RESUMEN DE METRADOS
1.2 EXPLANACIONES
EXPLANACIONES
SUSTENTO DE METRADOS
1.2.1 ESCARIFICACION Y COMPACTADO EN ZONA DE RELLENOS
PROGRESIVA LONGITUD Ec. Empalme LONGITUD ANCHO AREA AREA S/A 1 AREA TOTAL ESPESOR VOLUMEN
KM KM (m.) M REAL (m.) M M2 M2 M2 M M3
0+000.00 1+000.00 1,000.00 - 1,000.00 10.589 10,588.50 72.67 10,661.17
1+000.00 2+000.00 1,000.00 - 1,000.00 10.362 10,362.00 178.70 10,540.70
2+000.00 3+000.00 1,000.00 - 1,000.00 9.912 9,912.00 69.15 9,981.15
3+000.00 4+000.00 1,000.00 - 1,000.00 9.690 9,690.00 296.20 9,986.20
4+000.00 5+000.00 1,000.00 - 1,000.00 10.347 10,347.00 255.64 10,602.64
5+000.00 5+906.01 906.01 - 906.01 9.606 8,703.16 144.59 8,847.75
TOTAL 5,906.01 1,016.94 60,619.60
1 Ver sustento en la planilla de metrados de Sobreancho.
EJE DE VIA
S% S% S% CARPETA ASFALTICA
c 0.05
1.5 BASE 0.10
1
SUB BASE 0.15
ANCHO VARIABLE
ANCHOS PROMEDIOS A NIVEL DE RELLENO COMPACTADO
CON ALTURAS PROMEDIO
TALUD
VERTICAL 1
HORIZONTAL 1.5
DEL KM 00+000 AL KM 01+000 1.06 0.00 1.59 0.00 1.20 6.60 10.59 0.00 10.59
DEL KM 01+000 AL KM 02+000 0.91 0.00 1.36 0.00 1.20 6.60 10.36 0.00 10.36
DEL KM 02+000 AL KM 03+000 0.61 0.00 0.91 0.00 1.20 6.60 9.91 0.00 9.91
DEL KM 03+000 AL KM 04+000 0.46 0.00 0.69 0.00 1.20 6.60 9.69 0.00 9.69
DEL KM 04+000 AL KM 05+000 0.90 0.00 1.35 0.00 1.20 6.60 10.35 0.00 10.35
DEL KM 05+000 AL KM 05+906.013 0.40 0.00 0.61 0.00 1.20 6.60 9.61 0.00 9.61
OBSERVACION: El escarificado del suelo existente se realizara a diferentes alturas de relleno a lo largo del tramo, por lo que el ancho final proyectado
para el trabajo según el talud considerado para esta actividad en zona de relleno es diferente.
MUNICIPALIDAD DISTRITAL DE PUEBLO NUEVO
EXPLANACIONES
SUSTENTO DE METRADOS
CALCULO DE AREAS Y VOLUMENES DE CORTE Y RELLENO
1.2.2 EXCAVACION A NIVEL DE SUBRASANTE
50.497 50.497
MUNICIPALIDAD DISTRITAL DE PUEBLO NUEVO
EXPLANACIONES
SUSTENTO DE METRADOS
1.2.2 EXCAVACION DE TRATAMIENTO SUPERFICIAL MONOCAPA
PROGRESIVA LONGITUD Ec. Empalme LONGITUD ANCHO AREA AREA S/A 1 AREA TOTAL ESPESOR VOLUMEN
KM KM (m.) M REAL (m.) M M2 M2 M2 M M3
0+030.00 0+160.00 130.00 - 130.00 6.000 780.00 0.00 780.00 0.03 23.40
0+580.00 0+660.00 80.00 - 80.00 6.000 480.00 0.00 480.00 0.03 14.40
0+740.00 1+390.00 650.00 - 650.00 6.000 3,900.00 0.00 3,900.00 0.03 117.00
1+400.00 1+560.00 160.00 - 160.00 6.000 960.00 0.00 960.00 0.03 28.80
1+600.00 1+680.00 80.00 - 80.00 6.000 480.00 0.00 480.00 0.03 14.40
1+720.00 2+240.00 520.00 - 520.00 6.000 3,120.00 0.00 3,120.00 0.03 93.60
2+420.00 2+520.00 100.00 - 100.00 6.000 600.00 0.00 600.00 0.03 18.00
2+720.00 3+090.00 370.00 - 370.00 6.000 2,220.00 0.00 2,220.00 0.03 66.60
3+840.00 3+960.00 120.00 - 120.00 6.000 720.00 0.00 720.00 0.03 21.60
4+090.00 4+640.00 550.00 - 550.00 6.000 3,300.00 0.00 3,300.00 0.03 99.00
4+670.00 5+040.00 370.00 - 370.00 6.000 2,220.00 0.00 2,220.00 0.03 66.60
S% S% S% CARPETA ASFALTICA
c 0.05
1.5 BASE 0.10
1 SUB BASE 0.15
ANCHO VARIABLE
TALUD
VERTICAL 1
HORIZONTAL 1.5
OBSERVACION: El escarificado del suelo existente se realizara a diferentes alturas de relleno a lo largo del tramo, por lo que el ancho final proyectado
para el trabajo según el talud considerado para esta actividad en zona de relleno es diferente.
MUNICIPALIDAD DISTRITAL DE PUEBLO NUEVO
EXPLANACIONES
SUSTENTO DE METRADOS
1.2.3 ELIMINACION DE MATERIAL EXCEDENTE DE CORTE, D= 1.56 KM.
PROGRESIVA LONGITUD Ec. Empalme LONGITUD ANCHO AREA AREA S/A 1 AREA TOTAL ESPESOR VOLUMEN
KM KM (m.) M REAL (m.) M M2 M2 M2 M M3
0+000.00 1+000.00 1,000.00 1,000.00 649.36
1+000.00 2+000.00 1,000.00 1,000.00 23.39
2+000.00 3+000.00 1,000.00 1,000.00 225.29
3+000.00 4+000.00 1,000.00 1,000.00 1,719.32
4+000.00 5+000.00 1,000.00 1,000.00 44.47
5+000.00 5+906.01 906.01 906.01 2,974.27
PRESENCIA DE TRATAMIENTO SUPERFICIAL MONOCAPA (TSM) UBICADOS EN ZONA DE RELLENO
0+030.00 0+160.00 130.00 130.00 6.000 780.00 0.03 23.40
0+580.00 0+660.00 80.00 80.00 6.000 480.00 0.03 14.40
0+740.00 1+390.00 650.00 650.00 6.000 3,900.00 0.03 117.00
1+400.00 1+560.00 160.00 160.00 6.000 960.00 0.03 28.80
1+600.00 1+680.00 80.00 80.00 6.000 480.00 0.03 14.40
1+720.00 2+240.00 520.00 520.00 6.000 3,120.00 0.03 93.60
2+420.00 2+520.00 100.00 100.00 6.000 600.00 0.03 18.00
2+720.00 3+090.00 370.00 370.00 6.000 2,220.00 0.03 66.60
3+840.00 3+960.00 120.00 120.00 6.000 720.00 0.03 21.60
4+090.00 4+640.00 550.00 550.00 6.000 3,300.00 0.03 99.00
4+670.00 5+040.00 370.00 370.00 6.000 2,220.00 0.03 66.60
TOTAL ACUMULADO 6,199.50
COEFICIENTE ESPONJAMIENTO : 1.30
TOTAL 8,059.35
NOTA: Las areas de corte que se anotan son las areas de corte procesadas según las secciones transversales y que se dan en la planilla de excavacion
a nivel de subrasante.
MUNICIPALIDAD DISTRITAL DE PUEBLO NUEVO
SUSTENTO DE METRADOS
CALCULO DE AREAS Y VOLUMENES DE MATERIAL ORGANICO
1.2.4 ELIMINACIÓN DE MATERIAL ORGANICO ( LIMPIEZA DE DREN ) Dp = 1.56 Km.
50.497 50.497
MUNICIPALIDAD DISTRITAL DE PUEBLO NUEVO
Longitud de
CN° PI SA Area AREA (m2)
Curva
0 0 0.000 0 0.000
1 0+034.512 37.651 1.930 72.666 72.666
2 01+000.011 2.751 0.780 2.146
3 01+392.873 12.976 1.710 22.189
4 01+440.830 16.551 1.710 28.302
5 01+520.677 51.916 0.780 40.494
6 01+635.455 22.292 2.790 62.195
7 01+850.347 22.551 0.520 11.727
8 01+926.907 14.937 0.780 11.651 178.703
9 02+048.915 11.112 0.780 8.667
10 02+163.644 25.143 0.520 13.074
11 02+273.106 26.617 0.780 20.761
12 02+394.630 20.800 0.520 10.816
13 02+454.408 14.104 0.780 11.001
14 02+979.106 2.823 1.710 4.827 69.147
15 03+094.343 95.046 1.210 115.006
16 03+173.351 12.246 0.780 9.552
17 03+364.633 7.435 1.930 14.350
18 03+399.446 4.566 1.930 8.812
19 03+421.635 13.060 1.930 25.206
20 03+440.461 4.135 1.930 7.981
21 03+502.168 9.012 1.210 10.905
22 03+640.430 4.326 1.930 8.349
23 03+654.645 4.190 1.930 8.087
24 03+700.825 3.895 1.930 7.517
25 03+758.602 4.540 1.930 8.8
26 03+787.267 6.727 1.930 12.983
27 03+807.495 3.599 1.930 6.946
28 03+841.801 26.809 1.930 51.741 296.196
29 04+176.613 111.884 1.210 135.380
30 04+217.920 11.200 1.410 15.792
31 04+270.247 7.370 1.210 8.918
32 04+660.203 24.548 1.930 47.378
33 04+727.919 34.163 1.410 48.170 255.637
34 05+080.352 53.389 1.210 64.601
35 05+396.466 17.005 0.780 13.264
36 05+459.099 11.573 0.780 9.027
37 05+501.938 7.918 0.780 6.176
38 05+781.368 12.408 0.780 9.678
39 05+839.715 25.867 0.780 20.176
40 05+875.396 6.884 0.780 5.370
41 05+897.101 8.444 1.930 16.297 144.589