15 12.38
0.15 2.97
0.15 3.61
0.15 2.98
0.15 7.17
0.15 2.20
0.15 4.32
0.15 3.25
0.15 2.95
0.15 2.02
0.15 4.67
0.15 5.89
0.15 5.43
0.15 7.14
0.15 6.59
0.15 5.90
0.15 5.44
181.90
363.80
st and conveyance of
te and seigniorage
ncrete, vibrating,
0.15lift 28.24056
0.15 26.0415
0.15 13.48344
0.15 12.4335
0.15 2.196
0.15 2.025
0.15 5.88528
0.15 5.427
0.15 7.14432
0.15 6.588
0.15 5.89992
0.15 5.4405
120.80502

845.63514

ll materials like
n all materials and

3.90 17.24
3.90 23.38

3.90 2.41
3.90 2.63
3.90 2.77
3.90 2.50
3.90 1.26
3.90 1.25
3.90 2.31
3.90 2.14
3.90 0.97
3.90 0.97
total 59.81

2.10 0.72
2.10 0.58
2.10 0.85
2.10 0.47

1.00 2.42

0.45 0.10

0.15 0.05
0.15 0.04
0.15 0.06
0.15 0.03

0.15 0.36

0.15 0.03

0.15 0.36

3.90 3.74
total 9.83
total sum 49.98
99.95
499.77

te and cost of
tal charges and
harges, curing,
3.90 149.92
3.90 203.27

3.90 32.14
3.90 35.10
3.90 36.89
3.90 33.31
3.90 16.77
3.90 16.69
3.90 30.81
3.90 28.47
3.90 12.87
3.90 12.87
total 609.10

2.10 3.15
2.10 2.52
2.10 5.67
2.10 3.15

1.00 10.50

0.45 0.45
3.90 16.26
total 41.70
total sum 567.40
1134.80
5673.99

ers specification
h as preparing the

3.90 149.92
3.90 203.27

3.90 32.14
3.90 35.10
3.90 36.89
3.90 33.31
3.90 16.77
3.90 16.69
3.90 30.81
3.90 28.47
3.90 12.87
3.90 12.87
total 609.10

2.10 3.15
2.10 2.52
2.10 5.67
2.10 3.15

1.00 10.50

0.45 0.45
3.90 16.26
total 41.70
total sum 567.40
1134.80
5673.99
0.05 117.12

0.05 13.30
0.05 3.00
total 16.30
total sum 100.82
201.64
1008.20

luding cost and


ional, incidental,
polishing, acid
0.05 3.00

1.80 7.20
1.80 5.40
0.05 2.25

1.80 7.20
1.80 5.40
total 30.45
60.90
304.50

matching shade,
ved sources to work
0.60
0.60

0.45
0.45

0.15 0.05
0.15 0.04
0.15 0.06
0.15 0.03

0.15 0.36

0.15 0.03

0.15 0.36
0.95
1.89
9.47

machine mix laying


uding cost of steel
0.15 0.95
1.89
9.45

and conveyance
t of seigniorage
ur charges, like
3.75 8.29
3.75 29.72
3.75

3.75 2.53
3.75 2.33
3.75 2.66
3.75 2.54
3.75 4.46
3.75 3.77
3.75 2.03
3.75 2.62
3.75 2.22
3.75 2.05
3.75 1.69
total 66.90

3.75 1.38
3.75 1.04
2.42
19.32

3.75 8.78
1.70 1.08
9.86
0.00
86.22

2.10 0.72
2.10 0.58
2.10 1.13
2.10 0.95
0.15 0.05
0.15 0.04
0.15 0.08
0.15 0.07

1.00 2.42

0.15 0.36

0.15 0.36

0.45 0.16

0.15 0.05

3.90 2.08
total 9.05
total sum 57.85
173.54
867.72

ponge finishing
gniorage and all
rtor, lift charges,
3.90 149.92
3.90 268.79

3.90 35.10
3.90 32.37
3.90 36.89
3.90 35.18
3.90 61.78
3.90 52.26
3.90 28.08
3.90 36.27
3.90 30.81
3.90 28.47
3.90 23.40
total 819.31
2457.94
12289.68
2.10 3.15
2.10 2.52
2.10 7.56
2.10 6.30

1.00 12.00
0.00
0.45 0.68

3.90 18.10
total 50.30

150.90
754.52

11535.17

cluding cost and


harges, lift charges

3.90 149.92
3.90 268.79

3.90 35.10
3.90 32.37
3.90 36.89
3.90 35.18
3.90 61.78
3.90 52.26
3.90 28.08
3.90 36.27
3.90 30.81
3.90 28.47
3.90 23.40
total 819.31
2457.94
12289.68

2.10 3.15
2.10 2.52
2.10 7.56
2.10 6.30

1.00 12.00
0.00
0.45 0.68

3.90 18.10
total 50.30

150.90
754.52

11535.17

0.05 163.18

0.05 2.25
0.05 2.70
0.05 2.97
7.92

155.26

2328.87
nce of all materials
as mixing mortar,
mplete for finished
0.05 2.25

1.80 10.80

0.05 3.24

1.80 5.40
1.80 6.48

0.05 2.97

1.80 5.94
1.80 6.48
43.56
130.68
653.40

matching shade,
ved sources to work
0.60 1.84
0.60 2.30

0.45 1.38
0.45 1.73
t seigniorage and all
curing etc complete

0.15 0.05
0.15 0.04
0.15 0.06
0.15 0.07

0.15 0.41

0.15 0.05

0.15 0.41
1.10
3.30
16.52

machine mix laying


uding cost of steel
0.15 1.08
3.24
16.20

0.90 0.72
0.90 0.61
3.03

0.90 6.49
0.90 9.17
0.90 1.62
0.90 2.80
0.90 4.37
0.90 5.37
total 32.85

ges on all materials


mortar, finishing,
0.90 3.15
0.90 2.64
5.79
28.94

0.90 43.25
0.90 61.13
0.90 10.80
0.90 18.68
0.90 29.12
0.90 35.80
0.90 2.37
201.14

nce of materials and


ch as scaffolding,
117.06 234.12
153.26 459.78
75.05 75.05
768.95
3844.75
1,126.88 2253.76

130.56 130.56
50.94 152.82
2.76 2.76
17.17 17.17
sum 6401.82

ges on all materials


mortar, finishing,
21.10 1216.63
21.10 1433.11
21.10 253.20
21.10 438.04
21.10 682.59
21.10 839.36
20.10 475.37
5338.28

1.00 49.50
247.50

0.45 2.93
14.63

2.10 25.20
126.00

2.90 10.15
2.90 8.50
3.90 46.80
3.90 6.98
72.43
362.14
735.64

4602.64

o give an even shade


wedered materials,
bour charges 21.10
etc., 1216.63
21.10 1433.11
21.10 253.20
21.10 438.04
21.10 682.59
21.10 839.36
20.10 475.37
5338.28

1.00 49.50
247.50

0.45 2.93
14.63

2.10 25.20
126.00

2.90 10.15
2.90 8.50
3.90 46.80
3.90 6.98
72.43
362.14
735.64

4602.64

abor charges

90
65
25
25

65
190

4 50.0572
4 61.7228
4 61.916
4 69.92
4 14.536
4 28.336
286.488
work break down structure
Activity
Activity code: Activity Description: Quantity Duration
: (days)

Work Package Site:


A Site Clearance
B Marking.
Work Package no.2: Building structure : cellar
A1 Excuvation 5116.64
B1 PCC 29.14
C1 Footings 116.58
D1 Columns up to plinth beam 11.57
E1 Plinth beam 62.36703
F1 columns 28.93
G1 Concrete bed 181.90
H1 Retaining wall 140.86488
I1 Half stair case 1.08
J1 Slab & Ramp & Beams 296.95
K1 Half stair case 2 1.08
L1 Plastering 501.38
M1 Flooring 56.4885
Work Package no. 2:Building Structure: stilt
A2 Columns 28.93
B2 Half Staircase (1) 1.08
C2 Slabs and Beams 226.99
D2 Half Staicase (2) 1.08
E2 plastering (columns,beams,slab) 1323.61
F2 flooring 56.4885
Work Package no. 3:Building structure :First Floor
A3 Columns 22.25 12
B3 Half Staircase (1) 1.08 3
C3 Slabs and Beams 165.90 23
D3 Half Staircase (2) 1.08 3
Brick work with door and windows 273.50 30
E3 opening
F3 Plastering (1st Coat) 3598.52 27
G3 Electric ( Metal Boxes) 15
H3 Plumbing (Pipelines) 15
I3 Plastering (2nd Coat) 3598.52 23
J3 Primer 3598.52 7
K3 Electrical Wiring and Switch boards 4
L3 Painting (internal ) 3598.52 8
M3 Door Frames and Shutters 2
N3 Flooring 24
O3 plumbing fixtures 2
Work Package no. Building structure :second
4: Floor
A4 Columns 22.25 12
B4 Half Staircase (1) 1.08 3
C4 Slabs and Beams 165.90 23
D4 Half Staicase (2) 1.08 3
Brick work with door and windows 273.50 30
E4 opening
F4 Plastering (1st Coat) 3598.52 27
G4 Electric ( Metal Boxes) 15
H4 Plumbing (Pipelines) 15
I4 Plastering (2nd Coat) 3598.52 23
J4 Primer 3598.52 7
K4 Electrical Wiring and Switch boards 4
L4 Painting (internal and External) 3598.52 8
M4 Door Frames and Shutters 2
N4 Flooring 24
O4 plumbing fixtures 2
Work Package no. Building structure :Third
A5 Columns 22.25 12
B5 Half Staircase (1) 1.08 3
C5 Slabs and Beams 165.90 23
D5 Half Staircase (2) 1.08 3
Brick work with door and windows 30
E5 opening 273.50
F5 Plastering (1st Coat) 3598.52 27
G5 Electric ( Metal Boxes) 15
H5 Plumbing (Pipelines) 15
I5 Plastering (2nd Coat) 3598.52 23
J5 Primer 3598.52 7
K5 Electrical Wiring and Switch boards 4
L5 Painting (internal and External) 3598.52 8
M5 Door Frames and Shutters 2
N5 Flooring 24
O5 plumbing fixtures 2
Work Package no. Building structure:Fourth
A6 Columns 22.25 12
B6 Half Staircase (1) 1.08 3
C6 Slabs and Beams 165.90 23
D6 Half Staircase (2) 1.08 3
Brick work with door and windows 30
E6 opening 273.50
F6 Plastering (1st Coat) 3598.52 27
G6 Electric ( Metal Boxes) 15
H6 Plumbing (Pipelines) 15
I6 Plastering (2nd Coat) 3598.52 23
J6 Primer 3598.52 7
K6 Electrical Wiring and Switch boards 4
L6 Painting (internal and External) 3598.52 8
M6 Door Frames and Shutters 2
N6 Flooring 24
O6 plumbing fixtures 2
Work Pakcage no. Building Structure: Fifth
A7 Columns 22.25 12
B7 Half Staircase (1) 1.08 3
C7 Slabs and Beams 165.90 23
D7 Half Staircase (2) 1.08 3
E7 Brick work with door and windows 30
opening 273.50
F7 Plastering (1st Coat) 3598.52 27
G7 Electric ( Metal Boxes) 15
H7 Plumbing (Pipelines) 15
I7 Plastering (2nd Coat) 3598.52 23
J7 Primer 3598.52 7
K7 Electrical Wiring and Switch boards 4
L7 Painting (internal and External) 8
M7 Door Frames and Shutters 2
N7 Flooring 24
O7 plumbing fixtures 2
Work package no. 8Services:
A8 Lifts
B8 External plastering coat 1 4602.64
C8 External plastering coat 2 4602.64
D8 External primer 4602.64
E8 Elevation (four sides)
F8 external painting 4602.64
G8 Landscaping 1320
H8 drive ways
I8 compound wall 286.488
J8 transformer
H8 septic tank
Materials

Preceeding
Succeeding Activity: Metal Metal4
Activty (s): cement sand Bricks Tiles
20 0

- B
A C

B B1
A1 C1
B1 D1
C1 E1
D1 F1
E1 G1
F1 H1
G1 A2,I1
H1 J1
I1 K1
J1 L1
D1 M1
L1

I1,J1 B2
A2 C2
B2 D2
C2 E2,A3
D2 F2
D1

C2,D2 B3
A3 C3
B3 D3
C3 E3,A4
D3 F3

E3 G3
F3 H3
G3 I3
H3 J3
I3 K3
J3 L3
K3 M3
L3 N3
M3 O3
N3

D3 B4
A4 C4
B4 D4
C4 E4,A5
D4 F4

E4 G4
F4 H4
G4 I4
H4 J4
I4 K4
J4 L4
K4 M4
L4 N4
M4 O4
N4

D4 B5
A5 C5
B5 D5
C5 E5,A6
D5 F5

E5 G5
F5 H5
G5 I5
H5 J5
I5 K5
J5 L5
K5 M5
L5 N5
M5 O5
N5

D5 B6
A6 C6
B6 D6
C6 E6,A7
D6 F6

E6 G6
F6 H6
G6 I6
H6 J6
I6 K6
J6 L6
K6 M6
L6 N6
M6 O6
N6

D6 B7
A7 C7
B7 D7
C7 E7,A8
D7 F7

E7 G7
F7 H7
G7 I7
H7 J7
I7 K7
J7 L7
K7 M7
L7 N7
M7 O7
N7

M7 B8

A8 C8

B8 D8
C8 E8
D8 F8
E8 G8
F8
erials labour

Wome
Steel wood Upvc Paints Man Mason Equipment
n
WORK BREAKDOWN APPARTMENT

Activity code: Activity Preceedi


Succeedi
Quantit Duratio ng
Activity Description: ng
y n: Activty
Activity:
(days) (s):

Work Package Site:


A Site Clearance 3 - B
B Marking. 2 A C
Work Package no.2: Building structure : cellar
A1 Excuvation 5116.64 45 B B1
B1 PCC 29.14 9 A1 C1
C1 Footings 116.58 25 B1 D1
D1 Columns up to plinth beam 11.57 12 C1 E1
E1 Plinth beam 62.36703 13 D1 F1
F1 columns 28.93 12 E1 G1
G1 Concrete bed 181.90 6 F1 H1
H1 Retaining wall 140.86488 8 G1 A2,I1
I1 Half stair case 1.08 5 H1 J1
J1 Slab & Ramp & Beams 296.95 28 I1 K1
K1 Half stair case 2 1.08 5 J1 L1
L1 Plastering 501.38 7 D1 M1
M1 Flooring 56.4885 L1
Work Package no. 2:Building Structure: stilt
A2 Columns 28.93 13 I1,J1 B2
B2 Half Staircase (1) 1.08 5 A2 C2
C2 Slabs and Beams 226.99 21 B2 D2
D2 Half Staicase (2) 1.08 5 C2 E2,A3
E2 plastering (columns,beams,slab) 1323.61 10 D2 F2
F2 flooring 56.4885 D1
Work Package no. 3:Building structure :First Floor
A3 Columns 22.25 12 C2,D2 B3
B3 Half Staircase (1) 1.08 5 A3 C3
C3 Slabs and Beams 165.90 23 B3 D3
D3 Half Staircase (2) 1.08 5 C3 E3,A4
Brick work with door and windows 30 D3 F3
opening 273.50
E3
F3 Plastering (1st Coat) 3598.52 27 E3 G3
G3 Electric ( Metal Boxes) 15 F3 H3
H3 Plumbing (Pipelines) 15 G3 I3
I3 Plastering (2nd Coat) 3598.52 23 H3 J3
J3 Primer 3598.52 7 I3 K3
K3 Electrical Wiring and Switch boards 4 J3 L3
L3 Painting (internal ) 3598.52 8 K3 M3
M3 Door Frames and Shutters 2 L3 N3
N3 Flooring 24 M3 O3
O3 plumbing fixtures 2 N3
Work Package no. Building structure :second
4: Floor
A4 Columns 22.25 12 D3 B4
B4 Half Staircase (1) 1.08 5 A4 C4
C4 Slabs and Beams 165.90 23 B4 D4
D4 Half Staicase (2) 1.08 5 C4 E4,A5
Brick work with door and windows 30 D4 F4
E4 opening 273.50
F4 Plastering (1st Coat) 3598.52 27 E4 G4
G4 Electric ( Metal Boxes) 15 F4 H4
H4 Plumbing (Pipelines) 15 G4 I4
I4 Plastering (2nd Coat) 3598.52 23 H4 J4
J4 Primer 3598.52 7 I4 K4
K4 Electrical Wiring and Switch boards 4 J4 L4
L4 Painting (internal and External) 3598.52 8 K4 M4
M4 Door Frames and Shutters 2 L4 N4
N4 Flooring 24 M4 O4
O4 plumbing fixtures 2 N4
Work Package no. Building structure :Third
A5 Columns 22.25 12 D4 B5
B5 Half Staircase (1) 1.08 5 A5 C5
C5 Slabs and Beams 165.90 23 B5 D5
D5 Half Staircase (2) 1.08 5 C5 E5,A6
Brick work with door and windows 30 D5 F5
opening 273.50
E5
F5 Plastering (1st Coat) 3598.52 27 E5 G5
G5 Electric ( Metal Boxes) 15 F5 H5
H5 Plumbing (Pipelines) 15 G5 I5
I5 Plastering (2nd Coat) 3598.52 23 H5 J5
J5 Primer 3598.52 7 I5 K5
K5 Electrical Wiring and Switch boards 4 J5 L5
L5 Painting (internal and External) 3598.52 8 K5 M5
M5 Door Frames and Shutters 2 L5 N5
N5 Flooring 24 M5 O5
O5 plumbing fixtures 2 N5
Work Package no. Building structure:Fourth
A6 Columns 22.25 12 D5 B6
B6 Half Staircase (1) 1.08 5 A6 C6
C6 Slabs and Beams 165.90 23 B6 D6
D6 Half Staircase (2) 1.08 5 C6 E6,A7
Brick work with door and windows 30 D6 F6
E6 opening 273.50
F6 Plastering (1st Coat) 3598.52 27 E6 G6
G6 Electric ( Metal Boxes) 15 F6 H6
H6 Plumbing (Pipelines) 15 G6 I6
I6 Plastering (2nd Coat) 3598.52 23 H6 J6
J6 Primer 3598.52 7 I6 K6
K6 Electrical Wiring and Switch boards 4 J6 L6
L6 Painting (internal and External) 3598.52 8 K6 M6
M6 Door Frames and Shutters 2 L6 N6
N6 Flooring 24 M6 O6
O6 plumbing fixtures 2 N6
Work Pakcage no. Building Structure: Fifth
A7 Columns 22.25 12 D6 B7
B7 Half Staircase (1) 1.08 5 A7 C7
C7 Slabs and Beams 165.90 23 B7 D7
D7 Half Staircase (2) 1.08 5 C7 E7,A8
E7 Brick work with door and windows 30 D7 F7
opening 273.50
F7 Plastering (1st Coat) 3598.52 27 E7 G7
G7 Electric ( Metal Boxes) 15 F7 H7
H7 Plumbing (Pipelines) 15 G7 I7
I7 Plastering (2nd Coat) 3598.52 23 H7 J7
J7 Primer 3598.52 7 I7 K7
K7 Electrical Wiring and Switch boards 4 J7 L7
L7 Painting (internal and External) 3598.52 8 K7 M7
M7 Door Frames and Shutters 2 L7 N7
N7 Flooring 24 M7 O7
O7 plumbing fixtures 2 N7
Work package no. 8Services:
A8 Lifts 45 M7 B8
B8 External plastering coat 1 4602.64 31
C8 External plastering coat 2 4602.64 25
D8 External primer 4602.64 10
E8 Elevation (four sides) A8 C8
F8 external painting 4602.64 13
G8 Landscaping 1320 10 B8 D8
H8 drive ways 10 C8 E8
I8 compound wall 286.488 15 D8 F8
J8 transformer 5 E8 G8
H8 septic tank 10 F8
DAY-1 TUE
DAY-2 WED
DAY-3 THU
DAY-4 FRI
DAY-5 SAT
DAY-6 SUN
DAY-7 MON
DAY-8 TUE
DAY-9 WED
DAY-10 THU
DAY-11 FRI
DAY-12 SAT
DAY-13 SUN
DAY-14 MON
DAY-15 TUE
DAY-16 WED
DAY-17 THU
January ,2019

DAY-18 FRI
DAY-19 SAT
DAY-20 SUN
DAY-21 MON
DAY-22 TUE
DAY-23 WED
DAY-24 THU
DAY-25 FRI
DAY-26 SAT
DAY-27 SUN
DAY-28 MON
DAY-29 TUE
DAY-30 WED
DAY-31 THU
DAY-1 FRI
DAY-2 SAT
DAY-3 SUN
DAY-4 MON
DAY-5 TUE
DAY-6 WED
DAY-7 THU
DAY-8 FRI
DAY-9 SAT
DAY-10 SUN
DAY-11 MON
DAY-12 TUE
DAY-13 WED
DAY-14 THU
DAY-15 FRI
DAY-16
February ,2019

SAT
DAY-17 SUN
DAY-18 MON
DAY-19 TUE
DAY-20 WED
DAY-21 THU
DAY-22 FRI
DAY-23 SAT
DAY-24 SUN
DAY-25 MON
DAY-26 TUE
DAY-27 WED
DAY-28 THU
DAY-1 FRI
DAY-2 SAT
DAY-3 SUN
DAY-4 MON
DAY-5 TUE
DAY-6 WED
DAY-7 THU
DAY-8 FRI
DAY-9 SAT
DAY-10 SUN
DAY-11 MON
DAY-12 TUE
DAY-13 WED
DAY-14 THU
DAY-15 FRI
DAY-16 SAT
March ,2019
DAY-17 SUN
March ,2019
DAY-18 MON
DAY-19 TUE
DAY-20 WED
DAY-21
THU
DAY-22 FRI
DAY-23 SAT
DAY-24 SUN
DAY-25 MON
DAY-26 TUE
DAY-27 WED
DAY-28 THU
DAY-29 FRI
DAY-30 SAT
DAY-31 SUN
DAY-1 MON
DAY-2 TUE
DAY-3 WED
DAY-4 THU
DAY-5 FRI
DAY-6 SAT
DAY-7 SUN
DAY-8 MON
DAY-9 TUE
DAY-10 WED
DAY-11 THU
DAY-12 FRI
DAY-13 SAT
DAY-14 SUN
DAY-15 MON
DAY-16 TUE
April ,2019

DAY-17 WED
DAY-18 THU
DAY-19 FRI
DAY-20 SAT
DAY-21 SUN
DAY-22 MON
DAY-23 TUE
DAY-24 WED
DAY-25 THU
DAY-26 FRI
DAY-27 SAT
DAY-28 SUN
DAY-29 MON
DAY-30 TUE
DAY-1 WED
DAY-2 THU
DAY-3 FRI
DAY-4 SAT
DAY-5 SUN
DAY-6 MON
DAY-7 TUE
DAY-8 WED
DAY-9 THU
DAY-10 FRI
DAY-11 SAT
DAY-12 SUN
DAY-13 MON
DAY-14 TUE
DAY-15 WED
DAY-16 THU
DAY-17
May ,2019

FRI
DAY-18 SAT
DAY-19 SUN
DAY-20 MON
DAY-21 TUE
DAY-22 WED
DAY-23 THU
DAY-24 FRI
DAY-25 SAT
DAY-26 SUN
DAY-27 MON
DAY-28 TUE
DAY-29 WED
DAY-30 THU
DAY-31 FRI
DAY-1 SAT
DAY-2 SUN
DAY-3 MON
DAY-4 TUE
DAY-5 WED
DAY-6 THU
DAY-7 FRI
DAY-8 SAT
DAY-9 SUN
DAY-10 MON
DAY-11 TUE
DAY-12 WED
DAY-13 THU
DAY-14 FRI
DAY-15 SAT
DAY-16 SUN
June ,2019

DAY-17 MON
DAY-18 TUE
DAY-19 WED
DAY-20 THU
DAY-21 FRI
DAY-22 SAT
DAY-23 SUN
DAY-24 MON
DAY-25 TUE
DAY-26 WED
DAY-27 THU
DAY-28 FRI
DAY-29 SAT
DAY-30 SUN
DAY-1 MON
DAY-2 TUE
DAY-3 WED
DAY-4 THU
DAY-5 FRI
DAY-6 SAT
DAY-7 SUN
DAY-8 MON
DAY-9 TUE
DAY-10 WED
DAY-11 THU
DAY-12 FRI
DAY-13 SAT
DAY-14 SUN
DAY-15 MON
DAY-16 TUE
DAY-17
July ,2019

WED
DAY-18 THU
DAY-19 FRI
9
DAY-20 SAT
DAY-21 SUN
DAY-22 MON
DAY-23 TUE
DAY-24 WED
DAY-25 THU
DAY-26 FRI
DAY-27 SAT
DAY-28 SUN
DAY-29 MON
DAY-30 TUE
DAY-31 WED
DAY-1 THU
DAY-2 FRI
DAY-3 SAT
DAY-4 SUN
DAY-5 MON
DAY-6 TUE
DAY-7 WED
DAY-8 THU
DAY-9 FRI
DAY-10 SAT
DAY-11 SUN
DAY-12 MON
DAY-13 TUE
August ,
DAY-14 WED
DAY-15 THU
DAY-16 FRI
DAY-17 SAT
August ,2019

DAY-18 SUN
DAY-19 MON
DAY-20 TUE
DAY-21 WED
DAY-22 THU
DAY-23 FRI
DAY-24 SAT
DAY-25 SUN
DAY-26 MON
DAY-27 TUE
DAY-28 WED
DAY-29 THU
DAY-30 FRI
DAY-31 SAT
DAY-1 SUN
DAY-2 MON
DAY-3 TUE
DAY-4 WED
DAY-5 THU
DAY-6 FRI
DAY-7 SAT
DAY-8 SUN
DAY-9 MON
DAY-10 TUE
DAY-11 WED
DAY-12 THU
DAY-13 FRI
DAY-14 SAT
DAY-15 SUN
DAY-16 MON
DAY-17 TUE
September ,2019

DAY-18 WED
DAY-19 THU
DAY-20 FRI
DAY-21 SAT
DAY-22 SUN
DAY-23 MON
DAY-24 TUE
DAY-25 WED
DAY-26 THU
DAY-27 FRI
DAY-28 SAT
DAY-29 SUN
DAY-30 MON
DAY-1 TUE
DAY-2 WED
DAY-3 THU
DAY-4 FRI
DAY-5 SAT
DAY-6 SUN
DAY-7 MON
DAY-8 TUE
DAY-9 WED
DAY-10 THU
DAY-11 FRI
DAY-12 SAT
DAY-13 SUN
DAY-14 MON
DAY-15 TUE
DAY-16 WED
DAY-17 THU
October ,2019

DAY-18 FRI
DAY-19 SAT
DAY-20 SUN
DAY-21 MON
DAY-22 TUE
DAY-23 WED
DAY-24 THU
DAY-25 FRI
DAY-26 SAT
DAY-27 SUN
DAY-28 MON
DAY-29 TUE
DAY-30 WED
DAY-31 THU
DAY-1 FRI
DAY-2 SAT
DAY-3 SUN
DAY-4 MON
DAY-5 TUE
DAY-6 WED
DAY-7 THU
DAY-8 FRI
DAY-9 SAT
DAY-10 SUN
DAY-11 MON
DAY-12 TUE
DAY-13 WED
DAY-14 THU
DAY-15 FRI
DAY-16 SAT
DAY-17
November ,2019

SUN
DAY-18 MON
DAY-19 TUE
DAY-20 WED
DAY-21 THU
DAY-22 FRI
DAY-23 SAT
DAY-24 SUN
DAY-25 MON
DAY-26 TUE
DAY-27 WED
DAY-28 THU
DAY-29 FRI
DAY-30 SAT
DAY-1 SUN
DAY-2 MON
DAY-3 TUE
DAY-4 WED
DAY-5 THU
DAY-6 FRI
DAY-7 SAT
DAY-8 SUN
DAY-9 MON
DAY-10 TUE
DAY-11 WED
DAY-12 THU
DAY-13 FRI
DAY-14 SAT
DAY-15 SUN
DAY-16 MON
December ,2019
DAY-17 TUE
December ,2019
DAY-18 WED
DAY-19 THU
DAY-20 FRI
DAY-21 SAT
DAY-22 SUN
DAY-23 MON
DAY-24 TUE
DAY-25 WED
DAY-26 THU
DAY-27 FRI
DAY-28 SAT
DAY-29 SUN
DAY-30 MON
DAY-31 TUE
DAY-1 WED
DAY-2 THU
DAY-3 FRI
DAY-4 SAT
DAY-5 SUN
DAY-6 MON
DAY-7 TUE
DAY-8 WED
DAY-9 THU
DAY-10 FRI
DAY-11 SAT
DAY-12 SUN
DAY-13 MON
DAY-14 TUE
DAY-15 WED
DAY-16 THU
DAY-17 FRI
January ,2020

DAY-18 SAT
DAY-19 SUN
DAY-20 MON
DAY-21 TUE
DAY-22 WED
DAY-23 THU
DAY-24 FRI
DAY-25 SAT
DAY-26 SUN
DAY-27 MON
DAY-28 TUE
DAY-29 WED
DAY-30 THU
DAY-31 FRI
DAY-1 SAT
DAY-2 SUN
DAY-3 MON
DAY-4 TUE
DAY-5 WED
DAY-6 THU
DAY-7 FRI
DAY-8 SAT
DAY-9 SUN
DAY-10 MON
DAY-11 TUE
DAY-12 WED
DAY-13 THU
DAY-14 FRI
DAY-15 SAT
DAY-16 SUN
February ,2020

DAY-17 MON
DAY-18 TUE
DAY-19 WED
DAY-20 THU
DAY-21 FRI
DAY-22 SAT
DAY-23 SUN
DAY-24 MON
DAY-25 TUE
DAY-26 WED
DAY-27 THU
DAY-28 FRI
DAY-29 SAT
DAY-1 SUN
DAY-2 MON
DAY-3 TUE
DAY-4 WED
DAY-5 THU
DAY-6 FRI
DAY-7 SAT
DAY-8 SUN
DAY-9 MON
DAY-10 TUE
DAY-11 WED
DAY-12 THU
DAY-13 FRI
DAY-14 SAT
DAY-15 SUN
DAY-16 MON
DAY-17 TUE
March ,2020

DAY-18 WED
DAY-19 THU
DAY-20 FRI
DAY-21 SAT
DAY-22 SUN
DAY-23 MON
DAY-24 TUE
DAY-25 WED
DAY-26 THU
DAY-27 FRI
DAY-28 SAT
DAY-29 SUN
DAY-30 MON
DAY-31 TUE
DAY-1 WED
DAY-2 THU
DAY-3 FRI
DAY-4 SAT
DAY-5 SUN
DAY-6 MON
DAY-7 TUE
DAY-8 WED
DAY-9 THU
DAY-10 FRI
DAY-11 SAT
DAY-12 SUN
DAY-13 MON
DAY-14 TUE
DAY-15 WED
DAY-16 THU
April ,2020

DAY-17 FRI
DAY-18 SAT
DAY-19 SUN
DAY-20 MON
DAY-21 TUE
DAY-22 WED
DAY-23 THU
DAY-24 FRI
DAY-25 SAT
DAY-26 SUN
DAY-27 MON
DAY-28 TUE
DAY-29 WED
DAY-30 THU
DAY-1 FRI
DAY-2 SAT
DAY-3 SUN
DAY-4 MON
DAY-5 TUE
DAY-6 WED
DAY-7 THU
DAY-8 FRI
DAY-9 SAT
DAY-10 SUN
DAY-11 MON
DAY-12 TUE
DAY-13 WED
DAY-14 THU
May ,2020
DAY-15 FRI
DAY-16 SAT
DAY-17
May ,2020

SUN
DAY-18 MON
DAY-19 TUE
DAY-20 WED
DAY-21 THU
DAY-22 FRI
DAY-23 SAT
DAY-24 SUN
DAY-25 MON
DAY-26 TUE
DAY-27 WED
DAY-28 THU
DAY-29 FRI
DAY-30 SAT
DAY-31 SUN
DAY-1 MON
DAY-2 TUE
DAY-3 WED
DAY-4 THU
DAY-5 FRI
DAY-6 SAT
DAY-7 SUN
DAY-8 MON
DAY-9 TUE
DAY-10 WED
DAY-11 THU
DAY-12 FRI
DAY-13 SAT
DAY-14 SUN
DAY-15 MON
DAY-16 TUE
June ,2020

DAY-17 WED
DAY-18 THU
DAY-19 FRI
DAY-20 SAT
DAY-21 SUN
DAY-22 MON
DAY-23 TUE
DAY-24 WED
DAY-25 THU
DAY-26 FRI
DAY-27 SAT
DAY-28 SUN
DAY-29 MON
DAY-30 TUE
DAY-1 WED
DAY-2 THU
DAY-3 FRI
DAY-4 SAT
DAY-5 SUN
DAY-6 MON
DAY-7 TUE
DAY-8 WED
DAY-9 THU
DAY-10 FRI
DAY-11 SAT
DAY-12 SUN
DAY-13 MON
DAY-14 TUE
DAY-15 WED
DAY-16 THU
DAY-17
June ,2020

FRI
DAY-18 SAT
DAY-19 SUN
DAY-20 MON
DAY-21 TUE
DAY-22 WED
DAY-23 THU
DAY-24 FRI
DAY-25 SAT
DAY-26 SUN
DAY-27 MON
DAY-28 TUE
DAY-29 WED
DAY-30 THU
DAY-31 FRI
DAY-1 SAT
DAY-2 SUN
DAY-3 MON
DAY-4 TUE
DAY-5 WED
DAY-6 THU
DAY-7 FRI
DAY-8 SAT
DAY-9 SUN
DAY-10 MON
DAY-11 TUE
DAY-12 WED
DAY-13 THU
DAY-14 FRI
DAY-15 SAT
DAY-16 SUN
DAY-17
July ,2020

MON
DAY-18 TUE
DAY-19 WED
DAY-20 THU
DAY-21 FRI
DAY-22 SAT
DAY-23 SUN
DAY-24 MON
DAY-25 TUE
DAY-26 WED
DAY-27 THU
DAY-28 FRI
DAY-29 SAT
DAY-30 SUN
DAY-31 MON
WORKBREAKDOWN FOR APPARTMENT

Activity code:
Activity Preceedin
Quantit
Activity Description: Duration: g Activty
y
(days) (s):

Work Package Site:


A Site Clearance 3 -
B Marking. 2 A
Work Package no.2: Building structure : cellar
A1 Excuvation 5116.64 30 B
B1 PCC 29.14 9 A1
C1 Footings 116.58 20 B1
D1 Columns up to plinth beam 11.57 12 C1
E1 Plinth beam 62.36703 13 D1
F1 columns 28.93 12 E1
G1 Concrete bed 181.90 6 F1
H1 Retaining wall 140.86488 6 G1
I1 Half stair case 1.08 3 H1
J1 Slab & Ramp & Beams 296.95 19 I1
K1 Half stair case 2 1.08 3 J1
L1 Plastering 501.38 7 D1
M1 Flooring 56.4885 L1
Work Package no. 2:Building Structure: stilt
A2 Columns 28.93 13 I1,J1
B2 Half Staircase (1) 1.08 3 A2
C2 Slabs and Beams 226.99 19 B2
D2 Half Staicase (2) 1.08 3 C2
E2 plastering (columns,beams,slab) 1323.61 10 D2
F2 flooring 56.4885 D1
Work Package no. 3:Building structure :First Floor
A3 Columns 22.25 11 C2,D2
B3 Half Staircase (1) 1.08 3 A3
C3 Slabs and Beams 165.90 19 B3
D3 Half Staircase (2) 1.08 3 C3
Brick work with door and windows 20 D3
opening 273.50
E3
F3 Plastering (1st Coat) 3598.52 20 E3
G3 Electric ( Metal Boxes) 10 F3
H3 Plumbing (Pipelines) 10 G3
I3 Plastering (2nd Coat) 3598.52 18 H3
J3 Primer 3598.52 6 I3
K3 Electrical Wiring and Switch boards 4 J3
L3 Painting (internal ) 3598.52 7 K3
M3 Door Frames and Shutters 2 L3
N3 Flooring 20 M3
O3 plumbing fixtures 2 N3
Work Package no. Building structure :second
4: Floor
A4 Columns 22.25 11 D3
B4 Half Staircase (1) 1.08 3 A4
C4 Slabs and Beams 165.90 19 B4
D4 Half Staicase (2) 1.08 3 C4
Brick work with door and windows 20 D4
E4 opening 273.50
F4 Plastering (1st Coat) 3598.52 20 E4
G4 Electric ( Metal Boxes) 10 F4
H4 Plumbing (Pipelines) 10 G4
I4 Plastering (2nd Coat) 3598.52 18 H4
J4 Primer 3598.52 6 I4
K4 Electrical Wiring and Switch boards 4 J4
L4 Painting (internal and External) 3598.52 7 K4
M4 Door Frames and Shutters 2 L4
N4 Flooring 20 M4
O4 plumbing fixtures 2 N4
Work Package no. Building structure :Third
A5 Columns 22.25 11 D4
B5 Half Staircase (1) 1.08 3 A5
C5 Slabs and Beams 165.90 19 B5
D5 Half Staircase (2) 1.08 3 C5
Brick work with door and windows 20 D5
opening 273.50
E5
F5 Plastering (1st Coat) 3598.52 20 E5
G5 Electric ( Metal Boxes) 10 F5
H5 Plumbing (Pipelines) 10 G5
I5 Plastering (2nd Coat) 3598.52 18 H5
J5 Primer 3598.52 6 I5
K5 Electrical Wiring and Switch boards 4 J5
L5 Painting (internal and External) 3598.52 7 K5
M5 Door Frames and Shutters 2 L5
N5 Flooring 20 M5
O5 plumbing fixtures 2 N5
Work Package no. Building structure:Fourth
A6 Columns 22.25 11 D5
B6 Half Staircase (1) 1.08 3 A6
C6 Slabs and Beams 165.90 19 B6
D6 Half Staircase (2) 1.08 3 C6
Brick work with door and windows 20 D6
E6 opening 273.50
F6 Plastering (1st Coat) 3598.52 20 E6
G6 Electric ( Metal Boxes) 10 F6
H6 Plumbing (Pipelines) 10 G6
I6 Plastering (2nd Coat) 3598.52 18 H6
J6 Primer 3598.52 6 I6
K6 Electrical Wiring and Switch boards 4 J6
L6 Painting (internal and External) 3598.52 7 K6
M6 Door Frames and Shutters 2 L6
N6 Flooring 20 M6
O6 plumbing fixtures 2 N6
Work Pakcage no. Building Structure: Fifth
A7 Columns 22.25 11 D6
B7 Half Staircase (1) 1.08 3 A7
C7 Slabs and Beams 165.90 19 B7
D7 Half Staircase (2) 1.08 3 C7
E7 Brick work with door and windows 20 D7
opening 273.50
F7 Plastering (1st Coat) 3598.52 20 E7
G7 Electric ( Metal Boxes) 10 F7
H7 Plumbing (Pipelines) 10 G7
I7 Plastering (2nd Coat) 3598.52 18 H7
J7 Primer 3598.52 6 I7
K7 Electrical Wiring and Switch boards 4 J7
L7 Painting (internal and External) 3598.52 7 K7
M7 Door Frames and Shutters 2 L7
N7 Flooring 20 M7
O7 plumbing fixtures 2 N7
Work package no. 8Services:
A8 Lifts 45 M7
B8 External plastering coat 1 4602.64 20
C8 External plastering coat 2 4602.64 20
D8 External primer 4602.64 10
E8 Elevation (four sides) A8
F8 external painting 4602.64 10
G8 Landscaping 1320 5 B8
H8 drive ways 7 C8
I8 compound wall 286.488 12 D8
J8 transformer 3 E8
H8 septic tank 5 F8
B
C

I3
J3
J1

L3
L1

F3
F2
F1

K3
B3
B2
K1
E1
B1

N3
H3
D3
C3
D2
C2
H1
D1
C1

O3
G3
G1

M3
M1
A2,I1

E3,A4
E2,A3
g Activity:
Succeedin
DAY-1 TUE
DAY-2 WED
DAY-3 THU
DAY-4 FRI
DAY-5 SAT
DAY-6 SUN
DAY-7
MON
DAY-8 TUE
DAY-9 WED
DAY-10 THU
DAY-11 FRI
DAY-12 SAT
DAY-13 SUN
DAY-14 MON
DAY-15 TUE
DAY-16 WED
DAY-17 THU
January ,2019

DAY-18 FRI
DAY-19 SAT
DAY-20 SUN
DAY-21 MON
DAY-22 TUE
B4
C4
D4
E4,A5
F4

G4
H4
I4
J4
K4
L4
M4
N4
O4

B5
C5
D5
E5,A6
F5

G5
H5
I5
J5
K5
L5
M5
N5
O5

B6
C6
D6
E6,A7
F6

G6
H6
I6
J6
K6
L6
M6
N6
O6
B7
C7
D7
E7,A8
F7

G7
H7
I7
J7
K7
L7
M7
N7
O7

B8

C8

D8
E8
F8
G8
DAY-23 WED
DAY-24 THU
DAY-25 FRI
DAY-26 SAT
DAY-27 SUN
DAY-28 MON
DAY-29 TUE
DAY-30 WED
DAY-31 THU
DAY-1 FRI
DAY-2 SAT
DAY-3 SUN
DAY-4 MON
DAY-5 TUE
DAY-6 WED
DAY-7 THU
DAY-8 FRI
DAY-9 SAT
DAY-10 SUN
DAY-11 MON
DAY-12 TUE
DAY-13 WED
DAY-14 THU
DAY-15 FRI
DAY-16
February ,2019

SAT
uary ,2019
DAY-17 SUN
DAY-18 MON
DAY-19 TUE
DAY-20 WED
DAY-21 THU
DAY-22 FRI
DAY-23 SAT
DAY-24 SUN
DAY-25 MON
DAY-26 TUE
DAY-27 WED
DAY-28 THU
DAY-1 FRI
DAY-2 SAT
DAY-3 SUN
DAY-4 MON
DAY-5 TUE
DAY-6 WED
DAY-7 THU
DAY-8 FRI
DAY-9 SAT
DAY-10 SUN
DAY-11 MON
DAY-12 TUE
DAY-13 WED
March ,
DAY-14 THU
DAY-15 FRI
DAY-16 SAT
DAY-17 SUN
March ,2019

DAY-18 MON
DAY-19 TUE
DAY-20 WED
DAY-21 THU
DAY-22 FRI
DAY-23 SAT
DAY-24 SUN
DAY-25 MON
DAY-26 TUE
DAY-27 WED
DAY-28 THU
DAY-29 FRI
DAY-30 SAT
DAY-31 SUN
DAY-1 MON
DAY-2 TUE
DAY-3 WED
DAY-4 THU
DAY-5 FRI
DAY-6 SAT
DAY-7 SUN
DAY-8 MON
DAY-9 TUE
DAY-10 WED
DAY-11 THU
DAY-12 FRI
DAY-13 SAT
DAY-14 SUN
DAY-15 MON
DAY-16 TUE
April ,2019

DAY-17 WED
DAY-18 THU
DAY-19 FRI
DAY-20 SAT
DAY-21 SUN
DAY-22 MON
DAY-23 TUE
DAY-24 WED
DAY-25 THU
DAY-26 FRI
DAY-27 SAT
DAY-28 SUN
DAY-29 MON
DAY-30 TUE
DAY-1 WED
DAY-2 THU
DAY-3 FRI
DAY-4 SAT
DAY-5 SUN
DAY-6 MON
DAY-7 TUE
DAY-8 WED
DAY-9 THU
DAY-10 FRI
DAY-11 SAT
DAY-12 SUN
DAY-13 MON
DAY-14 TUE
DAY-15 WED
DAY-16 THU
DAY-17
May ,2019

FRI
DAY-18 SAT
DAY-19 SUN
DAY-20 MON
DAY-21 TUE
DAY-22 WED
DAY-23 THU
DAY-24 FRI
DAY-25 SAT
DAY-26 SUN
DAY-27 MON
DAY-28 TUE
DAY-29 WED
DAY-30 THU
DAY-31 FRI
DAY-1 SAT
DAY-2 SUN
DAY-3 MON
DAY-4 TUE
DAY-5 WED
DAY-6 THU
DAY-7 FRI
DAY-8 SAT
DAY-9 SUN
DAY-10 MON
DAY-11 TUE
DAY-12 WED
DAY-13 THU
DAY-14 FRI
DAY-15 SAT
DAY-16 SUN
June ,2019

DAY-17 MON
DAY-18 TUE
DAY-19 WED
DAY-20 THU
DAY-21 FRI
DAY-22 SAT
DAY-23 SUN
DAY-24 MON
DAY-25 TUE
DAY-26 WED
DAY-27 THU
DAY-28 FRI
DAY-29 SAT
DAY-30 SUN
DAY-1 MON
DAY-2 TUE
DAY-3 WED
DAY-4 THU
DAY-5 FRI
DAY-6 SAT
DAY-7 SUN
DAY-8 MON
DAY-9 TUE
DAY-10 WED
DAY-11 THU
DAY-12 FRI
DAY-13 SAT
DAY-14 SUN
DAY-15 MON
DAY-16 TUE
July ,2019
DAY-17
July ,2019
WED
DAY-18 THU
DAY-19 FRI
DAY-20 SAT
DAY-21 SUN
DAY-22 MON
DAY-23 TUE
DAY-24 WED
DAY-25 THU
DAY-26 FRI
DAY-27 SAT
DAY-28 SUN
DAY-29 MON
DAY-30 TUE
DAY-31 WED
DAY-1 THU
DAY-2 FRI
DAY-3 SAT
DAY-4 SUN
DAY-5 MON
DAY-6 TUE
DAY-7 WED
DAY-8 THU
DAY-9 FRI
DAY-10 SAT
DAY-11 SUN
DAY-12 MON
DAY-13 TUE
DAY-14 WED
DAY-15 THU
DAY-16 FRI
DAY-17 SAT
August ,2019

DAY-18 SUN
DAY-19 MON
DAY-20 TUE
DAY-21 WED
DAY-22 THU
DAY-23 FRI
DAY-24 SAT
DAY-25 SUN
DAY-26 MON
DAY-27 TUE
DAY-28 WED
DAY-29 THU
DAY-30 FRI
DAY-31 SAT
DAY-1 SUN
DAY-2 MON
DAY-3 TUE
DAY-4 WED
DAY-5 THU
DAY-6 FRI
DAY-7 SAT
DAY-8 SUN
DAY-9 MON
DAY-10 TUE
DAY-11 WED
DAY-12 THU
DAY-13 FRI
DAY-14 SAT
DAY-15 SUN
DAY-16 MON
DAY-17 TUE
September ,2019

DAY-18 WED
DAY-19 THU
DAY-20 FRI
DAY-21 SAT
DAY-22 SUN
DAY-23 MON
DAY-24 TUE
DAY-25 WED
DAY-26 THU
DAY-27 FRI
DAY-28 SAT
DAY-29 SUN
DAY-30 MON
DAY-1 TUE
DAY-2 WED
DAY-3 THU
DAY-4 FRI
DAY-5 SAT
DAY-6 SUN
DAY-7 MON
DAY-8 TUE
DAY-9 WED
DAY-10 THU
DAY-11 FRI
DAY-12 SAT
DAY-13 SUN
DAY-14 MON
DAY-15 TUE
DAY-16 WED
DAY-17 THU
October ,2019

DAY-18 FRI
DAY-19 SAT
DAY-20 SUN
DAY-21 MON
DAY-22 TUE
DAY-23 WED
DAY-24 THU
DAY-25 FRI
DAY-26 SAT
DAY-27 SUN
DAY-28 MON
DAY-29 TUE
DAY-30 WED
DAY-31 THU
DAY-1 FRI
DAY-2 SAT
DAY-3 SUN
DAY-4 MON
DAY-5 TUE
DAY-6 WED
DAY-7 THU
DAY-8 FRI
DAY-9 SAT
DAY-10 SUN
DAY-11 MON
DAY-12 TUE
DAY-13 WED
DAY-14 THU
DAY-15 FRI
DAY-16 SAT
DAY-17
November ,2019

SUN
DAY-18 MON
,2019
DAY-19 TUE
DAY-20 WED
DAY-21 THU
DAY-22 FRI
DAY-23 SAT
DAY-24 SUN
DAY-25 MON
DAY-26 TUE
DAY-27 WED
DAY-28 THU
DAY-29 FRI
DAY-30 SAT
DAY-1 SUN
DAY-2 MON
DAY-3 TUE
DAY-4 WED
DAY-5 THU
DAY-6 FRI
DAY-7 SAT
DAY-8 SUN
DAY-9 MON
DAY-10 TUE
DAY-11 WED
DAY-12 THU
DAY-13 FRI
Decembe
DAY-14 SAT
DAY-15 SUN
DAY-16 MON
DAY-17 TUE
December ,2019

DAY-18 WED
DAY-19 THU
DAY-20 FRI
DAY-21 SAT
DAY-22 SUN
DAY-23 MON
DAY-24 TUE
DAY-25 WED
DAY-26 THU
DAY-27 FRI
DAY-28 SAT
DAY-29 SUN
DAY-30 MON
DAY-31 TUE
DAY-1 WED
DAY-2 THU
DAY-3 FRI
DAY-4 SAT
DAY-5 SUN
DAY-6 MON
DAY-7 TUE
DAY-8 WED
DAY-9 THU
DAY-10 FRI
DAY-11 SAT
DAY-12 SUN
DAY-13 MON
DAY-14 TUE
DAY-15 WED
DAY-16 THU
DAY-17 FRI
January ,2020

DAY-18 SAT
DAY-19 SUN
DAY-20 MON
DAY-21 TUE
DAY-22 WED
DAY-23 THU
DAY-24 FRI
DAY-25 SAT
DAY-26 SUN
DAY-27 MON
DAY-28 TUE
DAY-29 WED
DAY-30 THU
DAY-31 FRI
DAY-1 SAT
DAY-2 SUN
DAY-3 MON
DAY-4 TUE
DAY-5 WED
DAY-6 THU
DAY-7 FRI
DAY-8 SAT
DAY-9 SUN
DAY-10 MON
DAY-11 TUE
DAY-12 WED
DAY-13 THU
DAY-14 FRI
DAY-15 SAT
DAY-16 SUN
February ,2020

DAY-17 MON
DAY-18 TUE
DAY-19 WED
DAY-20 THU
DAY-21 FRI
DAY-22 SAT
DAY-23 SUN
DAY-24 MON
DAY-25 TUE
DAY-26 WED
DAY-27 THU
DAY-28 FRI
DAY-29 SAT
DAY-1 SUN
DAY-2 MON
DAY-3 TUE
DAY-4 WED
DAY-5 THU
DAY-6 FRI
DAY-7 SAT
DAY-8 SUN
DAY-9 MON
DAY-10 TUE
DAY-11 WED
DAY-12 THU
DAY-13 FRI
DAY-14 SAT
DAY-15 SUN
DAY-16 MON
DAY-17 TUE
March ,2020

DAY-18 WED
DAY-19 THU
DAY-20 FRI
DAY-21 SAT
DAY-22 SUN
DAY-23 MON
DAY-24 TUE
DAY-25 WED
DAY-26 THU
DAY-27 FRI
DAY-28 SAT
DAY-29 SUN
DAY-30 MON
DAY-31 TUE
DAY-1 WED
DAY-2 THU
DAY-3 FRI
DAY-4 SAT
DAY-5 SUN
DAY-6 MON
DAY-7 TUE
DAY-8 WED
DAY-9 THU
DAY-10 FRI
DAY-11 SAT
DAY-12 SUN
DAY-13 MON
DAY-14 TUE
DAY-15 WED
DAY-16 THU
April ,2020
April ,2020
DAY-17 FRI
DAY-18 SAT
DAY-19 SUN
DAY-20 MON
DAY-21 TUE
DAY-22 WED
DAY-23 THU
DAY-24 FRI
DAY-25 SAT
DAY-26 SUN
DAY-27 MON
DAY-28 TUE
DAY-29 WED
DAY-30 THU
labour
LABOURS FEMALE
Wome
Man Mason Equipment Skilled
n
SKILLED UNSKILLED PAINTERS UNSKILLED

2
25
25
4
12
7
10
20
2
800
2
33

7
2
800
2
33

7
2
100
2
120
240

5
240

7
2
100
2
120
240

5
240

7
2
100
2
120
240

5
240

7
2
100
2
120
240

5
240

7
2
100
2
120
240

5
240
labour
equipment
unskilled painter carpenter excuvator tipper
rmc
210 10 tyre

2 2 2
100 5
430 110 19
50 20 2
150 50 11
120 30 5
30 30
200 24
5 2
500 450 50
5 2
45

120 30 5
5 2
500 450 50
5 2
45

120 30 4
5 2
1539 450 25
5 2
255
310

10
310
324

324

120 30 4
5 2
1539 450 25
5 2
255
310

10
310
324

324

120 30 4
5 2
1539 450 25
5 2
255
310

10
310
324

324

120 30 4
5 2
1539 450 25
5 2
255
310

10
310
324

324

120 30 4
5 2
1539 450 25
5 2
255
310

10
310
324

324
c
Activity code:
Quantit
Activity Description: CUM UNITS
y
Work Package Site:
A Site Clearance
B Marking.
Work Package no.2: Building structure : cellar
A1 Excuvation 5116.64 CUM
B1 PCC 29.14 10.00 CUM
C1 Footings 116.58 10.00 CUM
D1 Columns up to plinth beam 11.57 10.00 CUM
E1 Plinth beam 62.36703 100 SQM
F1 columns 28.93 10.00 CUM
G1 Concrete bed 181.90
H1 Retaining wall 140.86488 10 CUM
I1 Half stair case 1.08 10 CUM
J1 Slab & Ramp & Beams 296.95 10.00 CUM
K1 Half stair case 2 1.08 10 CUM
L1 Plastering 501.38 100.00 SQM
M1 Flooring 56.4885 100 SQM
Work Package no. 2:Building Structure: stilt
A2 Columns 28.93 10.00 CUM
B2 Half Staircase (1) 1.08 10 CUM
C2 Slabs and Beams 226.99 10.00 CUM
D2 Half Staicase (2) 1.08 10 CUM
E2 plastering (columns,beams,slab) 1323.61 100.00 SQM
F2 flooring 56.4885 100 SQM
Work Package no. 3:Building structure :First Floor
A3 Columns 22.25 10.00 CUM
B3 Half Staircase (1) 1.08 10 CUM
C3 Slabs and Beams 165.90 10.00 CUM
D3 Half Staircase (2) 1.08 10 CUM
Brick work with door and windows
opening 273.50 10.00 CUM
E3
F3 Plastering (1st Coat) 3598.52 100.00 SQM
G3 Electric ( Metal Boxes)
H3 Plumbing (Pipelines)
I3 Plastering (2nd Coat) 3598.52 100.00 SQM
J3 Primer 3598.52 100.00 SQM
K3 Electrical Wiring and Switch boards
L3 Painting (internal ) 3598.52 100.00 SQM
M3 Door Frames and Shutters
N3 Flooring
O3 plumbing fixtures
Work Package no. Building structure :second
4: Floor
A4 Columns 22.25 10.00 CUM
B4 Half Staircase (1) 1.08 10 CUM
C4 Slabs and Beams 165.90 10.00 CUM
D4 Half Staicase (2) 1.08 10 CUM
Brick work with door and windows
opening 10.00 CUM
E4 273.50
F4 Plastering (1st Coat) 3598.52 100.00 SQM
G4 Electric ( Metal Boxes)
H4 Plumbing (Pipelines)
I4 Plastering (2nd Coat) 3598.52 100.00 SQM
J4 Primer 3598.52 100.00 SQM
K4 Electrical Wiring and Switch boards
L4 Painting (internal and External) 3598.52 100.00 SQM
M4 Door Frames and Shutters
N4 Flooring
O4 plumbing fixtures
Work Package no. Building structure :Third
A5 Columns 22.25 10.00 CUM
B5 Half Staircase (1) 1.08 10 CUM
C5 Slabs and Beams 165.90 10.00 CUM
D5 Half Staircase (2) 1.08 10 CUM
Brick work with door and windows
opening 273.50 10.00 CUM
E5
F5 Plastering (1st Coat) 3598.52 100.00 SQM
G5 Electric ( Metal Boxes)
H5 Plumbing (Pipelines)
I5 Plastering (2nd Coat) 3598.52 100.00 SQM
J5 Primer 3598.52 100.00 SQM
K5 Electrical Wiring and Switch boards
L5 Painting (internal and External) 3598.52 100.00 SQM
M5 Door Frames and Shutters
N5 Flooring
O5 plumbing fixtures
Work Package no. Building structure:Fourth
A6 Columns 22.25 10.00 CUM
B6 Half Staircase (1) 1.08 10 CUM
C6 Slabs and Beams 165.90 10.00 CUM
D6 Half Staircase (2) 1.08 10 CUM
Brick work with door and windows
opening 10.00 CUM
E6 273.50
F6 Plastering (1st Coat) 3598.52 100.00 SQM
G6 Electric ( Metal Boxes)
H6 Plumbing (Pipelines)
I6 Plastering (2nd Coat) 3598.52 100.00 SQM
J6 Primer 3598.52 100.00 SQM
K6 Electrical Wiring and Switch boards
L6 Painting (internal and External) 3598.52 100.00 SQM
M6 Door Frames and Shutters
N6 Flooring
O6 plumbing fixtures
Work Pakcage no. Building Structure: Fifth
A7 Columns 22.25 10.00 CUM
B7 Half Staircase (1) 1.08 10 CUM
C7 Slabs and Beams 165.90 10.00 CUM
D7 Half Staircase (2) 1.08 10 CUM
E7 Brick work with door and windows
opening 273.50 10.00 CUM
F7 Plastering (1st Coat) 3598.52 100.00 SQM
G7 Electric ( Metal Boxes)
H7 Plumbing (Pipelines)
I7 Plastering (2nd Coat) 3598.52 100.00 SQM
J7 Primer 3598.52 100.00 SQM
K7 Electrical Wiring and Switch boards
L7 Painting (internal and External) 3598.52 100.00 SQM
M7 Door Frames and Shutters
N7 Flooring
O7 plumbing fixtures
Work package no. 8Services:
A8 Lifts
B8 External plastering coat 1 4602.64 100.00 SQM
C8 External plastering coat 2 4602.64 100.00 SQM
D8 External primer 4602.64 100.00 SQM
E8 Elevation (four sides)
F8 external painting 4602.64 100.00 SQM
G8 Landscaping 1320
H8 drive ways
I8 compound wall 286.488
J8 transformer
H8 septic tank
labour

Activity Preceeding Activty unskille painte


Succeeding Activity: Skilled
Duration: (days) (s): d r

3 - B
2 A C

45 B B1 2 2
9 A1 C1 25 100
25 B1 D1 25 430
12 C1 E1 4 50
13 D1 F1 12 150
12 E1 G1 7 120
6 F1 H1 10 30
8 G1 A2,I1 20 200
5 H1 J1 2 5
28 I1 K1 800 500
5 J1 L1 2 5
7 D1 M1 33 45
L1

13 I1,J1 B2 7 120
5 A2 C2 2 5
21 B2 D2 800 500
5 C2 E2,A3 2 5
10 D2 F2 33 45
D1

12 C2,D2 B3 7 120
5 A3 C3 2 5
23 B3 D3 100 1539
5 C3 E3,A4 2 5
30 D3 F3
120 255
27 E3 G3 240 310
15 F3 H3
15 G3 I3 5 10
23 H3 J3 240 310
7 I3 K3 324
4 J3 L3
8 K3 M3 324
2 L3 N3
24 M3 O3
2 N3

12 D3 B4 7 120
5 A4 C4 2 5
23 B4 D4 100 1539
5 C4 E4,A5 2 5
30 D4 F4
120 255
27 E4 G4 240 310
15 F4 H4
15 G4 I4 5 10
23 H4 J4 240 310
7 I4 K4 324
4 J4 L4
8 K4 M4 324
2 L4 N4
24 M4 O4
2 N4

12 D4 B5 7 120
5 A5 C5 2 5
23 B5 D5 100 1539
5 C5 E5,A6 2 5
30 D5 F5
120 255
27 E5 G5 240 310
15 F5 H5
15 G5 I5 5 10
23 H5 J5 240 310
7 I5 K5 324
4 J5 L5
8 K5 M5 324
2 L5 N5
24 M5 O5
2 N5

12 D5 B6 7 120
5 A6 C6 2 5
23 B6 D6 100 1539
5 C6 E6,A7 2 5
30 D6 F6
120 255
27 E6 G6 240 310
15 F6 H6
15 G6 I6 5 10
23 H6 J6 240 310
7 I6 K6 324
4 J6 L6
8 K6 M6 324
2 L6 N6
24 M6 O6
2 N6

12 D6 B7 7 120
5 A7 C7 2 5
23 B7 D7 100 1539
5 C7 E7,A8 2 5
30 D7 F7
120 255
27 E7 G7 240 310
15 F7 H7
15 G7 I7 5 10
23 H7 J7 240 310
7 I7 K7 324
4 J7 L7
8 K7 M7 324
2 L7 N7
24 M7 O7
2 N7

45 M7 B8
31
25
10
A8 C8
13
B8 D8
C8 E8
D8 F8
E8 G8
F8
labour Materials
equipment
carpente tipper Metal Metal4
excuvato cement sand Bricks Tiles
r 10 rmc 20 0
r 210
tyre

2 2
5 131.1518 1.311518 10.20069 26.23035
110 19 979.2665 48.96332 66.45022 97.92665
20 2 97.19892 4.859946 6.595641 9.719892
50 11 52.38831 2.619415 35.54921 5.238831
30 5 242.9973 12.14987 16.4891 24.29973
30
24 1183.265 59.16325 80.29298 118.3265
2 9.072 0.4536 0.6156 0.9072
450 50 2494.339 124.717 169.2587 249.4339
2 9.072 0.4536 0.6156 0.9072
45.12375 1.153163

30 5 242.9973 12.14987 16.4891 24.29973


2 9.072 0.4536 0.6156 0.9072
450 50 1906.753 95.33765 129.3868 190.6753
2 9.072 0.4536 0.6156 0.9072
119.1247 3.044297

30 4 186.921 9.34605 12.68393 18.6921


2 9.072 0.4536 0.6156 0.9072
450 25 1393.568 69.67842 94.56357 139.3568
2 9.072 0.4536 0.6156 0.9072
369.2234 114.8695 133.1939
323.8669 8.276598

323.8669 8.276598

30 4 186.921 9.34605 12.68393 18.6921


2 9.072 0.4536 0.6156 0.9072
450 25 1393.568 69.67842 94.56357 139.3568
2 9.072 0.4536 0.6156 0.9072

369.2234 114.8695 133.1939


323.8669 8.276598

323.8669 8.276598

30 4 186.921 9.34605 12.68393 18.6921


4403.29
2 9.072 0.4536 0.6156 0.9072
450 25 1393.568 69.67842 94.56357 139.3568
2 9.072 0.4536 0.6156 0.9072

369.2234 114.8695 133.1939


323.8669 8.276598

323.8669 8.276598

30 4 186.921 9.34605 12.68393 18.6921


2 9.072 0.4536 0.6156 0.9072
450 25 1393.568 69.67842 94.56357 139.3568
2 9.072 0.4536 0.6156 0.9072

369.2234 114.8695 133.1939


323.8669 8.276598

323.8669 8.276598

30 4 186.921 9.34605 12.68393 18.6921


2 9.072 0.4536 0.6156 0.9072
450 25 1393.568 69.67842 94.56357 139.3568
2 9.072 0.4536 0.6156 0.9072

369.2234 114.8695 133.1939


323.8669 8.276598

323.8669 8.276598
Paints

3598.52
3598.52

3598.52

3598.52
3598.52

4602.64
WORK BREAK DOWN STRUCTURE

ACTIVITY CODE: ACTIVITY DESCRIPTION: QUANTITY PRECEEDING


ACTIVTY (S):

WORK PACKAGE SITE:


NO.1:
A.1 SITE CLEARANCE
A.2 MARKING. A.1

WORK PACKAGE NO. 2:BUILDING STRUCTURE: STILT


B.1 EXCAVATION 535.97 A.2
B.2 PCC 30.21 B.1
B.3 FOOTING (R.C.C) 120.85 B.2
B.4 COLUMNS UP TO PLINTH BEAMS 18.01 B.3
B.5 FILLING 366.89 B.4
B.6 PLINTH BEAM 49.92 B.5
B.7 REFILLING 316.97 B.6
B.8 COLUMNS 35.37 B.7
B.9 HALF STAIRCASE (1) 1.51 B.8
B.10 SLABS AND BEAMS 452.52 B.9
B.11 HALF STAIR CASE (2) 1.51 B.10
B.12 WATCH MAN ROOM BRICKWORK 9.25 B.11
B.13 PLASTERING 1ST COAT 276.79 B.13
B.14 ELECTRIC METAL BOXES B.14
B.15 PLUMBING (PIPE LINES) B.15
B.16 PLASTERING (2ND COAT) 276.79 B.16
B.17 PRIMER AND PUTTY 48.09 B.17
B.18 FLOORING B.18
ELECTRICAL WIRING AND SWITCH
B.19 BOARDS B.19

B.20 PAINTING INTERNAL 48.09 B.20


B.21 PAINTING EXTERNAL 533.93 B.21
B.22 DOOR FRAMES AND SHUTTERS 2.52 B.22
UPVC WINDOW FIXING AND VENTILATOR
B.23 0.33 B.23

B.24 PLUMBING FIXTURES B.24

WORK PACKAGE NO. 3: BUILDING STRUCTURE :FIRST FLOOR


C.1 COLUMNS 27.12 B.10,B.11
C.2 HALF STAIRCASE (1) 1.51 C.1
C.3 SLABS AND BEAMS 452.52 C.2
C.4 HALF STAICASE (2) 1.51 C.3
C.5 BRICK WORK 147.45 C.4
C.6 PLASTERING 1ST COAT 1849.64 C.5
C.7 ELECTRIC ( METAL BOXES) C.6
C.8 PLUMBING (PIPELINES) C.7
C.9 PLASTERING (2ND COAT) 1849.64 C.8
C.10 PRIMER AND PUTTY 1645.53 C.9
C.11 FLOORING AND DADDOING 918.678 C.10
ELECTRICAL WIRING AND SWITCH
C.12 BOARDS C.11
C.13 PAINTING INTERNAL 1769.89 C.12
C.14 PAINTING EXTERNAL 1521.17 C.13
C.15 DOOR FRAMES AND SHUTTERS 56 C.14
UPVC WINDOW FIXING AND VENTILATOR
51.33
C.16 C.15
C.17 SS RAILING WITH GLASS C.16
C.18 PLUMBING FIXTURES C.17

WORK PACKAGE NO. 4: BUILDING STRUCTURE :SECOND FLOOR


D.1 COLUMNS 27.12 C.3,C.4
D.2 HALF STAIRCASE (1) 1.51 D.1
D.3 SLABS AND BEAMS 452.52 D.2
D.4 HALF STAICASE (2) 1.51 D.3
D.5 BRICK WORK 147.45 D.4
D.6 PLASTERING 1ST COAT 1849.64 D.5
D.7 ELECTRIC ( METAL BOXES) D.6
D.8 PLUMBING (PIPELINES) D.7
D.9 PLASTERING (2ND COAT) 1849.64 D.8
D.10 PRIMER AND PUTTY 1645.53 D.9
D.11 FLOORING AND DADDOING 918.678 D.10
ELECTRICAL WIRING AND SWITCH
D.12 BOARDS D.11
D.13 PAINTING INTERNAL 1769.89 D.12
D.14 PAINTING EXTERNAL 1521.17 D.13
D.15 DOOR FRAMES AND SHUTTERS 56 D.14
UPVC WINDOW FIXING AND VENTILATOR
51.33
D.16 D.15
D.17 SS RAILING WITH GLASS D.16
D.18 PLUMBING FIXTURES D.17

WORK PACKAGE NO. 5: BUILDING STRUCTURE :THIRD FLOOR


E.1 COLUMNS 27.12 D.3,D.4
E.2 HALF STAIRCASE (1) 1.51 E.1
E.3 SLABS AND BEAMS 452.52 E.2
E.4 HALF STAICASE (2) 1.51 E.3
E.5 BRICK WORK 147.45 E.4
E.6 PLASTERING 1ST COAT 1849.64 E.5
E.7 ELECTRIC ( METAL BOXES) E.6
E.8 PLUMBING (PIPELINES) E.7
E.9 PLASTERING (2ND COAT) 1849.64 E.8
E.10 PRIMER AND PUTTY 1645.53 E.9
E.11 FLOORING AND DADDOING 918.678 E.10
ELECTRICAL WIRING AND SWITCH
E.12 BOARDS E.11
E.13 PAINTING INTERNAL 1769.89 E.12
E.14 PAINTING EXTERNAL 1521.17 E.13
E.15 DOOR FRAMES AND SHUTTERS 56 E.14
UPVC WINDOW FIXING AND VENTILATOR
51.33
E.16 E.15
E.17 SS RAILING WITH GLASS E.16
E.18 PLUMBING FIXTURES E.17

WORK PACKAGE NO. 6: BUILDING STRUCTURE :FOURTH FLOOR


F.1 COLUMNS 27.12 E.3,E.4
F.2 HALF STAIRCASE (1) 1.51 F.1
F.3 SLABS AND BEAMS 452.52 F.2
F.4 HALF STAICASE (2) 1.51 F.3
F.5 BRICK WORK 147.45 F.4
F.6 PLASTERING 1ST COAT 1849.64 F.5
F.7 ELECTRIC ( METAL BOXES) F.6
F.8 PLUMBING (PIPELINES) F.7
F.9 PLASTERING (2ND COAT) 1849.64 F.8
F.10 PRIMER AND PUTTY 1645.53 F.9
F.11 FLOORING AND DADDOING 918.678 F.10
ELECTRICAL WIRING AND SWITCH
F.12 BOARDS F.11
F.13 PAINTING INTERNAL 1769.89 F.12
F.14 PAINTING EXTERNAL 1521.17 F.13
F.15 DOOR FRAMES AND SHUTTERS 56 F.14
UPVC WINDOW FIXING AND VENTILATOR
51.33
F.16 F.15
F.17 SS RAILING WITH GLASS F.16
F.18 PLUMBING FIXTURES F.17

WORK PACKAGE NO. 7: BUILDING STRUCTURE :FIFTH FLOOR


G.1 COLUMNS 27.12 F.3,F.4
G.2 HALF STAIRCASE (1) 1.51 G.1
G.3 SLABS AND BEAMS 452.52 G.2
G.4 HALF STAICASE (2) 1.51 G.3
G.5 BRICK WORK 147.45 G.4
G.6 PLASTERING 1ST COAT 1849.64 G.5
G.7 ELECTRIC ( METAL BOXES) G.6
G.8 PLUMBING (PIPELINES) G.7
G.9 PLASTERING (2ND COAT) 1849.64 G.8
G.10 PRIMER AND PUTTY 1645.53 G.9
G.11 FLOORING AND DADDOING 918.678 G.10
ELECTRICAL WIRING AND SWITCH
G.12 BOARDS G.11
G.13 PAINTING INTERNAL 1769.89 G.12
G.14 PAINTING EXTERNAL 1521.17 G.13
G.15 DOOR FRAMES AND SHUTTERS 56 G.14
UPVC WINDOW FIXING AND VENTILATOR
51.33
G.16 G.15
G.17 SS RAILING WITH GLASS G.16
G.18 PLUMBING FIXTURES G.17
WORK PACKAGE NO. 8: BUILDING STRUCTURE :SIXTH FLOOR
H.1 COLUMNS 27.12 G.3,G.4
H.2 HALF STAIRCASE (1) 1.51 H.1
H.3 SLABS AND BEAMS 452.52 H.2
H.4 HALF STAICASE (2) 1.51 H.3
H.5 BRICK WORK 147.45 H.4
H.6 PLASTERING 1ST COAT 1849.64 H.5
H.7 ELECTRIC ( METAL BOXES) H.6
H.8 PLUMBING (PIPELINES) H.7
H.9 PLASTERING (2ND COAT) 1849.64 H.8
H.10 PRIMER AND PUTTY 1645.53 H.9
H.11 FLOORING AND DADDOING 918.678 H.10
ELECTRICAL WIRING AND SWITCH
H.12 BOARDS H.11
H.13 PAINTING INTERNAL 1769.89 H.12
H.14 PAINTING EXTERNAL 1521.17 H.13
H.15 DOOR FRAMES AND SHUTTERS 56 H.14
UPVC WINDOW FIXING AND VENTILATOR
51.33
H.16 H.15
H.17 SS RAILING WITH GLASS H.16
H.18 PLUMBING FIXTURES H.17

WORK PACKAGE NO. 10:BUILDING STRUCTURE :TERRACE


I.1 PARAPET BRICK WORK 32.76 H.9
I.2 STAIRCASE HEAD ROOM BRICK WORK 5.99 I.1
I.3 LIFT HEAD ROOM BRICK WORK 3.55 I.2
I.4 PLASTERING 393.38000 I.3
I.5 LIFT INSTATLATION I.4
I.6 PAINTING 393.38 I.5
I.7 ELEVATION ASPECTS 1 I.6
I.8 ELEVATION ASPECTS 2 I.7
I.9 ELEVATION ASPECTS 3 I.8
I.10 ELEVATION ASPECTS 4 I.9

WORK PACKAGE NO. 11:BUILDING STRUCTURE :FINISHINGS


K.1 COMPOUND WALL I.4
K.2 DRIVE WAYS K.1
K.3 LANDSCAPE K.2
K.4 TRANSFORMER K.3
K.5 SEPTIC TANK K.4
K.6 MAIN GATE K.5
CTURE
ACTIVITY REDUCED
SUCCEEDING DURATION: DURATION CEMENT SAND METAL METAL
CUM UNITS
ACTIVITY: (DAYS) (BAGS) (TONS) 20 40(CUM)

A.2 3 3
B.1 3 3

B.2 7 7
B.3 10 CUM 7 7 136 1.4 10.6 27.19
B.4 10 CUM 12 12 1015 50.76 68.9 101.5
B.5 10 CUM 12 10 151 7.56 10.3 15.1
B.6 100 SQM 7 7
B.7 10 CUM 10 10 419 20.97 28.5 41.9
B.8 100.0 SQM 2 2
B.9 10.00 SQM 10 8 297 14.86 20.2 29.7
B.10 10 CUM 2 2 13 0.64 0.9 1.3
B.11,C.1 10.00 CUM 21 18 3801 190.06 257.9 380.1
B.12,C.1 10 CUM 2 2 13 0.64 0.9 1.3
B.13 10 CUM 3 2 12 0.2
B.15 100 CUM 10 10 25 0.6
B.16 1 1 30.4 152.2
B.17 1 1
B.18 100 SQM 10 10 25 0.6
B.19 100 SQM 5 5 30.4 152.2
B.20 6 6
4 4
B.21

B.22 100 SQM 2 2


B.23 100 SQM 6 6
B.24 1 1
2 2
B.25

1 1

C.2 10 CUM 10 8 228 11.39 15.5 22.8


C.3 10 CUM 2 2 13 0.64 0.9 1.3
C.4,D.1 10 CUM 21 18 3801 190.06 257.9 380.1
C.5,D.1 10 CUM 2 2 13 0.64 0.9 1.3
C.6 10 CUM 18 15 199 3.4
C.7 100 SQM 12 10 166 4.3
C.8 7 7
C.9 12 12
C.10 100 SQM 12 10 166 4.3
C.11 100 SQM 15 15
C.12 20 18
12 12
C.13
C.14 100 SQM 12 12
C.15 100 SQM 12 12
C.16 SQM 7 7
7 7
SQM
C.17
C.18 7 7
12 10

D.2 10 CUM 10 8 228 11.39 15.5 22.8


D.3 10 CUM 2 2 13 0.64 0.9 1.3
D.4,E.1 10 CUM 21 18 3801 190.06 257.9 380.1
D.5,E.1 10 CUM 2 2 13 0.64 0.9 1.3
D.6 10 CUM 18 15 199 3.4 84.04482 123.855522
D.7 100 SQM 12 10 166 4.3 1054.295 155.369863
D.8 7 7
D.9 12 12
D.10 100 SQM 12 10 166 4.3
D.11 100 SQM 15 15
D.12 20 18
12 12
D.13
D.14 100 SQM 12 12
D.15 100 SQM 12 12
D.16 SQM 7 7
7 7
SQM
D.17
D.18 7 7
12 10

E.2 10 CUM 10 8 228 11.39 15.5 22.8


E.3 10 CUM 2 2 13 0.64 0.9 1.3
E.4,F.1 10 CUM 21 18 3801 190.06 257.9 380.1
E.5,F.1 10 CUM 1 2 13 0.64 0.9 1.3
E.6 10 CUM 18 15 199 3.4
E.7 100 SQM 12 10 166 4.3
E.8 7 7
E.9 12 12
E.10 100 SQM 12 10 166 4.3
E.11 100 SQM 15 15
E.12 20 18
12 12
E.13
E.14 100 SQM 12 12
E.15 100 SQM 12 12
E.16 SQM 7 7
7 7
SQM
E.17
E.18 7 7
12 10

F.2 10 CUM 12 9 228 11.39 15.5 22.8


F.3 10 CUM 1 2 13 0.64 0.9 1.3
F.4,G.1 10 CUM 24 20 3801 190.06 257.9 380.1
F.5.G.1 10 CUM 2 2 13 0.64 0.9 1.3
F.6 10 CUM 21 17 199 3.4
F.7 100 SQM 14 12 166 4.3
F.8 7 7
F.9 12 12
F.10 100 SQM 14 12 166 4.3
F.11 100 SQM 15 15
F.12 11 19
12 12
F.13
F.14 100 SQM 12 12
F.15 100 SQM 12 12
F.16 SQM 8 8
8 8
SQM
F.17
F.18 7 7
12 10

G.2 10 CUM 13 10 228 11.39 15.5 22.8


G.3 10 CUM 2 2 13 0.64 0.9 1.3
G.4,H.1 10 CUM 25 21 3801 190.06 257.9 380.1
G.5,H.2 10 CUM 2 2 13 0.64 0.9 1.3
G.6 10 CUM 22 18 199 3.4
G.7 100 SQM 15 13 166 4.3
G.8 7 7
G.9 12 12
G.10 100 SQM 15 13 166 4.3
G.11 100 SQM 15 15
G.12 23 20
12 12
G.13
G.14 100 SQM 12 12
G.15 100 SQM 12 12
G.16 SQM 9 9
9 9
SQM
G.17
G.18 7 7
12 10
H.2 10 CUM 14 11 228 11.39 15.5 22.8
H.3 10 CUM 2 2 13 0.64 0.9 1.3
H.4 10 CUM 26 22 3801 190.06 257.9 380.1
H.5 10 CUM 2 2 13 0.64 0.9 1.3
H.6 10 CUM 23 19 199 3.4
H.7 100 SQM 16 14 166 4.3
H.8 7 7
H.9 12 12
H.10,I.1 100 SQM 16 14 166 4.3
H.11 100 SQM 15 15
H.12 24 21
12 12
H.13
H.14 100 SQM 12 12
H.15 100 SQM 12 12
H.16 SQM 10 10
10 10
SQM
H.17
H.18 7 7
12 10

I.2 10 CUM 7 7 44 0.8


I.3 10 CUM 4 4 8 0.1
I.4 10 CUM 2 2 5 0.1
I.6,K.1 100 SQM 12 12 35 0.9
I.6 40 30
I.7 7 7
I.8 10 7
I.9 10 7
I.10 10 7
K.1 10 7

K.2 45 28
K.3 12 12
K.4 12 12
K.5 3 3
K.6 7 7
2 2
MATERIALS
GLAZED BROWN CERAMIC
BRICKS STEEL VITRIFIED MARBLE TILES GRANITE WOOD UPVC PAINTS
TILES

7.25112
3.6018

4.992219

0.8064
39.667
0.8064
4.5038

48.09
533.93
2.52

0.33

4.5195
0.8064
39.667
0.8064
71.8067

1645.53
732.9 119.0 151.2 10.18
1769.89
1521.17
56

51.33

4.5195
0.8064
39.667
0.8064
71.8067

1645.53
732.9 119.0 151.2 10.18

1769.89
1521.17
56

51.33

4.5195
0.8064
39.667
0.8064
71.8067

1645.53
732.9 119.0 151.2 10.18

1769.89
1521.17
56
51.33

4.5195
0.8064
39.667
0.8064
71.8067

1645.53
732.9 119.0 151.2 10.18

1769.89
1521.17
56

51.33

4.5195
0.8064
39.667
0.8064
71.8067

1645.53
732.9 119.0 151.2 10.18

1769.89
1521.17
56

51.33
4.5195
0.8064
39.667
0.8064
71.8067

1645.53
732.9 119.0 151.2 10.18

1769.89
1521.17
56

51.33

15.9564
2.9167
1.7299
LABOUR LABOUR PER DAY REDUCED LABOUR PER

SKILLED UNSKILLED PAINTER CARPENTER SKILLED UNSKILLED PAINTER CARPENTER SKILLED UNSKILLED

6 103 1 15 1 15
24 411 121 2 34 10 2 34
4 61 18 0 5 2 1 6
29 44 4 6 4 6
10 170 50 1 17 5 1 17
25 38 13 19 0 13 19
7 120 35 1 12 4 1 15
0 5 2 0 3 1 0 3
905 407 453 43 19 22 50 23
0 5 2 0 3 1 0 3
7 15 2 5 0 3 7
33 44 3 4 0 3 4

33 44 3 4
7 1

7 4
80 13

5 92 27 1 9 3 1 12
0 5 2 0 3 1 0 3
91 1539 453 4 73 22 5 85
0 5 2 0 3 1 0 3
111 236 6 13 7 16
222 296 18 25 22 30

222 296 18 25 22 30
247 16
265 22
228 19

5 92 27 1 9 0 3 1 12
0 5 2 0 3 0 1 0 3
91 1539 453 4 73 0 22 5 85
0 5 2 0 3 0 1 0 3
111 236 147 6 13 0 0 7 16
222 296 185 18 25 0 0 22 30
0 0 0 0 0 0
0 0 0 0 0 0
222 296 18 25 0 0 22 30
247 0 0 16 0 0 0
0 0 0 0 0 0

0 0 0 0 0 0

265 0 0 22 0 0 0
228 0 0 19 0 0 0
0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0
0 0 0 0
5 92 27 1 9 0 3 1 12
0 5 2 0 3 0 1 0 3
91 1539 453 4 73 0 22 5 85
0 5 2 0 3 0 1 0 3
111 236 6 13 0 0 7 16
222 296 18 25 0 0 22 30
0 0 0 0 0 0
0 0 0 0 0 0
222 296 18 25 0 0 22 30
247 0 0 16 0 0 0
0 0 0 0 0 0

0 0 0 0 0 0

265 0 0 22 0 0 0
228 0 0 19 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0

0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
5 92 27 1 9 0 3 1 12
0 5 2 0 3 0 1 0 3
91 1539 453 4 73 0 22 5 85
0 5 2 0 3 0 1 0 3
111 236 6 13 0 0 7 16
222 296 18 25 0 0 22 30
0 0 0 0 0 0
0 0 0 0 0 0
222 296 18 25 0 0 22 30
247 0 0 16 0 0 0
0 0 0 0 0 0

0 0 0 0 0 0

265 0 0 22 0 0 0
228 0 0 19 0 0 0
0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
5 92 27 1 9 0 3 1 12
0 5 2 0 3 0 1 0 3
91 1539 453 4 73 0 22 5 85
0 5 2 0 3 0 1 0 3
111 236 6 13 0 0 7 16
222 296 18 25 0 0 22 30
0 0 0 0 0 0
0 0 0 0 0 0
222 296 18 25 0 0 22 30
247 0 0 16 0 0 0
0 0 0 0 0 0

0 0 0 0 0 0

265 0 0 22 0 0 0
228 0 0 19 0 0 0
0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
5 92 27 1 9 0 3 1 12
0 5 2 0 3 0 1 0 3
91 1539 453 4 73 0 22 5 85
0 5 2 0 3 0 1 0 3
111 236 6 13 0 0 7 16
222 296 18 25 0 0 22 30
0 0 0 0 0 0
0 0 0 0 0 0
222 296 18 25 0 0 22 30
247 0 0 16 0 0 0
0 0 0 0 0 0

0 0 0 0 0 0

265 0 0 22 0 0 0
228 0 0 19 0 0 0
0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0
0 0 0 0 0 0

25 52 4 7 4 7
4 10 1 2 1 2
3 6 1 3 1 3
47 63 4 5 4 5
UCED LABOUR PER DAY EQUIPMENT

PAINTER CARPENTER JCB TIPPER RMC

2 1
5
10 20
2 3

5 8

4 6
1 0.252
25 75.41943
1 0.252

4
13

3 4.5195
1 0.252
25 75.41943
1 0.252

16
22
19

0 3 4.5195
0 1 0.252
0 25 75.41943
0 1 0.252
0 0
0 0
0 0
0 0
0 0
16 0
0 0

0 0

22 0
19 0
0 0

0 0

0 0
0 0

0 3 4.5195
0 1 0.252
0 25 75.41943
0 1 0.252
0 0
0 0
0 0
0 0
0 0
16 0
0 0

0 0

22 0
19 0
0 0
0 0

0 0
0 0
0 0
0 0
0 3 4.5195
0 1 0.252
0 25 75.41943
0 1 0.252
0 0
0 0
0 0
0 0
0 0
16 0
0 0

0 0

22 0
19 0
0 0

0 0

0 0
0 0
0 0
0 0
0 3 4.5195
0 1 0.252
0 25 75.41943
0 1 0.252
0 0
0 0
0 0
0 0
0 0
16 0
0 0

0 0

22 0
19 0
0 0

0 0

0 0
0 0
0 0
0 0
0 3 4.5195
0 1 0.252
0 25 75.41943
0 1 0.252
0 0
0 0
0 0
0 0
0 0
16 0
0 0

0 0

22 0
19 0
0 0

0 0

0 0
0 0
c

Activity code:
Activity Preceedin
Quantit
Activity Description: Duration: g Activty
y
(days) (s):

Work Package Site:


A Site Clearance 3 -
B Marking. 2 A
Work Package no.2: Building structure : cellar
A1 Excuvation 5116.64 30 B
B1 PCC 29.14 9 A1
C1 Footings 116.58 20 B1
D1 Columns up to plinth beam 11.57 12 C1
E1 Plinth beam 62.36703 13 D1
F1 columns 28.93 12 E1
G1 Concrete bed 181.90 6 F1
H1 Retaining wall 140.86488 6 G1
I1 Half stair case 1.08 3 H1
J1 Slab & Ramp & Beams 296.95 19 I1
K1 Half stair case 2 1.08 3 J1
L1 Plastering 501.38 7 D1
M1 Flooring 56.4885 L1
Work Package no. 2:Building Structure: stilt
A2 Columns 28.93 13 I1,J1
B2 Half Staircase (1) 1.08 3 A2
C2 Slabs and Beams 226.99 19 B2
D2 Half Staicase (2) 1.08 3 C2
E2 plastering (columns,beams,slab) 1323.61 10 D2
F2 flooring 56.4885 D1
Work Package no. 3:Building structure :First Floor
A3 Columns 22.25 11 C2,D2
B3 Half Staircase (1) 1.08 3 A3
C3 Slabs and Beams 165.90 19 B3
D3 Half Staircase (2) 1.08 3 C3
Brick work with door and windows 20 D3
opening 273.50
E3
F3 Plastering (1st Coat) 3598.52 20 E3
G3 Electric ( Metal Boxes) 10 F3
H3 Plumbing (Pipelines) 10 G3
I3 Plastering (2nd Coat) 3598.52 18 H3
J3 Primer 3598.52 6 I3
K3 Electrical Wiring and Switch boards 4 J3
L3 Painting (internal ) 3598.52 7 K3
M3 Door Frames and Shutters 2 L3
N3 Flooring 20 M3
O3 plumbing fixtures 2 N3
Work Package no. Building structure :second
4: Floor
A4 Columns 22.25 11 D3
B4 Half Staircase (1) 1.08 3 A4
C4 Slabs and Beams 165.90 19 B4
D4 Half Staicase (2) 1.08 3 C4
Brick work with door and windows 20 D4
E4 opening 273.50
F4 Plastering (1st Coat) 3598.52 20 E4
G4 Electric ( Metal Boxes) 10 F4
H4 Plumbing (Pipelines) 10 G4
I4 Plastering (2nd Coat) 3598.52 18 H4
J4 Primer 3598.52 6 I4
K4 Electrical Wiring and Switch boards 4 J4
L4 Painting (internal and External) 3598.52 7 K4
M4 Door Frames and Shutters 2 L4
N4 Flooring 20 M4
O4 plumbing fixtures 2 N4
Work Package no. Building structure :Third
A5 Columns 22.25 11 D4
B5 Half Staircase (1) 1.08 3 A5
C5 Slabs and Beams 165.90 19 B5
D5 Half Staircase (2) 1.08 3 C5
Brick work with door and windows 20 D5
opening 273.50
E5
F5 Plastering (1st Coat) 3598.52 20 E5
G5 Electric ( Metal Boxes) 10 F5
H5 Plumbing (Pipelines) 10 G5
I5 Plastering (2nd Coat) 3598.52 18 H5
J5 Primer 3598.52 6 I5
K5 Electrical Wiring and Switch boards 4 J5
L5 Painting (internal and External) 3598.52 7 K5
M5 Door Frames and Shutters 2 L5
N5 Flooring 20 M5
O5 plumbing fixtures 2 N5
Work Package no. Building structure:Fourth
A6 Columns 22.25 11 D5
B6 Half Staircase (1) 1.08 3 A6
C6 Slabs and Beams 165.90 19 B6
D6 Half Staircase (2) 1.08 3 C6
Brick work with door and windows 20 D6
E6 opening 273.50
F6 Plastering (1st Coat) 3598.52 20 E6
G6 Electric ( Metal Boxes) 10 F6
H6 Plumbing (Pipelines) 10 G6
I6 Plastering (2nd Coat) 3598.52 18 H6
J6 Primer 3598.52 6 I6
K6 Electrical Wiring and Switch boards 4 J6
L6 Painting (internal and External) 3598.52 7 K6
M6 Door Frames and Shutters 2 L6
N6 Flooring 20 M6
O6 plumbing fixtures 2 N6
Work Pakcage no. Building Structure: Fifth
A7 Columns 22.25 11 D6
B7 Half Staircase (1) 1.08 3 A7
C7 Slabs and Beams 165.90 19 B7
D7 Half Staircase (2) 1.08 3 C7
E7 Brick work with door and windows 20 D7
opening 273.50
F7 Plastering (1st Coat) 3598.52 20 E7
G7 Electric ( Metal Boxes) 10 F7
H7 Plumbing (Pipelines) 10 G7
I7 Plastering (2nd Coat) 3598.52 18 H7
J7 Primer 3598.52 6 I7
K7 Electrical Wiring and Switch boards 4 J7
L7 Painting (internal and External) 3598.52 7 K7
M7 Door Frames and Shutters 2 L7
N7 Flooring 20 M7
O7 plumbing fixtures 2 N7
Work package no. 8Services:
A8 Lifts M7
B8 External plastering coat 1 4602.64
C8 External plastering coat 2 4602.64
D8 External primer 4602.64
E8 Elevation (four sides) A8
F8 external painting 4602.64
G8 Landscaping 1320 B8
H8 drive ways C8
I8 compound wall 286.488 D8
J8 transformer E8
H8 septic tank F8
labour January

WED

MON

WED
SUN
THU

THU
TUE

TUE
SAT

SAT
FRI

FRI
Succeedin Wome
Man Mason Equipment
g Activity: n

DAY-10

DAY-12
DAY-11
DAY-1

DAY-2

DAY-3

DAY-4

DAY-5

DAY-6

DAY-7

DAY-8

DAY-9
B
C

B1
C1
D1
E1
F1
G1
H1
A2,I1
J1
K1
L1
M1

B2
C2
D2
E2,A3
F2

B3
C3
D3
E3,A4
F3

G3
H3
I3
J3
K3
L3
M3
N3
O3

B4
C4
D4
E4,A5
F4

G4
H4
I4
J4
K4
L4
M4
N4
O4

B5
C5
D5
E5,A6
F5

G5
H5
I5
J5
K5
L5
M5
N5
O5

B6
C6
D6
E6,A7
F6

G6
H6
I6
J6
K6
L6
M6
N6
O6

B7
C7
D7
E7,A8
F7

G7
H7
I7
J7
K7
L7
M7
N7
O7

B8

C8

D8
E8
F8
G8
DAY-13 SUN
DAY-14 MON
DAY-15 TUE
DAY-16 WED
DAY-17 THU
January ,2019

DAY-18 FRI
DAY-19 SAT
DAY-20 SUN
DAY-21 MON
DAY-22 TUE
DAY-23 WED
DAY-24 THU
DAY-25 FRI
DAY-26 SAT
DAY-27 SUN
DAY-28 MON
DAY-29 TUE
DAY-30 WED
DAY-31 THU
DAY-1 FRI
DAY-2 SAT
DAY-3 SUN
DAY-4 MON
DAY-5 TUE
DAY-6 WED
DAY-7 THU
DAY-8 FRI
DAY-9 SAT
DAY-10 SUN
DAY-11 MON
DAY-12 TUE
DAY-13 WED
DAY-14 THU
DAY-15 FRI
DAY-16
February ,2019

SAT
DAY-17 SUN
DAY-18 MON
DAY-19 TUE
DAY-20 WED
DAY-21 THU
DAY-22 FRI
DAY-23 SAT
DAY-24 SUN
DAY-25 MON
DAY-26 TUE
DAY-27 WED
DAY-28 THU
DAY-1 FRI
DAY-2 SAT
DAY-3 SUN
DAY-4 MON
DAY-5 TUE
DAY-6 WED
DAY-7 THU
DAY-8 FRI
DAY-9 SAT
DAY-10 SUN
DAY-11 MON
DAY-12 TUE
DAY-13 WED
DAY-14 THU
DAY-15 FRI
DAY-16 SAT
DAY-17 SUN
March ,2019

DAY-18 MON
DAY-19 TUE
DAY-20 WED
DAY-21 THU
DAY-22 FRI
DAY-23 SAT
DAY-24 SUN
DAY-25 MON
DAY-26 TUE
DAY-27 WED
DAY-28 THU
DAY-29 FRI
DAY-30 SAT
DAY-31 SUN
DAY-1 MON
DAY-2 TUE
DAY-3 WED
DAY-4 THU
DAY-5 FRI
DAY-6 SAT
DAY-7 SUN
DAY-8 MON
DAY-9 TUE
DAY-10 WED
DAY-11 THU
DAY-12 FRI
DAY-13 SAT
DAY-14 SUN
DAY-15 MON
DAY-16 TUE
April ,2019

DAY-17 WED
DAY-18 THU
DAY-19 FRI
DAY-20 SAT
DAY-21 SUN
DAY-22 MON
DAY-23 TUE
DAY-24 WED
DAY-25 THU
DAY-26 FRI
DAY-27 SAT
DAY-28 SUN
DAY-29 MON
DAY-30 TUE
DAY-1 WED
DAY-2 THU
DAY-3 FRI
DAY-4 SAT
DAY-5 SUN
DAY-6 MON
DAY-7 TUE
DAY-8 WED
DAY-9 THU
DAY-10 FRI
DAY-11 SAT
DAY-12 SUN
DAY-13 MON
DAY-14 TUE
DAY-15 WED
DAY-16 THU
DAY-17
May ,2019

FRI
DAY-18 SAT May ,2019
DAY-19 SUN
DAY-20 MON
DAY-21 TUE
DAY-22 WED
DAY-23 THU
DAY-24 FRI
DAY-25 SAT
DAY-26 SUN
DAY-27 MON
DAY-28 TUE
DAY-29 WED
DAY-30 THU
DAY-31 FRI
DAY-1 SAT
DAY-2 SUN
DAY-3 MON
DAY-4 TUE
DAY-5 WED
DAY-6 THU
DAY-7 FRI
DAY-8 SAT
DAY-9 SUN
DAY-10 MON
DAY-11 TUE
DAY-12 WED
DAY-13 THU
DAY-14 FRI
DAY-15 SAT
DAY-16 SUN
June ,2019

DAY-17 MON
DAY-18 TUE
DAY-19 WED
DAY-20 THU
DAY-21 FRI
DAY-22 SAT
DAY-23 SUN
DAY-24 MON
DAY-25 TUE
DAY-26 WED
DAY-27 THU
DAY-28 FRI
DAY-29 SAT
DAY-30 SUN
DAY-1 MON
DAY-2 TUE
DAY-3 WED
DAY-4 THU
DAY-5 FRI
DAY-6 SAT
DAY-7 SUN
DAY-8 MON
DAY-9 TUE
DAY-10 WED
DAY-11 THU
DAY-12 FRI
DAY-13 SAT
DAY-14 SUN
DAY-15 MON
DAY-16 TUE
DAY-17
July ,2019

WED
DAY-18 THU
DAY-19 FRI
DAY-20 SAT
DAY-21 SUN
DAY-22 MON
DAY-23 TUE
DAY-24 WED
DAY-25 THU
DAY-26 FRI
DAY-27 SAT
DAY-28 SUN
DAY-29 MON
DAY-30 TUE
DAY-31 WED
DAY-1 THU
DAY-2 FRI
DAY-3 SAT
DAY-4 SUN
DAY-5 MON
DAY-6 TUE
DAY-7 WED
DAY-8 THU
DAY-9 FRI
DAY-10 SAT
DAY-11 SUN
DAY-12 MON
DAY-13 TUE
DAY-14 WED
DAY-15 THU
DAY-16 FRI
DAY-17 SAT
August ,2019

DAY-18 SUN
DAY-19 MON
DAY-20 TUE
DAY-21 WED
DAY-22 THU
DAY-23 FRI
DAY-24 SAT
DAY-25 SUN
DAY-26 MON
DAY-27 TUE
DAY-28 WED
DAY-29 THU
DAY-30 FRI
DAY-31 SAT
DAY-1 SUN
DAY-2 MON
DAY-3 TUE
DAY-4 WED
DAY-5 THU
DAY-6 FRI
DAY-7 SAT
DAY-8 SUN
DAY-9 MON
DAY-10 TUE
DAY-11 WED
DAY-12 THU
DAY-13 FRI
DAY-14 SAT
DAY-15 SUN
DAY-16 MON
DAY-17 TUE
September ,2019

DAY-18 WED
DAY-19 THU
DAY-20 FRI 19
DAY-21 SAT
DAY-22 SUN
DAY-23 MON
DAY-24 TUE
DAY-25 WED
DAY-26 THU
DAY-27 FRI
DAY-28 SAT
DAY-29 SUN
DAY-30 MON
DAY-1 TUE
DAY-2 WED
DAY-3 THU
DAY-4 FRI
DAY-5 SAT
DAY-6 SUN
DAY-7 MON
DAY-8 TUE
DAY-9 WED
DAY-10 THU
DAY-11 FRI
DAY-12 SAT
DAY-13 SUN
DAY-14 MON
October ,201
DAY-15 TUE
DAY-16 WED
DAY-17 THU
October ,2019

DAY-18 FRI
DAY-19 SAT
DAY-20 SUN
DAY-21 MON
DAY-22 TUE
DAY-23 WED
DAY-24 THU
DAY-25 FRI
DAY-26 SAT
DAY-27 SUN
DAY-28 MON
DAY-29 TUE
DAY-30 WED
DAY-31 THU
DAY-1 FRI
DAY-2 SAT
DAY-3 SUN
DAY-4 MON
DAY-5 TUE
DAY-6 WED
DAY-7 THU
DAY-8 FRI
DAY-9 SAT
DAY-10 SUN
DAY-11 MON
DAY-12 TUE
DAY-13 WED
DAY-14 THU
DAY-15 FRI
DAY-16 SAT
DAY-17
November ,2019

SUN
DAY-18 MON
DAY-19 TUE
DAY-20 WED
DAY-21 THU
DAY-22 FRI
DAY-23 SAT
DAY-24 SUN
DAY-25 MON
DAY-26 TUE
DAY-27 WED
DAY-28 THU
DAY-29 FRI
DAY-30 SAT
DAY-1 SUN
DAY-2 MON
DAY-3 TUE
DAY-4 WED
DAY-5 THU
DAY-6 FRI
DAY-7 SAT
DAY-8 SUN
DAY-9 MON
DAY-10 TUE
DAY-11 WED
DAY-12 THU
DAY-13 FRI
DAY-14 SAT
DAY-15 SUN
DAY-16 MON
DAY-17 TUE
December ,2019

DAY-18 WED
DAY-19 THU
DAY-20 FRI
DAY-21 SAT
DAY-22 SUN
DAY-23 MON
DAY-24 TUE
DAY-25 WED
DAY-26 THU
DAY-27 FRI
DAY-28 SAT
DAY-29 SUN
DAY-30 MON
DAY-31 TUE
DAY-1 WED
DAY-2 THU
DAY-3 FRI
DAY-4 SAT
DAY-5 SUN
DAY-6 MON
DAY-7 TUE
DAY-8 WED
DAY-9 THU
DAY-10 FRI
DAY-11 SAT
DAY-12 SUN
DAY-13 MON
DAY-14 TUE
DAY-15 WED
DAY-16 THU
DAY-17 FRI
January ,2020

DAY-18 SAT
DAY-19 SUN
DAY-20 MON
DAY-21 TUE
DAY-22 WED
DAY-23 THU
DAY-24 FRI
DAY-25 SAT
DAY-26 SUN
DAY-27 MON
DAY-28 TUE
DAY-29 WED
DAY-30 THU
DAY-31 FRI
DAY-1 SAT
DAY-2 SUN
DAY-3 MON
DAY-4 TUE
DAY-5 WED
DAY-6 THU
DAY-7 FRI
DAY-8 SAT
DAY-9 SUN
DAY-10 MON
DAY-11 TUE
DAY-12 WED
DAY-13 THU
DAY-14 FRI
DAY-15 SAT
DAY-16 SUN
February ,2020
DAY-17 MON bruary ,2020
DAY-18 TUE
DAY-19 WED
DAY-20 THU
DAY-21 FRI
DAY-22 SAT
DAY-23 SUN
DAY-24 MON
DAY-25 TUE
DAY-26 WED
DAY-27 THU
DAY-28 FRI
DAY-29 SAT
DAY-1 SUN
DAY-2 MON
DAY-3 TUE
DAY-4 WED
DAY-5 THU
DAY-6 FRI
DAY-7 SAT
DAY-8 SUN
DAY-9 MON
DAY-10 TUE
DAY-11 WED
DAY-12 THU
Ma
DAY-13 FRI
DAY-14 SAT
DAY-15 SUN
DAY-16 MON
DAY-17 TUE
March ,2020

DAY-18 WED
DAY-19 THU
DAY-20 FRI
DAY-21 SAT
DAY-22 SUN
DAY-23 MON
DAY-24 TUE
DAY-25 WED
DAY-26 THU
DAY-27 FRI
DAY-28 SAT
DAY-29 SUN
DAY-30 MON
DAY-31 TUE
DAY-1 WED
DAY-2 THU
DAY-3 FRI
DAY-4 SAT
DAY-5 SUN
DAY-6 MON
DAY-7 TUE
DAY-8 WED
DAY-9 THU
DAY-10 FRI
DAY-11 SAT
DAY-12 SUN
DAY-13 MON
DAY-14 TUE
DAY-15 WED
DAY-16 THU
April ,2020

DAY-17 FRI
DAY-18 SAT
DAY-19 SUN
DAY-20 MON
DAY-21 TUE
DAY-22 WED
DAY-23 THU
DAY-24 FRI
DAY-25 SAT
DAY-26 SUN
DAY-27 MON
DAY-28 TUE
DAY-29 WED
DAY-30 THU
DAY-1 FRI
DAY-2 SAT
DAY-3 SUN
DAY-4 MON
DAY-5 TUE
DAY-6 WED
DAY-7 THU
DAY-8 FRI
DAY-9 SAT
DAY-10 SUN
DAY-11 MON
DAY-12 TUE
DAY-13 WED
DAY-14 THU
DAY-15 FRI
DAY-16 SAT
DAY-17
May ,2020

SUN
DAY-18 MON
DAY-19 TUE
DAY-20 WED
DAY-21 THU
DAY-22 FRI
DAY-23 SAT
DAY-24 SUN
DAY-25 MON
DAY-26 TUE
DAY-27 WED
DAY-28 THU
DAY-29 FRI
DAY-30 SAT
DAY-31 SUN
DAY-1 MON
DAY-2 TUE
DAY-3 WED
DAY-4 THU
DAY-5 FRI
DAY-6 SAT
DAY-7 SUN
DAY-8 MON
DAY-9 TUE
DAY-10 WED
DAY-11 THU
DAY-12 FRI
DAY-13 SAT
DAY-14 SUN
DAY-15 MON
DAY-16 TUE
DAY-17 WED
DAY-18 THU
DAY-19 FRI
DAY-20 SAT
DAY-21 SUN
DAY-22 MON
DAY-23 TUE
DAY-24 WED
DAY-25 THU
DAY-26 FRI
DAY-27 SAT
DAY-28 SUN
DAY-29 MON

S-ar putea să vă placă și