Presupuesto
Presupuesto 0301072
03.07 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO PESADO m3 247.97 96.10 23,829.92
04 OBRAS DE CONCRETO SIMPLE 34,312.01
04.01 SOLADOS DE CONCRETO C:H 1:12 E=4" PARA ZAPATAS m2 114.24 43.57 4,977.44
04.02 CONCRETO PARA CIMIENTOS CORRIDOS C:H-1:10 + 30% P.G. m3 2.89 179.71 519.36
04.03 CONCRETO PARA SOBRECIMIENTOS C:H-1:8 + 25% P.M. m3 12.19 363.77 4,434.36
04.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO H=1.0M m2 132.57 113.30 15,020.18
04.05 FALSO PISO DE CONCRETO 1:12 DE E=4" m2 208.20 44.96 9,360.67
05 OBRAS DE CONCRETO ARMADO 371,403.60
05.01 ZAPATAS 39,925.19
05.01.01 CONCRETO EN ZAPATAS F'C=210 KG/CM2 m3 68.54 456.89 31,315.24
05.01.02 ACERO F'Y=4200 KG/CM2 GRADO 60 kg 1,643.12 5.24 8,609.95
05.02 VIGAS DE CIMENTACION 26,398.60
02.06 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO PESADO m3 101.86 96.10 9,788.75
03 OBRAS DE CONCRETO SIMPLE 19,531.00
03.01 SOLADOS DE CONCRETO C:H 1:12 E=4" PARA ZAPATAS m2 63.46 43.57 2,764.95
03.02 SOLADOS DE CONCRETO C:H 1:12 E=4" PARA ZAPATAS m2 5.57 43.57 242.68
03.03 CONCRETO PARA CIMIENTOS CORRIDOS C:H-1:10 + 30% P.G. m3 5.17 179.71 929.10
03.04 CONCRETO PARA SOBRECIMIENTOS C:H-1:8 + 25% P.M. m3 6.87 363.77 2,499.10
03.05 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO H=1.0M m2 69.08 113.30 7,826.76
03.06 FALSO PISO DE CONCRETO 1:12 DE E=4" m2 117.18 44.96 5,268.41
04 OBRAS DE CONCRETO ARMADO 534,042.66
04.01 ZAPATAS 23,941.59
04.01.01 CONCRETO EN ZAPATAS F'C=210 KG/CM2 m3 38.06 456.89 17,389.23
04.01.02 ACERO F'Y=4200 KG/CM2 GRADO 60 kg 1,250.45 5.24 6,552.36
04.02 VIGAS DE CIMENTACION 9,633.75
05.01.07 SALIDA DE PARED PARA TOMACORRIENTE CON LINEA A TIERRA (PARA RED pto 13.00 88.09 1,145.17
DATA Y TOMACORRIENTE)
06 CANALIZACION, TUBERIAS Y/O CABLES 4,088.68
06.01 TUBERIAS EMPOTRADAS Y/O VISIBLES 2,013.64
06.01.01 TUBERIA PPVC SEL D=20MM (3/4") m 478.30 4.21 2,013.64
06.02 CABLES ELECTRICOS 2,075.04
06.02.01 CABLES ELECTRICO TW 2X6 MM2 m 128.50 3.23 415.06
06.02.02 CABLES ELECTRICO TW 2X4 MM2 m 88.40 2.17 191.83
06.02.03 CABLES ELECTRICO TW 2X2.5 MM2 m 248.00 1.61 399.28
06.02.04 CABLES DE RED DATA m 27.40 39.01 1,068.87
07 TABLEROS, LLAVES, CUCHILLAS Y CAJAS 1,045.84
07.01 TABLEROS DE DISTRIBUCION 620.77
07.01.01 TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA DE 4 CIRCUITOS und 1.00 465.77 465.77
07.01.02 TABLERO DE DISTRIBUCION UPS und 1.00 155.00 155.00
07.02 CAJAS DE PASE 425.07
07.02.01 CAJA DE PASE DE FºGº LIVIANA DE 6"X6"X3" und 2.00 126.36 252.72
07.02.02 CAJA DE PASE DE FºGº LIVIANA DE 4"X4"X2" und 5.00 34.47 172.35
08 CONEXION EXTERNA Y PARARRAYOS 5,329.38
08.01 POZO A TIERRA 1,397.35
08.01.01 POZO A TIERRA und 1.00 1,236.35 1,236.35
08.01.02 CONDUCTOR A POZO A TIERRA m 23.00 7.00 161.00
08.02 ARTEFACTOS ELECTRICOS 3,932.03
08.02.01 FLUORESCENTE RECTO ISPE 2 X 40 W INCLUYE EQUIPO Y PANTALLA und 22.00 137.45 3,023.90
08.02.02 FLUORESCENTE RECTO ISPE 2 X 20 W INCLUYE EQUIPO Y PANTALLA und 5.00 137.45 687.25
08.02.03 BRAKETES und 2.00 60.93 121.86
08.02.04 FLUORESCENTE CIRCULAR DE 32 WATT (INC. EQUIPO COMPLETO) und 1.00 99.02 99.02
09 APARATOS SANITARIOS 430.38
09.01 INODORO SIFON JET C/BLANCO INC. ACCESORIOS und 2.00 175.19 350.38
09.02 LAVATORIO DE PARED DE COLOR 1/LLAVE und 1.00 80.00 80.00
10 SISTEMA DE DESAGUE 2,765.20
10.01 PUNTOS DE SALIDA 967.55
10.01.01 SALIDA DE DESAGUE DE PVC 4" pto 2.00 96.32 192.64
10.01.02 SALIDA DE DESAGUE DE PVC 2" pto 7.00 96.43 675.01
10.01.03 SALIDA DE VENTILACION EN PVC SAL 2" pto 1.00 99.90 99.90
10.02 REDES DE DERIVACION 522.35
10.02.01 EXCAVACION DE ZANJAS PARA TUBERIA DE DESAGUE m3 6.02 3.41 20.53
10.02.02 RED DE DERIVACION PVC SAL PARA DESAGUE 4" m 6.02 22.93 138.04
10.02.03 RED DE DERIVACION PVC SAL PARA DESAGUE DE 2" m 22.40 16.24 363.78
10.03 ACCESORIOS DE REDES DE DERIVACION 1,275.30
10.03.01 TEE PVC-SAL 4" X 4" und 2.00 19.46 38.92
10.03.02 TEE PVC-SAL 4" CON REDUCCION A 2" und 2.00 21.26 42.52
10.03.03 TEE PVC-SAL 2" X 2" und 7.00 17.76 124.32
10.03.04 YEE PVC SAL 4" pza 2.00 19.76 39.52
10.03.05 YEE PVC SAL 4" CON REDUCCION A 3" pza 2.00 19.76 39.52
10.03.06 YEE PVC SAL 3" pza 2.00 18.76 37.52
10.03.07 YEE PVC SAL 3" CON REDUCCION A 2" pza 2.00 19.26 38.52
10.03.08 YEE PVC-SAP DE 2" pza 6.00 18.26 109.56
10.03.09 CODO PVC SAL 3"X45° pza 2.00 21.45 42.90
10.03.10 SUMIDERO DE BRONCE CROMADO DE 2" pza 4.00 66.86 267.44
10.03.11 REGISTROS DE BRONCE DE 4" pza 2.00 26.48 52.96
10.03.12 CAJA DE REGISTRO DE DESAGUE 12" X 24" CON TAPA und 5.00 88.32 441.60
11 SISTEMA DE AGUA FRIA 1,833.07
11.01 PUNTOS DE SALIDA 293.85
11.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 9.00 32.65 293.85
11.02 RED DE DISTRIBUCION 449.79
11.02.01 RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP ml 90.50 4.97 449.79
11.03 ACCESORIOS DE REDES DE DISTRIBUCION 1,089.43
11.03.01 CODO DE FIERRO GALVANIZADO UNION ROSCADA DE 1/2" pza 24.00 18.21 437.04
11.03.02 TEE PVC-SAP 1/2" pza 16.00 13.77 220.32
11.03.03 VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE 1/2" pza 3.00 78.34 235.02
11.03.04 GRIFO PARA LAVADERO DE 1/2" pza 7.00 28.15 197.05
12 SISTEMA DE AGUA DE LLUVIA 9,403.40
12.01 TUBERIAS Y ACCESORIOS 9,403.40
12.01.01 RED DE DERIVACION PVC SAL PARA PLUVIAL DE 3" m 60.00 120.29 7,217.40
12.01.02 CODO PVC SAL 3"X90° pza 12.00 112.94 1,355.28
12.01.03 CANALETA SEMICIRCULAR GALVANIZADA DE 4" m 64.00 12.98 830.72
01 LOSA DEPORTIVA 87,835.58
01.01 OBRAS PRELIMINARES 6,237.00
01.01.01 LIMPIEZA DE TERRENO MANUAL m2 540.00 3.01 1,625.40
01.01.02 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR m2 540.00 4.65 2,511.00
01.01.03 TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 540.00 3.89 2,100.60
01.02 MOVIMIENTO DE TIERRAS 45,358.61
01.02.01 CORTE DE TERRENO A NIVEL DE SUBRASANTE m3 216.00 44.64 9,642.24
01.02.02 EXCAVACION MANUAL PARA SARDINELES HASTA 0.30CM DE PRUFUNDIDAD EN m3 4.32 54.61 235.92
TERRENO NORMAL
01.02.03 EXCAVACION PARA ZAPATAS EN ARCOS m3 0.51 54.61 27.85
01.02.04 REFINE Y NIVELACION EN TERRENO NORMAL m2 540.00 5.84 3,153.60
01.02.05 RELLENO Y CONPACTADO MANUAL CON MATERIAL DE PRESTAMO m2 540.00 46.72 25,228.80
01.02.06 ACARREO MATERIAL EXEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30.00 m3 265.00 22.75 6,028.75
ML
01.02.07 ELIMINACION DE MATERIAL EXCEDENTE m3 265.00 3.93 1,041.45
01.03 OBRAS DE CONCRETO SIMPLE 25,606.97
01.03.01 CONCRETO f'c=175 kg/cm2 PARA LOSA m3 56.35 378.21 21,312.13
01.03.02 ENCOFRADO Y DESENCOFRADO DE LOSA (PAÑOS) m2 82.80 51.87 4,294.84
01.04 ACABADOS 4,372.77
01.04.01 JUNTAS ASFALTICAS m 276.00 4.93 1,360.68
01.04.02 PINTADO DE DELIMITACION DE LOSA m 329.19 9.15 3,012.09
01.05 EQUIPAMIENTO DEPORTIVO 6,260.23
01.05.01 ARCO DE FIERRO C&N MALLA Y TABLERO DE BASQUET und 2.00 2,613.60 5,227.20
01.05.02 JUEGO DE NET INCLUYE PARANTES METALICOS und 1.00 1,033.03 1,033.03
23 TANQUE SEPTICO 21,490.75
23.01 TRABAJOS PRELIMINARES 82.04