Sunteți pe pagina 1din 2

Date: 10.11.

2015

To

M/s.Supreme Scientific Corporation


SP.V (Athavan) Building,
1- Koodal Alagar Perumal Koil Entrance,
Madurai – 625 001.

Sir,

Sub: Purchase Order for Metrology and Measurements Lab - Reg.


Ref : Your quotation No.SSC/15-16/MECH/D/1-new proposal dt:06.11.2015.

We are pleased to place the order for the supply of the following items to our Metrology
and Measurements Lab.

Rate Amount
S.No Name of the Item Qty
(Rs.) (Rs.)
1 Coordinate measuring machine 1 1,82,450.00 1,82,450.00
2 Surface finish measuring equipment 1 98,475.00 98,475.00
3 Bore gauge 1 24,500.00 24,500.00
4 Telescope gauge 1 45,200.00 45,200.00
Total 3,50,625.00
Less Discount 25% 87656.25
262968.75
Add VAT 14.5% 38130.40
Grand Total 301279.15

Terms & Conditions

Delivery : Within 7 weeks


Payment : Against delivery
Warranty : One Year

Thanking you,

Yours Faithfully,
For Paavai College of Engineering,

CHAIRMAN
ME6512 THERMAL ENGINEERING LABORATORY – II L T P C
0 0 3 2
OBJECTIVES
To study the heat transfer phenomena predict the relevant coefficient using
implementation
To study the performance of refrigeration cycle / components
LIST OF EXPERIMENTS:

HEAT TRANSFER LAB: 30


1. Thermal conductivity measurement using guarded plate apparatus.
2. Thermal conductivity measurement of pipe insulation using lagged pipe apparatus.
3. Determination of heat transfer coefficient under natural convection from a vertical
cylinder.
4. Determination of heat transfer coefficient under forced convection from a tube.
5. Determination of Thermal conductivity of composite wall.
6. Determination of Thermal conductivity of insulating powder.
7. Heat transfer from pin-fin apparatus
8. Determination of Stefan – Boltzmann constant.
9. Determination of emissivity of a grey surface.
10. Effectiveness of Parallel / counter flow heat exchanger.

REFRIGERATION AND AIR CONDITIONING LAB 15


1. Determination of COP of a refrigeration system
2. Experiments on Psychrometric processes
3. Performance test on a reciprocating air compressor
4. Performance test in a HC Refrigeration System
5. Performance test in a fluidized Bed Cooling Tower
TOTAL: 45 PERIODS

OUTCOMES
Ability to demonstrate the fundamentals of heat and predict the coefficient used in that
transfer application and also design refrigeration cycle.

LIST OF EQUIPMENT FOR A BATCH OF 30 STUDENTS

S.No. NAME OF THE EQUIPMENT Qty.

1. Guarded plate apparatus 1


2. Lagged pipe apparatus 1
3. Natural convection-vertical cylinder apparatus 1
4. Forced convection inside tube apparatus 1
5. Composite wall apparatus 1
6. Thermal conductivity of insulating powder apparatus 1
7. Pin-fin apparatus 1
8. Stefan-Boltzmann apparatus 1
9. Emissivity measurement apparatus 1
10. Parallel/counter flow heat exchanger apparatus 1
11. Single/two stage reciprocating air compressor 1
12. Refrigeration test rig 1
13. Air-conditioning test rig 1
14. HC Refrigeration System 1
15. Fluidized Bed Cooling Tower 1

S-ar putea să vă placă și