Sunteți pe pagina 1din 1

September 10-14 , 2018

SECTOR: Construction Industry COURSE: Electrical Inastallation and maintenance NC-II


MPONDAY/TUESDAY/WEDNESDAY THURSDAY/FRIDAY
LESSON: PERFORM ROUGHING-IN ACTIVITIES FOR COMMUNICATION PERFORM ROUGHING-IN ACTIVITIES FOR COMMUNICATION AND
AND DISTRIBUTION SYSTEM (RC) DISTRIBUTION SYSTEM (RC)
Learning competency LO 2.2 Install wire ways and cable trays according to the job LO 2.3 Observe safety procedure in installing wire ways and cable
requirements following PEC and NEC trays according to OHS guidelines and procedures
Content/Topic PEC/NEC provisions on wire ways and cable trays Procedure in installing wire ways and cable trays
Content standard The learner demonstrates an understanding of the principles in The learner demonstrates an understanding of the principles in
performing roughing-in activities. performing roughing-in activities.
Code TLE_IAEI9- 12RC-IIa-j-1 TLE_IAEI9- 12RC-IIa-j-1
Materials PEC/NEC chart Procedures of wire ways and cable tray installation.
Reference/s: 1. Azares, Efren F and Recana, Cirilo B. Practical Electricity III TG pp—13
2. Fajardo,Module
Max B.and
title:
Fajardo, Leo R. Electrical Layouts and Estimates. 2. Lay-out and estimate
LM pp____
TG pp____
Learning Procedure: Preliminaries: Preliminaries:
a. Prayer a. Prayer
Activities b. Greetings b. Greetings
Drill/Review Drill/Review
Methodology: Demonstration/Discussion Demonstration/Discussion
Strategy: Group work/Reporting Group work/Reporting
Assessment: Recite the PEC/NEC provisions in the class Explain why we have to follow OHS guidelines and observe safety?.
Assignment: Bring written safety procedures and OHS guidelines. Bring panel board and 30A circuit breakers.
Remarks: No. of Learners with
a. Mastery
b. Needing enrichment
Refinement lessons:
Teachers Reflection

Prepared by : ________________ Checked by: _________________


EIM Trainer TLE Coordinator/MT-I

S-ar putea să vă placă și