Documente Academic
Documente Profesional
Documente Cultură
SPOTLIGHT
02 DISCOVER THE DIFFERENCE RENEWABLES SPOTLIGHT 03
Experience.
Applied.
Petrofac is a leading international
>12,000 people provider of integrated services with
supporting our almost four decades of experience.
operations
OUR APPROACH:
Global footprint,
local capability
Certainty.
Delivered.
GEOGRAPHIC FOCUS Aberdeen Petrofac combines its Two key projects we are currently undertaking within the renewables sector include:
We have a global footprint Hamburg extensive track record BORWIN3 GAMMA PLATFORM GALLOPER OFFSHORE WIND FARM
with a network of offices and and leverages its global
operations in 29 countries London Client: TenneT Client: Galloper Wind Farm Ltd
worldwide. We successfully
presence to deliver Scope: EPCI (an SSE Renewables/RWE Innogy JV)
blend our service delivery, taking turnkey solutions which Date: 2012 – ongoing Scope: EPCI
advantage of regional expertise
support on-time, effective Location: German North Sea Date: 2016 – 2018
and capabilities to deliver in Leiden Location: UK
full alignment with our client’s and safe project delivery BorWin3 is a HVDC link under construction
requirements, whether driven for our clients. to transmit offshore wind power to the Petrofac and GE were awarded a contract
by cost, schedule or the power grid of the German mainland. to engineer, procure, construct and install
creation of in-country value. Currently under installation 130 km off a HVAC offshore substation platform (OSP)
the German coast, in water depths of 40 to facilitate wind farm grid connection in
Our current renewables metres, it is scheduled to go online in 2019. the UKCS area. Galloper consists of 56
portfolio is predominantly offshore turbines.
in support of the European When operational, it will house a
offshore wind market. We Such was the scale of the construction 900 megawatt (MW) Siemens HVDC The substation provides a transmission
are an established provider in site for BorWin3 that many staff station. When completed it will be one capacity of approximately 340 MW. Petrofac
the German and UK offshore used bicycles to get around
of the world’s heaviest and largest has designed, procured, constructed, and
sectors supporting both HVDC platforms, with the topside installed Galloper’s jacket and topside,
fixed and floating assets, and standing at six storeys and weighing which are located at a water depth of
are fully conversant with the around 18,000 metric tonnes (MT). 30 metres and weigh 1,743 metric tonnes
sector’s challenges, and our (MT) and 2,200 tonnes respectively. Two
clients’ aims. Petrofac, in consortium with Siemens, of the major components – the jacket and
has full responsibility for the engineering, deck for the OSP – were completed at the
procurement, construction, and offshore Heerema fabrication yard in Hartlepool.
installation of the platform. Installation was successfully completed in
LIFE CYCLE Operations services: First power on Galloper was May 2017.
ASSET SUPPORT Market-defining asset solutions that reduce operating
achieved in November 2017 The jacket was successfully installed in
expenditure and improve efficiency, from the supply of May 2018. As a normally unmanned installation, the
Another key aspect of experienced, competent people, through to full responsibility platform and all equipment housed on
Petrofac’s service provision for asset management, performance, integrity, and operations. it were designed to prioritise availability,
is to extend our support reliability, low maintenance and ease of
beyond the project phase into service and repair.
operations. As an established
market leader in the provision Training and competence:
Industry leading training courses* and crisis management
900 336 MW
of asset support services such
as Duty Holder and Operations consultancy, including major emergency management,
through to the development of bespoke training programmes
MW
and Maintenance services in
the UKCS, we are well placed and solutions to manage workforce competency. HVDC link of clean energy
to provide a range of asset *Our training courses are approved
by the Global Wind Organisation.
support solutions.
Six-story 2,200
topside MT topside
Offshore wind
– select experience
TenneT/ABB BorWin Alpha Operations and maintenance consultancy services contract for world’s first 2009
offshore HVDC converter substation
TenneT/ABB DolWin Alpha Design verification and construction management services for the world’s 2010
largest offshore HVDC converter substation
Moray Offshore Wind Farm Moray Firth Offshore Wind Farm Concept selection and design studies 2010
Centrica Renewable Energy Race Bank Wind Farm Technical/engineering support 2012
Fluor Greater Gabbard Engineering consultancy assessing in-field cable stability of various span 2012
lengths and tensions, considering cable and soil properties and cable
configurations. Worst case storm simulation and analysis of movement,
tension and bending
Triton Knoll offshore Triton Knoll – OSP Structural Engineering consultancy – concept and FEED 2015
wind farm Concept Design Study
Iberdrola Engineering and East Anglia One – OSS Jacket Engineering consultancy – FEED, detailed design, 2015
Construction UK Limited Foundation Basic Design fabrication and installation support services
Transmission Capital Lincs Wind Farm export cable Engineering consultancy for risk assessment and repair methodologies 2017
Transmission Capital Robin Rigg Wind Farm Cable fatigue analysis 2017
Carbon Trust Floating Wind Joint Industry Project Engineering consultancy – floating wind turbine study assessing floating 2017
substations and associated export and inter array cables
Transmission Capital Ormonde Wind Farm Export Cable Engineering consultancy for risk assessment and freespan rectification 2018
Carbon Trust Transition Piece Optimisation Design optimisation of interface between turbine tower and monopile 2018
including electrical and installation considerations