Documente Academic
Documente Profesional
Documente Cultură
F-XC A N GE F-XC A N GE
PD PD
!
W
W
O
O
N
N
y
y
bu
bu
to
to
k
k
lic
lic
C
C
w
w
m
m
w w
w
w
o
o
.d o .c .d o .c
c u-tr a c k c u-tr a c k
Main Particulars
Built: 1981 at Orenstein & Koppel AG Lübeck, Germany
GL Register No. 016549 GL Class 100 A5 E2 MC E2 AUT IMO No.7928677
Lower Deck:
5 double Crew Cabins
Fender
Main Deck:
6 double Scientist Cabins Draught
Upper Deck:
1 double President’ s Suit
1 double Captain’ s Cabin
1 single 1st Officer Cabin
1 single Purser Cabin
1 single Chief Engineer Cabin
1 double Officer Cabin
1 double Crew Cabin
Removable Handrail
CD
Fuel Oil
Engine Room Engine Room PROFILE
Day Tank
Fresh Water
Water
Ballast Bow Thruster Void
Engine Room Fuel Oil Tank
Gym Laundry Room Space
Dirty Oil Tank
Engine Room Fore Peak Water Ballast
Fresh Water
CD
CD
Water Fuel Oil Fuel Oil Tank Fuel Oil Tank Fuel Oil Tank Water Void Space 45
Ballast
Ballast With Lead
Settling Tank
Bridge
500
Outdoor [530]
Lounge 502
75 80 85 90 95 100 40 45 50 55 60 65 70 75 51080 520 85 90 95 100 105 75 80 85 90 95 100
Hydr aulic
Operating
HIAB 121-2 WC
Panel Lifting Capacity 133 kNm
GMDSS
Outreach Lifting Capacity: 2,4m = 5,51 t
10' 5,3m =
7,5m =
2,55 t
1,78 t
501 503
9,7m = 1,31 t Safety Electrical
Locker Room
500
Traction 3,1752 t
Thread M30
Distance 4' x 4' Deck 4
Upper Deck
Container
10'
462 456
Supply
[402] Meeting Room 402 404 Paint
Box
Ships Office [416]
[426] 430 Locker
Winch Deck Boat Deck [412] Forecastle
Purser
444
Jerry Can [404]
414 422
Locker 408 418
Locker
Fogtec Locker 423 405 407 411 413 419 421 429
2nd Engineer
1.Officer
1x ETO
Shore Connection
394
398
[308]
H KND 6 0 0 , Control Room
FCU
+4 C
Deck 3
Supply Box Deck Locker Port
[358]
324 336 1 Chief [366]
[368] Interior
(Garage Door With Access
Scientist Store
Control, No Windows) Deck Science
Staging Bay 390 Changing
Control 372
Work Deck
Room
FCU
1000X1160
WT WT WT
WT WT
Electrical Store
Dry Food
Thread M12
214
[212]
Main Switchboard Store Deck 2
Steering Gear 299 Distance 2' x 2' Switchboard 200 224 Bakery
Science Switchboard
238 Lower Deck
Room [200]
Room [214] 236 202 204
208 AV/IT
Automation Switchboard Galley 228 [244] [248]
Room
Science 290 Fuel Oil 23 218 280
Store Port [202] 210 [222]
WC 234 Sonar Store
Day Tank 281
226 242 246 Room Fore Peak
32
Separator Room
-5 0 5 10 Corridor 15 206 20 25 30 24 35 40 45
Engine Room
50 55 60 220
65 70 75 240 80 85 90
WC
95
Fwd
100 Lounge 105
270
110 115 120
1 125 130
-20 C
29 WC
215 230
Scullery 240a
250 260
CD
Day Tank
AC
Workshop 213
[205]
WT
WT WT
WT
WT WT
WT WT
Fresh Water
26 9 Sewage 3.1 m3
Dirty Oil Tank 23.8m3 Treatment
Plant
WT Deck 1
Stabilizer
30 Room Port
Water Ballast Tank Top
100 104 31.0 m3
112 Fuel Oil
Water Ballast
Walk In
4 52.1 m3
36.8 m3 33 102 Fore Peak
Fuel Oil Settling
27 106 Fridge 114 2
Aftpeak
35 Tank
Sludge-
108 1
-5 0 5 10 15 20 25 Tank 30 35 40 45 50 55 60 65 70 75 80 85 90 4395 100 105 110 115 120 125 130
Fresh Water
37 38 Provision CD
Void
Fuel Oil Settling Sludge- Space 44
app. 24.8 m3 Tank Tank Store SL2 Fuel Oil Water Ballast
Gym
Water Ballast 28 120 103 117 105 52.1 m3 54.8 m3
50.1 m3 34 Freezer -18° 5 3
101 Water Ballast
31.0 m3
Stabilizer
31 Room Stb Fresh Water
10 WT
23.8m3
13.1 m3
WT 13 WT
WT WT
WT WT
WT WT
26 41 CD Double
Void Space WT
30
Dirty Oil Tank
18 Bilge Water
5.1m3
Water Ballast Bottom
31.0 m3
Water Ballast Fuel Oil 14 Fuel Oil 4
36.8 m3 Settlingtank
44.6 m3 2 Fuel Oil
33 49.8 m3
Flow Tank 6,2 m3
52.1 m3
Lube Oil Fuel Oil
Fuel Oil Over
4.6m3 16 21.5m3
Aftpeak
35 21 7
65 11
Fuel Oil
-5 0 5 10 15 20 25 30 35 19.1m3 40 20 45 50 55 60 70 75 80 85 90 95 100 105 110 115 120 125 130
37 38 Leak 45
Sea Chest