Sunteți pe pagina 1din 1

Legend

Total Builtup Area in Total Net FSI Area in


Block Name Floor Name
Sq.m. Sq.m.

Hindustan petroleum
SITE CUM BASEMENT FLOOR PLAN
& GROUND FLOOR PLAN SHEET NO - 1 / 3
FLOOR-BF1 7.958342 0
Thiruvandram Road

Gas Station

KEY PLAN
25.40 (As Per Site & F.M.B) (NOT TO SCALE)

Annai
Multispeciality
With 7.5 cm dwarf wall

4.85 5.20 1.62 1.78 Hospital


3.87

3.66

FLOOR-GROUND 771.725 771.725


a
Gate 7.20m wide

Ro

Waste water
1.50
1.52
2.05
6.77

Sewage treatment S T Sump filter tank


Plant plan
Road

3.05
14.60 (As Per Site)

6.98 17.65
Road
4.50 10.67 .30
.78

.23 8.41 .23 2.50 .12 4.02 .23 1.68 .23


UP
6.98 1.75
17.48
SITE
1.85

3.01 Above Balcony projection at F.F, S.F, T.F, F.F


4.80 9.72 1.20 SPECIFICATION
.78

rehnus street
V2

V2
V2

V2

DN UP
.25 .61
IOB Bank

TREAD-.30 Lift 1. R.C.C RAFT FOUNDATION.


1.12

RISER-.15 UP TREAD-.30 2. BRICK WORK IN SUPERSTRUCTURE IN C.M. 1:5


30.20 (As Per Site & F.M.B)

1.68x1.70 RISER-.15
Selvi Kalyana
V1

3.25 V V V W1 W1 W1 3. R.C.C. COLUMNS, PLINTH BEAMS, ROOF SLAB,


9.10

Mahaal
.23 1.70 .23

15.11
Above Balcony projection at F.F, S.F, T.F, F.F

D
UP
ram Road ETC. IN C.C. 1:2:4.
UP TO Ground Lvl

Lift
Thiruvand
4.99

.16 3.25 .61


1.93

Road 4. PLASTERING WORK IN C.M. 1:4.


6.00m wide Drive way

V 4.02 X 1.93 1.68x1.70


Rain Water Trench 1.0m Wide 1.5m Deep

8.24 .62 8.16 5. MOSAIC OR MARBLE FLOORING IN C.M. 1:3.


V1

V1

Municipal Ground

6.10 6. TWO COATS OF COLOUR OR WHITE WASH.


Store
Glass window

2.50 x 4.99 7. ALL DOORS AND WINDOWS IN TEAKWOOD.


Grrenment Siddha 4th & TERRACE FLOOR PLAN

FLOOR01 901.4418 901.4418


10.87

Service Room
La

1st , 2nd & 3rd FLOOR PLAN SHEET NO - 2/ 3 SHEET NO - 3 / 3


Tenkasi
10.87

.50

8. TWO COATS OF ENAMEL PAINT OVER ONE


7.30 (As Medical College
ng

LIGHTNING ARRESTER
V ELEVATION & SECTION

.80
8.41 x 10.64
ark

Road

Per Site) COAT OF PRIMER ON WOOD WORK.


an

D Centenary Hall
V1

6.00
aS

Office Canteen
3.57 9. WEATHERING COURSE IN BRICK JELLY
10.70

1.45
V1

O.H.T
Tirunelveli
tre

Gate 6.10 x 8.94 CONCRETE IN C.M. WITH TWO COURSES OF FLAT


With 7.55.00m wide
et
15.47

4.88

5.38
5.38
cm dw TILES LAID TO DETAIL
8.82

Machine room
8.94

arf wall D
V
5.30 3.00 Passage
3.53

AREA STATEMENT SQM


Above Slab Projection

3.05
Glass window

Ro
V1

2.50 x 2.76
V1

6.10
ad

Road 17.65
4.79

Others
4.34 17.65 19.57
.50

D
AS PER DOCUMENT - 1560.13 SQ.M 17.65
3.00

TERRACE FLOOR LVL


18.00 (As Per Site & F.M.B)

5.93 Store .23 15.28 .23 1.68 .23 .23 3.20 .12 1.52 .12 2.71 .12 1.52 .12 5.85 .23 1.68 .23 1.69 .23 .23
6.10 8.24 .62 8.16 .23 .23 8.41 .23 3.50 .12 3.02 .23 1.68 .23 .23 1.62 .12 1.96 .12 4.98 .231.10.121.10.12 3.81 .23 1.68 .23
V 19.57
.23 1.28.12 3.30 .12.88
2.50 x 2.76 AS PER PATTA - 1559.56 Sq.m 8.73 6.98 1.75 6.98 1.75 8.73

CORRIDOR
V1

V4 D

3.40
10.84 9.72
.23 1.87 .12 1.36 .12 1.30 .23

9.72 1.20 1.28 5.70 10.84


.78

.78

.78

.78
.12

1.14
1.34

1.20
Above

UP
wc UP
10% NON .30

UP
D .30 UP
4.60

A A
1.28 x 1.30 Tank For Roof
FLOOR F.S.I TOTAL 1.52 Room-16
R.S2

V4

Wash
D2 Passage F.S.I PARKING .30 BALCONY Top water Gymnasium Area Office
Glass window

.23 1.85

.23 1.85
BALCONY BALCONY BALCONY DN FOURTH FLOOR LVL

1.35
1.29
Scientifically closed

3.30 x 2.50 DN 3.68 x 2.63 x 0.90


O 5.50 x 2.50 W3 W2 W2 W2 W2 W2 V3 W2 V4 V4 W2
W3 V3 W2 W2 W1 W1 V4 V4 8,700 Lts Capacity
V1

Above Balcony projection at F.F, S.F, T.F, F.F

1.28 x 1.36 M.V


BASEMENT FLOOR - - 760.04 760.04
27,000 lts capacity

.23 1.70 .23

.23

.23 1.70 .23

.23

.23

.12 1.70 .12 1.52 .23 1.70 .23

.121.17.23

.23 1.70 .23


901.4418 901.4418
V4

FLOOR02
Metro Water tank

D D2 D D
A 3.25 .61

Lift Machine room


D
B LIFT Toilet Wc Wc

CORRIDOR 2.00M WIDE


1.12

CORRIDOR

CORRIDOR
LIFT

D
D2 DN LIFT Lift Office Room - 9 1.62x1.64 Store Room

3.40
3.00x3.00x3.00

.50

.50

W2 W2

3.03 x 1.10

3.03 x 1.10
1.68 x 1.70 3.50 x 1.93 Toilet 1.96 x 1.52 1.37x1.17 1.73x1.17

2.69 x 1.52
Wide 1.5m Deep

(Centralized A.C) 1.68x1.70 3.81 x 3.03 1.68x1.70

2.63
2.69 x 1.52
:20 PASSAGE 1.68 x 1.70
Room e1 -

D2
GROUND FLOOR 761.14 - 761.14 D2

Toilet
wc GL 3.02 x 1.81 D2 D2

Toilet
V4

OFFICE
OPEN TERRACE
p wc

Glass window
D
D2

5.85 x 3.95

Wc

Wc
(1:8 SLOPE) 1.28x1.87 Slo OFFICE L.D Room-03

23.68
34.99

5.50 x 2.36 1.28 x 1.30


Compound Wall AHU THIRD FLOOR LVL Room-08 Room-11

1.68 x 1.70
Above
4.88

6.79 x 4.88 SPECIFICATION Office15 SPECIFICATION

D
8.55 x 3.09 8.55 x 3.09 4.98 x 5.49

5.27

5.72

5.72
5.37
W2 W2

1.52
V

5.49
Sand bed
6.15m wide Drive way D wc AHU Office GP Over Head Water Tank Above

D2

D2
51.22 3.70 x 3.73
32.60

PASSAGE

for .15thk. FIRST FLOOR 839.64 - 890.86 scientifically Closed

3.97
D Tank For Recycled
1.50

Store Store 1.50 x 1.10


3.06

3.09
8.55 x 3.09 ALL CONCRETE WORK SHOULD BE ALL CONCRETE WORK SHOULD BE
39.42

8.41 x 10.70

3.33
R.S 5/G.D5 GP
D2 D2

OFFICE 2.12m wide Passage 4.82x5.26x0.90


6.15

2.42 x 2.20 2.40 x 2.20 Sullage Water


Office - 1 D
5.85

5.85

34.99

2.40
5 to 7.5cm Store Room 22,000 Lts Capacity For Flushing Of Toilet
7.80 (As Per Sit

CARRIED AS PER IS:456-2000 CARRIED AS PER IS:456-2000

12.72
5cm to 7cm

2.12

3.50
wc W2 W2 V3
size pebbles 3.81 x 3.03 Closed 3.68 x 2.40 x 0.90
R.S2

sized pebbles D D D
SECOND FLOOR 654.41 236.46 - 890.87
1.50 x 1.10
(Centralized A.C) USE MIX M:25 GRADE FOR ALL R.C.C WORKS 8,000 Lts Capacity USE MIX M:25 GRADE FOR ALL R.C.C WORKS

18.30
10.70

10.70

10.70

10.70
D2
.23

10.47
.12
Glass window

.23
D
1.00 D

.12

.23

.23
store Office Canteen

.12
Toilet CLEAR COVER TO THE RENIFORCEMENT FOR Retail Shop Retail Shop CLEAR COVER TO THE RENIFORCEMENT FOR
V

M.V
Office D .23 4.82 .23 3.68 .23 SECOND FLOOR LVL

2.73 x 1.55 M.V


D 5.50 x 5.85 8.72 x 23.66 1.75 8.41 x 2.91 D
8.18 .62 2.50 .12 2.92 .23 .39 8.16 .23 2.76 x 1.52 4.69 x 1.64
THIRD FLOOR 849.78 41.08 - 890.86 W2
RS7

FOOTING :50MM , COLUMN 40MM, BEAM 30MM 9.18 FOOTING :50MM , COLUMN 40MM, BEAM 30MM
3.88
2.91

BALCONY
Room W3

D2

3.17
Toilet
.23

SLAB 30MM , R.C.C WALL 30MM SLAB 30MM , R.C.C WALL 30MM

Glass window
Rain Water Trench 1.0m

W2 3.02 x 3.17
.50

2.92
Glass window

D2
Rain Water Trench Detail Office Electrical meter Room Office
23.99

23.66

4.95

3.50
D Office-10
1.46

4.98
QUARRY DUST CAN BE USED FOR ALL QUARRY DUST CAN BE USED FOR ALL

5.40

5.15
4.98
FOURTH FLOOR 862.87 49.15 - 912.02 8.55 x 5.40 R.S3/G.D3 W2 W1 5.66 x 5.38
.12 1.57 .12

6.53 x 4.98
1.46 1.46 4.95 Office Canteen Toilet Electrical meter Room 7.57 x 3.51 P.C.C WORKS P.C.C 1:4:8/1:5:10) AND BRICK JELLY P.C.C WORKS P.C.C 1:4:8/1:5:10) AND BRICK JELLY

1.69 .12
6.10 Retail Shop
V

Meeting Hall
V4

1.94 x 1.52
8.55 x 3.09 (Centralized A.C) 6.10 A/C Parlour Shop
V

D2
8.61 x 23.66 WORKS (RIVER SAND IF NOT AVAILABLE) W3 WORKS (RIVER SAND IF NOT AVAILABLE)
24.29

6.10 Store FIRST FLOOR LVL


.30

23.66

1.50

TOTAL 3967.84 377.91 760.04 5105.79


D2
1.46

6.35 x 2.50
6.10 .23 4.45 .121.30
W2 (Centralized A.C) .23 3.18 .12 2.57 Toilet
Schedule of Joineries. Schedule of Joineries.

901.143 901.143
.23 1.60 .12
3.00

4.15

FLOOR03
W1 6.10

D
e & F.M.B)

D
.64
5.86

W1

D
D 3.02 x 1.86

.12
.12 1.48 .23

.23

.23

.23
.23
.12

D2
1.46 1.46 DWarfWall Masonry 4.61 x 1.97

3.30
Glass window

M.V
G.W2

wc
F.S.I ACHIEVED =2.54 Toilet R.S ROLLING SHUTTER 8.00 X 2.44 Toilet R.S ROLLING SHUTTER 8.00 X 2.44

M.V

M.V
3.18 x 1.64

2.73 x 1.55 M.V


.075m ht.
Toilet

D
1.60 x 1.48 4.69 x 1.64 V3
Office R.S1 ROLLING SHUTTER 5.00 X 2.44 R.S1 ROLLING SHUTTER 5.00 X 2.44
V4
V

18.83

Gate Detail 2.76 x 1.52 2.85 x 1.52


UP

W1 Office-03 W1

2.73 x 1.55
V

1.88 x 1.85
RS8

D2 Office
3.90

R.S2 ROLLING SHUTTER 4.60 X 2.44 R.S2 ROLLING SHUTTER 4.60 X 2.44

D2
1.62 .50 1.67

= 55.327% Office-08 Burner Department Store

D2
D2Toilet

Toilet
5.50 PLOT COVERAGE Office 8.55 x 4.98 W1
GROUND FLOOR LVL wc Restaurant
Glass window

Glass window
Sump For Rain Water

2.46 x 5.13 4.45 x 4.77 D2


1.52 TREAD-.30 8.78 x 4.90 14.51 x 8.18 R.S3 ROLLING SHUTTER 3.66 X 2.44 R.S3 ROLLING SHUTTER 3.66 X 2.44
Glass window

4.77
4.72 x 4.98

4.94
4.87
Office-16

4.98
RISER-.15 5.50 x 8.22 R.S3/G.D3 (Centralized A.C) Office-11 R.S4 ROLLING SHUTTER 3.05 X 2.44 R.S4 ROLLING SHUTTER 3.05 X 2.44
B A B

1.20
CAR PARKING PROVIDED - 44 NOS A
.50

.30
Scientifically closed

(Centralized A.C) GROUND LVL


3.22

W1 7.57 x 3.23 R.S5 ROLLING SHUTTER 2.00 X 2.44 W1 6.15 x 3.13 W3 6.10 G.L R.S5 ROLLING SHUTTER 2.00 X 2.44
1.83

2.12m WIDE CORRIDOR

1.68m WIDE CORRIDOR


23.50 (As Per Site & F.M.B)

D
T.W PARKING PROVIDED - 176 NOS R.S6 ROLLING SHUTTER 1.62 X 2.44 R.S6 ROLLING SHUTTER 1.62 X 2.44
1.62

Railing at .90m Height


8,100 lts capacity

(Centralized A.C)
Above Slab Projection

UP DWarfWall Masonry (Centralized A.C) .23 5.64 .23

1.57
2.45 .23 .075m ht. R.S7 ROLLING SHUTTER 6.05 X 2.44 Office R.S7 ROLLING SHUTTER 6.05 X 2.44
office
TREAD-.30

2.39M WIDE CORRIDOR

2.39M WIDE CORRIDOR


V

D
.30 .075
V

GL GL R.S8 ROLLING SHUTTER 5.96 X 2.44 R.S8 ROLLING SHUTTER 5.96 X 2.44
1.83x1.83x2.44

7.00 (As Per Sit

BASEMENT FLOOR LVL

D
6.61 x 9.36

D
D
RISER-.15 Railing at .75m Height D W3
Indoor Game
.20

R.S9 ROLLING SHUTTER 5.68 X 2.44 R.S9 ROLLING SHUTTER 5.68 X 2.44

.23

.23

.23
(Centralized A.C)

.12
NORTH POINT
R.S6/G.D6

.23
11.33
.34 Toilet Toilet

M.V
11.39

Toilet

M.V

M.V
4.72 x 2.85 4.69 x 1.64 G.D GLASS DOOR 1.22 X 2.10 6.39 x 10.95 G.D GLASS DOOR 1.22 X 2.10
5.58

ALL DIMENSIONS ARE IN METRES 3.18 x 1.64


3.28 M WIDE PASSAGE

3.18 x 1.64

39.42

39.42
2.85 x 1.52 2.76 x 1.52
Tread 0.30 .46 L.D LIFT DOOR 1.50 X 2.10 2.85 x 1.52 (Centralized A.C) L.D LIFT DOOR 1.50 X 2.10
Lift Well

2.73 x 1.55
34.99

34.99

34.99

34.99
3.73 x 1.99

Dn TO Basement W3 W3
Harvesting

W W

D2

D2

D2
1 / 3rd OF TERRACE FLOOR AREA
4.23

Riser 0.15 D DOOR 1.00 X 2.10 D DOOR 1.00 X 2.10

Toilet
25.19

Glass Partition
W3
.15
Glass window

Glass window

D2 Head Room
SECTION ON AB
P.C.C 1:4:8 mix
Lift D2 DOOR 0.75 X 2.10 D2 DOOR 0.75 X 2.10
Glass window

SCALE 1: 100
R.S1/G.D1

R.S1/G.D1
V

Office 2.12 1.68


.15 Office
V

Sand Filling Office G.W GLASS WINDOW Office-17 5.64 x 6.10 FOR SOLAR G.W GLASS WINDOW
RS9

1.99 x 1.94 .60 R.S4/G.D4 W1 6.05 X 2.44 6.05 X 2.44


6.20

5.95
12.12 8.55 Finished level

6.12
8.55 x 5.95
5.66

6.22

6.22
8.78 x 6.20 R.S4/G.D4 R.S3/G.D3 Office-04 Office-07 Office-12 G.W1 GLASS WINDOW
3.41 of step Waist slab DWarfWall Masonry detail LEGEND:
8.55 x 25.19 2.12 2.39
5.96 X 2.44 6.15 x 4.58
OFFICE G.W1 GLASS WINDOW 5.96 X 2.44
.27

5.50 G.W2 GLASS WINDOW 5.68 X 2.44 G.W2 GLASS WINDOW 5.68 X 2.44
Lift
6.15 x 4.58 6.39 x 3.00 7.57 x 4.48 PHOTO VOLTAIC SYSTEM LIGHTNING ARRESTER LIGHTNING ARRESTER

.80
(Centralized A.C)

FLOOR04 901.143 901.143


3.28
Above Balcony projection at F.F, S.F, T.F, F.F office (Centralized A.C) (Centralized A.C) OFFICE (Centralized A.C) W WINDOW 2.51 X 2.00 W3 W WINDOW 2.51 X 2.00
2.61

1.99 x 1.94 8.78 x 3.21 5.50 x 2.82 W W W3 W3


1.80

HAND RAIL SECTION W1 WINDOW 1.83 X 2.00 W1 WINDOW 1.83 X 2.00


4.06
D
D

23.58
D

3.55 R.S/G.D R.S4/G.D4 R.S/G.D EXISTING SHOWN IN O.H.T


W2 WINDOW 1.52 X 2.00 W2 WINDOW 1.52 X 2.00

D
e & F.M.B)

1.80 .23

.23

D
10.63

D
W3 WINDOW 1.22 X 2.00 W3 WINDOW 1.22 X 2.00
5.29

D
.12
8.74
.65

.65

.23
.12

5.30
5.38
5.38
12.71
.23

BALCONY
PROPOSED SHOWN IN 2.46 2.92 2.92 2.46 2.92 2.89 2.92
.23

.23

.23
Machine room
V 2.51 X 0.61 V 2.51 X 0.61

24.12
GD VENTILATOR 2.92 VENTILATOR
24.29

24.29

24.29

4.50
Glass window

M.V
6.10 Toilet 3.18 x 1.49 Toilet

M.V

M.V
1.46

1.46

1.46

1.46
Toilet
OPEN TERRACE

1.32
Office 2.76 x 1.52
4.69 x 1.64 V1 VENTILATOR 1.83 X 0.61 2.85 x 1.52
2.18 V1 VENTILATOR 1.83 X 0.61
BOUNDARY SHOWN IN V2 V2
BALCONY

2.85 x 1.52
VENTILATOR 1.52 X 0.61 VENTILATOR 1.52 X 0.61
2.90

25.92
Machine room
UP UP 8.78 x 2.90 R.S5/G.D5 1.46 1.46 1.46 1.46 1.46 1.46 2.46 1.46 1.46
Above Slab Projection 2.46

D2
8.77 10.63 W3
.65

.65

2.18m WIDE CORRIDOR


D2

D2
V3 VENTILATOR 1.22 X 0.61 W3 V3 VENTILATOR 1.22 X 0.61
.30

1.83
Glass window

W W
Glass window

Office
.30

.30

.30
5.30

6.10 Terrace Floor Level ROAD SHOWN IN V4 VENTILATOR 0.91 X 0.61 V4 VENTILATOR 0.91 X 0.61

BALCONY
1.46 1.46 TERRACE FLOOR LVL
11.66

.M.B) e

R.S3/G.D3
1.20m hot 6.53 x 6.13
.12

6.13
Office-12
6.92

.23 8.61 .23 3.28 .23 1.99 .23 8.72 .23

6.13
6.13

6.13
Water storagetank Office-05 (Centralized A.C)
1.83

3.90

3.90

3.90

3.90
Office-18
e&F Deep
W1

4.19
Office Office NORTH POINT NORTH POINT
Glass window

23.75 7.57 x 4.48

er Sit te 7.20m w arf wall

20.82
id 1.5m Office 6.39 x 3.00 ALL DIMENSIONS ARE IN METRES 6.15 x 4.49 ALL DIMENSIONS ARE IN METRES
06

HotWater outlet
Tr 5.00
12.21 x 8.78 8.83 x 12.59

3.40
(Centralized A.C)
s P ide (Centralized A.C)
3.50

R.S5/G.D5 W3
(A
8.78 x 3.50 (Centralized A.C)
mW W W W3

5.40 Ga
1.0 w
cm d

.30
an SCALE 1: 100 SCALE 1: 100
sfo r e n ch
.00 2 7 .5
Cold Water Inlet
UP DN UP DN UP DN UP DN
18
R.S6/G.D6

12.59

D
DN FOURTH FLOOR LVL

D
T h
GROUND FLOOR PLAN
5.00

D
12.21

.98
r Wit

.23
rm
Wate

.23
.23

.23
.12

LEGEND: LEGEND:
2.89

Solar Water Heating Detail


.M.B) y close

3.04

3.04
M.V
TREAD-.30 TREAD-.30 TREAD-.30 TREAD-.30

M.V
er d Toilet 5.88
Rain Toilet

M.V

D
RISER-.15 RISER-.15 Toilet RISER-.15 3.18 x 1.49 RISER-.15 2.45

e & SFcientificall Sump For


ya R.S6/G.D6 2.76 x 1.52 4.69 x 1.64 2.85 x 1.52 G.D6
R.S6/G.D6 2.85 x 1.52 .23 1.99 .23

3.40
rd
it
EXISTING SHOWN IN EXISTING SHOWN IN

4384.853 4376.895
AHU

2.12m WIDE CORRIDOR


Grand Total

D2
3.28 M WIDE PASSAGE

D2
S
D

D2
W
r W

2.39M WIDE CORRIDOR


e
.23

.23
P n

PASSAGE 3.28 M WIDE


PASSAGE 3.28 M WIDE

D Electrical meter Room


Glass window

ctio
AHU
5.30 (As
R.S1/G.D1

Colle e Water
PROPOSED SHOWN IN Lift PROPOSED SHOWN IN

Lift Machine room


16.10

23.68
Glass window

Lift Lift Office-06 Lift W1 Electrical meter Room


R.S1/G.D1

8.78 x 5.85 Office-14

6.12

5.58
Scientifically sealed

5.95
THIRD FLOOR LVL
5.85

5.85

5.85
Office-19 W3
GL

1.50 g 1.99 x 1.94


Sulla
R.C.C. cover Manhole cover 1.99 x 1.94
1.99 x 1.94 1.99 x 1.94
2.44 y
slab 6.15 x 5.85 7.57 x 4.31 BOUNDARY SHOWN IN 8.72 x 6.12 BOUNDARY SHOWN IN

4.50 x 4.50 1.83x


Office 6.15 x 4.36 3.28 (Centralized A.C)
4.00

4.00
4.46
Scientifically sealed

it GL R.C.C. cover Manhole cover


(Centralized A.C)
.15

1.83x lts capac


G L
G.L. 8.55 x 4.00
(Centralized A.C)

8.41
slab
Lift
.15

Lift ROAD SHOWN IN (Centralized A.C) ROAD SHOWN IN

4.00 x 1.99
G.L. GL
Lift Lift W W

1.5

3.50
8,100
Plinth Beam
OWNER'S SIGNATURE 1.99 x 1.94

Splay
R.C.C. Wall
1.99 x 1.94 1.99 x 1.94 1.99 x 1.94 D
1.20

R.C.C. Wall
1.92

18.30
R.S/G.D
2.44

8mm dia stirrups


R.S/G.D

D
D
3.00

at .15mm c/c
R.S/G.D R.S/G.D 3.28 R.S/G.D

.50
3.28
1.80 .23

.23

1.80 .23

.23

.23

1.80 .23

1.80 .23

.23

.23
Water proofing Water proofing
2.70

Both Way 12mm at


treatment treatment
To Motor. W Glass Partition W w SECOND FLOOR LVL
R.C.C SLOPE ROOF SLAB

1.68
6" c/c

G.D
1.50

1.80

1.80
G.D
BALCONY BALCONY BALCONY BALCONY

G.D
CORRIDOR CORRIDOR BALCONY BALCONY
.30

P.C.C.1:5:10
BALCONY
.30

BALCONY BALCONY
.30

RCC
.30 .30 .90

Grade M P.C.C.1:5:10 Sand bed. .15m dia BALCONY


.30

perforated
Section of Sump.
.23 thk Brick Wall
pipe
8.94 10.63 10.63

3.50
8.94 10.63 10.63 8.94 10.63 8.94 8.94
.65

.65

.65

.65

.65

.65

.65

.65

.65
.23

Sand bed.
Manhole cover Earth
6.10 6.10 6.10 6.10 6.10
PCC
Grade M
Sand Filling
Section of Sump. above .60x.60
OWNER'S SIGNATURE 25.67 OWNER'S SIGNATURE
GL GL Section of Footing .23 8.78 .23 3.28 .23 1.99 .23 8.55 .23 .23 8.78 .23 3.28 .23 1.99 .23 8.72 .23 .23 6.15 .12 2.28 .46 3.28 .23 2.22 2.90 7.57 .23 .23 6.15 .12 2.74 3.28 .23 1.99 .23 8.72 .23 FIRST FLOOR LVL
.23

3.00
Manhole cover 23.75 23.92 25.67 23.92
.34 above .60x.60

Floor Space Index


3.00
.30

Collection Sump For

4.6
TERRACE FLOOR PLAN
1.83

3.30
Rain Water
.46 1.83 x 1.83 x 2.44
8,100 lts capacity. Scientifically closed
Manhole cover
above .60x.60
FIRST FLOOR PLAN SECOND FLOOR PLAN THIRD FLOOR PLAN FOURTH FLOOR PLAN
3.00
.15.15

P.C.C 1:4:8 mix MetroWater sump Water

SITE CUM BASEMENT FLOOR PLAN


Column Main
Reinforcement
.23

3.00 x 3.00 x 3.00 Section. GROUND FLOOR LVL


.60 Sand Filling .23 .23 27,000 Its capacity
1.83

1.20

1.20
.23

GROUND LVL G.L G.L


CompoundWall detail Plan of Sump
.23 3.00 .23

ELEVATION
Column Foundation detail Plan of Sump Bore Well Detail
Plan of Footing Sullage & Roof top water sump Metro water sump LICENSED SURVEYOR SIGNATURE LICENSED SURVEYOR SIGNATURE LICENSED SURVEYOR SIGNATURE

Plot Coverage 58.33%

Existing Floor Space


1.77
Index

Existing Plot Coverage 48.00%

Applicant Name S Jagadheesan

Proposed Address 127,Trivandrum road,ward B, Block 25,T.Sno 2083Tirunelveli corporation

S-ar putea să vă placă și