218338-Q-PA-020
DOC TITLE : Rev. A
INSPECTION AND TEST PLAN MATRIX Page 7 of
SECTION
20
Action Points
SUB-
S. Rev
CON
JOB
Process Description Procedure QUALITY
Acceptance Criteria Verifying Document
No. .
PLAN NO JSPL KBR ABS
1 CORPORATE PROCEDURES
1.9 Control of Inspection and Test Equi QMP-11-01-P01 1 NA NA JSPL Records as Required. M M M
SUB-
S. Rev
CON
JOB
Process Description Procedure QUALITY
Acceptance Criteria Verifying Document
No. .
PLAN NO JSPL KBR ABS
5.2 Material Verification - - APP. JSPL ABS Mill Certificate H M M
SUB-
S. Rev
CON
JOB
Process Description Procedure QUALITY
Acceptance Criteria Verifying Document
No. .
PLAN NO JSPL KBR ABS
Mateval Procedure for Radiogrphy
6.1.1l 218338-Q-PA-012 A NA YES AWS D1.1 /ASME VIII /ABS I-PR-FGG-GENL-QM-BRY- R R/A R/A
Testing
Mateval Procedure for Ultrasonic 002
6.1.1
Testing 218338-Q-PA-013 A NA YES AWS D1.1 I-PR-FGG-GENL-QM-BRY- R R/A R/A
m
( AWS
Mateval )
Procedure for Ultrasonic 002
6.1.1n Testing ( 218338-Q-PA-014 A NA YES ASME SEC VIII I-PR-FGG-GENL-QM-BRY- R R/A R/A
ASME ) Procedure
Mateval for Ultrasonic 002
6.1.1o Testing 218338-Q-PA-015 A NA YES ABS I-PR-FGG-GENL-QM-BRY- R R/A R/A
( ABS ) 002
Mateval Procedure for Magnetic
6.1.1p 218338-Q-PA-016 A NA YES AWS D1.1 / ASME VIII I-PR-FGG-GENL-QM-BRY- R R/A R/A
Particle Testing
002
Mateval Procedure for Liquid
6.1.1q 218338-Q-PA-017 A NA YES AWS D1.1 / ASME VIII I-PR-FGG-GENL-QM-BRY- R R/A R/A
Penetrant Testing
002
ASME SEC V, AWS D1.1 /
6.1.1r Procedure for Thichkness Gauging 218338-Q-PA-018 A NA YES I-PR-FGG-GENL-QM-BRY- R R/A R/A
ANSI B31.3
002
Personnel Qualification
6.1.2 Personnel Qualification I-PR-FGG-GENL-QM-BRY-002
Certifiacates
6.2 WELDING
SUB-
S. Rev
CON
JOB
Process Description Procedure QUALITY
Acceptance Criteria Verifying Document
No. .
PLAN NO JSPL KBR ABS
ABS Rule , AWS D1.1, ASME
6.2.1 Welding Procedures / Qualificaiton Records NA JSPL WPS / PQS R R R/A
B31.3
Welder and Welding Operator ABS Rules, AWS D1.1, ASME
6.2.2 NA JSPL Certificates R R R/A
Qualification Test Procedure V & VIII, ASME B 31.3
6.3 QUALITY ASSURANCE / CONTROL PROCEDURE
6.3.1 Dimensional Control Procedure 218338 - Q - PA - 019 A APP JSPL JSPL/KBR QAD - 10 - 02 - P 02 H M M
6.3.2 Inspection and Test Plan 218338 - Q - PA - 020 A NA JSPL JSPL / KBR/ABS I-PR-FGG-GENL-QM-BRY-002 H H H
6.3.3 NDT Plan for Process Piping 218338 - Q - PA - 021 A NA JSPL JSPL / KBR/ABS ET-3010.00-1200-200-PSE-001 H W W
7.1 PROJECT
7.1.6 Product Identification and Traceabil218338 - Z - PA - 006 A APP JSPL JSPL Records as Required. M M M
SUB-
S. Rev
CON
JOB
Process Description Procedure QUALITY
Acceptance Criteria Verifying Document
No. .
PLAN NO JSPL KBR ABS
7.1.8 Weight Control Procedure 218338 - Z - PA - 002 A APP JSPL JSPL ET-3010.00-1200-941-PPC-002 M W -
7.2 SAFETY
HEALTH,SAFETY AND GENERAL
7.2.1 Arrangement of safety & Utility 218838 - S - PA -001 A NA JSPL JSPL ENVIRONMENTAL M M M
REQUIREMENTS (ANNEX J)
HEALTH,SAFETY AND GENERAL
7.2.2 JSPL Project Safety Plan 218838 - S - PA -002 A NA JSPL JSPL ENVIRONMENTAL M M M
REQUIREMENTS (ANNEX J)
7.3 STRUCTURE
7.3.4 Flare Boom Assembly Procedure 218338 - N - PA - 004 A APP YES - ET-3010.49-3050-105-PPC-002 H M M
ET-3010.44-3050-104-PPC-002 ,
NDT & Stress Relieving Plan for
7.3.5 218338 - N - PA - 005 A APP YES JSPL / KBR/ABS ANSI H W W
Flare Boom B31.3 , AWS D1.1
SUB-
S. Rev
CON
JOB
Process Description Procedure QUALITY
Acceptance Criteria Verifying Document
No. .
PLAN NO JSPL KBR ABS
7.3.10 Steel Work Inspection Procedure 218338 - N - PA - 010 A APP JSPL KBR / ABS Records as Required. H W H
7.3.11 Thermal Fairing Procedure 218338 - N - PA - 011 A APP YES JSPL ET-3010.44-3050-104-PPC-002, M M M
7.3.12 Tightness Test Procedure 218338 - N - PA - 012 A APP JSPL KBR / ABS ABS RULES H W W
7.3.13 Weld Repair in Steel Structure 218338 - N - PA - 013 A APP YES KBR / ABS Records as Required. H W H
Stress Relief and Hardness Test INDUSTRIAL HEATING TECH.
7.3.14 218338 - N - PA - 014 A APP YES JSPL/KBR SPEC.
M M M
Procedure ( Structure )
7.4 PIPING
7.4.2 Fibre Glass Pipe Assembly Procedur 218338- P - PA - 002 A APP YES JSPL/KBR - H W W
7.4.3 Fibre Glass Pipe Repair Procedure 218338- P - PA - 003 A APP YES JSPL/KBR - H W W
7.4.4 Hot Dip Galvanizing Procedure 218338- P - PA - 004 A APP YES JSPL/KBR ET-3010.49-1350-140-PPC-001 M M M
Piping Fabrication and Installation
7.4.5 218338- P - PA - 005 A APP YES JSPL/KBR ET-3010.49-1200-200-PSE-001 H W W
Procedure ( New Pipe )
7.4.6 Piping Weld Repair Procedure 218338- P - PA - 006 A APP YES JSPL / KBR/ABS Records as Required. H W W
Rubber lining Application & MANUFACTURER TECH.
7.4.7 218338- P - PA - 007 A APP YES JSPL/KBR
Inspection Procedure SPECH.
Procedure for Welders
7.4.8 Performance Records for Process 218338- P - PA - 008 A NA JSPL JSPL/KBR I-PR-FGG-GENL-QM-BRY-002 M M M
Piping
Stress Relief and Hardness Test
INDUSTRIAL HEATING TECH.
7.4.9 Procedure ( Process 218338- P - PA - 009 A APP YES JSPL/KBR SPEC. M M M
Pipe )
P - 43 F.P.S.O CONVERSION Doc. No. 218338-Q-PA-020
Doc . Title : Rev. A
INSPECTION AND TEST PLAN MATRIX Page 13 of
SECTION
20
Action Points
SUB-
S. Rev
CON
JOB
Process Description Procedure QUALITY
Acceptance Criteria Verifying Document
No. .
PLAN NO JSPL KBR ABS
Procedure for Testing of Process CALIBRATION REPORT, TEST
7.4.10 218338 - P - PA - 010 A APP YES ANSI B31.3 PACKAGE , ASMEB31.1 H W W
and Marine Piping
7.5 ELECTRICAL
IEC - 92 ,
7.5.1 Battery Bank Conection & Test Proc218338 - E - PA - 001 A APP YES JSPL/KBR ET- H W M
3010.49-5140-700-PPC-001
IEC - 92 ,
7.5.2 Cable Stripping Procedure 218338 - E - PA - 002 A APP YES JSPL/KBR ET- H M M
3010.49-5140-700-PPC-001
7.5.3 Cable Termination Procedure 218338 - E - PA - 003 A APP YES JSPL/KBR IEC - 79 - 0, 79 - 10 H M M
7.5.4 Cable Tagging Procedure 218338 - E - PA - 004 A APP YES JSPL/KBR IEC - 92 H M M
Cathodic Protection Connection &
7.5.5 218338 - E - PA - 005 A APP YES JSPL/KBR IEC - 92 H W M
Test Procedre
Electrical Cable Installation
7.5.6 218338 - E - PA - 006 A APP YES JSPL/KBR IEC - 92, IEEE - 141 H M M
Procedure
7.5.7 Electrical Installation Procedure 218338 - E - PA - 007 A APP YES JSPL/KBR IEC 93 - IEEE - 141 H W M
7.5.12 Procedure for conductivity test of F 218338 - E - PA - 012 A APP YES JSPL/KBR - H W M
7.5.13 Procedure for Receiving, Storage & 218338 - E - PA - 013 A APP YES JSPL/KBR VENDOR DOCUMENTS H M M
Rectifier, Battery Charges., UPS
7.5.14 218338 - E - PA - 014 A APP YES JSPL/KBR IEC - 92, IEC - 79-0 H W M
Connection & Test Procedures
SUB-
S. Rev
CON
JOB
Process Description Procedure QUALITY
Acceptance Criteria Verifying Document
No. .
PLAN NO JSPL KBR ABS
7.6 MECHANICAL
7.7.1 Instrumentation Calibration Record 218338 - I - PA - 001 A NA NA VENDOR DATA CHECK LIST H W W
SUB-
S. Rev
CON
JOB
Process Description Procedure QUALITY
Acceptance Criteria Verifying Document
No. .
PLAN NO JSPL KBR ABS
7.8.3 Hull Grit blasting and Painting 218338 - C - PA - 003 A APP YES JSPL/KBR ET-3010.49-1350-140-PPC-001 W W -
7.8.9 Thermal Spraying Procedure 218338 - C - PA - 009 A APP YES JSPL/KBR ET-3010.00-1200-940-PPC-001 W W -
7.9 HVAC
SUB-
S. Rev
CON
JOB
Process Description Procedure QUALITY
Acceptance Criteria Verifying Document
No. .
PLAN NO JSPL KBR ABS
e ) Tightness Test - APP JSPL ABS Rule Tightness Test Reports H W H
a ) Fit up - APP YES WPS / IACS/ Client Tech. Spec Inspection Reports H M M
d ) NDT - APP YES AWS D1.1 / ABS Rule NDT Reports R R/A R/A
SUB-
S. Rev
CON
JOB
Process Description Procedure QUALITY
Acceptance Criteria Verifying Document
No. .
PLAN NO JSPL KBR ABS
d ) Dimensional Control - APP JSPL Client Tech Spec. Dimensional Control Report H R R
e ) NDT - APP YES AWS D1.1 / ABS Rule NDT Report H R/A R/A
SUB-
S. Rev
CON
JOB
Process Description Procedure QUALITY
Acceptance Criteria Verifying Document
No. .
PLAN NO JSPL KBR ABS
d ) Dimensional Control - APP JSPL Client Spec. Dimensional Control Report H R R
e ) NDT - APP YES AWS D1.1 / ABS Rule NDT Reports R R/A R/A
e ) NDT - APP YES AWS D1.1 / ABS Rule NDT Report R R/A R/A
f ) PWHT - APP YES ASME B 31. 3 / AWS D1.1 PHWT & Hardness Report R R/A R/A
SUB-
S. Rev
CON
JOB
Process Description Procedure QUALITY
Acceptance Criteria Verifying Document
No. .
PLAN NO JSPL KBR ABS
AWS D1.1,ABS Rule and
c ) Visual - APP JSPL Inspection Reports H W H
Client Tech. Spec.
d ) NDT - APP YES AWS D1.1 / ABS Rule NDT Reports R R/A R/A
a ) Thickness Gauging - NA YES ABS Rule & Client Spec., Thickness Gauging Reports R R R
b ) Close Up Survey - NA YES ABS Rule & Client Spec., Close up Survey Reports R R R
c ) Renewal Plan - APP NA ABS Rule & Client Spec., Renewal Plan H A A
d ) Fit up - APP YES ABS Rule & Tech. Spec., Weld map, Inspection Reports H M M
f ) Visual - APP JSPL ABS Rule & Tech. Spec., Inspection Reports H M H
SUB-
S. Rev
CON
JOB
Process Description Procedure QUALITY
Acceptance Criteria Verifying Document
No. .
PLAN NO JSPL KBR ABS
g ) NDT - APP YES AWS D1.1 / ABS Rule NDT Reports R R/A R/A
h ) Tightness Test ( As Applicable ) - APP JSPL ABS Rule Tightness Test Reports H W H
9.1 Surface Preparation AFC Procedure APP YES ET-3010.49-1350-140-PPC-003 Blasting Report H W M
9.2 Paint Appllication AFC Procedure APP YES ET-3010.49-1350-140-PPC-003 Painting Scheme H W M
9.3 Dry Film Tickness Check AFC Procedure APP YES ET-3010.49-1350-140-PPC-003 Painting Report H W M
SUB-
S.
CON
Process Description Procedure Quality Acceptance Criteria Verifying Document
No. Plan No:
JSPL KBR ABS
1 CORPORATE PROCEDURES
1.9 Control of Inspection and Test Equipme QMP-11-01-P01 NA NA JSPL Records as Required. M M M
Personnel Qualification
6.1.2 Personnel Qualification I-PR-FGG-GENL-QM-BRY-002
Certificates
6.1.2a Welding Inspector NA JSPL CSWIP-W1-6-92 Certificates R R R
6.2 WELDING
ABS Rule , AWS D1.1, ASME
6.2.1 Welding Procedures / Qualification Records NA JSPL WPS / PQS R R R/A
B31.3
Welder and Welding Operator ABS Rules, AWS D1.1, ASME
6.2.2 NA JSPL Certificates R R R/A
Qualification Test Procedure V & VIII, ASME B 31.3
6.3 QUALITY ASSURANCE / CONTROL PROCEDURE
6.3.1 Dimensional Control Procedure 218338 - Q - PA - 019 APP JSPL JSPL/KBR QAD - 10 - 02 - P 02 H M M
6.3.2 Inspection and Test Plan 218338 - Q - PA - 020 NA JSPL JSPL / KBR/ABS I-PR-FGG-GENL-QM-BRY-002 H H H
6.3.3 NDT Plan for Process Piping 218338 - Q - PA - 021 NA JSPL JSPL / KBR/ABS ET-3010.00-1200-200-PSE-001 H W W
7.2 SAFETY
Health, Safety and General
7.2.1 JSPL Project HSE Management Plan 218838 - S - PA -001 NA JSPL JSPL Environmental Requirements M M M
(ANNEX J)
P 43 HSE Plan for all Subcontractor Health, Safety and General
7.2.2 218838 - S - PA -002 NA JSPL JSPL Environmental Requirements M M M
Personnel
P 43 Subcontractor Hazard (ANNEX J)
Health, Safety and General
7.2.3 Assessment and STOP/HOC Unsafe 218838 - S - PA -003 NA JSPL JSPL Environmental Requirements M M M
Act (ANNEX J)
P 43 Subcontractor Accident / Incident Health, Safety and General
7.2.4 218838 - S - PA -004 NA JSPL JSPL Environmental Requirements M M M
Reporting System Performance the
P 43 Subcontractor (ANNEX J)
progress on HSE Training of Health, Safety and General
7.2.5 Management / Supervision / Work 218838 - S - PA -005 NA JSPL JSPL Environmental Requirements M M M
force ( Two Weeks Before Start of (ANNEX J)
P 43 Subcontractor
Work ) Project Health
Health, Safety and General
7.2.6 Assessment Report. ( Thirty Days After 218838 - S - PA -006 NA JSPL JSPL Environmental Requirements M M M
Contract Award ) Project Safety
P 43 Subcontractor (ANNEX J)
Health, Safety and General
7.2.7 Assessment Report. ( Thirty Days After 218838 - S - PA -007 NA JSPL JSPL Environmental Requirements M M M
Contract Award ) (ANNEX J)
7.3 STRUCTURE
ET-3010.49-1350-140-PPC-
7.3.1 Steel Fabrication 218338 - N - PA - 001 APP YES JSPL H M M
002,
ET-3010.49-1350-140-PPC-
7.3.2 Block Erection 218338 - N - PA - 002 APP YES JSPL H M M
002
7.3.3 Control and Use of Welding Consumable218338 - N - PA - 003 NA JSPL Manufacture Recommendation Records as Required. M M M
ET-3010.49-3050-105-PPC-
7.3.4 Flare Boom Assembly Procedure 218338 - N - PA - 004 APP YES - H M M
002
ET-3010.44-3050-104-PPC-
NDT & Stress Relieving Plan for Flare 002 ,
7.3.5 218338 - N - PA - 005 APP YES JSPL / KBR/ABS H W W
Boom ANSI B31.3 , AWS
Procedure for Weld Build-up for D1.1
ET-3010.44-3050-104-PPC-
7.3.6 218338 - N - PA - 006 APP YES KBR / ABS H W W
Pitting, Scar and Root Gap 002 , WPS
Procedure for Welders Performance
7.3.7 218338 - N - PA - 007 NA JSPL JSPL/KBR I-PR-FGG-GENL-QM-BRY-002 M M M
Records for Structure
Procedure for Carbon ARC - Air ET-3010.44-3050-104-PPC-
7.3.8 218338 - N - PA - 008 APP YES JSPL/KBR H M M
Cutting / Gouging in Steel Structure 002
7.3.9 Steel Plate Traceability 218338 - N - PA - 009 APP JSPL JSPL Records as Required. M M M
7.3.10 Steel Work Inspection Procedure 218338 - N - PA - 010 APP JSPL KBR / ABS Records as Required. H W H
ET-3010.44-3050-104-PPC-
7.3.11 Thermal Fairing Procedure 218338 - N - PA - 011 APP YES JSPL M M M
002,
7.3.12 Tightness Test Procedure 218338 - N - PA - 012 APP JSPL KBR / ABS ABS RULES H W W
7.3.13 Weld Repair in Steel Structure 218338 - N - PA - 013 APP YES KBR / ABS Records as Required. H W H
Stress Relief and Hardness Test Industrial Heating Tech.
7.3.14 218338 - N - PA - 014 APP YES JSPL/KBR M M M
Procedure ( Structure ) Spec.,
7.4 PIPING
7.4.2 Fibre Glass Pipe Assembly Procedure 218338- P - PA - 002 APP YES JSPL/KBR - H W W
7.4.3 Fibre Glass Pipe Repair Procedure 218338- P - PA - 003 APP YES JSPL/KBR - H W W
ET-3010.49-1350-140-PPC-
7.4.4 Hot Dip Galvanizing Procedure 218338- P - PA - 004 APP YES JSPL/KBR M M M
001
Piping Fabrication and Installation ET-3010.49-1200-200-PSE-
7.4.5 218338- P - PA - 005 APP YES JSPL/KBR H W W
Procedure ( New Pipe ) 001
7.4.6 Piping Weld Repair Procedure 218338- P - PA - 006 APP YES JSPL / KBR/ABS Records as Required. H W W
7.5.4 Cable Tagging Procedure 218338 - E - PA - 004 APP YES JSPL/KBR IEC - 92 H M M
Cathodic Protection Connection & Test
7.5.5 218338 - E - PA - 005 APP YES JSPL/KBR IEC - 92 H W M
Procedure
7.5.6 Electrical Cable Installation Procedure 218338 - E - PA - 006 APP YES JSPL/KBR IEC - 92, IEEE - 141 H M M
7.5.7 Electrical Installation Procedure 218338 - E - PA - 007 APP YES JSPL/KBR IEC 93 - IEEE - 141 H W M
7.5.13 Procedure for Receiving, Storage & Del 218338 - E - PA - 013 APP YES JSPL/KBR Vendor Documents H M M
Rectifier, Battery Charges., UPS
7.5.14 218338 - E - PA - 014 APP YES JSPL/KBR IEC - 92, IEC - 79-0 H W M
Connection & Test Procedures
7.6 MECHANICAL
7.7.1 Instrumentation Calibration Records 218338 - I - PA - 001 NA NA Vendor Data Check List H W W
d ) NDT - APP YES AWS D1.1 / ABS Rule NDT Reports R R/A R/A
d ) Dimensional Control - APP JSPL Client Tech. Spec. Dimensional Control Report H R R
e ) NDT - APP YES AWS D1.1 / ABS Rule NDT Report H R/A R/A
f ) NDT - APP YES AWS D1.1 / ABS Rule NDT Reports R R/A R/A
e ) NDT - APP YES AWS D1.1 / ABS Rule NDT Reports R R/A R/A
e ) NDT - APP YES AWS D1.1 / ABS Rule NDT Report R R/A R/A
f ) PWHT - APP YES ASME B 31. 3 / AWS D1.1 PHWT & Hardness Report R R/A R/A
a ) Thickness Gauging - NA YES ABS Rule & Client Spec., Thickness Gauging Reports R R R
b ) Close Up Survey - NA YES ABS Rule & Client Spec., Close up Survey Reports R R R
c ) Renewal Plan - APP NA ABS Rule & Client Spec., AFC Renewal Plan H A A
d ) Fit up - APP YES ABS Rule & Client Spec., Weld map, Inspection Reports H M M
f ) Visual - APP JSPL ABS Rule & Client Spec., Inspection Reports H M H
g ) NDT - APP YES AWS D1.1 / ABS Rule NDT Reports R R/A R/A
h ) Tightness Test ( As Applicable ) - APP JSPL ABS Rule Tightness Test Reports H W H
Rev. A
Action Point
S/ Verifying
Process Description Quality Control Activity Reference Document Acceptance Criteria
N Document
JSPL SD ABS
1.0 PROJECT DOCUMENT
1.2 ABS MODU rules ( 2001 ) Review ABS requirements. ABS MODU rules ( 2001 ) - - R R R
1.4 Project Quality Plan Review Quality Plan. 111085-Q001 - As Approved R R+A R
1.5 Inspection & Test Plan Review Inspection & Test Plan 111085-Q002B - As Approved R R+A R
1.6 Project specific procedures Review project specific procedures Project specific procedures - As Approved R R+A R
1.7 Construction Drawings Check latest revision of AFC drawings Drawing Register - As Approved R R R
1.8 Project WPS/PQR Review project specific WPS/PQR Project WPS/PQR - As Approved R R+A R
2.0 MATERIAL
Receiving check
2.1 Receiving Inspection - to quantify & identify & documentati FAD-74-03-PA-P02 Contract Specification M W M
sheet
- to quantify & identify & perform
2.2 Material Verification (PIPING) - Mill Certificate Mill Certificate H W W
visual inspection ( ABS class I pipe )
- to quantify & identify & perform
visual inspection ( ABS class II, III Mill Certificate Mill Certificate W M M
pipe )
- to review Mill Certificates &
- Contract Specification Mill Certificate H R/A R
documentation
Page 27 of 44
SEADRILL 8 SEMI-SUBMERSIBLE (11-1085) Doc. No. 111085-Q002
Rev. A
Action Point
S/ Verifying
Process Description Quality Control Activity Reference Document Acceptance Criteria
N Document
JSPL SD ABS
3.1 FIT UP INSPECTION ( Class I pipe )
- to check joint preparation,
a ) Edge preparation WPS WPS Fit-up Report H W W
alignment etc
b) Spool number verification - to check spool number AFC ISO DRW AFC ISO DRW Fit-up Report H W W
c) Joint number verfication - to check joint number AFC ISO DRW AFC ISO DRW Fit-up Report H W W
d) Heat number verfication - to verify material using against ISO Mill Cert MILL CERT Fit-up Report H W W
- to check pipe spool dimension
e) Pre-dimensional check AFC ISO DRW AFC ISO DRW - M M M
against ISO drawing
3.2 FIT UP INSPECTION ( Class II, III pipe )
- to check joint preparation,
a ) Edge preparation WPS WPS Fit-up Report W M M
-alignment etc preparation,
to check joint
b) Spool number verification AFC ISO DRW AFC ISO DRW Fit-up Report M M M
alignment etc preparation,
- to check joint
c) Joint number verfication AFC ISO DRW AFC ISO DRW Fit-up Report M M M
alignment etc
d) Heat number verfication - to verify material using against ISO Mill Cert MILL CERT - M M M
- to check pipe spool dimension
e) Pre-dimensional check AFC ISO DRW AFC ISO DRW - M M M
against ISO drawing
3.3 Visual INSPECTION
- to check weld profile / surface Visual Inspection
a ) Weld Inspection - Contract Specification H W W
appearance Report.
ABS, ASME B31.3,ASME SEC
3.3 NDT - to check quality of the weld PIPING NDT PLAN NDT Report M M/R+A R
V& VIII
ASME B31.3,ABS Rules for Visual
3.4 Pipe spool repair (if required) - to check weld profile - material and welding part 2 Inpection/NDT H W W
(2005) Report
Hydrotest &
4.4 hyrotest and flushing - Cleaning pipe & test piping integrity H W W
Flushing report
Chemical Cleaning
4.5 Chemical Cleaning (if required) - Cleaning pipe or tubing H W M
report
- to ensure all equipment is install Reinstatemenrt
4.6 Reinstatement H W M
back after testing report
Page 28 of 44
SEADRILL 8 SEMI-SUBMERSIBLE (11-1085) Doc. No. 111085-Q002
Rev. A
Action Point
S/ Verifying
Process Description Quality Control Activity Reference Document Acceptance Criteria
N Document
JSPL SD ABS
Mechanical
4.7 Mechanical completion check & Final Mechanical Completion list & Completion check
H R+A R+A
documentation final Data Book Index list & final
documentation
Legend:
A step of activity where one may proceed with the work, if the organization’s representative is not available at the appointed time.
H: Hold Point (Formal written notification one day ahead from JSPL is required)
A hold on activity so that it does not progress to the next activity until formal verification has been completed or documented consent has been given by indicated authority.
R: Review
Review of certificates, records and documentation
M: Monitoring
Random / spot checks of the activities, i.e. in-process inspection. No formal notification required.
A : Approve
A document or an activity for which a document will be produced. The document will be reviewed by the indicated authority and their approval shall be obtained.
Page 29 of 44
P - 43 F.P.S.O CONVERSION Doc. No 218338 - Q - PA - 008
Doc . Title : Rev . A
INSPECTION AND TEST PLAN Page 7 of 20
APPENDIX - I
Design Action Points
S. No. Process Description Procedure Rev. Acceptance Criteria Verifying Document
Criteria
JSL CLIENT ABS
1 QUALITY OBJECTIVE - - - - Project Quality Plan
Acknowledgement of contrace / Quotation / Tender Relevant
2 CONTRACT REVIEW - - -
PO documents. R R
4 MATERIAL
Material / Equipment in coming
4.1 Receiving Inspection PAD-10-01-P02 - - - H M M
Check List for Pad-10-01-P01-01
4.2 Material Indetification and Traceability Check QAD-08-01P01 - - - - H M M
5 PERSONNEL QUALIFICATION
6.1.1 Customer Supplied Product Control 218338 - Z - PA - 001 A - - PAD - 07 -01 - P02 M M M
6.3 STRUCTURE
ET - 3010.49 - 1350 - 104 - PPC-
6.3.1 Steel Fabrication 218338 - N - PA - 001 A - JSL H M M
002, IHI . SPAIS STANDARD
ET - 3010.49 - 1350 - 140 - PPC
6.3.2 Block Erection 218338 - N - PA - 002 A - JSL H M M
- 002, IHI SPAIIS
6.3.3 Control and Use of Welding Consumables. 218338 - N - PA - 003 A - Manufacture Recommendation QAD - 15 - 02 - P 01 M M M
ET - 3010.49 - 3050 - 105 - PPC
6.3.4 Flare Boom Assembly Procedure 218338 - N - PA - 004 A - - H M M
- 002, IHI SPAIS
ET - 3010.44 - 3050 - 104 - PPC
6.3.5 NDT & Stress Relieving Plan for Flare Boom 218338 - N - PA - 005 A - JSL / CLIENT/ABS H W W
- 002, ANSI B31.3 , AWS D1.1
ET - 3010.44 - 3050 - 104 - PPC
6.3.6 Procedure for Weld Build-up for Pitting, Scar 218338 - N - PA - 006 A - CLIENT / ABS H W W
and Root Gap - 002, IHI SPAIS, WPS
Procedure for Welders Performance Records
6.3.7 218338 - N - PA - 007 A - JSL / CLIENT - M M M
for Structure
Procedure for Carbon ARC - Air Cutting / ET - 3010.44 - 3050 - 104 - PPC
6.3.8 218338 - N - PA - 008 A - JSL / CLIENT H M M
Gouging in Steel Structure - 002, IHI SPAIS
6.3.9 Steel Plate Traceabilty 218338 - N - PA - 009 A - JSL HCD - 08 - 01 - P 01 M M M
6.3.10 Steel Work Inspection Procedure 218338 - N - PA - 010 A - CLIENT / CLASS QAD - 10 - 03 - P01 H W H
ET - 3010.44 - 3050 - 104 - PPC
6.3.11 Thermal Fairing Procedure 218338 - N - PA - 011 A - JSL M M M
- 002, IHI SPAIS
6.3.12 Tightness Test Procedure 218338 - N - PA - 012 A - CLIENT / CLASS ABS RULES H W W
6.4 PIPING
6.4.2 Fibber Glass Pipe Assembly Procedure 218338- P - PA - 002 A - JSL / CLIENT AMERON TECH. SPECH. H W W
6.4.3 Fibber Glass Pipe Repair Procedure 218338- P - PA - 003 A - JSL / CLIENT AMERON TECH. SPECH. H W W
ET - 3010.49 - 1350 - 140 - PPC
6.4.4 Hot Dip Galvanizing Procedure 218338- P - PA - 004 A - JSL / CLIENT M M M
- 001
Piping Fabrication and Installation Procedure ET - 3010.49 - 1200 - 200 - PSE
6.4.5 218338- P - PA - 005 A - JSL / CLIENT H W W
( New Pipe ) - 001
6.4.6 Piping Weld Repair Procedure 218338- P - PA - 006 A - JSL / CLIENT/ABS QAD - 13 - 01 - P 01 H W W
Rubber lining Application & Inspection MANUFACTURER TECH.
6.4.7 218338- P - PA - 007 A - JSL / CLIENT
Procedure SPECH.
Procedure for Welders Performance Records
6.4.8 218338- P - PA - 008 A - JSL / CLIENT ANNEX - I M M M
for Process Piping
Stress Relief and Hardness Test Procedure INDUSTRIAL HEATING
6.4.9 218338- P - PA - 009 A - JSL / CLIENT M M M
( Process Pipe ) TECH. SPEC.
Procedure for Testing of Process and Marine CALIBRATION REPORT, TEST
6.4.10 218338 - P - PA - 010 A - ANSI B31.3 H W W
Piping PACKAGE , ASMEB31.1
6.5 QUALITY
6.5.1 Calibration Plan for Measuring Instruments 218338 - Q - PA - 001 A - JSL / CLIENT CALIBRATION RECORDS H M M
6.5.4 Calibration procedure for Sprit Level 218338 - Q - PA - 004 A - JSL / CLIENT CALIBRATION RECORDS H M M
6.5.5 Calibration Procedure for Draft Mark 218338 - Q - PA - 005 A - JSL / CLIENT CALIBRATION RECORDS H M M
Calibration Procedure for Steel Graduated
6.5.6 218338 - Q - PA - 006 A - JSL / CLIENT CALIBRATION RECORDS H M M
Ruler
6.5.7 Dimensional Control Procedure 218338 - Q - PA - 007 A - JSL / CLIENT QAD - 10 - 02 - P 02 H M M
6.5.8 Inspection and Test Plan 218338 - Q - PA - 008 A - JSL / CLIENT/ABS ANNEX - I H H H
ET - 3010.00 - 1200 - 200 - PSE
6.5.9 NDT Plan for Process Piping 218338 - Q - PA - 009 A - JSL / CLIENT/ABS H W W
- 001.
ASME SEC. V, AWS D1. V, ABS
6.5.10 Procedure for Radiography Testing 218338 - Q - PA - 010 A - CLIENT R R R
RULE / ANSI B 31.3
ASME SEC V, AWS D1.1 /
6.5.11 Procedure for Magnetic Particle Testing 218338 - Q - PA - 011 A - CLIENT R R R
ANSI B31.3
6.5.12 Procedure for Ultrasonic Testing ( ASME ) 218338 - Q - PA - 012 A - CLIENT ASEME SEC. V / ANSI B 31. 3 R R R
6.5.13 Procedure for Ultrasonic Testing ( AWS ) 218338 - Q - PA - 013 A - CLIENT ASME - V, AWS D1.1 R R R
ASME - V, ABS RULE FOR
6.5.14 Procedure for Ultrasonic Testing ( ABS ) 218338 - Q - PA - 014 A - CLIENT R R R
NDT
ASME - V, ABS RULE FOR
6.5.15 Procedure for Liquid Penetrate Testing 218338 - Q - PA - 015 A - CLIENT R R R
NDT
6.6.7 Electrical Installation Procedure 218338 - E - PA - 007 A - JSL / CLIENT IEC 93 - IEEE - 141 H W M
6.6.8 Electrical Isolation Procedure 218338 - E - PA - 008 A - JSL / CLIENT - H W -
IEC - 92,
6.6.9 Electrical Motor Connection & Test Procedure 218338 - E - PA - 009 A - JSL / CLIENT ET - 3000.00 - 5140 - 741 - H M M
PPC - 001
6.6.10 Lighting System Test Procedure 218338 - E - PA - 010 A - JSL / CLIENT IEC - 92, IEC - 79-0, 79-10 H M M
IEC - 92,
6.6.11 New Main Switchboard Installation Procedure 218338 - E - PA - 011 A - JSL / CLIENT ET - 3000.00 - 5140 - 741 - H W M
PPC - 001
AMERON / INSPECTION AND
6.6.12 Procedure for conductivity test of FPR Piping 218338 - E - PA - 012 A - JSL / CLIENT H W M
CHECK SHEETS
6.6.13 Procedure for Receiving, Storage & Delivery 218338 - E - PA - 013 A - JSL / CLIENT VENDOR DOCUMENTS H M M
6.7 MECHANICAL
6.8 INSTRUMENTATION
6.8.1 Instrumentation Calibration Records 218338 - I - PA - 001 A - VENDOR DATA CHECK LIST H W W
6.1 VAC
6.10.1 Installation of Ventilation Duct 218338 - H - PA - 001 A - JSL / VENDOR VIKING TECH. SPEC. H M M
6.10.2 Installation of Insulation 218338 - F - PA - 002 A - JSL / CLIENT VIKING TECH. SPEC. H M M
7 STRUCTURAL WORK
P - 43 F.P.S.O CONVERSION Doc. No 218338 - Q - PA - 008
Doc . Title : Rev . A
INSPECTION AND TEST PLAN Page 15 of 20
APPENDIX - I
Design Action Points
S. No. Process Description Procedure Rev. Acceptance Criteria Verifying Document
Criteria
JSL CLIENT ABS
7.1 ACCOMMODATION - Secondary
WPS / IACS/JSQS/ Client Tech, Approved Drawings, Inspection
a ) Fit up - - H M M
Spec Reports
b ) Welding - - AWS D1.1 WPS H W W
AWS D1.1 and Client Tech,
c ) Visual - - Inspection Reports H M H
Spec., ABS Rule
d ) NDT - - AWS D1.1 / ABS Rule NDT Reports R R R
e ) Tightness Test - - ABS Rule Tightness Test Reports H W H
e ) Records - - - - R R -
Fabrication - Secondary
Installation - Primary
WPS / IACS/JSQS/ Client Tech,
a ) Fit up - - Inspection Reports H M M
Spec
b ) Welding - - AWS D1.1 WPS H W W
a ) Thickness Gauging - - ABS Rule & Client Spec., Thickness Gauging Reports R R R
b ) Close Up Survey - - ABS Rule & Client Spec., Close up Survey Reports R R R
d ) Fit up - - ABS Rule & Tech. Spec., Weld map, Inspection Reports H M M
8.3 Dry Film Tickness Check Approved Procedure - ET-3010.49-1350-140-PPC-003 Painting Report H W M
9 DOCUMENTATION
Inspection Dossier Enusre all Test/Inspection
All Inspection Test Reports H R H
are done.
LEGENDS : -