Sunteți pe pagina 1din 4

SESSION PLAN

Sector : Electrical and Electronics


Qualification Title : Electrical Installation and Maintenance NC II
Unit of Competency : Install electrical protective devices for distribution, power, lighting, auxiliary, lightning protection
and grounding systems
Module Title : Installing electrical protective devices for distribution, power, lighting, auxiliary, lightning
protection and grounding systems

Learning Outcomes: (CBC)


LO1: Plan and prepare work
LO2: Install electrical protective devices
LO3: Install lighting fixture and auxiliary outlet
LO4: Notify completion of work
A. Introduction:
 This unit covers the knowledge, skills and attitudes on planning and preparing work, installing electrical protective devices,
lighting fixture and auxiliary outlet and notifying completion of work for distribution, power, lighting, auxiliary, lightning
protection and grounding systems.
B. Learning Activities:
LO1: Plan and prepare work
Learning Content Methods Presentation Practice Feedback Resources Time

CBLM on Electrical Installation and Date Developed: Document No:


Maintenance NC II – Installing electrical
October 2018 EIM Core 2
protective devices for distribution, power,
lighting, auxiliary, lightning protection, Developed By: Issued By:
and grounding systems.
E.D. PADULLON
Date Modified: N/A
Modified By: N/A Revision #:
 Instructions for Lecture read Answer Compare CBLM, Video presentation, 1.5
the preparation Video Information self-check with answer Safety Standards,
of work, job presentation Sheet 1.1-1 1.1-1 key 1.1-1 PEC, Building Electrician by Meralco
and On Foundation p. 21-22
understanding preparation of
Occupational work, Job and
Health and understanding
safety occupational
health and
safety

read Compare CBLM, video presentation, Building


Lecture with answer Electrician by Meralco p.14-17 1.5
 Preparation of
Information Answer
Video key 1.1-2
Tools, Sheet 1.1-2 self-check
presentation
Materials and on 1.1-2
PPE. preparation of
Tools,
Materials and
PPE
LO2: Install Electrical Protective Devices
Learning Content Methods Presentation Practice Feedback Resources Time
 safety and Lecture, read Answer Compare CBLM, electrical lay-out & estimate by 1.5
correct Video Information self-check with answer Fajardo Fajardo p. 59-68, PEC,
procedures in presentatio Sheet 2.2-1 on 2.2.1 key 2.2-1 Internet link1:
installing n, safety https://automationforum.co/electrical-
electrical Power point procedures in protective-device-types-of-protective-
protective presentatio installing device/
devices. n electrical
protective
 Work schedule devices. internet link2:

CBLM on Electrical Installation and Date Developed: Document No:


Maintenance NC II – Installing electrical
October 2018 EIM Core 2
protective devices for distribution, power,
lighting, auxiliary, lightning protection, Developed By: Issued By:
and grounding systems.
E.D. PADULLON
Date Modified: N/A
Modified By: N/A Revision #:
must be met Lecture read Answer Compare https://www.smu.edu/~/media/Site/ 1.5
and Group Information self-check with answer BusinessFinance/OPRM/EHS/Document
continuous discussion Sheet 2.2-1 on 2.2.1 key 2.2-1 s/
checking of Power point maintaining Electrical%20Safety.ashx?la=en
quality of work presentatio work schedule
must be done n with quality of
in accordance work. Internet link3:
with the https://www.ecmweb.com/ops-amp-
instructions maintenance/top-10-steps-schedule-
and management
requirements.

LO3: Install lighting fixture and electrical outlet


Learning Content Methods Presentation Practice Feedback Resources Time

LO4: Notify completion of work


Learning Content Methods Presentation Practice Feedback Resources Time

C. Assessment Plan:
D: Teacher’s Self-Reflection of the Session:

CBLM on Electrical Installation and Date Developed: Document No:


Maintenance NC II – Installing electrical
October 2018 EIM Core 2
protective devices for distribution, power,
lighting, auxiliary, lightning protection, Developed By: Issued By:
and grounding systems.
E.D. PADULLON
Date Modified: N/A
Modified By: N/A Revision #:
CBLM on Electrical Installation and Date Developed: Document No:
Maintenance NC II – Installing electrical
October 2018 EIM Core 2
protective devices for distribution, power,
lighting, auxiliary, lightning protection, Developed By: Issued By:
and grounding systems.
E.D. PADULLON
Date Modified: N/A
Modified By: N/A Revision #:

S-ar putea să vă placă și