Sunteți pe pagina 1din 463

DOCUMENTO N° REVISION

(DOCUMENT Nº) (REVISION)

602-MC-40-02 0

CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)

CLIENTE : REPSOL
(CLIENT)

PROYECTO C-10. AMPLIACION REFINERIA


:
(PROJECT) CARTAGENA
LOCALIZACIÓN : Cartagena, España
(LOCATION)

Memoria de Cálculo
ESTRUCTURA P
(Calculation STRUCTURE P)

Rev. Fecha Descripción Preparado por Revisado por Aprobado por


(Rev) (Date) (Description) (Originator) (Checker) (Approver)
0 03-08-09 FINAL PRAENUCH S. SIRILUCK C. MR.
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 2 de 463
(SUBJECT) (Page)

ÍNDICE
(INDEX)

1.0 COVER SHEET 1

2.0 INDEX 2

3.0 AMENDMENT SHEET 5

4.0 GENERAL NOTES AND REFERENCES 7

4.1 Strength of material 7


4.1.1 Concrete and reinforcement 7
4.1.2 Steel 8

4.2 Soil 8

4.3 Friction coefficient 9

4.4 References 9
4.4.1 Specifications 9
4.4.2 Design code 10
4.4.3 Drawings 10
4.4.4 Pipe stress report 11

5.0 STRUCTURE DESCRIPTION AND DESIGN PHILOSOPHY 12

5.1 Structure description 12

5.2 Design philosophy 13

6.0 STRUCTURAL DIAGRAM 13

6.1 Plan and elevation 13

6.2 Member section 21


6.2.1 Concrete section 21
6.2.2 Steel section 21
6.2.3 Foundation dimension 22

7.0 LOADING ASSUMPTION 22

7.1 Permanent loads 22


7.1.1 Load 01: Structure self-weight 22
7.1.2 Load 02: Fire proofing weight 22
7.1.3 Load 03: Equipment and platform 22
7.1.4 Load 04: Piping empty weight +Insulation 23

7.2 Variable loads 23


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 3 de 463
(SUBJECT) (Page)

7.2.1 Load 05: Hydrotest Loads 23


7.2.2 Load 06: Operating Loads 24
7.2.3 Load 07: Maintenance live load 24
7.2.4 Load 08: Platform live load, stair, paving refer to ED-M-02.00-02 section 3.1.2 and 5.1 25
7.2.5 Load 09: Snow Load – negligible 25
7.2.6 Load 10: Ambient Thermal refer to ED-M-02.01-02 section 3.3.1 25
7.2.7 Load 11: Stress_Y (Vertical loads) 25
7.2.8 Load 12: Stress_X (Horizontal loads in global X direction) 25
7.2.9 Load 13: Stress_Z (Horizontal loads in global Z direction) 25

7.3 Variable Wind loads 26


7.3.1 Load 14: Wind direction + X 27
7.3.2 Load 15: Wind direction - X 27
7.3.3 Load 16: Wind direction + Z 27
7.3.4 Load 17: Wind direction - Z 27

7.4 Variable Seismic loads 28


7.4.1 Load 18: Seismic direction + X 28
7.4.2 Load 19: Seismic direction + Z 28

7.5 Equipment load 29


7.5.1 602C-003 29
7.5.2 602C-004 31
7.5.3 602C-005 33
7.5.4 602E-013A/C 35
7.5.5 602E-013B/D 37
7.5.6 602E-014A/B 39
7.5.7 602E-015A/B 41
7.5.8 602L-011 43

8.0 LOAD COMBINATION 47

8.1 Load Combination for Stability Check 47

8.2 Load Combination for Reactions & Displacements (ELS) 47

8.3 Load Combination for Steel on Ultimate (ELU) and Concrete on Ultimate (Precast Concrete) 47

8.4 Load Combination for Concrete on Ultimate (In Site Concrete) 47

9.0 CONCRETE STRUCTURE DESIGN 48

9.1 Beam design (with a sketch of GA and RC) 48


9.1.1 Beam V-1 48
9.1.2 Beam V-2 58
9.1.3 Beam V-3 65
9.1.4 Beam V-4 72

9.2 Column design 79


9.2.1 Column C-1 79
9.2.2 Column C-2 85
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 4 de 463
(SUBJECT) (Page)

9.3 Slab design 91


9.3.1 Slab L1 91
9.3.2 Slab L2 96

9.4 Embedded plate design 102


9.4.1 Type A-3 102
9.4.2 Type A-5 105
9.4.3 Type A-14 108
9.4.4 Type A-20 111
9.4.5 Type B-5 114
9.4.6 Type B-15 117
9.4.7 Type C-13 120
9.4.8 Type D-14 123
9.4.9 Type E-13 126

10.0 STEEL DESIGN 129

10.1 Utility Ratio 129

10.2 LATERAL DISPLACEMENT 130

10.3 Base plate design 131


10.3.1 COLUMN HEB500 131
10.3.2 COLUMN HEB300 135

10.4 Monorail design 138

11.0 FOUNDATION DESIGN 141

11.1 Soil bearing pressure 142

11.2 Stability check 143

11.3 FOUNDATION C-1 148


11.3.1 Slab reinforcement 148
11.3.2 Shear capacity 157

11.4 FOUNDATION C-2 161


11.4.1 Slab reinforcement 161
11.4.2 Shear capacity 170

11.5 FOUNDATION C-3 176


11.5.1 Slab reinforcement 176
11.5.2 Shear capacity 181

11.6 Tie beam design 184


11.6.1 Beam VC-1 184
11.6.2 Ultimate force for reinforce concrete design 184

11.7 Beam deflection 189

PROGRAM INPUT & OUTOUT 210


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 5 de 463
(SUBJECT) (Page)

11.8 STAAD Input 210


11.8.1 Staad input for structural design 210
11.8.2 Staad input for foundation design 298

11.9 Equipment data 374

11.10 Stress report SC-008 409

11.11 Stress report SC-025 420

11.12 Stress report SC-026 432

11.13 Stress report SC-041 434

11.14 Stress report SC-042 457

11.15 Stress report SC-044 459


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 6 de 463
(SUBJECT) (Page)

AMENDMENT SHEET

SECTION NO. PAGE NO. AMENDMENT NO. REMARKS


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 7 de 463
(SUBJECT) (Page)

4.0 GENERAL NOTES AND REFERENCES

4.1 Strength of material


4.1.1 Concrete and reinforcement
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 8 de 463
(SUBJECT) (Page)

4.1.2 Steel

4.2 Soil
The soil properties are presented in the geotechnical report issued by Jolsa on Nov, 2007
including allowable soil bearing pressure, elastic moduli, soil density and etc. The values which
affect significantly to the foundation design are recommended in accordance with the soil
characteristic of an individual area and type of structure.

For structure P, soil condition refers to the test results of drilled borehole S-652/22 which is
located near the structure P.
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 9 de 463
(SUBJECT) (Page)

Soil Parameter:

Soil unit weight 20 kN/m³

Soil stiffness (refer structure N) 30000 kN/m²/m


2
Allowable foundation pressure 3.0 kg/cm

Increase 25% for wind and earthquake loads combination


2
Allowable foundation pressure = 1.3*2.5 = 3.25 kg/cm

4.3 Friction coefficient


Refer to ED-M-02.01-02: Loads for design of structures

• Teflon to Teflon φ = 0.10

• Steel to Steel φ = 0.35

• Steel to Concrete φ = 0.45

Refer to Soil report:

• Concrete to soil φ = 0.45

4.4 References
4.4.1 Specifications

Specification Description
DBD-C10 Rev1 DESIGN BASIC DATA
ED-M-02.00-02 LOAD FOR STRUCTURE DESIGN
ED-M-01.00-02 STEEL STRUCTURE DESIGN SPECIFICATION
CONCRETE STRUCTURE AND FOUNDATION DESIGN
ED-Q-01.00-02
SPECIFICATION

GEOTECHNICAL STUDY UNIT 652 DELAYED COKIFICATION


094-059-07 AND SUBSTATION S-21 C10 PROJECT OF EXPANSION OF THE
REPSOL YPF REFINERY IN CARTAGENA , NOV 2007
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 10 de 463
(SUBJECT) (Page)

4.4.2 Design code

Code Description
EHE 98 “INSTRUCCION DE ORMIGON ESTRUCTURAL”
NCSE-02 “NORMA DE CONSTRUCCION SISMORRESISTENTE”
MINIMUM DESIGN LOADS FOR BUILDING AND OTHER
ASCE 7-05
STRUCTURE
EUROCODE 3 DESIGN OF STEEL STRUCTURES
UBC 97 UNIFORM BUILDING CODE 1997

4.4.3 Drawings

4.4.3.1 General Arrangement Drawings

Drawing no. Description


U-C10-A-75510 REV. 0 GENERAL PLOT PLAN
602-Q-U-C10-A-74045 REV.2 ANCHOR BOLT STANDARD
602-Q-U-C10-A-74046 REV.0 EMBEDDED PLATE STANDARD
602-M-U-C10-A-73889 REV.1 STRUCTURE P STEEL STRUCTURE
602-Q-U-C10-A-74053 REV.1 STRUCTURE P CONCRETE STRUCTURE
602-Q-U-C10-A-74052 REV.1 STRUCTURE P CONCRETE FOUNDATION

4.4.3.2 Equipment Drawings

Drawing no. Description


U-C10-C-73543 REV.0 EQUIPMENT DATA 602C-003
U-C10-C-73544 REV.0 EQUIPMENT DATA 602C-004
U-C10-C-73541 REV.2 EQUIPMENT DATA 602C-005
084039-D-042/EP-50270 REV.3 EQUIPMENT DATA 602E-013A/D
084039-D-050/EP-50271 REV.3 EQUIPMENT DATA 602E-013B/C
084039-D-058/EP-50272 REV.3 EQUIPMENT DATA 602E-014A/B
084039-D-066/EP-50273 REV.3 EQUIPMENT DATA 602E-015A/B
602-L-EP-50419 TO 422 REV.1 SISTEMA DE VACIO 602L-015
602-L-EP-50450 TO 454 REV.0 SISTEMA DE VACIO 602L-015
7996.07.00 REV.2 SEPARADOR DE VAPOR 602L-011
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 11 de 463
(SUBJECT) (Page)

4.4.4 Pipe stress report


Pipe stress reports relevant to loading on structure is as shown in the following table:

Pipe stress report Description


Preliminary loading information and embedded plates
SC-008
required on structure P
Preliminary loading information and embedded plates
SC-008 Rev.2
required on structure P

Release of hold information on SC-008 and additional


SC-025
loading information

SC-026 Additional loading information on structure P


SC-041 Update of loading information on structure P
SC-042 al loading information on structure P in area AM
SC-044 Update of loading information on structure P
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 12 de 463
(SUBJECT) (Page)

5.0 STRUCTURE DESCRIPTION AND DESIGN PHILOSOPHY

5.1 Structure description


Structure P is process structure located in Vacuum area. It is proposed in order to support the equipment no.
602C-001, 602C-002, 602C-003, 602E-013ABCD, 602E-014AB, 602E-015AB, 602H-001ABCD, 602H-
002ABCD, 602H-003ABCD, 602L-005AB, 602L-011

Structure P size is 23.8 x 12.0 x 40.0 metre height of 6 stories. Up to 21.0 metre (1st-3rd floor) is concrete
th th
structure and over 21.0 metre (4 -6 Floor) is steel structure. In plan figure 2 x 6 metre span transverse
direction and 2 x 10.0 metre span longitudinal direction.

Cast in situ concrete floors with beams at 2 start elevation +5.000 and + 11.800 in order to support
equipment 602C-001, 002, 003 and be fire protection in fire potential area.

Steel grating floors are defined using over floor elevation +21.0 metre as they are fast erection, not require
fire proof, non-tight platform type and light weight.

Fire protection to structural member as Repsol specification no. ED-N-02.00-02 ,structure P has tight floor at
elevation +11.80 then in vertical fire protection it is needed to extend the protection to +20.80 m

According to document U-C10-D-73510 and Repsol specification ED-N-02.00-02 equipments 602E-


013ABCD, 602E-014AB and 602E-015AB contains toxic material. All main steel members shall be fireproof.

Over the elevation +21.00 should be steel structure due to difficult erection of equipments.

Plant North

Perspective view of structure P


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 13 de 463
(SUBJECT) (Page)

5.2 Design philosophy


Structure P is 40 metre height structure. Moment frame concrete structure up to 21.0 metre and
continuous with moment frame steel structure entirely top in major axis column and brace frame
in minor axis column, connecting joint between two steel and concrete with anchor bolt by fix
connection. Space along longitudinal grid line is required for bundle pulling volume while
maintenance those exchanger. Plan bracings are applied every steel structure floors +27.0 ,
+33.0 , +40.0 etc.

Structure P foundation is considered to be combine foundation along transverse grid line with
totally 3 combine foundation. 1.40 metre below ground level is provided for underground system
room.

The structure resists the seismic acceleration of design, ac 0.07 g the concrete reinforcement in
accordance with NCSE chapter 4.5 not require.

6.0 STRUCTURAL DIAGRAM

6.1 Plan and elevation


• Plot plan shows Plan and Elevation of structure with gridline numbers

Structure P
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 14 de 463
(SUBJECT) (Page)

• Perspective view of structure P looking west


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 15 de 463
(SUBJECT) (Page)

• Plan view from STAAD Structural model

• Plan EL. +3000 mm

• Plan EL. +5000 mm


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 16 de 463
(SUBJECT) (Page)

• Plan EL. +11800 mm

• Plan EL. +21000 mm


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 17 de 463
(SUBJECT) (Page)

• Plan EL. +27000 mm

• Plan EL. +33000 mm


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 18 de 463
(SUBJECT) (Page)

• Plan EL. +37000,40000 mm


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 19 de 463
(SUBJECT) (Page)

• Elevation from STAAD file

Grid line Z 2 Grid line AA 2

Grid line AB 2 Grid line 21 A


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 20 de 463
(SUBJECT) (Page)

Grid line 23 A Grid line 25

Grid line 25 A
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 21 de 463
(SUBJECT) (Page)

6.2 Member section


6.2.1 Concrete section

Section Name Size Remark


Column P1 Rec. 1000x1000 Main column
P2,P3 Rec. 800x800 Stair column
Beam V1,V2 Rec. 800x1000 Main beam
V3 Rec. 600x800 Minor beam
V3 Rec. 600x800 Minor beam

6.2.2 Steel section

Section Name Size Remark


Column HEB 500 Main column
HEB 300 Stair column
HEB 260 Pipe support
HEB 200 Platform column
Beam HEB 550 Main beam
HEB 500 Main beam
HEB 360 Main beam
HEB 300 Main beam
IPE 600 Main beam
IPE 500 Main beam
IPE 400 Main beam
IPE 360 Minor beam
IPE 330 Minor beam
IPE 300 Minor beam
IPE 200 Minor beam
IPN 400 Monorail beam
Bracing HEB 240 Vertical bracing
HEB 200 Vertical bracing
L150x150x15 Plan bracing
L120x120x12 Plan bracing
L100x100x10 Plan bracing
L 70x70x7 Plan bracing
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 22 de 463
(SUBJECT) (Page)

6.2.3 Foundation dimension

• Foundation dimension

Section Name Size Remark


- C-1 17.5x4.0x1.2 Grid line 21 A
- C-2 17.5x6.0x1.2 Grid line 23 A
- C-3 17.5x6.8x1.2 Grid line 25 ,25 A

• Tie beam

Section Name Size Remark


- VC-1 0.40x0.40 Tie beam

7.0 LOADING ASSUMPTION

7.1 Permanent loads


7.1.1 Load 01: Structure self-weight


3
Concrete unit weight = 25 kN/m

3
Steel unit weight = 78 kN/m
7.1.2 Load 02: Fire proofing weight
Consider weight of fire proofing in the contour profile for steel beam d > 300 and block section for
steel beam d < 300mm with a minimum thickness 50 mm.

• unit weight = 15 kN/m


3

Note. Fireproofing weight will be generated automatically by program STAAD Pro and
inputted in their properties.
7.1.3 Load 03: Equipment and platform

• Equipment empty wt.+ insulation + top platform + connecting pipes

At elevation +5000

• Equipment no. 602C-003 = 184 kN (Rev. 0)

At elevation +11800

• Equipment no. 602C-004 = 36 kN (Rev. 0)


• Equipment no. 602C-005 = 76 kN (Rev. 0)
• Equipment no. 602L-011 = 24.6 kN (Rev. 2)

At elevation +21000
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 23 de 463
(SUBJECT) (Page)

• Equipment no. 602E-013A/C = 285 kN (Rev. 3)


• Equipment no. 602E-013B/D = 158 kN (Rev. 3)

At elevation +27000

• Equipment no. 602E-014A/B = 159 kN (Rev. 3)


• Equipment no. 602E-015A/B = 43 kN (Rev. 3)

At elevation +33000

• Equipment no. 602H-001A/C = 63 kN (Rev. 0)


• Equipment no. 602H-001B/D = 33 kN (Rev. 0)


2
Grating self-weight 0.3 kN/m for maximum support span 1.40m
• Grating/Checker plate above 602C-003
• Handrail 0.36kN/m
• Cable tray UDL 8kN/m for only supporting span 3.0m
7.1.4 Load 04: Piping empty weight +Insulation

• φ < 12” uniform loads of empty pipe wt. 0.8kN/m


2

• φ > 12” Concentrated loads of empty pipe wt. 0.8kN/m


2

• Vertical force of pipe install in pipe stress information SC-008, SC-008 Rev.2, SC-026,
SC-026, SC-041, SC-042 and SC-044)

7.2 Variable loads


7.2.1 Load 05: Hydrotest Loads

• Hydrotest fluid wt. of equipment

At elevation +5000

• Equipment no. 602C-003 = 662 kN (Rev. 0)

At elevation +11800

• Equipment no. 602C-004 = 34 kN (Rev. 0)


• Equipment no. 602C-005 = 69 kN (Rev. 0)
• Equipment no. 602L-011 = 46.6 kN (Rev. 2)

At elevation +21000

• Equipment no. 602E-013A/C = 146 kN (Rev. 3)


• Equipment no. 602E-013B/D = 78 kN (Rev. 3)

At elevation +27000

• Equipment no. 602E-014A/B = 80 kN (Rev. 3)


• Equipment no. 602E-015A/B = 17 kN (Rev. 3)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 24 de 463
(SUBJECT) (Page)

At elevation +33000

• Equipment no. 602H-001A/C = 72 kN (Rev. 0)


• Equipment no. 602H-001B/D = 30 kN (Rev. 0)


2 2 2
Hydro test fluid wt. of pipe 1.2kN/m (= 2.0kN/m – 0.8kN/m )
• Hydro test fluid wt. of pipe stress information SC-008, SC-008 Rev.2, SC-026, SC-026,
SC-041, SC-042 and SC-044

7.2.2 Load 06: Operating Loads

• Operating fluid wt. of equipment

At elevation +5000

• Equipment no. 602C-003 = 628 kN (Rev. 0)

At elevation +11800

• Equipment no. 602C-004 = 23 kN (Rev. 0)


• Equipment no. 602C-005 = 8 kN (Rev. 0)
• Equipment no. 602L-011 = 25 kN (Rev. 2)

At elevation +21000

• Equipment no. 602E-013A/C = 146 kN (Rev. 3)


• Equipment no. 602E-013B/D = 78 kN (Rev. 3)

At elevation +27000

• Equipment no. 602E-014A/B = 80 kN (Rev. 3)


• Equipment no. 602E-015A/B = 17 kN (Rev. 3)

At elevation +33000

• Equipment no. 602H-001A/C = 21 kN (Rev. 0)


• Equipment no. 602H-001B/D = 12 kN (Rev. 0)

7.2.3 Load 07: Maintenance live load

• Bundle pull 100% of bundle weight

At elevation +21000

• Equipment no. 602E-013A/C = 168 kN (Rev. 3)


• Equipment no. 602E-013B/D = 92 kN (Rev. 3)

At elevation +27000

• Equipment no. 602E-014A/B = 92 kN (Rev. 3)


• Equipment no. 602E-015A/B = 18 kN (Rev. 3)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 25 de 463
(SUBJECT) (Page)

• Crane/Davit/monorail loads refer to ED-M-02.00--02 section 5.4


7.2.4 Load 08: Platform live load, stair, paving refer to ED-M-02.00-02 section 3.1.2 and 5.1


2
Grating imposed load 5.0 kN/m for maximum support span 1.40m
7.2.5 Load 09: Snow Load – negligible

7.2.6 Load 10: Ambient Thermal refer to ED-M-02.01-02 section 3.3.1


o
A differential ambient temperature is +25 c
7.2.7 Load 11: Stress_Y (Vertical loads)


2
Piping Fluid wt.during normal operating = 1.0 kN/m
• Vertical operating fluid wt. (Fy (operating fluid wt. – Install wt.)of pipe stress information
SC-008, SC-008 Rev.2, SC-026, SC-026, SC-041, SC-042 and SC-044)
7.2.8 Load 12: Stress_X (Horizontal loads in global X direction)

• Anchor force (Fx operating fluid wt. of pipe stress information SC-008, SC-008 Rev.2,
SC-026, SC-026, SC-041, SC-042 and SC-044)

2
Friction force = 0.25 kN/m
• The frictional force (F) between steel plates0.25 x W , where W = the vertically applied
load on the sliding end due to the operating weight of the vessel.

7.2.9 Load 13: Stress_Z (Horizontal loads in global Z direction)

• Anchor force (Fz operating fluid wt. of pipe stress information SC-008, SC-008 Rev.2,
SC-026, SC-026, SC-041, SC-042 and SC-044)

2
Friction force = 0.25 kN/m
• The frictional force (F) between steel plates0.25 x W , where W = the vertically applied
load on the sliding end due to the operating weight of the vessel.
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 26 de 463
(SUBJECT) (Page)

7.3 Variable Wind loads


Wind load is in according to ASCE-7-05, applied along North, South, East and West directions.

Wind load definitions

• Exposure C

• Importance I : 1.15

• Design wind speed, Vb : 40 m/s

• Basic dynamic pressure


2
: 0.45 kN/m

• Topography, Kzt : 1

• Wind directionally, Kd : 0.85

• No shielding effect
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 27 de 463
(SUBJECT) (Page)

7.3.1 Load 14: Wind direction + X

7.3.2 Load 15: Wind direction - X

7.3.3 Load 16: Wind direction + Z

7.3.4 Load 17: Wind direction - Z


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 28 de 463
(SUBJECT) (Page)

7.4 Variable Seismic loads


Seismic analysis shall be in accordance with NCSE-02;
• Basic acceleration 0.07g
• Contribution coefficient, k 1
• Ductility 2
• Importance coefficient 1.3
• Ground Coefficient 1.3
• Buffer factor 5%
The following acceleration spectrum shall be applied for the calculation.

Period (sec) Acceleration Spectrum


0 0.0946g
0.130 0.1183g
0.520 0.1183g
0.770 0.0799g
1.020 0.0603g
1.270 0.0484g
1.520 0.0405g
1.770 0.0348g
2.020 0.0305g
2.270 0.0271g
2.520 0.0244g
2.770 0.0222g
3.020 0.0204g
3.270 0.0188g
3.520 0.0175g
3.770 0.0163g
4.020 0.0153g

7.4.1 Load 18: Seismic direction + X


Specify the design seismic force whether Dynamic by Response spectrum

7.4.2 Load 19: Seismic direction + Z


Specify the design seismic force whether Dynamic by Response spectrum
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 29 de 463
(SUBJECT) (Page)

7.5 Equipment load


7.5.1 602C-003
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 30 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 31 de 463
(SUBJECT) (Page)

7.5.2 602C-004
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 32 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 33 de 463
(SUBJECT) (Page)

7.5.3 602C-005
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 34 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 35 de 463
(SUBJECT) (Page)

7.5.4 602E-013A/C
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 36 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 37 de 463
(SUBJECT) (Page)

7.5.5 602E-013B/D
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 38 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 39 de 463
(SUBJECT) (Page)

7.5.6 602E-014A/B
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 40 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 41 de 463
(SUBJECT) (Page)

7.5.7 602E-015A/B
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 42 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 43 de 463
(SUBJECT) (Page)

7.5.8 602L-011
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 44 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 45 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 46 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 47 de 463
(SUBJECT) (Page)

8.0 LOAD COMBINATION


There are 4 groups of load combinations, the purpose of each group are as follows;

8.1 Load Combination for Stability Check


To check stability of the whole structure against horizontal force during erection and operating, the static
check from following cases shall be used.

Load 61: Total vertical Dead Load


• The summation of load cases 1+3+4
Load 62: Wind + Stress direction +X
• The summation of load cases 12+14
Load 63: Wind + Stress direction –X
• The summation of load cases 12+15
Load 64: Wind + Stress direction +Z
• The summation of load cases 13+16
Load 65: Wind + Stress direction –Z
• The summation of load cases 13+17
Load 66: Total Vertical Load during Operating
• The summation of load cases 1+3+4+6+8+11

To check the stability of structure, 2 conditions had been considered.


• Stability check for erection case
Stability against overturning and sliding considered Load cases 61 and 14, 16
• Stability check for operating case
Stability against overturning and sliding considered Load cases 66 and 62, 64

8.2 Load Combination for Reactions & Displacements (ELS)


Load combinations 101 TO 999 – CTE Code

8.3 Load Combination for Steel on Ultimate (ELU) and Concrete on Ultimate
(Precast Concrete)
Load combinations 2001 TO 3698 – CTE Code

8.4 Load Combination for Concrete on Ultimate (In Site Concrete)


Load combinations 6001 TO 7698 – EHE Code
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 48 de 463
(SUBJECT) (Page)

9.0 CONCRETE STRUCTURE DESIGN

9.1 Beam design (with a sketch of GA and RC)


9.1.1 Beam V-1
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 49 de 463
(SUBJECT) (Page)

Ultimate force for reinforce concrete design


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 50 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 51 de 463
(SUBJECT) (Page)

Sign convention

+
+ +
- -

Bending Moment Shear Force


Diagram Diagram

+Compression
-Tension

Axial Force

Local Axis
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 52 de 463
(SUBJECT) (Page)

Shear capacity with stirrup 2-10@125


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 53 de 463
(SUBJECT) (Page)

-STAAD Shear-yy limit minimum -1311 kN , maximum 1311 kN

From STAAD result, Maximum shear is over shear capacity, However they are still passing

because that location is within the column zone.


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 54 de 463
(SUBJECT) (Page)

Shear capacity with stirrup 2-10@175


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 55 de 463
(SUBJECT) (Page)

STAAD Shear-yy limit minimum -1067 kN , maximum 1067 kN

From STAAD result, Maximum shear is over shear capacity, However they are still passing -

because that location is within the higher shear capacity zone.


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 56 de 463
(SUBJECT) (Page)

Cracking Check E.L.S.


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 57 de 463
(SUBJECT) (Page)

STAAD summary force cracking checked load combination.

From STAAD result, Maximum cracking moment is over cracking capacity, However they are

still passing because that location is within the column zone.


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 58 de 463
(SUBJECT) (Page)

9.1.2 Beam V-2


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 59 de 463
(SUBJECT) (Page)

Ultimate force for reinforce concrete design


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 60 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 61 de 463
(SUBJECT) (Page)

Shear capacity with stirrup 2-10@150


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 62 de 463
(SUBJECT) (Page)

STAAD Shear-yy limit minimum -1035 kN , maximum 1035 kN


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 63 de 463
(SUBJECT) (Page)

Cracking Check E.L.S.


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 64 de 463
(SUBJECT) (Page)

STAAD summary force cracking checked load combination.

From STAAD result, Maximum cracking moment is more than cracking capacity of beam.
However they are acceptable because that location is within the column zone.
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 65 de 463
(SUBJECT) (Page)

9.1.3 Beam V-3


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 66 de 463
(SUBJECT) (Page)

Ultimate force for reinforce concrete design


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 67 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 68 de 463
(SUBJECT) (Page)

Shear capacity with stirrup 2-10@200


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 69 de 463
(SUBJECT) (Page)

STAAD Shear-yy limit minimum -696 kN , maximum 696 kN


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 70 de 463
(SUBJECT) (Page)

Cracking Check E.L.S.


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 71 de 463
(SUBJECT) (Page)

STAAD summary force cracking checked load combination.

From STAAD result, Maximum cracking moment is lower than cracking capacity.
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 72 de 463
(SUBJECT) (Page)

9.1.4 Beam V-4


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 73 de 463
(SUBJECT) (Page)

Ultimate force for reinforce concrete design


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 74 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 75 de 463
(SUBJECT) (Page)

Shear capacity with stirrup 2-10@175


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 76 de 463
(SUBJECT) (Page)

STAAD Shear-yy limit minimum -738 kN, maximum 738 kN


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 77 de 463
(SUBJECT) (Page)

Cracking Check E.L.S.


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 78 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 79 de 463
(SUBJECT) (Page)

9.2 Column design


9.2.1 Column C-1
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 80 de 463
(SUBJECT) (Page)

Design result in beam end force summary:

For case Max Fx PRONTUARIO R.C. design for column shown safety factor equal 10.42

For case Min Fx PRONTUARIO R.C. design for column shown safety factor equal 16.87

For case Max Fy PRONTUARIO R.C. design for column shown safety factor equal 13.54

For case Min Fy PRONTUARIO R.C. design for column shown safety factor equal 7.36

For case Max Fz PRONTUARIO R.C. design for column shown safety factor equal 7.93

For case Min Fz PRONTUARIO R.C. design for column shown safety factor equal 9.75

For case Max Mx PRONTUARIO R.C. design for column shown safety factor equal 46.82

For case Min Mx PRONTUARIO R.C. design for column shown safety factor equal 2.81

For case Max My PRONTUARIO R.C. design for column shown safety factor equal 5.82

For case Min My PRONTUARIO R.C. design for column shown safety factor equal 1.97

For case Max Mz PRONTUARIO R.C. design for column shown safety factor equal 1.56

For case Min Mz PRONTUARIO R.C. design for column shown safety factor equal 1.69
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 81 de 463
(SUBJECT) (Page)

Ultimate force for reinforce concrete design


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 82 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 83 de 463
(SUBJECT) (Page)

Shear capacity with stirrup 5-10@250


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 84 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 85 de 463
(SUBJECT) (Page)

9.2.2 Column C-2


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 86 de 463
(SUBJECT) (Page)

Design result in beam end force summary:

For case Max Fx PRONTUARIO R.C. design for column shown safety factor equal 2.12

For case Min Fx PRONTUARIO R.C. design for column shown safety factor equal 2.74

For case Max Fy PRONTUARIO R.C. design for column shown safety factor equal 5.23

For case Min Fy PRONTUARIO R.C. design for column shown safety factor equal 12.15

For case Max Fz PRONTUARIO R.C. design for column shown safety factor equal 2.01

For case Min Fz PRONTUARIO R.C. design for column shown safety factor equal 1.85

For case Max Mx PRONTUARIO R.C. design for column shown safety factor equal 7.31

For case Min Mx PRONTUARIO R.C. design for column shown safety factor equal 4.23

For case Max My PRONTUARIO R.C. design for column shown safety factor equal 1.83

For case Min My PRONTUARIO R.C. design for column shown safety factor equal 2.01

For case Max Mz PRONTUARIO R.C. design for column shown safety factor equal 1.85

For case Min Mz PRONTUARIO R.C. design for column shown safety factor equal 1.64
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 87 de 463
(SUBJECT) (Page)

Ultimate force for reinforce concrete design


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 88 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 89 de 463
(SUBJECT) (Page)

Shear capacity with stirrup 3-10@300


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 90 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 91 de 463
(SUBJECT) (Page)

9.3 Slab design


9.3.1 Slab L1
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 92 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 93 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 94 de 463
(SUBJECT) (Page)

PRONTUARIO report for top & bottom reinforcement D16-200


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 95 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 96 de 463
(SUBJECT) (Page)

9.3.2 Slab L2
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 97 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 98 de 463
(SUBJECT) (Page)

PRONTUARIO report for top reinforcement D20-150


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 99 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 100 de 463
(SUBJECT) (Page)

PRONTUARIO report for bottom reinforcement D25-150


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 101 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 102 de 463
(SUBJECT) (Page)

9.4 Embedded plate design


9.4.1 Type A-3
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 103 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 104 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 105 de 463
(SUBJECT) (Page)

9.4.2 Type A-5


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 106 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 107 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 108 de 463
(SUBJECT) (Page)

9.4.3 Type A-14


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 109 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 110 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 111 de 463
(SUBJECT) (Page)

9.4.4 Type A-20


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 112 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 113 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 114 de 463
(SUBJECT) (Page)

9.4.5 Type B-5


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 115 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 116 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 117 de 463
(SUBJECT) (Page)

9.4.6 Type B-15


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 118 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 119 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 120 de 463
(SUBJECT) (Page)

9.4.7 Type C-13


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 121 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 122 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 123 de 463
(SUBJECT) (Page)

9.4.8 Type D-14


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 124 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 125 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 126 de 463
(SUBJECT) (Page)

9.4.9 Type E-13


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 127 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 128 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 129 de 463
(SUBJECT) (Page)

10.0 STEEL DESIGN

10.1 Utility Ratio


The steel structure of “Structure P” has been checked and the results showed that all steel
members have utility ratio less than 1.0

The 20 maximum utility ratios are as the following table

Beam Section Actual


670 IPE500 0.875
672 IPE500 0.871
698 IPE200 0.887
700 IPE200 0.886
702 IPE200 0.880
1286 HEB500 0.860
1292 HEB500 0.981
1923 IPE500 0.840
2031 IPE300 0.851
2192 HEB600 0.986
2553 HEB300 0.918
2567 IPE600 0.880
2569 IPE600 0.880
2591 HEB500 0.912
7413 HEB600 0.858
7549 HEB600 0.840
7596 HEB600 0.859
7632 IPE500 0.920
7634 IPE500 0.915
7668 HEB600 0.883
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 130 de 463
(SUBJECT) (Page)

10.2 LATERAL DISPLACEMENT


The maximum lateral displacement at each elevation is as show the following table. The
maximum lateral displacement of structure is 69.1 mm at elevation 40000 mm, which is not
exceed the allowable = H/200 = 200 mm.

Lateral Displacement (mm) Allowable lateral displacement


Elevation (mm)
(mm)
(North-South Direction) (East-West Direction)

5,000 7.6 8.9 25.0

11,800 17.4 20.0 59.0

21,000 31.3 36.6 105.0

27,000 46.6 42.5 135.0

33,000 48.5 48.3 165.0

37,000 62.3 51.1 185.0

40,000 69.1 52.4 200.0

Deflected shape of structure Deflected shape of structure

in North-South direction in East-West Direction


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 131 de 463
(SUBJECT) (Page)

10.3 Base plate design


10.3.1 COLUMN HEB500
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 132 de 463
(SUBJECT) (Page)

Design result in beam end force summary:

LIMCON V3.5 26-FEB-09

14:24:56
Connection: HE500B
Type: Base Plate
2: Moment base plate
Country: US
Units: Metric
Design code: BS 5950

Column: Mark=COL Section=HE500B Grade=S235


D = 500 mm Root rad. = 27 mm fyf = 235 MPa
B = 300 mm Area = 2.3900E+04 fyw = 235 MPa
Tf = 28 mm Zx = 4.8150E+06 fu = 360 MPa
Tw = 15 mm
Section bending capacity . . . . 1131.5 kN.m
Section shear capacity . . . . . 1022.3 kN
Section axial capacity . . . . . 5616.5 kN

Base plate:
800x800x64 Gr./fy/fu=A36/248/400 MPa

Welds:
20 FW fu=483 MPa all around column.

Bolts:
12-M36 A307/X anchor bolts.
No. bolt rows = 4
No. bolt cols. = 4
Spacing of outer bolts, sg = 600 in XX direction.
Spacing of outer bolts, sp = 600 in YY direction.
Embedment length = 500, hook = 125
Shear capacity of bolts considered.

No shear key.

Foundation:
Foundation strength, fcu = . . . 30 MPa
Grout thickness . . . . . . . . . 25 mm
Rectangular, D . . . . . . . . . 1000 mm
B . . . . . . . . . 1000 mm
Min. bolt edge distance . . . . . 200 mm
Depth . . . . . . . . . . . . . . 1000 mm
Concrete confinement ignored.
Foundation is reinforced - reinforcement not checked.
Coefficient of friction . . . . . 0.55

MINIMUM ACTION CHECK


Specified minimum design actions:
Bending 30% of φMs ( 1018.4) = 305.5 kN.m
Shear 40.0 kN
Tension 0% of φNs ( 5054.9) = 0.0 kN
Compression 0% of φNs ( 5054.9) = 0.0 kN
NOTE: Input design actions are not automatically increased if they are less than
the specified minimum actions. Minimum actions may be set in any load case.
This check warns if any design action is less than the specified minimum
for all load cases.
WARNING: Design shear force is less than specified minimum.
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 133 de 463
(SUBJECT) (Page)

DESIGN CHECK SUMMARY

Case P* V*x V*y M*x M*y LF Util.


1 -2606c 12 3 -40.8 10.3 1.34 75%
2 0c 85 1 9.7 0.0 23.00 4%
3 -1465c 145 2 418.0 10.2 1.64 61%
4 -1199c 153 1 -488.8 2.6 1.10 91% <-- Critical
5 -285c 58 10 172.0 -7.1 3.14 32%
6 -779c 12 12 -58.2 -34.5 3.21 31%
7 -456c 11 0 -54.7 -3.3 7.27 14%
8 0c 59 3 178.9 1.4 3.03 33%
9 -1313c 45 7 -125.9 31.5 2.37 42%
10 -779c 12 12 -58.2 -34.5 3.21 31%
11 -1465c 145 2 418.0 10.2 1.64 61%
12 -1199c 153 1 -488.8 2.6 1.10 91%
13 427t 85 1 0.0 0.0 4.45 22%
14 65t 59 3 0.0 0.0 17.21 6%

INPUT DESIGN ACTIONS FOR CASE NO. 4


Axial, N* . . . . . . . . . . . . -1199.0 kN (comp.)
Shear, V*x . . . . . . . . . . . 152.7 kN
Shear, V*y . . . . . . . . . . . 1.0 kN
Moment, M*x . . . . . . . . . . . -488.8 kN.m
Moment, M*y . . . . . . . . . . . 2.60 kN.m

DESIGN CAPACITY CHECKS...


Utilization ratio ─────┐
Design action ──┐ │
┌── Design capacity │ │
│ │ │
NOTE: Capacity of section is not checked.

Using AISC 2006 model...

Compression + moment analysis:


AREA RATIO ASSUMED TO BE 1.0
Concrete confinement ratio . . . 1.00
Bearing strength, fp(max) . . . . 20 MPa
Foundation concentric compression capacity 12480 ≥ P*c = 1199.0 10% Pass
Strong Axis Bending...
Eccentricity . . . . . . . . . . 408 mm
Critical eccentricity . . . . . 362 mm
Outstand . . . . . . . . . . . . 163 mm
=== Large moment - bolts in tension ===
Bearing strength per unit length, qmax . . 15.600 kN/mm
Concrete bearing length, Y . . . 83 mm
Concrete bearing force . . . . . 1288.1 kN
Total bolt tension, T . . . . . 89.1 kN
Single bolt tension capacity . . . . . . . 196.1 ≥ T1 = 22.3 11% Pass
Single bolt pull-out capacity (unreinf.) . 1067.3 ≥ T1 = 22.3 2% Pass
Base plate yield (bearing) capacity . . . 183.0 ≥ Mpb = 156.1 85% Pass
Bolt tension lever arm . . . . . 63 mm
Base plate yield (tension) capacity . . . 183.0 ≥ Mpt = 5.57 3% Pass
Weak Axis Bending...
Eccentricity . . . . . . . . . . 2 mm
Critical eccentricity . . . . . 362 mm
Outstand . . . . . . . . . . . . 280 mm
=== Small moment - no bolt tension ===
Concrete bearing length, Y . . . 796 mm
Concrete bearing strength, fp(max) . . . . 20 ≥ fp = 2 10% Pass
Base plate yield (bearing) capacity . . . 183.0 ≥ Mpb = 59.1 32% Pass
Bi-axial Bending...
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 134 de 463
(SUBJECT) (Page)

Base plate yield (bearing) capacity . . . 183.0 ≥ Mpb = 166.9 91% Pass
Column weld capacity . . . . . . . . . . . 3.536 ≥ v*res = 1.971 56% Pass

Shear analysis:
Friction...
Slip factor . . . . . . . . . . 0.55
Compression force . . . . . . . 1199.0 kN
Available base plate friction . . . . . . 461.6 kN
Design shear less friction (x) . 0.0 kN
Design shear less friction (y) . 0.0 kN
Anchor bolt shear...
Bolt design shear (x) . . . . . 0.0 kN
Bolt design shear (y) . . . . . 0.0 kN
Bolt shear capacity (resultant) . . . . . 1954.6 ≥ V*res = 0.0 0% Pass
Bolt edge distance (unreinforced) . . . . . 200 ≥ min. = 330 165% Fail
Informative

Total shear capacity:


Shear capacity (x) . . . . . . . . . . . . 2416.2 ≥ V*x = 152.7 6% Pass
Shear capacity (y) . . . . . . . . . . . . 2416.2 ≥ V*y = 1.0 0% Pass

CRITICAL LOAD CASE . . . . 4


CRITICAL LIMIT STATE . . . Base plate yield (bearing) capacity
UTILIZATION RATIO . . . . 91%
CAPACITY RATIO, φ.Ru/S* . 1.096 Pass

Note.

Base plate thickness in calculation is 64 mm is very thick, therefore we provided


stiffener plate for reduce the base plate thickness.

Maximum pressure q max = 15.6 N/mm.


Bending moment in base plate = 0.5x15.6x150^2/2 = 87,750 N/mm2

Tp,base plate thickness = (4M/0.9Fy)^0.5

=(4x87,750/0.9x245) = 40 mm.
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 135 de 463
(SUBJECT) (Page)

10.3.2 COLUMN HEB300


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 136 de 463
(SUBJECT) (Page)

Design result in beam end force summary:

LIMCON V3.5 26-


FEB-09

15:55:11
Connection: HE300B
Type: Base Plate
2: Moment base plate
Country: US
Units: Metric
Design code: BS 5950

Column: Mark=COL Section=HE300B Grade=S235


D = 300 mm Root rad. = 27 mm fyf = 235 MPa
B = 300 mm Area = 1.4900E+04 fyw = 235 MPa
Tf = 19 mm Zx = 1.8690E+06 fu = 360 MPa
Tw = 11 mm
Section bending capacity . . . . 439.2 kN.m
Section shear capacity . . . . . 465.3 kN
Section axial capacity . . . . . 3501.5 kN

Base plate:
550x550x40 Gr./fy/fu=A36/248/400 MPa

Welds:
14 FW fu=483 MPa all around column.

Bolts:
4-M30 A307/X anchor bolts.
No. bolt rows = 2
No. bolt cols. = 2
Spacing of outer bolts, sg = 400 in XX direction.
Spacing of outer bolts, sp = 400 in YY direction.
Embedment length = 457, no hook.
Shear capacity of bolts considered.

No shear key.

Foundation:
Foundation strength, fcu = . . . 30 MPa
Grout thickness . . . . . . . . . 25 mm
Rectangular, D . . . . . . . . . 700 mm
B . . . . . . . . . 700 mm
Min. bolt edge distance . . . . . 150 mm
Depth . . . . . . . . . . . . . . 800 mm
Foundation is reinforced - reinforcement not checked.
Coefficient of friction . . . . . 0.55

MINIMUM ACTION CHECK


Specified minimum design actions:
Bending 30% of φMs ( 395.3) = 118.6 kN.m
Shear 40.0 kN
Tension 0% of φNs ( 3151.3) = 0.0 kN
Compression 0% of φNs ( 3151.3) = 0.0 kN
NOTE: Input design actions are not automatically increased if they are less than
the specified minimum actions. Minimum actions may be set in any load case.
This check warns if any design action is less than the specified minimum
for all load cases.
WARNING: Design bending moment is less than specified minimum.
WARNING: Design shear force is less than specified minimum.
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 137 de 463
(SUBJECT) (Page)

DESIGN CHECK SUMMARY


Case P* V*x V*y M*x M*y LF Util.
1 -1285c 29 7 103.5 23.1 1.18 85%
2 0c 6 1 0.2 -1.7 69.47 1%
3 -291c 30 1 96.7 -0.1 1.21 83%
4 0c 19 5 -65.9 -15.9 1.87 54%
5 0c 10 10 -37.4 -31.9 2.59 39%
6 -1218c 21 12 75.0 39.0 1.25 80%
7 0c 7 1 -21.3 1.7 5.97 17%
8 -865c 21 3 68.5 -10.1 1.78 56%
9 -1218c 21 12 75.0 39.0 1.25 80%
10 0c 10 10 -37.4 -31.9 2.59 39%
11 -1285c 29 7 103.5 23.1 1.18 85%
12 0c 19 5 -65.9 -15.9 1.87 54%
13 468t 0 0 0.0 0.0 1.15 87% <-- Critical

INPUT DESIGN ACTIONS FOR CASE NO. 13


Axial, N* . . . . . . . . . . . . 468.0 kN (tens.)
Shear, V*x . . . . . . . . . . . 0.0 kN
Shear, V*y . . . . . . . . . . . 0.0 kN
Moment, M*x . . . . . . . . . . . 0.00 kN.m
Moment, M*y . . . . . . . . . . . 0.00 kN.m

DESIGN CAPACITY CHECKS...


Utilization ratio ─────┐
Design action ──┐ │
┌── Design capacity │ │
│ │ │
NOTE: Capacity of section is not checked.

Using ASI 1994 model...

Tension analysis:
Plate tension capacity (corner) . . . . . . 881.7 ≥ P*t = 468.0 53% Pass
Plate tension capacity (X cantilever) . . . 950.7 ≥ P*t = 468.0 49% Pass
Plate tension capacity (Y cantilever) . . . 950.7 ≥ P*t = 468.0 49% Pass
Column weld tension capacity . . . . . . . 4212.2 ≥ P*t = 468.0 11% Pass
Bolt group tension capacity . . . . . . . . 538.6 ≥ P*t = 468.0 87% Pass
Bolt group pull-out capacity (unreinf.) . . 768.5 ≥ P*t = 468.0 61% Pass
Weight of foundation . . . . . . . . . . . 9.4 ≥ P*t = 468.0 999% Fail
Informative
NOTE: No additional factor of safety included in above check.
Weight of foundation is compared with applied load (uplift).

CRITICAL LOAD CASE . . . . 13


CRITICAL LIMIT STATE . . . Bolt group tension capacity
UTILIZATION RATIO . . . . 87%
CAPACITY RATIO, φ.Ru/S* . 1.151 Pass
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 138 de 463
(SUBJECT) (Page)

10.4 Monorail design


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 139 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 140 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 141 de 463
(SUBJECT) (Page)

11.0 FOUNDATION DESIGN

Staad model rendered viewed


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 142 de 463
(SUBJECT) (Page)

11.1 Soil bearing pressure


2
Maximum bearing capacity = 300 kN/m

Increase 30% for wind and earthquake loads combination (load case 14 to 19)
2
Allowable foundation pressure = 1.3*300 kN/m
2
= 390 kN/m

The maximum bearing pressures is taken from load combination 101 to 999.
2
The maximum pressure is 271 kN/m at load case 666 which is not exceed the allowable bearing
2
capacity 300 kN/m .
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 143 de 463
(SUBJECT) (Page)

11.2 Stability check


Stability against overturning and sliding force shall be as following conditions.

0.9× Re sisting Moment


Safety factor against overturnin g = ≥ 1 .8
Active Moment

µ× 0 .9 × Total Vertical Force


Safety factor against sliding = ≥ 1 .5
Active Sliding Force

To use “PRINT C.G.” command to find the lowest resisting moment and “PRINT PROBLEM
STATIC CHECK” to find overturning and resisting moment at that point
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 144 de 463
(SUBJECT) (Page)

(x,z) = (0,0)

Possible overturning point is (X, Z) = (0, 0), (23.8, 0), (0, 12) and (23.8, 12).

The result shows CG. X = 11.49 m < (20+3.8)/2 = 11.9 m

CG. Z = 5.89 m < 12/2 = 6.0 m

Then, the resisting moment from self-weight is minimum value at origin point.
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 145 de 463
(SUBJECT) (Page)

PRINT STATIC CHECK FROM STAAD REPORT.

• Resisting moment from structure self weight.

Load case Resisting moment (kN-m)


MX MZ
Structure self weight, LC 1 1.54 E+05 3.0 E+05
Equipment empty weight , LC 3 1.26 E+04 2.40 E+04
Pipe empty weight , LC 4 1.46 E+04 2.54 E+04
SUM 1.81 E+05 3.49 E+05

• Overturning moment from wind +X

Load case Overturning moment (kN-m)


MX MZ
Wind +X ,LC14 4.12 E-03 1.91 E+04
Wind +Z ,LC16 1.95 E+04 3.52 E-05
Maximum 1.95 E+04 1.91 E+04

• Summary

“Structure P” has a factor of safety again overturning (Maximum overturning / Resisting moment)

Factor of safety again overturning around X axis = 18.1 / 1.95 = 9.2 >> 1.5 OK.

Factor of safety again overturning around Z axis = 34.9 / 1.91 = 18.27 >> 1.5 OK.
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 146 de 463
(SUBJECT) (Page)

The Wood-Armer equations to get the maximum bending moment in foundation for reinforced concrete
design, as follows:

Highlighted plate for design moment foundation C-1


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 147 de 463
(SUBJECT) (Page)

Highlighted plate for design moment foundation C-2

Highlighted plate for design moment foundation C-3


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 148 de 463
(SUBJECT) (Page)

11.3 FOUNDATION C-1


11.3.1 Slab reinforcement
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 149 de 463
(SUBJECT) (Page)

PRONTUARIO report for top bar longitudinal direction D25 @ 250 (Myd,Top)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 150 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 151 de 463
(SUBJECT) (Page)

PRONTUARIO report for top bar short direction D25 @ 200 (Myd,Top).
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 152 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 153 de 463
(SUBJECT) (Page)

PRONTUARIO report for bottom bar short direction D32@200 (Mxd,Bottom).


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 154 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 155 de 463
(SUBJECT) (Page)

PRONTUARIO report for bottom bar longitudinal direction D32@150 (Myd,Bottom).


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 156 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 157 de 463
(SUBJECT) (Page)

11.3.2 Shear capacity


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 158 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 159 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 160 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 161 de 463
(SUBJECT) (Page)

11.4 FOUNDATION C-2


11.4.1 Slab reinforcement
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 162 de 463
(SUBJECT) (Page)

PRONTUARIO report for top bar longitudinal direction D25 @ 250 (Myd,Top)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 163 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 164 de 463
(SUBJECT) (Page)

PRONTUARIO report for top bar short direction D25 @ 200 (Myd,Top).
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 165 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 166 de 463
(SUBJECT) (Page)

PRONTUARIO report for bottom bar short direction D32@200 (Mxd,Bottom).


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 167 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 168 de 463
(SUBJECT) (Page)

PRONTUARIO report for bottom bar longitudinal direction D32@150 (Myd,Bottom).


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 169 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 170 de 463
(SUBJECT) (Page)

11.4.2 Shear capacity


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 171 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 172 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 173 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 174 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 175 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 176 de 463
(SUBJECT) (Page)

11.5 FOUNDATION C-3


11.5.1 Slab reinforcement
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 177 de 463
(SUBJECT) (Page)

PRONTUARIO report for top&bot bar longitudinal direction D25 @ 150 (Myd,Top,Bottom)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 178 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 179 de 463
(SUBJECT) (Page)

PRONTUARIO report for top&bot bar short direction D25 @ 200 (Mxd,Top,Bottom)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 180 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 181 de 463
(SUBJECT) (Page)

11.5.2 Shear capacity


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 182 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 183 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 184 de 463
(SUBJECT) (Page)

11.6 Tie beam design


11.6.1 Beam VC-1

11.6.2 Ultimate force for reinforce concrete design


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 185 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 186 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 187 de 463
(SUBJECT) (Page)

Shear capacity with stirrup 2-10@200


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 188 de 463
(SUBJECT) (Page)

STAAD Shear-yy limit minimum -147 kN , maximum 147 kN


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 189 de 463
(SUBJECT) (Page)

11.7 Beam deflection


Checked by Program STAAD Pro 2007 by DJ1, DJ2 DFF parameter. Please see STAAD input.

STAAD deflection checked result


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 190 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 191 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 192 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 193 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 194 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 195 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 196 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 197 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 198 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 199 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 200 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 201 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 202 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 203 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 204 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 205 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 206 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 207 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 208 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 209 de 463
(SUBJECT) (Page)

ATTACHMENT
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 210 de 463
(SUBJECT) (Page)

PROGRAM INPUT & OUTOUT

11.8 STAAD Input

11.8.1 Staad input for structural design


STAAD SPACE 113 14.5 7.05 3; 114 5.5 7.05 3; 115 14.5 5.4 3; 116 5.5 5.4 3;
START JOB INFORMATION 117 23.8 27 12;
JOB NAME REFINERIA CARTAGENA 118 23.8 27 6; 119 23.8 7.2 12; 120 23.8 11.8 12; 121 23.8
JOB CLIENT REPSOL 15.2 12;
JOB NO 1DD5524A 122 23.8 11.8 6; 123 20 7.2 12; 124 20 11.8 12; 125 20 15.2
JOB PART ESTRUCTURA P (UNIDAD DE VACIO) 12; 126 20 11.8 6;
ENGINEER NAME EKACHAI M. 127 10 11.8 12; 128 0 11.8 12; 129 10 11.8 6; 130 0 11.8 6;
JOB REV 1 131 20 11.8 0;
ENGINEER DATE JULY-08 132 10 11.8 0; 133 0 11.8 0; 134 23.8 33 12; 135 20 33 12;
END JOB INFORMATION 136 23.8 30 6;
INPUT WIDTH 79 137 23.8 33 6; 138 20 30 6; 140 23.8 11.8 0; 141 20 2.8 12;
SET NL 90 142 23.8 2.8 12;
SET SDAMP 1 143 23.8 18.6 6; 144 20 18.6 6; 145 20 23.8 6; 146 23.8 23.8
*********************************************************************** 6; 148 0 33 12;
********* 151 20 33 0; 152 10 33 0; 153 0 33 0; 165 7.5 12.1 8; 166 20
UNIT METER KN 21 2.5;
JOINT COORDINATES 167 4.3 22.3164 5.2; 168 7.525 22.114 5.2; 169 14.3 22.3164
1 20 -2.1 12; 2 10 -2.1 12; 3 0 -2.1 12; 4 20 5 12; 5 10 5 12; 6 5.2;
0 5 12; 172 17.525 22.114 5.2; 177 20 27 9.14; 185 23.8 15.2 6; 186
7 20 -2.1 6; 8 10 -2.1 6; 9 0 -2.1 6; 10 20 5 6; 11 10 5 6; 12 0 5 20 15.2 6;
6; 189 20 5 3; 190 0 5 3; 207 10 21 4; 218 20 27 6; 233 2 33 0;
13 20 -2.1 0; 14 10 -2.1 0; 15 0 -2.1 0; 16 20 5 0; 17 10 5 0; 18 257 2 33 6;
0 5 0; 273 5.3 27 12; 274 5.3 27 0; 279 16.7 27 12; 280 16.7 27 0;
19 20 21 12; 20 10 21 12; 21 0 21 12; 22 20 21 6; 23 10 21 6; 283 15.3 27 9.14;
24 0 21 6; 284 15.3 27 12; 285 15.3 27 0; 291 5.3 27 6; 295 15.3 27 6;
25 20 21 0; 26 10 21 0; 27 0 21 0; 28 20 27 12; 29 10 27 12; 302 0 27 6;
30 0 27 12; 307 15.3 27 4.51; 309 16.7 27 6; 313 21.9 11.8 4; 314 23.8
31 20 27 0; 32 10 27 0; 33 0 27 0; 34 23.8 -2.1 12; 35 23.8 5 11.8 4;
12; 315 20 11.8 4; 316 0 5 8; 317 10 5 8; 318 10 5 3; 319 14.5 5
36 23.8 -2.1 6; 37 23.8 5 6; 38 23.8 -2.1 0; 39 23.8 5 0; 40 12; 320 20 5 8;
23.8 21 12; 321 14.5 5 8; 322 7.5 5 6; 323 7.5 5 8; 324 7.5 5 12; 325 7.5 5
41 23.8 21 6; 43 5.5 5 12; 44 5.5 5 8; 45 7.5 14.055 8; 46 21.9 0; 326 7.5 5 3;
13 4; 334 3.8 21 12; 335 3.8 21 6.73; 336 3.8 21 3.67; 337 3.8 21 0;
47 10 21 9; 48 0 21 9; 49 10 21 2.5; 50 0 21 2.5; 51 20 21 9; 338 3.8 21 6;
60 4.3 22.3164 6.73; 61 4.3 22.3164 3.67; 62 4.3 21.2 6.73; 339 4.8 21 12; 340 4.8 21 6.73; 341 4.8 21 3.67; 342 4.8 21 0;
63 4.3 21.2 3.67; 343 4.8 21 6;
64 7.525 22.114 7.665; 65 7.525 22.114 3.035; 66 7.525 21.2 344 13.8 21 12; 345 13.8 21 6.73; 346 13.8 21 3.67; 347 13.8
7.665; 21 0;
67 7.525 21.2 3.035; 68 14.3 22.3164 6.73; 69 14.3 22.3164 348 13.8 21 6; 349 14.8 21 12; 350 14.8 21 6.73; 351 14.8 21
3.67; 3.67;
70 14.3 21.2 6.73; 71 14.3 21.2 3.67; 72 17.525 22.114 7.665; 352 14.8 21 0; 353 14.8 21 6; 354 18.25 21 12; 355 18.25 21
73 17.525 22.114 3.035; 74 17.525 21.2 7.665; 75 17.525 7.665;
21.2 3.035; 356 18.25 21 2.5; 357 18.25 21 0; 358 8.25 21 12; 359 8.25
76 21.9 29.025 4; 77 10 27 9.14; 78 0 27 9.14; 79 10 27 3; 91 21 7.665;
1.2 27.85 7.7; 360 8.25 21 2.5; 361 8.25 21 0; 362 18.25 21 6; 363 8.25 21
92 1.2 27.85 6; 93 1.2 27.2 7.7; 94 1.2 27.2 6; 95 6 28.114 6; 364 16.8 21 12;
8.345; 365 16.8 21 7.665; 366 16.8 21 2.5; 367 16.8 21 0; 368 6.8 21
96 6 28.114 4.605; 97 6 27.2 8.345; 98 6 27.2 4.605; 99 11.2 12;
27.85 7.7; 369 6.8 21 7.665; 370 6.8 21 2.5; 371 6.8 21 0; 372 16.8 21 6;
100 11.2 27.85 6; 101 11.2 27.2 7.7; 102 11.2 27.2 6; 103 16 373 6.8 21 6;
28.114 8.345; 374 14.8 21.2 6.73; 375 14.8 21.2 3.67; 376 4.8 21.2 6.73;
104 16 28.114 4.605; 105 16 27.2 8.345; 106 16 27.2 4.605; 377 4.8 21.2 3.67;
107 14.5 5 0; 382 3.8 21.2 6.73; 383 3.8 21.2 3.67; 384 13.8 21.2 6.73; 385
108 5.5 5 0; 109 14.5 5 6; 110 5.5 5 6; 111 14.5 5 3; 112 5.5 5 13.8 21.2 3.67;
3; 386 18.25 21.2 7.665; 387 18.25 21.2 3.035; 388 8.25 21.2
7.665;
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 211 de 463
(SUBJECT) (Page)

389 8.25 21.2 3.035; 390 16.8 21.2 7.665; 391 16.8 21.2 550 22.85 11.8 3; 551 22.85 11.8 1; 552 23.8 11.8 3; 553 23.8
3.035; 11.8 1;
392 6.8 21.2 7.665; 393 6.8 21.2 3.035; 394 16.7 27 9.14; 395 554 20.95 11.8 5; 555 20 11.8 5; 556 21.9 11.8 5; 557 22.85
16.7 27.2 8.345; 11.8 5;
396 16.7 27 4.51; 397 16.7 27.2 4.605; 398 6.7 27 9.14; 399 558 23.8 11.8 5; 559 20.95 11.8 2.3; 560 20 11.8 2.3; 561
6.7 27.2 8.345; 21.9 11.8 2.3;
400 6.7 27 4.51; 401 6.7 27.2 4.605; 403 15.3 27.2 8.345; 406 562 22.85 11.8 2.3; 563 23.8 11.8 2.3; 566 23.8 27 9; 567
5.3 27 9.14; 23.8 7.2 6;
407 5.3 27.2 8.345; 408 5.3 27 4.51; 409 5.3 27.2 4.605; 411 568 20 7.2 6; 569 23.8 2.8 6; 570 20 2.8 6; 571 23.8 18.6 12;
15.3 27.2 4.605; 572 20 18.6 12;
412 6.7 27 12; 413 6.7 27 0; 415 6.7 27 6; 430 8.75 5 12; 431 573 23.8 33 9; 574 23.8 30 12; 575 23.8 30 9; 576 20 30 12;
8.75 5 8; 577 23.8 23.8 12;
432 8.75 5 6; 433 8.75 5 3; 434 8.75 5 0; 435 6.5 5 12; 436 578 23.8 23.8 9; 579 23.8 21 9; 584 20 23.8 12; 587 23.8 5 7;
6.5 5 8; 588 20 5 7;
437 6.5 5 6; 438 6.5 5 3; 439 6.5 5 0; 440 1.375 5 12; 441 591 23.8 11.8 7; 592 20 11.8 7; 595 23.8 21 11; 596 20 21 11;
1.375 5 8; 599 23.8 33 10.63; 603 23.8 23.8 7; 605 23.8 30 7; 651 21.9
442 2.8 5 12; 443 2.8 5 8; 444 4.125 5 12; 445 4.125 5 8; 446 21 4; 654 20.8 5 6;
1.375 5 6; 655 21.8 5 6; 656 22 5 6; 657 23 5 6; 658 20.8 11.8 6; 659
447 2.8 5 6; 448 4.125 5 6; 449 1.375 5 3; 450 2.8 5 3; 451 21.8 11.8 6;
4.125 5 3; 660 22 11.8 6; 661 23 11.8 6; 666 20.8 23.8 6; 667 21.8 23.8
452 1.375 5 0; 453 2.8 5 0; 454 4.125 5 0; 455 11.125 5 12; 6; 668 22 23.8 6;
456 11.125 5 8; 669 23 23.8 6; 670 20.8 30 6; 671 21.8 30 6; 672 22 30 6; 673
457 12.25 5 12; 458 12.25 5 8; 459 13.375 5 12; 460 13.375 5 23 30 6;
8; 461 11.125 5 6; 674 22 33 12; 675 23 33 12; 676 20.8 27 12; 677 21.8 27 12;
462 12.25 5 6; 463 13.375 5 6; 464 11.125 5 3; 465 12.25 5 3; 678 22 27 12;
466 13.375 5 3; 679 23 27 12; 680 22 21 12; 681 23 21 12; 682 20.8 21 12;
467 11.125 5 0; 468 12.25 5 0; 469 13.375 5 0; 470 15.875 5 683 21.8 21 12;
12; 471 15.875 5 8; 692 23.8 0 12; 693 10 27 6; 694 10 33 6; 695 20 30 0; 701 0
472 17.2 5 12; 473 17.2 5 8; 474 18.625 5 12; 475 18.625 5 8; 27 3;
476 15.875 5 6; 702 23.8 33 0; 703 23.8 30 0; 704 23.8 21 0; 705 23.8 21 4.5;
477 17.2 5 6; 478 18.625 5 6; 479 15.875 5 3; 480 17.2 5 3; 706 20 21 4.5;
481 18.625 5 3; 707 23.8 21 3.5; 708 20 21 3.5; 709 21.9 21 4.5; 710 21.9 21
482 15.875 5 0; 483 17.2 5 0; 484 18.625 5 0; 485 8.75 5 10; 3.5;
486 7.5 5 10; 711 22.4 21 4.5; 712 22.4 21 3.5; 713 21.4 21 4.5; 714 21.4
487 10 5 10; 488 6.5 5 10; 489 5.5 5 10; 490 1.375 5 10; 491 21 3.5;
0 5 10; 715 22.4 21 4; 716 21.4 21 4; 717 23.8 27 0; 718 7.5 11.8 8;
492 2.8 5 10; 493 4.125 5 10; 494 11.125 5 10; 495 12.25 5 719 4 11.8 10;
10; 496 13.375 5 10; 720 5 11.8 6; 721 4 11.8 8; 722 4 11.8 12; 723 8.75 11.8 8;
497 14.5 5 10; 498 15.875 5 10; 499 17.2 5 10; 500 18.625 5 724 8.75 11.8 6;
10; 501 20 5 10; 725 7.5 11.8 6; 726 10 11.8 8; 727 7.5 11.8 12; 728 8.75 11.8
502 8.75 5 4.5; 503 7.5 5 4.5; 504 10 5 4.5; 505 8.75 5 1.5; 12;
506 7.5 5 1.5; 729 8.75 11.8 10; 730 7.5 11.8 10; 731 10 11.8 10; 732 6.25
507 10 5 1.5; 508 6.5 5 4.5; 509 5.5 5 4.5; 510 6.5 5 1.5; 511 11.8 8;
5.5 5 1.5; 733 6.25 11.8 6; 734 6.25 11.8 12; 735 6.25 11.8 10; 736 23.8
512 1.375 5 4.5; 513 0 5 4.5; 514 2.8 5 4.5; 515 4.125 5 4.5; 27 1.5;
516 1.375 5 1.5; 737 20 27 1.5; 738 23.8 27 3; 739 20 27 3; 740 23.8 27 4.5;
517 0 5 1.5; 518 2.8 5 1.5; 519 4.125 5 1.5; 520 11.125 5 4.5; 741 20 27 4.5;
521 12.25 5 4.5; 742 23.8 30 1.5; 743 20 30 1.5; 744 23.8 30 3; 745 20 30 3;
522 13.375 5 4.5; 523 14.5 5 4.5; 524 11.125 5 1.5; 525 12.25 746 23.8 30 4.5;
5 1.5; 747 20 30 4.5; 749 10 11.8 7; 750 0 40 12; 751 0 40 0; 752 0
526 13.375 5 1.5; 527 14.5 5 1.5; 528 15.875 5 4.5; 529 17.2 40 6; 753 2 40 12;
5 4.5; 754 2 40 0; 755 2 40 6; 756 8.75 33 7.6; 770 20 33 6; 771 0
530 18.625 5 4.5; 531 20 5 4.5; 532 15.875 5 1.5; 533 17.2 5 33 6;
1.5; 774 16.25 33 6; 776 2 33 12; 778 10 33 12; 781 8.75 33 2.8;
534 18.625 5 1.5; 535 20 5 1.5; 536 21.9 11.8 6; 537 21.9 783 12.5 33 7.35;
11.8 0; 785 12.5 33 2.8; 787 20 33 2.8; 789 20 33 4.2; 800 2 33 7.6;
538 20.95 11.8 6; 539 20.95 11.8 4; 540 22.85 11.8 6; 541 801 2 37 7.6;
22.85 11.8 4; 802 2 37 6; 805 0 35.3333 12; 806 0 37.6667 12; 807 2
542 20.95 11.8 0; 543 22.85 11.8 0; 544 20.95 11.8 3; 545 20 37.6667 12;
11.8 3; 808 2 37.6667 0; 809 0 37.6667 0; 810 2 35.3333 12; 811 2
546 20.95 11.8 1; 547 20 11.8 1; 548 21.9 11.8 3; 549 21.9 35.3333 0;
11.8 1;
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 212 de 463
(SUBJECT) (Page)

812 0 35.3333 0; 813 2 40 10.5; 814 0 40 10.5; 815 2 40 4.5; 1072 2.8 21 3.67; 1073 5.8 21 3.67; 1074 2.8 21 6.73; 1075
816 0 40 4.5; 5.8 21 6.73;
817 2 40 9; 818 0 40 9; 819 2 40 3; 820 0 40 3; 821 2 40 7.5; 1076 12.8 21 6.73; 1077 15.8 21 6.73; 1078 12.8 21 3.67;
822 0 40 7.5; 1079 15.8 21 3.67;
823 2 40 1.5; 824 0 40 1.5; 825 2 35 7.6; 826 2 35 6; 849 1.7 1080 2.9 27 12; 1083 2.9 27 0; 1084 2.9 27 6; 1085 4.1 27 12;
27 7.7; 1086 4.1 27 6;
850 1.7 27.2 7.7; 851 1.7 27 6; 852 1.7 27.2 6; 853 1.7 27 12; 1087 4.1 27 0; 1088 7.8 27 12; 1089 7.8 27 6; 1090 7.8 27 0;
854 1.7 27 0; 1091 8.9 27 12;
856 0.7 27 7.7; 857 0.7 27.2 7.7; 858 0.7 27 6; 859 0.7 27.2 6; 1092 8.9 27 6; 1093 8.9 27 0; 1094 12.9 27 12; 1095 12.9 27
860 0.7 27 12; 6; 1096 12.9 27 0;
861 0.7 27 0; 863 11.7 27 7.7; 864 11.7 27.2 7.7; 865 11.7 27 1097 14.1 27 12; 1098 14.1 27 6; 1099 14.1 27 0; 1100 17.8
6; 27 12;
866 11.7 27.2 6; 867 11.7 27 12; 868 11.7 27 0; 870 10.7 27 1101 17.8 27 6; 1102 17.8 27 0; 1103 18.9 27 12; 1104 18.9
7.7; 27 6;
871 10.7 27.2 7.7; 872 10.7 27 6; 873 10.7 27.2 6; 874 10.7 1105 18.9 27 0; 1106 0.7 27 9.14; 1107 1.7 27 9.14; 1108 2.9
27 12; 27 9.14;
875 10.7 27 0; 928 5 11.8 0; 929 4 11.8 6; 930 4 11.8 0; 932 1109 4.1 27 9.14; 1110 7.8 27 9.14; 1111 8.9 27 9.14; 1112
10 11.8 2.3; 10.7 27 9.14;
935 8.75 11.8 0; 936 4.45 11.8 0.4; 937 0 11.8 0.4; 938 0 11.8 1113 11.7 27 9.14; 1114 12.9 27 9.14; 1115 14.1 27 9.14;
-1.5; 1116 17.8 27 9.14;
939 2 11.8 -1.5; 940 2 11.8 0; 941 0 11.8 -0.4; 942 2 11.8 -0.4; 1117 18.9 27 9.14; 1118 0.7 27 3; 1119 1.7 27 3; 1120 2.9 27
944 5 11.8 10; 3; 1121 4.1 27 3;
945 5 11.8 8; 946 5 11.8 12; 948 22 5 10.17; 949 22 7.2 7.64; 1122 5.3 27 3; 1123 6.7 27 3; 1124 7.8 27 3; 1125 8.9 27 3;
958 22 2.8 7.64; 1126 10.7 27 3;
959 21.8 5 10.17; 960 21.8 7.2 7.64; 968 23 5 10.17; 969 23 1127 11.7 27 3; 1128 12.9 27 3; 1129 14.1 27 3; 1130 15.3 27
7.2 7.64; 3; 1131 16.7 27 3;
978 23 2.8 7.64; 979 20.8 5 10.17; 980 20.8 7.2 7.64; 988 23 1132 17.8 27 3; 1133 18.9 27 3; 1134 2.9 27 4.4; 1135 4.1 27
2.8 6; 4.4;
989 22 2.8 6; 990 20.8 5 12; 991 21.8 5 12; 992 22 5 12; 993 1136 5.3 27 4.4; 1137 7.8 27 4.51; 1138 8.9 27 4.51; 1139 10
23 5 12; 27 4.51;
994 20.8 9.6 12; 995 21.8 9.6 12; 996 22 9.6 12; 997 23 9.6 1140 8.1 27 4.51; 1141 8.1 27 6; 1142 9.4 27 4.51; 1143 9.4
12; 27 6;
998 20.8 13.8 12; 999 21.8 13.8 12; 1000 22 13.8 12; 1001 23 1146 15.3 27 4.49; 1147 12.9 27 4.4; 1148 14.1 27 4.4; 1149
13.8 12; 15.3 27 4.4;
1002 20.8 23.8 12; 1003 21.8 23.8 12; 1004 22 23.8 12; 1005 1150 17.8 27 4.51; 1151 18.9 27 4.51; 1152 13.4 27 6; 1153
23 23.8 12; 13.4 27 4.4;
1006 20.8 30 12; 1007 21.8 30 12; 1008 22 30 12; 1009 23 30 1154 18.1 27 4.51; 1155 18.1 27 6; 1156 19.4 27 4.51; 1157
12; 1010 21.8 33 6; 19.4 27 6;
1011 20.8 33 6; 1012 20.8 27 6; 1013 21.8 27 6; 1014 22 27 1158 0.9 33 12; 1159 0.9 33 0; 1160 0.9 33 6; 1161 0 33 9;
6; 1015 23 27 6; 1162 0 33 3;
1016 22 15.6 6; 1017 23 15.6 6; 1018 20.8 15.6 6; 1019 21.8 1163 2.15 33 12; 1164 2.15 33 6; 1165 2.15 33 0; 1166 3.4 33
15.6 6; 12; 1167 3.4 33 6;
1024 22 7.2 6; 1025 23 7.2 6; 1026 20.8 7.2 6; 1027 21.8 7.2 1168 3.4 33 0; 1169 4.3 33 12; 1170 4.3 33 6; 1171 4.3 33 0;
6; 1028 2.8 21 12; 1172 5.2 33 12;
1031 2.8 21 0; 1032 2.8 21 6; 1033 1.8 21 12; 1034 1.8 21 6; 1173 5.2 33 6; 1174 5.2 33 0; 1175 7.5 33 12; 1176 7.5 33 6;
1035 1.8 21 0; 1177 7.5 33 0;
1036 5.8 21 12; 1037 5.8 21 6; 1038 5.8 21 0; 1039 11.8 21 1178 8.75 33 12; 1179 8.75 33 6; 1180 8.75 33 0; 1181 0.9 33
12; 1040 11.8 21 6; 7.6;
1041 11.8 21 0; 1042 12.8 21 12; 1043 12.8 21 6; 1044 12.8 1182 2.15 33 7.6; 1183 11.25 33 12; 1184 11.25 33 6; 1185
21 0; 12.5 33 12;
1045 15.8 21 12; 1046 15.8 21 6; 1047 15.8 21 0; 1048 1.8 21 1186 12.5 33 6; 1187 13.4 33 12; 1188 13.4 33 6; 1189 15 33
9; 1049 2.8 21 9; 12; 1190 15.2 33 6;
1050 3.8 21 9; 1051 4.8 21 9; 1052 5.8 21 9; 1053 6.8 21 9; 1191 16.25 33 12; 1192 17.805 33 12; 1193 17.805 33 6;
1054 8.25 21 9; 1194 18.75 33 12;
1055 11.8 21 9; 1056 12.8 21 9; 1057 13.8 21 9; 1058 14.8 21 1195 18.75 33 6; 1196 0.9 33 9; 1197 2.15 33 9; 1198 3.4 33
9; 1059 15.8 21 9; 9; 1199 4.3 33 9;
1060 16.8 21 9; 1061 18.25 21 9; 1062 1.8 21 2.5; 1063 2.8 1200 5.2 33 9; 1201 7.5 33 9; 1202 8.75 33 9; 1203 10 33 9;
21 2.5; 1204 11.25 33 9;
1064 3.8 21 2.5; 1065 4.8 21 2.5; 1066 5.8 21 2.5; 1067 11.8 1205 12.5 33 9; 1206 13.4 33 9; 1207 15 33 9; 1208 16.25 33
21 2.5; 9;
1068 12.8 21 2.5; 1069 13.8 21 2.5; 1070 14.8 21 2.5; 1071 1209 17.805 33 9; 1210 18.75 33 9; 1211 20 33 9; 1212 11.25
15.8 21 2.5; 33 3;
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 213 de 463
(SUBJECT) (Page)

1213 11.25 33 0; 1214 12.5 33 1.6; 1215 12.5 33 0; 1216 12.5 1359 2.8 3.5 3; 1360 5.5 3.5 3; 1361 14.5 3.5 3; 1362 17.2 3.5
33 3; 3;
1217 13.4 33 3; 1218 15.2 33 3; 1219 16.25 33 3; 1220 17.5 1363 10 3.5 3; 1364 0 37.45 12; 1365 0 37.45 0; 1366 0 37.45
33 3; 6; 1367 0 37.45 4;
1221 18.75 33 3; 1222 13.4 33 0; 1223 15.2 33 0; 1224 16.25 1368 0 37.45 8.7; 1371 8.75 33 10.5; 1375 0 33 9.685; 1377 0
33 0; 33 2.35;
1225 17.5 33 0; 1226 18.75 33 0; 1227 10 33 3; 1228 20 33 3; 1378 0 32.1 12; 1379 0 32.1 0; 1382 0 32.1 0.85; 1384 0 32.1
1229 0.9 33 3; 1.5;
1230 2.15 33 3; 1231 3.4 33 3; 1232 4.3 33 3; 1233 5.2 33 3; 1386 0 32.1 6; 1387 -1.415 32.1 6; 1388 -2.08 32.1 6; 1389 -
1234 7.5 33 3; 2.48 32.1 6;
1235 8.75 33 3; 1236 2.15 33 4.475; 1237 3.4 33 4.475; 1238 1390 0 30.1 6; 1396 7.3 27 -1; 1397 6.535 27 -1; 1400 5.3 27 -
4.3 33 4.475; 1;
1239 3.25 33 6; 1241 5.2 33 5.09; 1242 7.5 33 4.8; 1243 8.75 1401 7.8 27 -1; 1408 17.805 33 7.35; 1410 18.75 33 7.35;
33 4.8; 1411 7.5 33 2.094;
1244 6.7 33 6; 1245 6.7 33 4.8; 1246 8.2 33 6; 1247 8.2 33 1412 8.75 33 2.094; 1413 5.2 33 2.094; 1415 4.3 33 2.094;
4.8; 1416 3.4 33 2.094;
1248 12.5 33 4.475; 1249 13.4 33 4.475; 1250 15.2 33 4.475; 1417 7.5 33 4.014; 1418 0 37.45 3; 1419 0 37.45 9; 1423 23.8
1251 13.25 33 6; 9.6 12;
1253 16.7 33 4.8; 1254 17.5 33 4.8; 1255 18.75 33 4.8; 1256 1424 20 9.6 12; 1425 22 9.6 10.4; 1426 21.8 9.6 10.4; 1427
16.7 33 6; 23 9.6 10.4;
1258 18.2 33 6; 1259 18.2 33 4.8; 1260 0 27 9; 1261 10 27 9; 1428 20.8 9.6 10.4; 1429 22 11.8 7.87; 1430 21.8 11.8 7.87;
1262 20 27 9; 1431 23 11.8 7.87;
1264 4.025 33 4.475; 1265 3.925 33 6; 1266 14.3 33 4.475; 1432 20.8 11.8 7.87; 1433 23.8 13.8 12; 1435 20 13.8 12;
1267 13.955 33 6; 1436 22 13.8 10.17;
1268 23.8 23.8 0; 1269 23.8 15.57 0; 1270 23.8 19.16 0; 1271 1437 21.8 13.8 10.17; 1438 23 13.8 10.17; 1439 20.8 13.8
20 15.57 0; 10.17;
1272 20 19.16 0; 1273 20 23.8 0; 1274 0 1.7 0; 1275 10 0 12; 1440 23.8 15.6 6; 1441 20 15.6 6; 1443 22 15.6 8.1; 1444
1276 10 1.04 12; 21.8 15.6 8.1;
1277 10 3 12; 1278 10 3.5 12; 1279 0 0 12; 1280 0 1.04 12; 1445 23 15.6 8.1; 1446 20.8 15.6 8.1; 1447 23.8 17.4 12;
1281 0 2.36 12; 1448 23 17.4 12;
1282 0 3 12; 1283 10 0 6; 1284 10 1.04 6; 1285 10 3 6; 1286 1449 20.8 17.4 12; 1450 20 17.4 12; 1451 21.8 17.4 12; 1452
10 3.5 6; 22 17.4 12;
1287 0 0 6; 1288 0 1.04 6; 1289 0 2.36 6; 1290 0 3 6; 1291 20 1453 21.8 17.4 10.17; 1454 22 17.4 10.17; 1455 23 17.4
0 0; 10.17;
1292 20 1.04 0; 1293 20 2.51 0; 1294 20 3 0; 1295 10 0 0; 1456 20.8 17.4 10.17; 1457 23.8 19.2 6; 1458 23 19.2 6; 1459
1296 10 1.04 0; 22 19.2 6;
1297 10 3 0; 1298 10 3.5 0; 1299 0 1.00583e-007 0; 1300 0 3 1460 21.8 19.2 6; 1461 20.8 19.2 6; 1462 20 19.2 6; 1463
0; 1301 20 0 6; 21.8 19.2 8.1;
1302 20 0.45 6; 1303 20 1.475 6; 1304 20 3 6; 1305 23.8 0 0; 1464 22 19.2 8.1; 1465 23 19.2 8.1; 1466 20.8 19.2 8.1; 1467
1306 23.8 1.04 0; 21.8 21 10.17;
1307 23.8 2.36 0; 1308 23.8 3.68 0; 1309 23.8 0 6; 1310 23.8 1468 22 21 10.17; 1469 23 21 10.17; 1470 20.8 21 10.17;
0.45 6; 1471 21.8 23.8 6.95;
1311 23.8 1.475 6; 1312 20 0 12; 1313 20 0.45 12; 1314 20 1472 22 23.8 6.95; 1473 23 23.8 6.95; 1474 20.8 23.8 6.95;
1.475 12; 1475 21.8 27 10.63;
1315 20 3 12; 1316 2.8 3 12; 1317 2.8 3 6; 1318 2.8 3 0; 1319 1476 22 27 10.63; 1477 23 27 10.63; 1478 20.8 27 10.63;
5.5 3 12; 1479 21.8 30 7.18;
1320 5.5 3 6; 1321 5.5 3 0; 1322 14.5 3 12; 1323 14.5 3 6; 1480 22 30 7.18; 1481 23 30 7.18; 1482 20.8 30 7.18; 1483
1324 14.5 3 0; 20.8 33 10.63;
1325 17.2 3 12; 1326 17.2 3 6; 1327 17.2 3 0; 1328 2.8 3.5 1484 21.8 33 10.63; 1485 21.8 33 12; 1486 20.8 33 12; 1487
12; 1329 2.8 3.5 6; 23.8 9.6 6;
1330 2.8 3.5 0; 1331 5.5 3.5 12; 1332 5.5 3.5 6; 1333 5.5 3.5 1488 23.8 15.6 11; 1490 23.8 17.4 6; 1491 23.8 17.4 0; 1492
0; 20 33 10.63;
1334 14.5 3.5 12; 1335 14.5 3.5 6; 1336 14.5 3.5 0; 1337 17.2 4703 23.8 15.6 12; 4705 23.8 15.6 9; 4706 23.8 21 10.17;
3.5 12; 4707 20 21 10.17;
1338 17.2 3.5 6; 1339 17.2 3.5 0; 1340 0 3 9; 1341 2.8 3 9; 4708 0 10.5 12; 4709 0 10.5 6; 4710 0 10.5 0; 4711 -2 10.5
1342 10 3 9; 12; 4712 -2 10.5 6;
1343 14.5 3 9; 1344 5.5 3 9; 1345 17.2 3 9; 1346 20 3 9; 1347 4713 -2 10.5 0; 4714 -1.7 10.5 12; 4715 -1.7 10.5 6; 4716 -1.7
2.8 3.5 9; 10.5 0;
1348 5.5 3.5 9; 1349 14.5 3.5 9; 1350 17.2 3.5 9; 1351 10 3.5 4717 0 8.8 12; 4718 0 8.8 6; 4719 0 8.8 0; 4720 0 10.5 9;
9; 1353 2.8 3 3; 4722 -2 10.5 9;
1354 10 3 3; 1355 14.5 3 3; 1356 5.5 3 3; 1357 17.2 3 3; 1358 4723 0 10.5 3; 4725 -2 10.5 3; 4726 20 15.6 12; 4727 23.8
20 3 3; 15.6 8.1;
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 214 de 463
(SUBJECT) (Page)

4728 20 15.6 8.1; 4729 10 15.8 12; 4730 10 15.8 6; 4731 4 4863 3.25 11.8 6; 4864 3.25 11.8 0; 4865 6.75 5 12; 4866
15.8 12; 6.75 5 6;
4732 4 15.8 6; 4733 6.25 15.8 12; 4734 6.25 15.8 6; 4735 4867 6.75 5 0; 4868 6.75 21 12; 4869 6.75 21 6; 4870 6.75 21
8.35 15.8 12; 0;
4736 8.35 15.8 6; 4737 4 15.8 11; 4738 6.25 15.8 11; 4739 4871 6.75 11.8 12; 4872 6.75 11.8 6; 4873 6.75 11.8 0; 4874
8.35 15.8 11; 13.25 5 12;
4740 10 15.8 11; 4741 4 15.8 10.25; 4742 6.25 15.8 10.25; 4875 13.25 5 6; 4876 13.25 5 0; 4877 13.25 21 12; 4878
4743 8.35 15.8 10.25; 13.25 21 6;
4744 10 15.8 10.25; 4745 4 15.8 9; 4746 6.25 15.8 9; 4747 4879 13.25 21 0; 4880 13.25 11.8 12; 4881 13.25 11.8 6;
8.35 15.8 9; 4882 13.25 11.8 0;
4748 10 15.8 9; 4749 4 15.8 8; 4750 6.25 15.8 8; 4751 8.35 4883 16.75 5 12; 4884 16.75 5 6; 4885 16.75 5 0; 4886 16.75
15.8 8; 21 12;
4752 10 15.8 8; 4753 4 15.8 7; 4754 6.25 15.8 7; 4755 8.35 4887 16.75 21 6; 4888 16.75 21 0; 4889 16.75 11.8 12; 4890
15.8 7; 16.75 11.8 6;
4756 10 15.8 7; 4757 5.2 15.8 12; 4758 5.2 15.8 11; 4759 - 4891 16.75 11.8 0; 4892 2.9 5 12; 4893 2.9 5 6; 4894 2.9 5 0;
2.48 32.1 0; 4895 2.9 21 12;
4760 -2.08 32.1 0; 4761 -1.41 32.1 0; 4762 0 30.1 0; 4763 -0.3 4896 2.9 21 6; 4897 2.9 21 0; 4898 2.9 11.8 12; 4899 2.9 11.8
32.1 0; 6;
4764 -0.3 32.1 6; 4765 -2.48 32.1 1.5; 4766 -2.48 32.1 3; 4767 4900 2.9 11.8 0; 4901 7.1 5 12; 4902 7.1 5 6; 4903 7.1 5 0;
-2.48 32.1 4.5; 4904 7.1 21 12;
4768 -0.3 32.1 1.5; 4769 -0.3 32.1 3; 4770 -0.3 32.1 4.5; 4771 4905 7.1 21 6; 4906 7.1 21 0; 4907 7.1 11.8 12; 4908 7.1 11.8
0 30.6 0; 6;
4772 10 33 9.685; 4776 10 32.1 12; 4777 20 33 9.685; 4781 4909 7.1 11.8 0; 4910 12.9 5 12; 4911 12.9 5 6; 4912 12.9 5
20 32.1 12; 0; 4913 12.9 21 12;
4782 0.5 5 12; 4783 0.5 5 6; 4784 0.5 5 0; 4785 0.5 21 12; 4914 12.9 21 6; 4915 12.9 21 0; 4916 12.9 11.8 12; 4917 12.9
4786 0.5 21 6; 11.8 6;
4787 0.5 21 0; 4788 0.5 11.8 12; 4789 0.5 11.8 6; 4790 0.5 4918 12.9 11.8 0; 4919 17.1 5 12; 4920 17.1 5 6; 4921 17.1 5
11.8 0; 0;
4791 9.5 5 12; 4792 9.5 5 6; 4793 9.5 5 0; 4794 9.5 21 12; 4922 17.1 21 12; 4923 17.1 21 6; 4924 17.1 21 0; 4925 17.1
4795 9.5 21 6; 11.8 12;
4796 9.5 21 0; 4797 9.5 11.8 12; 4798 9.5 11.8 6; 4799 9.5 4926 17.1 11.8 6; 4927 17.1 11.8 0; 4928 20 5 0.5; 4929 10 5
11.8 0; 0.5; 4930 0 5 0.5;
4800 10.5 5 12; 4801 10.5 5 6; 4802 10.5 5 0; 4803 10.5 21 4931 20 21 0.5; 4932 10 21 0.5; 4933 0 21 0.5; 4934 20 11.8
12; 4804 10.5 21 6; 0.5;
4805 10.5 21 0; 4806 10.5 11.8 12; 4807 10.5 11.8 6; 4808 4935 10 11.8 0.5; 4936 0 11.8 0.5; 4937 20 5 6.5; 4938 10 5
10.5 11.8 0; 6.5; 4939 0 5 6.5;
4809 19.5 5 12; 4810 19.5 5 6; 4811 19.5 5 0; 4812 19.5 21 4940 20 21 6.5; 4941 10 21 6.5; 4942 0 21 6.5; 4943 20 11.8
12; 4813 19.5 21 6; 6.5;
4814 19.5 21 0; 4815 19.5 11.8 12; 4816 19.5 11.8 6; 4817 4944 10 11.8 6.5; 4945 0 11.8 6.5; 4946 20 5 5.5; 4947 10 5
19.5 11.8 0; 5.5; 4948 0 5 5.5;
4818 20.5 5 6; 4819 20.5 5 0; 4820 20.5 11.8 6; 4821 20.5 4949 20 21 5.5; 4950 10 21 5.5; 4951 0 21 5.5; 4952 20 11.8
11.8 0; 5.5;
4822 23.3 5 6; 4823 23.3 5 0; 4824 23.3 11.8 6; 4825 23.3 4953 10 11.8 5.5; 4954 0 11.8 5.5; 4955 20 5 11.5; 4956 10 5
11.8 0; 11.5;
4826 1.75 5 12; 4827 1.75 5 6; 4828 1.75 5 0; 4829 1.75 21 4957 0 5 11.5; 4958 20 21 11.5; 4959 10 21 11.5; 4960 0 21
12; 4830 1.75 21 6; 11.5;
4831 1.75 21 0; 4832 1.75 11.8 12; 4833 1.75 11.8 6; 4834 4961 20 11.8 11.5; 4962 10 11.8 11.5; 4963 0 11.8 11.5; 4964
1.75 11.8 0; 23.8 5 5.5;
4835 8.25 5 12; 4836 8.25 5 6; 4837 8.25 5 0; 4838 8.25 11.8 4965 23.8 11.8 5.5; 4966 23.8 5 0.5; 4967 23.8 11.8 0.5; 5308
12; 12.5 33 10.5;
4839 8.25 11.8 6; 4840 8.25 11.8 0; 4841 11.75 5 12; 4842 5310 0 3 2.5; 5311 2.8 3 2.5; 5312 2.8 3.5 2.5; 5313 0 5 2.5;
11.75 5 6; 5314 0 5 9;
4843 11.75 5 0; 4844 11.75 21 12; 4845 11.75 21 6; 4846 5315 10 5 9; 5316 20 5 9; 5325 8.75 33 4.2; 5326 10 33 4.2;
11.75 21 0; 5327 9.16 33 3;
4847 11.75 11.8 12; 4848 11.75 11.8 6; 4849 11.75 11.8 0; 5329 20 3 -1; 5330 15 11.8 6; 5331 15 11.8 0; 5332 15 11.8
4850 18.25 5 12; 2.3; 5333 19 11.8 6;
4851 18.25 5 6; 4852 18.25 5 0; 4853 18.25 11.8 12; 4854 5334 19 11.8 0; 5335 19 11.8 4; 5336 19 11.8 3; 5337 19 11.8
18.25 11.8 6; 1; 5338 19 11.8 5;
4855 18.25 11.8 0; 4856 3.25 5 12; 4857 3.25 5 6; 4858 3.25 5339 19 11.8 2.3; 5340 18 11.8 6; 5341 18 11.8 0; 5342 18
5 0; 11.8 4;
4859 3.25 21 12; 4860 3.25 21 6; 4861 3.25 21 0; 4862 3.25 5343 18 11.8 3; 5344 18 11.8 1; 5345 18 11.8 5; 5346 18 11.8
11.8 12; 2.3;
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 215 de 463
(SUBJECT) (Page)

5347 17 11.8 6; 5348 17 11.8 0; 5349 17 11.8 4; 5350 17 11.8 5479 18.55 31.5 9.55; 5480 3.4 31.5 10.65; 5481 10 31.5
3; 5351 17 11.8 1; 10.65;
5352 17 11.8 5; 5353 17 11.8 2.3; 5354 16 11.8 6; 5355 16 5482 15.55 31.5 10.65; 5483 18.55 31.5 10.65; 5484 0 25.5
11.8 0; 12;
5356 16 11.8 4; 5357 16 11.8 3; 5358 16 11.8 1; 5359 16 11.8 5485 3.6 25.5 9.5; 5486 3.6 25.5 8; 5487 3.6 27 9.5; 5488 3.6
5; 27 8;
5360 16 11.8 2.3; 5361 15 11.8 4; 5362 15 11.8 3; 5363 15 5489 8.15 25.5 9.5; 5490 8.15 25.5 8; 5491 8.15 27 9.5; 5492
11.8 1; 8.15 27 8;
5364 15 11.8 5; 5365 14 11.8 6; 5366 14 11.8 0; 5367 14 11.8 5493 13.6 25.5 9.5; 5494 13.6 25.5 8; 5495 13.6 27 9.5; 5496
4; 5368 14 11.8 3; 13.6 27 8;
5369 14 11.8 1; 5370 14 11.8 5; 5371 14 11.8 2.3; 5372 13 5497 18.15 25.5 9.5; 5498 18.15 25.5 8; 5499 18.15 27 9.5;
11.8 6; 5500 18.15 27 8;
5373 13 11.8 0; 5374 13 11.8 4; 5375 13 11.8 3; 5376 13 11.8 5501 4.1 27 8; 5502 4.1 27 9.5; 5503 8.9 27 8; 5504 8.9 27
1; 5377 13 11.8 5; 9.5; 5505 14.1 27 8;
5378 13 11.8 2.3; 5379 12 11.8 6; 5380 12 11.8 0; 5381 12 5506 14.1 27 9.5; 5507 18.9 27 8; 5508 18.9 27 9.5; 5509
11.8 4; 17.8 27 9.5;
5382 12 11.8 3; 5383 12 11.8 1; 5384 12 11.8 5; 5385 12 11.8 5510 17.8 27 8; 5511 12.9 27 8; 5512 12.9 27 9.5; 5513 7.8
2.3; 27 8;
5386 11 11.8 6; 5387 11 11.8 0; 5388 11 11.8 4; 5389 11 11.8 5514 7.8 27 9.5; 5515 2.9 27 8; 5516 2.9 27 9.5; 5517 12.5
3; 5390 11 11.8 1; 37.45 7.35;
5391 11 11.8 5; 5392 11 11.8 2.3; 5393 10 11.8 4; 5394 10 5518 12.5 37.45 10.5; 5519 12.5 36.5 7.35; 5520 12.5 36.5
11.8 3; 10.5;
5395 10 11.8 1; 5396 10 11.8 5; 5397 20 14.6 0; 5398 23.8 5521 12.5 37.45 9.05; 5522 15.875 36.5 6; 5523 15.805 36.5
14.6 0; 7.35;
5399 20 14.6 6; 5400 23.8 14.6 6; 5401 23.8 14.6 1.5; 5402 5524 17.305 36.5 6; 5525 17.305 36.5 7.35; 5526 15.875
23.8 14.6 3.15; 38.25 6;
5403 20 14.6 1.5; 5404 20 14.6 3.15; 5409 21.35 14.6 0; 5410 5527 15.805 38.25 7.35; 5528 17.305 38.25 6; 5529 17.305
23.8 14.6 4.85; 38.25 7.35;
5411 20 14.6 4.85; 5412 21.35 14.6 6; 5413 21.35 14.6 4.85; 5531 3.6 25.5 8.75; 5532 8.15 25.5 8.75; 5533 13.6 25.5 8.75;
5414 21.35 14.6 3.15; 5415 21.35 14.6 1.5; 5416 22.575 14.6 5534 18.15 25.5 8.75; 5535 15.875 33 6; 5537 17.305 33
0; 7.35;
5417 22.575 14.6 6; 5418 22.575 14.6 4.85; 5419 22.575 14.6 5538 15.805 37.45 7.35; 5539 17.305 33 6; 5541 5.2 33
3.15; 4.475; 5542 6.7 33 3;
5420 22.575 14.6 1.5; 5421 22.775 14.6 1.5; 5422 22.775 5543 8.2 33 3; 5544 6.7 33 4.014; 5545 8.2 33 4.014; 5546
14.6 3.15; 4.675 33 6;
5424 10 11.8 2.6; 5425 8.75 11.8 2.6; 5426 7.65 11.8 0; 5427 5547 3.4 33 5.09; 5548 3.6625 33 5.545; 5549 4.9375 33
7.65 11.8 2.6; 5.545;
5428 6.55 11.8 0; 5429 6.55 11.8 2.6; 5430 5.45 11.8 0; 5431 5550 5.9 33 2.094; 5551 7.705 33 6; 5552 7.395 33 6; 5553
5.45 11.8 2.6; 6.7 33 5.145;
5433 5.45 11.8 6; 5434 7.65 11.8 2.3; 5435 6.55 11.8 2.3; 5554 8.2 33 5.145; 5555 7.0475 33 5.5725; 5556 7.9525 33
5436 7.1 11.8 2.3; 5.5725; 5557 6.7 33 0;
5437 8.75 36.07 0; 5438 11.25 36.07 0; 5439 8.75 36.07 6; 5558 6.7 33 2.094; 5559 6.2 33 9; 5560 6.2 33 6; 5561 6.2 33
5440 11.25 36.07 6; 12;
5442 16.7 33 12; 5443 16.7 33 9; 5444 16.7 33 9.35; 5445 5564 13.4 33 7.35; 5565 15.2 33 5.09; 5566 13.4 33 5.09;
16.7 33 7.35; 5567 14.675 33 6;
5446 15.805 33 12; 5447 15.805 33 6; 5448 15.805 33 9; 5568 13.6775 33 5.545; 5569 14.9375 33 5.545; 5570 14.3 33
5449 15.805 33 9.35; 3; 5571 14.3 33 0;
5450 15.805 33 7.35; 5451 14.605 33 12; 5452 14.605 33 9; 5572 17.705 33 6; 5573 16.7 33 5.115; 5574 18.2 33 5.115;
5453 14.635 33 6; 5575 17.0025 33 5.5575; 5576 17.9525 33 5.5575; 5577 16.7
5454 14.635 33 9; 5455 14.635 33 7.35; 5456 13.43 33 6; 33 3; 5578 16.7 33 0;
5457 13.43 33 9; 5579 2.9 27 3.2; 5580 8.9 27 3.2; 5581 12.9 27 3.2; 5582 18.9
5458 23.8 33 3; 5460 11.25 36.07 2; 5461 11.25 36.07 4; 27 3.2;
5462 8.75 36.07 2; 5583 6.2 33 7.35; 5584 0.9 33 5.7; 5585 8.75 33 5.7; 5586
5463 8.75 36.07 4; 5464 3.4 31.5 12; 5465 3.4 31.5 9; 5466 11.25 33 5.7;
10 31.5 12; 5587 18.75 33 5.7; 5588 2.15 33 5.7; 5589 8.2 33 5.7; 5590
5467 10 31.5 9; 5468 15.55 33 12; 5469 15.55 33 9; 5470 12.5 33 5.7;
15.55 31.5 12; 5591 18.2 33 5.7; 5592 1.8 21 8.7; 5593 8.25 21 8.7; 5594
5471 15.55 31.5 9; 5472 18.55 33 12; 5473 18.55 33 9; 5474 12.8 21 8.7;
18.55 31.5 12; 5595 18.25 21 8.7; 5596 16 28.114 6.825; 5597 11.2 27.85
5475 18.55 31.5 9; 5476 3.4 31.5 9.55; 5477 10 31.5 9.55; 6.62;
5478 15.55 31.5 9.55; 5598 6 28.114 6.825; 5599 1.2 27.85 6.62; 5600 16.7 27
4.605;
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 216 de 463
(SUBJECT) (Page)

5601 15.3 27 4.605; 5602 6.7 27 4.605; 5603 5.3 27 4.605; 229 127 4797; 230 126 4816; 232 129 4798; 233 131 4817;
5604 15.3 27 8.345; 235 132 4799;
5605 16.7 27 8.345; 5606 6.7 27 8.345; 5607 5.3 27 8.345; 236 124 4961; 237 126 4952; 239 131 4934; 240 127 4962;
5609 0 11.8 1.4; 241 129 4953;
5610 10 11.8 7.8; 5611 20 11.8 7.8; 5612 4.45 11.8 1.4; 5613 242 128 4963; 243 130 4954; 252 140 4825; 253 122 4965;
4.45 11.8 6; 255 140 4967;
5614 4.45 11.8 0; 5615 0 11.8 4.25; 5616 4.45 11.8 4.25; 267 19 4812; 268 364 4922; 269 344 349; 270 20 4794; 271
5617 18.25 21 3.035; 368 4904; 272 334 339;
5618 8.25 21 3.035; 5619 16.8 21 3.035; 5620 6.8 21 3.035; 273 22 4813; 274 23 4795; 275 25 4814; 276 367 4924; 277
5621 10.25 33 6; 347 352; 278 26 4796;
5622 9.75 33 6; 5623 12.25 3 12; 5624 12.25 3 6; 5625 12.25 279 371 4906; 280 337 342; 293 19 4958; 295 51 4940; 297
3 9; 22 4949; 298 166 4931;
5626 12.25 3 3; 5627 2 37.6667 6; 299 20 4959; 301 47 4941; 302 23 4950; 303 207 49; 304 49
*********************************************************************** 4932; 305 21 4960;
****** 307 48 4942; 309 24 4951; 310 50 4933; 321 28 1103; 322
MEMBER INCIDENCES 279 284; 324 284 1097;
1 1 1312; 2 141 1315; 3 4 123; 4 123 1424; 5 124 1435; 6 125 325 29 1091; 327 273 1085; 328 860 853; 331 218 1157; 332
4726; 7 2 1275; 693 1143;
8 5 127; 9 127 4729; 10 3 1279; 11 6 4717; 12 128 21; 13 7 333 31 1105; 334 280 285; 335 285 1099; 337 32 1093; 339
1301; 14 10 568; 274 1087; 340 861 854;
15 126 5399; 16 186 1441; 17 144 1462; 18 8 1283; 19 11 341 28 177; 343 177 1262; 345 218 741; 346 737 739; 347 29
129; 20 129 4730; 77; 348 77 1261;
21 9 1287; 22 12 4718; 23 130 24; 24 13 1291; 25 16 131; 26 350 693 1139; 351 79 32; 352 30 78; 353 78 1260; 355 302
131 5397; 701; 356 33 701;
28 14 1295; 29 17 132; 30 132 26; 31 15 1299; 32 18 4719; 357 279 394; 358 396 1131; 359 284 283; 360 307 1146; 365
33 133 27; 273 406;
34 36 1309; 35 37 567; 36 38 1305; 37 39 140; 38 19 584; 39 366 408 1136; 385 394 5605; 387 283 5604; 389 295 5601;
28 576; 40 20 29; 392 406 5607;
41 29 5466; 42 21 5484; 43 30 1378; 61 25 1273; 62 31 695; 394 291 5603; 397 309 295; 401 415 291; 402 291 1086; 407
64 26 32; 65 32 152; 135 1194;
66 27 33; 67 33 4762; 71 34 692; 72 142 35; 73 35 119; 74 412 778 1178; 416 776 1158; 437 151 1226; 442 152 1180;
119 1423; 77 40 577; 446 233 1159;
78 117 574; 81 143 1457; 82 41 146; 83 146 118; 85 118 136; 447 135 1492; 450 770 789; 451 778 4772; 453 152 1227;
86 136 137; 454 148 1375;
90 35 587; 91 120 591; 93 40 595; 94 117 566; 95 134 599; 456 153 1377; 500 1188 5456; 504 1167 1265; 528 138 747;
97 35 993; 538 295 1098;
98 37 4822; 100 1423 997; 101 122 4824; 105 40 681; 106 540 858 851; 549 309 5600; 559 313 46; 560 316 4939; 563
1440 1017; 107 146 669; 317 4938; 565 318 507;
108 117 679; 109 118 1015; 110 136 673; 111 134 675; 112 572 319 459; 573 320 588; 585 322 4902; 586 324 4901; 591
137 1010; 115 37 4964; 325 4903;
116 39 4823; 117 46 651; 125 74 72; 126 75 73; 127 72 172; 606 338 343; 608 373 4905; 610 348 353; 612 372 4923; 621
128 172 73; 334 4859;
134 105 103; 135 106 104; 136 103 5596; 139 111 115; 140 623 334 1050; 625 337 4861; 626 336 1064; 627 338 4860;
115 113; 143 345 384; 628 335 338;
144 346 385; 145 70 68; 146 71 69; 147 68 169; 148 169 69; 629 338 336; 632 339 1051; 635 341 1065; 637 340 343; 638
154 101 99; 343 341;
155 102 100; 156 99 5597; 159 113 114; 164 66 64; 165 67 639 344 4877; 641 344 1057; 643 347 4879; 644 346 1069;
65; 166 64 168; 645 348 4878;
167 168 65; 173 97 95; 174 98 96; 175 95 5598; 176 722 719; 646 345 348; 647 348 346; 650 349 1058; 653 351 1070; 655
177 721 929; 350 353; 656 353 351;
178 718 165; 179 112 116; 180 116 114; 186 335 382; 187 659 354 1061; 662 356 357; 665 358 1054; 668 360 361; 670
336 383; 188 62 60; 355 362; 672 359 363;
189 63 61; 190 60 167; 191 167 61; 197 93 91; 198 94 92; 673 362 5617; 674 363 5618; 675 364 4886; 677 364 1060;
199 91 5599; 679 367 4888;
202 4 4809; 203 5 4791; 204 43 444; 205 10 4810; 206 109 680 366 367; 681 368 4868; 683 368 1053; 685 371 4870;
463; 207 11 4792; 686 370 371;
208 110 448; 209 16 4811; 210 107 469; 211 17 4793; 212 687 372 4887; 688 365 372; 689 373 4869; 690 369 373; 691
108 454; 213 4 4955; 372 5619;
214 10 4946; 215 189 535; 216 5 4956; 217 11 4947; 218 6 692 373 5620; 693 350 374; 694 351 375; 695 340 376; 696
4957; 219 12 4948; 341 377; 697 355 386;
220 190 5313; 221 109 523; 222 111 527; 223 110 509; 224 698 5617 387; 699 359 388; 700 5618 389; 701 365 390; 702
112 511; 227 124 4815; 5619 391;
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 217 de 463
(SUBJECT) (Page)

703 369 392; 704 5620 393; 705 70 384; 706 62 382; 707 71 1233 668 667; 1235 669 668; 1237 670 138; 1239 671 670;
385; 708 63 383; 1241 672 671;
709 376 62; 710 377 63; 711 374 70; 712 375 71; 713 74 390; 1243 673 672; 1245 674 1485; 1247 675 674; 1249 676 28;
714 66 392; 1251 677 676;
715 75 391; 716 67 393; 717 386 74; 718 387 75; 719 388 66; 1253 678 677; 1255 679 678; 1257 680 683; 1259 681 680;
720 389 67; 1261 682 19;
722 5605 395; 724 5600 397; 726 5606 399; 728 5602 401; 1263 683 682; 1281 692 142; 1282 24 302; 1284 302 1390;
730 5604 403; 1286 23 693;
733 5607 407; 735 5603 409; 737 5601 411; 738 105 403; 1288 693 694; 1289 22 145; 1290 145 218; 1291 218 138;
739 106 411; 740 97 407; 1292 138 770;
741 98 409; 742 395 105; 743 397 106; 744 399 97; 745 401 1293 695 151; 1297 770 1195; 1299 1193 1258; 1300 774
98; 748 412 273; 5535; 1301 1184 1186;
749 412 398; 750 413 274; 751 400 1123; 753 398 5606; 754 1303 694 5622; 1307 257 1160; 1330 140 5398; 1331 702
415 5602; 151; 1332 137 5458;
757 874 867; 759 875 868; 765 872 865; 769 1186 1251; 773 1333 703 702; 1334 703 695; 1335 136 746; 1336 704 1268;
1164 1239; 1337 704 25;
774 430 4835; 777 432 4836; 782 434 4837; 785 435 43; 788 1338 41 705; 1339 705 707; 1340 706 708; 1341 705 711;
437 110; 793 439 108; 1342 707 704;
796 440 4782; 798 442 4826; 800 444 4856; 803 446 4783; 1343 708 166; 1344 707 712; 1345 709 713; 1346 651 709;
805 447 4827; 1347 710 714;
807 448 4857; 817 452 4784; 819 453 4828; 821 454 4858; 1348 651 710; 1349 711 709; 1350 712 710; 1351 711 715;
824 455 4800; 1352 713 706;
826 457 4841; 828 459 4874; 831 461 4801; 833 462 4842; 1353 714 708; 1354 713 716; 1355 715 712; 1356 651 715;
835 463 4875; 1357 716 714;
842 467 4802; 844 468 4843; 846 469 4876; 849 470 319; 1358 651 716; 1359 717 703; 1360 717 31; 1361 118 740;
851 472 4919; 1365 165 45;
853 474 4850; 856 476 109; 858 477 4920; 860 478 4851; 1366 720 5613; 1367 722 4862; 1368 724 4839; 1369 725
870 482 107; 4908; 1371 726 5610;
872 483 4921; 874 484 4852; 877 719 721; 880 487 5315; 1373 727 4907; 1374 728 4838; 1377 731 726; 1380 733
887 491 5314; 5433; 1383 734 946;
910 501 5316; 915 504 318; 920 507 4929; 923 509 112; 928 1388 736 717; 1389 737 31; 1390 736 737; 1391 738 736;
511 108; 933 513 190; 1393 738 739;
942 517 4930; 957 523 111; 966 527 107; 975 531 189; 984 1394 740 738; 1395 741 739; 1396 740 741; 1397 742 703;
535 4928; 987 536 659; 1398 743 695;
990 537 542; 993 538 658; 997 540 660; 1001 542 4821; 1399 742 743; 1400 744 742; 1401 745 743; 1402 744 745;
1004 543 537; 1403 746 744;
1007 545 315; 1009 547 560; 1018 552 314; 1020 553 563; 1404 747 745; 1405 746 747; 1406 5611 5610; 1407 749
1023 555 315; 4944; 1408 148 805;
1030 558 314; 1033 560 545; 1040 563 552; 1045 566 118; 1409 153 812; 1410 771 1366; 1411 776 810; 1412 233 811;
1046 567 1487; 1413 257 826;
1048 568 126; 1049 567 1025; 1051 569 37; 1053 570 1304; 1414 753 750; 1415 754 751; 1416 750 814; 1417 751 824;
1054 569 988; 1418 755 752;
1056 571 40; 1057 572 19; 1058 1433 1001; 1061 573 137; 1419 753 813; 1420 754 823; 1437 787 151; 1439 789 1228;
1062 574 573; 1449 781 1235;
1063 136 573; 1064 574 134; 1065 574 575; 1066 575 605; 1451 756 1179; 1452 781 1412; 1453 756 1202; 1469 800
1067 117 575; 825; 1471 802 5627;
1068 118 575; 1070 574 1009; 1072 577 117; 1073 577 578; 1472 801 802; 1476 805 1364; 1477 806 750; 1478 807 753;
1074 578 603; 1479 807 806;
1075 577 566; 1076 146 566; 1077 579 41; 1079 40 578; 1480 808 754; 1481 809 751; 1482 808 809; 1483 810 807;
1080 41 578; 1484 810 805;
1082 4703 579; 1084 1440 579; 1092 121 4703; 1094 185 1485 811 808; 1486 812 1365; 1487 811 812; 1488 813 817;
1440; 1096 120 1433; 1489 814 818;
1097 120 4705; 1098 122 5400; 1099 122 4705; 1100 584 28; 1490 813 814; 1491 815 755; 1492 816 752; 1493 815 816;
1101 577 1005; 1494 817 821;
1106 587 37; 1107 588 4937; 1112 591 122; 1113 592 4943; 1495 818 822; 1496 817 818; 1497 819 815; 1498 820 816;
1118 595 4706; 1499 819 820;
1119 596 4707; 1124 599 573; 1130 603 146; 1133 605 136; 1500 821 755; 1501 822 752; 1502 821 822; 1503 823 819;
1200 651 76; 1504 824 820;
1205 654 4818; 1207 655 654; 1209 656 655; 1211 657 656; 1505 823 824; 1506 750 813; 1507 813 818; 1508 818 821;
1213 658 4820; 1509 821 752;
1215 659 538; 1217 660 536; 1219 661 540; 1229 666 145; 1510 752 815; 1511 815 820; 1512 820 823; 1513 823 751;
1231 667 666; 1515 810 806;
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 218 de 463
(SUBJECT) (Page)

1516 806 753; 1518 811 809; 1519 809 754; 1520 825 801; 1874 1016 1443; 1875 659 1430; 1876 658 1432; 1877 661
1521 826 802; 1431; 1878 660 1429;
1522 825 826; 1523 800 826; 1524 826 801; 1579 849 850; 1879 1027 960; 1880 1026 980; 1881 1025 969; 1882 1024
1580 851 852; 949; 1883 1028 1033;
1582 853 1107; 1584 851 1119; 1586 849 851; 1588 856 857; 1884 1028 1049; 1885 1031 1035; 1886 1031 1063; 1887
1589 858 859; 1032 1034; 1888 1033 4829;
1590 860 30; 1591 860 1106; 1592 861 33; 1593 858 1118; 1889 1034 4830; 1890 1033 1048; 1891 1035 4831; 1892
1594 858 302; 1035 1062; 1893 1036 339;
1595 856 858; 1597 93 857; 1598 850 93; 1599 94 859; 1600 1894 1037 343; 1895 1036 1052; 1896 1038 342; 1897 1038
852 94; 1602 863 864; 1066; 1898 1039 4844;
1603 865 866; 1605 867 1113; 1607 865 1127; 1609 863 865; 1899 1040 4845; 1900 1039 1055; 1901 1041 4846; 1902
1611 870 871; 1041 1067; 1903 1042 1039;
1612 872 873; 1613 874 29; 1614 874 1112; 1615 875 32; 1904 1043 1040; 1905 1042 1056; 1906 1044 1041; 1907
1616 872 1126; 1044 1068; 1908 1045 349;
1617 872 693; 1618 870 872; 1620 101 871; 1621 864 101; 1909 1046 353; 1910 1045 1059; 1911 1047 352; 1912 1047
1622 102 873; 1071; 1913 1048 5592;
1623 866 102; 1707 1182 800; 1715 783 1186; 1717 783 1914 48 1048; 1915 1049 1074; 1916 1048 1049; 1917 1050
1205; 1724 928 5614; 335; 1918 1049 1050;
1725 5433 5431; 1726 929 4863; 1727 930 4864; 1728 5613 1919 1051 340; 1920 1050 1051; 1921 1052 1075; 1922 1051
5616; 1731 932 5395; 1052; 1923 1053 369;
1733 5424 5425; 1734 5425 5427; 1735 935 4840; 1736 5425 1924 1052 1053; 1925 1054 5593; 1926 1053 1054; 1927
935; 1737 936 5614; 1054 47; 1928 1055 1040;
1738 937 133; 1739 5612 5609; 1740 133 941; 1741 938 939; 1929 47 1055; 1930 1056 5594; 1931 1055 1056; 1932 1057
1742 940 4834; 345; 1933 1056 1057;
1743 939 942; 1744 941 938; 1745 942 940; 1746 941 942; 1934 1058 350; 1935 1057 1058; 1936 1059 1077; 1937 1058
1748 946 722; 1059; 1938 1060 365;
1753 988 989; 1755 990 4; 1756 991 990; 1757 992 991; 1939 1059 1060; 1940 1061 5595; 1941 1060 1061; 1942
1758 993 992; 1061 51; 1943 1062 1034;
1759 994 1424; 1760 995 994; 1761 996 995; 1762 997 996; 1944 50 1062; 1945 1063 1072; 1946 1062 1063; 1947 1064
1763 998 1435; 337; 1948 1065 342;
1764 999 998; 1765 1000 999; 1766 1001 1000; 1767 1002 1949 1066 1073; 1950 1067 1040; 1951 1068 1078; 1952
584; 1768 1003 1002; 1069 347; 1953 1070 352;
1769 1004 1003; 1770 1005 1004; 1771 1006 576; 1772 1007 1954 1071 1079; 1958 1066 370; 1960 360 49; 1961 49 1067;
1006; 1773 1008 1007; 1962 1067 1068;
1774 1009 1008; 1775 1010 1011; 1777 1012 218; 1778 1013 1966 1071 366; 1968 356 166; 1969 1072 1032; 1970 1072
1012; 1779 1014 1013; 336; 1971 336 341;
1780 1015 1014; 1781 1016 1019; 1782 1017 1016; 1783 1972 1073 1037; 1973 341 1073; 1974 1074 1032; 1975 1074
1018 1441; 1784 1019 1018; 335; 1976 335 340;
1789 1024 1027; 1790 1025 1024; 1791 1026 568; 1792 1027 1977 1075 1037; 1978 340 1075; 1979 369 359; 1980 1076
1026; 1794 959 948; 1043; 1981 1076 345;
1795 960 949; 1796 1426 1425; 1797 1430 1429; 1798 1444 1982 345 350; 1983 1077 1046; 1984 350 1077; 1985 1078
1443; 1800 1437 1436; 1043; 1986 1078 346;
1803 958 978; 1804 948 968; 1805 949 969; 1806 1425 1427; 1987 346 351; 1988 1079 1046; 1989 351 1079; 1990 365
1807 1429 1431; 355; 1991 1080 853;
1808 1443 1445; 1810 1436 1438; 1813 979 959; 1814 980 1992 1080 5516; 1993 1083 854; 1994 1083 1120; 1995 1084
960; 1815 1428 1426; 851; 1996 1085 1080;
1816 1432 1430; 1817 1446 1444; 1820 1439 1437; 1823 978 1997 1086 1084; 1998 1085 5502; 1999 1087 1083; 2000
968; 1824 958 948; 1087 1121; 2001 1088 412;
1825 960 959; 1826 980 979; 1827 969 1427; 1828 949 1425; 2002 1089 415; 2003 1088 5514; 2004 1090 413; 2005 1090
1829 1430 1426; 1124; 2006 1091 1088;
1830 1432 1428; 1831 1431 1438; 1832 1429 1436; 1833 2007 1092 1141; 2008 1091 5504; 2009 1093 1090; 2010
1444 1437; 1834 1446 1439; 1093 1125; 2011 1094 867;
1835 1445 1455; 1836 1443 1454; 1837 1463 1453; 1838 2012 1095 865; 2013 1094 5512; 2014 1096 868; 2015 1096
1466 1456; 1839 1465 1469; 1128; 2016 1097 1094;
1840 1464 1468; 1841 1473 1469; 1842 1472 1468; 1843 988 2017 1098 1152; 2018 1097 5506; 2019 1099 1096; 2020
978; 1844 989 958; 1099 1129; 2021 1100 279;
1845 968 993; 1846 948 992; 1847 959 991; 1848 979 990; 2022 1101 309; 2023 1100 5509; 2024 1102 280; 2025 1102
1849 1427 997; 1132; 2026 1103 1100;
1850 1425 996; 1851 1426 995; 1852 1428 994; 1853 1438 2027 1104 1155; 2028 1103 5508; 2029 1105 1102; 2030
1001; 1854 1436 1000; 1105 1133; 2031 1106 856;
1855 1437 999; 1856 1439 998; 1871 1019 1444; 1872 1018 2032 78 1106; 2033 1107 849; 2034 1106 1107; 2035 1108
1446; 1873 1017 1445; 5515; 2036 1107 1108;
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 219 de 463
(SUBJECT) (Page)

2037 1109 5501; 2038 1108 1109; 2039 1109 406; 2040 5607 2223 5448 5450; 2224 5443 5445; 2225 1209 1408; 2226
5606; 2041 1110 5513; 1210 1410; 2227 1211 770;
2042 398 1110; 2043 1111 5503; 2044 1110 1111; 2045 1111 2228 1161 1196; 2229 1196 1197; 2230 1197 1198; 2231
77; 2046 1112 870; 1198 1199; 2232 1199 1200;
2047 77 1112; 2048 1113 863; 2049 1112 1113; 2050 1114 2233 1200 5559; 2234 1201 1202; 2235 1202 1203; 2236
5511; 2051 1113 1114; 1203 1204; 2237 1204 1205;
2052 1115 5505; 2053 1114 1115; 2054 1115 283; 2055 5604 2238 1205 1206; 2239 1206 5457; 2240 1207 5469; 2241
5605; 2056 1116 5510; 1208 5443; 2242 1209 5473;
2057 394 1116; 2058 1117 5507; 2059 1116 1117; 2060 1117 2243 1210 1211; 2244 1184 5586; 2245 1213 152; 2246 1212
177; 2061 1118 861; 1213; 2247 1215 1213;
2062 701 1118; 2063 1119 854; 2064 1118 1119; 2065 1120 2248 1214 1215; 2249 1214 785; 2251 1190 5565; 2254 1195
5579; 2066 1119 1120; 5587; 2255 1216 1248;
2067 1121 1135; 2068 1120 1121; 2069 1122 274; 2070 1121 2256 1222 1215; 2257 1217 1222; 2258 1223 5571; 2259
1122; 2071 1123 413; 1218 1223; 2260 1224 1223;
2072 1122 1123; 2073 1124 1137; 2074 1123 1124; 2075 2261 5577 5578; 2262 1225 5578; 2263 1220 1225; 2264
1125 5580; 2076 1124 1125; 1226 1225; 2265 1221 1226;
2077 1125 79; 2078 1126 875; 2079 79 1126; 2080 1127 868; 2266 1227 5326; 2267 1227 1212; 2268 1212 1216; 2269
2081 1126 1127; 1216 1217; 2270 1217 5570;
2082 1128 5581; 2083 1127 1128; 2084 1129 1148; 2085 2271 1218 1219; 2272 1219 5577; 2273 1220 1221; 2274
1128 1129; 2086 1130 285; 1228 787; 2275 1221 1228;
2087 1129 1130; 2088 1131 280; 2089 1130 1131; 2090 1132 2276 785 1216; 2277 1229 1159; 2278 1162 1229; 2279 1230
1150; 2091 1131 1132; 1165; 2280 1229 1230;
2092 1133 5582; 2093 1132 1133; 2094 1133 739; 2095 1134 2281 1231 1416; 2282 1230 1231; 2283 1232 1415; 2284
1084; 2097 1134 1135; 1231 1232; 2285 1233 1413;
2098 1136 1122; 2099 1135 1136; 2100 5603 5602; 2102 400 2286 1232 1233; 2287 1234 1411; 2288 1233 5542; 2289
1137; 2104 1137 1140; 1235 5325; 2290 1234 5543;
2105 1139 79; 2106 1138 1142; 2107 1140 1138; 2108 1141 2291 1235 5327; 2292 1236 1230; 2293 1167 5547; 2295
1089; 2109 1140 1141; 1238 1232; 2296 1237 1264;
2110 1142 1139; 2111 1143 1092; 2112 1142 1143; 2113 2297 1239 1167; 2299 1241 5541; 2300 1242 1417; 2302
1095 1147; 2116 1146 1149; 1243 5585; 2303 1242 1247;
2120 1147 1153; 2121 1149 1130; 2122 1148 1149; 2123 2304 1244 5560; 2305 1245 1242; 2306 1244 5553; 2307
5601 5600; 2125 396 1150; 1246 5551; 2309 1246 5589;
2127 1150 1154; 2128 1156 741; 2129 1152 1095; 2130 1153 2310 1248 5590; 2311 1188 5566; 2313 1250 1218; 2314
1148; 2131 1152 1153; 1249 1266; 2318 1253 5577;
2132 1154 1151; 2133 1155 1101; 2134 1154 1155; 2135 2319 1254 1220; 2321 1255 1221; 2322 1254 1259; 2323
1157 1104; 2136 1156 1157; 1256 774; 2324 1253 1254;
2137 1151 1156; 2141 872 865; 2142 1158 148; 2143 1159 2325 1256 5573; 2327 1259 1255; 2328 1258 5591; 2329 302
153; 2144 1160 771; 1162; 2330 1162 33;
2145 1158 1196; 2146 1160 5584; 2147 1161 771; 2148 1162 2331 24 701; 2332 701 27; 2337 693 1227; 2338 1227 32;
771; 2149 1163 776; 2341 747 1228;
2150 1164 257; 2151 1163 1197; 2152 1165 233; 2153 1164 2342 1228 743; 2343 23 79; 2344 79 26; 2345 1260 302;
5588; 2154 1166 1163; 2346 1261 693;
2156 1166 1198; 2157 1168 1165; 2159 1169 1166; 2161 2351 1262 218; 2355 739 22; 2356 739 25; 2358 1264 1238;
1169 1199; 2162 1171 1168; 2359 1265 1170;
2164 1172 1169; 2165 1173 5546; 2166 5561 5559; 2167 2360 1266 1250; 2361 1267 5453; 2362 30 1108; 2363 1108
1174 1171; 2168 1173 1241; 273; 2364 273 1110;
2169 1175 5561; 2170 1176 5552; 2171 1175 1201; 2172 2366 29 1114; 2367 1114 284; 2369 284 1116; 2371 1108
1177 5557; 2174 1178 1175; 302; 2372 302 1120;
2175 1179 1246; 2177 1180 1177; 2179 1181 1160; 2180 2373 1120 33; 2374 1120 274; 2375 274 1124; 2376 1124 32;
1182 1164; 2188 989 570; 2377 32 1128;
2190 1011 770; 2191 1183 778; 2192 1184 5621; 2193 1183 2378 1128 285; 2379 285 1132; 2380 1132 31; 2381 1132
1204; 2194 1185 1183; 218; 2382 218 1116;
2197 1187 1185; 2198 1188 1251; 2199 5451 5452; 2200 2383 148 1198; 2384 1198 1172; 2385 1172 1201; 2386 1201
1189 5451; 2202 5446 5449; 1371; 2387 778 1205;
2203 1191 5446; 2204 5442 5444; 2205 1192 5442; 2206 2388 1205 5446; 2389 5446 1209; 2390 1209 135; 2391 1209
1193 5572; 2207 1192 1209; 770; 2393 1220 151;
2208 1194 5472; 2209 1195 1258; 2210 1194 1210; 2211 800 2394 1220 1223; 2395 1223 1216; 2396 1216 152; 2397 152
1181; 2212 1196 1181; 1234; 2398 1234 1174;
2213 1197 1182; 2214 1198 1167; 2215 1199 1170; 2216 2399 1174 1231; 2400 1231 153; 2401 1231 771; 2402 771
5559 5583; 2217 1201 1176; 1198; 2403 1268 717;
2218 1202 1371; 2219 1203 694; 2220 1204 1184; 2221 1205 2404 1269 1491; 2405 1270 704; 2408 146 1268; 2409 1271
5308; 2222 5454 5455; 1272; 2410 1269 1271;
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 220 de 463
(SUBJECT) (Page)

2411 1272 25; 2412 1270 1272; 2413 1273 31; 2414 1268 2580 1377 1162; 2581 1378 148; 2582 1379 153; 2583 1379
1273; 2415 40 584; 1382; 2584 1382 1384;
2416 584 117; 2417 117 576; 2418 576 134; 2419 704 1273; 2591 1386 771; 2592 1386 4764; 2593 1387 1388; 2594 1388
2420 1273 717; 1389; 2595 1390 1386;
2421 717 695; 2422 695 702; 2423 747 218; 2424 743 31; 2596 1388 1390; 2604 274 1400; 2608 1401 1090; 2609 1400
2425 576 4781; 1397; 2610 1397 1396;
2426 1274 1300; 2427 1275 1276; 2428 1276 1277; 2429 2611 1396 1401; 2612 5449 5448; 2613 5444 5443; 2616
1277 1278; 2430 1278 5; 5450 5447; 2617 5455 5453;
2431 1279 1280; 2432 1280 1281; 2433 1281 1282; 2434 2620 1408 1193; 2621 5445 1256; 2622 1410 1195; 2623
1282 6; 2435 1283 1284; 1408 5537; 2625 1411 1177;
2436 1284 1285; 2437 1285 1286; 2438 1286 11; 2439 1287 2626 1412 1180; 2627 1413 1174; 2630 1415 1171; 2632
1288; 2440 1288 1289; 1416 1168; 2634 1417 1234;
2441 1289 1290; 2442 1290 12; 2443 1291 1292; 2444 1292 2640 1418 1367; 2641 1419 1364; 2647 1423 120; 2648 1424
1293; 2445 1293 1294; 124; 2649 1433 121;
2446 1294 16; 2447 1295 1296; 2448 1296 1297; 2449 1297 2650 1435 125; 2651 1440 1490; 2652 1441 144; 2653 1447
1298; 2450 1298 17; 571; 2654 1447 1448;
2451 1299 1274; 2452 1300 18; 2453 1301 1302; 2454 1302 2655 1450 572; 2656 1449 1450; 2657 1451 1449; 2658 1452
1303; 2455 1303 570; 1451; 2659 1448 1452;
2456 1304 10; 2457 1305 1306; 2458 1306 1307; 2459 1307 2660 1453 1454; 2661 1454 1455; 2662 1456 1453; 2663
1308; 2460 1308 39; 1455 1448; 2664 1454 1452;
2461 1309 1310; 2462 1310 1311; 2463 1311 569; 2464 1312 2665 1453 1451; 2666 1456 1449; 2667 1457 41; 2668 1457
1313; 2465 1313 1314; 1458; 2669 1459 1460;
2466 1314 141; 2470 1315 4; 2471 1282 1316; 2472 1277 2670 1458 1459; 2671 1462 22; 2672 1461 1462; 2673 1460
5623; 2473 1290 1317; 1461; 2674 1463 1464;
2474 1285 5624; 2475 1300 1318; 2476 1297 1324; 2477 2675 1464 1465; 2676 1466 1463; 2677 1460 1463; 2678
1298 1363; 2478 1286 1351; 1461 1466; 2679 1458 1465;
2479 1282 1340; 2481 1315 1346; 2482 1304 1358; 2483 2680 1459 1464; 2681 1467 1468; 2682 1468 1469; 2683
1316 1319; 2484 1317 1320; 1470 1467; 2684 1469 681;
2485 1318 1321; 2486 1319 1277; 2487 1320 1285; 2488 2685 1468 680; 2686 1467 683; 2687 1470 682; 2688 1471
1321 1297; 2489 1322 1325; 1472; 2689 1472 1473;
2490 1323 1326; 2491 1324 1327; 2492 1325 1315; 2493 2690 1474 1471; 2691 667 1471; 2692 666 1474; 2693 669
1326 1304; 2494 1327 1294; 1473; 2694 668 1472;
2495 1316 1328; 2496 1317 1329; 2497 1318 1330; 2498 2695 1475 1476; 2696 1476 1477; 2697 1478 1475; 2698
1319 1331; 2499 1320 1332; 1477 679; 2699 1476 678;
2500 1321 1333; 2501 1322 1334; 2502 1323 1335; 2503 2700 1475 677; 2701 1478 676; 2702 1471 1475; 2703 1474
1324 1336; 2504 1325 1337; 1478; 2704 1479 1480;
2505 1326 1338; 2506 1327 1339; 2507 1328 1347; 2508 2705 1480 1481; 2706 1482 1479; 2707 671 1479; 2708 670
1329 1359; 2509 1331 1348; 1482; 2709 673 1481;
2510 1332 1360; 2511 1334 1349; 2512 1335 1361; 2513 2710 672 1480; 2711 1477 1481; 2712 1476 1480; 2713 1483
1337 1350; 2514 1338 1362; 1484; 2714 1485 1486;
2515 1340 1290; 2516 1340 1341; 2517 1342 5625; 2518 2715 1484 1485; 2716 1486 135; 2717 1483 1486; 2718 1479
1341 1344; 2519 1344 1342; 1484; 2719 1482 1483;
2520 1343 1345; 2521 1346 1304; 2522 1345 1346; 2523 2720 1487 122; 2721 1423 1487; 2722 4703 1488; 2723 1490
1347 1329; 2524 1341 1347; 143; 2724 4705 4727;
2525 1348 1332; 2526 1344 1348; 2527 1349 1335; 2528 2725 1488 4705; 2726 1491 1270; 2727 1490 1491; 2728 599
1343 1349; 2529 1350 1338; 1484; 2729 1492 4777;
2530 1345 1350; 2531 1351 1278; 2532 1342 1351; 2535 2730 1483 1492; 6393 4703 1447; 6394 4706 579; 6395 1469
1354 5626; 2536 1353 1356; 4706; 6396 4707 51;
2537 1356 1354; 2538 1355 1357; 2539 1358 1294; 2540 6397 1470 4707; 6398 4708 128; 6399 4709 130; 6400 4710
1357 1358; 2541 1359 5312; 133; 6401 4710 4716;
2542 1353 1359; 2543 1360 1333; 2544 1356 1360; 2545 6402 4709 4715; 6403 4708 4714; 6404 4709 4720; 6405
1361 1336; 2546 1355 1361; 4710 4723; 6406 4713 4725;
2547 1362 1339; 2548 1357 1362; 2549 1363 1286; 2550 6407 4712 4722; 6408 4714 4711; 6409 4715 4712; 6410
1354 1363; 2551 1328 442; 4716 4713; 6411 4717 4708;
2552 1329 447; 2553 1330 453; 2554 1331 43; 2555 1332 6412 4718 4709; 6413 4719 4710; 6414 4719 4716; 6415
110; 2556 1333 108; 4718 4715; 6416 4717 4714;
2557 1334 319; 2558 1335 109; 2559 1336 107; 2560 1337 6417 4720 4708; 6418 4720 4722; 6419 4722 4711; 6421
472; 2561 1338 477; 4723 4709; 6422 4723 4725;
2562 1339 483; 2563 1364 806; 2564 1365 809; 2565 1366 6424 4708 4722; 6425 4710 4725; 6426 4726 1450; 6427
752; 2566 1365 1418; 1441 4728; 6428 4727 1440;
2567 1366 1368; 2568 1367 1366; 2569 1368 1419; 2573 6429 1445 4727; 6430 4728 4726; 6431 1446 4728; 6432
1371 1178; 2578 1375 1161; 4729 20; 6433 4730 23;
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 221 de 463
(SUBJECT) (Page)

6434 722 4731; 6435 929 4732; 6436 4731 4757; 6437 4732 6599 4846 4805; 6600 4847 4806; 6601 4848 5386; 6602
4734; 6438 4731 4737; 4849 5387; 6603 4850 472;
6439 4729 4740; 6440 4733 4735; 6441 4734 4736; 6442 6604 4851 477; 6605 4852 483; 6606 4853 4925; 6607 4854
4733 4738; 6443 4735 4729; 5340; 6608 4855 5341;
6444 4736 4730; 6445 4735 4739; 6446 4737 4741; 6447 6609 4856 4892; 6610 4857 4893; 6611 4858 4894; 6612
4738 4742; 6448 4737 4758; 4859 4895; 6613 4860 4896;
6449 4739 4743; 6450 4738 4739; 6451 4740 4744; 6452 6614 4861 4897; 6615 4862 4898; 6616 4863 4899; 6617
4739 4740; 6453 4741 4745; 4864 4900; 6618 4865 435;
6454 4742 4746; 6455 4741 4742; 6456 4743 4747; 6457 6619 4866 437; 6620 4867 439; 6621 4868 1036; 6622 4869
4742 4743; 6458 4744 4748; 1037; 6623 4870 1038;
6459 4743 4744; 6460 4745 4749; 6461 4746 4750; 6462 6624 4871 734; 6625 4872 733; 6626 4873 5428; 6627 4874
4745 4746; 6463 4747 4751; 4910; 6628 4875 4911;
6464 4746 4747; 6465 4748 4752; 6466 4747 4748; 6467 6629 4876 4912; 6630 4877 4913; 6631 4878 4914; 6632
4749 4753; 6468 4750 4754; 4879 4915; 6633 4880 4916;
6469 4749 4750; 6470 4751 4755; 6472 4752 4756; 6473 6634 4881 5372; 6635 4882 5373; 6636 4883 470; 6637 4884
4751 4752; 6474 4753 4732; 476; 6638 4885 482;
6475 4754 4734; 6476 4753 4754; 6477 4755 4736; 6478 6639 4886 1045; 6640 4887 1046; 6641 4888 1047; 6642
4754 4755; 6479 4756 4730; 4889 4880; 6643 4890 5354;
6480 4755 4756; 6481 4757 4733; 6482 4758 4738; 6483 6644 4891 5355; 6645 4892 442; 6646 4893 447; 6647 4894
4757 4758; 6484 4757 4738; 453; 6648 4895 1028;
6485 4738 4741; 6486 4741 4746; 6487 4746 4749; 6488 6649 4896 1032; 6650 4897 1031; 6651 4898 4832; 6652
4749 4754; 6489 4754 4732; 4899 4833; 6653 4900 940;
6490 4729 4739; 6491 4739 4744; 6492 4744 4747; 6493 6654 4901 4865; 6655 4902 4866; 6656 4903 4867; 6657
4747 4752; 6494 4752 4755; 4904 358; 6658 4905 363;
6495 4755 4730; 6496 4712 4725; 6497 1379 4763; 6498 6659 4906 361; 6660 4907 4871; 6661 4908 4872; 6662 4909
4761 4760; 6499 4760 4759; 4873; 6663 4910 457;
6500 4762 4771; 6502 4759 4765; 6503 4763 4761; 6504 6664 4911 462; 6665 4912 468; 6666 4913 1042; 6667 4914
4764 1387; 6505 4763 4768; 1043; 6668 4915 1044;
6506 4762 4760; 6507 4765 4766; 6508 4766 4767; 6509 6669 4916 4847; 6670 4917 5379; 6671 4918 5380; 6672
4767 1389; 6510 4768 4769; 4919 4883; 6673 4920 4884;
6511 4769 4770; 6512 4770 4764; 6513 4771 1379; 6514 6674 4921 4885; 6675 4922 354; 6676 4923 362; 6677 4924
4771 1384; 6515 1384 4768; 357; 6678 4925 4889;
6516 4768 4765; 6517 4769 4766; 6518 4770 4767; 6519 6679 4926 5347; 6680 4927 5348; 6681 4928 16; 6682 4929
4764 4767; 6520 4767 4769; 17; 6683 4930 18;
6521 4769 4765; 6522 4765 4763; 6523 4772 1203; 6527 6684 4931 25; 6685 4932 26; 6686 4933 27; 6687 4934 547;
4776 778; 6529 4777 1211; 6688 4935 132;
6533 4781 135; 6535 4782 6; 6536 4783 12; 6537 4784 18; 6689 4936 937; 6690 4937 10; 6691 4938 11; 6692 4939 12;
6538 4785 21; 6693 4940 22;
6539 4786 24; 6540 4787 27; 6541 4788 128; 6542 4789 130; 6694 4941 23; 6695 4942 24; 6696 4943 126; 6697 4944 129;
6543 4790 133; 6698 4945 130;
6544 4791 430; 6545 4792 432; 6546 4793 434; 6547 4794 6699 4946 531; 6700 4947 504; 6701 4948 513; 6702 4949
358; 6548 4795 363; 706; 6703 4950 207;
6549 4796 361; 6550 4797 728; 6551 4798 724; 6552 4799 6704 4951 50; 6705 4952 555; 6706 4953 5396; 6707 4954
935; 6553 4800 5; 5615; 6708 4955 501;
6554 4801 11; 6555 4802 17; 6556 4803 20; 6557 4804 23; 6709 4956 487; 6710 4957 491; 6711 4958 596; 6712 4959
6558 4805 26; 47; 6713 4960 48;
6559 4806 127; 6560 4807 129; 6561 4808 132; 6562 4809 6714 4961 5611; 6715 4962 731; 6716 4963 4945; 6717 4964
474; 6563 4810 478; 4966; 6718 4965 558;
6564 4811 484; 6565 4812 354; 6566 4813 362; 6567 4814 6719 4966 39; 6720 4967 553; 7203 1110 693; 7204 693
357; 6568 4815 4853; 1114; 7205 693 1124;
6569 4816 5333; 6570 4817 5334; 6571 4818 10; 6572 4819 7206 693 1128; 7207 153 1418; 7208 771 1418; 7209 5308
16; 6573 4820 126; 1185; 7212 5310 5311;
6574 4821 131; 6575 4822 657; 6576 4823 4819; 6577 4824 7213 5312 1330; 7214 5311 5312; 7215 5313 517; 7216 5310
661; 6578 4825 543; 5313; 7217 5314 316;
6579 4826 440; 6580 4827 446; 6581 4828 452; 6582 4829 7218 1340 5314; 7219 5315 317; 7221 5316 320; 7223 1363
4785; 6583 4830 4786; 318; 7224 1351 5315;
6584 4831 4787; 6585 4832 4788; 6586 4833 4789; 6587 7226 1358 189; 7227 1346 5316; 7238 1371 778; 7241 5325
4834 4790; 6588 4835 324; 1243; 7242 5326 694;
6589 4836 322; 6590 4837 325; 6591 4838 727; 6592 4839 7244 5327 1227; 7247 1294 5329; 7248 1293 5329; 7249
725; 6593 4840 5426; 5330 5365; 7250 5331 5366;
6594 4841 455; 6595 4842 461; 6596 4843 467; 6597 4844 7251 5331 5363; 7252 5332 5362; 7253 5333 4854; 7254
4803; 6598 4845 4804; 5334 4855; 7261 5340 4926;
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 222 de 463
(SUBJECT) (Page)

7262 5341 4927; 7269 5347 4890; 7270 5348 4891; 7277 7489 5503 1092; 7490 5492 5503; 7491 5504 1111; 7492
5354 5330; 7278 5355 5331; 5491 5504; 7493 5505 1098;
7285 5361 5364; 7286 5362 5361; 7287 5363 5332; 7288 7494 5496 5505; 7495 5506 1115; 7496 5495 5506; 7497
5364 5330; 7295 5365 4881; 5507 1104; 7498 5500 5507;
7296 5366 4882; 7303 5372 4917; 7304 5373 4918; 7311 7499 5508 1117; 7500 5499 5508; 7501 5509 1116; 7502
5379 4848; 7312 5380 4849; 5499 5509; 7503 5510 1101;
7319 5386 4807; 7320 5387 4808; 7327 5393 5394; 7328 7504 5500 5510; 7505 5511 1095; 7506 5496 5511; 7507
5394 5424; 7329 5395 4935; 5512 1114; 7508 5495 5512;
7330 5396 5393; 7337 5397 1271; 7338 5398 1269; 7339 7509 5513 1089; 7510 5492 5513; 7511 5514 1110; 7512
5397 5409; 7340 5399 186; 5491 5514; 7513 5515 1084;
7341 5400 185; 7343 5398 5401; 7344 5397 5403; 7345 5401 7514 5488 5515; 7515 5516 1108; 7516 5487 5516; 7517 783
5402; 7346 5402 5410; 5519; 7518 5308 5520;
7347 5403 5404; 7349 5404 5411; 7357 5409 5416; 7359 7519 5517 5521; 7520 5519 5517; 7521 5520 5518; 7522
5399 5412; 7360 5410 5400; 5519 5520; 7523 5521 5518;
7361 5411 5399; 7362 5411 5413; 7363 5404 5414; 7364 7524 5519 5521; 7525 5521 5520; 7526 5535 5522; 7527
5403 5415; 7365 5412 5417; 5522 5526; 7528 5539 5524;
7366 5413 5418; 7367 5414 5419; 7368 5415 5420; 7369 7529 5524 5528; 7530 5450 5523; 7531 5523 5538; 7532
5412 5413; 7370 5413 5414; 5537 5525; 7533 5525 5529;
7371 5414 5415; 7372 5415 5409; 7373 5416 5398; 7374 7534 5522 5523; 7535 5524 5525; 7536 5526 5527; 7537
5417 5400; 7375 5418 5410; 5528 5529; 7538 5526 5528;
7376 5419 5422; 7377 5420 5421; 7378 5417 5418; 7379 7539 5527 5529; 7540 5522 5524; 7541 5523 5525; 7542
5418 5419; 7380 5422 5421; 5538 5527; 7543 5517 5538;
7381 5417 5410; 7382 5410 5419; 7383 5421 5401; 7384 7544 5518 5538; 7545 5531 5485; 7546 5532 5489; 7547
5422 5402; 7385 5414 5421; 5533 5493; 7548 5534 5497;
7387 5424 932; 7388 5426 4909; 7389 5427 5429; 7390 5427 7549 5535 5447; 7550 5537 5445; 7551 5539 1256; 7552
5434; 7391 5428 5430; 5519 5523; 7555 1237 1231;
7392 5429 5431; 7393 5429 5435; 7394 5430 928; 7396 5431 7556 5541 1233; 7557 1238 5541; 7558 5542 1234; 7559
5430; 7397 5433 720; 1245 5544; 7560 5543 1235;
7398 5434 5426; 7399 5435 5428; 7400 5434 5436; 7401 7561 1247 5545; 7562 5544 5542; 7563 1417 5544; 7564
5436 5435; 7402 1213 5438; 5545 5543; 7565 1417 5545;
7403 1180 5437; 7404 5437 5438; 7405 5439 5440; 7409 7566 5546 1170; 7567 5547 1237; 7568 5547 5548; 7569
5442 1191; 7410 5443 1209; 1241 5549; 7570 5548 1265;
7412 5446 5468; 7413 5447 1190; 7414 5448 1208; 7415 7571 5549 5546; 7572 1413 5550; 7573 5550 5558; 7574
5451 1187; 7416 5452 5454; 5551 1176; 7575 5552 1244;
7417 1206 1187; 7418 1206 5564; 7419 5453 5567; 7420 7576 5553 1245; 7577 5554 1247; 7578 5552 5555; 7579
5454 1207; 7422 5456 1267; 5551 5556; 7580 5555 5553;
7423 5457 5452; 7424 5458 702; 7425 1228 5458; 7426 702 7581 5556 5554; 7582 5557 1174; 7583 5542 5558; 7585
1228; 7427 1228 137; 5558 5557; 7586 5559 1201;
7429 5564 1188; 7430 1216 694; 7431 1205 694; 7432 1201 7587 5560 1173; 7588 5561 1172; 7589 1172 1200; 7590
694; 7433 5438 5460; 1200 1173; 7592 1249 1217;
7434 5437 5462; 7435 1179 5439; 7436 1184 5440; 7437 7593 5565 1250; 7594 5566 1249; 7595 1267 5568; 7596
1180 5438; 7438 1179 5440; 5567 1190; 7597 5567 5569;
7439 5460 5461; 7440 5461 5440; 7441 5462 5463; 7442 7598 5568 5566; 7599 5569 5565; 7600 5570 1218; 7601
5463 5439; 7443 5462 5460; 1266 5570; 7602 5571 1222;
7444 5463 5461; 7445 5438 5462; 7446 5462 5461; 7447 7603 5570 5571; 7604 5572 5539; 7605 5573 1253; 7606
5461 5439; 7448 5464 1166; 5574 1259; 7607 5539 5575;
7449 5465 1198; 7450 5465 5476; 7451 5466 4776; 7452 7608 5572 5576; 7609 5575 5573; 7610 5576 5574; 7611
5467 1203; 7453 5467 5477; 5577 1220; 7612 5578 1224;
7454 5468 1189; 7455 5469 5448; 7456 5470 5468; 7457 7613 5579 1134; 7614 5580 1138; 7615 5581 1147; 7616
5471 5469; 7458 5471 5478; 5582 1151; 7617 5583 5560;
7459 5472 1192; 7460 5473 1210; 7461 5474 5472; 7462 7618 5584 1229; 7619 5585 1179; 7621 5586 1212; 7623
5475 5473; 7463 5475 5479; 5587 1255; 7624 5588 1236;
7464 5476 5480; 7465 5477 5481; 7466 5478 5482; 7467 7626 5589 5554; 7628 5590 1186; 7630 5591 5574; 7631
5479 5483; 7468 5480 5464; 5592 1034; 7632 5593 359;
7469 5481 5466; 7470 5482 5470; 7471 5483 5474; 7472 7633 5594 1076; 7634 5595 355; 7635 5596 104; 7636 5597
5484 30; 7473 5486 5531; 100; 7637 5598 96;
7474 5486 5488; 7475 5485 5487; 7476 5490 5532; 7477 7638 5599 92; 7639 5600 396; 7640 5601 307; 7641 5602
5490 5492; 7478 5489 5491; 400; 7642 5603 408;
7479 5494 5533; 7480 5494 5496; 7481 5493 5495; 7482 7643 5604 295; 7644 5605 309; 7645 5606 415; 7646 5607
5498 5534; 7483 5498 5500; 291; 7647 406 398;
7484 5497 5499; 7485 5501 1086; 7486 5488 5501; 7487 7648 283 394; 7649 5612 936; 7650 5609 4936; 7651 5610
5502 1109; 7488 5487 5502; 749; 7652 5611 592;
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 223 de 463
(SUBJECT) (Page)

7653 5613 929; 7654 5614 930; 7655 5615 5609; 7656 5616 918 326 433 505 506; 919 506 505 434 325; 921 433 318 507
5612; 7657 5616 5615; 505;
7658 5617 356; 7659 5618 360; 7660 5619 366; 7661 5620 922 505 507 17 434; 924 110 437 508 509; 925 509 508 438
370; 7662 5620 5618; 112;
7663 5619 5617; 7664 576 138; 7665 138 1211; 7666 576 926 437 322 503 508; 927 508 503 326 438; 929 112 438 510
1211; 7667 5621 694; 511;
7668 5622 1179; 7669 5623 1322; 7670 5624 1323; 7671 930 511 510 439 108; 931 438 326 506 510; 932 510 506 325
5625 1343; 7672 5626 1355; 439;
7673 5624 5625; 7674 5625 5623; 7675 1354 5624; 7676 934 12 446 512 513; 935 513 512 449 190; 936 446 447 514
5624 1355; 7677 1342 5624; 512;
7678 1343 5624; 7679 1342 5623; 7680 1343 5623; 7681 937 512 514 450 449; 938 447 448 515 514; 939 514 515 451
1063 1064; 7682 1064 1065; 450;
7683 1065 1066; 7684 370 360; 7685 1068 1069; 7686 1069 940 448 110 509 515; 941 515 509 112 451; 943 190 449 516
1070; 7687 1070 1071; 517;
7688 366 356; 7689 807 5627; 7690 5627 755; 7691 5627 944 517 516 452 18; 945 449 450 518 516; 946 516 518 453
808; 7692 978 989; 452;
7693 968 992; 7694 979 991; 7695 1428 995; 7696 1427 996; 947 450 451 519 518; 948 518 519 454 453; 949 451 112 511
7697 980 1027; 519;
7698 969 1024; 7699 658 1430; 7700 661 1429; 7701 1438 950 519 511 108 454; 951 11 461 520 504; 952 504 520 464
1000; 7702 1439 999; 318;
7703 1456 1451; 7704 1455 1452; 7705 1446 1019; 7706 953 461 462 521 520; 954 520 521 465 464; 955 462 463 522
1445 1016; 7707 1458 1464; 521;
7708 1461 1463; 7709 681 1468; 7710 682 1467; 7711 669 956 521 522 466 465; 958 463 109 523 522; 959 522 523 111
1472; 7712 666 1471; 466;
7713 679 1476; 7714 676 1475; 7715 670 1479; 7716 673 960 318 464 524 507; 961 507 524 467 17; 962 464 465 525
1480; 7717 1486 1484; 524;
ELEMENT INCIDENCES SHELL 963 524 525 468 467; 964 465 466 526 525; 965 525 526 469
778 323 431 432 322; 779 431 317 11 432; 789 44 436 437 468;
110; 967 466 111 527 526; 968 526 527 107 469; 969 109 476 528
790 436 323 322 437; 804 316 441 446 12; 806 441 443 447 523;
446; 970 523 528 479 111; 971 476 477 529 528; 972 528 529 480
808 443 445 448 447; 809 445 44 110 448; 832 317 456 461 479;
11; 973 477 478 530 529; 974 529 530 481 480; 976 478 10 531
834 456 458 462 461; 836 458 460 463 462; 837 460 321 109 530;
463; 977 530 531 189 481; 978 111 479 532 527; 979 527 532 482
857 321 471 476 109; 859 471 473 477 476; 861 473 475 478 107;
477; 980 479 480 533 532; 981 532 533 483 482; 982 480 481 534
862 475 320 10 478; 878 324 430 485 486; 879 486 485 431 533;
323; 983 533 534 484 483; 985 481 189 535 534; 986 534 535 16
881 430 5 487 485; 882 485 487 317 431; 883 43 435 488 484;
489; 884 489 488 436 44; 1008 315 539 544 545; 1011 547 546 542 131; 1012 539 313
885 435 324 486 488; 886 488 486 323 436; 888 6 440 490 548 544;
491; 1014 546 549 537 542; 1015 313 541 550 548; 1017 549 551
889 491 490 441 316; 890 440 442 492 490; 891 490 492 443 543 537;
441; 1019 541 314 552 550; 1022 551 553 140 543; 1024 126 538
892 442 444 493 492; 893 492 493 445 443; 894 444 43 489 554 555;
493; 1025 555 554 539 315; 1026 538 536 556 554; 1027 554 556
895 493 489 44 445; 896 5 455 494 487; 897 487 494 456 313 539;
317; 1028 536 540 557 556; 1029 556 557 541 313; 1031 540 122
898 455 457 495 494; 899 494 495 458 456; 900 457 459 496 558 557;
495; 1032 557 558 314 541; 1034 545 544 559 560; 1035 560 559
901 495 496 460 458; 902 459 319 497 496; 903 496 497 321 546 547;
460; 1036 544 548 561 559; 1037 559 561 549 546; 1038 548 550
904 319 470 498 497; 905 497 498 471 321; 906 470 472 499 562 561;
498; 1039 561 562 551 549; 1041 550 552 563 562; 1042 562 563
907 498 499 473 471; 908 472 474 500 499; 909 499 500 475 553 551;
473; 1370 718 723 724 725; 1372 723 726 129 724; 1375 727 728
911 474 4 501 500; 912 500 501 320 475; 913 322 432 502 729 730;
503; 1376 730 729 723 718; 1378 728 127 731 729; 1379 729 731
914 503 502 433 326; 916 432 11 504 502; 917 502 504 318 726 723;
433; 1381 945 732 733 720; 1382 732 718 725 733; 1384 946 734
735 944;
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 224 de 463
(SUBJECT) (Page)

1385 944 735 732 945; 1386 734 727 730 735; 1387 735 730 0.056 0.3 0.093333 1.3 0.021538 0.009807 0.000226 7e-006
718 732; 0.015087 -
1749 721 945 720 929; 1750 719 944 945 721; 1751 722 946 0.001506 0.042 0.042 0.019268 0.002372 7e-006 0.113333
944 719; END
7255 5335 315 545 5336; 7256 5337 547 131 5334; 7257 START GROUP DEFINITION
5333 126 555 5338; MEMBER
7258 5338 555 315 5335; 7259 5336 545 560 5339; 7260 _STEEL 38 TO 43 61 62 64 TO 67 72 TO 74 77 78 81 TO 83
5339 560 547 5337; 85 86 90 91 93 TO 95 -
7263 5342 5335 5336 5343; 7264 5344 5337 5334 5341; 97 100 105 TO 112 143 144 186 187 321 322 324 325 327
7265 5340 5333 5338 5345; 328 331 TO 335 337 -
7266 5345 5338 5335 5342; 7267 5343 5336 5339 5346; 339 TO 341 343 345 TO 348 350 TO 353 355 TO 360 365
7268 5346 5339 5337 5344; 366 385 387 389 392 394 -
7271 5349 5342 5343 5350; 7272 5351 5344 5341 5348; 397 401 402 407 412 416 437 442 446 447 450 451 453 454
7273 5347 5340 5345 5352; 456 500 504 528 538 -
7274 5352 5345 5342 5349; 7275 5350 5343 5346 5353; 540 549 623 626 628 629 632 635 637 638 641 644 646 647
7276 5353 5346 5344 5351; 650 653 655 656 659 -
7279 5356 5349 5350 5357; 7280 5358 5351 5348 5355; 662 665 668 670 672 TO 674 677 680 683 686 688 690 TO
7281 5354 5347 5352 5359; 720 722 724 726 728 -
7282 5359 5352 5349 5356; 7283 5357 5350 5353 5360; 730 733 735 737 TO 745 748 TO 751 753 754 757 759 765
7284 5360 5353 5351 5358; 769 773 1045 1049 1054 -
7289 5361 5356 5357 5362; 7290 5363 5358 5355 5331; 1056 1058 1061 TO 1068 1070 1072 TO 1077 1079 1080
7291 5330 5354 5359 5364; 1082 1084 1092 1094 1096 -
7292 5364 5359 5356 5361; 7293 5362 5357 5360 5332; 1097 TO 1101 1106 1112 1118 1124 1130 1133 1229 1231
7294 5332 5360 5358 5363; 1233 1235 1237 1239 1241 -
7297 5367 5361 5362 5368; 7298 5369 5363 5331 5366; 1243 1245 1247 1249 1251 1253 1255 1257 1259 1261 1263
7299 5365 5330 5364 5370; 1281 1282 1284 1286 -
7300 5370 5364 5361 5367; 7301 5368 5362 5332 5371; 1288 TO 1293 1297 1299 TO 1301 1303 1307 1330 TO 1339
7302 5371 5332 5363 5369; 1341 1342 1344 1345 -
7305 5374 5367 5368 5375; 7306 5376 5369 5366 5373; 1347 1349 TO 1355 1357 1359 TO 1361 1388 TO 1391 1393
7307 5372 5365 5370 5377; TO 1406 1408 TO 1420 -
7308 5377 5370 5367 5374; 7309 5375 5368 5371 5378; 1437 1439 1449 1451 TO 1453 1469 1471 1472 1476 TO
7310 5378 5371 5369 5376; 1513 1515 1516 -
7313 5381 5374 5375 5382; 7314 5383 5376 5373 5380; 1518 TO 1524 1579 1580 1582 1584 1586 1588 TO 1595
7315 5379 5372 5377 5384; 1597 TO 1600 1602 1603 -
7316 5384 5377 5374 5381; 7317 5382 5375 5378 5385; 1605 1607 1609 1611 TO 1618 1620 TO 1623 1707 1715
7318 5385 5378 5376 5383; 1717 1725 1728 1733 1734 -
7321 5388 5381 5382 5389; 7322 5390 5383 5380 5387; 1736 1737 1739 1741 1743 1745 1746 1753 1755 TO 1775
7323 5386 5379 5384 5391; 1777 TO 1784 -
7324 5391 5384 5381 5388; 7325 5389 5382 5385 5392; 1789 TO 1792
7326 5392 5385 5383 5390; _STEEL 1794 TO 1798 1800 1803 TO 1808 1810 1813 TO
7331 5393 5388 5389 5394; 7332 5395 5390 5387 132; 7333 1817 1820 1823 TO 1856 -
129 5386 5391 5396; 1871 TO 1882 1884 1886 1890 1892 1895 1897 1900 1902
7334 5396 5391 5388 5393; 7335 5394 5389 5392 932; 7336 1905 1907 1910 1912 -
932 5392 5390 5395; 1913 TO 1954 1958 1960 TO 1962 1966 1968 TO 2095 2097
*********************************************************************** TO 2100 2102 -
**** 2104 TO 2113 2116 2120 TO 2123 2125 2127 TO 2137 2141
START USER TABLE TO 2154 2156 2157 2159 -
TABLE 1 2161 2162 2164 TO 2172 2174 2175 2177 2179 2180 2188
UNIT METER KN 2190 TO 2194 -
GENERAL 2197 TO 2200 2202 TO 2249 2251 2254 TO 2293 2295 TO
2HEB500 2297 2299 2300 -
0.04772 0.5 0.04772 0.4999 0.04773 0.001198 0.001198 2302 TO 2307 2309 TO 2311 2313 2314 2318 2319 2321 TO
1.2e-005 0.004792 - 2325 2327 TO 2332 2337 -
0.004792 0.03579 0.03579 0.006126 0.006114 1.2e-005 2338 2341 TO 2346 2351 2355 2356 2358 TO 2364 2366
0.40456 2367 2369 2371 TO 2391 -
2HEA550 2393 TO 2405 2408 2410 2412 TO 2425 2471 TO 2479 2481
0.04235 0.54 0.039213 0.54 0.039213 0.001228 0.001228 7e- TO 2532 2535 TO 2569 -
006 0.004546 - 2573 2578 2580 TO 2584 2591 TO 2596 2604 2608 TO 2613
0.004546 0.031762 0.031762 0.005734 0.005735 7e-006 2616 2617 2620 TO 2623 -
0.461574 2625 TO 2627 2630 2632 2634 2640 2641 2647 2649 2651
SADDLENVE51 2653 2654 2656 TO 2670 -
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 225 de 463
(SUBJECT) (Page)

2672 TO 2719 2721 TO 2730 6393 TO 6395 6397 6401 TO _V1 98 101 116 202 TO 212 227 229 230 232 233 235 252
6410 6414 TO 6419 6421 - 267 TO 280 572 585 586 -
6422 6424 6425 6427 TO 6431 6434 TO 6470 6472 TO 6500 591 606 608 610 612 621 625 627 639 643 645 675 679 681
6502 TO 6523 6527 6529 - 685 687 689 774 777 -
6533 7203 TO 7209 7212 TO 7214 7216 7218 7223 7224 782 785 788 793 796 798 800 803 805 807 817 819 821 824
7226 7227 7238 7241 7242 - 826 828 831 833 835 -
7244 7247 7248 7338 7339 7341 7343 TO 7347 7349 7357 842 844 846 849 851 853 856 858 860 870 872 874 987 990
7359 TO 7385 7389 7390 - 993 997 1001 1004 -
7392 7393 7396 7398 TO 7405 7409 7410 7412 TO 7420 1205 1207 1209 1211 1213 1215 1217 1219 1366 TO 1369
7422 TO 7427 7429 TO 7552 - 1373 1374 1380 1383 -
7555 TO 7583 7585 TO 7590 7592 TO 7619 7621 7623 7624 1724 1726 1727 1742 1748 1883 1885 1887 TO 1889 1891
7626 7628 7630 TO 7634 - 1893 1894 1896 1898 -
7639 TO 7649 7656 TO 7687 7689 1899 1901 1903 1904 1906 1908 1909 1911 6535 TO 6680
_STEEL 7691 7249 7250 7253 7254 -
*********************************************************************** 7261 7262 7269 7270 7277 7278 7295 7296 7303 7304 7311
******** 7312 7319 7320 7388 -
_DFF 321 322 324 325 327 328 331 TO 335 337 339 TO 341 7391 7394 7397 7653 7654
343 347 348 352 353 - _V2 213 TO 220 236 237 239 TO 243 293 295 297 TO 299
357 TO 360 365 366 385 387 389 392 394 397 401 402 407 301 TO 305 307 309 310 -
412 416 437 442 446 - 560 563 565 573 880 887 910 915 920 933 942 975 984 1007
447 451 454 500 504 538 540 549 623 626 628 629 632 635 1009 1023 1033 1107 -
637 638 641 644 646 - 1113 1119 1340 1343 1371 1377 1407 1731 1738 6396 6681
647 650 653 655 656 659 662 665 668 670 672 TO 674 677 TO 6716 7215 7217 -
680 683 686 688 690 - 7219 7221 7327 TO 7330 7387 7650 TO 7652 7655
691 TO 692 748 TO 751 753 754 757 759 765 769 773 1297 _V3 115 176 177 253 255 877 1018 1020 1030 1040 6717 TO
1299 TO 1301 1303 1307 - 6720
1406 1416 1417 1489 1492 1495 1498 1501 1504 1584 1586 _V4 221 TO 224 923 928 957 966
1590 1592 TO 1595 - _P1 1 TO 26 28 TO 33 1048 1053 1057 2409 2411 2426 TO
1607 1609 1613 1615 TO 1618 1725 1736 1739 1900 1902 2456 2464 TO 2466 2470 -
1917 1919 1923 1925 - 2648 2650 2652 2655 2671 6398 TO 6400 6411 TO 6413
1928 1932 1934 1938 1940 1947 1948 1950 1952 1953 1991 6426 6432 6433 7337 7340
1993 1995 TO 1997 - _P2 34 TO 37 71 1046 1051 2457 TO 2463 2720
1999 2001 2002 2004 2006 2007 2009 2011 2012 2014 2016 _DESIGN 38 TO 43 61 62 64 TO 67 72 TO 74 77 78 81 TO 83
2017 2019 2021 2022 - 85 86 90 91 -
2024 2026 2027 2029 2031 TO 2034 2036 2038 TO 2040 93 TO 95 97 100 105 TO 112 143 144 186 187 321 322 324
2042 2044 TO 2049 2051 - 325 327 328 -
2053 TO 2055 2057 2059 2060 2062 2064 2066 2068 TO 331 TO 335 337 339 TO 341 343 345 TO 348 350 TO 353
2072 2074 2076 2077 2079 - 355 TO 360 365 366 385 -
2081 2083 2085 TO 2089 2091 2093 2094 2098 2108 2111 387 389 392 394 397 401 402 407 412 416 437 442 446 447
2116 2121 2129 2133 - 450 451 453 454 456 -
2135 2142 TO 2144 2147 2149 2150 2152 2154 2157 2159 500 504 528 538 540 549 623 626 628 629 632 635 637 638
2162 2164 2165 2167 - 641 644 646 647 650 -
2168 TO 2170 2172 2174 2175 2177 2191 2192 2194 2197 653 655 656 659 662 665 668 670 672 TO 674 677 680 683
2198 2200 2202 TO 2206 - 686 688 690 TO 702 -
2208 2209 2218 2219 2222 2223 2225 2227 TO 2243 2245 722 724 726 728 730 733 735 737 748 TO 751 753 754 757
2247 2256 2258 2260 - 759 765 769 773 1045 -
2262 2264 2267 TO 2273 2275 2278 2280 TO 2284 2286 TO 1049 1054 1056 1058 1061 TO 1068 1070 1072 TO 1077
2291 2297 2299 2300 - 1079 1080 1082 1084 1092 -
2302 TO 2305 2307 2323 2345 2346 2351 2359 2361 2567 1094 1096 TO 1101 1106 1112 1118 1124 1130 1133 1229
TO 2569 2573 2578 2612 - 1231 1233 1235 1237 -
2613 2616 2617 1239 1241 1243 1245 1247 1249 1251 1253 1255 1257 1259
_DFF 2620 2625 2630 2632 2634 2640 2729 6523 6529 7241 1261 1263 1281 1282 -
7244 7390 7393 7396 - 1284 1286 1288 TO 1293 1297 1299 TO 1301 1307 1330 TO
7398 7399 7409 7410 7412 TO 7416 7419 7420 7422 7423 1339 1341 1342 1344 -
7454 7455 7459 7460 - 1345 1347 1349 TO 1355 1357 1359 TO 1361 1388 TO 1391
7549 7551 7556 7558 7560 7566 7574 7575 7582 7586 TO 1393 TO 1406 -
7588 7596 7600 7602 - 1408 TO 1420 1437 1439 1449 1451 TO 1453 1469 1471
7604 7611 7612 7619 7632 7634 7639 TO 7646 7648 7657 1472 1476 TO 1513 1515 -
TO 7661 7667 7668 1516 1518 TO 1524 1579 1580 1582 1584 1586 1588 TO
*********************************************************************** 1595 1602 1603 1605 1607 -
******** 1609 1611 TO 1618 1707 1715 1717 1725 1728 1733 1734
1736 1737 1739 1741 -
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 226 de 463
(SUBJECT) (Page)

1743 1745 1746 1753 1755 TO 1775 1777 TO 1784 1789 TO 1725 TO 1728 1731 1733 TO 1739 1742 1748 6542 6543
1792 1794 TO 1798 1800 - 6550 TO 6552 6560 6561 -
1803 TO 1808 1810 1813 6569 6570 6573 6574 6577 6578 6586 6587 6591 TO 6593
_DESIGN 1814 TO 1817 1820 1823 TO 1856 1871 TO 1882 6601 6602 6607 6608 -
1884 1886 1890 1892 1895 - 6616 6617 6624 TO 6626 6634 6635 6643 6644 6652 6653
1897 1900 1902 1905 1907 1910 1912 TO 1954 1958 1960 6660 TO 6662 6670 6671 -
TO 1962 1966 - 6679 6680 6687 TO 6689 6696 6697 6705 TO 6707 6715
1968 TO 2095 2097 TO 2100 2102 2104 TO 2113 2116 2120 6718 6720 7249 TO 7254 -
TO 2123 2125 - 7261 7262 7269 7270 7277 7278 7285 TO 7288 7295 7296
2127 TO 2137 2141 TO 2154 2156 2157 2159 2161 2162 7303 7304 7311 7312 -
2164 TO 2172 2174 2175 - 7319 7320 7327 TO 7330 7387 TO 7394 7396 TO 7399 7649
2177 2179 2180 2188 2190 TO 2194 2197 TO 2200 2202 TO TO 7654 7656 7657
2249 2251 2254 TO 2293 - _EL11800_2 101 176 177 229 230 232 233 237 239 TO 241
2295 TO 2297 2299 2300 2302 TO 2307 2309 TO 2311 2313 252 253 255 877 987 -
2314 2318 2319 2321 - 990 993 997 1001 1004 1007 1009 1018 1020 1023 1030
2322 TO 2325 2327 TO 2332 2337 2338 2341 TO 2346 2351 1033 1040 1213 1215 1217 -
2355 2356 2358 TO 2364 - 1219 1366 1368 1369 1371 1373 1374 1377 1380 1383 1407
2366 2367 2369 2371 TO 2391 2393 TO 2405 2408 2410 1731 1748 6550 6551 -
2412 TO 2425 2471 TO 2479 - 6560 6561 6569 6570 6573 6574 6577 6578 6591 6592 6601
2481 TO 2532 2535 TO 2569 2573 2578 2580 TO 2584 2591 6602 6607 6608 6624 -
TO 2596 2604 - 6625 6634 6635 6643 6644 6660 6661 6670 6671 6679 6680
2608 TO 2613 2616 2617 2620 TO 2623 2625 TO 2627 2630 6687 6688 6697 6705 -
2632 2634 2640 2641 - 6706 6715 6718 6720 7249 7250 7253 7254 7261 7262 7269
2647 2649 2651 2653 2654 2656 TO 2670 2672 TO 2719 7270 7277 7278 7295 -
2721 TO 2730 6393 TO 6395 - 7296 7303 7304 7311 7312 7319 7320 7327 TO 7330 7387
6397 6401 TO 6410 6414 TO 6419 6421 6422 6424 6425 7397 7651 7653
6427 TO 6431 6434 TO 6470 - _EL11800_3 230 235 243 1113 1366 1406 1407 1724 TO
6472 TO 6500 6502 TO 6523 6527 6529 6533 7203 TO 7209 1728 1731 1733 TO 1739 -
7212 TO 7214 7216 7218 - 1742 6542 6543 6552 6560 6569 6586 6587 6593 6601 6607
7223 7224 7226 7227 7238 7241 7242 7244 7247 7248 7338 6616 6617 6626 6634 -
7339 7341 - 6643 6652 6653 6662 6670 6679 6688 6689 6696 6697 6707
7343 TO 7347 7349 7357 7359 TO 7385 7389 7390 7392 7249 7253 7261 7269 -
7393 7396 7398 TO 7405 - 7277 7295 7303 7311 7319 7329 7387 TO 7394 7396 TO
7409 7410 7412 TO 7420 7422 TO 7427 7429 TO 7447 7451 7399 7649 TO 7654 7656 -
7454 7455 7459 7460 - 7657
7472 7485 TO 7544 7549 TO 7552 7555 TO 7583 7585 TO _EL21000 267 TO 280 293 295 297 TO 299 301 TO 305 307
7590 7592 TO 7619 7621 - 309 310 606 608 610 -
7623 7624 7626 7628 7630 TO 7634 7639 TO 7649 612 621 623 625 TO 629 632 635 637 TO 639 641 643 TO
_DESIGN 7656 TO 7666 7668 TO 7683 7685 TO 7687 7689 647 650 653 655 656 -
TO 7691 659 662 665 668 670 672 TO 675 677 679 TO 681 683 685
FLOOR TO 692 1119 1340 1343 -
_EL5000 202 TO 224 560 563 565 572 573 585 586 591 774 1883 TO 1913 1915 1917 1919 1921 1923 1925 1928 1930
777 782 785 788 793 - 1932 1934 1936 1938 -
796 798 800 803 805 807 817 819 821 824 826 828 831 833 1940 1943 1945 1947 TO 1954 1969 1972 1974 1977 1980
835 842 844 846 849 - 1983 1985 1988 6396 -
851 853 856 858 860 870 872 874 880 887 910 915 920 923 6538 TO 6540 6547 TO 6549 6556 TO 6558 6565 TO 6567
928 933 942 957 966 - 6582 TO 6584 -
975 984 1107 6535 TO 6537 6544 TO 6546 6553 TO 6555 6597 TO 6599 6612 TO 6614 6621 TO 6623 6630 TO 6632
6562 TO 6564 - 6639 TO 6641 -
6579 TO 6581 6588 TO 6590 6594 TO 6596 6603 TO 6605 6648 TO 6650 6657 TO 6659 6666 TO 6668 6675 TO 6677
6609 TO 6611 - 6684 TO 6686 -
6618 TO 6620 6627 TO 6629 6636 TO 6638 6645 TO 6647 6693 TO 6695 6702 TO 6704 6711 TO 6713 7631 TO 7634
6654 TO 6656 - 7658 TO 7661
6663 TO 6665 6672 TO 6674 6681 TO 6683 6690 TO 6692 _EL27000 109 321 322 324 325 327 328 331 TO 335 337 339
6699 TO 6701 - TO 341 343 -
6708 TO 6710 7215 7217 7219 7221 345 TO 348 350 TO 353 355 TO 360 365 366 385 387 389
_EL11800 101 176 177 229 230 232 233 235 237 239 TO 241 392 394 397 401 402 -
243 252 253 255 877 - 538 540 549 748 TO 751 753 754 757 759 765 1360 1361
987 990 993 997 1001 1004 1007 1009 1018 1020 1023 1030 1388 TO 1391 -
1033 1040 1113 1213 - 1393 TO 1396 1582 1584 1586 1590 TO 1595 1605 1607
1215 1217 1219 1366 1368 1369 1371 1373 1374 1377 1380 1609 1613 TO 1618 1777 -
1383 1406 1407 1724 -
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 227 de 463
(SUBJECT) (Page)

1778 TO 1780 1991 TO 2031 2033 2035 2037 2041 2043 301 TO 305 307 309 310 321 322 324 325 327 328 331 TO
2046 2048 2050 2052 2056 - 335 337 339 TO 341 -
2058 2061 2063 2065 2067 2069 2071 2073 2075 2078 2080 343 345 TO 348 350 TO 353 355 TO 360 365 366 385 387
2082 2084 2086 2088 - 389 392 394 397 401 -
2090 2092 2095 2097 TO 2099 2102 2104 TO 2113 2116 402 407 412 416 437 442 446 447 450 451 453 454 456 500
2120 TO 2123 2125 2127 - 504 528 538 540 549 -
2128 TO 2137 2345 2346 2351 7485 7487 7489 7491 7493 559 560 563 565 572 573 585 586 591 606 608 610 612 621
7495 7497 7499 7501 7503 - 623 625 TO 629 632 -
7505 7507 7509 7511 7513 7515 7613 TO 7616 7639 TO 635 637 TO 639 641 643 TO 647 650 653 655 656 659 662
7646 665 668 670 -
_EL30000 110 528 1237 1239 1241 1243 1334 1335 1397 TO 672 TO 675 677 679 TO 681 683 685 TO 720 722 724 726
1405 728 730 733 735 737 -
_EL33000 407 412 416 437 442 446 447 450 451 453 454 738 TO 745 748 TO 751 753 754 757 759 765 769 773 774
456 500 504 769 773 1297 - 777 782 785 788 793 -
1299 TO 1301 1303 1307 1437 1439 1449 1451 TO 1453 796 798 800 803 805 807 817 819 821 824 826 828 831 833
1715 1717 2142 TO 2154 - 835 842 844 846 849 -
2156 2157 2159 2161 2162 2164 TO 2172 2174 2175 2177 851 853 856 858 860 870 872 874 877 880 887 910 915 920
2179 2180 2191 TO 2194 - 923 928 933 942 957 -
2197 TO 2200 2202 TO 2210 2212 TO 2227 2239 2240 2244 966 975 984 987 990 993
TO 2249 2251 - _TEMP 997 1001 1004 1007 1009 1018 1020 1023 1030
2254 TO 2266 2274 2276 2277 2279 2281 2283 2285 2287 1033 1040 1045 1046 1048 -
2289 TO 2293 - 1049 1051 1053 1054 1056 TO 1058 1061 TO 1068 1070
2295 TO 2297 2299 2300 2302 TO 2307 2309 TO 2311 2313 1072 TO 1077 1079 1080 -
2314 2318 2319 2321 - 1082 1084 1092 1094 1096 TO 1101 1106 1107 1112 1113
2322 TO 2325 2327 2328 2358 TO 2361 2573 2578 2580 1118 1119 1124 1130 -
2612 2613 2616 2617 2620 - 1133 1200 1205 1207 1209 1211 1213 1215 1217 1219 1229
2621 TO 2622 2625 TO 2627 2630 2632 2634 2729 6523 1231 1233 1235 1237 -
6529 7209 7241 7242 7244 - 1239 1241 1243 1245 1247 1249 1251 1253 1255 1257 1259
7409 7412 7413 7415 TO 7420 7422 7423 7429 7454 7455 1261 1263 1281 1282 -
7459 7549 7551 7555 - 1284 1286 1288 TO 1293 1297 1299 TO 1301 1303 1307
7556 TO 7562 7564 7566 7567 7574 TO 7577 7581 TO 7583 1330 TO 1361 1365 TO 1369 -
7585 7587 TO 7590 7592 - 1371 1373 1374 1377 1380 1383 1388 TO 1391 1393 TO
7593 TO 7594 7596 7601 TO 7606 7612 7617 TO 7619 7621 1420 1437 1439 1449 1451 -
7623 7624 7626 7628 - 1452 TO 1453 1469 1471 1472 1476 TO 1513 1515 1516
7630 7667 7668 1518 TO 1524 1579 1580 -
_EL40000 1414 TO 1420 1488 TO 1505 1582 1584 1586 1588 TO 1595 1597 TO 1600 1602 1603
_STAIR 95 97 100 101 105 TO 108 110 111 447 987 993 997 1605 1607 1609 -
1049 1054 1058 1213 - 1611 TO 1618 1620 TO 1623 1707 1715 1717 1724 TO 1728
1215 1217 1219 1229 1231 1233 1235 1237 1239 1241 1243 1731 1733 1734 1736 -
1245 1247 1249 1251 - 1737 TO 1746 1748 1753 1755 TO 1775 1777 TO 1784 1789
1253 1255 1257 1259 1261 1263 1753 1755 TO 1766 1781 TO 1792 1794 TO 1798 -
TO 1784 1789 TO 1792 - 1800 1803 TO 1808 1810 1813 TO 1817 1820 1823 TO 1856
1794 TO 1798 1800 1803 TO 1808 1810 1813 TO 1817 1820 1871 TO 1954 1958 1960 -
1823 TO 1856 - 1961 TO 1962 1966 1968 TO 2095 2097 TO 2100 2102 2104
1871 TO 1882 2188 2654 2656 TO 2666 2668 TO 2670 2672 TO 2113 2116 -
TO 2719 2728 2730 6395 - 2120 TO 2123 2125 2127 TO 2137 2141 TO 2154 2156 2157
6397 6427 TO 6429 6431 6573 6577 2159 2161 2162 2164 -
_EL15800 6436 TO 6441 6443 6444 6446 6448 6450 TO 2165 TO 2172 2174 2175 2177 2179 2180 2188 2190 TO
6453 6455 6457 TO 6470 6472 - 2194 2197 TO 2200 2202 -
6473 TO 6474 6476 6478 TO 6482 2203 TO 2249 2251 2254 TO 2293 2295 TO 2297 2299 2300
GEOMETRY 2302 TO 2307 -
_TEMP 2 TO 6 8 9 11 12 14 TO 17 19 20 22 23 25 26 29 30 2309 TO 2311 2313 2314 2318 2319 2321 TO 2325 2327 TO
32 33 35 37 TO 43 - 2332 2337 2338 2341 -
61 62 64 TO 67 72 TO 74 77 78 81 TO 83 85 86 90 91 93 TO 2342 TO 2346 2351 2355 2356 2358 TO 2364 2366 2367
95 97 98 100 101 - 2369 2371 TO 2391 2393 -
105 TO 112 115 TO 117 125 TO 128 134 TO 136 139 140 2394 TO 2405 2408
143 TO 148 154 TO 156 - _TEMP 2409 TO 2466 2470 TO 2479 2481 TO 2532 2535 TO
159 164 TO 167 173 TO 180 186 TO 191 197 TO 199 202 TO 2569 2573 2578 -
224 227 229 230 232 - 2580 TO 2584 2591 TO 2596 2604 2608 TO 2613 2616 2617
233 235 TO 237 239 TO 243 252 253 255 267 TO 280 293 2620 TO 2623 -
295 297 TO 299 - 2625 TO 2627 2630 2632 2634 2640 2641 2647 TO 2730
6393 TO 6419 6421 6422 -
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 228 de 463
(SUBJECT) (Page)

6424 TO 6470 6472 TO 6500 6502 TO 6523 6527 6529 6533 291 295 302 307 309 394 396 398 400 406 408 412 413 415
6535 TO 6720 - 693 701 717 737 739 -
7203 TO 7209 7212 TO 7215 7217 7219 7221 7238 7241 741 849 851 853 854 856 858 860 861 863 865 867 868 870
7242 7244 7249 7250 7253 - 872 874 875 1080 -
7254 7261 7262 7269 7270 7277 7278 7295 7296 7303 7304 1083 TO 1143 1146 TO 1157 1260 TO 1262 1396 1397 1400
7311 7312 7319 7320 - 1401
7327 TO 7330 7337 7338 7340 7341 7387 TO 7394 7396 TO _NODE_EL_33000 134 135 137 148 151 TO 153 233 257 694
7399 7409 7410 7412 - 702 756 770 771 774 -
7413 TO 7416 7419 7420 7422 TO 7424 7451 7454 7455 776 778 781 783 785 787 789 800 1158 TO 1239 1241 TO
7459 7460 7472 7485 7487 - 1251 1253 TO 1256 1258 -
7489 7491 7493 7495 7497 7499 7501 7503 7505 7507 7509 1259 1264 TO 1267 1371 1375 1377 1408 1410 TO 1413
7511 7513 7515 7549 - 1415 TO 1417 1492 4772 -
7550 TO 7551 7555 7556 7558 7560 7566 7567 7574 TO 4777 5325 TO 5327
7577 7582 7586 TO 7590 - _NODE_EL_37000 801 802
7592 TO 7594 7596 7600 7602 7604 TO 7606 7611 TO 7619 _NODE_EL_40000 750 TO 755 813 TO 824
7621 7623 7624 7626 - ELEMENT
7628 7630 TO 7646 7648 TO 7663 7667 TO 7672 7690 *
JOINT *
_NODE10 1367 END GROUP DEFINITION
_NODE20 1368 ***********************************************************************
_NODE110 1384 *******
_NODE120 1382 ELEMENT PROPERTY
_NODE90 1387 778 779 789 790 804 806 808 809 832 834 836 837 857 859
_NODE100 1388 861 862 878 879 881 -
_NODE150 1397 882 TO 886 888 TO 909 911 TO 914 916 TO 919 921 922
_NODE160 1396 924 TO 927 929 TO 932 -
_NODE50_E33 1408 934 TO 941 943 TO 956 958 TO 965 967 TO 974 976 TO 983
_NODE60_E33 1411 1417 985 986 1370 1372 -
_NODE80_E33 1417 1375 1376 1378 1379 1381 1382 1384 TO 1387 1749 TO
_NODE_EL_5000 4 TO 6 10 TO 12 16 TO 18 35 37 39 43 44 1751 THICKNESS 0.25
107 TO 112 189 190 316 - 1008 1011 1012 1014 1015 1017 1019 1022 1024 TO 1029
317 TO 326 430 TO 535 588 4782 TO 4784 4791 TO 4793 1031 1032 1034 TO 1039 -
4800 TO 4802 4809 TO 4811 - 1041 1042 7255 TO 7260 7263 TO 7268 7271 TO 7276 7279
4826 TO 4828 4835 TO 4837 4841 TO 4843 4850 TO 4852 TO 7284 7289 TO 7294 -
4856 TO 4858 - 7297 TO 7302 7305 TO 7310 7313 TO 7318 7321 TO 7326
4865 TO 4867 4874 TO 4876 4883 TO 4885 4892 TO 4894 7331 TO 7335 -
4901 TO 4903 - 7336 THICKNESS 0.35
4910 TO 4912 4919 TO 4921 4928 TO 4930 4937 TO 4939 DEFINE MATERIAL START
4946 TO 4948 - ISOTROPIC EQUIPMENT
4955 TO 4957 E 2e+008
_NODE_EL_11800 120 122 124 126 TO 133 140 314 315 537 POISSON 0.3
542 543 545 547 552 - DENSITY 0
553 555 558 560 563 592 718 TO 735 749 928 TO 930 932 ALPHA 1.2e-005
935 TO 942 944 TO 946 - ISOTROPIC CONCRETE
4788 TO 4790 4797 TO 4799 4806 TO 4808 4815 TO 4817 E 2.17185e+007
4821 4832 TO 4834 4838 - POISSON 0.17
4839 4847 TO 4849 4853 TO 4855 4862 TO 4864 4871 TO DENSITY 25
4873 4880 TO 4882 4889 - ALPHA 1e-005
4890 TO 4891 4898 TO 4900 4907 TO 4909 4916 TO 4918 DAMP 0.05
4925 TO 4927 4934 TO 4936 - ISOTROPIC STEEL
4943 TO 4945 4952 TO 4954 4961 TO 4963 4965 E 2.05e+008
_NODE_EL_21000 19 TO 27 40 41 47 TO 51 166 207 334 TO POISSON 0.3
373 596 704 706 708 - DENSITY 76.8195
1028 1031 TO 1079 4785 TO 4787 4794 TO 4796 4803 TO ALPHA 1.2e-005
4805 4812 TO 4814 4829 - DAMP 0.03
4830 TO 4831 4844 TO 4846 4859 TO 4861 4868 TO 4870 END DEFINE MATERIAL
4877 TO 4879 4886 TO 4888 - ***********************************************************************
4895 TO 4897 4904 TO 4906 4913 TO 4915 4922 TO 4924 *****
4931 TO 4933 - MEMBER PROPERTY AMERICAN
4940 TO 4942 4949 TO 4951 4958 TO 4960 98 116 202 TO 212 267 TO 280 572 585 586 591 606 608
_NODE_EL_27000 28 TO 33 77 TO 79 117 118 177 218 273 610 612 621 625 627 639 -
274 279 280 283 TO 285 -
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 229 de 463
(SUBJECT) (Page)

643 645 675 679 681 685 687 689 774 777 782 785 788 793 *_PEDE014AB TAPERED 1.35 0.035 1.35 0.45 0.035 0.45
796 798 800 803 805 - 0.035
807 817 819 821 824 826 828 831 833 835 842 844 846 849 139 179 PRIS YD 2.5 ZD 0.45
851 853 856 858 860 - 178 PRIS ROUND STA 1.4 END 1.4 THI 0.025
870 872 874 1205 1207 1209 1211 1883 1885 1887 TO 1889 559 PRIS YD 1.7
1891 1893 1894 1896 - 71 PRIS YD 0.8 ZD 0.8
1898 1899 1901 1903 1904 1906 1908 1909 1911 6535 TO MEMBER PROPERTY SPANISH
6540 6544 TO 6549 6553 - 321 322 324 325 327 328 333 TO 335 337 339 TO 341 343
6554 TO 6558 6562 TO 6567 6571 6572 6575 6576 6579 TO 345 346 352 353 355 -
6584 6588 TO 6590 6594 - 356 450 453 456 748 750 757 759 1389 1395 1406 1437
6595 TO 6599 6603 TO 6605 6609 TO 6614 6618 TO 6623 1439 1590 1592 1613 1615 -
6627 TO 6632 6636 TO 6641 - 1991 1993 1996 1999 2001 2004 2006 2009 2011 2014 2016
6645 TO 6650 6654 TO 6659 6663 TO 6668 6672 TO 6677 2019 2021 2024 2026 -
PRIS YD 1 ZD 0.8 2029 2148 2266 2274 2345 2351 2566 TO 2569 2580 2640
213 TO 220 236 237 239 TO 243 293 295 297 TO 299 301 2641 -
TO 305 307 309 310 560 - 7242 TABLE ST IPE600
563 565 573 880 887 910 915 920 933 942 975 984 1007 90 91 93 TO 95 97 100 105 TO 112 1045 1049 1054 1058
1009 1023 1033 1107 - 1061 1065 1066 1070 1073 -
1113 1119 1340 1343 1371 1377 1407 1731 1738 1740 1744 1074 1077 1101 1106 1112 1118 1124 1130 1133 1229 1231
6396 6681 TO 6716 - 1233 1235 1237 1239 -
7215 7217 7219 7221 7327 TO 7330 7387 7650 TO 7652 1241 1243 1245 1247 1249 1251 1253 1255 1257 1259 1261
7655 PRIS YD 1 ZD 0.8 1263 1331 1332 1334 -
101 227 229 230 232 233 235 252 987 990 993 997 1001 1337 TO 1339 1342 1360 1390 1393 1396 1739 1753 1755
1004 1213 1215 1217 1219 - TO 1775 1777 TO 1784 -
1366 TO 1369 1373 1374 1380 1383 1724 1726 1727 1735 1789 TO 1792 2188 2190 2199 2261 2293 2306 2309 2311
1742 1748 6541 TO 6543 - 2318 2325 2328 2408 -
6550 TO 6552 6559 TO 6561 6568 TO 6570 6573 6574 6577 2410 2412 2414 2654 2656 TO 2659 2668 TO 2670 2672
6578 6585 TO 6587 6591 - 2673 2713 2714 2716 2721 -
6592 TO 6593 6600 TO 6602 6606 TO 6608 6615 TO 6617 2722 2724 2725 2727 2728 2730 6394 6427 6428 6430 7247
6624 TO 6626 6633 TO 6635 - 7339 7343 TO 7347 -
6642 TO 6644 6651 TO 6653 6660 TO 6662 6669 TO 6671 7349 7357 7359 TO 7380 7383 7384 7418 7424 7429 7555
6678 TO 6680 7249 7250 - 7559 7561 7562 7564 -
7253 7254 7261 7262 7269 7270 7277 7278 7295 7296 7303 7567 7576 7577 7583 7585 7592 7594 7598 7601 7603 7605
7304 7311 7312 7319 - 7606 7626 7630 -
7320 7388 7391 7394 7397 7653 7654 PRIS YD 1 ZD 0.8 7657 TABLE ST IPE300
115 176 177 221 TO 224 253 255 877 923 928 957 966 1018 72 TO 74 77 78 81 TO 83 85 86 1056 1064 1072 1092 1094
1020 1030 1040 6717 - 1096 1098 1281 1330 -
6718 TO 6720 7251 7252 7285 TO 7288 PRIS YD 0.8 ZD 0.6 1333 1336 1359 1408 TO 1413 1451 1453 1471 1476 TO
1 TO 26 28 TO 33 1048 1053 1057 2409 2411 2426 TO 2456 1478 1480 1481 1483 1485 -
2464 TO 2466 2470 2648 - 1486 1521 2040 2055 2166 2171 2216 2283 2403 TO 2405
2650 2652 2655 2671 6398 TO 6400 6411 TO 6413 6426 2495 TO 2506 2532 2550 -
6432 6433 7337 - 2551 TO 2565 2630 2647 2649 2651 2653 2667 2723 2726
7340 PRIS YD 1 ZD 1 6393 7216 7218 7223 7224 -
34 TO 37 1046 1051 2457 TO 2463 2720 PRIS YD 0.8 ZD 0.8 7226 7227 7338 7341 7589 7590 7617 7690 TABLE ST
1365 PRIS ROUND STA 1.21 END 1.21 THI 0.025 HEB300
117 1200 PRIS ROUND STA 0.79 END 0.79 THI 0.02 1062 1063 1067 1068 1075 1076 1079 1080 1082 1084 1097
159 PRIS ROUND STA 2.67 END 2.67 THI 0.02 1099 1736 1798 1808 -
147 148 190 191 PRIS ROUND STA 1.5 END 1.5 THI 0.02 1817 2415 TO 2422 2681 TO 2683 6395 6397 6429 6431
127 128 166 167 PRIS ROUND STA 1.1 END 1.1 THI 0.02 7390 7393 7398 TO 7400 -
136 199 7635 7638 PRIS ROUND STA 0.762 END 0.762 THI 7401 TABLE ST HEB200
0.02 38 TO 43 61 62 64 TO 67 359 365 387 392 623 626 628 629
156 175 7636 7637 PRIS ROUND STA 1.168 END 1.168 THI 632 635 637 638 641 -
0.02 644 646 647 650 653 655 656 730 733 1100 1282 1284 1286
145 146 188 189 TAPERED 1.45 0.035 1.45 0.23 0.035 0.23 1288 TO 1293 1917 -
0.035 1919 1932 1934 1947 1948 1952 1953 2168 2202 2223 2251
125 164 TAPERED 1.07 0.035 1.07 0.23 0.035 0.23 0.035 2259 2285 2299 2313 -
134 135 197 198 TAPERED 0.74 0.035 0.74 0.15 0.035 0.15 2413 2425 2581 2582 2591 2595 2612 2616 2627 6500 6513
0.035 6527 6533 7451 7472 -
154 155 173 174 TAPERED 1.12 0.035 1.12 0.23 0.035 0.23 7556 7593 7643 7646 TABLE ST HEB500
0.035 143 144 186 187 358 549 693 TO 697 699 701 703 722 724
140 180 TAPERED 2.3 0.035 2.3 0.23 0.035 0.23 0.035 726 728 751 754 1579 -
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 230 de 463
(SUBJECT) (Page)

1580 1588 1589 1602 1603 1611 1612 1715 1717 2207 2221 1966 1968 2300 2596 2634 6418 6422 6448 6450 6452 6455
2222 2225 2617 2620 - 6457 6459 6462 6464 -
7209 7639 7641 TABLE ST HEB300 6466 6469 6473 6476 6478 6480 6482 6483 6506 6514 TO
1794 TO 1797 1800 1803 TO 1807 1810 1813 TO 1816 1820 6518 7443 7444 7681 -
1823 TO 1856 - 7682 TO 7688 TABLE ST IPE200
1871 TO 1882 2660 TO 2666 2674 TO 2680 2684 TO 2712 1449 1452 1707 1733 1734 2145 2146 2151 2153 2156 2161
2715 2717 TO 2718 - 2179 2180 2193 2204 -
2719 TABLE ST UPN200 2210 TO 2215 2217 2220 2224 2226 2244 2246 2248 2249
1346 1348 1356 1358 TABLE ST PIP1013.6 2254 2255 2257 2263 -
1469 1520 2287 2583 2584 2604 2608 TO 2611 2625 6434 2265 2276 2277 2279 2281 2289 2292 2295 2302 2310 2319
6435 7207 7208 7402 7403 - 2321 2592 TO 2594 -
7435 7436 7519 7522 7523 7526 TO 7533 7542 7563 7565 2613 2621 2622 2626 2632 6401 TO 6410 6417 6419 6421
TABLE ST HEB200 6496 TO 6499 -
1414 1415 1418 1479 1482 1484 1487 1490 1493 1496 1499 6502 TO 6505 6507 TO 6512 7241 7389 7392 7404 7405
1502 1505 1522 1741 - 7417 7425 7433 7434 7439 -
1743 1745 1746 7673 7674 TABLE ST IPE200 7440 TO 7442 7618 7619 7621 7623 7624 7628 TABLE ST
1506 TO 1513 6484 TO 6495 6519 TO 6522 7248 7381 7382 IPE300
7385 7692 TO 7716 - 528 1398 1401 1404 2329 TO 2332 2337 2338 2341 TO 2344
7717 TABLE ST L70X70X7 2355 2356 2423 2424 -
357 385 749 753 1335 1341 1344 1345 1347 1349 TO 1355 2623 7550 7664 TO 7666 TABLE ST HEB240
1357 1361 1388 1391 - 2471 2472 2475 2477 TO 2479 2481 TO 2483 2486 2489
1394 1397 1400 1403 1416 1417 1419 1420 1472 1488 1489 2492 2507 TO 2515 2521 -
1491 1492 1494 1495 - 2523 2525 2527 2529 2531 2539 2541 2543 2545 2547 2549
1497 1498 1500 1501 1503 1504 1582 1584 1586 1591 1593 7213 -
1595 1605 1607 1609 - 7669 TABLE ST IPE400
1614 1616 1618 1992 1994 1998 2000 2003 2005 2008 2010 2524 2526 2528 2530 2542 2544 2546 2548 7214 7426 7427
2013 2015 2018 2020 - 7448 TO 7450 7452 7453 -
2023 2025 2028 2030 2031 2033 2035 2037 2041 2043 2046 7456 TO 7458 7461 TO 7471 7473 TO 7484 7486 7488 7490
2048 2050 2052 2056 - 7492 7494 7496 7498 -
2058 2061 2063 2065 2067 2071 2073 2075 2078 2080 2082 7500 7502 7504 7506 7508 7510 7512 7514 7516 7534 TO
2084 2088 2090 2092 - 7541 7545 TO 7548 7568 -
2095 2097 2099 2100 2102 2104 2106 2107 2109 2110 2112 7569 TO 7571 7578 TO 7581 7595 7597 7599 7607 TO 7610
2113 2120 2122 2123 - TABLE ST HEB160
2125 2127 2128 2130 TO 2132 2134 2136 2137 2218 2473 6436 TO 6447 6449 6451 6453 6454 6456 6458 6460 6461
2474 2476 2484 2485 - 6463 6465 6467 6468 6470 -
2487 2488 2490 2491 2493 2494 2516 TO 2520 2522 2535 6472 6474 6475 6477 6479 6481 TABLE ST IPE330
TO 2538 2540 2573 7212 - 331 332 347 348 350 351 397 401 402 407 412 416 437 442
7485 7487 7489 7491 7493 7495 7497 7499 7501 7503 7505 446 447 451 454 500 -
7507 7509 7511 7513 - 504 538 540 765 769 773 1297 1299 TO 1301 1303 1307
7515 7543 7552 7613 TO 7616 7644 7645 7670 TO 7672 1594 1617 1995 1997 2002 -
7689 - 2007 2012 2017 2022 2027 2105 2108 2111 2129 2133 2135
7691 TABLE ST IPE300 2141 TO 2144 2147 -
659 662 665 668 670 672 TO 674 677 680 683 686 688 690 2149 2150 2152 2154 2157 2159 2162 2164 2165 2167 2169
TO 692 1725 1728 1737 - 2170 2172 2174 2175 -
1884 1886 1890 1892 1895 1897 1900 1902 1905 1907 1910 2177 2191 2192 2194 2197 2198 2200 2203 2205 2206 2208
1912 1913 1915 1921 - 2209 2219 2227 2245 -
1923 1925 1928 1930 1936 1938 1940 1943 1945 1949 TO 2247 2256 2258 2260 2262 2264 2297 2304 2307 2323 2346
1951 1954 1969 TO 1978 - 2359 2361 2578 2729 -
1980 TO 1989 2032 2034 2036 2038 2039 2042 2044 2045 6523 6529 7409 7412 7413 7415 7419 7422 7454 7459 7549
2047 2049 2051 2053 - 7551 7566 7574 7575 -
2054 2057 2059 2060 2228 TO 2243 2267 TO 2273 2275 7582 7587 7588 7596 7602 7604 7612 7667 7668 TABLE ST
2278 2280 2282 2284 2286 - HEB600
2288 2290 2291 7244 7396 7410 7414 7416 7420 7423 7455 MEMBER PROPERTY SPANISH
7460 7558 7560 7586 - 7437 7438 7445 TO 7447 7524 7525 TABLE ST
7600 7611 7631 TO 7634 7647 TO 7649 7656 7658 TO 7661 L120X120X12
TABLE ST IPE500 6414 TO 6416 6424 6425 TABLE LD L100X100X10 SP 0.01
1515 1516 1518 1519 1523 1524 TABLE ST L100X100X10 2296 2303 2305 2314 2322 2324 2327 2358 2360 7557 7572
126 165 698 700 702 704 1399 1402 1405 1914 1916 1918 7573 TABLE ST HEB200
1920 1922 1924 1926 - 2362 TO 2364 2366 2367 2369 2371 TO 2391 2393 TO 2402
1927 1929 1931 1933 1935 1937 1939 1941 1942 1944 1946 7203 TO 7206 7238 7430 -
1958 1960 TO 1962 - 7431 TO 7432 7544 7675 TO 7680 TABLE ST L150X150X15
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 231 de 463
(SUBJECT) (Page)

1979 1990 7517 7518 7520 7521 7662 7663 TABLE ST 765 769 773 1045 1049 1054 1056 1058 1061 TO 1068 1070
HEB260 1072 TO 1077 1079 -
705 TO 720 738 TO 745 1597 TO 1600 1620 TO 1623 TABLE 1080 1082 1084 1092 1094 1096 TO 1101 1106 1112 1118
ST HEB260 1124 1130 1133 1229 -
360 366 389 394 735 737 2062 2064 2066 2068 TO 2070 1231 1233 1235 1237 1239 1241 1243 1245 1247 1249 1251
2072 2074 2076 2077 2079 - 1253 1255 1257 1259 -
2081 2083 2085 TO 2087 2089 2091 2093 2094 2098 2116 1261 1263 1281 1282 1284 1286 1288 TO 1293 1297 1299
2121 7640 - TO 1301 1303 1307 1330 -
7642 TABLE ST HEB550 1331 TO 1339 1341 1342 1344 TO 1361 1388 TO 1391 1393
*********************************************************************** TO 1406 1408 TO 1420 -
** 1437 1439 1449 1451 TO 1453 1469 1471 1472 1476 TO
CONSTANTS 1513 1515 1516 -
BETA 90 MEMB 139 140 143 144 179 180 186 187 693 TO 1518 TO 1524 1579 1580 1582 1584 1586 1588 TO 1595
704 722 724 726 728 730 - 1597 TO 1600 1602 1603 -
733 735 737 1341 1344 1345 1347 1349 TO 1355 1357 1469 1605 1607 1609 1611 TO 1618 1620 TO 1623 1707 1715
1520 1579 1580 1588 - 1717 1725 1728 1733 1734 -
1589 1602 1603 1611 1612 6434 6435 7402 7403 7435 7436 1736 1737 1739 1741 1743 1745 1746 1753 1755 TO 1775
7517 7518 7520 7521 1777 TO 1784 -
BETA 45 MEMB 1506 TO 1513 1515 1516 1518 1519 1523 1789 TO 1792 1794 TO 1798 1800 1803
1524 2362 TO 2364 2366 - MATERIAL STEEL MEMB 1804 TO 1808 1810 1813 TO 1817
2367 2369 2371 TO 2391 2393 TO 2402 7238 1820 1823 TO 1856 -
MATERIAL CONCRETE MEMB 1 TO 26 28 TO 37 71 98 101 1871 TO 1882 1884 1886 1890 1892 1895 1897 1900 1902
115 116 139 176 TO 179 202 - 1905 1907 1910 1912 -
203 TO 224 227 229 230 232 233 235 TO 237 239 TO 243 1913 TO 1954 1958 1960 TO 1962 1966 1968 TO 2095 2097
252 253 255 267 TO 280 - TO 2100 2102 -
293 295 297 TO 299 301 TO 305 307 309 310 559 560 563 2104 TO 2113 2116 2120 TO 2123 2125 2127 TO 2137 2141
565 572 573 585 586 - TO 2154 2156 2157 2159 -
591 606 608 610 612 621 625 627 639 643 645 675 679 681 2161 2162 2164 TO 2172 2174 2175 2177 2179 2180 2188
685 687 689 774 777 - 2190 TO 2194 -
778 TO 779 782 785 788 TO 790 793 796 798 800 803 TO 2197 TO 2200 2202 TO 2249 2251 2254 TO 2293 2295 TO
809 817 819 821 824 826 - 2297 2299 2300 -
828 831 TO 837 842 844 846 849 851 853 856 TO 862 870 2302 TO 2307 2309 TO 2311 2313 2314 2318 2319 2321 TO
872 874 877 TO 987 - 2325 2327 TO 2332 2337 -
990 993 997 1001 1004 1007 TO 1009 1011 1012 1014 1015 2338 2341 TO 2346 2351 2355 2356 2358 TO 2364 2366
1017 TO 1020 1022 - 2367 2369 2371 TO 2391 -
1023 TO 1042 1046 1048 1051 1053 1057 1107 1113 1119 2393 TO 2405 2408 2410 2412 TO 2425 2471 TO 2479 2481
1205 1207 1209 1211 1213 - TO 2532 2535 TO 2569 -
1215 1217 1219 1340 1343 1366 TO 1387 1407 1724 1726 2573 2578 2580 TO 2584 2591 TO 2596 2604 2608 TO 2613
1727 1731 1735 1738 - 2616 2617 2620 TO 2623 -
1740 1742 1744 1748 TO 1751 1883 1885 1887 TO 1889 2625 TO 2627 2630 2632 2634 2640 2641 2647 2649 2651
1891 1893 1894 1896 1898 - 2653 2654 2656 TO 2670 -
1899 1901 1903 1904 1906 1908 1909 1911 2409 2411 2426 2672 TO 2719 2721 TO 2730 6393 TO 6395 6397 6401 TO
TO 2466 2470 2648 - 6410 6414 TO 6419 6421 -
2650 2652 2655 2671 2720 6396 6398 TO 6400 6411 TO 6422 6424 6425 6427 TO 6431 6434 TO 6470 6472 TO 6500
6413 6426 6432 6433 6535 - 6502 TO 6523 6527 6529 -
6536 TO 6720 7215 7217 7219 7221 7249 TO 7337 7340 6533 7203 TO 7209 7212 TO 7214 7216 7218 7223 7224
7387 7388 7391 7394 7397 - 7226 7227 7238 7241 7242 -
7650 TO 7655 7244 7247 7248 7338 7339 7341 7343 TO 7347 7349 7357
MATERIAL STEEL MEMB 38 TO 43 61 62 64 TO 67 72 TO 7359 TO 7385 7389 7390 -
74 77 78 81 TO 83 85 86 - 7392 7393 7396 7398 TO 7405 7409 7410 7412 TO 7420
90 91 93 TO 95 97 100 105 TO 112 126 143 144 165 186 187 7422 TO 7427 7429 TO 7552 -
321 322 324 325 - 7555 TO 7583 7585 TO 7590 7592 TO 7619 7621 7623 7624
327 328 331 TO 335 337 339 TO 341 343 345 TO 348 350 7626 7628 7630 TO 7634 -
TO 353 355 TO 360 365 - 7639 TO 7649 7656 TO 7717
366 385 387 389 392 394 397 401 402 407 412 416 437 442 MATERIAL EQUIPMENT MEMB 117 125 127 128 134 TO
446 447 450 451 453 - 136 140 145 TO 148 154 TO 156 -
454 456 500 504 528 538 540 549 623 626 628 629 632 635 159 164 166 167 173 TO 175 180 188 TO 191 197 TO 199
637 638 641 644 646 - 1200 1365 7635 TO 7638
647 650 653 655 656 659 662 665 668 670 672 TO 674 677 ***********************************************************************
680 683 686 688 690 - **
691 TO 720 722 724 726 728 730 733 735 737 TO 745 748 ***********************************************************************
TO 751 753 754 757 759 - **
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 232 de 463
(SUBJECT) (Page)

MEMBER RELEASE 2722 2727 START MY MZ


1062 1063 1067 1068 1075 1076 1079 1080 1082 1084 1097 2295 2715 2717 2721 START MY MZ
1099 START MX MY MZ 2305 2623 2634 START MY MZ
1062 1063 1067 1068 1075 1076 1079 1080 1082 1084 1097 385 394 753 1707 2071 2088 2153 2168 2212 2213 2251
1099 END MX MY MZ 2254 2255 2277 2289 2300 -
*125 134 145 154 164 173 180 188 197 1406 START MX MY 2306 2309 2311 2319 2325 2328 2414 2423 2424 2477 2478
126 135 140 146 155 165 174 189 198 2040 2072 7382 7647 2592 2728 6436 6437 -
START FZ MX 6442 6445 6483 TO 6495 6502 6505 7385 7438 START MY
*159 START MX MZ
90 91 93 TO 95 97 100 105 TO 112 341 345 347 350 352 355 351 357 358 628 637 646 655 662 668 670 672 680 686 688
TO 357 359 365 389 - 690 751 1045 1061 -
447 450 451 453 454 456 528 549 623 629 632 638 641 647 1077 1106 1112 1130 1133 1229 1237 1249 1261 1331 1334
650 656 659 665 673 - 1337 1342 1352 1353 -
674 677 683 691 692 749 754 1049 1054 1058 1065 1070 1355 1357 1360 1388 TO 1390 1393 1396 TO 1399 1402
1073 1101 1331 1332 - 1405 1406 1414 1415 1418 -
1334 1335 1337 1338 1341 1344 1351 1354 1360 1361 1390 1437 1449 1451 1453 1479 1482 1484 1487 1490 1493 1496
1393 1396 1399 1402 - 1499 1502 1505 1522 -
1405 1411 TO 1415 1418 1469 1472 1479 1482 1484 1487 1582 1584 1586 1591 1593 1595 1605 1607 1609 1614 1616
1490 1493 1496 1499 - 1618 1715 1717 1755 -
1502 1505 1522 1582 1591 1605 1614 1794 TO 1797 1800 1759 1763 1767 1771 1777 1783 1791 1794 TO 1797 1800
1803 TO 1807 1810 1813 - 1803 TO 1807 1810 1813 -
1814 TO 1816 1820 1833 TO 1836 1884 1886 1890 1892 1814 TO 1816 1820 1839 TO 1842 1845 TO 1856 1914 1916
1895 1897 1900 1902 1905 - 1918 1920 1922 1924 -
1907 1910 1912 1914 1916 1918 1920 1922 1924 1926 1927 1926 TO 1929 1931 1933 1935 1937 1939 1941 1942 1944
1929 1931 1933 1935 - 1946 TO 1948 1952 1953 -
1937 1939 1941 1942 1944 1946 1958 1960 TO 1962 1966 1958 1960 TO 1962 1966 1968 1970 1971 1973 TO 1984
1968 1970 1971 1973 - 1986 1987 1989 1990 1994 -
1975 1976 1978 1979 1981 1982 1984 1986 1987 1989 1990 2000 2005 2010 2015 2020 2025 2030 2039 2040 2045 2060
1992 1994 1998 2000 - 2061 2063 2067 2069 -
2003 2005 2008 2010 2013 2015 2018 2020 2023 2025 2028 2071 2073 2077 2078 2080 2084 2086 2088 2090 2094 2095
2030 TO 2033 2035 - 2099 2109 2110 2112 -
2037 2041 2043 2046 TO 2048 2050 2052 2056 2058 2061 2122 2123 2128 2131 2134 2136 2141 2145 2147 2148 2151
TO 2063 2065 2067 2073 - 2156 2161 2171 2179 -
2075 2078 TO 2080 2082 2084 2090 2092 2097 2102 2109 2180 2188 2190 2193 2207 2210 2211 2214 2215 2217 2219
2112 2113 2120 2123 - 2220 2227 2235 2243 -
2125 2131 2134 2136 2141 2145 2146 2151 2156 2161 2166 2248 2257 2259 2261 2263 2265 2275 TO 2277 2279 2286
2171 2193 2199 2202 - 2292 2295 2318 2568 -
2204 2207 2210 2214 2215 2217 2218 2220 2221 2224 TO 2596 2625 TO 2627 2630 2632 2634 2641 7207 TO 7209
2226 2228 2236 2244 - 7242 7404 7405 7437 7438 -
2246 2257 2263 2265 2267 2278 2279 2281 2283 2287 2293 7443 TO 7447 7455 7485 7487 7489 7491 7493 7495 7497
2296 2410 2412 2566 - 7499 7501 7503 7505 -
2567 7404 7405 7437 7443 TO 7447 7519 7522 7524 7525 7507 7509 7511 7513 7515 7522 7550 7555 7590 7592 7600
7544 7583 7589 7662 - 7614 7616 TO 7618 -
7663 7681 TO 7688 START MY MZ 7621 7628 7631 7643 TO 7646 7662 7663 END MY MZ
2055 2222 7417 7418 7425 TO 7427 7430 TO 7432 7648 2087 2300 2303 7392 7401 7430 TO 7432 7523 TO 7525
START MY MZ 7563 TO 7565 END MY MZ
1584 1593 1607 1616 2233 2288 2314 7251 7339 7343 7344 7244 7417 7424 TO 7427 7429 7573 7585 END MY MZ
7362 TO 7364 - 2054 7288 7360 7361 7369 TO 7371 7373 7375 7378 TO
7369 TO 7371 7378 TO 7381 7595 7597 7607 7608 START 7385 7557 END MY MZ
MY MZ 7603 END MY MZ
2089 7568 7569 7572 7578 7579 7664 7665 7673 TO 7680 6506 6514 6516 TO 6522 7543 7552 END MY MZ
START MY MZ 6443 6444 6450 6452 6455 6457 6459 6462 6464 6466 6469
2583 7207 7208 7666 START MY MZ 6473 6475 TO 6478 6480 -
2271 2596 6497 START MY MZ 6482 TO 6495 6509 6512 7562 END MY MZ
1406 6448 6450 6452 6455 6457 6459 6462 6464 6466 6469 6430 7598 7599 7601 7609 7610 END MY MZ
6473 6476 6478 6480 - 1871 TO 1874 2199 2232 2656 2660 6395 6397 7673 TO
6506 6514 6516 TO 6522 7400 START MY MZ 7680 END MY MZ
6414 TO 6416 6418 6422 6424 6425 6427 7601 7603 START 2661 TO 2666 END MY MZ
MY MZ 2672 2674 TO 2676 2684 TO 2690 2695 TO 2701 2704 TO
2684 TO 2687 7414 START MY MZ 2706 2715 TO 2719 2721 -
2654 2660 TO 2662 2668 2674 TO 2676 2688 TO 2690 2695 6428 6429 6431 END MY MZ
TO 2697 2704 TO 2706 - 2613 2616 2617 2620 TO 2622 2730 END MY MZ
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 233 de 463
(SUBJECT) (Page)

2319 2321 2327 2573 7486 7488 7490 7492 7494 7496 7498 896 897 924 925 929 951 952 960 969 970 978 J4 MY
7500 7502 7504 7506 - Member FireProofing
7508 7510 7512 7514 7516 7666 END MY MZ 38 TO 43 61 62 64 TO 67 321 322 324 325 327 328 331 TO
2055 2486 TO 2488 2492 TO 2494 2515 2521 2531 2539 335 337 339 TO 341 -
END MY MZ 343 345 TO 348 350 TO 353 355 TO 360 365 366 385 387
2423 2424 7570 7571 7580 7581 7664 7665 END MY MZ 389 392 394 397 401 -
2246 2410 2412 2414 2727 END MY MZ 402 407 412 416 437 442 446 447 450 451 453 454 456 500
7606 7619 7681 TO 7688 END MY MZ 504 538 540 549 623 -
749 2345 2346 2351 2360 END MY MZ 626 628 629 632 635 637 638 641 644 646 647 650 653 655
1843 1844 1871 TO 1882 2677 TO 2680 2691 TO 2694 2707 656 659 662 665 668 -
TO 2710 START FX MY MZ 670 672 TO 674 677 680 683 686 688 690 TO 692 748 TO
143 144 186 187 693 TO 704 START MY 751 753 754 757 759 -
1725 1728 1733 1736 1739 1746 2329 TO 2332 2337 2338 765 769 773 1100 1282 1284 1286 1288 TO 1293 1297 1299
2341 TO 2344 2355 2356 - TO 1301 1303 1307 -
2483 TO 2494 2507 TO 2522 2531 2535 TO 2540 2549 6401 1389 1395 1437 1439 1449 1582 1584 1586 1590 TO 1595
TO 6405 7212 7390 7393 - 1605 1607 1609 1613 -
7657 START MY MZ 1614 TO 1618 1884 1886 1890 1892 1895 1897 1900 1902
1736 1737 1739 1746 2070 2329 TO 2332 2337 2338 2341 1905 1907 1910 1912 1913 -
TO 2344 2355 2356 2477 - 1915 1917 1919 1921 1923 1925 1928 1930 1932 1934 1936
2478 TO 2479 2481 2482 2516 2518 TO 2520 2522 2523 1938 1940 1943 1945 -
2525 2527 2529 - 1947 TO 1954 1969 TO 2095 2097 TO 2100 2102 2104 TO
2536 TO 2538 2540 2543 2545 2547 6408 TO 6410 6414 TO 2113 2116 2120 TO 2123 -
6418 6421 6422 6424 - 2125 2127 TO 2137 2141 TO 2144 2147 TO 2150 2152 2154
6425 7212 7213 7396 7398 7399 7544 7657 7671 7672 END 2157 2159 2162 2164 -
MY MZ 2165 2167 2169 2170 2172 2174 2175 2177 2191 2192 2194
1943 1950 1969 1972 1985 1988 2471 2473 2475 2476 2483 2197 2198 2200 2203 -
TO 2485 2489 TO 2491 - 2205 2206 2208 2209 2219 2227 TO 2243 2245 2247 2256
7669 7670 END MY MZ 2258 2260 2262 2264 -
2324 START MY MZ 2266 TO 2276 2278 2280 2282 2284 2286 2288 2290 2291
2261 START MY MZ 2297 2304 2307 2323 -
2471 TO 2476 2479 2481 2482 START FX MY MZ 2345 2346 2351 2359 2361 2413 2425 2578 2580 TO 2582
2549 END FX MY MZ 2591 2595 2604 2608 -
ELEMENT RELEASE 2609 TO 2611 2729 6500 6513 6523 6527 6529 6533 7242
804 878 881 883 885 888 TO 890 892 894 896 898 900 902 7244 7409 7410 -
904 906 908 911 924 - 7412 TO 7416 7419 7420 7422 7423 7451 7454 7455 7459
934 935 943 944 951 969 1008 1011 1024 TO 1026 1028 7460 7472 7485 7487 -
1031 1034 1035 1375 1378 - 7489 FIRE CFP THICK 0.05 DENSITY 15
1384 1386 1749 TO 1751 J1 MX MY 7667 7668 FIRE CFP THICK 0.05 DENSITY 15
862 878 881 883 885 888 890 892 894 896 898 900 902 904 7658 TO 7661 FIRE CFP THICK 0.05 DENSITY 15
906 908 911 912 916 - 7648 FIRE CFP THICK 0.05 DENSITY 15
940 958 976 977 985 986 1019 1022 1024 1026 1028 1031 7491 7639 TO 7646 FIRE CFP THICK 0.05 DENSITY 15
1032 1041 1042 1372 - 7604 7611 TO 7616 7631 TO 7634 FIRE CFP THICK 0.05
1375 1378 1379 1384 1386 1751 J2 MX MY DENSITY 15
779 862 911 912 919 922 930 932 944 946 948 950 961 963 7558 7560 7566 7574 7575 7582 7586 TO 7588 7596 7600 -
965 968 976 977 979 - 7602 FIRE CFP THICK 0.05 DENSITY 15
981 983 985 986 1011 1014 1017 1019 1022 1031 1032 1041 7549 7551 FIRE CFP THICK 0.05 DENSITY 15
1042 1370 1372 1378 - 7493 7495 7497 7499 7501 7503 7505 7507 7509 7511 7513
1379 1381 1382 1749 J3 MX MY -
804 832 888 889 919 922 930 932 934 935 943 944 946 948 7515 FIRE CFP THICK 0.05 DENSITY 15
950 961 963 965 968 - 1914 1916 1918 1920 1922 1924 1926 1927 1929 1931 1933
979 981 983 986 1008 1011 1014 1017 1022 1024 1025 1034 1935 1937 1939 1941 -
1035 1370 1372 1381 - 1942 1944 1946 1958 1960 TO 1962 1966 1968 2329 TO
1382 1749 TO 1751 J4 MX MY 2332 2337 2338 -
778 789 790 804 806 808 809 832 834 836 837 857 859 861 2341 TO 2344 2355 2356 2362 TO 2364 2366 2367 2369
J3 MX 2371 TO 2382 2423 2424 -
778 779 789 790 806 808 809 834 836 837 857 859 861 862 7662 7663 FIRE BFP THICK 0.05 DENSITY 15
J4 MX MEMBER TRUSS
913 916 926 936 938 940 953 955 958 971 973 976 J1 MX 1346 1348 1356 1358 1506 TO 1513 1515 1516 1518 1519
913 924 926 934 936 938 951 953 955 969 971 973 J2 MX 1523 1524 2362 TO 2364 -
832 897 925 929 930 952 960 961 970 978 979 J1 MY 2366 2367 2369 2371 TO 2391 2393 TO 2402 2415 TO 2422
779 882 917 921 922 941 949 950 959 967 968 J2 MY 7203 TO 7206 7238
881 882 916 917 921 940 941 949 958 959 967 J3 MY SUPPORTS
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 234 de 463
(SUBJECT) (Page)

1 TO 3 7 TO 9 13 TO 15 34 36 38 FIXED 6397 6427 TO 6429 6431 6573 6577 UNI PY -0.61


MEMBER OFFSET * 602L-015
7248 START 0 0 -0.5 JOINT LOAD
DEFINE WIND LOAD 1238 5548 5549 FY -21
TYPE 1 1242 5555 5556 FY -11.25
INT 1.247 1.32 1.379 1.438 1.526 1.599 1.658 1.716 1.775 1266 5568 5569 FY -21
1.819 1.848 1.922 - 1254 5575 5576 FY -11
1.995 2.039 2.098 2.142 2.244 2.332 2.406 2.479 2.538 MEMBER LOAD
2.596 HEIG 4.6 6.1 - 176 177 227 229 233 235 TO 237 239 TO 243 252 255 267
7.6 9.1 12.2 15.2 18 21.3 24.4 27.4 30.5 36.6 42.7 TO 272 275 TO 280 293 -
48.8 54.9 61 - 295 297 298 305 307 309 310 321 322 324 325 327 328 333
76.2 91.4 106.7 121.9 137.2 152.4 TO 335 337 339 340 -
*********************************************************************** 343 345 346 352 353 355 356 407 412 416 437 442 450 454
* 456 621 625 639 643 -
CUT OFF MODE SHAPE 48 675 679 681 685 748 750 757 759 877 990 1001 1004 1007
LOAD 1 LOADTYPE None TITLE SD STRUCTURE SELF 1009 1018 1020 1023 -
WT 1030 1033 1040 1113 1119 1340 1343 1367 1371 1373 1374
SELFWEIGHT Y -1 1377 1383 1389 1395 -
* 1406 1407 1414 TO 1417 1419 1420 1437 1439 1488 1489
LOAD 2 LOADTYPE None TITLE F FIREPROOFING WT 1491 1492 1494 1495 -
* 1497 1498 1500 1501 1503 1504 1590 1592 1613 1615 1724
LOAD 3 LOADTYPE None TITLE CM EQUIPMENT EMPTY 1725 1727 -
WT + PLATFORMS 1733 TO 1735 1738 1742 1748 1883 1885 1888 1891 1893
*Equipment empty weight + Permanent loads in structures ,DL 1896 1898 1901 1903 -
platform 1906 1908 1911 1991 1993 1996 1999 2001 2004 2006 2009
*CM of C-003=183 2011 2014 2016 2019 -
JOINT LOAD 2021 2024 2026 2029 2142 2147 2148 2154 2157 2159 2162
113 FY -88.2 2164 2167 2169 2172 -
114 FY -132.2 2174 2177 2191 2194 2197 2200 2203 2205 2208 2227 2245
*CM of C-004=36 kN 2247 2256 2258 2260 -
45 FY -36 2262 2264 2274 2345 2351 2578 2580 2729 6396 6529 6538
*CM of C-005=76.3 kN Distributed to 3 NODE lump mass 6540 6541 6543 6547 -
entire equipment.(25% 50% 25%) 6549 6550 6552 6556 6558 6559 6561 6565 6567 6568 6570
76 FY -19.75 6574 6578 6582 6584 -
651 FY -38.15 6585 6587 6591 6593 6597 6599 6600 6602 6606 6608 6612
46 FY -19.75 6614 6615 6617 6621 -
*CM of E-013AC=285 kN 6623 6624 6626 6630 6632 6633 6635 6639 6641 6642 6644
60 68 FY -171 6648 6650 6651 6653 -
61 69 FY -114 6657 6659 6660 6662 6666 6668 6669 6671 6675 6677 6678
*CM of E-013BD=158 kN 6680 6684 6686 6687 -
64 72 FY -94.8 6689 6693 6695 6696 6698 6702 6704 TO 6707 6711 6713
65 73 FY -63.2 TO 6716 6718 6720 7250 -
*CM of E-014AB=159 kN 7254 7262 7270 7278 7296 7304 7312 7320 7327 7328 7330
95 103 FY -95.1 UNI GY -0.36
96 104 FY -63.4 7655 UNI GY -0.36
*CM of E-015AB=43 kN 55%=24 kN to fixed side, 45%=19 kN 7650 TO 7652 7654 UNI GY -0.36
to slinding side 7388 7389 7391 7392 7394 7402 TO 7404 7409 7412 7415
91 99 FY -25.7 7437 7454 7459 -
92 100 FY -17.1 7534 TO 7541 7582 7588 7602 7612 UNI GY -0.36
MEMBER LOAD * 602L-011 23.8 kN(+15% for connecting pipes)
*Stair platform DL =0.5kN/m2 * 1.0/2 =0.25 kN/m JOINT LOAD
*Handrail 0.36 kN/m 5364 FY -27.37
95 97 100 101 105 TO 108 110 111 447 987 993 997 1049 ONEWAY LOAD
1054 1058 1213 1215 - **Steel grating at each floor 0.3 kN/m2 apply on service area
1217 1219 1229 1231 1233 1235 1237 1239 1241 1243 1245 _EL15800 ONE -0.3 GY
1247 1249 1251 1253 - _EL21000 ONE -0.3 GY
1255 1257 1259 1261 1263 1753 1755 TO 1766 1781 TO _EL27000 ONE -0.3 GY
1784 1789 TO 1792 1794 - _EL30000 ONE -0.3 GY
1795 TO 1798 1800 1803 TO 1808 1810 1813 TO 1817 1820 _EL33000 ONE -0.3 GY
1823 TO 1856 - _EL40000 ONE -0.3 GY
1871 TO 1882 2188 2654 2656 TO 2666 2668 TO 2670 2672 _EL11800_3 ONE -0.3 GY
TO 2719 2728 2730 6395 - ***********************************************************************
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 235 de 463
(SUBJECT) (Page)

LOAD 4 LOADTYPE None TITLE PA PIPE OPERATION + 1415 FY -111.2


INSULATIONS 1411 FY -33
* Pipe weight and pipe insulation 5550 FY -67.8
*PA of C-003 = 27.5kN 1174 FY -26.4
JOINT LOAD 1171 FY -26.7
113 FY -11 * Load fron Vendor
114 FY -16 5476 5480 FY -10
*PA of C-004=9.8 kN 5477 5481 FY -23.75
45 FY -9.8 5478 5482 FY -5
*PA of C-005=24 kN Distributed to 3 NODE lump mass entire 5483 FY -4.5
equipment.(25% 50% 25%) 5531 FY -6
76 FY -6 5532 FY -2.5
651 FY -12 5533 FY -6
46 FY -6 5534 FY -2.5
*PA of E-013AC=40 kN 5500 FY -1.25
60 68 FY -24 5496 FY -1.25
61 69 FY -16 5511 FY -1.5
*PA of E-013BD= 23.7 kN 5492 FY -1.25
64 72 FY -5 5488 FY -1.25
65 73 FY -3 5515 FY -1.5
*PA of E-014AB= 7.65 kN 5579 TO 5582 FY -1.5
95 103 FY -4.59 5450 5583 FY -7.75
96 104 FY -3.06 5584 TO 5587 FY -7
*PA of E-015AB=2.21 kN 5588 TO 5591 FY -1.5
91 99 FY -1.33 5592 5594 FY -15
92 100 FY -0.89 5593 5595 FY -9
* *
_NODE90 FY -7 LOAD 5 LOADTYPE None TITLE LP HYDRAULIC TEST
_NODE100 FY -9 (LIQUID ONLY)
MEMBER LOAD * Liquid weight in test
2471 TO 2479 2481 TO 2494 2507 TO 2523 2525 2527 2529 *LP of C-003=622 kN
2531 2535 TO 2541 2543 - JOINT LOAD
2545 2547 2549 7212 7213 7669 TO 7672 UNI GY -2.4 113 FY -265
6401 TO 6403 6408 TO 6410 6418 6422 UNI GY -4.8 114 FY -397
MEMBER LOAD *LP of C-004=11 kN
7247 UNI GY -2.4 45 FY -11
* SC-044 EL.32.970 *LP of C-005=69 kN Distributed to 3 NODE lump mass entire
2199 CON GY -120.5 2.65 equipment.(25% 50% 25%)
2617 CON GY -117.8 0.517 76 FY -17
JOINT LOAD 651 FY -35
1408 FY -30 46 FY -17
JOINT LOAD *LP of E-013AC=217.92 kN
_NODE80_E33 FY -97.04 60 68 FY -130.75
* SC-041 EL.11.770 61 69 FY -87.17
4909 FY -12.6 *LP of E-013BD=88.7 kN
5436 FY -12.9 64 72 FY -50.2
MEMBER LOAD 65 73 FY -33.5
7396 CON GY -12 0.3 *LP of E-014AB=90.25 kN
JOINT LOAD 95 103 FY -54.15
5430 FY -14 96 104 FY -36.1
* EL 36.070 *LP of E-015AB=17 kN
MEMBER LOAD 91 99 FY -13.05
7404 CON GY -9.6 0.75 92 100 FY -8.68
7404 CON GY -11.8 1.75 1227 5326 5327 FY -5.45
7405 CON GY -7.2 0.75 *
7405 CON GY -7.4 1.75 _NODE90 FY -10.5
* EL 32.970 _NODE100 FY -14
JOINT LOAD _NODE110 FY -18.9
5521 FY -16 _NODE120 FY -15
1367 FY -85 _NODE10 FY -193
1368 FY -16 _NODE20 FY -270.35
5444 FY -70.4 MEMBER LOAD
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 236 de 463
(SUBJECT) (Page)

2471 TO 2479 2481 TO 2494 2507 TO 2523 2525 2527 2529 *


2531 2535 TO 2541 2543 - ***********************************************************************
2545 2547 2549 7212 7213 7669 TO 7672 UNI GY -4.8 *
6401 TO 6403 6408 TO 6410 6418 6422 UNI GY -7.2 LOAD 6 LOADTYPE None TITLE LO EQUIPMENT (LIQUID
MEMBER LOAD ONLY)
7247 UNI GY -3.6 * Liquid weight in operation
MEMBER LOAD *LO of C-003=628 kN
7247 UNI GY -2.4 JOINT LOAD
* SC-044 EL.32.970 113 FY -251
2199 CON GY -20 2.65 114 FY -377
2617 CON GY -47.4 0.517 *LO of C-004= 4 kN
JOINT LOAD 45 FY -4
1408 FY -52 *LO of C-005=8 kN Distributed to 3 NODE lump mass entire
JOINT LOAD equipment.(25% 50% 25%)
* SC-041 EL.11.770 76 FY -2
4909 FY -11.3 651 FY -4
5436 FY -10.9 46 FY -2
MEMBER LOAD *LO of E-013AC=149.3 kN
7396 CON GY -9.5 0.3 60 68 FY -89.6
JOINT LOAD 61 69 FY -59.7
5430 FY -13.6 *LO of E-013BD=40.5 kN
* EL 36.070 64 72 FY -24.3
MEMBER LOAD 65 73 FY -16.2
7404 CON GY -15.2 0.75 *LO of E-014AB=40.45 kN
7404 CON GY -16.1 1.75 95 103 FY -24.27
7405 CON GY -10.4 0.75 96 104 FY -16.18
7405 CON GY -20.5 1.75 *LO of E-015AB=8.8 kN
* EL 32.970 91 99 FY -5.3
JOINT LOAD 92 100 FY -3.5
5521 FY -100 *602L-011
5444 FY -40.1 5364 FY -24.97
1174 FY -44.1 * 602L-015
1171 FY -43.6 1238 1266 5548 5549 5568 5569 FY -7
* Load fron Vendor 1242 1254 5555 5556 5575 5576 FY -4
**** *
1417 FY -1.89 ***********************************************************************
* 602L-015 LOAD 7 LOADTYPE None TITLE LM MAINTENANCE
1238 1266 5548 5549 5568 5569 FY -24 *(MAINTENANCE PLATFORMS, BUNDLE EXTRACTION)
1242 1254 5555 5556 5575 5576 FY -10 JOINT LOAD
* Vendor *LM of E-013AC Bundle pull force = 168 kN --> centre line of
5476 5480 FY -10 tube
5477 5481 FY -23.75 60 68 FZ 168
5478 5482 FY -5 *LM of E-013BD Bundle pull force = 92 kN --> centre line of
5483 FY -4.5 tube
5531 FY -6 64 72 FZ 92
5532 FY -2.5 *LM of E-014AB Bundle pull force = 92 kN --> centre line of
5533 FY -6 tube
5534 FY -2.5 95 103 FZ 92
5500 FY -1.25 *LM of E-015AB Bundle pull force = 18 kN --> centre line of
5496 FY -1.25 tube
5511 FY -1.5 91 99 FZ 18
5492 FY -1.25 MEMBER LOAD
5488 FY -1.25 2516 CON GY -12.5 2.45
5515 FY -1.5 877 CON GY -12.5 1
5579 TO 5582 FY -1.5 6658 CON GY -12.5 0.4
5450 5583 FY -7.75 2069 2086 CON GY -12.5 1.1
5584 TO 5587 FY -7 7560 CON GY -12.5 0.3
5588 TO 5591 FY -1.5 ***********************************************************************
5592 5594 FY -15 LOAD 8 LOADTYPE None TITLE LSC ON BUILDING
5593 5595 FY -9 PLATFORMS, STAIRS, PAVING
* 602L-011 *OP, maintenance
5364 FY -46.6 * Live load use platform 5.0 kN/m2 above C-003
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 237 de 463
(SUBJECT) (Page)

*36 sqm x 5 kN/m2 = 187kN 785 788 793 796 798 800 803 805 807 817 819 821 824 826
JOINT LOAD 828 831 833 835 842 -
113 FY -112 844 846 849 851 853 856 858 860 870 872 874 877 880 887
114 FY -75 910 915 920 923 928 -
MEMBER LOAD 933 942 957 966 975 984 987 990 993 997 1001 1004 1007
*Stair =5.0 kN/m2 * 1.0/2 =2.5 kN/m 1009 1018 1020 1023 -
95 97 100 101 105 TO 108 110 111 447 987 993 997 1049 1030 1033 1040 1045 1046 1048 1049 1051 1053 1054
1054 1058 1213 1215 - TEMP 25
1217 1219 1229 1231 1233 1235 1237 1239 1241 1243 1245 1056 TO 1058 1061 TO 1068 1070 1072 TO 1077 1079 1080
1247 1249 1251 1253 - 1082 1084 1092 1094 -
1255 1257 1259 1261 1263 1753 1755 TO 1766 1781 TO 1096 TO 1101 1106 1107 1112 1113 1118 1119 1124 1130
1784 1789 TO 1792 1794 - 1133 1200 1205 1207 -
1795 TO 1798 1800 1803 TO 1808 1810 1813 TO 1817 1820 1209 1211 1213 1215 1217 1219 1229 1231 1233 1235 1237
1823 TO 1856 - 1239 1241 1243 1245 -
1871 TO 1882 2188 2654 2656 TO 2666 2668 TO 2670 2672 1247 1249 1251 1253 1255 1257 1259 1261 1263 1281 1282
TO 2719 2728 2730 6395 - 1284 1286 -
6397 6427 TO 6429 6431 6573 6577 UNI PY -2.5 1288 TO 1293 1297 1299 TO 1301 1303 1307 1330 TO 1361
*Floor +21.00 +27.00 +33.00 +37 +40 1365 TO 1369 1371 1373 -
ONEWAY LOAD 1374 1377 1380 1383 1388 TO 1391 1393 TO 1420 1437
_EL15800 ONE -5 GY 1439 1449 1451 TO 1453 -
_EL21000 ONE -5 GY 1469 1471 1472 1476 TO 1513 1515 1516 1518 TO 1524
_EL27000 ONE -5 GY 1579 1580 1582 1584 1586 -
_EL30000 ONE -5 GY 1588 TO 1595 1597 TO 1600 1602 1603 1605 1607 1609
_EL33000 ONE -5 GY 1611 TO 1618 1620 TO 1623 -
_EL40000 ONE -5 GY 1707 1715 1717 1724 TO 1728 1731 1733 TO 1746 1748
_EL11800_3 ONE -5 GY 1753 1755 TO 1775 1777 -
FLOOR LOAD 1778 TO 1784 1789 TO 1792 1794 TO 1798 1800 1803 TO
_EL11800_2 FLOAD -5 GY 1808 1810 1813 TO 1817 -
_EL5000 FLOAD -5 GY 1820 1823 TO 1856 1871 TO 1954 1958 1960 TO 1962 1966
* 1968 TO 2095 -
LOAD 9 LOADTYPE None TITLE SL SNOW , ROOF LIVE 2097 TO 2100 2102 2104 TO 2113 2116 2120 TO 2123 2125
LOAD 2127 TO 2137 -
* Snow or roof live load 2141 TO 2154 2156 2157 2159 2161 2162 2164 TO 2172
* 2174 2175 2177 2179 2180 -
LOAD 10 LOADTYPE None TITLE T1 ENVIRONMENTAL 2188 2190 TO 2194 2197 TO 2200 2202 TO 2249 2251 2254
TEMPERATURE LOADING TO 2293 2295 TO 2297 -
* Temperature load in operation 2299 2300 2302 TO 2307 2309 TO 2311 2313 2314 2318
* 2319 2321 TO 2325 2327 -
TEMPERATURE LOAD 2328 TO 2332 2337 2338 2341 TO 2346 2351 2355 2356
1 TO 26 28 TO 43 61 62 64 TO 67 71 TO 74 77 78 81 TO 83 2358 TO 2364 2366 2367 -
85 86 90 91 - 2369 2371 TO 2391 2393 TO 2405 2408 TO 2466 2470 TO
93 TO 95 97 98 100 101 105 TO 112 115 TO 117 125 TO 128 2479 2481 TO 2532 2535 -
134 TO 136 139 140 - 2536 TO 2569 2573 2578 2580 TO 2584 2591 TO 2596 2604
143 TO 148 154 TO 156 159 164 TO 167 173 TO 180 186 TO 2608 TEMP 25
191 197 TO 199 202 - 2609 TO 2613 2616 2617 2620 TO 2623 2625 TO 2627 2630
203 TO 224 227 229 230 232 233 235 TO 237 239 TO 243 2632 2634 2640 2641 -
252 253 255 267 TO 280 - 2647 TO 2730 6393 TO 6419 6421 6422 6424 TO 6470 6472
293 295 297 TO 299 301 TO 305 307 309 310 321 322 324 TO 6500 6502 TO 6523 -
325 327 328 - 6527 6529 6533 6535 TO 6720 7203 TO 7209 7212 TO 7219
331 TO 335 337 339 TO 341 343 345 TO 348 350 TO 353 7221 7223 7224 7226 -
355 TO 360 365 366 385 - 7227 7238 7241 7242 7244 7247 TO 7254 7261 7262 7269
387 389 392 394 397 401 402 407 412 416 437 442 446 447 7270 7277 7278 7285 -
450 451 453 454 456 - 7286 TO 7288 7295 7296 7303 7304 7311 7312 7319 7320
500 504 528 538 540 549 559 560 563 565 572 573 585 586 7327 TO 7330 -
591 606 608 610 612 - 7337 TO 7341 7343 TO 7347 7349 7357 7359 TO 7385 7387
621 623 625 TO 629 632 635 637 TO 639 641 643 TO 647 TO 7394 7396 TO 7405 -
650 653 655 656 659 - 7409 7410 7412 TO 7420 7422 TO 7427 7429 TO 7552 7555
662 665 668 670 672 TO 675 677 679 TO 681 683 685 TO TO 7583 7585 TO 7590 -
720 722 724 726 728 - 7592 TO 7619 7621 7623 7624 7626 7628 7630 TO 7691
730 733 735 737 TO 745 748 TO 751 753 754 757 759 765 TEMP 25
769 773 774 777 782 - ***********************************************************************
*****
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 238 de 463
(SUBJECT) (Page)

LOAD 11 LOADTYPE None TITLE STRESS_Y OPERATION * Temperature load in operation X (+/-)
TEMPERATURE LOAD *Friction of C-003=149 kN to fixed & slinding side
* Temperature load in operation+pipe containing JOINT LOAD
JOINT LOAD 115 FX -149
_NODE90 FY -13.6 116 FX 149
_NODE100 FY -19 *Piping anchor of C-003=33.53 kN to fixed side
_NODE110 FY -13.6 114 FX 33.53
_NODE120 FY -13.5 *Piping anchor C-004=25.91 kN
MEMBER LOAD 45 FX 25.91
2471 TO 2479 2481 TO 2494 2507 TO 2523 2525 2527 2529 *Piping anchor C-005=50.3 kN at 8.5 height
2531 2535 TO 2541 2543 - 651 FX 50.3
2545 2547 2549 7212 7213 7669 TO 7672 UNI GY -3 *Piping anchor E-013AC=48.2 kN to fixed / Sliding side
6401 TO 6403 6408 TO 6410 6418 6422 UNI GY -6 60 68 FX 48.2
JOINT LOAD 61 69 FX 48.2
*CM of 602L-011 0.17 kN *Piping anchor E-013BD=33.3 kN to fixed / Sliding side
1227 5326 5327 FY -0.085 64 72 FX 33.3
MEMBER LOAD 65 73 FX 33.3
7247 UNI GY -3.6 *Piping anchor E-014AB=33.3 kN to fixed / Sliding side
MEMBER LOAD 95 103 FX 33.3
7247 UNI GY -2.4 96 104 FX 33.3
* SC-041 EL.11.770 *Piping anchor E-015AB=21.5 kN to fixed / Sliding side
JOINT LOAD 91 99 FX 21.5
4909 FY -6.3 92 100 FX 21.5
5436 FY -44.9 *602L-011
MEMBER LOAD 5364 FX 20.12
7396 CON GY -28.5 0.3 *
JOINT LOAD JOINT LOAD
5430 FY -19.2 _NODE90 FX 6.9
* EL 36.070 _NODE100 FX 8.25
MEMBER LOAD _NODE110 FX 6
7404 CON GY -13.9 0.75 _NODE120 FX 8
7404 CON GY -15.2 1.75 MEMBER LOAD
7405 CON GY -4.2 0.75 2477 TO 2479 2481 2482 2507 TO 2515 2521 2523 2525
7405 CON GY -7.6 1.75 2527 2529 2531 2539 2541 -
JOINT LOAD 2543 2545 2547 2549 7213 UNI GX 1.5
1174 FY -33.2 6401 TO 6403 6408 TO 6410 6418 6422 UNI GX 2.25
1171 FY -37.1 JOINT LOAD
* Vendor * SC-041 EL.11.770
5476 5480 FY -10 4909 FX 6.6
5477 5481 FY -23.75 5436 FX 2.9
5478 5482 FY -5 MEMBER LOAD
5483 FY -4.5 7396 CON GX -6.6 0.3
5531 FY -6 JOINT LOAD
5532 FY -2.5 5430 FX -9.3
5533 FY -6 * EL 36.070
5534 FY -2.5 MEMBER LOAD
5500 FY -1.25 7404 CON GX 11.2 0.75
5496 FY -1.25 7404 CON GX 5.8 1.75
5511 FY -1.5 7405 CON GX 0.5 0.75
5492 FY -1.25 7405 CON GX 1.3 1.75
5488 FY -1.25 * EL 32.970
5515 FY -1.5 JOINT LOAD
5579 TO 5582 FY -1.5 5521 FX 1
5450 5583 FY -7.75 1367 FX 1.05
5584 TO 5587 FY -7 1368 FX 5
5588 TO 5591 FY -1.5 1174 FX 5.5
5592 5594 FY -15 1171 FX 11
5593 5595 FY -9 * Vendor
*********************************************************************** 5476 5480 FX 3
* 5477 5481 FX 7.125
LOAD 12 LOADTYPE None TITLE STRESS_X(+/-) 5478 5482 FX 1.5
TEMPERATURE LOAD IN OPERATION X 5483 FX 1.35
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 239 de 463
(SUBJECT) (Page)

5531 FX 1.8 * SC-041 EL.11.770


5532 FX 0.75 4909 FZ 2
5533 FX 1.8 5436 FZ 20.1
5534 FX 0.75 MEMBER LOAD
5500 FX 0.375 7396 CON GZ 13 0.3
5496 FX 0.375 JOINT LOAD
5511 FX 0.45 5430 FZ 7
5492 FX 0.375 * EL 36.070
5488 FX 0.375 MEMBER LOAD
5515 FX 0.45 7404 CON GZ 4 0.75
5579 TO 5582 FX 0.45 7404 CON GZ 9.5 1.75
5450 5583 FX 2.325 7405 CON GZ 4 0.75
5584 TO 5587 FX 2.1 7405 CON GZ 4.6 1.75
5588 TO 5591 FX 0.45 * EL 32.970
5592 5594 FX 4.5 JOINT LOAD
5593 5595 FX 2.7 1171 FZ 11.5
*********************************************************************** 1174 FZ 11.5
* 5521 FZ 8.3
LOAD 13 LOADTYPE None TITLE STRESS_Z(+/-) 1367 FZ 3.5
TEMPERATURE LOAD IN OPERATION Z 1368 FZ 21
JOINT LOAD *Vendor
*Piping anchor of C-003=67.06 kN to fixed side & sliding side 5476 5480 FZ 3
113 114 FZ 33.53 5477 5481 FZ 7.125
*Piping anchor C-004=25.91 kN 5478 5482 FZ 1.5
45 FZ 25.91 5483 FZ 1.35
*Piping anchor C-005=50.3 kN at 8.5 height 5531 FZ 1.8
651 FZ 50.3 5532 FZ 0.75
* Temperature load in operation Z (+/-) 5533 FZ 1.8
*Friction of E-013AC=66.4 kN to fixed & slinding side 5534 FZ 0.75
62 70 FZ 66.4 5500 FZ 0.375
63 71 FZ -66.4 5496 FZ 0.375
*Friction of E-013BD=36.4 kN to fixed & sliding side 5511 FZ 0.45
66 74 FZ 36.4 5492 FZ 0.375
67 75 FZ -36.4 5488 FZ 0.375
*Friction of E-014AB= 36.8 kN to fixed & sliding side 5515 FZ 0.45
97 105 FZ 36.8 5579 TO 5582 FZ 0.45
98 106 FZ -36.8 5450 5583 FZ 2.325
*Friction of E-015AB=9.2 kN to fixed & sliding side 5584 TO 5587 FZ 2.1
93 101 FZ 9.2 5588 TO 5591 FZ 0.45
94 102 FZ -9.2 5592 5594 FZ 4.5
* 5593 5595 FZ 2.7
*Piping anchor E-013AC=152.04 kN to fixed side ***********************************************************************
60 68 FZ 152.04 *
*Piping anchor E-013BD= 69.45 kN to fixed side LOAD 14 LOADTYPE None TITLE WXPOS WIND
64 72 FZ 69.45 DIRECTION +X
*Piping anchor E-014AB= 69.45 kN to fixed side JOINT LOAD
95 103 FZ 69.45 * Wind in direction +X
*Piping anchor E-015AB=18.06 kN to fixed side *C-003=3.9 kN to fixed side
91 99 FZ 18.06 113 FX 3.9
*602L-011 *C-004=3.8 kN and moment 8.7 kNm
5364 FZ 20.12 165 FX 3.8 MZ -8.7
JOINT LOAD *C-005=11.5 kN and moment 97 kNm
_NODE90 FZ 2.1 46 FX 11.5 MZ -97
_NODE100 FZ 2.5 *E-013AC
_NODE110 FZ 15.5 60 61 68 69 FX 18 MZ -31.5
_NODE120 FZ 42.5 *E-013BD
MEMBER LOAD 64 65 72 73 FX 9 MZ -16.25
2471 TO 2476 2483 TO 2494 2516 TO 2520 2522 2535 TO *E-014AB
2538 2540 7212 - 95 96 103 104 FX 12 MZ -15
7669 TO 7672 UNI GZ 1.5 *E-015AB
6401 TO 6403 6408 TO 6410 6418 6422 UNI GZ 2.25 91 92 99 100 FX 5 MZ -5
JOINT LOAD *
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 240 de 463
(SUBJECT) (Page)

*To main structure 5436 FZ 0.5


WIND LOAD X 1 TYPE 1 XR -1 1 YR 0 40 ZR -1 40 OPEN MEMBER LOAD
WIND LOAD X 1 TYPE 1 XR 9 11 YR 0 40 ZR -1 40 OPEN 7396 CON GZ 0.5 0.3
WIND LOAD X 1 TYPE 1 XR 19 21 YR 0 40 ZR -1 40 OPEN JOINT LOAD
WIND LOAD X 1 TYPE 1 XR 23 25 YR 0 40 ZR -1 40 OPEN 5430 FZ 3
JOINT LOAD * EL 36.070
1264 TO 1267 5522 5526 FX 2.5 MEMBER LOAD
1176 1193 1242 1254 FX 1 7404 CON GZ 1.7 0.75
* SC-041 EL.11.770 7404 CON GZ 0.5 1.75
4909 FX 0.5 7405 CON GZ 0.5 0.75
5436 FX 1.9 7405 CON GZ 10.5 1.75
MEMBER LOAD * EL 32.970
7396 CON GX 1.3 0.3 JOINT LOAD
JOINT LOAD 1171 FZ 2
5430 FX 0.5 1174 FZ 1.5
* EL 36.070 ***********************************************************************
MEMBER LOAD LOAD 17 LOADTYPE None TITLE WZNEG WIND
7404 CON GX 1.9 0.75 DIRECTION -Z
7404 CON GX 1.2 1.75 * Wind in direction -Z
7405 CON GX 0.9 0.75 REPEAT LOAD
7405 CON GX 0.5 1.75 16 -1.0
* EL 32.970 **********************************************************************
JOINT LOAD LOAD 18 LOADTYPE None TITLE EX(+/-) SEISMIC X ON
1171 FX 0.7 FLOOR & PIPERACKS
1174 FX 1.1 SELFWEIGHT X 1
*********************************************************************** SELFWEIGHT Y 1
** SELFWEIGHT Z 1
LOAD 15 LOADTYPE None TITLE WXNEG WIND * SEISMIC in X direction (+/-) / concern load 01 02 03 04 06
DIRECTION -X 08*0.3 11
* Wind in direction -X *LOAD 3 LOADTYPE None TITLE CM EQUIPMENT EMPTY
REPEAT LOAD WT + PLATFORMS
14 -1.0 *Equipment empty weight + Permanent loads in structures ,DL
*********************************************************************** platform
** *CM of C-003=183
LOAD 16 LOADTYPE None TITLE WZPOS WIND JOINT LOAD
DIRECTION +Z 113 FX 88.2 FY 88.2 FZ 88.2
JOINT LOAD 114 FX 132.2 FY 132.2 FZ 132.2
* Wind in direction +Z *CM of C-004=36 kN
*C-003=20 kN 45 FX 36 FY 36 FZ 36
113 114 FZ 10 *CM of C-005=59 kN Distributed to 3 NODE lump mass entire
*C-004=3.8 kN and moment 8.7 kNm equipment.(25% 50% 25%)
165 FZ 3.8 MX 8.7 76 FX 19.075 FY 19.075 FZ 19.075
*C-005=11.5 kN and moment 97 kNm 651 FX 38.15 FY 38.15 FZ 38.15
46 FZ 11.5 MX 97 46 FX 19.075 FY 19.075 FZ 19.075
*E-013AC=2.8 kN to fixed side *CM of E-013AC=285 kN
167 169 FZ 12.25 MX 21.43 60 68 FX 171 FY 171 FZ 171
*E-013BD=1.5 kN to fixed side 61 69 FX 114 FY 114 FZ 114
168 172 FZ 6.25 MX 7.81 *CM of E-013BD=158 kN
*E-014AB= 1.6 kN to fixed side 64 72 FX 94.8 FY 94.8 FZ 94.8
5596 5598 FZ 4 MX 5 65 73 FX 63.2 FY 63.2 FZ 63.2
*E-015AB= 1.6 kN to fixed side *CM of E-014AB=159 kN
5597 5599 FZ 4 MX 4 95 103 FX 95.1 FY 95.1 FZ 95.1
* 96 104 FX 63.4 FY 63.4 FZ 63.1
*Wind against conc frame *CM of E-015AB=43 kN 55%=24 kN to fixed side, 45%=19 kN
WIND LOAD Z 1 TYPE 1 XR -1 40 YR 0 40 ZR -1 1 OPEN to slinding side
WIND LOAD Z 1 TYPE 1 XR -1 40 YR 0 40 ZR 5.7 6.3 OPEN 91 99 FX 25.7 FY 25.7 FZ 25.7
WIND LOAD Z 1 TYPE 1 XR -1 40 YR 0 40 ZR 11 13 OPEN 92 100 FX 17.1 FY 17.1 FZ 17.1
JOINT LOAD MEMBER LOAD
1264 TO 1267 5522 5526 FZ 2.5 *Stair platform DL =0.5kN/m2 * 1.0/2 =0.25 kN/m
1176 1193 1242 1254 FZ 1 *Handrail 0.36 kN/m
* SC-041 EL.11.770 95 97 100 101 105 TO 108 110 111 447 987 993 997 1049
4909 FZ 3.4 1054 1058 1213 1215 -
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 241 de 463
(SUBJECT) (Page)

1217 1219 1229 1231 1233 1235 1237 1239 1241 1243 1245 6549 6550 6552 6556 6558 6559 6561 6565 6567 6568 6570
1247 1249 1251 1253 - 6574 6578 6582 6584 -
1255 1257 1259 1261 1263 1753 1755 TO 1766 1781 TO 6585 6587 6591 6593 6597 6599 6600 6602 6606 6608 6612
1784 1789 TO 1792 1794 - 6614 6615 6617 6621 -
1795 TO 1798 1800 1803 TO 1808 1810 1813 TO 1817 1820 6623 6624 6626 6630 6632 6633 6635 6639 6641 6642 6644
1823 TO 1856 - 6648 6650 6651 6653 -
1871 TO 1882 2188 2654 2656 TO 2666 2668 TO 2670 2672 6657 6659 6660 6662 6666 6668 6669 6671 6675 6677 6678
TO 2719 2728 2730 6395 - 6680 6684 6686 6687 -
6397 6427 TO 6429 6431 6573 6577 UNI PX 0.61 6689 6693 6695 6696 6698 6702 6704 TO 6707 6711 6713
95 97 100 101 105 TO 108 110 111 447 987 993 997 1049 TO 6716 6718 6720 7250 -
1054 1058 1213 1215 - 7254 7262 7270 7278 7296 7304 7312 7320 7327 7328 7330
1217 1219 1229 1231 1233 1235 1237 1239 1241 1243 1245 UNI GX 0.36
1247 1249 1251 1253 - 7655 UNI GX 0.36
1255 1257 1259 1261 1263 1753 1755 TO 1766 1781 TO 7650 TO 7652 7654 UNI GX 0.36
1784 1789 TO 1792 1794 - 176 177 227 229 233 235 TO 237 239 TO 243 252 255 267
1795 TO 1798 1800 1803 TO 1808 1810 1813 TO 1817 1820 TO 272 275 TO 280 293 -
1823 TO 1856 - 295 297 298 305 307 309 310 321 322 324 325 327 328 333
1871 TO 1882 2188 2654 2656 TO 2666 2668 TO 2670 2672 TO 335 337 339 340 -
TO 2719 2728 2730 6395 - 343 345 346 352 353 355 356 407 412 416 437 442 450 454
6397 6427 TO 6429 6431 6573 6577 UNI PY 0.61 456 621 625 639 643 -
95 97 100 101 105 TO 108 110 111 447 987 993 997 1049 675 679 681 685 748 750 757 759 877 990 1001 1004 1007
1054 1058 1213 1215 - 1009 1018 1020 1023 -
1217 1219 1229 1231 1233 1235 1237 1239 1241 1243 1245 1030 1033 1040 1113 1119 1340 1343 1367 1371 1373 1374
1247 1249 1251 1253 - 1377 1383 1389 1395 -
1255 1257 1259 1261 1263 1753 1755 TO 1766 1781 TO 1406 1407 1414 TO 1417 1419 1420 1437 1439 1488 1489
1784 1789 TO 1792 1794 - 1491 1492 1494 1495 -
1795 TO 1798 1800 1803 TO 1808 1810 1813 TO 1817 1820 1497 1498 1500 1501 1503 1504 1590 1592 1613 1615 1724
1823 TO 1856 - 1725 1727 -
1871 TO 1882 2188 2654 2656 TO 2666 2668 TO 2670 2672 1733 TO 1735 1738 1742 1748 1883 1885 1888 1891 1893
TO 2719 2728 2730 6395 - 1896 1898 1901 1903 -
6397 6427 TO 6429 6431 6573 6577 UNI PZ 0.61 1906 1908 1911 1991 1993 1996 1999 2001 2004 2006 2009
JOINT LOAD 2011 2014 2016 2019 -
1238 5548 5549 FX 21 FY 21 FZ 21 2021 2024 2026 2029 2142 2147 2148 2154 2157 2159 2162
1242 5555 5556 FX 11.25 FY 11.25 FZ 11.25 2164 2167 2169 2172 -
1266 5568 5569 FX 21 FY 21 FZ 21 2174 2177 2191 2194 2197 2200 2203 2205 2208 2227 2245
1254 5575 5576 FX 11 FY 11 FZ 11 2247 2256 2258 2260 -
MEMBER LOAD 2262 2264 2274 2345 2351 2578 2580 2729 6396 6529 6538
176 177 227 229 233 235 TO 237 239 TO 243 252 255 267 6540 6541 6543 6547 -
TO 272 275 TO 280 293 - 6549 6550 6552 6556 6558 6559 6561 6565 6567 6568 6570
295 297 298 305 307 309 310 321 322 324 325 327 328 333 6574 6578 6582 6584 -
TO 335 337 339 340 - 6585 6587 6591 6593 6597 6599 6600 6602 6606 6608 6612
343 345 346 352 353 355 356 407 412 416 437 442 450 454 6614 6615 6617 6621 -
456 621 625 639 643 - 6623 6624 6626 6630 6632 6633 6635 6639 6641 6642 6644
675 679 681 685 748 750 757 759 877 990 1001 1004 1007 6648 6650 6651 6653 -
1009 1018 1020 1023 - 6657 6659 6660 6662 6666 6668 6669 6671 6675 6677 6678
1030 1033 1040 1113 1119 1340 1343 1367 1371 1373 1374 6680 6684 6686 6687 -
1377 1383 1389 1395 - 6689 6693 6695 6696 6698 6702 6704 TO 6707 6711 6713
1406 1407 1414 TO 1417 1419 1420 1437 1439 1488 1489 TO 6716 6718 6720 7250 -
1491 1492 1494 1495 - 7254 7262 7270 7278 7296 7304 7312 7320 7327 7328 7330
1497 1498 1500 1501 1503 1504 1590 1592 1613 1615 1724 UNI GZ 0.36
1725 1727 - 7655 UNI GZ 0.36
1733 TO 1735 1738 1742 1748 1883 1885 1888 1891 1893 7650 TO 7652 7654 UNI GZ 0.36
1896 1898 1901 1903 - 176 177 227 229 233 235 TO 237 239 TO 243 252 255 267
1906 1908 1911 1991 1993 1996 1999 2001 2004 2006 2009 TO 272 275 TO 280 293 -
2011 2014 2016 2019 - 295 297 298 305 307 309 310 321 322 324 325 327 328 333
2021 2024 2026 2029 2142 2147 2148 2154 2157 2159 2162 TO 335 337 339 340 -
2164 2167 2169 2172 - 343 345 346 352 353 355 356 407 412 416 437 442 450 454
2174 2177 2191 2194 2197 2200 2203 2205 2208 2227 2245 456 621 625 639 643 -
2247 2256 2258 2260 - 675 679 681 685 748 750 757 759 877 990 1001 1004 1007
2262 2264 2274 2345 2351 2578 2580 2729 6396 6529 6538 1009 1018 1020 1023 -
6540 6541 6543 6547 - 1030 1033 1040 1113 1119 1340 1343 1367 1371 1373 1374
1377 1383 1389 1395 -
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 242 de 463
(SUBJECT) (Page)

1406 1407 1414 TO 1417 1419 1420 1437 1439 1488 1489 _EL27000 ONE 0.3 GZ
1491 1492 1494 1495 - _EL30000 ONE 0.3 GZ
1497 1498 1500 1501 1503 1504 1590 1592 1613 1615 1724 _EL33000 ONE 0.3 GZ
1725 1727 - _EL40000 ONE 0.3 GZ
1733 TO 1735 1738 1742 1748 1883 1885 1888 1891 1893 _EL11800_3 ONE 0.3 GZ
1896 1898 1901 1903 - *
1906 1908 1911 1991 1993 1996 1999 2001 2004 2006 2009 *LOAD 4 LOADTYPE None TITLE PA PIPE OPERATION +
2011 2014 2016 2019 - INSULATIONS
2021 2024 2026 2029 2142 2147 2148 2154 2157 2159 2162 * Pipe weight and pipe insulation
2164 2167 2169 2172 - *PA of C-003 = 27.5kN
2174 2177 2191 2194 2197 2200 2203 2205 2208 2227 2245 JOINT LOAD
2247 2256 2258 2260 - 113 FX 11 FY 11 FZ 11
2262 2264 2274 2345 2351 2578 2580 2729 6396 6529 6538 114 FX 16 FY 16 FZ 16
6540 6541 6543 6547 - *PA of C-004=9.8 kN
6549 6550 6552 6556 6558 6559 6561 6565 6567 6568 6570 45 FX 9.8 FY 9.8 FZ 9.8
6574 6578 6582 6584 - *PA of C-005=24 kN Distributed to 3 NODE lump mass entire
6585 6587 6591 6593 6597 6599 6600 6602 6606 6608 6612 equipment.(25% 50% 25%)
6614 6615 6617 6621 - 76 FX 6 FY 6 FZ 6
6623 6624 6626 6630 6632 6633 6635 6639 6641 6642 6644 651 FX 12 FY 12 FZ 12
6648 6650 6651 6653 - 46 FX 6 FY 6 FZ 6
6657 6659 6660 6662 6666 6668 6669 6671 6675 6677 6678 *PA of E-013AC=40 kN
6680 6684 6686 6687 - 60 68 FX 24 FY 24 FZ 24
6689 6693 6695 6696 6698 6702 6704 TO 6707 6711 6713 61 69 FX 16 FY 16 FZ 16
TO 6716 6718 6720 7250 - *PA of E-013BD= 8 kN
7254 7262 7270 7278 7296 7304 7312 7320 7327 7328 7330 64 72 FX 5 FY 5 FZ 5
UNI GY 0.36 65 73 FX 3 FY 3 FZ 3
7655 UNI GY 0.36 *PA of E-014AB= 7.65 kN
7650 TO 7652 7654 UNI GY 0.36 95 103 FX 4.59 FY 4.59 FZ 4.59
* 96 104 FX 3.06 FY 3.06 FZ 3.06
7388 7389 7391 7392 7394 7402 TO 7404 7409 7412 7415 *PA of E-015AB=2.21 kN
7437 7454 7459 - 91 99 FX 1.33 FY 1.33 FZ 1.33
7534 TO 7541 7582 7588 7602 7612 UNI GX 0.36 92 100 FX 0.89 FY 0.89 FZ 0.89
7388 7389 7391 7392 7394 7402 TO 7404 7409 7412 7415 **PA of H-001AC=5 kN distributed two point = 2.5 kN
7437 7454 7459 - **PA of H-001BD=2 kN distributed two point = 1 kN
7534 TO 7541 7582 7588 7602 7612 UNI GY 0.36 *1264 TO 1267 FY -2.5
7388 7389 7391 7392 7394 7402 TO 7404 7409 7412 7415 *1176 1193 1242 1254 FY -1
7437 7454 7459 - *
7534 TO 7541 7582 7588 7602 7612 UNI GZ 0.36 _NODE90 FX 7 FY 7 FZ 7
* 602L-011 _NODE100 FX 9 FY 9 FZ 9
JOINT LOAD MEMBER LOAD
5364 FX 24.6 FY 24.6 FZ 24.6 2471 TO 2479 2481 TO 2494 2507 TO 2523 2525 2527 2529
******************* 2531 2535 TO 2541 2543 -
ONEWAY LOAD 2545 2547 2549 7212 7213 7669 TO 7672 UNI GX 2.4
**Steel grating at each floor 0.3 kN/m2 apply on service area 2471 TO 2479 2481 TO 2494 2507 TO 2523 2525 2527 2529
_EL15800 ONE 0.3 GY 2531 2535 TO 2541 2543 -
_EL21000 ONE 0.3 GY 2545 2547 2549 7212 7213 7669 TO 7672 UNI GY 2.4
_EL27000 ONE 0.3 GY 2471 TO 2479 2481 TO 2494 2507 TO 2523 2525 2527 2529
_EL30000 ONE 0.3 GY 2531 2535 TO 2541 2543 -
_EL33000 ONE 0.3 GY 2545 2547 2549 7212 7213 7669 TO 7672 UNI GZ 2.4
_EL40000 ONE 0.3 GY *
_EL11800_3 ONE 0.3 GY 6401 TO 6403 6408 TO 6410 6418 6422 UNI GX 4.8
* 6401 TO 6403 6408 TO 6410 6418 6422 UNI GY 4.8
_EL15800 ONE 0.3 GX 6401 TO 6403 6408 TO 6410 6418 6422 UNI GZ 4.8
_EL21000 ONE 0.3 GX MEMBER LOAD
_EL27000 ONE 0.3 GX 7247 UNI GX 2.4
_EL30000 ONE 0.3 GX 7247 UNI GY 2.4
_EL33000 ONE 0.3 GX 7247 UNI GZ 2.4
_EL40000 ONE 0.3 GX * SC-044 EL.32.970
_EL11800_3 ONE 0.3 GX 2199 CON GY 120.5 2.65
* 2617 CON GY 117.8 0.517
_EL15800 ONE 0.3 GZ *
_EL21000 ONE 0.3 GZ 2199 CON GX 120.5 2.65
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 243 de 463
(SUBJECT) (Page)

2617 CON GX 117.8 0.517 5588 TO 5591 FX 3 FY 3 FZ 3


* 5592 5594 FX 30 FY 30 FZ 30
2199 CON GZ 120.5 2.65 5593 5595 FX 18 FY 18 FZ 18
2617 CON GZ 117.8 0.517 *
JOINT LOAD *LOAD 6 LOADTYPE None TITLE LO EQUIPMENT (LIQUID
1408 FX 30 FY 30 FZ 30 ONLY)
JOINT LOAD * Liquid weight in operation
_NODE80_E33 FX 97.04 FY 97.04 FZ 97.04 *LO of C-003=628 kN
* SC-041 EL.11.770 JOINT LOAD
4909 FX 12.6 FY 12.6 FZ 112.6 113 FX 251 FY 251 FZ 251
5436 FX 12.9 FY 12.9 FZ 12.9 114 FX 377 FY 377 FZ 377
MEMBER LOAD *LO of C-004= 4 kN
7396 CON GX 12 0.3 45 FX 4 FY 4 FZ 4
7396 CON GY 12 0.3 *LO of C-005=8 kN Distributed to 3 NODE lump mass entire
7396 CON GZ 12 0.3 equipment.(25% 50% 25%)
JOINT LOAD 76 FX 2 FY 2 FZ 2
5430 FX 14 FY 14 FZ 14 651 FX 4 FY 4 FZ 4
* EL 36.070 46 FX 2 FY 2 FZ 2
MEMBER LOAD *LO of E-013AC
7404 CON GY 9.6 0.75 60 68 FX 89.6 FY 89.6 FZ 89.6
7404 CON GY 11.8 1.75 61 69 FX 59.7 FY 59.7 FZ 59.7
7405 CON GY 7.2 0.75 *LO of E-013BD
7405 CON GY 7.4 1.75 64 72 FX 24.3 FY 24.3 FZ 24.3
* 65 73 FX 16.2 FY 16.2 FZ 16.2
7404 CON GX 9.6 0.75 *LO of E-014AB
7404 CON GX 11.8 1.75 95 103 FX 24.27 FY 24.27 FZ 24.27
7405 CON GX 7.2 0.75 96 104 FX 16.18 FY 16.18 FZ 16.18
7405 CON GX 7.4 1.75 *LO of E-015AB
* 91 99 FX 5.3 FY 5.3 FZ 5.3
7404 CON GZ 9.6 0.75 92 100 FX 3.5 FY 3.5 FZ 3.5
7404 CON GZ 11.8 1.75 * 602L-011
7405 CON GZ 7.2 0.75 5364 FX 25 FY 25 FZ 25
7405 CON GZ 7.4 1.75 * 602L-015
* EL 32.970 1238 1266 5548 5549 5568 5569 FX 24 FY 24 FZ 7
JOINT LOAD 1242 1254 5555 5556 5575 5576 FX 10 FY 10 FZ 4
5521 FX 16 FY 16 FZ 16 *LOAD 8 LOADTYPE None TITLE LSC ON BUILDING
1367 FX 85 FY 85 FZ 85 PLATFORMS, STAIRS, PAVING
1368 FX 16 FY 16 FZ 16 *OP, maintenance
5444 FX 70.4 FY 70.4 FZ 70.4 * Live load use platform 5.0 kN/m2 above C-003
1415 FX 111.2 FY 111.2 FZ 111.2 *36 sqm x 5 kN/m2 = 187kN
1411 FX 33 FY 33 FZ 33 JOINT LOAD
5550 FX 67.8 FY 67.8 FZ 67.8 113 FX 112 FY 112 FZ 112
1174 FX 26.4 FY 26.4 FZ 26.4 114 FX 75 FY 75 FZ 75
1171 FX 26.7 FY 26.7 FZ 26.7 MEMBER LOAD
* Load fron Vendor (Empty+Fluid) *Stair =5.0 kN/m2 * 1.0/2 =2.5 kN/m
5476 5480 FX 20 FY 20 FZ 20 95 97 100 101 105 TO 108 110 111 447 987 993 997 1049
5477 5481 FX 47.5 FY 47.5 FZ 47.5 1054 1058 1213 1215 -
5478 5482 FX 10 FY 10 FZ 10 1217 1219 1229 1231 1233 1235 1237 1239 1241 1243 1245
5483 FX 9 FY 9 FZ 9 1247 1249 1251 1253 -
5531 FX 12 FY 12 FZ 12 1255 1257 1259 1261 1263 1753 1755 TO 1766 1781 TO
5532 FX 5 FY 5 FZ 5 1784 1789 TO 1792 1794 -
5533 FX 12 FY 12 FZ 12 1795 TO 1798 1800 1803 TO 1808 1810 1813 TO 1817 1820
5534 FX 5 FY 5 FZ 5 1823 TO 1856 -
5500 FX 2.5 FY 2.5 FZ 2.5 1871 TO 1882 2188 2654 2656 TO 2666 2668 TO 2670 2672
5496 FX 2.5 FY 2.5 FZ 2.5 TO 2719 2728 2730 6395 -
5511 FX 3 FY 3 FZ 3 6397 6427 TO 6429 6431 6573 6577 UNI PX 0.75
5492 FX 2.5 FY 2.5 FZ 2.5 95 97 100 101 105 TO 108 110 111 447 987 993 997 1049
5488 FX 2.5 FY 2.5 FZ 2.5 1054 1058 1213 1215 -
5515 FX 3 FY 3 FZ 3 1217 1219 1229 1231 1233 1235 1237 1239 1241 1243 1245
5579 TO 5582 FX 3 FY 3 FZ 3 1247 1249 1251 1253 -
5450 5583 FX 15.5 FY 15.5 FZ 15.5 1255 1257 1259 1261 1263 1753 1755 TO 1766 1781 TO
5584 TO 5587 FX 14 FY 14 FZ 14 1784 1789 TO 1792 1794 -
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 244 de 463
(SUBJECT) (Page)

1795 TO 1798 1800 1803 TO 1808 1810 1813 TO 1817 1820 2471 TO 2479 2481 TO 2494 2507 TO 2523 2525 2527 2529
1823 TO 1856 - 2531 2535 TO 2541 2543 -
1871 TO 1882 2188 2654 2656 TO 2666 2668 TO 2670 2672 2545 2547 2549 7212 7213 7669 TO 7672 UNI GY 1
TO 2719 2728 2730 6395 - *
6397 6427 TO 6429 6431 6573 6577 UNI PZ 0.75 6401 TO 6403 6408 TO 6410 6418 6422 UNI GX 6
95 97 100 101 105 TO 108 110 111 447 987 993 997 1049 6401 TO 6403 6408 TO 6410 6418 6422 UNI GZ 6
1054 1058 1213 1215 - 6401 TO 6403 6408 TO 6410 6418 6422 UNI GY 6
1217 1219 1229 1231 1233 1235 1237 1239 1241 1243 1245 JOINT LOAD
1247 1249 1251 1253 - *CM of 602L-011 0.17 kN
1255 1257 1259 1261 1263 1753 1755 TO 1766 1781 TO 1227 5326 5327 FX 0.085 FY 0.085 FZ 0.085
1784 1789 TO 1792 1794 - MEMBER LOAD
1795 TO 1798 1800 1803 TO 1808 1810 1813 TO 1817 1820 7247 UNI GX 3.6
1823 TO 1856 - 7247 UNI GX 2.4
1871 TO 1882 2188 2654 2656 TO 2666 2668 TO 2670 2672 *
TO 2719 2728 2730 6395 - 7247 UNI GZ 3.6
6397 6427 TO 6429 6431 6573 6577 UNI PY 0.75 7247 UNI GZ 2.4
*Floor +21.00 +27.00 +33.00 +37 +40 *
******************* 7247 UNI GY 3.6
* 7247 UNI GY 2.4
ONEWAY LOAD * SC-041 EL.11.770
_EL15800 ONE 1.5 GX JOINT LOAD
_EL21000 ONE 1.5 GX 4909 FX 6.3 FY 6.3 FZ 6.3
_EL27000 ONE 1.5 GX 5436 FX 44.9 FY 44.9 FZ 44.9
_EL30000 ONE 1.5 GX MEMBER LOAD
_EL33000 ONE 1.5 GX 7396 CON GX 28.5 0.3
_EL40000 ONE 1.5 GX 7396 CON GY 28.5 0.3
_EL11800_3 ONE 1.5 GX 7396 CON GZ 28.5 0.3
* JOINT LOAD
_EL15800 ONE 1.5 GZ 5430 FX 19.2 FY 19.2 FZ 19.2
_EL21000 ONE 1.5 GZ * EL 36.070
_EL27000 ONE 1.5 GZ MEMBER LOAD
_EL30000 ONE 1.5 GZ 7404 CON GX 13.9 0.75
_EL33000 ONE 1.5 GZ 7404 CON GX 15.2 1.75
_EL40000 ONE 1.5 GZ 7405 CON GX 4.2 0.75
_EL11800_3 ONE 1.5 GZ 7405 CON GX 7.6 1.75
* *
_EL15800 ONE 1.5 GY 7404 CON GY 13.9 0.75
_EL21000 ONE 1.5 GY 7404 CON GY 15.2 1.75
_EL27000 ONE 1.5 GY 7405 CON GY 4.2 0.75
_EL30000 ONE 1.5 GY 7405 CON GY 7.6 1.75
_EL33000 ONE 1.5 GY *
_EL40000 ONE 1.5 GY 7404 CON GZ 13.9 0.75
_EL11800_3 ONE 1.5 GY 7404 CON GZ 15.2 1.75
*Floor +5.00 , +11.80 7405 CON GZ 4.2 0.75
* 7405 CON GZ 7.6 1.75
* JOINT LOAD
* 1174 FX 33.2 FY 33.2 FZ 33.2
*LOAD 11 LOADTYPE None TITLE STRESS_Y OPERATION 1171 FX 37.1 FY 37.1 FZ 37.1
TEMPERATURE LOAD ***********************************************************************
* Temperature load in operation+pipe containing *
JOINT LOAD SPECTRUM SRSS X 1 Y 0 Z 0 ACC SCALE 9.81 DAMP 0.05
_NODE90 FX 13.6 FY 13.6 FZ 13.6 LIN
_NODE100 FX 19 FY 19 FZ 19 *********************************************************************
_NODE110 FX 13.6 FY 13.6 FZ 13.6 0 0.095; 0.1 0.113; 0.13 0.119; 0.2 0.119; 0.3 0.119; 0.4
_NODE120 FX 13.5 FY 13.5 FZ 13.5 0.119; 0.5 0.119;
MEMBER LOAD 0.52 0.119; 0.55 0.112; 0.6 0.103; 0.7 0.088; 0.8 0.077; 0.9
2471 TO 2479 2481 TO 2494 2507 TO 2523 2525 2527 2529 0.069; 1 0.062;
2531 2535 TO 2541 2543 - 1.1 0.056; 1.2 0.051; 1.3 0.048; 1.4 0.044; 1.5 0.041; 1.6
2545 2547 2549 7212 7213 7669 TO 7672 UNI GX 1 0.039; 1.7 0.036;
2471 TO 2479 2481 TO 2494 2507 TO 2523 2525 2527 2529 1.8 0.034; 1.9 0.033; 2 0.031; 2.1 0.029; 2.2 0.028; 2.3 0.027;
2531 2535 TO 2541 2543 - 2.4 0.026;
2545 2547 2549 7212 7213 7669 TO 7672 UNI GZ 1
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 245 de 463
(SUBJECT) (Page)

2.5 0.025; 2.6 0.024; 2.7 0.023; 2.8 0.022; 2.9 0.021; 3 0.021; LOAD 33 LOADTYPE None TITLE EHXNEG EMPTY WALL
3.1 0.02; VIBRATION +X
3.2 0.019; 3.3 0.019; *-Increase due to seismic pressure from soil or empty wall
LOAD 19 LOADTYPE None TITLE EZ(+/-) SEISMIC Z ON vibration in -X
FLOOR & PIPERACKS LOAD 34 LOADTYPE None TITLE EHZPOS EMPTY WALL
* SEISMIC in Z direction (+/-) VIBRATION +Z
SPECTRUM SRSS X 0 Y 0 Z 1 ACC SCALE 9.81 DAMP 0.05 *-Increase due to seismic pressure from soil or empty wall
LIN vibration in +Z
********************************************************************* LOAD 35 LOADTYPE None TITLE EHZNEG EMPTY WALL
0 0.095; 0.1 0.113; 0.13 0.119; 0.2 0.119; 0.3 0.119; 0.4 VIBRATION -Z
0.119; 0.5 0.119; *-Increase due to seismic pressure from soil or empty wall
0.52 0.119; 0.55 0.112; 0.6 0.103; 0.7 0.088; 0.8 0.077; 0.9 vibration in -Z
0.069; 1 0.062; LOAD 36 LOADTYPE None TITLE EFLXPOS DYNAMIC
1.1 0.056; 1.2 0.051; 1.3 0.048; 1.4 0.044; 1.5 0.041; 1.6 PRESSURE FROM FLUID +X
0.039; 1.7 0.036; *-Dynamic pressure from fluid in +X
1.8 0.034; 1.9 0.033; 2 0.031; 2.1 0.029; 2.2 0.028; 2.3 0.027; LOAD 37 LOADTYPE None TITLE EFLXNEG DYNAMIC
2.4 0.026; PRESSURE FROM FLUID -X
2.5 0.025; 2.6 0.024; 2.7 0.023; 2.8 0.022; 2.9 0.021; 3 0.021; *-Dynamic pressure from fluid in -X
3.1 0.02; *
3.2 0.019; 3.3 0.019; LOAD 38 LOADTYPE None TITLE EFLZPOS DYNAMIC
LOAD 20 LOADTYPE None TITLE EY SEISMIC MASS PRESSURE FROM FLUID +Z
ESTIMATION (Y) *-Dynamic pressure from fluid in +Z
*SEISMIC MASS ESTIMATION (Y) *
********************************************************************* LOAD 39 LOADTYPE None TITLE EFLZNEG DYNAMIC
LOAD 21 LOADTYPE None TITLE PS_1 SOIL WT CASE 1 PRESSURE FROM FLUID -Z
FOR COKER *-Dynamic pressure from fluid in -Z
*-Soil weight *
LOAD 22 LOADTYPE None TITLE PS_2 SOIL WT CASE 2 LOAD 40 LOADTYPE None TITLE ILX(+/-) IMPACT LOADS
FOR COKER ON X
* *-impact loads on X
LOAD 23 LOADTYPE None TITLE PW_1 FLUID WT (FROM *
SOIL OR OTHER) LOAD 41 LOADTYPE None TITLE ILZ(+/-) IMPACT LOADS
*-Fluid water from soil or other ON Z
LOAD 24 LOADTYPE None TITLE HXPOS STATIC SOIL *-impact loads on Z
PRESSURE OR EMPTY WALL +X *
*-Static soil preassure in +X LOAD 42 LOADTYPE None TITLE ILY(+) IMPACT LOADS
LOAD 25 LOADTYPE None TITLE HXNEG STATIC SOIL ON Y
PRESSURE OR EMPTY WALL -X *-impact loads on Y
*-Static soil preassure in -X *
LOAD 26 LOADTYPE None TITLE HXPOS STATIC SOIL LOAD 43 LOADTYPE None TITLE VL VIBRATION
PRESSURE OR EMPTY WALL +Z *-Vibration
*-Static soil preassure in +Z *
LOAD 27 LOADTYPE None TITLE HZNEG STATIC SOIL LOAD 44 LOADTYPE None TITLE OPA IRREGULAR
PRESSURE OR EMPTY WALL -Z OPERATION LOADS
*-Static soil preassure in -Z *-Irregular operation loads
LOAD 28 LOADTYPE None TITLE FLXPOS STATIC FLUID *
PRESSURE +X ***************************************************************
*-Static fluid preassure in +X From soil or other *
LOAD 29 LOADTYPE None TITLE FLXNEG STATIC FLUID * 101 TO 999 FOR REACCTIONS & DISPLACEMENTS
PRESSURE -X * 2001 HASTA 3698 FOR STEEL ON ULTIMATE (LRFD) -
*-Static fluid preassure in -X From soil or other CTE
LOAD 30 FLZPOSLOAD 30 LOADTYPE NONE TITLE * 2001 HASTA 3698 FOR CONCRETE ON ULTIMATE -
FLZPOS STATIC FLUID PRESSURE +Z EHE - INTENSE CONTROL (PRECAST CONCRETE)
*-Static fluid preassure in +Z From soil or other * 4001 HASTA 4829 FOR STEEL ON SERVICE (ASD) -
LOAD 31 LOADTYPE None TITLE FLZNEG STATIC FLUID CTE
PRESSURE -Z * 4001 HASTA 4829 FOR CONCRETE ON SERVICE - EHE
*-Static fluid preassure in -Z From soil or other - (CRACKING)
LOAD 32 LOADTYPE None TITLE EHXPOS EMPTY WALL * 6001 HASTA 7698 FOR CONCRETE ON ULTIMATE -
VIBRATION +X EHE - REGULAR CONTROL (IN SITE CONCRETE)
*-Increase due to seismic pressure from soil or empty wall *
vibration in +X ***********************************************************************
**********
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 246 de 463
(SUBJECT) (Page)

*************************************************** LOAD COMB 2033 _: 1.35ºSD+1.35ºCM-


* 1.5ºT1+0.9ºWZPOS+1.35ºPS_1
* 2001 HASTA 3698 HORMIGON ARMADO ESTADOS 1 1.35 3 1.35 10 -1.5 16 0.9 21 1.35
LIMITES ULTIMOS - EHE - CONTROL INTENSO LOAD COMB 2034 _: 1ºSD+1ºCM-
* 1.5ºT1+0.9ºWZPOS+1ºPS_1
*************************************************** 1 1.0 3 1.0 10 -1.5 16 0.9 21 1.0
* LOAD COMB 2039 _:
* DESFAVORABLE: 1.35 APm 1.35ºSD+1.35ºCM+1.5ºT1+0.9ºWZNEG+1.35ºPS_1
* FAVORABLE: 1.00 APm 1 1.35 3 1.35 10 1.5 17 0.9 21 1.35
LOAD COMB 2001 _: 1.35ºSD+1.35ºCM+1.35ºPS_1 LOAD COMB 2040 _:
1 1.35 3 1.35 21 1.35 1ºSD+1ºCM+1.5ºT1+0.9ºWZNEG+1ºPS_1
LOAD COMB 2002 _: 1ºSD+1ºCM+1ºPS_1 1 1.0 3 1.0 10 1.5 17 0.9 21 1.0
1 1.0 3 1.0 21 1.0 LOAD COMB 2043 _: 1.35ºSD+1.35ºCM-
* 1.5ºT1+0.9ºWZNEG+1.35ºPS_1
* VARIABLE DETERMINANTE: TEMPERATURA 1 1.35 3 1.35 10 -1.5 17 0.9 21 1.35
* DESFAVORABLE: 1.35 APm +/- 1.50 T1 LOAD COMB 2044 _: 1ºSD+1ºCM-
* FAVORABLE: 1.00 APm +/- 1.50 T1 1.5ºT1+0.9ºWZNEG+1ºPS_1
LOAD COMB 2003 _: 1.35ºSD+1.35ºCM+1.5ºT1+1.35ºPS_1 1 1.0 3 1.0 10 -1.5 17 0.9 21 1.0
1 1.35 3 1.35 10 1.5 21 1.35 *
LOAD COMB 2004 _: 1ºSD+1ºCM+1.5ºT1+1ºPS_1 * VARIABLE DETERMINANTE: TEMPERATURA
1 1.0 3 1.0 10 1.5 21 1.0 * DESFAVORABLE: 1.35 APm + 1.50 T1 + 1.05 LSC
LOAD COMB 2005 _: 1.35ºSD+1.35ºCM-1.5ºT1+1.35ºPS_1 * FAVORABLE: 1.00 APm + 1.50 T1 + 1.05 LSC
1 1.35 3 1.35 10 -1.5 21 1.35 LOAD COMB 2077 _:
LOAD COMB 2006 _: 1ºSD+1ºCM-1.5ºT1+1ºPS_1 1.35ºSD+1.35ºCM+1.05ºLSC+1.5ºT1+1.35ºPS_1
1 1.0 3 1.0 10 -1.5 21 1.0 1 1.35 3 1.35 8 1.05 10 1.5 21 1.35
* LOAD COMB 2078 _: 1ºSD+1ºCM+1.05ºLSC+1.5ºT1+1ºPS_1
* VARIABLE DETERMINANTE: TEMPERATURA 1 1.0 3 1.0 8 1.05 10 1.5 21 1.0
* DESFAVORABLE: 1.35 APm +/- 1.50 T1 +/- 0.90 (WX & LOAD COMB 2081 _: 1.35ºSD+1.35ºCM+1.05ºLSC-
WZ) 1.5ºT1+1.35ºPS_1
* FAVORABLE: 1.00 APm +/- 1.50 T1 +/- 0.90 (WX & 1 1.35 3 1.35 8 1.05 10 -1.5 21 1.35
WZ) LOAD COMB 2082 _: 1ºSD+1ºCM+1.05ºLSC-1.5ºT1+1ºPS_1
LOAD COMB 2009 _: 1 1.0 3 1.0 8 1.05 10 -1.5 21 1.0
1.35ºSD+1.35ºCM+1.5ºT1+0.9ºWXPOS+1.35ºPS_1 *
1 1.35 3 1.35 10 1.5 14 0.9 21 1.35 *
LOAD COMB 2010 _: * VARIABLE DETERMINANTE: TEMPERATURA
1ºSD+1ºCM+1.5ºT1+0.9ºWXPOS+1ºPS_1 * DESFAVORABLE: 1.35 APm - 1.50 T1 +/- 1.05 LSC +
1 1.0 3 1.0 10 1.5 14 0.9 21 1.0 0.90 (WX & WZ)
LOAD COMB 2013 _: 1.35ºSD+1.35ºCM- * FAVORABLE: 1.00 APm - 1.50 T1 +/- 1.05 LSC + 0.90
1.5ºT1+0.9ºWXPOS+1.35ºPS_1 (WX & WZ)
1 1.35 3 1.35 10 -1.5 14 0.9 21 1.35 LOAD COMB 2121 _:
LOAD COMB 2014 _: 1ºSD+1ºCM- 1.35ºSD+1.35ºCM+1.05ºLSC+1.5ºT1+0.9ºWXPOS+1.35ºPS_
1.5ºT1+0.9ºWXPOS+1ºPS_1 1
1 1.0 3 1.0 10 -1.5 14 0.9 21 1.0 1 1.35 3 1.35 8 1.05 10 1.5 14 0.9 21 1.35
LOAD COMB 2019 _: LOAD COMB 2122 _:
1.35ºSD+1.35ºCM+1.5ºT1+0.9ºWXNEG+1.35ºPS_1 1ºSD+1ºCM+1.05ºLSC+1.5ºT1+0.9ºWXPOS+1ºPS_1
1 1.35 3 1.35 10 1.5 15 0.9 21 1.35 1 1.0 3 1.0 8 1.05 10 1.5 14 0.9 21 1.0
LOAD COMB 2020 _: LOAD COMB 2127 _: 1.35ºSD+1.35ºCM+1.05ºLSC-
1ºSD+1ºCM+1.5ºT1+0.9ºWXNEG+1ºPS_1 1.5ºT1+0.9ºWXPOS+1.35ºPS_1
1 1.0 3 1.0 10 1.5 15 0.9 21 1.0 1 1.35 3 1.35 8 1.05 10 -1.5 14 0.9 21 1.35
LOAD COMB 2023 _: 1.35ºSD+1.35ºCM- LOAD COMB 2128 _: 1ºSD+1ºCM+1.05ºLSC-
1.5ºT1+0.9ºWXNEG+1.35ºPS_1 1.5ºT1+0.9ºWXPOS+1ºPS_1
1 1.35 3 1.35 10 -1.5 15 0.9 21 1.35 1 1.0 3 1.0 8 1.05 10 -1.5 14 0.9 21 1.0
LOAD COMB 2024 _: 1ºSD+1ºCM- LOAD COMB 2139 _:
1.5ºT1+0.9ºWXNEG+1ºPS_1 1.35ºSD+1.35ºCM+1.05ºLSC+1.5ºT1+0.9ºWXNEG+1.35ºPS_
1 1.0 3 1.0 10 -1.5 15 0.9 21 1.0 1
LOAD COMB 2029 _: 1 1.35 3 1.35 8 1.05 10 1.5 15 0.9 21 1.35
1.35ºSD+1.35ºCM+1.5ºT1+0.9ºWZPOS+1.35ºPS_1 LOAD COMB 2140 _:
1 1.35 3 1.35 10 1.5 16 0.9 21 1.35 1ºSD+1ºCM+1.05ºLSC+1.5ºT1+0.9ºWXNEG+1ºPS_1
LOAD COMB 2030 _: 1 1.0 3 1.0 8 1.05 10 1.5 15 0.9 21 1.0
1ºSD+1ºCM+1.5ºT1+0.9ºWZPOS+1ºPS_1 LOAD COMB 2141 _:
1 1.0 3 1.0 10 1.5 16 0.9 21 1.0 1.35ºSD+1.35ºCM+1.05ºLSC+0.9ºT1+1.5ºWXNEG+1.35ºPS_
1
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 247 de 463
(SUBJECT) (Page)

1 1.35 3 1.35 8 1.05 10 0.9 15 1.5 21 1.35 LOAD COMB 2012 _:


LOAD COMB 2142 1ºSD+1ºCM+0.9ºT1+1.5ºWXPOS+1ºPS_1
_:1.0ºSD+1.35ºCM+1.05ºLSC+0.9ºT1+1.5ºWXNEG+1.35ºPS_ 1 1.0 3 1.0 10 0.9 14 1.5 21 1.0
1 LOAD COMB 2015 _: 1.35ºSD+1.35ºCM-
1 1.0 3 1.35 8 1.05 10 0.9 15 1.5 21 1.35 0.9ºT1+1.5ºWXPOS+1.35ºPS_1
LOAD COMB 2158 _: 1 1.35 3 1.35 10 -0.9 14 1.5 21 1.35
1ºSD+1ºCM+1.05ºLSC+1.5ºT1+0.9ºWZPOS+1ºPS_1 LOAD COMB 2016 _: 1ºSD+1ºCM-
1 1.0 3 1.0 8 1.05 10 1.5 16 0.9 21 1.0 0.9ºT1+1.5ºWXPOS+1ºPS_1
LOAD COMB 2163 _: 1.35ºSD+1.35ºCM+1.05ºLSC- 1 1.0 3 1.0 10 -0.9 14 1.5 21 1.0
1.5ºT1+0.9ºWZPOS+1.35ºPS_1 LOAD COMB 2021 _:
1 1.35 3 1.35 8 1.05 10 -1.5 16 0.9 21 1.35 1.35ºSD+1.35ºCM+0.9ºT1+1.5ºWXNEG+1.35ºPS_1
LOAD COMB 2164 _: 1ºSD+1ºCM+1.05ºLSC- 1 1.35 3 1.35 10 0.9 15 1.5 21 1.35
1.5ºT1+0.9ºWZPOS+1ºPS_1 LOAD COMB 2022 _:
1 1.0 3 1.0 8 1.05 10 -1.5 16 0.9 21 1.0 1ºSD+1ºCM+0.9ºT1+1.5ºWXNEG+1ºPS_1
LOAD COMB 2175 _: 1 1.0 3 1.0 10 0.9 15 1.5 21 1.0
1.35ºSD+1.35ºCM+1.05ºLSC+1.5ºT1+0.9ºWZNEG+1.35ºPS_ LOAD COMB 2025 _: 1.35ºSD+1.35ºCM-
1 0.9ºT1+1.5ºWXNEG+1.35ºPS_1
1 1.35 3 1.35 8 1.05 10 1.5 17 0.9 21 1.35 1 1.35 3 1.35 10 -0.9 15 1.5 21 1.35
LOAD COMB 2176 _: LOAD COMB 2026 _: 1ºSD+1ºCM-
1ºSD+1ºCM+1.05ºLSC+1.5ºT1+0.9ºWZNEG+1ºPS_1 0.9ºT1+1.5ºWXNEG+1ºPS_1
1 1.0 3 1.0 8 1.05 10 1.5 17 0.9 21 1.0 1 1.0 3 1.0 10 -0.9 15 1.5 21 1.0
LOAD COMB 2181 _: 1.35ºSD+1.35ºCM+1.05ºLSC- LOAD COMB 2031 _:
1.5ºT1+0.9ºWZNEG+1.35ºPS_1 1.35ºSD+1.35ºCM+0.9ºT1+1.5ºWZPOS+1.35ºPS_1
1 1.35 3 1.35 8 1.05 10 -1.5 17 0.9 21 1.35 1 1.35 3 1.35 10 0.9 16 1.5 21 1.35
LOAD COMB 2182 _: 1ºSD+1ºCM+1.05ºLSC- LOAD COMB 2032 _:
1.5ºT1+0.9ºWZNEG+1ºPS_1 1ºSD+1ºCM+0.9ºT1+1.5ºWZPOS+1ºPS_1
1 1.0 3 1.0 8 1.05 10 -1.5 17 0.9 21 1.0 1 1.0 3 1.0 10 0.9 16 1.5 21 1.0
* LOAD COMB 2035 _: 1.35ºSD+1.35ºCM-
* 0.9ºT1+1.5ºWZPOS+1.35ºPS_1
* VARIABLE DETERMINANTE: VIENTO 1 1.35 3 1.35 10 -0.9 16 1.5 21 1.35
* DESFAVORABLE: 1.35 APm +/- 1.50 (WX & WZ) LOAD COMB 2036 _: 1ºSD+1ºCM-
* FAVORABLE: 1.00 APm +/- 1.50 WX & WZ) 0.9ºT1+1.5ºWZPOS+1ºPS_1
LOAD COMB 2007 _: 1 1.0 3 1.0 10 -0.9 16 1.5 21 1.0
1.35ºSD+1.35ºCM+1.5ºWXPOS+1.35ºPS_1 LOAD COMB 2041 _:
1 1.35 3 1.35 14 1.5 21 1.35 1.35ºSD+1.35ºCM+0.9ºT1+1.5ºWZNEG+1.35ºPS_1
LOAD COMB 2008 _: 1ºSD+1ºCM+1.5ºWXPOS+1ºPS_1 1 1.35 3 1.35 10 0.9 17 1.5 21 1.35
1 1.0 3 1.0 14 1.5 21 1.0 LOAD COMB 2042 _:
LOAD COMB 2017 _: 1ºSD+1ºCM+0.9ºT1+1.5ºWZNEG+1ºPS_1
1.35ºSD+1.35ºCM+1.5ºWXNEG+1.35ºPS_1 1 1.0 3 1.0 10 0.9 17 1.5 21 1.0
1 1.35 3 1.35 15 1.5 21 1.35 LOAD COMB 2045 _: 1.35ºSD+1.35ºCM-0.9ºT1+1.5ºWZNEG
LOAD COMB 2018 _: 1ºSD+1ºCM+1.5ºWXNEG+1ºPS_1 1 1.35 3 1.35 10 -0.9 17 1.5
1 1.0 3 1.0 15 1.5 21 1.0 LOAD COMB 2046 _: 1ºSD+1ºCM-0.9ºT1+1.5ºWZNEG
LOAD COMB 2027 _: 1 1.0 3 1.0 10 -0.9 17 1.5
1.35ºSD+1.35ºCM+1.5ºWZPOS+1.35ºPS_1 *
1 1.35 3 1.35 16 1.5 21 1.35 *
LOAD COMB 2028 _: 1ºSD+1ºCM+1.5ºWZPOS+1ºPS_1 * VARIABLE DETERMINANTE: VIENTO
1 1.0 3 1.0 16 1.5 21 1.0 * DESFAVORABLE: 1.35 APm +/- 1.50 (WX & WZ) + 1.05
LOAD COMB 2037 _: LSC
1.35ºSD+1.35ºCM+1.5ºWZNEG+1.35ºPS_1 * FAVORABLE: 1.00 APm +/- 1.50 (WX & WZ) + 1.05
1 1.35 3 1.35 17 1.5 21 1.35 LSC
LOAD COMB 2038 _: 1ºSD+1ºCM+1.5ºWZNEG+1ºPS_1 LOAD COMB 2089 _:
1 1.0 3 1.0 17 1.5 21 1.0 1.35ºSD+1.35ºCM+1.05ºLSC+1.5ºWXPOS+1.35ºPS_1
* 1 1.35 3 1.35 8 1.05 14 1.5 21 1.35
* VARIABLE DETERMINANTE: VIENTO LOAD COMB 2090 _:
* DESFAVORABLE: 1.35 APm +/- 1.50 (WX & WZ) +/- 1ºSD+1ºCM+1.05ºLSC+1.5ºWXPOS+1ºPS_1
0.90 T1 1 1.0 3 1.0 8 1.05 14 1.5 21 1.0
* FAVORABLE: 1.00 APm +/- 1.50 (WX & WZ) +/- 0.90 LOAD COMB 2097 _:
T1 1.35ºSD+1.35ºCM+1.05ºLSC+1.5ºWXNEG+1.35ºPS_1
LOAD COMB 2011 _: 1 1.35 3 1.35 8 1.05 15 1.5 21 1.35
1.35ºSD+1.35ºCM+0.9ºT1+1.5ºWXPOS+1.35ºPS_1 LOAD COMB 2098 _:
1 1.35 3 1.35 10 0.9 14 1.5 21 1.35 1ºSD+1ºCM+1.05ºLSC+1.5ºWXNEG+1ºPS_1
1 1.0 3 1.0 8 1.05 15 1.5 21 1.0
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 248 de 463
(SUBJECT) (Page)

LOAD COMB 2105 _: 1 1.35 3 1.35 8 1.5 21 1.35


1.35ºSD+1.35ºCM+1.05ºLSC+1.5ºWZPOS+1.35ºPS_1 LOAD COMB 2072 _: 1ºSD+1ºCM+1.5ºLSC+1ºPS_1
1 1.35 3 1.35 8 1.05 16 1.5 21 1.35 1 1.0 3 1.0 8 1.5 21 1.0
LOAD COMB 2106 _: *
1ºSD+1ºCM+1.05ºLSC+1.5ºWZPOS+1ºPS_1 * VARIABLE DETERMINANTE: SOBRECARGA LSC
1 1.0 3 1.0 8 1.05 16 1.5 21 1.0 * DESFAVORABLE: 1.35 APm + 1.50 LSC +/- 0.9 T1
LOAD COMB 2113 _: * FAVORABLE: 1.00 APm + 1.50 LSC +/- 0.9 T1
1.35ºSD+1.35ºCM+1.05ºLSC+1.5ºWZNEG+1.35ºPS_1 LOAD COMB 2075 _:
1 1.35 3 1.35 8 1.05 17 1.5 21 1.35 1.35ºSD+1.35ºCM+1.5ºLSC+0.9ºT1+1.35ºPS_1
LOAD COMB 2114 _: 1 1.35 3 1.35 8 1.5 10 0.9 21 1.35
1ºSD+1ºCM+1.05ºLSC+1.5ºWZNEG+1ºPS_1 LOAD COMB 2076 _: 1ºSD+1ºCM+1.5ºLSC+0.9ºT1+1ºPS_1
1 1.0 3 1.0 8 1.05 17 1.5 21 1.0 1 1.0 3 1.0 8 1.5 10 0.9 21 1.0
* LOAD COMB 2079 _: 1.35ºSD+1.35ºCM+1.5ºLSC-
* 0.9ºT1+1.35ºPS_1
* VARIABLE DETERMINANTE: VIENTO 1 1.35 3 1.35 8 1.5 10 -0.9 21 1.35
* DESFAVORABLE: 1.35 APm +/- 1.50 (WX & WZ) + 1.05 LOAD COMB 2080 _: 1ºSD+1ºCM+1.5ºLSC-0.9ºT1+1ºPS_1
LSC + 0.90 T1 1 1.0 3 1.0 8 1.5 10 -0.9 21 1.0
* FAVORABLE: 1.00 APm +/- 1.50 (WX & WZ) + 1.05 *
LSC + 0.90 T1 *
LOAD COMB 2129 _: 1.35ºSD+1.35ºCM+1.05ºLSC- * VARIABLE DETERMINANTE: SOBRECARGA LSC
0.9ºT1+1.5ºWXPOS+1.35ºPS_1 * DESFAVORABLE: 1.35 APm + 1.50 LSC +/- 0.90 (WX &
1 1.35 3 1.35 8 1.05 10 -0.9 14 1.5 21 1.35 WZ)
LOAD COMB 2130 _: 1ºSD+1ºCM+1.05ºLSC- * FAVORABLE: 1.00 APm + 1.50 LSC +/- 0.90 (WX &
0.9ºT1+1.5ºWXPOS+1ºPS_1 WZ)
1 1.0 3 1.0 8 1.05 10 -0.9 14 1.5 21 1.0 LOAD COMB 2087 _:
LOAD COMB 2147 _: 1.35ºSD+1.35ºCM+1.05ºLSC- 1.35ºSD+1.35ºCM+1.5ºLSC+0.9ºWXPOS+1.35ºPS_1
0.9ºT1+1.5ºWXNEG+1.35ºPS_1 1 1.35 3 1.35 8 1.5 14 0.9 21 1.35
1 1.35 3 1.35 8 1.05 10 -0.9 15 1.5 21 1.35 LOAD COMB 2088 _:
LOAD COMB 2148 _: 1ºSD+1ºCM+1.05ºLSC- 1ºSD+1ºCM+1.5ºLSC+0.9ºWXPOS+1ºPS_1
0.9ºT1+1.5ºWXNEG+1ºPS_1 1 1.0 3 1.0 8 1.5 14 0.9 21 1.0
1 1.0 3 1.0 8 1.05 10 -0.9 15 1.5 21 1.0 LOAD COMB 2091 _:
LOAD COMB 2159 _: 1.35ºSD+1.35ºCM+1.5ºLSC+0.9ºSL+0.9ºWXPOS+1.35ºPS_1
1.35ºSD+1.35ºCM+1.05ºLSC+0.9ºT1+1.5ºWZPOS+1.35ºPS_ 1 1.35 3 1.35 8 1.5 9 0.9 14 0.9 21 1.35
1 LOAD COMB 2092 _:
1 1.35 3 1.35 8 1.05 10 0.9 16 1.5 21 1.35 1ºSD+1ºCM+1.5ºLSC+0.9ºSL+0.9ºWXPOS+1ºPS_1
LOAD COMB 2160 _: 1 1.0 3 1.0 8 1.5 9 0.9 14 0.9 21 1.0
1ºSD+1ºCM+1.05ºLSC+0.9ºT1+1.5ºWZPOS+1ºPS_1 LOAD COMB 2095 _:
1 1.0 3 1.0 8 1.05 10 0.9 16 1.5 21 1.0 1.35ºSD+1.35ºCM+1.5ºLSC+0.9ºWXNEG+1.35ºPS_1
LOAD COMB 2165 _: 1.35ºSD+1.35ºCM+1.05ºLSC- 1 1.35 3 1.35 8 1.5 15 0.9 21 1.35
0.9ºT1+1.5ºWZPOS+1.35ºPS_1 LOAD COMB 2096 _:
1 1.35 3 1.35 8 1.05 10 -0.9 16 1.5 21 1.35 1ºSD+1ºCM+1.5ºLSC+0.9ºWXNEG+1ºPS_1
LOAD COMB 2166 _: 1ºSD+1ºCM+1.05ºLSC- 1 1.0 3 1.0 8 1.5 15 0.9 21 1.0
0.9ºT1+1.5ºWZPOS+1ºPS_1 LOAD COMB 2103 _:
1 1.0 3 1.0 8 1.05 10 -0.9 16 1.5 21 1.0 1.35ºSD+1.35ºCM+1.5ºLSC+0.9ºWZPOS+1.35ºPS_1
LOAD COMB 2177 _: 1 1.35 3 1.35 8 1.5 16 0.9 21 1.35
1.35ºSD+1.35ºCM+1.05ºLSC+0.9ºT1+1.5ºWZNEG+1.35ºPS_ LOAD COMB 2104 _:
1 1ºSD+1ºCM+1.5ºLSC+0.9ºWZPOS+1ºPS_1
1 1.35 3 1.35 8 1.05 10 0.9 17 1.5 21 1.35 1 1.0 3 1.0 8 1.5 16 0.9 21 1.0
LOAD COMB 2178 _: LOAD COMB 2111 _:
1ºSD+1ºCM+1.05ºLSC+0.9ºT1+1.5ºWZNEG+1ºPS_1 1.35ºSD+1.35ºCM+1.5ºLSC+0.9ºWZNEG+1.35ºPS_1
1 1.0 3 1.0 8 1.05 10 0.9 17 1.5 21 1.0 1 1.35 3 1.35 8 1.5 17 0.9 21 1.35
LOAD COMB 2183 _: 1.35ºSD+1.35ºCM+1.05ºLSC- LOAD COMB 2112 _:
0.9ºT1+1.5ºWZNEG+1.35ºPS_1 1ºSD+1ºCM+1.5ºLSC+0.9ºWZNEG+1ºPS_1
1 1.35 3 1.35 8 1.05 10 -0.9 17 1.5 21 1.35 1 1.0 3 1.0 8 1.5 17 0.9 21 1.0
LOAD COMB 2184 _: 1ºSD+1ºCM+1.05ºLSC- *
0.9ºT1+1.5ºWZNEG+1ºPS_1 * FAVORABLE: 1.00 APm + 1.50 LSC + 0.9(WX & WZ)
1 1.0 3 1.0 8 1.05 10 -0.9 17 1.5 21 1.0 + 0.90 T1
* LOAD COMB 2119 _:
* VARIABLE DETERMINANTE: SOBRECARGA LSC 1.35ºSD+1.35ºCM+1.5ºLSC+0.9ºT1+0.9ºWXPOS+1.35ºPS_1
* DESFAVORABLE: 1.35 APm + 1.50 LSC 1 1.35 3 1.35 8 1.5 10 0.9 14 0.9 21 1.35
* FAVORABLE: 1.00 APm + 1.50 LSC LOAD COMB 2120 _:
LOAD COMB 2071 _: 1.35ºSD+1.35ºCM+1.5ºLSC+1.35ºPS_1 1ºSD+1ºCM+1.5ºLSC+0.9ºT1+0.9ºWXPOS+1ºPS_1
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 249 de 463
(SUBJECT) (Page)

1 1.0 3 1.0 8 1.5 10 0.9 14 0.9 21 1.0 LOAD COMB 2167 _: 1.35ºSD+1.35ºCM+1.5ºLSC+0.9ºSL-
LOAD COMB 2125 _: 1.35ºSD+1.35ºCM+1.5ºLSC- 0.9ºT1+0.9ºWZPOS+1.35ºPS_1
0.9ºT1+0.9ºWXPOS+1.35ºPS_1 1 1.35 3 1.35 8 1.5 9 0.9 10 -0.9 16 0.9 21 1.35
1 1.35 3 1.35 8 1.5 10 -0.9 14 0.9 21 1.35 LOAD COMB 2168 _: 1ºSD+1ºCM+1.5ºLSC+0.9ºSL-
LOAD COMB 2126 _: 1ºSD+1ºCM+1.5ºLSC- 0.9ºT1+0.9ºWZPOS+1ºPS_1
0.9ºT1+0.9ºWXPOS+1ºPS_1 1 1.0 3 1.0 8 1.5 9 0.9 10 -0.9 16 0.9 21 1.0
1 1.0 3 1.0 8 1.5 10 -0.9 14 0.9 21 1.0 LOAD COMB 2185 _: 1.35ºSD+1.35ºCM+1.5ºLSC+0.9ºSL-
LOAD COMB 2137 _: 0.9ºT1+0.9ºWZNEG+1.35ºPS_1
1.35ºSD+1.35ºCM+1.5ºLSC+0.9ºT1+0.9ºWXNEG+1.35ºPS_1 1 1.35 3 1.35 8 1.5 9 0.9 10 -0.9 17 0.9 21 1.35
1 1.35 3 1.35 8 1.5 10 0.9 15 0.9 21 1.35 LOAD COMB 2186 _: 1ºSD+1ºCM+1.5ºLSC+0.9ºSL-
LOAD COMB 2138 _: 0.9ºT1+0.9ºWZNEG+1ºPS_1
1ºSD+1ºCM+1.5ºLSC+0.9ºT1+0.9ºWXNEG+1ºPS_1 1 1.0 3 1.0 8 1.5 9 0.9 10 -0.9 17 0.9 21 1.0
1 1.0 3 1.0 8 1.5 10 0.9 15 0.9 21 1.0 *
LOAD COMB 2143 _: 1.35ºSD+1.35ºCM+1.5ºLSC- *
0.9ºT1+0.9ºWXNEG+1.35ºPS_1 * 1.3.- SITUACIONES SISMICAS
1 1.35 3 1.35 8 1.5 10 -0.9 15 0.9 21 1.35 * --------------------
LOAD COMB 2144 _: 1ºSD+1ºCM+1.5ºLSC- * 1.0 APm +/- 1.0 EX +/- 0.3 EZ
0.9ºT1+0.9ºWXNEG+1ºPS_1 LOAD COMB 2199 _: 1ºSD+1ºCM+1ºEX+0.3ºEZ+1ºPS_1
1 1.0 3 1.0 8 1.5 10 -0.9 15 0.9 21 1.0 1 1.0 3 1.0 18 1.0 19 0.3 21 1.0
LOAD COMB 2155 _: LOAD COMB 2200 _: 1ºSD+1ºCM+1ºEX-0.3ºEZ+1ºPS_1
1.35ºSD+1.35ºCM+1.5ºLSC+0.9ºT1+0.9ºWZPOS+1.35ºPS_1 1 1.0 3 1.0 18 1.0 19 -0.3 21 1.0
1 1.35 3 1.35 8 1.5 10 0.9 16 0.9 21 1.35 LOAD COMB 2201 _: 1ºSD+1ºCM-1ºEX+0.3ºEZ+1ºPS_1
LOAD COMB 2156 _: 1 1.0 3 1.0 18 -1.0 19 0.3 21 1.0
1ºSD+1ºCM+1.5ºLSC+0.9ºT1+0.9ºWZPOS+1ºPS_1 LOAD COMB 2202 _: 1ºSD+1ºCM-1ºEX-0.3ºEZ+1ºPS_1
1 1.0 3 1.0 8 1.5 10 0.9 16 0.9 21 1.0 1 1.0 3 1.0 18 -1.0 19 -0.3 21 1.0
LOAD COMB 2161 _: 1.35ºSD+1.35ºCM+1.5ºLSC- *
0.9ºT1+0.9ºWZPOS+1.35ºPS_1 * 1.0 APm +/- 0.3 EX +/- 0.3 EZ
1 1.35 3 1.35 8 1.5 10 -0.9 16 0.9 21 1.35 LOAD COMB 2203 _: 1ºSD+1ºCM+0.3ºEX+0.3ºEZ+1ºPS_1
LOAD COMB 2162 _: 1ºSD+1ºCM+1.5ºLSC- 1 1.0 3 1.0 18 0.3 19 0.3 21 1.0
0.9ºT1+0.9ºWZPOS+1ºPS_1 LOAD COMB 2204 _: 1ºSD+1ºCM+0.3ºEX-0.3ºEZ+1ºPS_1
1 1.0 3 1.0 8 1.5 10 -0.9 16 0.9 21 1.0 1 1.0 3 1.0 18 0.3 19 -0.3 21 1.0
LOAD COMB 2173 _: LOAD COMB 2205 _: 1ºSD+1ºCM-0.3ºEX+0.3ºEZ+1ºPS_1
1.35ºSD+1.35ºCM+1.5ºLSC+0.9ºT1+0.9ºWZNEG+1.35ºPS_1 1 1.0 3 1.0 18 -0.3 19 0.3 21 1.0
1 1.35 3 1.35 8 1.5 10 0.9 17 0.9 21 1.35 LOAD COMB 2206 _: 1ºSD+1ºCM-0.3ºEX-0.3ºEZ+1ºPS_1
LOAD COMB 2174 _: 1 1.0 3 1.0 18 -0.3 19 -0.3 21 1.0
1ºSD+1ºCM+1.5ºLSC+0.9ºT1+0.9ºWZNEG+1ºPS_1 *
1 1.0 3 1.0 8 1.5 10 0.9 17 0.9 21 1.0 * 1.0 APm + 0.30 LSC +/- 1.0 EX +/- 0.3 EZ
LOAD COMB 2179 _: 1.35ºSD+1.35ºCM+1.5ºLSC- LOAD COMB 2191 _:
0.9ºT1+0.9ºWZNEG+1.35ºPS_1 1ºSD+1ºCM+0.3ºLSC+1ºEX+0.3ºEZ+1ºPS_1
1 1.35 3 1.35 8 1.5 10 -0.9 17 0.9 21 1.35 1 1.0 3 1.0 8 0.3 18 1.0 19 0.3 21 1.0
LOAD COMB 2180 _: 1ºSD+1ºCM+1.5ºLSC- LOAD COMB 2192 _: 1ºSD+1ºCM+0.3ºLSC-1ºEX-
0.9ºT1+0.9ºWZNEG+1ºPS_1 0.3ºEZ+1ºPS_1
1 1.0 3 1.0 8 1.5 10 -0.9 17 0.9 21 1.0 1 1.0 3 1.0 8 0.3 18 1.0 19 -0.3 21 -1.0
* LOAD COMB 2193 _: 1ºSD+1ºCM+0.3ºLSC+1ºEX-
* VARIABLE DETERMINANTE: SOBRECARGA LSC 0.3ºEZ+1ºPS_1
* DESFAVORABLE: 1.35 APm + 1.50 LSC + 0.9(WX & 1 1.0 3 1.0 8 0.3 18 -1.0 19 0.3 21 -1.0
WZ) + 0.90 SL + 0.90 T1 LOAD COMB 2194 _: 1ºSD+1ºCM+0.3ºLSC-
* FAVORABLE: 1.00 APm + 1.50 LSC + 0.9(WX & WZ) 1ºEX+0.3ºEZ+1ºPS_1
+ 0.90 SL + 0.90 T1 1 1.0 3 1.0 8 0.3 18 -1.0 19 -0.3 21 1.0
LOAD COMB 2131 _: 1.35ºSD+1.35ºCM+1.5ºLSC+0.9ºSL- *
0.9ºT1+0.9ºWXPOS+1.35ºPS_1 * 1.0 APm + 0.30 LSC +/- 0.3 EX +/- 0.3 EZ
1 1.35 3 1.35 8 1.5 9 0.9 10 -0.9 14 0.9 21 1.35 LOAD COMB 2195 _:
LOAD COMB 2132 _: 1ºSD+1ºCM+1.5ºLSC+0.9ºSL- 1ºSD+1ºCM+0.3ºLSC+0.3ºEX+0.3ºEZ+1ºPS_1
0.9ºT1+0.9ºWXPOS+1ºPS_1 1 1.0 3 1.0 8 0.3 18 0.3 19 0.3 21 1.0
1 1.0 3 1.0 8 1.5 9 0.9 10 -0.9 14 0.9 21 1.0 LOAD COMB 2196 _: 1ºSD+1ºCM+0.3ºLSC-0.3ºEX-
LOAD COMB 2149 _: 1.35ºSD+1.35ºCM+1.5ºLSC+0.9ºSL- 0.3ºEZ+1ºPS_1
0.9ºT1+0.9ºWXNEG+1.35ºPS_1 1 1.0 3 1.0 8 0.3 18 0.3 19 -0.3 21 -1.0
1 1.35 3 1.35 8 1.5 9 0.9 10 -0.9 15 0.9 21 1.35 LOAD COMB 2197 _: 1ºSD+1ºCM+0.3ºLSC+0.3ºEX-
LOAD COMB 2150 _: 1ºSD+1ºCM+1.5ºLSC+0.9ºSL- 0.3ºEZ+1ºPS_1
0.9ºT1+0.9ºWXNEG+1ºPS_1 1 1.0 3 1.0 8 0.3 18 -0.3 19 0.3 21 -1.0
1 1.0 3 1.0 8 1.5 9 0.9 10 -0.9 15 0.9 21 1.0 LOAD COMB 2198 _: 1ºSD+1ºCM+0.3ºLSC-
0.3ºEX+0.3ºEZ+1ºPS_1
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 250 de 463
(SUBJECT) (Page)

1 1.0 3 1.0 8 0.3 18 -0.3 19 -0.3 21 1.0 LOAD COMB 2248 _:


* 1ºSD+1ºCM+1ºPA+1.5ºT1+0.45ºWZNEG+1ºPS_1
LOAD COMB 2207 _: 1.35ºSD+1.35ºCM+1.35ºPA+1.35ºPS_1 1 1.0 3 1.0 4 1.0 10 1.5 17 0.45 21 1.0
1 1.35 3 1.35 4 1.35 21 1.35 LOAD COMB 2251 _: 1.35ºSD+1.35ºCM+1.35ºPA-
LOAD COMB 2208 _: 1ºSD+1ºCM+1ºPA+1ºPS_1 1.5ºT1+0.45ºWZNEG+1.35ºPS_1
1 1.0 3 1.0 4 1.0 21 1.0 1 1.35 3 1.35 4 1.35 10 -1.5 17 0.45 21 1.35
* LOAD COMB 2252 _: 1ºSD+1ºCM+1ºPA-
* 1.5ºT1+0.45ºWZNEG+1ºPS_1
LOAD COMB 2209 _: 1 1.0 3 1.0 4 1.0 10 -1.5 17 0.45 21 1.0
1.35ºSD+1.35ºCM+1.35ºPA+1.5ºT1+1.35ºPS_1 *
1 1.35 3 1.35 4 1.35 10 1.5 21 1.35 * VARIABLE DETERMINANTE: TEMPERATURA
LOAD COMB 2210 _: 1ºSD+1ºCM+1ºPA+1.5ºT1+1ºPS_1 * DESFAVORABLE: 1.35 APP + 1.50 T1 + 1.05 (LSC+LP)
1 1.0 3 1.0 4 1.0 10 1.5 21 1.0 * FAVORABLE: 1.00 APP + 1.50 T1 + 1.05 (LSC+LP)
LOAD COMB 2211 _: 1.35ºSD+1.35ºCM+1.35ºPA- LOAD COMB 2289 _:
1.5ºT1+1.35ºPS_1 1.35ºSD+1.35ºCM+1.35ºPA+1.05ºLP+1.05ºLSC-
1 1.35 3 1.35 4 1.35 10 -1.5 21 1.35 1.5ºT1+1.35ºPS_1
LOAD COMB 2212 _: 1ºSD+1ºCM+1ºPA-1.5ºT1+1ºPS_1 1 1.35 3 1.35 4 1.35 5 1.05 8 1.05 10 -1.5 21 1.35
1 1.0 3 1.0 4 1.0 10 -1.5 21 1.0 LOAD COMB 2290 _: 1ºSD+1ºCM+1ºPA+1.05ºLP+1.05ºLSC-
* 1.5ºT1+1ºPS_1
LOAD COMB 2215 _: 1 1.0 3 1.0 4 1.0 5 1.05 8 1.05 10 -1.5 21 1.0
1.35ºSD+1.35ºCM+1.35ºPA+1.5ºT1+0.45ºWXPOS+1.35ºPS_ *
1 * VARIABLE DETERMINANTE: TEMPERATURA
1 1.35 3 1.35 4 1.35 10 1.5 14 0.45 21 1.35 * DESFAVORABLE: 1.35 APP + 1.50 T1 + 1.05 (LSC+LP)
LOAD COMB 2216 _: + 0.45 (WX & WZ)
1ºSD+1ºCM+1ºPA+1.5ºT1+0.45ºWXPOS+1ºPS_1 * FAVORABLE: 1.00 APP + 1.50 T1 + 1.05 (LSC+LP) +
1 1.0 3 1.0 4 1.0 10 1.5 14 0.45 21 1.0 0.45 (WX & WZ)
LOAD COMB 2219 _: 1.35ºSD+1.35ºCM+1.35ºPA- *1.35ºSD+1.35ºCM+1.35ºPA+1.05ºLP+1.05ºLSC+1.5ºT1+0.4
1.5ºT1+0.45ºWXPOS+1.35ºPS_1 5ºWXPOS+1.35ºPS_1
1 1.35 3 1.35 4 1.35 10 -1.5 14 0.45 21 1.35 LOAD COMB 2329 _:
LOAD COMB 2220 _: 1ºSD+1ºCM+1ºPA- 1 1.35 3 1.35 4 1.35 5 1.05 8 1.05 10 1.5 14 0.45 21 1.35
1.5ºT1+0.45ºWXPOS+1ºPS_1 *1ºSD+1ºCM+1ºPA+1.05ºLP+1.05ºLSC+1.5ºT1+0.45ºWXPOS
1 1.0 3 1.0 4 1.0 10 -1.5 14 0.45 21 1.0 +1ºPS_1
LOAD COMB 2227 _: LOAD COMB 2330 _:
1.35ºSD+1.35ºCM+1.35ºPA+1.5ºT1+0.45ºWXNEG+1.35ºPS_ 1 1.0 3 1.0 4 1.0 5 1.05 8 1.05 10 1.5 14 0.45 21 1.0
1 *1.35ºSD+1.35ºCM+1.35ºPA+1.05ºLP+1.05ºLSC-
1 1.35 3 1.35 4 1.35 10 1.5 15 0.45 21 1.35 1.5ºT1+0.45ºWXPOS+1.35ºPS_1
LOAD COMB 2228 _: LOAD COMB 2335 _:
1ºSD+1ºCM+1ºPA+1.5ºT1+0.45ºWXNEG+1ºPS_1 1 1.35 3 1.35 4 1.35 5 1.05 8 1.05 10 -1.5 14 0.45 21 1.35
1 1.0 3 1.0 4 1.0 10 1.5 15 0.45 21 1.0 *1ºSD+1ºCM+1ºPA+1.05ºLP+1.05ºLSC-
LOAD COMB 2231 _: 1.35ºSD+1.35ºCM+1.35ºPA- 1.5ºT1+0.45ºWXPOS+1ºPS_1
1.5ºT1+0.45ºWXNEG+1.35ºPS_1 LOAD COMB 2336 _:
1 1.35 3 1.35 4 1.35 10 -1.5 15 0.45 21 1.35 1 1.0 3 1.0 4 1.0 5 1.05 8 1.05 10 -1.5 14 0.45 21 1.0
LOAD COMB 2232 _: 1ºSD+1ºCM+1ºPA- *1.35ºSD+1.35ºCM+1.35ºPA+1.05ºLP+1.05ºLSC+1.5ºT1+0.4
1.5ºT1+0.45ºWXNEG+1ºPS_1 5ºWXNEG+1.35ºPS_1
1 1.0 3 1.0 4 1.0 10 -1.5 15 0.45 21 1.0 LOAD COMB 2347 _:
LOAD COMB 2237 _: 1 1.35 3 1.35 4 1.35 5 1.05 8 1.05 10 1.5 15 0.45 21 1.35
1.35ºSD+1.35ºCM+1.35ºPA+1.5ºT1+0.45ºWZPOS+1.35ºPS_ *1ºSD+1ºCM+1ºPA+1.05ºLP+1.05ºLSC+1.5ºT1+0.45ºWXNEG
1 +1ºPS_1
1 1.35 3 1.35 4 1.35 10 1.5 16 0.45 21 1.35 LOAD COMB 2348 _:
LOAD COMB 2238 _: 1 1.0 3 1.0 4 1.0 5 1.05 8 1.05 10 1.5 15 0.45 21 1.0
1ºSD+1ºCM+1ºPA+1.5ºT1+0.45ºWZPOS+1ºPS_1 *1.35ºSD+1.35ºCM+1.35ºPA+1.05ºLP+1.05ºLSC-
1 1.0 3 1.0 4 1.0 10 1.5 16 0.45 21 1.0 1.5ºT1+0.45ºWXNEG+1.35ºPS_1
LOAD COMB 2241 _: 1.35ºSD+1.35ºCM+1.35ºPA- LOAD COMB 2353 _:
1.5ºT1+0.45ºWZPOS+1.35ºPS_1 1 1.35 3 1.35 4 1.35 5 1.05 8 1.05 10 -1.5 15 0.45 21 1.35
1 1.35 3 1.35 4 1.35 10 -1.5 16 0.45 21 1.35 *1ºSD+1ºCM+1ºPA+1.05ºLP+1.05ºLSC-
LOAD COMB 2242 _: 1ºSD+1ºCM+1ºPA- 1.5ºT1+0.45ºWXNEG+1ºPS_1
1.5ºT1+0.45ºWZPOS+1ºPS_1 LOAD COMB 2354 _:
1 1.0 3 1.0 4 1.0 10 -1.5 16 0.45 21 1.0 1 1.0 3 1.0 4 1.0 5 1.05 8 1.05 10 -1.5 15 0.45 21 1.0
LOAD COMB 2247 _: *1.35ºSD+1.35ºCM+1.35ºPA+1.05ºLP+1.05ºLSC+1.5ºT1+0.4
1.35ºSD+1.35ºCM+1.35ºPA+1.5ºT1+0.45ºWZNEG+1.35ºPS_ 5ºWZPOS+1.35ºPS_1
1 LOAD COMB 2365 _:
1 1.35 3 1.35 4 1.35 10 1.5 17 0.45 21 1.35 1 1.35 3 1.35 4 1.35 5 1.05 8 1.05 10 1.5 16 0.45 21 1.35
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 251 de 463
(SUBJECT) (Page)

*1ºSD+1ºCM+1ºPA+1.05ºLP+1.05ºLSC+1.5ºT1+0.45ºWZPOS 1 1.35 3 1.35 4 1.35 16 0.75 21 1.35


+1ºPS_1 LOAD COMB 2236 _:
LOAD COMB 2366 _: 1ºSD+1ºCM+1ºPA+0.75ºWZPOS+1ºPS_1
1 1.0 3 1.0 4 1.0 5 1.05 8 1.05 10 1.5 16 0.45 21 1.0 1 1.0 3 1.0 4 1.0 16 0.75 21 1.0
*1.35ºSD+1.35ºCM+1.35ºPA+1.05ºLP+1.05ºLSC- *
1.5ºT1+0.45ºWZPOS+1.35ºPS_1 * VARIABLE DETERMINANTE: VIENTO
LOAD COMB 2371 _: * DESFAVORABLE: 1.35 APP +/- 0.75 (WX & WZ) + 0.9
1 1.35 3 1.35 4 1.35 5 1.05 8 1.05 10 -1.5 16 0.45 21 1.35 T1
*1ºSD+1ºCM+1ºPA+1.05ºLP+1.05ºLSC- * FAVORABLE: 1.00 APP +/- 0.75 (WX & WZ) + 0.9 T1
1.5ºT1+0.45ºWZPOS+1ºPS_1 LOAD COMB 2217 _:
LOAD COMB 2372 _: 1.35ºSD+1.35ºCM+1.35ºPA+0.9ºT1+0.75ºWXPOS+1.35ºPS_
1 1.0 3 1.0 4 1.0 5 1.05 8 1.05 10 -1.5 16 0.45 21 1.0 1
*1.35ºSD+1.35ºCM+1.35ºPA+1.05ºLP+1.05ºLSC+1.5ºT1+0.4 1 1.35 3 1.35 4 1.35 10 0.9 14 0.75 21 1.35
5ºWZNEG+1.35ºPS_1 LOAD COMB 2218 _:
LOAD COMB 2383 _: 1ºSD+1ºCM+1ºPA+0.9ºT1+0.75ºWXPOS+1ºPS_1
1 1.35 3 1.35 4 1.35 5 1.05 8 1.05 10 1.5 17 0.45 21 1.35 1 1.0 3 1.0 4 1.0 10 0.9 14 0.75 21 1.0
*1ºSD+1ºCM+1ºPA+1.05ºLP+1.05ºLSC+1.5ºT1+0.45ºWZNEG LOAD COMB 2221 _: 1.35ºSD+1.35ºCM+1.35ºPA-
+1ºPS_1 0.9ºT1+0.75ºWXPOS+1.35ºPS_1
LOAD COMB 2384 _: 1 1.35 3 1.35 4 1.35 10 -0.9 14 0.75 21 1.35
1 1.0 3 1.0 4 1.0 5 1.05 8 1.05 10 1.5 17 0.45 21 1.0 LOAD COMB 2222 _: 1ºSD+1ºCM+1ºPA-
*1.35ºSD+1.35ºCM+1.35ºPA+1.05ºLP+1.05ºLSC- 0.9ºT1+0.75ºWXPOS+1ºPS_1
1.5ºT1+0.45ºWZNEG+1.35ºPS_1 1 1.0 3 1.0 4 1.0 10 -0.9 14 0.75 21 1.0
LOAD COMB 2389 _: LOAD COMB 2229 _:
1 1.35 3 1.35 4 1.35 5 1.05 8 1.05 10 -1.5 17 0.45 21 1.35 1.35ºSD+1.35ºCM+1.35ºPA+0.9ºT1+0.75ºWXNEG+1.35ºPS_
*1ºSD+1ºCM+1ºPA+1.05ºLP+1.05ºLSC- 1
1.5ºT1+0.45ºWZNEG+1ºPS_1 1 1.35 3 1.35 4 1.35 10 0.9 15 0.75 21 1.35
LOAD COMB 2390 _: LOAD COMB 2230 _:
1 1.0 3 1.0 4 1.0 5 1.05 8 1.05 10 -1.5 17 0.45 21 1.0 1ºSD+1ºCM+1ºPA+0.9ºT1+0.75ºWXNEG+1ºPS_1
* 1 1.0 3 1.0 4 1.0 10 0.9 15 0.75 21 1.0
* VARIABLE DETERMINANTE: VIENTO LOAD COMB 2233 _: 1.35ºSD+1.35ºCM+1.35ºPA-
* DESFAVORABLE: 1.35 APP +/- 0.75 (WX & WZ) 0.9ºT1+0.75ºWXNEG+1.35ºPS_1
* FAVORABLE: 1.00 APP +/- 0.75 (WX & WZ) 1 1.35 3 1.35 4 1.35 10 -0.9 15 0.75 21 1.35
LOAD COMB 2213 _: LOAD COMB 2234 _: 1ºSD+1ºCM+1ºPA-
1.35ºSD+1.35ºCM+1.35ºPA+0.75ºWXPOS+1.35ºPS_1 0.9ºT1+0.75ºWXNEG+1ºPS_1
1 1.35 3 1.35 4 1.35 14 0.75 21 1.35 1 1.0 3 1.0 4 1.0 10 -0.9 15 0.75 21 1.0
LOAD COMB 2214 _: LOAD COMB 2239 _:
1ºSD+1ºCM+1ºPA+0.75ºWXPOS+1ºPS_1 1.35ºSD+1.35ºCM+1.35ºPA+0.9ºT1+0.75ºWZPOS+1.35ºPS_
1 1.0 3 1.0 4 1.0 14 0.75 21 1.0 1
LOAD COMB 2225 _: 1 1.35 3 1.35 4 1.35 10 0.9 16 0.75 21 1.35
1.35ºSD+1.35ºCM+1.35ºPA+0.75ºWXNEG+1.35ºPS_1 LOAD COMB 2240 _:
1 1.35 3 1.35 4 1.35 15 0.75 21 1.35 1ºSD+1ºCM+1ºPA+0.9ºT1+0.75ºWZPOS+1ºPS_1
LOAD COMB 2226 _: 1 1.0 3 1.0 4 1.0 10 0.9 16 0.75 21 1.0
1ºSD+1ºCM+1ºPA+0.75ºWXNEG+1ºPS_1 LOAD COMB 2243 _: 1.35ºSD+1.35ºCM+1.35ºPA-
1 1.0 3 1.0 4 1.0 15 0.75 21 1.0 0.9ºT1+0.75ºWZPOS+1.35ºPS_1
LOAD COMB 2245 _: 1 1.35 3 1.35 4 1.35 10 -0.9 16 0.75 21 1.35
1.35ºSD+1.35ºCM+1.35ºPA+0.75ºWZNEG+1.35ºPS_1 LOAD COMB 2244 _: 1ºSD+1ºCM+1ºPA-
1 1.35 3 1.35 4 1.35 17 0.75 21 1.35 0.9ºT1+0.75ºWZPOS+1ºPS_1
LOAD COMB 2246 _: 1 1.0 3 1.0 4 1.0 10 -0.9 16 0.75 21 1.0
1ºSD+1ºCM+1ºPA+0.75ºWZNEG+1ºPS_1 LOAD COMB 2249 _:
1 1.0 3 1.0 4 1.0 17 0.75 21 1.0 1.35ºSD+1.35ºCM+1.35ºPA+0.9ºT1+0.75ºWZNEG+1.35ºPS_
* 1
* VARIABLE DETERMINANTE: VIENTO 1 1.35 3 1.35 4 1.35 10 0.9 17 0.75 21 1.35
* DESFAVORABLE: 1.35 APP +/- 0.45 (WX & WZ) LOAD COMB 2250 _:
* FAVORABLE: 1.00 APP +/- 0.45 (WX & WZ) 1ºSD+1ºCM+1ºPA+0.9ºT1+0.75ºWZNEG+1ºPS_1
LOAD COMB 2223 _: 1 1.0 3 1.0 4 1.0 10 0.9 17 0.75 21 1.0
1.35ºSD+1.35ºCM+1.35ºPA+0.45ºWXNEG+1.35ºPS_1 LOAD COMB 2253 _: 1.35ºSD+1.35ºCM+1.35ºPA-
1 1.35 3 1.35 4 1.35 15 0.45 21 1.35 0.9ºT1+0.75ºWZNEG+1.35ºPS_1
LOAD COMB 2224 _: 1 1.35 3 1.35 4 1.35 10 -0.9 17 0.75 21 1.35
1ºSD+1ºCM+1ºPA+0.45ºWXNEG+1ºPS_1 LOAD COMB 2254 _: 1ºSD+1ºCM+1ºPA-
1 1.0 3 1.0 4 1.0 15 0.45 21 1.0 0.9ºT1+0.75ºWZNEG+1ºPS_1
LOAD COMB 2235 _: 1 1.0 3 1.0 4 1.0 10 -0.9 17 0.75 21 1.0
1.35ºSD+1.35ºCM+1.35ºPA+0.75ºWZPOS+1.35ºPS_1 *
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 252 de 463
(SUBJECT) (Page)

* VARIABLE DETERMINANTE: VIENTO 1 1.35 3 1.35 4 1.35 5 1.05 8 1.05 10 0.9 15 0.75 21 1.35
* DESFAVORABLE: 1.35 APP +/- 0.75 (WX & WZ) + 1.05 *1ºSD+1ºCM+1ºPA+1.05ºLP+1.05ºLSC+0.9ºT1+0.75ºWXNEG
(LSC + LP) +1ºPS_1
* FAVORABLE: 1.00 APP +/- 0.75 (WX & WZ) + 1.05 LOAD COMB 2350 _:
(LSC + LP) 1 1.0 3 1.0 4 1.0 5 1.05 8 1.05 10 0.9 15 0.75 21 1.0
*1.35ºSD+1.35ºCM+1.35ºPA+1.05ºLP+1.05ºLSC+0.75ºWXPO *1.35ºSD+1.35ºCM+1.35ºPA+1.05ºLP+1.05ºLSC-
S+1.35ºPS_1 0.9ºT1+0.75ºWXNEG+1.35ºPS_1
LOAD COMB 2297 _: LOAD COMB 2355 _:
1 1.35 3 1.35 4 1.35 5 1.05 8 1.05 14 0.75 21 1.35 1 1.35 3 1.35 4 1.35 5 1.05 8 1.05 10 -0.9 15 0.75 21 1.35
*1ºSD+1ºCM+1ºPA+1.05ºLP+1.05ºLSC+0.75ºWXPOS+1ºPS_ *1ºSD+1ºCM+1ºPA+1.05ºLP+1.05ºLSC-
1 0.9ºT1+0.75ºWXNEG+1ºPS_1
LOAD COMB 2298 _: LOAD COMB 2356 _:
1 1.0 3 1.0 4 1.0 5 1.05 8 1.05 14 0.75 21 1.0 1 1.0 3 1.0 4 1.0 5 1.05 8 1.05 10 -0.9 15 0.75 21 1.0
*1.35ºSD+1.35ºCM+1.35ºPA+1.05ºLP+1.05ºLSC+0.75ºWXNE *1.35ºSD+1.35ºCM+1.35ºPA+1.05ºLP+1.05ºLSC+0.9ºT1+0.7
G+1.35ºPS_1 5ºWZPOS+1.35ºPS_1
LOAD COMB 2305 _: LOAD COMB 2367 _:
1 1.35 3 1.35 4 1.35 5 1.05 8 1.05 15 0.75 21 1.35 1 1.35 3 1.35 4 1.35 5 1.05 8 1.05 10 0.9 16 0.75 21 1.35
*1ºSD+1ºCM+1ºPA+1.05ºLP+1.05ºLSC+0.75ºWXNEG+1ºPS_ *1ºSD+1ºCM+1ºPA+1.05ºLP+1.05ºLSC+0.9ºT1+0.75ºWZPOS
1 +1ºPS_1
LOAD COMB 2306 _: LOAD COMB 2368 _:
1 1.0 3 1.0 4 1.0 5 1.05 8 1.05 15 0.75 21 1.0 1 1.0 3 1.0 4 1.0 5 1.05 8 1.05 10 0.9 16 0.75 21 1.0
*1.35ºSD+1.35ºCM+1.35ºPA+1.05ºLP+1.05ºLSC+0.75ºWZPO *1.35ºSD+1.35ºCM+1.35ºPA+1.05ºLP+1.05ºLSC-
S+1.35ºPS_1 0.9ºT1+0.75ºWZPOS+1.35ºPS_1
LOAD COMB 2313 _: LOAD COMB 2373 _:
1 1.35 3 1.35 4 1.35 5 1.05 8 1.05 16 0.75 21 1.35 1 1.35 3 1.35 4 1.35 5 1.05 8 1.05 10 -0.9 16 0.75 21 1.35
*1ºSD+1ºCM+1ºPA+1.05ºLP+1.05ºLSC+0.75ºWZPOS+1ºPS_ *1ºSD+1ºCM+1ºPA+1.05ºLP+1.05ºLSC-
1 0.9ºT1+0.75ºWZPOS+1ºPS_1
LOAD COMB 2314 _: LOAD COMB 2374 _:
1 1.0 3 1.0 4 1.0 5 1.05 8 1.05 16 0.75 21 1.0 1 1.0 3 1.0 4 1.0 5 1.05 8 1.05 10 -0.9 16 0.75 21 1.0
*1.35ºSD+1.35ºCM+1.35ºPA+1.05ºLP+1.05ºLSC+0.75ºWZNE *1.35ºSD+1.35ºCM+1.35ºPA+1.05ºLP+1.05ºLSC+0.9ºT1+0.7
G+1.35ºPS_1 5ºWZNEG+1.35ºPS_1
LOAD COMB 2321 _: LOAD COMB 2385 _:
1 1.35 3 1.35 4 1.35 5 1.05 8 1.05 17 0.75 21 1.35 1 1.35 3 1.35 4 1.35 5 1.05 8 1.05 10 0.9 17 0.75 21 1.35
*1ºSD+1ºCM+1ºPA+1.05ºLP+1.05ºLSC+0.75ºWZNEG+1ºPS_ *1ºSD+1ºCM+1ºPA+1.05ºLP+1.05ºLSC+0.9ºT1+0.75ºWZNEG
1 +1ºPS_1
LOAD COMB 2322 _: LOAD COMB 2386 _:
1 1.0 3 1.0 4 1.0 5 1.05 8 1.05 17 0.75 21 1.0 1 1.0 3 1.0 4 1.0 5 1.05 8 1.05 10 0.9 17 0.75 21 1.0
* *1.35ºSD+1.35ºCM+1.35ºPA+1.05ºLP+1.05ºLSC-
* VARIABLE DETERMINANTE: VIENTO 0.9ºT1+0.75ºWZNEG+1.35ºPS_1
* DESFAVORABLE: 1.35 APP +/- 0.75 (WX & WZ) + 1.05 LOAD COMB 2391 _:
(LSC + LP) + 0.9 T1 1 1.35 3 1.35 4 1.35 5 1.05 8 1.05 10 -0.9 17 0.75 21 1.35
* FAVORABLE: 1.00 APP +/- 0.75 (WX & WZ) + 1.05 *1ºSD+1ºCM+1ºPA+1.05ºLP+1.05ºLSC-
(LSC + LP) + 0.9 T1 0.9ºT1+0.75ºWZNEG+1ºPS_1
*1.35ºSD+1.35ºCM+1.35ºPA+1.05ºLP+1.05ºLSC+0.9ºT1+0.7 LOAD COMB 2392 _:
5ºWXPOS+1.35ºPS_1 1 1.0 3 1.0 4 1.0 5 1.05 8 1.05 10 -0.9 17 0.75 21 1.0
LOAD COMB 2331 _: *
1 1.35 3 1.35 4 1.35 5 1.05 8 1.05 10 0.9 14 0.75 21 1.35 * VARIABLE DETERMINANTE: SOBRECARGA (LSC +
*1ºSD+1ºCM+1ºPA+1.05ºLP+1.05ºLSC+0.9ºT1+0.75ºWXPOS LP)
+1ºPS_1 * DESFAVORABLE: 1.35 APP +/- 1.50 (LSC + LP)
LOAD COMB 2332 _: * FAVORABLE: 1.00 APP +/- 1.50 (LSC + LP)
1 1.0 3 1.0 4 1.0 5 1.05 8 1.05 10 0.9 14 0.75 21 1.0 LOAD COMB 2279 _:
*1.35ºSD+1.35ºCM+1.35ºPA+1.05ºLP+1.05ºLSC- 1.35ºSD+1.35ºCM+1.35ºPA+1.5ºLP+1.5ºLSC+1.35ºPS_1
0.9ºT1+0.75ºWXPOS+1.35ºPS_1 1 1.35 3 1.35 4 1.35 5 1.5 8 1.5 21 1.35
LOAD COMB 2337 _: LOAD COMB 2280 _:
1 1.35 3 1.35 4 1.35 5 1.05 8 1.05 10 -0.9 14 0.75 21 1.35 1ºSD+1ºCM+1ºPA+1.5ºLP+1.5ºLSC+1ºPS_1
*1ºSD+1ºCM+1ºPA+1.05ºLP+1.05ºLSC- 1 1.0 3 1.0 4 1.0 5 1.5 8 1.5 21 1.0
0.9ºT1+0.75ºWXPOS+1ºPS_1 *
LOAD COMB 2338 _: * VARIABLE DETERMINANTE: SOBRECARGA (LSC +
1 1.0 3 1.0 4 1.0 5 1.05 8 1.05 10 -0.9 14 0.75 21 1.0 LP)
*1.35ºSD+1.35ºCM+1.35ºPA+1.05ºLP+1.05ºLSC+0.9ºT1+0.7 * DESFAVORABLE: 1.35 APP +/- 1.50 (LSC + LP) + 0.9
5ºWXNEG+1.35ºPS_1 T1
LOAD COMB 2349 _: * FAVORABLE: 1.00 APP +/- 1.50 (LSC + LP) + 0.9 T1
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 253 de 463
(SUBJECT) (Page)

LOAD COMB 2283 _: LOAD COMB 2328 _:


1.35ºSD+1.35ºCM+1.35ºPA+1.5ºLP+1.5ºLSC+0.9ºT1+1.35ºP 1 1.0 3 1.0 4 1.0 5 1.5 8 1.5 10 0.9 14 0.45 21 1.0
S_1 *1.35ºSD+1.35ºCM+1.35ºPA+1.5ºLP+1.5ºLSC-
1 1.35 3 1.35 4 1.35 5 1.5 8 1.5 10 0.9 21 1.35 0.9ºT1+0.45ºWXPOS+1.35ºPS_1
LOAD COMB 2284 _: LOAD COMB 2333 _:
1ºSD+1ºCM+1ºPA+1.5ºLP+1.5ºLSC+0.9ºT1+1ºPS_1 1 1.35 3 1.35 4 1.35 5 1.5 8 1.5 10 -0.9 14 0.45 21 1.35
1 1.0 3 1.0 4 1.0 5 1.5 8 1.5 10 0.9 21 1.0 *1ºSD+1ºCM+1ºPA+1.5ºLP+1.5ºLSC-
LOAD COMB 2287 _: 0.9ºT1+0.45ºWXPOS+1ºPS_1
1.35ºSD+1.35ºCM+1.35ºPA+1.5ºLP+1.5ºLSC- LOAD COMB 2334 _:
0.9ºT1+1.35ºPS_1 1 1.0 3 1.0 4 1.0 5 1.5 8 1.5 10 -0.9 14 0.45 21 1.0
1 1.35 3 1.35 4 1.35 5 1.5 8 1.5 10 -0.9 21 1.35 *1.35ºSD+1.35ºCM+1.35ºPA+1.5ºLP+1.5ºLSC+0.9ºT1+0.45º
LOAD COMB 2288 _: 1ºSD+1ºCM+1ºPA+1.5ºLP+1.5ºLSC- WXNEG+1.35ºPS_1
0.9ºT1+1ºPS_1 LOAD COMB 2345 _:
1 1.0 3 1.0 4 1.0 5 1.5 8 1.5 10 -0.9 21 1.0 1 1.35 3 1.35 4 1.35 5 1.5 8 1.5 10 0.9 15 0.45 21 1.35
* *1ºSD+1ºCM+1ºPA+1.5ºLP+1.5ºLSC+0.9ºT1+0.45ºWXNEG+
* VARIABLE DETERMINANTE: SOBRECARGA (LSC + 1ºPS_1
LP) LOAD COMB 2346 _:
* DESFAVORABLE: 1.35 APP +/- 1.50 (LSC + LP) + 0.45 1 1.0 3 1.0 4 1.0 5 1.5 8 1.5 10 0.9 15 0.45 21 1.0
(WX & WZ) *1.35ºSD+1.35ºCM+1.35ºPA+1.5ºLP+1.5ºLSC-
* FAVORABLE: 1.00 APP +/- 1.50 (LSC + LP) + 0.45 0.9ºT1+0.45ºWXNEG+1.35ºPS_1
(WX & WZ) LOAD COMB 2351 _:
*1.35ºSD+1.35ºCM+1.35ºPA+1.5ºLP+1.5ºLSC+0.45ºWXPOS 1 1.35 3 1.35 4 1.35 5 1.5 8 1.5 10 -0.9 15 0.45 21 1.35
+1.35ºPS_1 *1ºSD+1ºCM+1ºPA+1.5ºLP+1.5ºLSC-
LOAD COMB 2295 _: 0.9ºT1+0.45ºWXNEG+1ºPS_1
1 1.35 3 1.35 4 1.35 5 1.5 8 1.5 14 0.45 21 1.35 LOAD COMB 2352 _:
*1ºSD+1ºCM+1ºPA+1.5ºLP+1.5ºLSC+0.45ºWXPOS+1ºPS_1 1 1.0 3 1.0 4 1.0 5 1.5 8 1.5 10 -0.9 15 0.45 21 1.0
LOAD COMB 2296 _: *1.35ºSD+1.35ºCM+1.35ºPA+1.5ºLP+1.5ºLSC+0.9ºT1+0.45º
1 1.0 3 1.0 4 1.0 5 1.5 8 1.5 14 0.45 21 1.0 WZPOS+1.35ºPS_1
*1.35ºSD+1.35ºCM+1.35ºPA+1.5ºLP+1.5ºLSC+0.45ºWXNEG LOAD COMB 2363 _:
+1.35ºPS_1 1 1.35 3 1.35 4 1.35 5 1.5 8 1.5 10 0.9 16 0.45 21 1.35
LOAD COMB 2303 _: *1ºSD+1ºCM+1ºPA+1.5ºLP+1.5ºLSC+0.9ºT1+0.45ºWZPOS+1
1 1.35 3 1.35 4 1.35 5 1.5 8 1.5 15 0.45 21 1.35 ºPS_1
*1ºSD+1ºCM+1ºPA+1.5ºLP+1.5ºLSC+0.45ºWXNEG+1ºPS_1 LOAD COMB 2364 _:
LOAD COMB 2304 _: 1 1.0 3 1.0 4 1.0 5 1.5 8 1.5 10 0.9 16 0.45 21 1.0
1 1.0 3 1.0 4 1.0 5 1.5 8 1.5 15 0.45 21 1.0 *1.35ºSD+1.35ºCM+1.35ºPA+1.5ºLP+1.5ºLSC-
*1.35ºSD+1.35ºCM+1.35ºPA+1.5ºLP+1.5ºLSC+0.45ºWZPOS 0.9ºT1+0.45ºWZPOS+1.35ºPS_1
+1.35ºPS_1 LOAD COMB 2369 _:
LOAD COMB 2311 _: 1 1.35 3 1.35 4 1.35 5 1.5 8 1.5 10 -0.9 16 0.45 21 1.35
1 1.35 3 1.35 4 1.35 5 1.5 8 1.5 16 0.45 21 1.35 *1ºSD+1ºCM+1ºPA+1.5ºLP+1.5ºLSC-
*1ºSD+1ºCM+1ºPA+1.5ºLP+1.5ºLSC+0.45ºWZPOS+1ºPS_1 0.9ºT1+0.45ºWZPOS+1ºPS_1
LOAD COMB 2312 _: LOAD COMB 2370 _:
1 1.0 3 1.0 4 1.0 5 1.5 8 1.5 16 0.45 21 1.0 1 1.0 3 1.0 4 1.0 5 1.5 8 1.5 10 -0.9 16 0.45 21 1.0
*1.35ºSD+1.35ºCM+1.35ºPA+1.5ºLP+1.5ºLSC+0.45ºWZNEG *1.35ºSD+1.35ºCM+1.35ºPA+1.5ºLP+1.5ºLSC+0.9ºT1+0.45º
+1.35ºPS_1 WZNEG+1.35ºPS_1
LOAD COMB 2319 _: LOAD COMB 2381 _:
1 1.35 3 1.35 4 1.35 5 1.5 8 1.5 17 0.45 21 1.35 1 1.35 3 1.35 4 1.35 5 1.5 8 1.5 10 0.9 17 0.45 21 1.35
*1ºSD+1ºCM+1ºPA+1.5ºLP+1.5ºLSC+0.45ºWZNEG+1ºPS_1 *1ºSD+1ºCM+1ºPA+1.5ºLP+1.5ºLSC+0.9ºT1+0.45ºWZNEG+1
LOAD COMB 2320 _: ºPS_1
1 1.0 3 1.0 4 1.0 5 1.5 8 1.5 17 0.45 21 1.0 LOAD COMB 2382 _:
* 1 1.0 3 1.0 4 1.0 5 1.5 8 1.5 10 0.9 17 0.45 21 1.0
* VARIABLE DETERMINANTE: SOBRECARGA (LSC + *1.35ºSD+1.35ºCM+1.35ºPA+1.5ºLP+1.5ºLSC-
LP) 0.9ºT1+0.45ºWZNEG+1.35ºPS_1
* DESFAVORABLE: 1.35 APP +/- 1.50 (LSC + LP) + 0.45 LOAD COMB 2387 _:
(WX & WZ) + 0.9 T1 1 1.35 3 1.35 4 1.35 5 1.5 8 1.5 10 -0.9 17 0.45 21 1.35
* FAVORABLE: 1.00 APP +/- 1.50 (LSC + LP) + 0.45 *1ºSD+1ºCM+1ºPA+1.5ºLP+1.5ºLSC-
(WX & WZ) + 0.9 T1 0.9ºT1+0.45ºWZNEG+1ºPS_1
*1.35ºSD+1.35ºCM+1.35ºPA+1.5ºLP+1.5ºLSC+0.9ºT1+0.45º LOAD COMB 2388 _:
WXPOS+1.35ºPS_1 1 1.0 3 1.0 4 1.0 5 1.5 8 1.5 10 -0.9 17 0.45 21 1.0
LOAD COMB 2327 _: *
1 1.35 3 1.35 4 1.35 5 1.5 8 1.5 10 0.9 14 0.45 21 1.35 * 3.- OPERACION NORMAL
*1ºSD+1ºCM+1ºPA+1.5ºLP+1.5ºLSC+0.9ºT1+0.45ºWXPOS+1 * ================
ºPS_1 *
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 254 de 463
(SUBJECT) (Page)

* 3.1.- SITUACIONES PERSISTENTES O TRANSITORIAS *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºT1+1.35ºSTRESS_


* --------------------------------------- Y-1.35ºSTRESS_X+1.35ºSTRESS_Z+1.35ºPS_1
* DESFAVORABLE: 1.35 APN LOAD COMB 2411 _:
* FAVORABLE: 1.00 APN 1 1.35 2 1.35 3 1.35 4 1.35 10 1.5 11 1.35 12 -1.35 13 1.35 21
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.35ºSTRESS_Y+1.35º 1.35
STRESS_X+1.35ºSTRESS_Z+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1.5ºT1+1ºSTRESS_Y-
LOAD COMB 2399 _: 1ºSTRESS_X+1ºSTRESS_Z+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 11 1.35 12 1.35 13 1.35 21 1.35 LOAD COMB 2412 _:
*1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y+1ºSTRESS_X+1ºSTR 1 1.0 2 1.0 3 1.0 4 1.0 10 1.5 11 1.0 12 -1.0 13 1.0 21 1.0
ESS_Z+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºT1+1.35ºSTRESS_
LOAD COMB 2400 _: Y-1.35ºSTRESS_X-1.35ºSTRESS_Z+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 1.0 13 1.0 21 1.0 LOAD COMB 2413 _:
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.35ºSTRESS_Y+1.35º 1 1.35 2 1.35 3 1.35 4 1.35 10 1.5 11 1.35 12 -1.35 13 -1.35
STRESS_X-1.35ºSTRESS_Z+1.35ºPS_1 21 1.35
LOAD COMB 2401 _: *1ºSD+1ºF+1ºCM+1ºPA+1.5ºT1+1ºSTRESS_Y-
1 1.35 2 1.35 3 1.35 4 1.35 11 1.35 12 1.35 13 -1.35 21 1.35 1ºSTRESS_X-1ºSTRESS_Z+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y+1ºSTRESS_X- LOAD COMB 2414 _:
1ºSTRESS_Z+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 10 1.5 11 1.0 12 -1.0 13 -1.0 21 1.0
LOAD COMB 2402 _: *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA-
1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 1.0 13 -1.0 21 1.0 1.5ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.35ºSTRESS_Y- +1.35ºPS_1
1.35ºSTRESS_X+1.35ºSTRESS_Z+1.35ºPS_1 LOAD COMB 2415 _:
LOAD COMB 2403 _: 1 1.35 2 1.35 3 1.35 4 1.35 10 -1.5 11 1.35 12 1.35 13 1.35 21
1 1.35 2 1.35 3 1.35 4 1.35 11 1.35 12 -1.35 13 1.35 21 1.35 1.35
*1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y- *1ºSD+1ºF+1ºCM+1ºPA-
1ºSTRESS_X+1ºSTRESS_Z+1ºPS_1 1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+1ºPS_1
LOAD COMB 2404 _: LOAD COMB 2416 _:
1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 -1.0 13 1.0 21 1.0 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.5 11 1.0 12 1.0 13 1.0 21 1.0
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.35ºSTRESS_Y- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA-
1.35ºSTRESS_X-1.35ºSTRESS_Z+1.35ºPS_1 1.5ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
LOAD COMB 2405 _: 1.35ºSTRESS_Z+1.35ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 11 1.35 12 -1.35 13 -1.35 21 1.35 LOAD COMB 2417 _:
*1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y-1ºSTRESS_X- 1 1.35 2 1.35 3 1.35 4 1.35 10 -1.5 11 1.35 12 1.35 13 -1.35
1ºSTRESS_Z+1ºPS_1 21 1.35
LOAD COMB 2406 _: *1ºSD+1ºF+1ºCM+1ºPA-
1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 -1.0 13 -1.0 21 1.0 1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X-1ºSTRESS_Z+1ºPS_1
* LOAD COMB 2418 _:
* 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.5 11 1.0 12 1.0 13 -1.0 21 1.0
* 3.2.- SITUACIONES ACCIDENTALES *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA-
* ------------------------ 1.5ºT1+1.35ºSTRESS_Y-
* VARIABLE DETERMINANTE: TEMPERATURA 1.35ºSTRESS_X+1.35ºSTRESS_Z+1.35ºPS_1
* DESFAVORABLE: 1.35 APN + 1.5 T1 LOAD COMB 2419 _:
* FAVORABLE: 1.00 APN + 1.5 T1 1 1.35 2 1.35 3 1.35 4 1.35 10 -1.5 11 1.35 12 -1.35 13 1.35
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºT1+1.35ºSTRESS_ 21 1.35
Y+1.35ºSTRESS_X+1.35ºSTRESS_Z+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA-1.5ºT1+1ºSTRESS_Y-
LOAD COMB 2407 _: 1ºSTRESS_X+1ºSTRESS_Z+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 10 1.5 11 1.35 12 1.35 13 1.35 21 LOAD COMB 2420 _:
1.35 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.5 11 1.0 12 -1.0 13 1.0 21 1.0
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA-
+1ºSTRESS_Z+1ºPS_1 1.5ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X-
LOAD COMB 2408 _: 1.35ºSTRESS_Z+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 10 1.5 11 1.0 12 1.0 13 1.0 21 1.0 LOAD COMB 2421 _:
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºT1+1.35ºSTRESS_ 1 1.35 2 1.35 3 1.35 4 1.35 10 -1.5 11 1.35 12 -1.35 13 -1.35
Y+1.35ºSTRESS_X-1.35ºSTRESS_Z+1.35ºPS_1 21 1.35
LOAD COMB 2409 _: *1ºSD+1ºF+1ºCM+1ºPA-1.5ºT1+1ºSTRESS_Y-1ºSTRESS_X-
1 1.35 2 1.35 3 1.35 4 1.35 10 1.5 11 1.35 12 1.35 13 -1.35 21 1ºSTRESS_Z+1ºPS_1
1.35 LOAD COMB 2422 _:
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.5 11 1.0 12 -1.0 13 -1.0 21 1.0
-1ºSTRESS_Z+1ºPS_1 *
LOAD COMB 2410 _: * VARIABLE DETERMINANTE: TEMPERATURA
1 1.0 2 1.0 3 1.0 4 1.0 10 1.5 11 1.0 12 1.0 13 -1.0 21 1.0 * DESFAVORABLE: 1.35 APN + 1.5 T1 + 0.90 (WX & WZ)
* FAVORABLE: 1.00 APN + 1.5 T1 + 0.90 (WX & WZ)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 255 de 463
(SUBJECT) (Page)

*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºT1+1.35ºSTRESS_ *1ºSD+1ºF+1ºCM+1ºPA+1.5ºT1+1ºSTRESS_Y-
Y+1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWXPOS+1.35ºPS_ 1ºSTRESS_X+1ºSTRESS_Z+0.9ºWXNEG+1ºPS_1
1 LOAD COMB 2480 _:
LOAD COMB 2431 _: 1 1.0 2 1.0 3 1.0 4 1.0 10 1.5 11 1.0 12 -1.0 13 1.0 15 0.9 21
1 1.35 2 1.35 3 1.35 4 1.35 10 1.5 11 1.35 12 1.35 13 1.35 14 1.0
0.9 21 1.35 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+0.9ºT1+1.35ºSTRESS_
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X Y-
+1ºSTRESS_Z+0.9ºWXPOS+1ºPS_1 1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWXNEG+1.35ºPS_1
LOAD COMB 2432 _: LOAD COMB 2481 _:
1 1.0 2 1.0 3 1.0 4 1.0 10 1.5 11 1.0 12 1.0 13 1.0 14 0.9 21 1 1.35 2 1.35 3 1.35 4 1.35 10 0.9 11 1.35 12 -1.35 13 1.35 15
1.0 1.5 21 1.35
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºT1+1.35ºSTRESS_ *1ºSD+1ºF+1ºCM+1ºPA+0.9ºT1+1ºSTRESS_Y-
Y+1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWXNEG+1.35ºPS_ 1ºSTRESS_X+1ºSTRESS_Z+1.5ºWXNEG+1ºPS_1
1 LOAD COMB 2482 _:
LOAD COMB 2471 _: 1 1.0 2 1.0 3 1.0 4 1.0 10 0.9 11 1.0 12 -1.0 13 1.0 15 1.5 21
1 1.35 2 1.35 3 1.35 4 1.35 10 1.5 11 1.35 12 1.35 13 1.35 15 1.0
0.9 21 1.35 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºT1+1.35ºSTRESS_
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X Y-1.35ºSTRESS_X-
+1ºSTRESS_Z+0.9ºWXNEG+1ºPS_1 1.35ºSTRESS_Z+0.9ºWXNEG+1.35ºPS_1
LOAD COMB 2472 _: LOAD COMB 2483 _:
1 1.0 2 1.0 3 1.0 4 1.0 10 1.5 11 1.0 12 1.0 13 1.0 15 0.9 21 1 1.35 2 1.35 3 1.35 4 1.35 10 1.5 11 1.35 12 -1.35 13 -1.35
1.0 15 0.9 21 1.35
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+0.9ºT1+1.35ºSTRESS_ *1ºSD+1ºF+1ºCM+1ºPA+1.5ºT1+1ºSTRESS_Y-
Y+1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWXNEG+1.35ºPS_ 1ºSTRESS_X-1ºSTRESS_Z+0.9ºWXNEG+1ºPS_1
1 LOAD COMB 2484 _:
LOAD COMB 2473 _: 1 1.0 2 1.0 3 1.0 4 1.0 10 1.5 11 1.0 12 -1.0 13 -1.0 15 0.9 21
1 1.35 2 1.35 3 1.35 4 1.35 10 0.9 11 1.35 12 1.35 13 1.35 15 1.0
1.5 21 1.35 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+0.9ºT1+1.35ºSTRESS_
*1ºSD+1ºF+1ºCM+1ºPA+0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X Y-1.35ºSTRESS_X-
+1ºSTRESS_Z+1.5ºWXNEG+1ºPS_1 1.35ºSTRESS_Z+1.5ºWXNEG+1.35ºPS_1
LOAD COMB 2474 _: LOAD COMB 2485 _:
1 1.0 2 1.0 3 1.0 4 1.0 10 0.9 11 1.0 12 1.0 13 1.0 15 1.5 21 1 1.35 2 1.35 3 1.35 4 1.35 10 0.9 11 1.35 12 -1.35 13 -1.35
1.0 15 1.5 21 1.35
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºT1+1.35ºSTRESS_ *1ºSD+1ºF+1ºCM+1ºPA+0.9ºT1+1ºSTRESS_Y-
Y+1.35ºSTRESS_X- 1ºSTRESS_X-1ºSTRESS_Z+1.5ºWXNEG+1ºPS_1
1.35ºSTRESS_Z+0.9ºWXNEG+1.35ºPS_1 LOAD COMB 2486 _:
LOAD COMB 2475 _: 1 1.0 2 1.0 3 1.0 4 1.0 10 0.9 11 1.0 12 -1.0 13 -1.0 15 1.5 21
1 1.35 2 1.35 3 1.35 4 1.35 10 1.5 11 1.35 12 1.35 13 -1.35 15 1.0
0.9 21 1.35 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA-
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X 1.5ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z
-1ºSTRESS_Z+0.9ºWXNEG+1ºPS_1 +0.9ºWXNEG+1.35ºPS_1
LOAD COMB 2476 _: LOAD COMB 2487 _:
1 1.0 2 1.0 3 1.0 4 1.0 10 1.5 11 1.0 12 1.0 13 -1.0 15 0.9 21 1 1.35 2 1.35 3 1.35 4 1.35 10 -1.5 11 1.35 12 1.35 13 1.35 15
1.0 0.9 21 1.35
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+0.9ºT1+1.35ºSTRESS_ *1ºSD+1ºF+1ºCM+1ºPA-
Y+1.35ºSTRESS_X- 1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.9ºWXN
1.35ºSTRESS_Z+1.5ºWXNEG+1.35ºPS_1 EG+1ºPS_1
LOAD COMB 2477 _: LOAD COMB 2488 _:
1 1.35 2 1.35 3 1.35 4 1.35 10 0.9 11 1.35 12 1.35 13 -1.35 15 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.5 11 1.0 12 1.0 13 1.0 15 0.9 21
1.5 21 1.35 1.0
*1ºSD+1ºF+1ºCM+1ºPA+0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA-
-1ºSTRESS_Z+1.5ºWXNEG+1ºPS_1 0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z
LOAD COMB 2478 _: +1.5ºWXNEG+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 10 0.9 11 1.0 12 1.0 13 -1.0 15 1.5 21 LOAD COMB 2489 _:
1.0 1 1.35 2 1.35 3 1.35 4 1.35 10 -0.9 11 1.35 12 1.35 13 1.35 15
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºT1+1.35ºSTRESS_ 1.5 21 1.35
Y- *1ºSD+1ºF+1ºCM+1ºPA-
1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWXNEG+1.35ºPS_1 0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+1.5ºWXN
LOAD COMB 2479 _: EG+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 10 1.5 11 1.35 12 -1.35 13 1.35 15 LOAD COMB 2490 _:
0.9 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 10 -0.9 11 1.0 12 1.0 13 1.0 15 1.5 21
1.0
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 256 de 463
(SUBJECT) (Page)

*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA- 1 1.35 2 1.35 3 1.35 4 1.35 10 -0.9 11 1.35 12 -1.35 13 -1.35


1.5ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X- 15 1.5 21 1.35
1.35ºSTRESS_Z+0.9ºWXNEG+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA-0.9ºT1+1ºSTRESS_Y-1ºSTRESS_X-
LOAD COMB 2491 _: 1ºSTRESS_Z+1.5ºWXNEG+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 10 -1.5 11 1.35 12 1.35 13 -1.35 LOAD COMB 2502 _:
15 0.9 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 10 -0.9 11 1.0 12 -1.0 13 -1.0 15 1.5 21
*1ºSD+1ºF+1ºCM+1ºPA- 1.0
1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºT1+1.35ºSTRESS_
1ºSTRESS_Z+0.9ºWXNEG+1ºPS_1 Y+1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWZPOS+1.35ºPS_
LOAD COMB 2492 _: 1
1 1.0 2 1.0 3 1.0 4 1.0 10 -1.5 11 1.0 12 1.0 13 -1.0 15 0.9 21 LOAD COMB 2511 _:
1.0 1 1.35 2 1.35 3 1.35 4 1.35 10 1.5 11 1.35 12 1.35 13 1.35 16
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA- 0.9 21 1.35
0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X- *1ºSD+1ºF+1ºCM+1ºPA+1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X
1.35ºSTRESS_Z+1.5ºWXNEG+1.35ºPS_1 +1ºSTRESS_Z+0.9ºWZPOS+1ºPS_1
LOAD COMB 2493 _: LOAD COMB 2512 _:
1 1.35 2 1.35 3 1.35 4 1.35 10 -0.9 11 1.35 12 1.35 13 -1.35 1 1.0 2 1.0 3 1.0 4 1.0 10 1.5 11 1.0 12 1.0 13 1.0 16 0.9 21
15 1.5 21 1.35 1.0
*1ºSD+1ºF+1ºCM+1ºPA- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+0.9ºT1+1.35ºSTRESS_
0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X- Y+1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWZPOS+1.35ºPS_
1ºSTRESS_Z+1.5ºWXNEG+1ºPS_1 1
LOAD COMB 2494 _: LOAD COMB 2513 _:
1 1.0 2 1.0 3 1.0 4 1.0 10 -0.9 11 1.0 12 1.0 13 -1.0 15 1.5 21 1 1.35 2 1.35 3 1.35 4 1.35 10 0.9 11 1.35 12 1.35 13 1.35 16
1.0 1.5 21 1.35
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA- *1ºSD+1ºF+1ºCM+1ºPA+0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X
1.5ºT1+1.35ºSTRESS_Y- +1ºSTRESS_Z+1.5ºWZPOS+1ºPS_1
1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWXNEG+1.35ºPS_1 LOAD COMB 2514 _:
LOAD COMB 2495 _: 1 1.0 2 1.0 3 1.0 4 1.0 10 0.9 11 1.0 12 1.0 13 1.0 16 1.5 21
1 1.35 2 1.35 3 1.35 4 1.35 10 -1.5 11 1.35 12 -1.35 13 1.35 1.0
15 0.9 21 1.35 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºT1+1.35ºSTRESS_
*1ºSD+1ºF+1ºCM+1ºPA-1.5ºT1+1ºSTRESS_Y- Y+1.35ºSTRESS_X-
1ºSTRESS_X+1ºSTRESS_Z+0.9ºWXNEG+1ºPS_1 1.35ºSTRESS_Z+0.9ºWZPOS+1.35ºPS_1
LOAD COMB 2496 _: LOAD COMB 2515 _:
1 1.0 2 1.0 3 1.0 4 1.0 10 -1.5 11 1.0 12 -1.0 13 1.0 15 0.9 21 1 1.35 2 1.35 3 1.35 4 1.35 10 1.5 11 1.35 12 1.35 13 -1.35 16
1.0 0.9 21 1.35
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA- *1ºSD+1ºF+1ºCM+1ºPA+1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X
0.9ºT1+1.35ºSTRESS_Y- -1ºSTRESS_Z+0.9ºWZPOS+1ºPS_1
1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWXNEG+1.35ºPS_1 LOAD COMB 2516 _:
LOAD COMB 2497 _: 1 1.0 2 1.0 3 1.0 4 1.0 10 1.5 11 1.0 12 1.0 13 -1.0 16 0.9 21
1 1.35 2 1.35 3 1.35 4 1.35 10 -0.9 11 1.35 12 -1.35 13 1.35 1.0
15 1.5 21 1.35 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+0.9ºT1+1.35ºSTRESS_
*1ºSD+1ºF+1ºCM+1ºPA-0.9ºT1+1ºSTRESS_Y- Y+1.35ºSTRESS_X-
1ºSTRESS_X+1ºSTRESS_Z+1.5ºWXNEG+1ºPS_1 1.35ºSTRESS_Z+1.5ºWZPOS+1.35ºPS_1
LOAD COMB 2498 _: LOAD COMB 2517 _:
1 1.0 2 1.0 3 1.0 4 1.0 10 -0.9 11 1.0 12 -1.0 13 1.0 15 1.5 21 1 1.35 2 1.35 3 1.35 4 1.35 10 0.9 11 1.35 12 1.35 13 -1.35 16
1.0 1.5 21 1.35
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA- *1ºSD+1ºF+1ºCM+1ºPA+0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X
1.5ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X- -1ºSTRESS_Z+1.5ºWZPOS+1ºPS_1
1.35ºSTRESS_Z+0.9ºWXNEG+1.35ºPS_1 LOAD COMB 2518 _:
LOAD COMB 2499 _: 1 1.0 2 1.0 3 1.0 4 1.0 10 0.9 11 1.0 12 1.0 13 -1.0 16 1.5 21
1 1.35 2 1.35 3 1.35 4 1.35 10 -1.5 11 1.35 12 -1.35 13 -1.35 1.0
15 0.9 21 1.35 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºT1+1.35ºSTRESS_
*1ºSD+1ºF+1ºCM+1ºPA-1.5ºT1+1ºSTRESS_Y-1ºSTRESS_X- Y-
1ºSTRESS_Z+0.9ºWXNEG+1ºPS_1 1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWZPOS+1.35ºPS_1
LOAD COMB 2500 _: LOAD COMB 2519 _:
1 1.0 2 1.0 3 1.0 4 1.0 10 -1.5 11 1.0 12 -1.0 13 -1.0 15 0.9 21 1 1.35 2 1.35 3 1.35 4 1.35 10 1.5 11 1.35 12 -1.35 13 1.35 16
1.0 0.9 21 1.35
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA- *1ºSD+1ºF+1ºCM+1ºPA+1.5ºT1+1ºSTRESS_Y-
0.9ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X- 1ºSTRESS_X+1ºSTRESS_Z+0.9ºWZPOS+1ºPS_1
1.35ºSTRESS_Z+1.5ºWXNEG+1.35ºPS_1 LOAD COMB 2520 _:
LOAD COMB 2501 _: 1 1.0 2 1.0 3 1.0 4 1.0 10 1.5 11 1.0 12 -1.0 13 1.0 16 0.9 21
1.0
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 257 de 463
(SUBJECT) (Page)

*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+0.9ºT1+1.35ºSTRESS_ *1ºSD+1ºF+1ºCM+1ºPA-
Y- 1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X-
1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWZPOS+1.35ºPS_1 1ºSTRESS_Z+0.9ºWZPOS+1ºPS_1
LOAD COMB 2521 _: LOAD COMB 2532 _:
1 1.35 2 1.35 3 1.35 4 1.35 10 0.9 11 1.35 12 -1.35 13 1.35 16 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.5 11 1.0 12 1.0 13 -1.0 16 0.9 21
1.5 21 1.35 1.0
*1ºSD+1ºF+1ºCM+1ºPA+0.9ºT1+1ºSTRESS_Y- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA-
1ºSTRESS_X+1ºSTRESS_Z+1.5ºWZPOS+1ºPS_1 0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
LOAD COMB 2522 _: 1.35ºSTRESS_Z+1.5ºWZPOS+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 10 0.9 11 1.0 12 -1.0 13 1.0 16 1.5 21 LOAD COMB 2533 _:
1.0 1 1.35 2 1.35 3 1.35 4 1.35 10 -0.9 11 1.35 12 1.35 13 -1.35
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºT1+1.35ºSTRESS_ 16 1.5 21 1.35
Y-1.35ºSTRESS_X-1.35ºSTRESS_Z+0.9ºWZPOS+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA-
LOAD COMB 2523 _: 0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X-
1 1.35 2 1.35 3 1.35 4 1.35 10 1.5 11 1.35 12 -1.35 13 -1.35 1ºSTRESS_Z+1.5ºWZPOS+1ºPS_1
16 0.9 21 1.35 LOAD COMB 2534 _:
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºT1+1ºSTRESS_Y- 1 1.0 2 1.0 3 1.0 4 1.0 10 -0.9 11 1.0 12 1.0 13 -1.0 16 1.5 21
1ºSTRESS_X-1ºSTRESS_Z+0.9ºWZPOS+1ºPS_1 1.0
LOAD COMB 2524 _: *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA-
1 1.0 2 1.0 3 1.0 4 1.0 10 1.5 11 1.0 12 -1.0 13 -1.0 16 0.9 21 1.5ºT1+1.35ºSTRESS_Y-
1.0 1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWZPOS+1.35ºPS_1
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+0.9ºT1+1.35ºSTRESS_ LOAD COMB 2535 _:
Y-1.35ºSTRESS_X-1.35ºSTRESS_Z+1.5ºWZPOS+1.35ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 10 -1.5 11 1.35 12 -1.35 13 1.35
LOAD COMB 2525 _: 16 0.9 21 1.35
1 1.35 2 1.35 3 1.35 4 1.35 10 0.9 11 1.35 12 -1.35 13 -1.35 *1ºSD+1ºF+1ºCM+1ºPA-1.5ºT1+1ºSTRESS_Y-
16 1.5 21 1.35 1ºSTRESS_X+1ºSTRESS_Z+0.9ºWZPOS+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+0.9ºT1+1ºSTRESS_Y- LOAD COMB 2536 _:
1ºSTRESS_X-1ºSTRESS_Z+1.5ºWZPOS+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.5 11 1.0 12 -1.0 13 1.0 16 0.9 21
LOAD COMB 2526 _: 1.0
1 1.0 2 1.0 3 1.0 4 1.0 10 0.9 11 1.0 12 -1.0 13 -1.0 16 1.5 21 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA-
1.0 0.9ºT1+1.35ºSTRESS_Y-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA- 1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWZPOS+1.35ºPS_1
1.5ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z LOAD COMB 2537 _:
+0.9ºWZPOS+1.35ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 10 -0.9 11 1.35 12 -1.35 13 1.35
LOAD COMB 2527 _: 16 1.5 21 1.35
1 1.35 2 1.35 3 1.35 4 1.35 10 -1.5 11 1.35 12 1.35 13 1.35 16 *1ºSD+1ºF+1ºCM+1ºPA-0.9ºT1+1ºSTRESS_Y-
0.9 21 1.35 1ºSTRESS_X+1ºSTRESS_Z+1.5ºWZPOS+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA- LOAD COMB 2538 _:
1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.9ºWZP 1 1.0 2 1.0 3 1.0 4 1.0 10 -0.9 11 1.0 12 -1.0 13 1.0 16 1.5 21
OS+1ºPS_1 1.0
LOAD COMB 2528 _: *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA-
1 1.0 2 1.0 3 1.0 4 1.0 10 -1.5 11 1.0 12 1.0 13 1.0 16 0.9 21 1.5ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X-
1.0 1.35ºSTRESS_Z+0.9ºWZPOS+1.35ºPS_1
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA- LOAD COMB 2539 _:
0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z 1 1.35 2 1.35 3 1.35 4 1.35 10 -1.5 11 1.35 12 -1.35 13 -1.35
+1.5ºWZPOS+1.35ºPS_1 16 0.9 21 1.35
LOAD COMB 2529 _: *1ºSD+1ºF+1ºCM+1ºPA-1.5ºT1+1ºSTRESS_Y-1ºSTRESS_X-
1 1.35 2 1.35 3 1.35 4 1.35 10 -0.9 11 1.35 12 1.35 13 1.35 16 1ºSTRESS_Z+0.9ºWZPOS+1ºPS_1
1.5 21 1.35 LOAD COMB 2540 _:
*1ºSD+1ºF+1ºCM+1ºPA- 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.5 11 1.0 12 -1.0 13 -1.0 16 0.9 21
0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+1.5ºWZP 1.0
OS+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA-
LOAD COMB 2530 _: 0.9ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 10 -0.9 11 1.0 12 1.0 13 1.0 16 1.5 21 1.35ºSTRESS_Z+1.5ºWZPOS+1.35ºPS_1
1.0 LOAD COMB 2541 _:
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA- 1 1.35 2 1.35 3 1.35 4 1.35 10 -0.9 11 1.35 12 -1.35 13 -1.35
1.5ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X- 16 1.5 21 1.35
1.35ºSTRESS_Z+0.9ºWZPOS+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA-0.9ºT1+1ºSTRESS_Y-1ºSTRESS_X-
LOAD COMB 2531 _: 1ºSTRESS_Z+1.5ºWZPOS+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 10 -1.5 11 1.35 12 1.35 13 -1.35 LOAD COMB 2542 _:
16 0.9 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 10 -0.9 11 1.0 12 -1.0 13 -1.0 16 1.5 21
1.0
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 258 de 463
(SUBJECT) (Page)

*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºT1+1.35ºSTRESS_ *1ºSD+1ºF+1ºCM+1ºPA+0.9ºT1+1ºSTRESS_Y-
Y+1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWZNEG+1.35ºPS_ 1ºSTRESS_X+1ºSTRESS_Z+1.5ºWZNEG+1ºPS_1
1 LOAD COMB 2562 _:
LOAD COMB 2551 _: 1 1.0 2 1.0 3 1.0 4 1.0 10 0.9 11 1.0 12 -1.0 13 1.0 17 1.5 21
1 1.35 2 1.35 3 1.35 4 1.35 10 1.5 11 1.35 12 1.35 13 1.35 17 1.0
0.9 21 1.35 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºT1+1.35ºSTRESS_
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X Y-1.35ºSTRESS_X-1.35ºSTRESS_Z+0.9ºWZNEG+1.35ºPS_1
+1ºSTRESS_Z+0.9ºWZNEG+1ºPS_1 LOAD COMB 2563 _:
LOAD COMB 2552 _: 1 1.35 2 1.35 3 1.35 4 1.35 10 1.5 11 1.35 12 -1.35 13 -1.35
1 1.0 2 1.0 3 1.0 4 1.0 10 1.5 11 1.0 12 1.0 13 1.0 17 0.9 21 17 0.9 21 1.35
1.0 *1ºSD+1ºF+1ºCM+1ºPA+1.5ºT1+1ºSTRESS_Y-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+0.9ºT1+1.35ºSTRESS_ 1ºSTRESS_X-1ºSTRESS_Z+0.9ºWZNEG+1ºPS_1
Y+1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWZNEG+1.35ºPS_ LOAD COMB 2564 _:
1 1 1.0 2 1.0 3 1.0 4 1.0 10 1.5 11 1.0 12 -1.0 13 -1.0 17 0.9 21
LOAD COMB 2553 _: 1.0
1 1.35 2 1.35 3 1.35 4 1.35 10 0.9 11 1.35 12 1.35 13 1.35 17 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+0.9ºT1+1.35ºSTRESS_
1.5 21 1.35 Y-1.35ºSTRESS_X-1.35ºSTRESS_Z+1.5ºWZNEG+1.35ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X LOAD COMB 2565 _:
+1ºSTRESS_Z+1.5ºWZNEG+1ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 10 0.9 11 1.35 12 -1.35 13 -1.35
LOAD COMB 2554 _: 17 1.5 21 1.35
1 1.0 2 1.0 3 1.0 4 1.0 10 0.9 11 1.0 12 1.0 13 1.0 17 1.5 21 *1ºSD+1ºF+1ºCM+1ºPA+0.9ºT1+1ºSTRESS_Y-
1.0 1ºSTRESS_X-1ºSTRESS_Z+1.5ºWZNEG+1ºPS_1
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºT1+1.35ºSTRESS_ LOAD COMB 2566 _:
Y+1.35ºSTRESS_X- 1 1.0 2 1.0 3 1.0 4 1.0 10 0.9 11 1.0 12 -1.0 13 -1.0 17 1.5 21
1.35ºSTRESS_Z+0.9ºWZNEG+1.35ºPS_1 1.0
LOAD COMB 2555 _: *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA-
1 1.35 2 1.35 3 1.35 4 1.35 10 1.5 11 1.35 12 1.35 13 -1.35 17 1.5ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z
0.9 21 1.35 +0.9ºWZNEG+1.35ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X LOAD COMB 2567 _:
-1ºSTRESS_Z+0.9ºWZNEG+1ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 10 -1.5 11 1.35 12 1.35 13 1.35 17
LOAD COMB 2556 _: 0.9 21 1.35
1 1.0 2 1.0 3 1.0 4 1.0 10 1.5 11 1.0 12 1.0 13 -1.0 17 0.9 21 *1ºSD+1ºF+1ºCM+1ºPA-
1.0 1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.9ºWZN
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+0.9ºT1+1.35ºSTRESS_ EG+1ºPS_1
Y+1.35ºSTRESS_X- LOAD COMB 2568 _:
1.35ºSTRESS_Z+1.5ºWZNEG+1.35ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.5 11 1.0 12 1.0 13 1.0 17 0.9 21
LOAD COMB 2557 _: 1.0
1 1.35 2 1.35 3 1.35 4 1.35 10 0.9 11 1.35 12 1.35 13 -1.35 17 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA-
1.5 21 1.35 0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z
*1ºSD+1ºF+1ºCM+1ºPA+0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X +1.5ºWZNEG+1.35ºPS_1
-1ºSTRESS_Z+1.5ºWZNEG+1ºPS_1 LOAD COMB 2569 _:
LOAD COMB 2558 _: 1 1.35 2 1.35 3 1.35 4 1.35 10 -0.9 11 1.35 12 1.35 13 1.35 17
1 1.0 2 1.0 3 1.0 4 1.0 10 0.9 11 1.0 12 1.0 13 -1.0 17 1.5 21 1.5 21 1.35
1.0 *1ºSD+1ºF+1ºCM+1ºPA-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºT1+1.35ºSTRESS_ 0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+1.5ºWZN
Y- EG+1ºPS_1
1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWZNEG+1.35ºPS_1 LOAD COMB 2570 _:
LOAD COMB 2559 _: 1 1.0 2 1.0 3 1.0 4 1.0 10 -0.9 11 1.0 12 1.0 13 1.0 17 1.5 21
1 1.35 2 1.35 3 1.35 4 1.35 10 1.5 11 1.35 12 -1.35 13 1.35 17 1.0
0.9 21 1.35 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA-
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºT1+1ºSTRESS_Y- 1.5ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
1ºSTRESS_X+1ºSTRESS_Z+0.9ºWZNEG+1ºPS_1 1.35ºSTRESS_Z+0.9ºWZNEG+1.35ºPS_1
LOAD COMB 2560 _: LOAD COMB 2571 _:
1 1.0 2 1.0 3 1.0 4 1.0 10 1.5 11 1.0 12 -1.0 13 1.0 17 0.9 21 1 1.35 2 1.35 3 1.35 4 1.35 10 -1.5 11 1.35 12 1.35 13 -1.35
1.0 17 0.9 21 1.35
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+0.9ºT1+1.35ºSTRESS_ *1ºSD+1ºF+1ºCM+1ºPA-
Y- 1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X-
1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWZNEG+1.35ºPS_1 1ºSTRESS_Z+0.9ºWZNEG+1ºPS_1
LOAD COMB 2561 _: LOAD COMB 2572 _:
1 1.35 2 1.35 3 1.35 4 1.35 10 0.9 11 1.35 12 -1.35 13 1.35 17 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.5 11 1.0 12 1.0 13 -1.0 17 0.9 21
1.5 21 1.35 1.0
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 259 de 463
(SUBJECT) (Page)

*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA- *1ºSD+1ºF+1ºCM+1ºPA+0.9ºSL+1ºSTRESS_Y+1ºSTRESS_X
0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X- +1ºSTRESS_Z+1.5ºWXPOS+1ºPS_1
1.35ºSTRESS_Z+1.5ºWZNEG+1.35ºPS_1 LOAD COMB 2584 _:
LOAD COMB 2573 _: 1 1.0 2 1.0 3 1.0 4 1.0 9 0.9 11 1.0 12 1.0 13 1.0 14 1.5 21 1.0
1 1.35 2 1.35 3 1.35 4 1.35 10 -0.9 11 1.35 12 1.35 13 -1.35 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+0.9ºSL+1.35ºSTRESS_
17 1.5 21 1.35 Y+1.35ºSTRESS_X-
*1ºSD+1ºF+1ºCM+1ºPA- 1.35ºSTRESS_Z+1.5ºWXPOS+1.35ºPS_1
0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X- LOAD COMB 2585 _:
1ºSTRESS_Z+1.5ºWZNEG+1ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 9 0.9 11 1.35 12 1.35 13 -1.35 14
LOAD COMB 2574 _: 1.5 21 1.35
1 1.0 2 1.0 3 1.0 4 1.0 10 -0.9 11 1.0 12 1.0 13 -1.0 17 1.5 21 *1ºSD+1ºF+1ºCM+1ºPA+0.9ºSL+1ºSTRESS_Y+1ºSTRESS_X
1.0 -1ºSTRESS_Z+1.5ºWXPOS+1ºPS_1
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA- LOAD COMB 2586 _:
1.5ºT1+1.35ºSTRESS_Y- 1 1.0 2 1.0 3 1.0 4 1.0 9 0.9 11 1.0 12 1.0 13 -1.0 14 1.5 21
1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWZNEG+1.35ºPS_1 1.0
LOAD COMB 2575 _: *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+0.9ºSL+1.35ºSTRESS_
1 1.35 2 1.35 3 1.35 4 1.35 10 -1.5 11 1.35 12 -1.35 13 1.35 Y-
17 0.9 21 1.35 1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWXPOS+1.35ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA-1.5ºT1+1ºSTRESS_Y- LOAD COMB 2587 _:
1ºSTRESS_X+1ºSTRESS_Z+0.9ºWZNEG+1ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 9 0.9 11 1.35 12 -1.35 13 1.35 14
LOAD COMB 2576 _: 1.5 21 1.35
1 1.0 2 1.0 3 1.0 4 1.0 10 -1.5 11 1.0 12 -1.0 13 1.0 17 0.9 21 *1ºSD+1ºF+1ºCM+1ºPA+0.9ºSL+1ºSTRESS_Y-
1.0 1ºSTRESS_X+1ºSTRESS_Z+1.5ºWXPOS+1ºPS_1
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA- LOAD COMB 2588 _:
0.9ºT1+1.35ºSTRESS_Y- 1 1.0 2 1.0 3 1.0 4 1.0 9 0.9 11 1.0 12 -1.0 13 1.0 14 1.5 21
1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWZNEG+1.35ºPS_1 1.0
LOAD COMB 2577 _: *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+0.9ºSL+1.35ºSTRESS_
1 1.35 2 1.35 3 1.35 4 1.35 10 -0.9 11 1.35 12 -1.35 13 1.35 Y-1.35ºSTRESS_X-1.35ºSTRESS_Z+1.5ºWXPOS+1.35ºPS_1
17 1.5 21 1.35 LOAD COMB 2589 _:
*1ºSD+1ºF+1ºCM+1ºPA-0.9ºT1+1ºSTRESS_Y- 1 1.35 2 1.35 3 1.35 4 1.35 9 0.9 11 1.35 12 -1.35 13 -1.35 14
1ºSTRESS_X+1ºSTRESS_Z+1.5ºWZNEG+1ºPS_1 1.5 21 1.35
LOAD COMB 2578 _: *1ºSD+1ºF+1ºCM+1ºPA+0.9ºSL+1ºSTRESS_Y-
1 1.0 2 1.0 3 1.0 4 1.0 10 -0.9 11 1.0 12 -1.0 13 1.0 17 1.5 21 1ºSTRESS_X-1ºSTRESS_Z+1.5ºWXPOS+1ºPS_1
1.0 LOAD COMB 2590 _:
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA- 1 1.0 2 1.0 3 1.0 4 1.0 9 0.9 11 1.0 12 -1.0 13 -1.0 14 1.5 21
1.5ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X- 1.0
1.35ºSTRESS_Z+0.9ºWZNEG+1.35ºPS_1 *
LOAD COMB 2579 _: * VARIABLE DETERMINANTE: TEMPERATURA
1 1.35 2 1.35 3 1.35 4 1.35 10 -1.5 11 1.35 12 -1.35 13 -1.35 * DESFAVORABLE: 1.35 APN + 1.5 T1 + 1.05 (LO + LSC)
17 0.9 21 1.35 * FAVORABLE: 1.00 APN + 1.5 T1 + 0.90 (LO + LSC)
*1ºSD+1ºF+1ºCM+1ºPA-1.5ºT1+1ºSTRESS_Y-1ºSTRESS_X- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.5º
1ºSTRESS_Z+0.9ºWZNEG+1ºPS_1 T1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z+1.3
LOAD COMB 2580 _: 5ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 10 -1.5 11 1.0 12 -1.0 13 -1.0 17 0.9 21 LOAD COMB 2697 _:
1.0 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 1.5 11 1.35 12
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA- 1.35 13 1.35 -
0.9ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X- 21 1.35
1.35ºSTRESS_Z+1.5ºWZNEG+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1.5ºT1+1ºSTRE
LOAD COMB 2581 _: SS_Y+1ºSTRESS_X+1ºSTRESS_Z+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 10 -0.9 11 1.35 12 -1.35 13 -1.35 LOAD COMB 2698 _:
17 1.5 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 1.5 11 1.0 12 1.0 13
*1ºSD+1ºF+1ºCM+1ºPA-0.9ºT1+1ºSTRESS_Y-1ºSTRESS_X- 1.0 21 1.0
1ºSTRESS_Z+1.5ºWZNEG+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.5º
LOAD COMB 2582 _: T1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 10 -0.9 11 1.0 12 -1.0 13 -1.0 17 1.5 21 1.35ºSTRESS_Z+1.35ºPS_1
1.0 LOAD COMB 2701 _:
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+0.9ºSL+1.35ºSTRESS_ 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 1.5 11 1.35 12
Y+1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWXPOS+1.35ºPS_ 1.35 13 -1.35 -
1 21 1.35
LOAD COMB 2583 _: *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1.5ºT1+1ºSTRE
1 1.35 2 1.35 3 1.35 4 1.35 9 0.9 11 1.35 12 1.35 13 1.35 14 SS_Y+1ºSTRESS_X-1ºSTRESS_Z+1ºPS_1
1.5 21 1.35 LOAD COMB 2702 _:
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 260 de 463
(SUBJECT) (Page)

1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 1.5 11 1.0 12 1.0 13 - *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC-
1.0 21 1.0 1.5ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.5º 1.35ºSTRESS_Z+1.35ºPS_1
T1+1.35ºSTRESS_Y- LOAD COMB 2725 _:
1.35ºSTRESS_X+1.35ºSTRESS_Z+1.35ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -1.5 11 1.35 12 -
LOAD COMB 2705 _: 1.35 13 -1.35 -
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 1.5 11 1.35 12 - 21 1.35
1.35 13 1.35 - *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC-
21 1.35 1.5ºT1+1ºSTRESS_Y-1ºSTRESS_X-1ºSTRESS_Z+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1.5ºT1+1ºSTRE LOAD COMB 2726 _:
SS_Y-1ºSTRESS_X+1ºSTRESS_Z+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -1.5 11 1.0 12 -1.0 13 -
LOAD COMB 2706 _: 1.0 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 1.5 11 1.0 12 -1.0 13 *
1.0 21 1.0 * VARIABLE DETERMINANTE: VIENTO
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.5º * DESFAVORABLE: 1.35 APN + 1.5 (WX & WZ)
T1+1.35ºSTRESS_Y-1.35ºSTRESS_X- * FAVORABLE: 1.00 APN + 1.5 (WX & WZ)
1.35ºSTRESS_Z+1.35ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.35ºSTRESS_Y+1.35º
LOAD COMB 2709 _: STRESS_X+1.35ºSTRESS_Z+1.5ºWXPOS+1.35ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 1.5 11 1.35 12 - LOAD COMB 2423 _:
1.35 13 -1.35 - 1 1.35 2 1.35 3 1.35 4 1.35 11 1.35 12 1.35 13 1.35 14 1.5 21
21 1.35 1.35
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1.5ºT1+1ºSTRE *1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y+1ºSTRESS_X+1ºSTR
SS_Y-1ºSTRESS_X-1ºSTRESS_Z+1ºPS_1 ESS_Z+1.5ºWXPOS+1ºPS_1
LOAD COMB 2710 _: LOAD COMB 2424 _:
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 1.5 11 1.0 12 -1.0 13 - 1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 1.0 13 1.0 14 1.5 21 1.0
1.0 21 1.0 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.35ºSTRESS_Y+1.35º
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC- STRESS_X-1.35ºSTRESS_Z+1.5ºWXPOS+1.35ºPS_1
1.5ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z LOAD COMB 2425 _:
+1.35ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 11 1.35 12 1.35 13 -1.35 14 1.5 21
LOAD COMB 2713 _: 1.35
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -1.5 11 1.35 12 *1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y+1ºSTRESS_X-
1.35 13 1.35 - 1ºSTRESS_Z+1.5ºWXPOS+1ºPS_1
21 1.35 LOAD COMB 2426 _:
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC- 1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 1.0 13 -1.0 14 1.5 21 1.0
1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.35ºSTRESS_Y-
LOAD COMB 2714 _: 1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWXPOS+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -1.5 11 1.0 12 1.0 13 LOAD COMB 2427 _:
1.0 21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 11 1.35 12 -1.35 13 1.35 14 1.5 21
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC- 1.35
1.5ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X- *1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y-
1.35ºSTRESS_Z+1.35ºPS_1 1ºSTRESS_X+1ºSTRESS_Z+1.5ºWXPOS+1ºPS_1
LOAD COMB 2717 _: LOAD COMB 2428 _:
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -1.5 11 1.35 12 1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 -1.0 13 1.0 14 1.5 21 1.0
1.35 13 -1.35 - *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.35ºSTRESS_Y-
21 1.35 1.35ºSTRESS_X-1.35ºSTRESS_Z+1.5ºWXPOS+1.35ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC- LOAD COMB 2429 _:
1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X-1ºSTRESS_Z+1ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 11 1.35 12 -1.35 13 -1.35 14 1.5
LOAD COMB 2718 _: 21 1.35
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -1.5 11 1.0 12 1.0 13 - *1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y-1ºSTRESS_X-
1.0 21 1.0 1ºSTRESS_Z+1.5ºWXPOS+1ºPS_1
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC- LOAD COMB 2430 _:
1.5ºT1+1.35ºSTRESS_Y- 1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 -1.0 13 -1.0 14 1.5 21 1.0
1.35ºSTRESS_X+1.35ºSTRESS_Z+1.35ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.35ºSTRESS_Y+1.35º
LOAD COMB 2721 _: STRESS_X+1.35ºSTRESS_Z+1.5ºWXNEG+1.35ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -1.5 11 1.35 12 - LOAD COMB 2463 _:
1.35 13 1.35 - 1 1.35 2 1.35 3 1.35 4 1.35 11 1.35 12 1.35 13 1.35 15 1.5 21
21 1.35 1.35
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC- *1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y+1ºSTRESS_X+1ºSTR
1.5ºT1+1ºSTRESS_Y-1ºSTRESS_X+1ºSTRESS_Z+1ºPS_1 ESS_Z+1.5ºWXNEG+1ºPS_1
LOAD COMB 2722 _: LOAD COMB 2464 _:
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -1.5 11 1.0 12 -1.0 13 1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 1.0 13 1.0 15 1.5 21 1.0
1.0 21 1.0
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 261 de 463
(SUBJECT) (Page)

*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.35ºSTRESS_Y+1.35º 1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 -1.0 13 -1.0 16 1.5 21 1.0
STRESS_X-1.35ºSTRESS_Z+1.5ºWXNEG+1.35ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.35ºSTRESS_Y+1.35º
LOAD COMB 2465 _: STRESS_X+1.35ºSTRESS_Z+1.5ºWZNEG+1.35ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 11 1.35 12 1.35 13 -1.35 15 1.5 21 LOAD COMB 2543 _:
1.35 1 1.35 2 1.35 3 1.35 4 1.35 11 1.35 12 1.35 13 1.35 17 1.5 21
*1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y+1ºSTRESS_X- 1.35
1ºSTRESS_Z+1.5ºWXNEG+1ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y+1ºSTRESS_X+1ºSTR
LOAD COMB 2466 _: ESS_Z+1.5ºWZNEG+1ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 1.0 13 -1.0 15 1.5 21 1.0 LOAD COMB 2544 _:
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.35ºSTRESS_Y- 1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 1.0 13 1.0 17 1.5 21 1.0
1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWXNEG+1.35ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.35ºSTRESS_Y+1.35º
LOAD COMB 2467 _: STRESS_X-1.35ºSTRESS_Z+1.5ºWZNEG+1.35ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 11 1.35 12 -1.35 13 1.35 15 1.5 21 LOAD COMB 2545 _:
1.35 1 1.35 2 1.35 3 1.35 4 1.35 11 1.35 12 1.35 13 -1.35 17 1.5 21
*1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y- 1.35
1ºSTRESS_X+1ºSTRESS_Z+1.5ºWXNEG+1ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y+1ºSTRESS_X-
LOAD COMB 2468 _: 1ºSTRESS_Z+1.5ºWZNEG+1ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 -1.0 13 1.0 15 1.5 21 1.0 LOAD COMB 2546 _:
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.35ºSTRESS_Y- 1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 1.0 13 -1.0 17 1.5 21 1.0
1.35ºSTRESS_X-1.35ºSTRESS_Z+1.5ºWXNEG+1.35ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.35ºSTRESS_Y-
LOAD COMB 2469 _: 1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWZNEG+1.35ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 11 1.35 12 -1.35 13 -1.35 15 1.5 LOAD COMB 2547 _:
21 1.35 1 1.35 2 1.35 3 1.35 4 1.35 11 1.35 12 -1.35 13 1.35 17 1.5 21
*1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y-1ºSTRESS_X- 1.35
1ºSTRESS_Z+1.5ºWXNEG+1ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y-
LOAD COMB 2470 _: 1ºSTRESS_X+1ºSTRESS_Z+1.5ºWZNEG+1ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 -1.0 13 -1.0 15 1.5 21 1.0 LOAD COMB 2548 _:
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.35ºSTRESS_Y+1.35º 1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 -1.0 13 1.0 17 1.5 21 1.0
STRESS_X+1.35ºSTRESS_Z+1.5ºWZPOS+1.35ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.35ºSTRESS_Y-
LOAD COMB 2503 _: 1.35ºSTRESS_X-1.35ºSTRESS_Z+1.5ºWZNEG+1.35ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 11 1.35 12 1.35 13 1.35 16 1.5 21 LOAD COMB 2549 _:
1.35 1 1.35 2 1.35 3 1.35 4 1.35 11 1.35 12 -1.35 13 -1.35 17 1.5
*1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y+1ºSTRESS_X+1ºSTR 21 1.35
ESS_Z+1.5ºWZPOS+1ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y-1ºSTRESS_X-
LOAD COMB 2504 _: 1ºSTRESS_Z+1.5ºWZNEG+1ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 1.0 13 1.0 16 1.5 21 1.0 LOAD COMB 2550 _:
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.35ºSTRESS_Y+1.35º 1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 -1.0 13 -1.0 17 1.5 21 1.0
STRESS_X-1.35ºSTRESS_Z+1.5ºWZPOS+1.35ºPS_1 *
LOAD COMB 2505 _: * VARIABLE DETERMINANTE: VIENTO
1 1.35 2 1.35 3 1.35 4 1.35 11 1.35 12 1.35 13 -1.35 16 1.5 21 * DESFAVORABLE: 1.35 APN + 1.5 (WX & WZ) + 0.9 T1
1.35 * FAVORABLE: 1.00 APN + 1.5 (WX & WZ) + 0.9 T1
*1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y+1ºSTRESS_X- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+0.9ºT1+1.35ºSTRESS_
1ºSTRESS_Z+1.5ºWZPOS+1ºPS_1 Y+1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWXPOS+1.35ºPS_
LOAD COMB 2506 _: 1
1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 1.0 13 -1.0 16 1.5 21 1.0 LOAD COMB 2433 _:
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.35ºSTRESS_Y- 1 1.35 2 1.35 3 1.35 4 1.35 10 0.9 11 1.35 12 1.35 13 1.35 14
1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWZPOS+1.35ºPS_1 1.5 21 1.35
LOAD COMB 2507 _: *1ºSD+1ºF+1ºCM+1ºPA+0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X
1 1.35 2 1.35 3 1.35 4 1.35 11 1.35 12 -1.35 13 1.35 16 1.5 21 +1ºSTRESS_Z+1.5ºWXPOS+1ºPS_1
1.35 LOAD COMB 2434 _:
*1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y- 1 1.0 2 1.0 3 1.0 4 1.0 10 0.9 11 1.0 12 1.0 13 1.0 14 1.5 21
1ºSTRESS_X+1ºSTRESS_Z+1.5ºWZPOS+1ºPS_1 1.0
LOAD COMB 2508 _: *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºT1+1.35ºSTRESS_
1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 -1.0 13 1.0 16 1.5 21 1.0 Y+1.35ºSTRESS_X-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.35ºSTRESS_Y- 1.35ºSTRESS_Z+0.9ºWXPOS+1.35ºPS_1
1.35ºSTRESS_X-1.35ºSTRESS_Z+1.5ºWZPOS+1.35ºPS_1 LOAD COMB 2435 _:
LOAD COMB 2509 _: 1 1.35 2 1.35 3 1.35 4 1.35 10 1.5 11 1.35 12 1.35 13 -1.35 14
1 1.35 2 1.35 3 1.35 4 1.35 11 1.35 12 -1.35 13 -1.35 16 1.5 0.9 21 1.35
21 1.35 *1ºSD+1ºF+1ºCM+1ºPA+1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X
*1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y-1ºSTRESS_X- -1ºSTRESS_Z+0.9ºWXPOS+1ºPS_1
1ºSTRESS_Z+1.5ºWZPOS+1ºPS_1 LOAD COMB 2436 _:
LOAD COMB 2510 _:
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 262 de 463
(SUBJECT) (Page)

1 1.0 2 1.0 3 1.0 4 1.0 10 1.5 11 1.0 12 1.0 13 -1.0 14 0.9 21 *1ºSD+1ºF+1ºCM+1ºPA-
1.0 1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.9ºWXP
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+0.9ºT1+1.35ºSTRESS_ OS+1ºPS_1
Y+1.35ºSTRESS_X- LOAD COMB 2448 _:
1.35ºSTRESS_Z+1.5ºWXPOS+1.35ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.5 11 1.0 12 1.0 13 1.0 14 0.9 21
LOAD COMB 2437 _: 1.0
1 1.35 2 1.35 3 1.35 4 1.35 10 0.9 11 1.35 12 1.35 13 -1.35 14 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA-
1.5 21 1.35 0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z
*1ºSD+1ºF+1ºCM+1ºPA+0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X +1.5ºWXPOS+1.35ºPS_1
-1ºSTRESS_Z+1.5ºWXPOS+1ºPS_1 LOAD COMB 2449 _:
LOAD COMB 2438 _: 1 1.35 2 1.35 3 1.35 4 1.35 10 -0.9 11 1.35 12 1.35 13 1.35 14
1 1.0 2 1.0 3 1.0 4 1.0 10 0.9 11 1.0 12 1.0 13 -1.0 14 1.5 21 1.5 21 1.35
1.0 *1ºSD+1ºF+1ºCM+1ºPA-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºT1+1.35ºSTRESS_ 0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+1.5ºWXP
Y- OS+1ºPS_1
1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWXPOS+1.35ºPS_1 LOAD COMB 2450 _:
LOAD COMB 2439 _: 1 1.0 2 1.0 3 1.0 4 1.0 10 -0.9 11 1.0 12 1.0 13 1.0 14 1.5 21
1 1.35 2 1.35 3 1.35 4 1.35 10 1.5 11 1.35 12 -1.35 13 1.35 14 1.0
0.9 21 1.35 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA-
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºT1+1ºSTRESS_Y- 1.5ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
1ºSTRESS_X+1ºSTRESS_Z+0.9ºWXPOS+1ºPS_1 1.35ºSTRESS_Z+0.9ºWXPOS+1.35ºPS_1
LOAD COMB 2440 _: LOAD COMB 2451 _:
1 1.0 2 1.0 3 1.0 4 1.0 10 1.5 11 1.0 12 -1.0 13 1.0 14 0.9 21 1 1.35 2 1.35 3 1.35 4 1.35 10 -1.5 11 1.35 12 1.35 13 -1.35
1.0 14 0.9 21 1.35
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+0.9ºT1+1.35ºSTRESS_ *1ºSD+1ºF+1ºCM+1ºPA-
Y- 1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X-
1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWXPOS+1.35ºPS_1 1ºSTRESS_Z+0.9ºWXPOS+1ºPS_1
LOAD COMB 2441 _: LOAD COMB 2452 _:
1 1.35 2 1.35 3 1.35 4 1.35 10 0.9 11 1.35 12 -1.35 13 1.35 14 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.5 11 1.0 12 1.0 13 -1.0 14 0.9 21
1.5 21 1.35 1.0
*1ºSD+1ºF+1ºCM+1ºPA+0.9ºT1+1ºSTRESS_Y- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA-
1ºSTRESS_X+1ºSTRESS_Z+1.5ºWXPOS+1ºPS_1 0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
LOAD COMB 2442 _: 1.35ºSTRESS_Z+1.5ºWXPOS+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 10 0.9 11 1.0 12 -1.0 13 1.0 14 1.5 21 LOAD COMB 2453 _:
1.0 1 1.35 2 1.35 3 1.35 4 1.35 10 -0.9 11 1.35 12 1.35 13 -1.35
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºT1+1.35ºSTRESS_ 14 1.5 21 1.35
Y-1.35ºSTRESS_X-1.35ºSTRESS_Z+0.9ºWXPOS+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA-
LOAD COMB 2443 _: 0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X-
1 1.35 2 1.35 3 1.35 4 1.35 10 1.5 11 1.35 12 -1.35 13 -1.35 1ºSTRESS_Z+1.5ºWXPOS+1ºPS_1
14 0.9 21 1.35 LOAD COMB 2454 _:
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºT1+1ºSTRESS_Y- 1 1.0 2 1.0 3 1.0 4 1.0 10 -0.9 11 1.0 12 1.0 13 -1.0 14 1.5 21
1ºSTRESS_X-1ºSTRESS_Z+0.9ºWXPOS+1ºPS_1 1.0
LOAD COMB 2444 _: *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA-
1 1.0 2 1.0 3 1.0 4 1.0 10 1.5 11 1.0 12 -1.0 13 -1.0 14 0.9 21 1.5ºT1+1.35ºSTRESS_Y-
1.0 1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWXPOS+1.35ºPS_1
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+0.9ºT1+1.35ºSTRESS_ LOAD COMB 2455 _:
Y-1.35ºSTRESS_X-1.35ºSTRESS_Z+1.5ºWXPOS+1.35ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 10 -1.5 11 1.35 12 -1.35 13 1.35
LOAD COMB 2445 _: 14 0.9 21 1.35
1 1.35 2 1.35 3 1.35 4 1.35 10 0.9 11 1.35 12 -1.35 13 -1.35 *1ºSD+1ºF+1ºCM+1ºPA-1.5ºT1+1ºSTRESS_Y-
14 1.5 21 1.35 1ºSTRESS_X+1ºSTRESS_Z+0.9ºWXPOS+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+0.9ºT1+1ºSTRESS_Y- LOAD COMB 2456 _:
1ºSTRESS_X-1ºSTRESS_Z+1.5ºWXPOS+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.5 11 1.0 12 -1.0 13 1.0 14 0.9 21
LOAD COMB 2446 _: 1.0
1 1.0 2 1.0 3 1.0 4 1.0 10 0.9 11 1.0 12 -1.0 13 -1.0 14 1.5 21 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA-
1.0 0.9ºT1+1.35ºSTRESS_Y-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA- 1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWXPOS+1.35ºPS_1
1.5ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z LOAD COMB 2457 _:
+0.9ºWXPOS+1.35ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 10 -0.9 11 1.35 12 -1.35 13 1.35
LOAD COMB 2447 _: 14 1.5 21 1.35
1 1.35 2 1.35 3 1.35 4 1.35 10 -1.5 11 1.35 12 1.35 13 1.35 14 *1ºSD+1ºF+1ºCM+1ºPA-0.9ºT1+1ºSTRESS_Y-
0.9 21 1.35 1ºSTRESS_X+1ºSTRESS_Z+1.5ºWXPOS+1ºPS_1
LOAD COMB 2458 _:
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 263 de 463
(SUBJECT) (Page)

1 1.0 2 1.0 3 1.0 4 1.0 10 -0.9 11 1.0 12 -1.0 13 1.0 14 1.5 21 *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+1ºSTRESS_Y-
1.0 1ºSTRESS_X-1ºSTRESS_Z+1ºPS_1
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA- LOAD COMB 2686 _:
1.5ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X- 1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 11 1.0 12 -1.0 13 -1.0 21 1.0
1.35ºSTRESS_Z+0.9ºWXPOS+1.35ºPS_1 *
LOAD COMB 2459 _: *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+0.9ºT1
1 1.35 2 1.35 3 1.35 4 1.35 10 -1.5 11 1.35 12 -1.35 13 -1.35 +1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z+1.35º
14 0.9 21 1.35 PS_1
*1ºSD+1ºF+1ºCM+1ºPA-1.5ºT1+1ºSTRESS_Y-1ºSTRESS_X- LOAD COMB 2695 _:
1ºSTRESS_Z+0.9ºWXPOS+1ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 0.9 11 1.35 12 1.35
LOAD COMB 2460 _: 13 1.35 -
1 1.0 2 1.0 3 1.0 4 1.0 10 -1.5 11 1.0 12 -1.0 13 -1.0 14 0.9 21 21 1.35
1.0 *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+0.9ºT1+1ºSTRESS
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA- _Y+1ºSTRESS_X+1ºSTRESS_Z+1ºPS_1
0.9ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X- LOAD COMB 2696 _:
1.35ºSTRESS_Z+1.5ºWXPOS+1.35ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 0.9 11 1.0 12 1.0 13 1.0
LOAD COMB 2461 _: 21 1.0
1 1.35 2 1.35 3 1.35 4 1.35 10 -0.9 11 1.35 12 -1.35 13 -1.35 *
14 1.5 21 1.35 *
*1ºSD+1ºF+1ºCM+1ºPA-0.9ºT1+1ºSTRESS_Y-1ºSTRESS_X- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+0.9ºT1
1ºSTRESS_Z+1.5ºWXPOS+1ºPS_1 +1.35ºSTRESS_Y+1.35ºSTRESS_X-
LOAD COMB 2462 _: 1.35ºSTRESS_Z+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 10 -0.9 11 1.0 12 -1.0 13 -1.0 14 1.5 21 LOAD COMB 2699 _:
1.0 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 0.9 11 1.35 12 1.35
* 13 -1.35 -
* VARIABLE DETERMINANTE: CARGA VIVA 21 1.35
OPERACION LO *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+0.9ºT1+1ºSTRESS
* DESFAVORABLE: 1.35 APN + 1.5 LO _Y+1ºSTRESS_X-1ºSTRESS_Z+1ºPS_1
* FAVORABLE: 1.00 APN + 1.5 LO LOAD COMB 2700 _:
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+1.35º 1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 0.9 11 1.0 12 1.0 13 -1.0
STRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z+1.35ºPS_1 21 1.0
LOAD COMB 2679 _: *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+0.9ºT1
1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 11 1.35 12 1.35 13 +1.35ºSTRESS_Y-
1.35 21 1.35 1.35ºSTRESS_X+1.35ºSTRESS_Z+1.35ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+1ºSTRESS_Y+1ºS LOAD COMB 2703 _:
TRESS_X+1ºSTRESS_Z+1ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 0.9 11 1.35 12 -1.35
LOAD COMB 2680 _: 13 1.35 -
1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 11 1.0 12 1.0 13 1.0 21 1.0 21 1.35
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+1.35º *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+0.9ºT1+1ºSTRESS
STRESS_Y+1.35ºSTRESS_X-1.35ºSTRESS_Z+1.35ºPS_1 _Y-1ºSTRESS_X+1ºSTRESS_Z+1ºPS_1
LOAD COMB 2681 _: LOAD COMB 2704 _:
1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 11 1.35 12 1.35 13 - 1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 0.9 11 1.0 12 -1.0 13 1.0
1.35 21 1.35 21 1.0
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+1ºSTRESS_Y+1ºS *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+0.9ºT1
TRESS_X-1ºSTRESS_Z+1ºPS_1 +1.35ºSTRESS_Y-1.35ºSTRESS_X-
LOAD COMB 2682 _: 1.35ºSTRESS_Z+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 11 1.0 12 1.0 13 -1.0 21 1.0 LOAD COMB 2707 _:
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+1.35º 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 0.9 11 1.35 12 -1.35
STRESS_Y-1.35ºSTRESS_X+1.35ºSTRESS_Z+1.35ºPS_1 13 -1.35 -
LOAD COMB 2683 _: 21 1.35
1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 11 1.35 12 -1.35 13 *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+0.9ºT1+1ºSTRESS
1.35 21 1.35 _Y-1ºSTRESS_X-1ºSTRESS_Z+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+1ºSTRESS_Y- LOAD COMB 2708 _:
1ºSTRESS_X+1ºSTRESS_Z+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 0.9 11 1.0 12 -1.0 13 -1.0
LOAD COMB 2684 _: 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 11 1.0 12 -1.0 13 1.0 21 1.0 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+1.35º 0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z
STRESS_Y-1.35ºSTRESS_X-1.35ºSTRESS_Z+1.35ºPS_1 +1.35ºPS_1
LOAD COMB 2685 _: LOAD COMB 2711 _:
1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 11 1.35 12 -1.35 13 - 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 -0.9 11 1.35 12 1.35
1.35 21 1.35 13 1.35 -
21 1.35
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 264 de 463
(SUBJECT) (Page)

*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC- LOAD COMB 2746 _:


0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 11 1.0 12 1.0 13 1.0 14
LOAD COMB 2712 _: 1.5 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 -0.9 11 1.0 12 1.0 13 1.0 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+1.35º
21 1.0 STRESS_Y+1.35ºSTRESS_X-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC- 1.35ºSTRESS_Z+0.9ºWXPOS+1.35ºPS_1
0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X- LOAD COMB 2747 _:
1.35ºSTRESS_Z+1.35ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 11 1.35 12 1.35 13 -
LOAD COMB 2715 _: 1.35 14 0.9 -
1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 -0.9 11 1.35 12 1.35 21 1.35
13 -1.35 - *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+1ºSTRESS_Y+1ºS
21 1.35 TRESS_X-1ºSTRESS_Z+0.9ºWXPOS+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC- LOAD COMB 2748 _:
0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X-1ºSTRESS_Z+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 11 1.0 12 1.0 13 -1.0 14 0.9
LOAD COMB 2716 _: 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 -0.9 11 1.0 12 1.0 13 -1.0 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.3
21 1.0 5ºSTRESS_Y+1.35ºSTRESS_X-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC- 1.35ºSTRESS_Z+1.5ºWXPOS+1.35ºPS_1
0.9ºT1+1.35ºSTRESS_Y- LOAD COMB 2749 _:
1.35ºSTRESS_X+1.35ºSTRESS_Z+1.35ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 11 1.35 12 1.35 13 -
LOAD COMB 2719 _: 1.35 14 1.5 -
1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 -0.9 11 1.35 12 - 21 1.35
1.35 13 1.35 - *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1ºSTRESS_Y+1
21 1.35 ºSTRESS_X-1ºSTRESS_Z+1.5ºWXPOS+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC- LOAD COMB 2750 _:
0.9ºT1+1ºSTRESS_Y-1ºSTRESS_X+1ºSTRESS_Z+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 11 1.0 12 1.0 13 -1.0 14
LOAD COMB 2720 _: 1.5 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 -0.9 11 1.0 12 -1.0 13 1.0 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+1.35º
21 1.0 STRESS_Y-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC- 1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWXPOS+1.35ºPS_1
0.9ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X- LOAD COMB 2751 _:
*1.35ºSTRESS_Z+1.35ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 11 1.35 12 -1.35 13
LOAD COMB 2723 _: 1.35 14 0.9 -
1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 -0.9 11 1.35 12 - 21 1.35
1.35 13 -1.35 - *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+1ºSTRESS_Y-
21 1.35 1ºSTRESS_X+1ºSTRESS_Z+0.9ºWXPOS+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC- LOAD COMB 2752 _:
0.9ºT1+1ºSTRESS_Y-1ºSTRESS_X-1ºSTRESS_Z+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 11 1.0 12 -1.0 13 1.0 14 0.9
LOAD COMB 2724 _: 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 -0.9 11 1.0 12 -1.0 13 - *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.3
1.0 21 1.0 5ºSTRESS_Y-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+1.35º 1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWXPOS+1.35ºPS_1
STRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWXPOS LOAD COMB 2753 _:
+1.35ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 11 1.35 12 -1.35 13
LOAD COMB 2743 _: 1.35 14 1.5 -
1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 11 1.35 12 1.35 13 21 1.35
1.35 14 0.9 - *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1ºSTRESS_Y-
21 1.35 1ºSTRESS_X+1ºSTRESS_Z+1.5ºWXPOS+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+1ºSTRESS_Y+1ºS LOAD COMB 2754 _:
TRESS_X+1ºSTRESS_Z+0.9ºWXPOS+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 11 1.0 12 -1.0 13 1.0 14
LOAD COMB 2744 _: 1.5 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 11 1.0 12 1.0 13 1.0 14 0.9 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+1.35º
21 1.0 STRESS_Y-1.35ºSTRESS_X-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.3 1.35ºSTRESS_Z+0.9ºWXPOS+1.35ºPS_1
5ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWXPO LOAD COMB 2755 _:
S+1.35ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 11 1.35 12 -1.35 13 -
LOAD COMB 2745 _: 1.35 14 0.9 -
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 11 1.35 12 1.35 13 21 1.35
1.35 14 1.5 - *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+1ºSTRESS_Y-
21 1.35 1ºSTRESS_X-1ºSTRESS_Z+0.9ºWXPOS+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1ºSTRESS_Y+1 LOAD COMB 2756 _:
ºSTRESS_X+1ºSTRESS_Z+1.5ºWXPOS+1ºPS_1
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 265 de 463
(SUBJECT) (Page)

1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 11 1.0 12 -1.0 13 -1.0 14 0.9 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+1.35º
21 1.0 STRESS_Y-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.3 1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWXNEG+1.35ºPS_1
5ºSTRESS_Y-1.35ºSTRESS_X- LOAD COMB 2783 _:
1.35ºSTRESS_Z+1.5ºWXPOS+1.35ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 11 1.35 12 -1.35 13
LOAD COMB 2757 _: 1.35 15 0.9 -
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 11 1.35 12 -1.35 13 - 21 1.35
1.35 14 1.5 - *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+1ºSTRESS_Y-
21 1.35 1ºSTRESS_X+1ºSTRESS_Z+0.9ºWXNEG+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1ºSTRESS_Y- LOAD COMB 2784 _:
1ºSTRESS_X-1ºSTRESS_Z+1.5ºWXPOS+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 11 1.0 12 -1.0 13 1.0 15 0.9
LOAD COMB 2758 _: 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 11 1.0 12 -1.0 13 -1.0 14 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.3
1.5 21 1.0 5ºSTRESS_Y-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+1.35º 1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWXNEG+1.35ºPS_1
STRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWXNEG LOAD COMB 2785 _:
+1.35ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 11 1.35 12 -1.35 13
LOAD COMB 2775 _: 1.35 15 1.5 -
1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 11 1.35 12 1.35 13 21 1.35
1.35 15 0.9 - *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1ºSTRESS_Y-
21 1.35 1ºSTRESS_X+1ºSTRESS_Z+1.5ºWXNEG+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+1ºSTRESS_Y+1ºS LOAD COMB 2786 _:
TRESS_X+1ºSTRESS_Z+0.9ºWXNEG+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 11 1.0 12 -1.0 13 1.0 15
LOAD COMB 2776 _: 1.5 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 11 1.0 12 1.0 13 1.0 15 0.9 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+1.35º
21 1.0 STRESS_Y-1.35ºSTRESS_X-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.3 1.35ºSTRESS_Z+0.9ºWXNEG+1.35ºPS_1
5ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWXNE LOAD COMB 2787 _:
G+1.35ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 11 1.35 12 -1.35 13 -
LOAD COMB 2777 _: 1.35 15 0.9 -
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 11 1.35 12 1.35 13 21 1.35
1.35 15 1.5 - *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+1ºSTRESS_Y-
21 1.35 1ºSTRESS_X-1ºSTRESS_Z+0.9ºWXNEG+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1ºSTRESS_Y+1 LOAD COMB 2788 _:
ºSTRESS_X+1ºSTRESS_Z+1.5ºWXNEG+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 11 1.0 12 -1.0 13 -1.0 15 0.9
LOAD COMB 2778 _: 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 11 1.0 12 1.0 13 1.0 15 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.3
1.5 21 1.0 5ºSTRESS_Y-1.35ºSTRESS_X-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+1.35º 1.35ºSTRESS_Z+1.5ºWXNEG+1.35ºPS_1
STRESS_Y+1.35ºSTRESS_X- LOAD COMB 2789 _:
1.35ºSTRESS_Z+0.9ºWXNEG+1.35ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 11 1.35 12 -1.35 13 -
LOAD COMB 2779 _: 1.35 15 1.5 -
1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 11 1.35 12 1.35 13 - 21 1.35
1.35 15 0.9 - *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1ºSTRESS_Y-
21 1.35 1ºSTRESS_X-1ºSTRESS_Z+1.5ºWXNEG+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+1ºSTRESS_Y+1ºS LOAD COMB 2790 _:
TRESS_X-1ºSTRESS_Z+0.9ºWXNEG+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 11 1.0 12 -1.0 13 -1.0 15
LOAD COMB 2780 _: 1.5 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 11 1.0 12 1.0 13 -1.0 15 0.9 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+1.35º
21 1.0 STRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWZPOS
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.3 +1.35ºPS_1
5ºSTRESS_Y+1.35ºSTRESS_X- LOAD COMB 2807 _:
1.35ºSTRESS_Z+1.5ºWXNEG+1.35ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 11 1.35 12 1.35 13
LOAD COMB 2781 _: 1.35 16 0.9 -
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 11 1.35 12 1.35 13 - 21 1.35
1.35 15 1.5 - *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+1ºSTRESS_Y+1ºS
21 1.35 TRESS_X+1ºSTRESS_Z+0.9ºWZPOS+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1ºSTRESS_Y+1 LOAD COMB 2808 _:
ºSTRESS_X-1ºSTRESS_Z+1.5ºWXNEG+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 11 1.0 12 1.0 13 1.0 16 0.9
LOAD COMB 2782 _: 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 11 1.0 12 1.0 13 -1.0 15
1.5 21 1.0
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 266 de 463
(SUBJECT) (Page)

*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.3 *1.35ºSTRESS_Z+0.9ºWZPOS+1.35ºPS_1
5ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWZPO LOAD COMB 2819 _:
S+1.35ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 11 1.35 12 -1.35 13 -
LOAD COMB 2809 _: 1.35 16 0.9 -
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 11 1.35 12 1.35 13 21 1.35
1.35 16 1.5 - *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+1ºSTRESS_Y-
21 1.35 1ºSTRESS_X-1ºSTRESS_Z+0.9ºWZPOS+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1ºSTRESS_Y+1 LOAD COMB 2820 _:
ºSTRESS_X+1ºSTRESS_Z+1.5ºWZPOS+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 11 1.0 12 -1.0 13 -1.0 16 0.9
LOAD COMB 2810 _: 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 11 1.0 12 1.0 13 1.0 16 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.3
1.5 21 1.0 5ºSTRESS_Y-1.35ºSTRESS_X-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+1.35º *1.35ºSTRESS_Z+1.5ºWZPOS+1.35ºPS_1
STRESS_Y+1.35ºSTRESS_X- LOAD COMB 2821 _:
1.35ºSTRESS_Z+0.9ºWZPOS+1.35ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 11 1.35 12 -1.35 13 -
LOAD COMB 2811 _: 1.35 16 1.5 -
1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 11 1.35 12 1.35 13 - 21 1.35
1.35 16 0.9 - *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1ºSTRESS_Y-
21 1.35 1ºSTRESS_X-1ºSTRESS_Z+1.5ºWZPOS+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+1ºSTRESS_Y+1ºS LOAD COMB 2822 _:
TRESS_X-1ºSTRESS_Z+0.9ºWZPOS+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 11 1.0 12 -1.0 13 -1.0 16
LOAD COMB 2812 _: 1.5 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 11 1.0 12 1.0 13 -1.0 16 0.9 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+1.35º
21 1.0 STRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.3 *+0.9ºWZNEG+1.35ºPS_1
5ºSTRESS_Y+1.35ºSTRESS_X- LOAD COMB 2839 _:
1.35ºSTRESS_Z+1.5ºWZPOS+1.35ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 11 1.35 12 1.35 13
LOAD COMB 2813 _: 1.35 17 0.9 -
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 11 1.35 12 1.35 13 - 21 1.35
1.35 16 1.5 - *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+1ºSTRESS_Y+1ºS
21 1.35 TRESS_X+1ºSTRESS_Z+0.9ºWZNEG+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1ºSTRESS_Y+1 LOAD COMB 2840 _:
ºSTRESS_X-1ºSTRESS_Z+1.5ºWZPOS+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 11 1.0 12 1.0 13 1.0 17 0.9
LOAD COMB 2814 _: 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 11 1.0 12 1.0 13 -1.0 16 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.3
1.5 21 1.0 5ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+1.35º *_Z+1.5ºWZNEG+1.35ºPS_1
STRESS_Y- LOAD COMB 2841 _:
1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWZPOS+1.35ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 11 1.35 12 1.35 13
LOAD COMB 2815 _: 1.35 17 1.5 -
1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 11 1.35 12 -1.35 13 21 1.35
1.35 16 0.9 - *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1ºSTRESS_Y+1
21 1.35 ºSTRESS_X+1ºSTRESS_Z+1.5ºWZNEG+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+1ºSTRESS_Y- LOAD COMB 2842 _:
1ºSTRESS_X+1ºSTRESS_Z+0.9ºWZPOS+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 11 1.0 12 1.0 13 1.0 17
LOAD COMB 2816 _: 1.5 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 11 1.0 12 -1.0 13 1.0 16 0.9 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+1.35º
21 1.0 STRESS_Y+1.35ºSTRESS_X-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.3 *1.35ºSTRESS_Z+0.9ºWZNEG+1.35ºPS_1
5ºSTRESS_Y- LOAD COMB 2843 _:
1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWZPOS+1.35ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 11 1.35 12 1.35 13 -
LOAD COMB 2817 _: 1.35 17 0.9 -
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 11 1.35 12 -1.35 13 21 1.35
1.35 16 1.5 - *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+1ºSTRESS_Y+1ºS
21 1.35 TRESS_X-1ºSTRESS_Z+0.9ºWZNEG+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1ºSTRESS_Y- LOAD COMB 2844 _:
1ºSTRESS_X+1ºSTRESS_Z+1.5ºWZPOS+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 11 1.0 12 1.0 13 -1.0 17 0.9
LOAD COMB 2818 _: 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 11 1.0 12 -1.0 13 1.0 16 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.3
1.5 21 1.0 5ºSTRESS_Y+1.35ºSTRESS_X-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+1.35º *1.35ºSTRESS_Z+1.5ºWZNEG+1.35ºPS_1
STRESS_Y-1.35ºSTRESS_X- LOAD COMB 2845 _:
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 267 de 463
(SUBJECT) (Page)

1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 11 1.35 12 1.35 13 - 14 0.9 21 1.35
1.35 17 1.5 - *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+0.9ºT1+1ºSTRESS
21 1.35 _Y+1ºSTRESS_X+1ºSTRESS_Z+0.9ºWXPOS+1ºP
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1ºSTRESS_Y+1 *S_1
ºSTRESS_X-1ºSTRESS_Z+1.5ºWZNEG+1ºPS_1 LOAD COMB 2872 _:
LOAD COMB 2846 _: 1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 0.9 11 1.0 12 1.0 13 1.0
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 11 1.0 12 1.0 13 -1.0 17 14 0.9 -
1.5 21 1.0 21 1.0
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+1.35º *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.5º
STRESS_Y- T1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35
*1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWZNEG+1.35ºPS_1 *ºSTRESS_Z+0.9ºWXPOS+1.35ºPS_1
LOAD COMB 2847 _: LOAD COMB 2873 _:
1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 11 1.35 12 -1.35 13 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 1.5 11 1.35 12
1.35 17 0.9 - 1.35 13 1.35 -
21 1.35 14 0.9 21 1.35
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+1ºSTRESS_Y- *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1.5ºT1+1ºSTRE
1ºSTRESS_X+1ºSTRESS_Z+0.9ºWZNEG+1ºPS_1 SS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.9ºWXPOS+1
LOAD COMB 2848 _: *ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 11 1.0 12 -1.0 13 1.0 17 0.9 LOAD COMB 2874 _:
21 1.0 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 1.5 11 1.0 12 1.0 13
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.3 1.0 14 0.9 -
5ºSTRESS_Y- 21 1.0
*1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWZNEG+1.35ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+0.9º
LOAD COMB 2849 _: T1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 11 1.35 12 -1.35 13 *ºSTRESS_Z+1.5ºWXPOS+1.35ºPS_1
1.35 17 1.5 - LOAD COMB 2875 _:
21 1.35 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 0.9 11 1.35 12
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1ºSTRESS_Y- 1.35 13 1.35 -
1ºSTRESS_X+1ºSTRESS_Z+1.5ºWZNEG+1ºPS_1 14 1.5 21 1.35
LOAD COMB 2850 _: *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+0.9ºT1+1ºSTRE
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 11 1.0 12 -1.0 13 1.0 17 SS_Y+1ºSTRESS_X+1ºSTRESS_Z+1.5ºWXPOS+1
1.5 21 1.0 *ºPS_1
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+1.35º LOAD COMB 2876 _:
STRESS_Y-1.35ºSTRESS_X- 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 0.9 11 1.0 12 1.0 13
*1.35ºSTRESS_Z+0.9ºWZNEG+1.35ºPS_1 1.0 14 1.5 -
LOAD COMB 2851 _: 21 1.0
1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 11 1.35 12 -1.35 13 - *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC-
1.35 17 0.9 - *0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z
21 1.35 +0.9ºWXPOS+1.35ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+1ºSTRESS_Y- LOAD COMB 2877 _:
1ºSTRESS_X-1ºSTRESS_Z+0.9ºWZNEG+1ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 -0.9 11 1.35 12 1.35
LOAD COMB 2852 _: 13 1.35 -
1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 11 1.0 12 -1.0 13 -1.0 17 0.9 14 0.9 21 1.35
21 1.0 *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.3 *0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.9ºWX
5ºSTRESS_Y-1.35ºSTRESS_X- POS+1ºPS_1
*1.35ºSTRESS_Z+1.5ºWZNEG+1.35ºPS_1 LOAD COMB 2878 _:
LOAD COMB 2853 _: 1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 -0.9 11 1.0 12 1.0 13 1.0
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 11 1.35 12 -1.35 13 - 14 0.9 -
1.35 17 1.5 - 21 1.0
21 1.35 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC-
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1ºSTRESS_Y- *1.5ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z
1ºSTRESS_X-1ºSTRESS_Z+1.5ºWZNEG+1ºPS_1 +0.9ºWXPOS+1.35ºPS_1
LOAD COMB 2854 _: LOAD COMB 2879 _:
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 11 1.0 12 -1.0 13 -1.0 17 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -1.5 11 1.35 12
1.5 21 1.0 1.35 13 1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+0.9ºT1 14 0.9 21 1.35
+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºS *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC-
*TRESS_Z+0.9ºWXPOS+1.35ºPS_1 *1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.9ºWX
LOAD COMB 2871 _: POS+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 0.9 11 1.35 12 1.35 LOAD COMB 2880 _:
13 1.35 -
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 268 de 463
(SUBJECT) (Page)

1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -1.5 11 1.0 12 1.0 13 LOAD COMB 2895 _:
1.0 14 0.9 - 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 -0.9 11 1.35 12 1.35
21 1.0 13 1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC- 15 0.9 21 1.35
*0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC-
+1.5ºWXPOS+1.35ºPS_1 *0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.9ºWX
LOAD COMB 2881 _: NEG+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -0.9 11 1.35 12 LOAD COMB 2896 _:
1.35 13 1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 -0.9 11 1.0 12 1.0 13 1.0
14 1.5 21 1.35 15 0.9 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC- 21 1.0
*0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+1.5ºWX *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC-
POS+1ºPS_1 *1.5ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z
LOAD COMB 2882 _: +0.9ºWXNEG+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -0.9 11 1.0 12 1.0 13 LOAD COMB 2897 _:
1.0 14 1.5 - 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -1.5 11 1.35 12
21 1.0 1.35 13 1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+0.9ºT1 15 0.9 21 1.35
+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºS *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC-
*TRESS_Z+0.9ºWXNEG+1.35ºPS_1 *1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.9ºWX
LOAD COMB 2889 _: NEG+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 0.9 11 1.35 12 1.35 LOAD COMB 2898 _:
13 1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -1.5 11 1.0 12 1.0 13
15 0.9 21 1.35 1.0 15 0.9 -
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+0.9ºT1+1ºSTRESS 21 1.0
_Y+1ºSTRESS_X+1ºSTRESS_Z+0.9ºWXNEG+1ºP *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC-
*S_1 *0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z
LOAD COMB 2890 _: +1.5ºWXNEG+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 0.9 11 1.0 12 1.0 13 1.0 LOAD COMB 2899 _:
15 0.9 - 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -0.9 11 1.35 12
21 1.0 1.35 13 1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.5º 15 1.5 21 1.35
T1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC-
*ºSTRESS_Z+0.9ºWXNEG+1.35ºPS_1 *0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+1.5ºWX
LOAD COMB 2891 _: NEG+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 1.5 11 1.35 12 LOAD COMB 2900 _:
1.35 13 1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -0.9 11 1.0 12 1.0 13
15 0.9 21 1.35 1.0 15 1.5 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1.5ºT1+1ºSTRE 21 1.0
SS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.9ºWXNEG+1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+0.9ºT1
*ºPS_1 +1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºS
LOAD COMB 2892 _: *TRESS_Z+0.9ºWZPOS+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 1.5 11 1.0 12 1.0 13 LOAD COMB 2907 _:
1.0 15 0.9 - 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 0.9 11 1.35 12 1.35
21 1.0 13 1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+0.9º 16 0.9 21 1.35
T1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35 *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+0.9ºT1+1ºSTRESS
*ºSTRESS_Z+1.5ºWXNEG+1.35ºPS_1 _Y+1ºSTRESS_X+1ºSTRESS_Z+0.9ºWZPOS+1ºP
LOAD COMB 2893 _: *S_1
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 0.9 11 1.35 12 LOAD COMB 2908 _:
1.35 13 1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 0.9 11 1.0 12 1.0 13 1.0
15 1.5 21 1.35 16 0.9 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+0.9ºT1+1ºSTRE 21 1.0
SS_Y+1ºSTRESS_X+1ºSTRESS_Z+1.5ºWXNEG+1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.5º
*ºPS_1 T1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35
LOAD COMB 2894 _: *ºSTRESS_Z+0.9ºWZPOS+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 0.9 11 1.0 12 1.0 13 LOAD COMB 2909 _:
1.0 15 1.5 - 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 1.5 11 1.35 12
21 1.0 1.35 13 1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC- 16 0.9 21 1.35
*0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1.5ºT1+1ºSTRE
+0.9ºWXNEG+1.35ºPS_1 SS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.9ºWZPOS+1
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 269 de 463
(SUBJECT) (Page)

*ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+0.9ºT1
LOAD COMB 2910 _: +1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºS
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 1.5 11 1.0 12 1.0 13 *TRESS_Z+0.9ºWZNEG+1.35ºPS_1
1.0 16 0.9 - LOAD COMB 2925 _:
21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 0.9 11 1.35 12 1.35
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+0.9º 13 1.35 -
T1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35 17 0.9 21 1.35
*ºSTRESS_Z+1.5ºWZPOS+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+0.9ºT1+1ºSTRESS
LOAD COMB 2911 _: _Y+1ºSTRESS_X+1ºSTRESS_Z+0.9ºWZNEG+1ºP
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 0.9 11 1.35 12 *S_1
1.35 13 1.35 - LOAD COMB 2926 _:
16 1.5 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 0.9 11 1.0 12 1.0 13 1.0
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+0.9ºT1+1ºSTRE 17 0.9 -
SS_Y+1ºSTRESS_X+1ºSTRESS_Z+1.5ºWZPOS+1 21 1.0
*ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.5º
LOAD COMB 2912 _: T1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 0.9 11 1.0 12 1.0 13 *ºSTRESS_Z+0.9ºWZNEG+1.35ºPS_1
1.0 16 1.5 - LOAD COMB 2927 _:
21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 1.5 11 1.35 12
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC- 1.35 13 1.35 -
*0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z 17 0.9 21 1.35
+0.9ºWZPOS+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1.5ºT1+1ºSTRE
LOAD COMB 2913 _: SS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.9ºWZNEG+1
1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 -0.9 11 1.35 12 1.35 *ºPS_1
13 1.35 - LOAD COMB 2928 _:
16 0.9 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 1.5 11 1.0 12 1.0 13
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC- 1.0 17 0.9 -
*0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.9ºWZ 21 1.0
POS+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+0.9º
LOAD COMB 2914 _: T1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35
1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 -0.9 11 1.0 12 1.0 13 1.0 *ºSTRESS_Z+1.5ºWZNEG+1.35ºPS_1
16 0.9 - LOAD COMB 2929 _:
21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 0.9 11 1.35 12
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC- 1.35 13 1.35 -
*1.5ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z 17 1.5 21 1.35
+0.9ºWZPOS+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+0.9ºT1+1ºSTRE
LOAD COMB 2915 _: SS_Y+1ºSTRESS_X+1ºSTRESS_Z+1.5ºWZNEG+1
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -1.5 11 1.35 12 *ºPS_1
1.35 13 1.35 - LOAD COMB 2930 _:
16 0.9 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 0.9 11 1.0 12 1.0 13
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC- 1.0 17 1.5 -
*1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.9ºWZ 21 1.0
POS+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC-
LOAD COMB 2916 _: *0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -1.5 11 1.0 12 1.0 13 +0.9ºWZNEG+1.35ºPS_1
1.0 16 0.9 - LOAD COMB 2931 _:
21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 -0.9 11 1.35 12 1.35
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC- 13 1.35 -
*0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z 17 0.9 21 1.35
+1.5ºWZPOS+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC-
LOAD COMB 2917 _: *0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.9ºWZ
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -0.9 11 1.35 12 NEG+1ºPS_1
1.35 13 1.35 - LOAD COMB 2932 _:
16 1.5 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 -0.9 11 1.0 12 1.0 13 1.0
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC- 17 0.9 -
*0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+1.5ºWZ 21 1.0
POS+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC-
LOAD COMB 2918 _: *1.5ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -0.9 11 1.0 12 1.0 13 +0.9ºWZNEG+1.35ºPS_1
1.0 16 1.5 - LOAD COMB 2933 _:
21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -1.5 11 1.35 12
1.35 13 1.35 -
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 270 de 463
(SUBJECT) (Page)

17 0.9 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 0.9 11 1.0 12 1.0 13 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC- 1.0 14 1.5 -
*1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.9ºWZ 21 1.0
NEG+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC-
LOAD COMB 2934 _: 0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -1.5 11 1.0 12 1.0 13 *1.35ºSTRESS_Z+0.9ºWXPOS+1.35ºPS_1
1.0 17 0.9 - LOAD COMB 2949 _:
21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 -0.9 11 1.35 12 1.35
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC- 13 -1.35 -
*0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z 14 0.9 21 1.35
+1.5ºWZNEG+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC-
LOAD COMB 2935 _: 0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X-
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -0.9 11 1.35 12 *1ºSTRESS_Z+0.9ºWXPOS+1ºPS_1
1.35 13 1.35 - LOAD COMB 2950 _:
17 1.5 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 -0.9 11 1.0 12 1.0 13 -1.0
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC- 14 0.9 -
*0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+1.5ºWZ 21 1.0
NEG+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC-
LOAD COMB 2936 _: 1.5ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -0.9 11 1.0 12 1.0 13 *1.35ºSTRESS_Z+0.9ºWXPOS+1.35ºPS_1
1.0 17 1.5 - LOAD COMB 2951 _:
21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -1.5 11 1.35 12
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+0.9ºT1 1.35 13 -1.35 -
+1.35ºSTRESS_Y+1.35ºSTRESS_X- 14 0.9 21 1.35
*1.35ºSTRESS_Z+0.9ºWXPOS+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC-
LOAD COMB 2943 _: 1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X-
1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 0.9 11 1.35 12 1.35 *1ºSTRESS_Z+0.9ºWXPOS+1ºPS_1
13 -1.35 - LOAD COMB 2952 _:
14 0.9 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -1.5 11 1.0 12 1.0 13 -
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+0.9ºT1+1ºSTRESS 1.0 14 0.9 -
_Y+1ºSTRESS_X- 21 1.0
*1ºSTRESS_Z+0.9ºWXPOS+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC-
LOAD COMB 2944 _: 0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 0.9 11 1.0 12 1.0 13 -1.0 *1.35ºSTRESS_Z+1.5ºWXPOS+1.35ºPS_1
14 0.9 - LOAD COMB 2953 _:
21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -0.9 11 1.35 12
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.5º 1.35 13 -1.35 -
T1+1.35ºSTRESS_Y+1.35ºSTRESS_X- 14 1.5 21 1.35
*1.35ºSTRESS_Z+0.9ºWXPOS+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC-
LOAD COMB 2945 _: 0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X-
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 1.5 11 1.35 12 *1ºSTRESS_Z+1.5ºWXPOS+1ºPS_1
1.35 13 -1.35 - LOAD COMB 2954 _:
14 0.9 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -0.9 11 1.0 12 1.0 13 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1.5ºT1+1ºSTRE 1.0 14 1.5 -
SS_Y+1ºSTRESS_X- 21 1.0
*1ºSTRESS_Z+0.9ºWXPOS+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+0.9ºT1
LOAD COMB 2946 _: +1.35ºSTRESS_Y+1.35ºSTRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 1.5 11 1.0 12 1.0 13 - *1.35ºSTRESS_Z+0.9ºWXNEG+1.35ºPS_1
1.0 14 0.9 - LOAD COMB 2961 _:
21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 0.9 11 1.35 12 1.35
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+0.9º 13 -1.35 -
T1+1.35ºSTRESS_Y+1.35ºSTRESS_X- 15 0.9 21 1.35
*1.35ºSTRESS_Z+1.5ºWXPOS+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+0.9ºT1+1ºSTRESS
LOAD COMB 2947 _: _Y+1ºSTRESS_X-
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 0.9 11 1.35 12 *1ºSTRESS_Z+0.9ºWXNEG+1ºPS_1
1.35 13 -1.35 - LOAD COMB 2962 _:
14 1.5 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 0.9 11 1.0 12 1.0 13 -1.0
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+0.9ºT1+1ºSTRE 15 0.9 -
SS_Y+1ºSTRESS_X- 21 1.0
*1ºSTRESS_Z+1.5ºWXPOS+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.5º
LOAD COMB 2948 _: T1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
*1.35ºSTRESS_Z+0.9ºWXNEG+1.35ºPS_1
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 271 de 463
(SUBJECT) (Page)

LOAD COMB 2963 _: *1ºSTRESS_Z+1.5ºWXNEG+1ºPS_1


1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 1.5 11 1.35 12 LOAD COMB 2972 _:
1.35 13 -1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -0.9 11 1.0 12 1.0 13 -
15 0.9 21 1.35 1.0 15 1.5 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1.5ºT1+1ºSTRE 21 1.0
SS_Y+1ºSTRESS_X- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+0.9ºT1
*1ºSTRESS_Z+0.9ºWXNEG+1ºPS_1 +1.35ºSTRESS_Y+1.35ºSTRESS_X-
LOAD COMB 2964 _: *1.35ºSTRESS_Z+0.9ºWZPOS+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 1.5 11 1.0 12 1.0 13 - LOAD COMB 2979 _:
1.0 15 0.9 - 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 0.9 11 1.35 12 1.35
21 1.0 13 -1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+0.9º 16 0.9 21 1.35
T1+1.35ºSTRESS_Y+1.35ºSTRESS_X- *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+0.9ºT1+1ºSTRESS
*1.35ºSTRESS_Z+1.5ºWXNEG+1.35ºPS_1 _Y+1ºSTRESS_X-
LOAD COMB 2965 _: *1ºSTRESS_Z+0.9ºWZPOS+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 0.9 11 1.35 12 LOAD COMB 2980 _:
1.35 13 -1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 0.9 11 1.0 12 1.0 13 -1.0
15 1.5 21 1.35 16 0.9 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+0.9ºT1+1ºSTRE 21 1.0
SS_Y+1ºSTRESS_X- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.5º
*1ºSTRESS_Z+1.5ºWXNEG+1ºPS_1 T1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
LOAD COMB 2966 _: *1.35ºSTRESS_Z+0.9ºWZPOS+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 0.9 11 1.0 12 1.0 13 - LOAD COMB 2981 _:
1.0 15 1.5 - 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 1.5 11 1.35 12
21 1.0 1.35 13 -1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC- 16 0.9 21 1.35
0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X- *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1.5ºT1+1ºSTRE
*1.35ºSTRESS_Z+0.9ºWXNEG+1.35ºPS_1 SS_Y+1ºSTRESS_X-
LOAD COMB 2967 _: *1ºSTRESS_Z+0.9ºWZPOS+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 -0.9 11 1.35 12 1.35 LOAD COMB 2982 _:
13 -1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 1.5 11 1.0 12 1.0 13 -
15 0.9 21 1.35 1.0 16 0.9 -
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC- 21 1.0
0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+0.9º
*1ºSTRESS_Z+0.9ºWXNEG+1ºPS_1 T1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
LOAD COMB 2968 _: *1.35ºSTRESS_Z+1.5ºWZPOS+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 -0.9 11 1.0 12 1.0 13 -1.0 LOAD COMB 2983 _:
15 0.9 - 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 0.9 11 1.35 12
21 1.0 1.35 13 -1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC- 16 1.5 21 1.35
1.5ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X- *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+0.9ºT1+1ºSTRE
*1.35ºSTRESS_Z+0.9ºWXNEG+1.35ºPS_1 SS_Y+1ºSTRESS_X-
LOAD COMB 2969 _: *1ºSTRESS_Z+1.5ºWZPOS+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -1.5 11 1.35 12 LOAD COMB 2984 _:
1.35 13 -1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 0.9 11 1.0 12 1.0 13 -
15 0.9 21 1.35 1.0 16 1.5 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC- 21 1.0
1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC-
*1ºSTRESS_Z+0.9ºWXNEG+1ºPS_1 0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
LOAD COMB 2970 _: *1.35ºSTRESS_Z+0.9ºWZPOS+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -1.5 11 1.0 12 1.0 13 - LOAD COMB 2985 _:
1.0 15 0.9 - 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 -0.9 11 1.35 12 1.35
21 1.0 13 -1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC- 16 0.9 21 1.35
0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X- *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC-
*1.35ºSTRESS_Z+1.5ºWXNEG+1.35ºPS_1 0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X-
LOAD COMB 2971 _: *1ºSTRESS_Z+0.9ºWZPOS+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -0.9 11 1.35 12 LOAD COMB 2986 _:
1.35 13 -1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 -0.9 11 1.0 12 1.0 13 -1.0
15 1.5 21 1.35 16 0.9 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC- 21 1.0
0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X-
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 272 de 463
(SUBJECT) (Page)

*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC- 17 1.5 21 1.35


1.5ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X- *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+0.9ºT1+1ºSTRE
*1.35ºSTRESS_Z+0.9ºWZPOS+1.35ºPS_1 SS_Y+1ºSTRESS_X-
LOAD COMB 2987 _: *1ºSTRESS_Z+1.5ºWZNEG+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -1.5 11 1.35 12 LOAD COMB 3002 _:
1.35 13 -1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 0.9 11 1.0 12 1.0 13 -
16 0.9 21 1.35 1.0 17 1.5 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC- 21 1.0
1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC-
*1ºSTRESS_Z+0.9ºWZPOS+1ºPS_1 0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
LOAD COMB 2988 _: *1.35ºSTRESS_Z+0.9ºWZNEG+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -1.5 11 1.0 12 1.0 13 - LOAD COMB 3003 _:
1.0 16 0.9 - 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 -0.9 11 1.35 12 1.35
21 1.0 13 -1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC- 17 0.9 21 1.35
0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X- *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC-
*1.35ºSTRESS_Z+1.5ºWZPOS+1.35ºPS_1 0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X-
LOAD COMB 2989 _: *1ºSTRESS_Z+0.9ºWZNEG+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -0.9 11 1.35 12 LOAD COMB 3004 _:
1.35 13 -1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 -0.9 11 1.0 12 1.0 13 -1.0
16 1.5 21 1.35 17 0.9 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC- 21 1.0
0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC-
*1ºSTRESS_Z+1.5ºWZPOS+1ºPS_1 1.5ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
LOAD COMB 2990 _: *1.35ºSTRESS_Z+0.9ºWZNEG+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -0.9 11 1.0 12 1.0 13 - LOAD COMB 3005 _:
1.0 16 1.5 - 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -1.5 11 1.35 12
21 1.0 1.35 13 -1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+0.9ºT1 17 0.9 21 1.35
+1.35ºSTRESS_Y+1.35ºSTRESS_X- *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC-
*1.35ºSTRESS_Z+0.9ºWZNEG+1.35ºPS_1 1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X-
LOAD COMB 2997 _: *1ºSTRESS_Z+0.9ºWZNEG+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 0.9 11 1.35 12 1.35 LOAD COMB 3006 _:
13 -1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -1.5 11 1.0 12 1.0 13 -
17 0.9 21 1.35 1.0 17 0.9 -
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+0.9ºT1+1ºSTRESS 21 1.0
_Y+1ºSTRESS_X- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC-
*1ºSTRESS_Z+0.9ºWZNEG+1ºPS_1 0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
LOAD COMB 2998 _: *1.35ºSTRESS_Z+1.5ºWZNEG+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 0.9 11 1.0 12 1.0 13 -1.0 LOAD COMB 3007 _:
17 0.9 - 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -0.9 11 1.35 12
21 1.0 1.35 13 -1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.5º 17 1.5 21 1.35
T1+1.35ºSTRESS_Y+1.35ºSTRESS_X- *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC-
*1.35ºSTRESS_Z+0.9ºWZNEG+1.35ºPS_1 0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X-
LOAD COMB 2999 _: *1ºSTRESS_Z+1.5ºWZNEG+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 1.5 11 1.35 12 LOAD COMB 3008 _:
1.35 13 -1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -0.9 11 1.0 12 1.0 13 -
17 0.9 21 1.35 1.0 17 1.5 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1.5ºT1+1ºSTRE 21 1.0
SS_Y+1ºSTRESS_X- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+0.9ºT1
*1ºSTRESS_Z+0.9ºWZNEG+1ºPS_1 +1.35ºSTRESS_Y-
LOAD COMB 3000 _: *1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWXPOS+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 1.5 11 1.0 12 1.0 13 - LOAD COMB 3015 _:
1.0 17 0.9 - 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 0.9 11 1.35 12 -1.35
21 1.0 13 1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+0.9º 14 0.9 21 1.35
T1+1.35ºSTRESS_Y+1.35ºSTRESS_X- *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+0.9ºT1+1ºSTRESS
*1.35ºSTRESS_Z+1.5ºWZNEG+1.35ºPS_1 _Y-
LOAD COMB 3001 _: *1ºSTRESS_X+1ºSTRESS_Z+0.9ºWXPOS+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 0.9 11 1.35 12 LOAD COMB 3016 _:
1.35 13 -1.35 -
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 273 de 463
(SUBJECT) (Page)

1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 0.9 11 1.0 12 -1.0 13 1.0 LOAD COMB 3025 _:
14 0.9 - 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -0.9 11 1.35 12 -
21 1.0 1.35 13 1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.5º 14 1.5 21 1.35
T1+1.35ºSTRESS_Y- *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC-
*1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWXPOS+1.35ºPS_1 0.9ºT1+1ºSTRESS_Y-
LOAD COMB 3017 _: *1ºSTRESS_X+1ºSTRESS_Z+1.5ºWXPOS+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 1.5 11 1.35 12 - LOAD COMB 3026 _:
1.35 13 1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -0.9 11 1.0 12 -1.0 13
14 0.9 21 1.35 1.0 14 1.5 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1.5ºT1+1ºSTRE 21 1.0
SS_Y- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+0.9ºT1
*1ºSTRESS_X+1ºSTRESS_Z+0.9ºWXPOS+1ºPS_1 +1.35ºSTRESS_Y-
LOAD COMB 3018 _: *1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWXNEG+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 1.5 11 1.0 12 -1.0 13 LOAD COMB 3033 _:
1.0 14 0.9 - 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 0.9 11 1.35 12 -1.35
21 1.0 13 1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+0.9º 15 0.9 21 1.35
T1+1.35ºSTRESS_Y- *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+0.9ºT1+1ºSTRESS
*1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWXPOS+1.35ºPS_1 _Y-
LOAD COMB 3019 _: *1ºSTRESS_X+1ºSTRESS_Z+0.9ºWXNEG+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 0.9 11 1.35 12 - LOAD COMB 3034 _:
1.35 13 1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 0.9 11 1.0 12 -1.0 13 1.0
14 1.5 21 1.35 15 0.9 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+0.9ºT1+1ºSTRE 21 1.0
SS_Y- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.5º
*1ºSTRESS_X+1ºSTRESS_Z+1.5ºWXPOS+1ºPS_1 T1+1.35ºSTRESS_Y-
LOAD COMB 3020 _: *1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWXNEG+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 0.9 11 1.0 12 -1.0 13 LOAD COMB 3035 _:
1.0 14 1.5 - 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 1.5 11 1.35 12 -
21 1.0 1.35 13 1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC- 15 0.9 21 1.35
0.9ºT1+1.35ºSTRESS_Y- *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1.5ºT1+1ºSTRE
*1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWXPOS+1.35ºPS_1 SS_Y-
LOAD COMB 3021 _: *1ºSTRESS_X+1ºSTRESS_Z+0.9ºWXNEG+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 -0.9 11 1.35 12 - LOAD COMB 3036 _:
1.35 13 1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 1.5 11 1.0 12 -1.0 13
14 0.9 21 1.35 1.0 15 0.9 -
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC- 21 1.0
0.9ºT1+1ºSTRESS_Y- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+0.9º
*1ºSTRESS_X+1ºSTRESS_Z+0.9ºWXPOS+1ºPS_1 T1+1.35ºSTRESS_Y-
LOAD COMB 3022 _: *1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWXNEG+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 -0.9 11 1.0 12 -1.0 13 1.0 LOAD COMB 3037 _:
14 0.9 - 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 0.9 11 1.35 12 -
21 1.0 1.35 13 1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC- 15 1.5 21 1.35
1.5ºT1+1.35ºSTRESS_Y- *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+0.9ºT1+1ºSTRE
*1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWXPOS+1.35ºPS_1 SS_Y-
LOAD COMB 3023 _: *1ºSTRESS_X+1ºSTRESS_Z+1.5ºWXNEG+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -1.5 11 1.35 12 - LOAD COMB 3038 _:
1.35 13 1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 0.9 11 1.0 12 -1.0 13
14 0.9 21 1.35 1.0 15 1.5 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC- 21 1.0
1.5ºT1+1ºSTRESS_Y- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC-
*1ºSTRESS_X+1ºSTRESS_Z+0.9ºWXPOS+1ºPS_1 0.9ºT1+1.35ºSTRESS_Y-
LOAD COMB 3024 _: *1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWXNEG+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -1.5 11 1.0 12 -1.0 13 LOAD COMB 3039 _:
1.0 14 0.9 - 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 -0.9 11 1.35 12 -
21 1.0 1.35 13 1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC- 15 0.9 21 1.35
0.9ºT1+1.35ºSTRESS_Y- *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC-
*1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWXPOS+1.35ºPS_1 0.9ºT1+1ºSTRESS_Y-
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 274 de 463
(SUBJECT) (Page)

*1ºSTRESS_X+1ºSTRESS_Z+0.9ºWXNEG+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+0.9º
LOAD COMB 3040 _: T1+1.35ºSTRESS_Y-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 -0.9 11 1.0 12 -1.0 13 1.0 *1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWZPOS+1.35ºPS_1
15 0.9 - LOAD COMB 3055 _:
21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 0.9 11 1.35 12 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC- 1.35 13 1.35 -
1.5ºT1+1.35ºSTRESS_Y- 16 1.5 21 1.35
*1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWXNEG+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+0.9ºT1+1ºSTRE
LOAD COMB 3041 _: SS_Y-
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -1.5 11 1.35 12 - *1ºSTRESS_X+1ºSTRESS_Z+1.5ºWZPOS+1ºPS_1
1.35 13 1.35 - LOAD COMB 3056 _:
15 0.9 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 0.9 11 1.0 12 -1.0 13
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC- 1.0 16 1.5 -
1.5ºT1+1ºSTRESS_Y- 21 1.0
*1ºSTRESS_X+1ºSTRESS_Z+0.9ºWXNEG+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC-
LOAD COMB 3042 _: 0.9ºT1+1.35ºSTRESS_Y-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -1.5 11 1.0 12 -1.0 13 *1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWZPOS+1.35ºPS_1
1.0 15 0.9 - LOAD COMB 3057 _:
21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 -0.9 11 1.35 12 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC- 1.35 13 1.35 -
0.9ºT1+1.35ºSTRESS_Y- 16 0.9 21 1.35
*1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWXNEG+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC-
LOAD COMB 3043 _: 0.9ºT1+1ºSTRESS_Y-
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -0.9 11 1.35 12 - *1ºSTRESS_X+1ºSTRESS_Z+0.9ºWZPOS+1ºPS_1
1.35 13 1.35 - LOAD COMB 3058 _:
15 1.5 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 -0.9 11 1.0 12 -1.0 13 1.0
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC- 16 0.9 -
0.9ºT1+1ºSTRESS_Y- 21 1.0
*1ºSTRESS_X+1ºSTRESS_Z+1.5ºWXNEG+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC-
LOAD COMB 3044 _: 1.5ºT1+1.35ºSTRESS_Y-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -0.9 11 1.0 12 -1.0 13 *1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWZPOS+1.35ºPS_1
1.0 15 1.5 - LOAD COMB 3059 _:
21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -1.5 11 1.35 12 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+0.9ºT1 1.35 13 1.35 -
+1.35ºSTRESS_Y- 16 0.9 21 1.35
*1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWZPOS+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC-
LOAD COMB 3051 _: 1.5ºT1+1ºSTRESS_Y-
1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 0.9 11 1.35 12 -1.35 *1ºSTRESS_X+1ºSTRESS_Z+0.9ºWZPOS+1ºPS_1
13 1.35 - LOAD COMB 3060 _:
16 0.9 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -1.5 11 1.0 12 -1.0 13
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+0.9ºT1+1ºSTRESS 1.0 16 0.9 -
_Y- 21 1.0
*1ºSTRESS_X+1ºSTRESS_Z+0.9ºWZPOS+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC-
LOAD COMB 3052 _: 0.9ºT1+1.35ºSTRESS_Y-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 0.9 11 1.0 12 -1.0 13 1.0 *1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWZPOS+1.35ºPS_1
16 0.9 - LOAD COMB 3061 _:
21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -0.9 11 1.35 12 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.5º 1.35 13 1.35 -
T1+1.35ºSTRESS_Y- 16 1.5 21 1.35
*1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWZPOS+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC-
LOAD COMB 3053 _: 0.9ºT1+1ºSTRESS_Y-
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 1.5 11 1.35 12 - *1ºSTRESS_X+1ºSTRESS_Z+1.5ºWZPOS+1ºPS_1
1.35 13 1.35 - LOAD COMB 3062 _:
16 0.9 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -0.9 11 1.0 12 -1.0 13
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1.5ºT1+1ºSTRE 1.0 16 1.5 -
SS_Y- 21 1.0
*1ºSTRESS_X+1ºSTRESS_Z+0.9ºWZPOS+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+0.9ºT1
LOAD COMB 3054 _: +1.35ºSTRESS_Y-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 1.5 11 1.0 12 -1.0 13 *1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWZNEG+1.35ºPS_1
1.0 16 0.9 - LOAD COMB 3069 _:
21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 0.9 11 1.35 12 -1.35
13 1.35 -
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 275 de 463
(SUBJECT) (Page)

17 0.9 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -1.5 11 1.0 12 -1.0 13
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+0.9ºT1+1ºSTRESS 1.0 17 0.9 -
_Y- 21 1.0
*1ºSTRESS_X+1ºSTRESS_Z+0.9ºWZNEG+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC-
LOAD COMB 3070 _: 0.9ºT1+1.35ºSTRESS_Y-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 0.9 11 1.0 12 -1.0 13 1.0 *1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWZNEG+1.35ºPS_1
17 0.9 - LOAD COMB 3079 _:
21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -0.9 11 1.35 12 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.5º 1.35 13 1.35 -
T1+1.35ºSTRESS_Y- 17 1.5 21 1.35
*1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWZNEG+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC-
LOAD COMB 3071 _: 0.9ºT1+1ºSTRESS_Y-
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 1.5 11 1.35 12 - *1ºSTRESS_X+1ºSTRESS_Z+1.5ºWZNEG+1ºPS_1
1.35 13 1.35 - LOAD COMB 3080 _:
17 0.9 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -0.9 11 1.0 12 -1.0 13
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1.5ºT1+1ºSTRE 1.0 17 1.5 -
SS_Y- 21 1.0
*1ºSTRESS_X+1ºSTRESS_Z+0.9ºWZNEG+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+0.9ºT1
LOAD COMB 3072 _: +1.35ºSTRESS_Y-1.35ºSTRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 1.5 11 1.0 12 -1.0 13 *1.35ºSTRESS_Z+0.9ºWXPOS+1.35ºPS_1
1.0 17 0.9 - LOAD COMB 3087 _:
21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 0.9 11 1.35 12 -1.35
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+0.9º 13 -1.35 -
T1+1.35ºSTRESS_Y- 14 0.9 21 1.35
*1.35ºSTRESS_X+1.35ºSTRESS_Z+1.5ºWZNEG+1.35ºPS_1 *:
LOAD COMB 3073 _: 1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+0.9ºT1+1ºSTRESS
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 0.9 11 1.35 12 - _Y-1ºSTRESS_X-
1.35 13 1.35 - *1ºSTRESS_Z+0.9ºWXPOS+1ºPS_1
17 1.5 21 1.35 LOAD COMB 3088 _
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+0.9ºT1+1ºSTRE 1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 0.9 11 1.0 12 -1.0 13 -1.0
SS_Y- 14 0.9 -
*1ºSTRESS_X+1ºSTRESS_Z+1.5ºWZNEG+1ºPS_1 21 1.0
LOAD COMB 3074 _: *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.5º
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 0.9 11 1.0 12 -1.0 13 T1+1.35ºSTRESS_Y-1.35ºSTRESS_X-
1.0 17 1.5 - *1.35ºSTRESS_Z+0.9ºWXPOS+1.35ºPS_1
21 1.0 LOAD COMB 3089 _:
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC- 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 1.5 11 1.35 12 -
0.9ºT1+1.35ºSTRESS_Y- 1.35 13 -1.35 -
*1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWZNEG+1.35ºPS_1 14 0.9 21 1.35
LOAD COMB 3075 _: *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1.5ºT1+1ºSTRE
1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 -0.9 11 1.35 12 - SS_Y-1ºSTRESS_X-
1.35 13 1.35 - *1ºSTRESS_Z+0.9ºWXPOS+1ºPS_1
17 0.9 21 1.35 LOAD COMB 3090 _:
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC- 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 1.5 11 1.0 12 -1.0 13 -
0.9ºT1+1ºSTRESS_Y- 1.0 14 0.9 -
*1ºSTRESS_X+1ºSTRESS_Z+0.9ºWZNEG+1ºPS_1 21 1.0
LOAD COMB 3076 _: *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+0.9º
1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 -0.9 11 1.0 12 -1.0 13 1.0 T1+1.35ºSTRESS_Y-1.35ºSTRESS_X-
17 0.9 - *1.35ºSTRESS_Z+1.5ºWXPOS+1.35ºPS_1
21 1.0 LOAD COMB 3091 _:
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC- 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 0.9 11 1.35 12 -
1.5ºT1+1.35ºSTRESS_Y- 1.35 13 -1.35 -
*1.35ºSTRESS_X+1.35ºSTRESS_Z+0.9ºWZNEG+1.35ºPS_1 14 1.5 21 1.35
LOAD COMB 3077 _: *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+0.9ºT1+1ºSTRE
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -1.5 11 1.35 12 - SS_Y-1ºSTRESS_X-
1.35 13 1.35 - *1ºSTRESS_Z+1.5ºWXPOS+1ºPS_1
17 0.9 21 1.35 LOAD COMB 3092 _:
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC- 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 0.9 11 1.0 12 -1.0 13 -
1.5ºT1+1ºSTRESS_Y- 1.0 14 1.5 -
*1ºSTRESS_X+1ºSTRESS_Z+0.9ºWZNEG+1ºPS_1 21 1.0
LOAD COMB 3078 _: *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC-
0.9ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X-
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 276 de 463
(SUBJECT) (Page)

*1.35ºSTRESS_Z+0.9ºWXPOS+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1.5ºT1+1ºSTRE
LOAD COMB 3093 _: SS_Y-1ºSTRESS_X-
1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 -0.9 11 1.35 12 - *1ºSTRESS_Z+0.9ºWXNEG+1ºPS_1
1.35 13 -1.35 - LOAD COMB 3108 _:
14 0.9 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 1.5 11 1.0 12 -1.0 13 -
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC- 1.0 15 0.9 -
0.9ºT1+1ºSTRESS_Y-1ºSTRESS_X- 21 1.0
*1ºSTRESS_Z+0.9ºWXPOS+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+0.9º
LOAD COMB 3094 _: T1+1.35ºSTRESS_Y-1.35ºSTRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 -0.9 11 1.0 12 -1.0 13 - *1.35ºSTRESS_Z+1.5ºWXNEG+1.35ºPS_1
1.0 14 0.9 - LOAD COMB 3109 _:
21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 0.9 11 1.35 12 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC- 1.35 13 -1.35 -
1.5ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X- 15 1.5 21 1.35
*1.35ºSTRESS_Z+0.9ºWXPOS+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+0.9ºT1+1ºSTRE
LOAD COMB 3095 _: SS_Y-1ºSTRESS_X-
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -1.5 11 1.35 12 - *1ºSTRESS_Z+1.5ºWXNEG+1ºPS_1
1.35 13 -1.35 - LOAD COMB 3110 _:
14 0.9 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 0.9 11 1.0 12 -1.0 13 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC- 1.0 15 1.5 -
1.5ºT1+1ºSTRESS_Y-1ºSTRESS_X- 21 1.0
*1ºSTRESS_Z+0.9ºWXPOS+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC-
LOAD COMB 3096 _: 0.9ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -1.5 11 1.0 12 -1.0 13 - *1.35ºSTRESS_Z+0.9ºWXNEG+1.35ºPS_1
1.0 14 0.9 - LOAD COMB 3111 _:
21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 -0.9 11 1.35 12 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC- 1.35 13 -1.35 -
0.9ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X- 15 0.9 21 1.35
*1.35ºSTRESS_Z+1.5ºWXPOS+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC-
LOAD COMB 3097 _: 0.9ºT1+1ºSTRESS_Y-1ºSTRESS_X-
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -0.9 11 1.35 12 - *1ºSTRESS_Z+0.9ºWXNEG+1ºPS_1
1.35 13 -1.35 - LOAD COMB 3112 _:
14 1.5 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 -0.9 11 1.0 12 -1.0 13 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC- 1.0 15 0.9 -
0.9ºT1+1ºSTRESS_Y-1ºSTRESS_X- 21 1.0
*1ºSTRESS_Z+1.5ºWXPOS+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC-
LOAD COMB 3098 _: 1.5ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -0.9 11 1.0 12 -1.0 13 - *1.35ºSTRESS_Z+0.9ºWXNEG+1.35ºPS_1
1.0 14 1.5 - LOAD COMB 3113 _:
21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -1.5 11 1.35 12 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+0.9ºT1 1.35 13 -1.35 -
+1.35ºSTRESS_Y-1.35ºSTRESS_X- 15 0.9 21 1.35
*1.35ºSTRESS_Z+0.9ºWXNEG+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC-
LOAD COMB 3105 _: 1.5ºT1+1ºSTRESS_Y-1ºSTRESS_X-
1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 0.9 11 1.35 12 -1.35 *1ºSTRESS_Z+0.9ºWXNEG+1ºPS_1
13 -1.35 - LOAD COMB 3114 _:
15 0.9 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -1.5 11 1.0 12 -1.0 13 -
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+0.9ºT1+1ºSTRESS 1.0 15 0.9 -
_Y-1ºSTRESS_X- 21 1.0
*1ºSTRESS_Z+0.9ºWXNEG+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC-
LOAD COMB 3106 _: 0.9ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 0.9 11 1.0 12 -1.0 13 -1.0 *1.35ºSTRESS_Z+1.5ºWXNEG+1.35ºPS_1
15 0.9 - LOAD COMB 3115 _:
21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -0.9 11 1.35 12 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.5º 1.35 13 -1.35 -
T1+1.35ºSTRESS_Y-1.35ºSTRESS_X- 15 1.5 21 1.35
*1.35ºSTRESS_Z+0.9ºWXNEG+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC-
LOAD COMB 3107 _: 0.9ºT1+1ºSTRESS_Y-1ºSTRESS_X-
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 1.5 11 1.35 12 - *1ºSTRESS_Z+1.5ºWXNEG+1ºPS_1
1.35 13 -1.35 - LOAD COMB 3116 _:
15 0.9 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -0.9 11 1.0 12 -1.0 13 -
1.0 15 1.5 -
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 277 de 463
(SUBJECT) (Page)

21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -1.5 11 1.35 12 -


*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC+0.9ºT1 1.35 13 -1.35 -
+1.35ºSTRESS_Y-1.35ºSTRESS_X- 16 0.9 21 1.35
*1.35ºSTRESS_Z+0.9ºWZPOS+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC-
LOAD COMB 3123 _: 1.5ºT1+1ºSTRESS_Y-1ºSTRESS_X-
1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 0.9 11 1.35 12 -1.35 *1ºSTRESS_Z+0.9ºWZPOS+1ºPS_1
13 -1.35 - LOAD COMB 3132 _:
16 0.9 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -1.5 11 1.0 12 -1.0 13 -
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC+0.9ºT1+1ºSTRESS 1.0 16 0.9 -
_Y-1ºSTRESS_X- 21 1.0
*1ºSTRESS_Z+0.9ºWZPOS+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC-
LOAD COMB 3124 _: 0.9ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 0.9 11 1.0 12 -1.0 13 -1.0 *1.35ºSTRESS_Z+1.5ºWZPOS+1.35ºPS_1
16 0.9 - LOAD COMB 3133 _:
21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -0.9 11 1.35 12 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+1.5º 1.35 13 -1.35 -
T1+1.35ºSTRESS_Y-1.35ºSTRESS_X- 16 1.5 21 1.35
*1.35ºSTRESS_Z+0.9ºWZPOS+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC-
LOAD COMB 3125 _: 0.9ºT1+1ºSTRESS_Y-1ºSTRESS_X-
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 1.5 11 1.35 12 - *1ºSTRESS_Z+1.5ºWZPOS+1ºPS_1
1.35 13 -1.35 - LOAD COMB 3134 _:
16 0.9 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -0.9 11 1.0 12 -1.0 13 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+1.5ºT1+1ºSTRE 1.0 16 1.5 -
SS_Y-1ºSTRESS_X- 21 1.0
*1ºSTRESS_Z+0.9ºWZPOS+1ºPS_1 *1.35ºSD+1.35ºPA+1.5ºLO+1.5ºLSC+0.9ºT1+1.35ºSTRESS_
LOAD COMB 3126 _: Y-1.35ºSTRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 1.5 11 1.0 12 -1.0 13 - *1.35ºSTRESS_Z+0.9ºWZNEG+1.35ºPS_1
1.0 16 0.9 - LOAD COMB 3141 _:
21 1.0 1 1.35 4 1.35 6 1.5 8 1.5 10 0.9 11 1.35 12 -1.35 13 -1.35 17
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC+0.9º 0.9 21 1.35
T1+1.35ºSTRESS_Y-1.35ºSTRESS_X- *1ºSD+1ºPA+1.5ºLO+1.5ºLSC+0.9ºT1+1ºSTRESS_Y-
*1.35ºSTRESS_Z+1.5ºWZPOS+1.35ºPS_1 1ºSTRESS_X-1ºSTRESS_Z+0.9ºWZNEG+1ºPS_1
LOAD COMB 3127 _: LOAD COMB 3142 _:
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 0.9 11 1.35 12 - 1 1.0 4 1.0 6 1.5 8 1.5 10 0.9 11 1.0 12 -1.0 13 -1.0 17 0.9 21
1.35 13 -1.35 - 1.0
16 1.5 21 1.35 *1.35ºSD+1.35ºPA+1.05ºLO+1.05ºLSC+1.5ºT1+1.35ºSTRES
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC+0.9ºT1+1ºSTRE S_Y-1.35ºSTRESS_X-
SS_Y-1ºSTRESS_X- *1.35ºSTRESS_Z+0.9ºWZNEG+1.35ºPS_1
*1ºSTRESS_Z+1.5ºWZPOS+1ºPS_1 LOAD COMB 3143 _:
LOAD COMB 3128 _: 1 1.35 4 1.35 6 1.05 8 1.05 10 1.5 11 1.35 12 -1.35 13 -1.35
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 0.9 11 1.0 12 -1.0 13 - 17 0.9 21 1.35
1.0 16 1.5 - *1ºSD+1ºPA+1.05ºLO+1.05ºLSC+1.5ºT1+1ºSTRESS_Y-
21 1.0 1ºSTRESS_X-1ºSTRESS_Z+0.9ºWZNEG+1ºPS_1
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC- LOAD COMB 3144 _:
0.9ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X- 1 1.0 4 1.0 6 1.05 8 1.05 10 1.5 11 1.0 12 -1.0 13 -1.0 17 0.9
*1.35ºSTRESS_Z+0.9ºWZPOS+1.35ºPS_1 21 1.0
LOAD COMB 3129 _: *1.35ºSD+1.35ºPA+1.05ºLO+1.05ºLSC+0.9ºT1+1.35ºSTRES
1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 -0.9 11 1.35 12 - S_Y-1.35ºSTRESS_X-
1.35 13 -1.35 - *1.35ºSTRESS_Z+1.5ºWZNEG+1.35ºPS_1
16 0.9 21 1.35 LOAD COMB 3145 _:
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC- 1 1.35 4 1.35 6 1.05 8 1.05 10 0.9 11 1.35 12 -1.35 13 -1.35
0.9ºT1+1ºSTRESS_Y-1ºSTRESS_X- 17 1.5 21 1.35
*1ºSTRESS_Z+0.9ºWZPOS+1ºPS_1 *1ºSD+1ºPA+1.05ºLO+1.05ºLSC+0.9ºT1+1ºSTRESS_Y-
LOAD COMB 3130 _: 1ºSTRESS_X-1ºSTRESS_Z+1.5ºWZNEG+1ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 -0.9 11 1.0 12 -1.0 13 - LOAD COMB 3146 _:
1.0 16 0.9 - 1 1.0 4 1.0 6 1.05 8 1.05 10 0.9 11 1.0 12 -1.0 13 -1.0 17 1.5
21 1.0 21 1.0
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLO+1.5ºLSC-
1.5ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X- 0.9ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X-
*1.35ºSTRESS_Z+0.9ºWZPOS+1.35ºPS_1 *1.35ºSTRESS_Z+0.9ºWZNEG+1.35ºPS_1
LOAD COMB 3131 _: LOAD COMB 3147 _:
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 278 de 463
(SUBJECT) (Page)

1 1.35 2 1.35 3 1.35 4 1.35 6 1.5 8 1.5 10 -0.9 11 1.35 12 - *1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y+1ºS


1.35 13 -1.35 - TRESS_X+1ºSTRESS_Z+0.3ºEX+1ºEZ+1ºPS_1
17 0.9 21 1.35 LOAD COMB 3163 _:
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLO+1.5ºLSC- 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 1.0 18 0.3
0.9ºT1+1ºSTRESS_Y-1ºSTRESS_X- 19 1.0 -
*1ºSTRESS_Z+0.9ºWZNEG+1ºPS_1 21 1.0
LOAD COMB 3148 _: *1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y+1ºS
1 1.0 2 1.0 3 1.0 4 1.0 6 1.5 8 1.5 10 -0.9 11 1.0 12 -1.0 13 - TRESS_X+1ºSTRESS_Z+0.3ºEX-1ºEZ+1ºPS_1
1.0 17 0.9 - LOAD COMB 3164 _:
21 1.0 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 1.0 18 0.3
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC- 19 -1.0 -
1.5ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X- 21 1.0
*1.35ºSTRESS_Z+0.9ºWZNEG+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y+1ºS
LOAD COMB 3149 _: TRESS_X+1ºSTRESS_Z-0.3ºEX+1ºEZ+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -1.5 11 1.35 12 - LOAD COMB 3165 _:
1.35 13 -1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 1.0 18 -0.3
17 0.9 21 1.35 19 1.0 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC- 21 1.0
1.5ºT1+1ºSTRESS_Y-1ºSTRESS_X- *1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y+1ºS
*1ºSTRESS_Z+0.9ºWZNEG+1ºPS_1 TRESS_X+1ºSTRESS_Z-0.3ºEX-1ºEZ+1ºPS_1
LOAD COMB 3150 _: LOAD COMB 3166 _:
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -1.5 11 1.0 12 -1.0 13 - 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 1.0 18 -0.3
1.0 17 0.9 - 19 -1.0 -
21 1.0 21 1.0
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLO+1.05ºLSC- *1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y+1ºS
0.9ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X- TRESS_X-1ºSTRESS_Z+1ºEX+0.3ºEZ+1ºPS_1
*1.35ºSTRESS_Z+1.5ºWZNEG+1.35ºPS_1 LOAD COMB 3167 _:
LOAD COMB 3151 _: 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 -1.0 18 1.0
1 1.35 2 1.35 3 1.35 4 1.35 6 1.05 8 1.05 10 -0.9 11 1.35 12 - 19 0.3 -
1.35 13 -1.35 - 21 1.0
17 1.5 21 1.35 *1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y+1ºS
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLO+1.05ºLSC- TRESS_X-1ºSTRESS_Z+1ºEX-0.3ºEZ+1ºPS_1
0.9ºT1+1ºSTRESS_Y-1ºSTRESS_X- LOAD COMB 3168 _:
*1ºSTRESS_Z+1.5ºWZNEG+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 -1.0 18 1.0
LOAD COMB 3152 _: 19 -0.3 -
1 1.0 2 1.0 3 1.0 4 1.0 6 1.05 8 1.05 10 -0.9 11 1.0 12 -1.0 13 - 21 1.0
1.0 17 1.5 - *1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y+1ºS
21 1.0 TRESS_X-1ºSTRESS_Z-1ºEX+0.3ºEZ+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y+1ºS LOAD COMB 3169 _:
TRESS_X+1ºSTRESS_Z+1ºEX+0.3ºEZ+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 -1.0 18 -1.0
LOAD COMB 3159 _: 19 0.3 -
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 1.0 18 1.0 21 1.0
19 0.3 - *1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y+1ºS
21 1.0 TRESS_X-1ºSTRESS_Z-1ºEX-0.3ºEZ+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y+1ºS LOAD COMB 3170 _:
TRESS_X+1ºSTRESS_Z+1ºEX-0.3ºEZ+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 -1.0 18 -1.0
LOAD COMB 3160 _: 19 -0.3 -
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 1.0 18 1.0 21 1.0
19 -0.3 - *1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y+1ºS
21 1.0 TRESS_X-1ºSTRESS_Z+0.3ºEX+1ºEZ+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y+1ºS LOAD COMB 3171 _:
TRESS_X+1ºSTRESS_Z-1ºEX+0.3ºEZ+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 -1.0 18 0.3
LOAD COMB 3161 _: 19 1.0 -
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 1.0 18 -1.0 21 1.0
19 0.3 - *1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y+1ºS
21 1.0 TRESS_X-1ºSTRESS_Z+0.3ºEX-1ºEZ+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y+1ºS LOAD COMB 3172 _:
TRESS_X+1ºSTRESS_Z-1ºEX-0.3ºEZ+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 -1.0 18 0.3
LOAD COMB 3162 _: 19 -1.0 -
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 1.0 18 -1.0 21 1.0
19 -0.3 - *1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y+1ºS
21 1.0 TRESS_X-1ºSTRESS_Z-0.3ºEX+1ºEZ+1ºPS_1
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 279 de 463
(SUBJECT) (Page)

LOAD COMB 3173 _: 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 -1.0 18 1.0
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 -1.0 18 -0.3 19 0.3 -
19 1.0 - 21 1.0
21 1.0 *1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y-
*1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y+1ºS 1ºSTRESS_X-1ºSTRESS_Z+1ºEX-0.3ºEZ+1ºPS_1
TRESS_X-1ºSTRESS_Z-0.3ºEX-1ºEZ+1ºPS_1 LOAD COMB 3184 _:
LOAD COMB 3174 _: 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 -1.0 18 1.0
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 -1.0 18 -0.3 19 -0.3 -
19 -1.0 - 21 1.0
21 1.0 *1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y-
*1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y- 1ºSTRESS_X-1ºSTRESS_Z-1ºEX+0.3ºEZ+1ºPS_1
1ºSTRESS_X+1ºSTRESS_Z+1ºEX+0.3ºEZ+1ºPS_1 LOAD COMB 3185 _:
LOAD COMB 3175 _: 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 -1.0 18 -
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 1.0 18 1.0 1.0 19 0.3 -
19 0.3 - 21 1.0
21 1.0 *1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y-
*1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y- 1ºSTRESS_X-1ºSTRESS_Z-1ºEX-0.3ºEZ+1ºPS_1
1ºSTRESS_X+1ºSTRESS_Z+1ºEX-0.3ºEZ+1ºPS_1 LOAD COMB 3186 _:
LOAD COMB 3176 _: 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 -1.0 18 -
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 1.0 18 1.0 1.0 19 -0.3 -
19 -0.3 - 21 1.0
21 1.0 *1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y-
*1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y- 1ºSTRESS_X-1ºSTRESS_Z+0.3ºEX+1ºEZ+1ºPS_1
1ºSTRESS_X+1ºSTRESS_Z-1ºEX+0.3ºEZ+1ºPS_1 LOAD COMB 3187 _:
LOAD COMB 3177 _: 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 -1.0 18 0.3
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 1.0 18 -1.0 19 1.0 -
19 0.3 - 21 1.0
21 1.0 *1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y-
*1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y- 1ºSTRESS_X-1ºSTRESS_Z+0.3ºEX-1ºEZ+1ºPS_1
1ºSTRESS_X+1ºSTRESS_Z-1ºEX-0.3ºEZ+1ºPS_1 LOAD COMB 3188 _:
LOAD COMB 3178 _: 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 -1.0 18 0.3
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 1.0 18 -1.0 19 -1.0 -
19 -0.3 - 21 1.0
21 1.0 *1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y-
*1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y- 1ºSTRESS_X-1ºSTRESS_Z-0.3ºEX+1ºEZ+1ºPS_1
1ºSTRESS_X+1ºSTRESS_Z+0.3ºEX+1ºEZ+1ºPS_1 LOAD COMB 3189 _:
LOAD COMB 3179 _: 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 -1.0 18 -
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 1.0 18 0.3 0.3 19 1.0 -
19 1.0 - 21 1.0
21 1.0 *1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y-
*1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y- 1ºSTRESS_X-1ºSTRESS_Z-0.3ºEX-1ºEZ+1ºPS_1
1ºSTRESS_X+1ºSTRESS_Z+0.3ºEX-1ºEZ+1ºPS_1 LOAD COMB 3190 _:
LOAD COMB 3180 _: 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 -1.0 18 -
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 1.0 18 0.3 0.3 19 -1.0 -
19 -1.0 - 21 1.0
21 1.0 *
*1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y- *
1ºSTRESS_X+1ºSTRESS_Z-0.3ºEX+1ºEZ+1ºPS_1 * 3.3.- SITUACIONES SISMICAS
LOAD COMB 3181 _: * --------------------
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 1.0 18 -0.3 *1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y+1ºSTRESS_X+1ºSTR
19 1.0 - ESS_Z+1ºEX+0.3ºEZ+1ºPS_1
21 1.0 LOAD COMB 3191 _:
*1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y- 1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 1.0 13 1.0 18 1.0 19 0.3 21
1ºSTRESS_X+1ºSTRESS_Z-0.3ºEX-1ºEZ+1ºPS_1 1.0
LOAD COMB 3182 _: *1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y+1ºSTRESS_X+1ºSTR
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 1.0 18 -0.3 ESS_Z+1ºEX-0.3ºEZ+1ºPS_1
19 -1.0 - LOAD COMB 3192 _:
21 1.0 1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 1.0 13 1.0 18 1.0 19 -0.3 21
*1ºSD+1ºF+1ºCM+1ºPA+0.6ºLO+0.3ºLSC+1ºSTRESS_Y- 1.0
1ºSTRESS_X-1ºSTRESS_Z+1ºEX+0.3ºEZ+1ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y+1ºSTRESS_X+1ºSTR
LOAD COMB 3183 _: ESS_Z-1ºEX+0.3ºEZ+1ºPS_1
LOAD COMB 3193 _:
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 280 de 463
(SUBJECT) (Page)

1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 1.0 13 1.0 18 -1.0 19 0.3 21 *1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y+1ºSTRESS_X-
1.0 1ºSTRESS_Z-0.3ºEX-1ºEZ+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y+1ºSTRESS_X+1ºSTR LOAD COMB 3206 _:
ESS_Z-1ºEX-0.3ºEZ+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 1.0 13 -1.0 18 -0.3 19 -1.0 21
LOAD COMB 3194 _: 1.0
1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 1.0 13 1.0 18 -1.0 19 -0.3 21 *1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y-
1.0 1ºSTRESS_X+1ºSTRESS_Z+1ºEX+0.3ºEZ+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y+1ºSTRESS_X+1ºSTR LOAD COMB 3207 _:
ESS_Z+0.3ºEX+1ºEZ+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 -1.0 13 1.0 18 1.0 19 0.3 21
LOAD COMB 3195 _: 1.0
1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 1.0 13 1.0 18 0.3 19 1.0 21 *1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y-
1.0 1ºSTRESS_X+1ºSTRESS_Z+1ºEX-0.3ºEZ+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y+1ºSTRESS_X+1ºSTR LOAD COMB 3208 _:
ESS_Z+0.3ºEX-1ºEZ+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 -1.0 13 1.0 18 1.0 19 -0.3 21
LOAD COMB 3196 _: 1.0
1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 1.0 13 1.0 18 0.3 19 -1.0 21 *1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y-
1.0 1ºSTRESS_X+1ºSTRESS_Z-1ºEX+0.3ºEZ+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y+1ºSTRESS_X+1ºSTR LOAD COMB 3209 _:
ESS_Z-0.3ºEX+1ºEZ+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 -1.0 13 1.0 18 -1.0 19 0.3 21
LOAD COMB 3197 _: 1.0
1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 1.0 13 1.0 18 -0.3 19 1.0 21 *1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y-
1.0 1ºSTRESS_X+1ºSTRESS_Z-1ºEX-0.3ºEZ+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y+1ºSTRESS_X+1ºSTR LOAD COMB 3210 _:
ESS_Z-0.3ºEX-1ºEZ+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 -1.0 13 1.0 18 -1.0 19 -0.3 21
LOAD COMB 3198 _: 1.0
1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 1.0 13 1.0 18 -0.3 19 -1.0 21 *1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y-
1.0 1ºSTRESS_X+1ºSTRESS_Z+0.3ºEX+1ºEZ+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y+1ºSTRESS_X- LOAD COMB 3211 _:
1ºSTRESS_Z+1ºEX+0.3ºEZ+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 -1.0 13 1.0 18 0.3 19 1.0 21
LOAD COMB 3199 _: 1.0
1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 1.0 13 -1.0 18 1.0 19 0.3 21 *1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y-
1.0 1ºSTRESS_X+1ºSTRESS_Z+0.3ºEX-1ºEZ+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y+1ºSTRESS_X- LOAD COMB 3212 _:
1ºSTRESS_Z+1ºEX-0.3ºEZ+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 -1.0 13 1.0 18 0.3 19 -1.0 21
LOAD COMB 3200 _: 1.0
1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 1.0 13 -1.0 18 1.0 19 -0.3 21 *1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y-
1.0 1ºSTRESS_X+1ºSTRESS_Z-0.3ºEX+1ºEZ+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y+1ºSTRESS_X- LOAD COMB 3213 _:
1ºSTRESS_Z-1ºEX+0.3ºEZ+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 -1.0 13 1.0 18 -0.3 19 1.0 21
LOAD COMB 3201 _: 1.0
1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 1.0 13 -1.0 18 -1.0 19 0.3 21 *1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y-
1.0 1ºSTRESS_X+1ºSTRESS_Z-0.3ºEX-1ºEZ+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y+1ºSTRESS_X- LOAD COMB 3214 _:
1ºSTRESS_Z-1ºEX-0.3ºEZ+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 -1.0 13 1.0 18 -0.3 19 -1.0 21
LOAD COMB 3202 _: 1.0
1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 1.0 13 -1.0 18 -1.0 19 -0.3 21 *1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y-1ºSTRESS_X-
1.0 1ºSTRESS_Z+1ºEX+0.3ºEZ+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y+1ºSTRESS_X- LOAD COMB 3215 _:
1ºSTRESS_Z+0.3ºEX+1ºEZ+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 -1.0 13 -1.0 18 1.0 19 0.3 21
LOAD COMB 3203 _: 1.0
1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 1.0 13 -1.0 18 0.3 19 1.0 21 *1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y-1ºSTRESS_X-
1.0 1ºSTRESS_Z+1ºEX-0.3ºEZ+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y+1ºSTRESS_X- LOAD COMB 3216 _:
1ºSTRESS_Z+0.3ºEX-1ºEZ+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 -1.0 13 -1.0 18 1.0 19 -0.3 21
LOAD COMB 3204 _: 1.0
1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 1.0 13 -1.0 18 0.3 19 -1.0 21 *1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y-1ºSTRESS_X-
1.0 1ºSTRESS_Z-1ºEX+0.3ºEZ+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y+1ºSTRESS_X- LOAD COMB 3217 _:
1ºSTRESS_Z-0.3ºEX+1ºEZ+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 -1.0 13 -1.0 18 -1.0 19 0.3 21
LOAD COMB 3205 _: 1.0
1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 1.0 13 -1.0 18 -0.3 19 1.0 21 *1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y-1ºSTRESS_X-
1.0 1ºSTRESS_Z-1ºEX-0.3ºEZ+1ºPS_1
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 281 de 463
(SUBJECT) (Page)

LOAD COMB 3218 _: *1.5ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z


1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 -1.0 13 -1.0 18 -1.0 19 -0.3 21 +1.35ºPS_1
1.0 LOAD COMB 3253 _:
*1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y-1ºSTRESS_X- 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -1.5 11 1.35 12
1ºSTRESS_Z+0.3ºEX+1ºEZ+1ºPS_1 1.35 13 1.35 -
LOAD COMB 3219 _: 21 1.35
1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 -1.0 13 -1.0 18 0.3 19 1.0 21 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC-
1.0 1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y-1ºSTRESS_X- LOAD COMB 3254 _:
1ºSTRESS_Z+0.3ºEX-1ºEZ+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -1.5 11 1.0 12 1.0 13
LOAD COMB 3220 _: 1.0 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 -1.0 13 -1.0 18 0.3 19 -1.0 21 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC-
1.0 1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X-1ºSTRESS_Z+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y-1ºSTRESS_X- LOAD COMB 3258 _:
1ºSTRESS_Z-0.3ºEX+1ºEZ+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -1.5 11 1.0 12 1.0 13 -
LOAD COMB 3221 _: 1.0 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 -1.0 13 -1.0 18 -0.3 19 1.0 21 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC-
1.0 0.9ºT1+1.35ºSTRESS_Y-
*1ºSD+1ºF+1ºCM+1ºPA+1ºSTRESS_Y-1ºSTRESS_X- *1.35ºSTRESS_X+1.35ºSTRESS_Z+1.35ºPS_1
1ºSTRESS_Z-0.3ºEX-1ºEZ+1ºPS_1 LOAD COMB 3259 _:
LOAD COMB 3222 _: 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 -0.9 11 1.35 12 -
1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 12 -1.0 13 -1.0 18 -0.3 19 -1.0 21 1.35 13 1.35 -
1.0 21 1.35
* *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.5º 1.5ºT1+1.35ºSTRESS_Y-
T1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35 *1.35ºSTRESS_X+1.35ºSTRESS_Z+1.35ºPS_1
*ºSTRESS_Z+1.35ºPS_1 LOAD COMB 3261 _:
LOAD COMB 3241 _: 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -1.5 11 1.35 12 -
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 1.5 11 1.35 12 1.35 13 1.35 -
1.35 13 1.35 - 21 1.35
21 1.35 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC-
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1.5ºT1+1ºSTRE 1.5ºT1+1ºSTRESS_Y-1ºSTRESS_X+1ºSTRESS_Z+1ºPS_1
SS_Y+1ºSTRESS_X+1ºSTRESS_Z+1ºPS_1 LOAD COMB 3262 _:
LOAD COMB 3242 _: 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -1.5 11 1.0 12 -1.0 13
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 1.5 11 1.0 12 1.0 13 1.0 21 1.0
1.0 21 1.0 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.5º 1.5ºT1+1ºSTRESS_Y-1ºSTRESS_X-1ºSTRESS_Z+1ºPS_1
T1+1.35ºSTRESS_Y+1.35ºSTRESS_X- LOAD COMB 3266 _:
*1.35ºSTRESS_Z+1.35ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -1.5 11 1.0 12 -1.0 13 -
LOAD COMB 3245 _: 1.0 21 1.0
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 1.5 11 1.35 12 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC-
1.35 13 -1.35 - *1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.297º
21 1.35 WXNEG+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1.5ºT1+1ºSTRE LOAD COMB 3438 _:
SS_Y+1ºSTRESS_X-1ºSTRESS_Z+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -1.5 11 1.0 12 1.0 13
LOAD COMB 3246 _: 1.0 15 0.297 -
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 1.5 11 1.0 12 1.0 13 - 21 1.0
1.0 21 1.0 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.5º *0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z
T1+1.35ºSTRESS_Y- +0.495ºWXNEG+1.35ºPS_1
*1.35ºSTRESS_X+1.35ºSTRESS_Z+1.35ºPS_1 LOAD COMB 3439 _:
LOAD COMB 3249 _: 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -0.9 11 1.35 12
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 1.5 11 1.35 12 - 1.35 13 1.35 -
1.35 13 1.35 - 15 0.495 21 1.35
21 1.35 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.5º
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1.5ºT1+1ºSTRE T1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35
SS_Y-1ºSTRESS_X+1ºSTRESS_Z+1ºPS_1 *ºSTRESS_Z+0.297ºWZPOS+1.35ºPS_1
LOAD COMB 3250 _: LOAD COMB 3449 _:
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 1.5 11 1.0 12 -1.0 13 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 1.5 11 1.35 12
1.0 21 1.0 1.35 13 1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC- 16 0.297 21 1.35
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 282 de 463
(SUBJECT) (Page)

*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1.5ºT1+1ºSTRE 21 1.0
SS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.297ºWZPOS *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC-
*+1ºPS_1 1.5ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
LOAD COMB 3450 _: *1.35ºSTRESS_Z+0.297ºWXPOS+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 1.5 11 1.0 12 1.0 13 LOAD COMB 3491 _:
1.0 16 0.297 - 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -1.5 11 1.35 12
21 1.0 1.35 13 -1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC- 14 0.297 21 1.35
*1.5ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC-
+0.297ºWZPOS+1.35ºPS_1 1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X-
LOAD COMB 3455 _: *1ºSTRESS_Z+0.297ºWXPOS+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -1.5 11 1.35 12 LOAD COMB 3492 _:
1.35 13 1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -1.5 11 1.0 12 1.0 13 -
16 0.297 21 1.35 1.0 14 0.297 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC- 21 1.0
*1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.297º *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.5º
WZPOS+1ºPS_1 T1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
LOAD COMB 3456 _: *1.35ºSTRESS_Z+0.297ºWXNEG+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -1.5 11 1.0 12 1.0 13 LOAD COMB 3503 _:
1.0 16 0.297 - 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 1.5 11 1.35 12
21 1.0 1.35 13 -1.35 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1.5ºT1+1ºSTRE 15 0.297 21 1.35
SS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.297ºWZNEG *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1.5ºT1+1ºSTRE
*+1ºPS_1 SS_Y+1ºSTRESS_X-
LOAD COMB 3468 _: *1ºSTRESS_Z+0.297ºWXNEG+1ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 1.5 11 1.0 12 1.0 13 LOAD COMB 3504 _:
1.0 17 0.297 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 1.5 11 1.0 12 1.0 13 -
21 1.0 1.0 15 0.297 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+0.9º 21 1.0
T1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC-
*ºSTRESS_Z+0.495ºWZNEG+1.35ºPS_1 1.5ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
LOAD COMB 3469 _: *1.35ºSTRESS_Z+0.297ºWXNEG+1.35ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 0.9 11 1.35 12 LOAD COMB 3509 _:
1.35 13 1.35 - 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -1.5 11 1.35 12
17 0.495 21 1.35 1.35 13 -1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC- 15 0.297 21 1.35
*1.5ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC-
+0.297ºWZNEG+1.35ºPS_1 1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X-
LOAD COMB 3473 _: *1ºSTRESS_Z+0.297ºWXNEG+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -1.5 11 1.35 12 LOAD COMB 3510 _:
1.35 13 1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -1.5 11 1.0 12 1.0 13 -
17 0.297 21 1.35 1.0 15 0.297 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC- 21 1.0
*1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.297º *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1.5ºT1+1ºSTRE
WZNEG+1ºPS_1 SS_Y+1ºSTRESS_X-
LOAD COMB 3474 _: *1ºSTRESS_Z+0.297ºWZPOS+1ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -1.5 11 1.0 12 1.0 13 LOAD COMB 3522 _:
1.0 17 0.297 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 1.5 11 1.0 12 1.0 13 -
21 1.0 1.0 16 0.297 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.5º 21 1.0
T1+1.35ºSTRESS_Y+1.35ºSTRESS_X- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+0.9º
*1.35ºSTRESS_Z+0.297ºWXPOS+1.35ºPS_1 T1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
LOAD COMB 3485 _: *1.35ºSTRESS_Z+0.495ºWZPOS+1.35ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 1.5 11 1.35 12 LOAD COMB 3523 _:
1.35 13 -1.35 - 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 0.9 11 1.35 12
14 0.297 21 1.35 1.35 13 -1.35 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1.5ºT1+1ºSTRE 16 0.495 21 1.35
SS_Y+1ºSTRESS_X- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC-
*1ºSTRESS_Z+0.297ºWXPOS+1ºPS_1 1.5ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
LOAD COMB 3486 _: *1.35ºSTRESS_Z+0.297ºWZPOS+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 1.5 11 1.0 12 1.0 13 - LOAD COMB 3527 _:
1.0 14 0.297 -
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 283 de 463
(SUBJECT) (Page)

1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -1.5 11 1.35 12 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC-


1.35 13 -1.35 - 1.5ºT1+1ºSTRESS_Y-
16 0.297 21 1.35 *1ºSTRESS_X+1ºSTRESS_Z+0.297ºWXPOS+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC- LOAD COMB 3564 _:
1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X- 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -1.5 11 1.0 12 -1.0 13
*1ºSTRESS_Z+0.297ºWZPOS+1ºPS_1 1.0 14 0.297 -
LOAD COMB 3528 _: 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -1.5 11 1.0 12 1.0 13 - *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.5º
1.0 16 0.297 - T1+1.35ºSTRESS_Y-
21 1.0 *1.35ºSTRESS_X+1.35ºSTRESS_Z+0.297ºWXNEG+1.35ºPS
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.5º _1
T1+1.35ºSTRESS_Y+1.35ºSTRESS_X- LOAD COMB 3575 _:
*1.35ºSTRESS_Z+0.297ºWZNEG+1.35ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 1.5 11 1.35 12 -
LOAD COMB 3539 _: 1.35 13 1.35 -
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 1.5 11 1.35 12 15 0.297 21 1.35
1.35 13 -1.35 - *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1.5ºT1+1ºSTRE
17 0.297 21 1.35 SS_Y-
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1.5ºT1+1ºSTRE *1ºSTRESS_X+1ºSTRESS_Z+0.297ºWXNEG+1ºPS_1
SS_Y+1ºSTRESS_X- LOAD COMB 3576 _:
*1ºSTRESS_Z+0.297ºWZNEG+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 1.5 11 1.0 12 -1.0 13
LOAD COMB 3540 _: 1.0 15 0.297 -
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 1.5 11 1.0 12 1.0 13 - 21 1.0
1.0 17 0.297 - *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC-
21 1.0 1.5ºT1+1.35ºSTRESS_Y-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC- *1.35ºSTRESS_X+1.35ºSTRESS_Z+0.297ºWXNEG+1.35ºPS
1.5ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X- _1
*1.35ºSTRESS_Z+0.297ºWZNEG+1.35ºPS_1 LOAD COMB 3581 _:
LOAD COMB 3545 _: 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -1.5 11 1.35 12 -
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -1.5 11 1.35 12 1.35 13 1.35 -
1.35 13 -1.35 - 15 0.297 21 1.35
17 0.297 21 1.35 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC-
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC- 1.5ºT1+1ºSTRESS_Y-
1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X- *1ºSTRESS_X+1ºSTRESS_Z+0.297ºWXNEG+1ºPS_1
*1ºSTRESS_Z+0.297ºWZNEG+1ºPS_1 LOAD COMB 3582 _:
LOAD COMB 3546 _: 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -1.5 11 1.0 12 -1.0 13
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -1.5 11 1.0 12 1.0 13 - 1.0 15 0.297 -
1.0 17 0.297 - 21 1.0
21 1.0 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.5º
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.5º T1+1.35ºSTRESS_Y-
T1+1.35ºSTRESS_Y- *1.35ºSTRESS_X+1.35ºSTRESS_Z+0.297ºWZPOS+1.35ºPS
*1.35ºSTRESS_X+1.35ºSTRESS_Z+0.297ºWXPOS+1.35ºPS _1
_1 LOAD COMB 3593 _:
LOAD COMB 3557 _: 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 1.5 11 1.35 12 -
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 1.5 11 1.35 12 - 1.35 13 1.35 -
1.35 13 1.35 - 16 0.297 21 1.35
14 0.297 21 1.35 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1.5ºT1+1ºSTRE
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1.5ºT1+1ºSTRE SS_Y-
SS_Y- *1ºSTRESS_X+1ºSTRESS_Z+0.297ºWZPOS+1ºPS_1
*1ºSTRESS_X+1ºSTRESS_Z+0.297ºWXPOS+1ºPS_1 LOAD COMB 3594 _:
LOAD COMB 3558 _: 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 1.5 11 1.0 12 -1.0 13
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 1.5 11 1.0 12 -1.0 13 1.0 16 0.297 -
1.0 14 0.297 - 21 1.0
21 1.0 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC- 1.5ºT1+1.35ºSTRESS_Y-
1.5ºT1+1.35ºSTRESS_Y- *1.35ºSTRESS_X+1.35ºSTRESS_Z+0.297ºWZPOS+1.35ºPS
*1.35ºSTRESS_X+1.35ºSTRESS_Z+0.297ºWXPOS+1.35ºPS _1
_1 LOAD COMB 3599 _:
LOAD COMB 3563 _: 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -1.5 11 1.35 12 -
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -1.5 11 1.35 12 - 1.35 13 1.35 -
1.35 13 1.35 - 16 0.297 21 1.35
14 0.297 21 1.35 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC-
1.5ºT1+1ºSTRESS_Y-
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 284 de 463
(SUBJECT) (Page)

*1ºSTRESS_X+1ºSTRESS_Z+0.297ºWZPOS+1ºPS_1 14 0.297 21 1.0


LOAD COMB 3600 _: *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.5º
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -1.5 11 1.0 12 -1.0 13 T1+1.35ºSTRESS_Y-1.35ºSTRESS_X-
1.0 16 0.297 - *1.35ºSTRESS_Z+0.297ºWXNEG+1.35ºPS_1
21 1.0 LOAD COMB 3647 _:
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.5º 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 1.5 11 1.35 12 -
T1+1.35ºSTRESS_Y- 1.35 13 -1.35 -
*1.35ºSTRESS_X+1.35ºSTRESS_Z+0.297ºWZNEG+1.35ºPS 15 0.297 21 1.35
_1 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1.5ºT1+1ºSTRE
LOAD COMB 3611 _: SS_Y-1ºSTRESS_X-
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 1.5 11 1.35 12 - *1ºSTRESS_Z+0.297ºWXNEG+1ºPS_1
1.35 13 1.35 - LOAD COMB 3648 _:
17 0.297 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 1.5 11 1.0 12 -1.0 13 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1.5ºT1+1ºSTRE 1.0 15 0.297 -
SS_Y- 21 1.0
*1ºSTRESS_X+1ºSTRESS_Z+0.297ºWZNEG+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC-
LOAD COMB 3612 _: 1.5ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 1.5 11 1.0 12 -1.0 13 *1.35ºSTRESS_Z+0.297ºWXNEG+1.35ºPS_1
1.0 17 0.297 - LOAD COMB 3653 _:
21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -1.5 11 1.35 12 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC- 1.35 13 -1.35 -
1.5ºT1+1.35ºSTRESS_Y- 15 0.297 21 1.35
*1.35ºSTRESS_X+1.35ºSTRESS_Z+0.297ºWZNEG+1.35ºPS *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC-
_1 1.5ºT1+1ºSTRESS_Y-1ºSTRESS_X-
LOAD COMB 3617 _: *1ºSTRESS_Z+0.297ºWXNEG+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -1.5 11 1.35 12 - LOAD COMB 3654 _:
1.35 13 1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -1.5 11 1.0 12 -1.0 13 -
17 0.297 21 1.35 1.0 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC- 15 0.297 21 1.0
1.5ºT1+1ºSTRESS_Y- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.5º
*1ºSTRESS_X+1ºSTRESS_Z+0.297ºWZNEG+1ºPS_1 T1+1.35ºSTRESS_Y-1.35ºSTRESS_X-
LOAD COMB 3618 _: *1.35ºSTRESS_Z+0.297ºWZPOS+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -1.5 11 1.0 12 -1.0 13 LOAD COMB 3665 _:
1.0 17 0.297 - 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 1.5 11 1.35 12 -
21 1.0 1.35 13 -1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.5º 16 0.297 21 1.35
T1+1.35ºSTRESS_Y-1.35ºSTRESS_X- *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1.5ºT1+1ºSTRE
*1.35ºSTRESS_Z+0.297ºWXPOS+1.35ºPS_1 SS_Y-1ºSTRESS_X-
LOAD COMB 3629 _: *1ºSTRESS_Z+0.297ºWZPOS+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 1.5 11 1.35 12 - LOAD COMB 3666 _:
1.35 13 -1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 1.5 11 1.0 12 -1.0 13 -
14 0.297 21 1.35 1.0 16 0.297 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1.5ºT1+1ºSTRE 21 1.0
SS_Y-1ºSTRESS_X- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC-
*1ºSTRESS_Z+0.297ºWXPOS+1ºPS_1 1.5ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X-
LOAD COMB 3630 _: *1.35ºSTRESS_Z+0.297ºWZPOS+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 1.5 11 1.0 12 -1.0 13 - LOAD COMB 3671 _:
1.0 14 0.297 - 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -1.5 11 1.35 12 -
21 1.0 1.35 13 -1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC- 16 0.297 21 1.35
1.5ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X- *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC-
*1.35ºSTRESS_Z+0.297ºWXPOS+1.35ºPS_1 1.5ºT1+1ºSTRESS_Y-1ºSTRESS_X-
LOAD COMB 3635 _: *1ºSTRESS_Z+0.297ºWZPOS+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -1.5 11 1.35 12 - LOAD COMB 3672 _:
1.35 13 -1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -1.5 11 1.0 12 -1.0 13 -
14 0.297 21 1.35 1.0 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC- 16 0.297 21 1.0
1.5ºT1+1ºSTRESS_Y-1ºSTRESS_X- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.5º
*1ºSTRESS_Z+0.297ºWXPOS+1ºPS_1 T1+1.35ºSTRESS_Y-1.35ºSTRESS_X-
LOAD COMB 3636 _: *1.35ºSTRESS_Z+0.297ºWZNEG+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -1.5 11 1.0 12 -1.0 13 - LOAD COMB 3683 _:
1.0 -
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 285 de 463
(SUBJECT) (Page)

1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 1.5 11 1.35 12 - 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 11 1.35 12 -1.35 13 -
1.35 13 -1.35 - 1.35 21 1.35
17 0.297 21 1.35 *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+1ºSTRESS_Y-
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1.5ºT1+1ºSTRE 1ºSTRESS_X-1ºSTRESS_Z+1ºPS_1
SS_Y-1ºSTRESS_X- LOAD COMB 3230 _:
*1ºSTRESS_Z+0.297ºWZNEG+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 11 1.0 12 -1.0 13 -1.0 21 1.0
LOAD COMB 3684 _: *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+0.9ºT
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 1.5 11 1.0 12 -1.0 13 - 1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºS
1.0 17 0.297 - *TRESS_Z+1.35ºPS_1
21 1.0 LOAD COMB 3239 _:
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC- 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 0.9 11 1.35 12 1.35
1.5ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X- 13 1.35 -
*1.35ºSTRESS_Z+0.297ºWZNEG+1.35ºPS_1 21 1.35
LOAD COMB 3689 _: *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+0.9ºT1+1ºSTRESS
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -1.5 11 1.35 12 - _Y+1ºSTRESS_X+1ºSTRESS_Z+1ºPS_1
1.35 13 -1.35 - LOAD COMB 3240 _:
17 0.297 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 0.9 11 1.0 12 1.0 13 1.0
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC- 21 1.0
1.5ºT1+1ºSTRESS_Y-1ºSTRESS_X- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+0.9ºT
*1ºSTRESS_Z+0.297ºWZNEG+1ºPS_1 1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
LOAD COMB 3690 _: *1.35ºSTRESS_Z+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -1.5 11 1.0 12 -1.0 13 - LOAD COMB 3243 _:
1.0 - 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 0.9 11 1.35 12 1.35
17 0.297 21 1.0 13 -1.35 -
* 21 1.35
* VARIABLE DETERMINANTE: SOBRECARGA *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+0.9ºT1+1ºSTRESS
MANTENIMIENTO (LM + LSC) _Y+1ºSTRESS_X-1ºSTRESS_Z+1ºPS_1
* ---------------------------------------------------------- LOAD COMB 3244 _:
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+1.35º 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 0.9 11 1.0 12 1.0 13 -1.0
STRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z 21 1.0
*+1.35ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+0.9ºT
LOAD COMB 3223 _: 1+1.35ºSTRESS_Y-
1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 11 1.35 12 1.35 13 *1.35ºSTRESS_X+1.35ºSTRESS_Z+1.35ºPS_1
1.35 21 1.35 LOAD COMB 3247 _:
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+1ºSTRESS_Y+1ºS 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 0.9 11 1.35 12 -1.35
TRESS_X+1ºSTRESS_Z+1ºPS_1 13 1.35 -
LOAD COMB 3224 _: 21 1.35
1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 11 1.0 12 1.0 13 1.0 21 1.0 *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+0.9ºT1+1ºSTRESS
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+1.35º _Y-1ºSTRESS_X+1ºSTRESS_Z+1ºPS_1
STRESS_Y+1.35ºSTRESS_X- LOAD COMB 3248 _:
*1.35ºSTRESS_Z+1.35ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 0.9 11 1.0 12 -1.0 13 1.0
LOAD COMB 3225 _: 21 1.0
1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 11 1.35 12 1.35 13 - *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC-
1.35 21 1.35 *0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+1ºSTRESS_Y+1ºS +1.35ºPS_1
TRESS_X-1ºSTRESS_Z+1ºPS_1 LOAD COMB 3251 _:
LOAD COMB 3226 _: 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 -0.9 11 1.35 12 1.35
1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 11 1.0 12 1.0 13 -1.0 21 1.0 13 1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+1.35º 21 1.35
STRESS_Y- *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC-
*1.35ºSTRESS_X+1.35ºSTRESS_Z+1.35ºPS_1 0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+1ºPS_1
LOAD COMB 3227 _: LOAD COMB 3252 _:
1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 11 1.35 12 -1.35 13 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 -0.9 11 1.0 12 1.0 13 1.0
1.35 21 1.35 21 1.0
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+1ºSTRESS_Y- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC-
1ºSTRESS_X+1ºSTRESS_Z+1ºPS_1 0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
LOAD COMB 3228 _: *1.35ºSTRESS_Z+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 11 1.0 12 -1.0 13 1.0 21 1.0 LOAD COMB 3255 _:
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+1.35º 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 -0.9 11 1.35 12 1.35
STRESS_Y-1.35ºSTRESS_X- 13 -1.35 -
*1.35ºSTRESS_Z+1.35ºPS_1 21 1.35
LOAD COMB 3229 _:
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 286 de 463
(SUBJECT) (Page)

*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC- *1.35ºSTRESS_Z+0.297ºWXPOS+1.35ºPS_1
0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X-1ºSTRESS_Z+1ºPS_1 LOAD COMB 3287 _:
LOAD COMB 3256 _: 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 11 1.35 12 1.35 13 -
1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 -0.9 11 1.0 12 1.0 13 -1.0 1.35 14 0.297 -
21 1.0 21 1.35
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC- *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+1ºSTRESS_Y+1ºS
1.5ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X- TRESS_X-1ºSTRESS_Z+0.297ºWXPOS+1ºPS_1
*1.35ºSTRESS_Z+1.35ºPS_1 LOAD COMB 3288 _:
LOAD COMB 3257 _: 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 11 1.0 12 1.0 13 -1.0 14
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -1.5 11 1.35 12 0.297 21 1.0
1.35 13 -1.35 - *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.3
21 1.35 5ºSTRESS_Y+1.35ºSTRESS_X-
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC- *1.35ºSTRESS_Z+0.495ºWXPOS+1.35ºPS_1
0.9ºT1+1ºSTRESS_Y-1ºSTRESS_X+1ºSTRESS_Z+1ºPS_1 LOAD COMB 3289 _:
LOAD COMB 3260 _: 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 11 1.35 12 1.35 13 -
1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 -0.9 11 1.0 12 -1.0 13 1.0 1.35 14 0.495 -
21 1.0 21 1.35
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC- *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1ºSTRESS_Y+1
0.9ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X- ºSTRESS_X-1ºSTRESS_Z+0.495ºWXPOS+1ºPS_1
*1.35ºSTRESS_Z+1.35ºPS_1 LOAD COMB 3290 _:
LOAD COMB 3263 _: 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 11 1.0 12 1.0 13 -1.0 14
1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 -0.9 11 1.35 12 - 0.495 21 1.0
1.35 13 -1.35 - *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+1.35º
21 1.35 STRESS_Y-
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC- *1.35ºSTRESS_X+1.35ºSTRESS_Z+0.297ºWXPOS+1.35ºPS
0.9ºT1+1ºSTRESS_Y-1ºSTRESS_X-1ºSTRESS_Z+1ºPS_1 _1
LOAD COMB 3264 _: LOAD COMB 3291 _:
1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 -0.9 11 1.0 12 -1.0 13 - 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 11 1.35 12 -1.35 13
1.0 21 1.0 1.35 14 0.297 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC- 21 1.35
1.5ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X- *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+1ºSTRESS_Y-
*1.35ºSTRESS_Z+1.35ºPS_1 1ºSTRESS_X+1ºSTRESS_Z+0.297ºWXPOS+1ºPS_1
LOAD COMB 3265 _: LOAD COMB 3292 _:
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -1.5 11 1.35 12 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 11 1.0 12 -1.0 13 1.0 14
1.35 13 -1.35 - 0.297 21 1.0
21 1.35 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.3
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+1.35º 5ºSTRESS_Y-
STRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z *1.35ºSTRESS_X+1.35ºSTRESS_Z+0.495ºWXPOS+1.35ºPS
*+0.297ºWXPOS+1.35ºPS_1 _1
LOAD COMB 3283 _: LOAD COMB 3293 _:
1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 11 1.35 12 1.35 13 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 11 1.35 12 -1.35 13
1.35 14 0.297 - 1.35 14 0.495 -
21 1.35 21 1.35
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+1ºSTRESS_Y+1ºS *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1ºSTRESS_Y-
TRESS_X+1ºSTRESS_Z+0.297ºWXPOS+1ºPS_1 1ºSTRESS_X+1ºSTRESS_Z+0.495ºWXPOS+1ºPS_1
LOAD COMB 3284 _: LOAD COMB 3294 _:
1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 11 1.0 12 1.0 13 1.0 14 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 11 1.0 12 -1.0 13 1.0 14
0.297 21 1.0 0.495 21 1.0
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.3 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+1.35º
5ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS STRESS_Y-1.35ºSTRESS_X-
*_Z+0.495ºWXPOS+1.35ºPS_1 *1.35ºSTRESS_Z+0.297ºWXPOS+1.35ºPS_1
LOAD COMB 3285 _: LOAD COMB 3295 _:
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 11 1.35 12 1.35 13 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 11 1.35 12 -1.35 13 -
1.35 14 0.495 - 1.35 14 0.297 -
21 1.35 21 1.35
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1ºSTRESS_Y+1 *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+1ºSTRESS_Y-
ºSTRESS_X+1ºSTRESS_Z+0.495ºWXPOS+1ºPS_1 1ºSTRESS_X-1ºSTRESS_Z+0.297ºWXPOS+1ºPS_1
LOAD COMB 3286 _: LOAD COMB 3296 _:
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 11 1.0 12 1.0 13 1.0 14 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 11 1.0 12 -1.0 13 -1.0 14
0.495 21 1.0 0.297 21 1.0
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+1.35º *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.3
STRESS_Y+1.35ºSTRESS_X- 5ºSTRESS_Y-1.35ºSTRESS_X-
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 287 de 463
(SUBJECT) (Page)

*1.35ºSTRESS_Z+0.495ºWXPOS+1.35ºPS_1 LOAD COMB 3323 _:


LOAD COMB 3297 _: 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 11 1.35 12 -1.35 13
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 11 1.35 12 -1.35 13 - 1.35 15 0.297 -
1.35 14 0.495 - 21 1.35
21 1.35 *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+1ºSTRESS_Y-
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1ºSTRESS_Y- 1ºSTRESS_X+1ºSTRESS_Z+0.297ºWXNEG+1ºPS_1
1ºSTRESS_X-1ºSTRESS_Z+0.495ºWXPOS+1ºPS_1 LOAD COMB 3324 _:
LOAD COMB 3298 _: 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 11 1.0 12 -1.0 13 1.0 15
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 11 1.0 12 -1.0 13 -1.0 14 0.297 21 1.0
0.495 21 1.0 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.3
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+1.35º 5ºSTRESS_Y-
STRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z *1.35ºSTRESS_X+1.35ºSTRESS_Z+0.495ºWXNEG+1.35ºPS
*+0.297ºWXNEG+1.35ºPS_1 _1
LOAD COMB 3315 _: LOAD COMB 3325 _:
1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 11 1.35 12 1.35 13 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 11 1.35 12 -1.35 13
1.35 15 0.297 - 1.35 15 0.495 -
21 1.35 21 1.35
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+1ºSTRESS_Y+1ºS *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1ºSTRESS_Y-
TRESS_X+1ºSTRESS_Z+0.297ºWXNEG+1ºPS_1 1ºSTRESS_X+1ºSTRESS_Z+0.495ºWXNEG+1ºPS_1
LOAD COMB 3316 _: LOAD COMB 3326 _:
1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 11 1.0 12 1.0 13 1.0 15 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 11 1.0 12 -1.0 13 1.0 15
0.297 21 1.0 0.495 21 1.0
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.3 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+1.35º
5ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS STRESS_Y-1.35ºSTRESS_X-
*_Z+0.495ºWXNEG+1.35ºPS_1 *1.35ºSTRESS_Z+0.297ºWXNEG+1.35ºPS_1
LOAD COMB 3317 _: LOAD COMB 3327 _:
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 11 1.35 12 1.35 13 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 11 1.35 12 -1.35 13 -
1.35 15 0.495 - 1.35 15 0.297 -
21 1.35 21 1.35
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1ºSTRESS_Y+1 *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+1ºSTRESS_Y-
ºSTRESS_X+1ºSTRESS_Z+0.495ºWXNEG+1ºPS_1 1ºSTRESS_X-1ºSTRESS_Z+0.297ºWXNEG+1ºPS_1
LOAD COMB 3318 _: LOAD COMB 3328 _:
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 11 1.0 12 1.0 13 1.0 15 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 11 1.0 12 -1.0 13 -1.0 15
0.495 21 1.0 0.297 21 1.0
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+1.35º *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.3
STRESS_Y+1.35ºSTRESS_X- 5ºSTRESS_Y-1.35ºSTRESS_X-
*1.35ºSTRESS_Z+0.297ºWXNEG+1.35ºPS_1 *1.35ºSTRESS_Z+0.495ºWXNEG+1.35ºPS_1
LOAD COMB 3319 _: LOAD COMB 3329 _:
1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 11 1.35 12 1.35 13 - 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 11 1.35 12 -1.35 13 -
1.35 15 0.297 - 1.35 15 0.495 -
21 1.35 21 1.35
**1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+1ºSTRESS_Y+1º *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1ºSTRESS_Y-
STRESS_X-1ºSTRESS_Z+0.297ºWXNEG+1ºPS_1 1ºSTRESS_X-1ºSTRESS_Z+0.495ºWXNEG+1ºPS_1
LOAD COMB 3320 _: LOAD COMB 3330 _:
1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 11 1.0 12 1.0 13 -1.0 15 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 11 1.0 12 -1.0 13 -1.0 15
0.297 21 1.0 0.495 21 1.0
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.3 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+1.35º
5ºSTRESS_Y+1.35ºSTRESS_X- STRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z
*1.35ºSTRESS_Z+0.495ºWXNEG+1.35ºPS_1 *+0.297ºWZPOS+1.35ºPS_1
LOAD COMB 3321 _: LOAD COMB 3347 _:
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 11 1.35 12 1.35 13 - 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 11 1.35 12 1.35 13
1.35 15 0.495 - 1.35 16 0.297 -
21 1.35 21 1.35
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1ºSTRESS_Y+1 *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+1ºSTRESS_Y+1ºS
ºSTRESS_X-1ºSTRESS_Z+0.495ºWXNEG+1ºPS_1 TRESS_X+1ºSTRESS_Z+0.297ºWZPOS+1ºPS_1
LOAD COMB 3322 _: LOAD COMB 3348 _:
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 11 1.0 12 1.0 13 -1.0 15 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 11 1.0 12 1.0 13 1.0 16
0.495 21 1.0 0.297 21 1.0
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+1.35º *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.3
STRESS_Y- 5ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS
*1.35ºSTRESS_X+1.35ºSTRESS_Z+0.297ºWXNEG+1.35ºPS *_Z+0.495ºWZPOS+1.35ºPS_1
_1 LOAD COMB 3349 _:
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 288 de 463
(SUBJECT) (Page)

1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 11 1.35 12 1.35 13 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 11 1.35 12 -1.35 13 -
1.35 16 0.495 - 1.35 16 0.297 -
21 1.35 21 1.35
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1ºSTRESS_Y+1 *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+1ºSTRESS_Y-
ºSTRESS_X+1ºSTRESS_Z+0.495ºWZPOS+1ºPS_1 1ºSTRESS_X-1ºSTRESS_Z+0.297ºWZPOS+1ºPS_1
LOAD COMB 3350 _: LOAD COMB 3360 _:
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 11 1.0 12 1.0 13 1.0 16 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 11 1.0 12 -1.0 13 -1.0 16
0.495 21 1.0 0.297 21 1.0
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+1.35º *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.3
STRESS_Y+1.35ºSTRESS_X- 5ºSTRESS_Y-1.35ºSTRESS_X-
*1.35ºSTRESS_Z+0.297ºWZPOS+1.35ºPS_1 *1.35ºSTRESS_Z+0.495ºWZPOS+1.35ºPS_1
LOAD COMB 3351 _: LOAD COMB 3361 _:
1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 11 1.35 12 1.35 13 - 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 11 1.35 12 -1.35 13 -
1.35 16 0.297 - 1.35 16 0.495 -
21 1.35 21 1.35
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+1ºSTRESS_Y+1ºS *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1ºSTRESS_Y-
TRESS_X-1ºSTRESS_Z+0.297ºWZPOS+1ºPS_1 1ºSTRESS_X-1ºSTRESS_Z+0.495ºWZPOS+1ºPS_1
LOAD COMB 3352 _: LOAD COMB 3362 _:
1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 11 1.0 12 1.0 13 -1.0 16 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 11 1.0 12 -1.0 13 -1.0 16
0.297 21 1.0 0.495 21 1.0
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.3 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+1.35º
5ºSTRESS_Y+1.35ºSTRESS_X- STRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z
*1.35ºSTRESS_Z+0.495ºWZPOS+1.35ºPS_1 *+0.297ºWZNEG+1.35ºPS_1
LOAD COMB 3353 _: LOAD COMB 3379 _:
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 11 1.35 12 1.35 13 - 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 11 1.35 12 1.35 13
1.35 16 0.495 - 1.35 17 0.297 -
21 1.35 21 1.35
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1ºSTRESS_Y+1 *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+1ºSTRESS_Y+1ºS
ºSTRESS_X-1ºSTRESS_Z+0.495ºWZPOS+1ºPS_1 TRESS_X+1ºSTRESS_Z+0.297ºWZNEG+1ºPS_1
LOAD COMB 3354 _: LOAD COMB 3380 _:
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 11 1.0 12 1.0 13 -1.0 16 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 11 1.0 12 1.0 13 1.0 17
0.495 21 1.0 0.297 21 1.0
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+1.35º *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.3
STRESS_Y- 5ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS
*1.35ºSTRESS_X+1.35ºSTRESS_Z+0.297ºWZPOS+1.35ºPS *_Z+0.495ºWZNEG+1.35ºPS_1
_1 LOAD COMB 3381 _:
LOAD COMB 3355 _: 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 11 1.35 12 1.35 13
1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 11 1.35 12 -1.35 13 1.35 17 0.495 -
1.35 16 0.297 - 21 1.35
21 1.35 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1ºSTRESS_Y+1
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+1ºSTRESS_Y- ºSTRESS_X+1ºSTRESS_Z+0.495ºWZNEG+1ºPS_1
1ºSTRESS_X+1ºSTRESS_Z+0.297ºWZPOS+1ºPS_1 LOAD COMB 3382 _:
LOAD COMB 3356 _: 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 11 1.0 12 1.0 13 1.0 17
1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 11 1.0 12 -1.0 13 1.0 16 0.495 21 1.0
0.297 21 1.0 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+1.35º
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.3 STRESS_Y+1.35ºSTRESS_X-
5ºSTRESS_Y- *1.35ºSTRESS_Z+0.297ºWZNEG+1.35ºPS_1
*1.35ºSTRESS_X+1.35ºSTRESS_Z+0.495ºWZPOS+1.35ºPS LOAD COMB 3383 _:
_1 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 11 1.35 12 1.35 13 -
LOAD COMB 3357 _: 1.35 17 0.297 -
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 11 1.35 12 -1.35 13 21 1.35
1.35 16 0.495 - *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+1ºSTRESS_Y+1ºS
21 1.35 TRESS_X-1ºSTRESS_Z+0.297ºWZNEG+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1ºSTRESS_Y- LOAD COMB 3384 _:
1ºSTRESS_X+1ºSTRESS_Z+0.495ºWZPOS+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 11 1.0 12 1.0 13 -1.0 17
LOAD COMB 3358 _: 0.297 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 11 1.0 12 -1.0 13 1.0 16 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.3
0.495 21 1.0 5ºSTRESS_Y+1.35ºSTRESS_X-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+1.35º *1.35ºSTRESS_Z+0.495ºWZNEG+1.35ºPS_1
STRESS_Y-1.35ºSTRESS_X- LOAD COMB 3385 _:
*1.35ºSTRESS_Z+0.297ºWZPOS+1.35ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 11 1.35 12 1.35 13 -
LOAD COMB 3359 _: 1.35 17 0.495 -
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 289 de 463
(SUBJECT) (Page)

21 1.35 14 0.297 21 1.35


*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1ºSTRESS_Y+1 *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+0.9ºT1+1ºSTRESS
ºSTRESS_X-1ºSTRESS_Z+0.495ºWZNEG+1ºPS_1 _Y+1ºSTRESS_X+1ºSTRESS_Z+0.297ºWXPOS+1
LOAD COMB 3386 _: *ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 11 1.0 12 1.0 13 -1.0 17 LOAD COMB 3412 _:
0.495 21 1.0 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 0.9 11 1.0 12 1.0 13 1.0
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+1.35º 14 0.297 -
STRESS_Y- 21 1.0
*1.35ºSTRESS_X+1.35ºSTRESS_Z+0.297ºWZNEG+1.35ºPS *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.5º
_1 T1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35
LOAD COMB 3387 _: *ºSTRESS_Z+0.297ºWXPOS+1.35ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 11 1.35 12 -1.35 13 LOAD COMB 3413 _:
1.35 17 0.297 - 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 1.5 11 1.35 12
21 1.35 1.35 13 1.35 -
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+1ºSTRESS_Y- 14 0.297 21 1.35
1ºSTRESS_X+1ºSTRESS_Z+0.297ºWZNEG+1ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1.5ºT1+1ºSTRE
LOAD COMB 3388 _: SS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.297ºWXPOS
1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 11 1.0 12 -1.0 13 1.0 17 *+1ºPS_1
0.297 21 1.0 LOAD COMB 3414 _:
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.3 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 1.5 11 1.0 12 1.0 13
5ºSTRESS_Y- 1.0 14 0.297 -
*1.35ºSTRESS_X+1.35ºSTRESS_Z+0.495ºWZNEG+1.35ºPS 21 1.0
_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+0.9º
LOAD COMB 3389 _: T1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 11 1.35 12 -1.35 13 *ºSTRESS_Z+0.495ºWXPOS+1.35ºPS_1
1.35 17 0.495 - LOAD COMB 3415 _:
21 1.35 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 0.9 11 1.35 12
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1ºSTRESS_Y- 1.35 13 1.35 -
1ºSTRESS_X+1ºSTRESS_Z+0.495ºWZNEG+1ºPS_1 14 0.495 21 1.35
LOAD COMB 3390 _: *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+0.9ºT1+1ºSTRE
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 11 1.0 12 -1.0 13 1.0 17 SS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.495ºWXPOS
0.495 21 1.0 *+1ºPS_1
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+1.35º LOAD COMB 3416 _:
STRESS_Y-1.35ºSTRESS_X- 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 0.9 11 1.0 12 1.0 13
*1.35ºSTRESS_Z+0.297ºWZNEG+1.35ºPS_1 1.0 14 0.495 -
LOAD COMB 3391 _: 21 1.0
1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 11 1.35 12 -1.35 13 - *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC-
1.35 17 0.297 - *0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z
21 1.35 +0.297ºWXPOS+1.35ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+1ºSTRESS_Y- LOAD COMB 3417 _:
1ºSTRESS_X-1ºSTRESS_Z+0.297ºWZNEG+1ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 -0.9 11 1.35 12 1.35
LOAD COMB 3392 _: 13 1.35 -
1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 11 1.0 12 -1.0 13 -1.0 17 14 0.297 21 1.35
0.297 21 1.0 *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.3 *0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.297º
5ºSTRESS_Y-1.35ºSTRESS_X- WXPOS+1ºPS_1
*1.35ºSTRESS_Z+0.495ºWZNEG+1.35ºPS_1 LOAD COMB 3418 _:
LOAD COMB 3393 _: 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 -0.9 11 1.0 12 1.0 13 1.0
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 11 1.35 12 -1.35 13 - 14 0.297 -
1.35 17 0.495 - 21 1.0
21 1.35 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC-
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1ºSTRESS_Y- *1.5ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z
1ºSTRESS_X-1ºSTRESS_Z+0.495ºWZNEG+1ºPS_1 +0.297ºWXPOS+1.35ºPS_1
LOAD COMB 3394 _: LOAD COMB 3419 _:
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 11 1.0 12 -1.0 13 -1.0 17 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -1.5 11 1.35 12
0.495 21 1.0 1.35 13 1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+0.9ºT 14 0.297 21 1.35
1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºS *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC-
*TRESS_Z+0.297ºWXPOS+1.35ºPS_1 *1.5ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.297º
LOAD COMB 3411 _: WXPOS+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 0.9 11 1.35 12 1.35 LOAD COMB 3420 _:
13 1.35 -
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 290 de 463
(SUBJECT) (Page)

1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -1.5 11 1.0 12 1.0 13 LOAD COMB 3435 _:
1.0 14 0.297 - 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 -0.9 11 1.35 12 1.35
21 1.0 13 1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC- 15 0.297 21 1.35
*0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC-
+0.495ºWXPOS+1.35ºPS_1 *0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.297º
LOAD COMB 3421 _: WXNEG+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -0.9 11 1.35 12 LOAD COMB 3436 _:
1.35 13 1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 -0.9 11 1.0 12 1.0 13 1.0
14 0.495 21 1.35 15 0.297 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC- 21 1.0
*0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.495º *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC-
WXPOS+1ºPS_1 *1.5ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z
LOAD COMB 3422 _: +0.297ºWXNEG+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -0.9 11 1.0 12 1.0 13 LOAD COMB 3437 _:
1.0 14 0.495 - 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -1.5 11 1.35 12
21 1.0 1.35 13 1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+0.9ºT 15 0.297 21 1.35
1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºS *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC-
*TRESS_Z+0.297ºWXNEG+1.35ºPS_1 *0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.495º
LOAD COMB 3429 _: WXNEG+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 0.9 11 1.35 12 1.35 LOAD COMB 3440 _:
13 1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -0.9 11 1.0 12 1.0 13
15 0.297 21 1.35 1.0 15 0.495 -
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+0.9ºT1+1ºSTRESS 21 1.0
_Y+1ºSTRESS_X+1ºSTRESS_Z+0.297ºWXNEG+1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+0.9ºT
*ºPS_1 1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºS
LOAD COMB 3430 _: *TRESS_Z+0.297ºWZPOS+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 0.9 11 1.0 12 1.0 13 1.0 LOAD COMB 3447 _:
15 0.297 - 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 0.9 11 1.35 12 1.35
21 1.0 13 1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.5º 16 0.297 21 1.35
T1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35 *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+0.9ºT1+1ºSTRESS
*ºSTRESS_Z+0.297ºWXNEG+1.35ºPS_1 _Y+1ºSTRESS_X+1ºSTRESS_Z+0.297ºWZPOS+1
LOAD COMB 3431 _: *ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 1.5 11 1.35 12 LOAD COMB 3448 _:
1.35 13 1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 0.9 11 1.0 12 1.0 13 1.0
15 0.297 21 1.35 16 0.297 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+1.5ºT1+1ºSTRE 21 1.0
SS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.297ºWXNEG *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+0.9º
*+1ºPS_1 T1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35
LOAD COMB 3432 _: *ºSTRESS_Z+0.495ºWZPOS+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 1.5 11 1.0 12 1.0 13 LOAD COMB 3451 _:
1.0 15 0.297 - 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 0.9 11 1.35 12
21 1.0 1.35 13 1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+0.9º 16 0.495 21 1.35
T1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+0.9ºT1+1ºSTRE
*ºSTRESS_Z+0.495ºWXNEG+1.35ºPS_1 SS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.495ºWZPOS
LOAD COMB 3433 _: *+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 0.9 11 1.35 12 LOAD COMB 3452 _:
1.35 13 1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 0.9 11 1.0 12 1.0 13
15 0.495 21 1.35 1.0 16 0.495 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+0.9ºT1+1ºSTRE 21 1.0
SS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.495ºWXNEG *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC-
*+1ºPS_1 *0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z
LOAD COMB 3434 _: +0.297ºWZPOS+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 0.9 11 1.0 12 1.0 13 LOAD COMB 3453 _:
1.0 15 0.495 - 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 -0.9 11 1.35 12 1.35
21 1.0 13 1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC- 16 0.297 21 1.35
*0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC-
+0.297ºWXNEG+1.35ºPS_1
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 291 de 463
(SUBJECT) (Page)

*0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.297º *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC-
WZPOS+1ºPS_1 *0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z
LOAD COMB 3454 _: +0.495ºWZNEG+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 -0.9 11 1.0 12 1.0 13 1.0 LOAD COMB 3475 _:
16 0.297 - 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -0.9 11 1.35 12
21 1.0 1.35 13 1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC- 17 0.495 21 1.35
*0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC-
+0.495ºWZPOS+1.35ºPS_1 *0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.495º
LOAD COMB 3457 _: WZNEG+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -0.9 11 1.35 12 LOAD COMB 3476 _:
1.35 13 1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -0.9 11 1.0 12 1.0 13
16 0.495 21 1.35 1.0 17 0.495 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC- 21 1.0
*0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.495º *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+0.9ºT
WZPOS+1ºPS_1 1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
LOAD COMB 3458 _: *1.35ºSTRESS_Z+0.297ºWXPOS+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -0.9 11 1.0 12 1.0 13 LOAD COMB 3483 _:
1.0 16 0.495 - 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 0.9 11 1.35 12 1.35
21 1.0 13 -1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+0.9ºT 14 0.297 21 1.35
1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºS *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+0.9ºT1+1ºSTRESS
*TRESS_Z+0.297ºWZNEG+1.35ºPS_1 _Y+1ºSTRESS_X-
LOAD COMB 3465 _: *1ºSTRESS_Z+0.297ºWXPOS+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 0.9 11 1.35 12 1.35 LOAD COMB 3484 _:
13 1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 0.9 11 1.0 12 1.0 13 -1.0
17 0.297 21 1.35 14 0.297 -
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+0.9ºT1+1ºSTRESS 21 1.0
_Y+1ºSTRESS_X+1ºSTRESS_Z+0.297ºWZNEG+1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+0.9º
*ºPS_1 T1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
LOAD COMB 3466 _: *1.35ºSTRESS_Z+0.495ºWXPOS+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 0.9 11 1.0 12 1.0 13 1.0 LOAD COMB 3487 _:
17 0.297 - 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 0.9 11 1.35 12
21 1.0 1.35 13 -1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.5º 14 0.495 21 1.35
T1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+0.9ºT1+1ºSTRE
*ºSTRESS_Z+0.297ºWZNEG+1.35ºPS_1 SS_Y+1ºSTRESS_X-
LOAD COMB 3467 _: *1ºSTRESS_Z+0.495ºWXPOS+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 1.5 11 1.35 12 LOAD COMB 3488 _:
1.35 13 1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 0.9 11 1.0 12 1.0 13 -
17 0.297 21 1.35 1.0 14 0.495 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+0.9ºT1+1ºSTRE 21 1.0
SS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.495ºWZNEG *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC-
*+1ºPS_1 0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
LOAD COMB 3470 _: *1.35ºSTRESS_Z+0.297ºWXPOS+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 0.9 11 1.0 12 1.0 13 LOAD COMB 3489 _:
1.0 17 0.495 - 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 -0.9 11 1.35 12 1.35
21 1.0 13 -1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC- 14 0.297 21 1.35
*0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X+1.35ºSTRESS_Z *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC-
+0.297ºWZNEG+1.35ºPS_1 0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X-
LOAD COMB 3471 _: *1ºSTRESS_Z+0.297ºWXPOS+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 -0.9 11 1.35 12 1.35 LOAD COMB 3490 _:
13 1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 -0.9 11 1.0 12 1.0 13 -1.0
17 0.297 21 1.35 14 0.297 -
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC- 21 1.0
*0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X+1ºSTRESS_Z+0.297º *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC-
WZNEG+1ºPS_1 0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
LOAD COMB 3472 _: *1.35ºSTRESS_Z+0.495ºWXPOS+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 -0.9 11 1.0 12 1.0 13 1.0 LOAD COMB 3493 _:
17 0.297 - 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -0.9 11 1.35 12
21 1.0 1.35 13 -1.35 -
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 292 de 463
(SUBJECT) (Page)

14 0.495 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -0.9 11 1.0 12 1.0 13 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC- 1.0 15 0.495 -
0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X- 21 1.0
*1ºSTRESS_Z+0.495ºWXPOS+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+0.9ºT
LOAD COMB 3494 _: 1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -0.9 11 1.0 12 1.0 13 - *1.35ºSTRESS_Z+0.297ºWZPOS+1.35ºPS_1
1.0 14 0.495 - LOAD COMB 3519 _:
21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 0.9 11 1.35 12 1.35
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+0.9ºT 13 -1.35 -
1+1.35ºSTRESS_Y+1.35ºSTRESS_X- 16 0.297 21 1.35
*1.35ºSTRESS_Z+0.297ºWXNEG+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+0.9ºT1+1ºSTRESS
LOAD COMB 3501 _: _Y+1ºSTRESS_X-
1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 0.9 11 1.35 12 1.35 *1ºSTRESS_Z+0.297ºWZPOS+1ºPS_1
13 -1.35 - LOAD COMB 3520 _:
15 0.297 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 0.9 11 1.0 12 1.0 13 -1.0
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+0.9ºT1+1ºSTRESS 16 0.297 -
_Y+1ºSTRESS_X- 21 1.0
*1ºSTRESS_Z+0.297ºWXNEG+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+1.5º
LOAD COMB 3502 _: T1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 0.9 11 1.0 12 1.0 13 -1.0 *1.35ºSTRESS_Z+0.297ºWZPOS+1.35ºPS_1
15 0.297 - LOAD COMB 3521 _:
21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 1.5 11 1.35 12
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+0.9º 1.35 13 -1.35 -
T1+1.35ºSTRESS_Y+1.35ºSTRESS_X- 16 0.297 21 1.35
*1.35ºSTRESS_Z+0.495ºWXNEG+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+0.9ºT1+1ºSTRE
LOAD COMB 3505 _: SS_Y+1ºSTRESS_X-
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 0.9 11 1.35 12 *1ºSTRESS_Z+0.495ºWZPOS+1ºPS_1
1.35 13 -1.35 - LOAD COMB 3524 _:
15 0.495 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 0.9 11 1.0 12 1.0 13 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+0.9ºT1+1ºSTRE 1.0 16 0.495 -
SS_Y+1ºSTRESS_X- 21 1.0
*1ºSTRESS_Z+0.495ºWXNEG+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC-
LOAD COMB 3506 _: 0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 0.9 11 1.0 12 1.0 13 - *1.35ºSTRESS_Z+0.297ºWZPOS+1.35ºPS_1
1.0 15 0.495 - LOAD COMB 3525 _:
21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 -0.9 11 1.35 12 1.35
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC- 13 -1.35 -
0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X- 16 0.297 21 1.35
*1.35ºSTRESS_Z+0.297ºWXNEG+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC-
LOAD COMB 3507 _: 0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X-
1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 -0.9 11 1.35 12 1.35 *1ºSTRESS_Z+0.297ºWZPOS+1ºPS_1
13 -1.35 - LOAD COMB 3526 _:
15 0.297 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 -0.9 11 1.0 12 1.0 13 -1.0
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC- 16 0.297 -
0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X- 21 1.0
*1ºSTRESS_Z+0.297ºWXNEG+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC-
LOAD COMB 3508 _: 0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 -0.9 11 1.0 12 1.0 13 -1.0 *1.35ºSTRESS_Z+0.495ºWZPOS+1.35ºPS_1
15 0.297 - LOAD COMB 3529 _:
21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -0.9 11 1.35 12
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC- 1.35 13 -1.35 -
0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X- 16 0.495 21 1.35
*1.35ºSTRESS_Z+0.495ºWXNEG+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC-
LOAD COMB 3511 _: 0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X-
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -0.9 11 1.35 12 *1ºSTRESS_Z+0.495ºWZPOS+1ºPS_1
1.35 13 -1.35 - LOAD COMB 3530 _:
15 0.495 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -0.9 11 1.0 12 1.0 13 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC- 1.0 16 0.495 -
0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X- 21 1.0
*1ºSTRESS_Z+0.495ºWXNEG+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+0.9ºT
LOAD COMB 3512 _: 1+1.35ºSTRESS_Y+1.35ºSTRESS_X-
*1.35ºSTRESS_Z+0.297ºWZNEG+1.35ºPS_1
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 293 de 463
(SUBJECT) (Page)

LOAD COMB 3537 _: *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+0.9ºT1+1ºSTRESS


1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 0.9 11 1.35 12 1.35 _Y-
13 -1.35 - *1ºSTRESS_X+1ºSTRESS_Z+0.297ºWXPOS+1ºPS_1
17 0.297 21 1.35 LOAD COMB 3556 _:
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+0.9ºT1+1ºSTRESS 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 0.9 11 1.0 12 -1.0 13 1.0
_Y+1ºSTRESS_X- 14 0.297 -
*1ºSTRESS_Z+0.297ºWZNEG+1ºPS_1 21 1.0
LOAD COMB 3538 _: *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+0.9º
1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 0.9 11 1.0 12 1.0 13 -1.0 T1+1.35ºSTRESS_Y-
17 0.297 - *1.35ºSTRESS_X+1.35ºSTRESS_Z+0.495ºWXPOS+1.35ºPS
21 1.0 _1
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+0.9º LOAD COMB 3559 _:
T1+1.35ºSTRESS_Y+1.35ºSTRESS_X- 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 0.9 11 1.35 12 -
*1.35ºSTRESS_Z+0.495ºWZNEG+1.35ºPS_1 1.35 13 1.35 -
LOAD COMB 3541 _: 14 0.495 21 1.35
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 0.9 11 1.35 12 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+0.9ºT1+1ºSTRE
1.35 13 -1.35 - SS_Y-
17 0.495 21 1.35 *1ºSTRESS_X+1ºSTRESS_Z+0.495ºWXPOS+1ºPS_1
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+0.9ºT1+1ºSTRE LOAD COMB 3560 _:
SS_Y+1ºSTRESS_X- 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 0.9 11 1.0 12 -1.0 13
*1ºSTRESS_Z+0.495ºWZNEG+1ºPS_1 1.0 14 0.495 -
LOAD COMB 3542 _: 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 0.9 11 1.0 12 1.0 13 - *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC-
1.0 17 0.495 - 0.9ºT1+1.35ºSTRESS_Y-
21 1.0 *1.35ºSTRESS_X+1.35ºSTRESS_Z+0.297ºWXPOS+1.35ºPS
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC- _1
0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X- LOAD COMB 3561 _:
*1.35ºSTRESS_Z+0.297ºWZNEG+1.35ºPS_1 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 -0.9 11 1.35 12 -
LOAD COMB 3543 _: 1.35 13 1.35 -
1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 -0.9 11 1.35 12 1.35 14 0.297 21 1.35
13 -1.35 - *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC-
17 0.297 21 1.35 0.9ºT1+1ºSTRESS_Y-
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC- *1ºSTRESS_X+1ºSTRESS_Z+0.297ºWXPOS+1ºPS_1
0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X- LOAD COMB 3562 _:
*1ºSTRESS_Z+0.297ºWZNEG+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 -0.9 11 1.0 12 -1.0 13 1.0
LOAD COMB 3544 _: 14 0.297 -
1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 -0.9 11 1.0 12 1.0 13 -1.0 21 1.0
17 0.297 - *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC-
21 1.0 0.9ºT1+1.35ºSTRESS_Y-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC- *1.35ºSTRESS_X+1.35ºSTRESS_Z+0.495ºWXPOS+1.35ºPS
0.9ºT1+1.35ºSTRESS_Y+1.35ºSTRESS_X- _1
*1.35ºSTRESS_Z+0.495ºWZNEG+1.35ºPS_1 LOAD COMB 3565 _:
LOAD COMB 3547 _: 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -0.9 11 1.35 12 -
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -0.9 11 1.35 12 1.35 13 1.35 -
1.35 13 -1.35 - 14 0.495 21 1.35
17 0.495 21 1.35 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC-
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC- 0.9ºT1+1ºSTRESS_Y-
0.9ºT1+1ºSTRESS_Y+1ºSTRESS_X- *1ºSTRESS_X+1ºSTRESS_Z+0.495ºWXPOS+1ºPS_1
*1ºSTRESS_Z+0.495ºWZNEG+1ºPS_1 LOAD COMB 3566 _:
LOAD COMB 3548 _: 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -0.9 11 1.0 12 -1.0 13
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -0.9 11 1.0 12 1.0 13 - 1.0 14 0.495 -
1.0 17 0.495 - 21 1.0
21 1.0 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+0.9ºT
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+0.9ºT 1+1.35ºSTRESS_Y-
1+1.35ºSTRESS_Y- *1.35ºSTRESS_X+1.35ºSTRESS_Z+0.297ºWXNEG+1.35ºPS
*1.35ºSTRESS_X+1.35ºSTRESS_Z+0.297ºWXPOS+1.35ºPS _1
_1 LOAD COMB 3573 _:
LOAD COMB 3555 _: 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 0.9 11 1.35 12 -1.35
1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 0.9 11 1.35 12 -1.35 13 1.35 -
13 1.35 - 15 0.297 21 1.35
14 0.297 21 1.35 *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+0.9ºT1+1ºSTRESS
_Y-
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 294 de 463
(SUBJECT) (Page)

*1ºSTRESS_X+1ºSTRESS_Z+0.297ºWXNEG+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 0.9 11 1.0 12 -1.0 13 1.0
LOAD COMB 3574 _: 16 0.297 -
1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 0.9 11 1.0 12 -1.0 13 1.0 21 1.0
15 0.297 - *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+0.9º
21 1.0 T1+1.35ºSTRESS_Y-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+0.9º *1.35ºSTRESS_X+1.35ºSTRESS_Z+0.495ºWZPOS+1.35ºPS
T1+1.35ºSTRESS_Y- _1
*1.35ºSTRESS_X+1.35ºSTRESS_Z+0.495ºWXNEG+1.35ºPS LOAD COMB 3595 _:
_1 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 0.9 11 1.35 12 -
LOAD COMB 3577 _: 1.35 13 1.35 -
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 0.9 11 1.35 12 - 16 0.495 21 1.35
1.35 13 1.35 - *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+0.9ºT1+1ºSTRE
15 0.495 21 1.35 SS_Y-
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+0.9ºT1+1ºSTRE *1ºSTRESS_X+1ºSTRESS_Z+0.495ºWZPOS+1ºPS_1
SS_Y- LOAD COMB 3596 _:
*1ºSTRESS_X+1ºSTRESS_Z+0.495ºWXNEG+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 0.9 11 1.0 12 -1.0 13
LOAD COMB 3578 _: 1.0 16 0.495 -
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 0.9 11 1.0 12 -1.0 13 21 1.0
1.0 15 0.495 - *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC-
21 1.0 0.9ºT1+1.35ºSTRESS_Y-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC- *1.35ºSTRESS_X+1.35ºSTRESS_Z+0.297ºWZPOS+1.35ºPS
0.9ºT1+1.35ºSTRESS_Y- _1
*1.35ºSTRESS_X+1.35ºSTRESS_Z+0.297ºWXNEG+1.35ºPS LOAD COMB 3597 _:
_1 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 -0.9 11 1.35 12 -
LOAD COMB 3579 _: 1.35 13 1.35 -
1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 -0.9 11 1.35 12 - 16 0.297 21 1.35
1.35 13 1.35 - *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC-
15 0.297 21 1.35 0.9ºT1+1ºSTRESS_Y-
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC- *1ºSTRESS_X+1ºSTRESS_Z+0.297ºWZPOS+1ºPS_1
0.9ºT1+1ºSTRESS_Y- LOAD COMB 3598 _:
*1ºSTRESS_X+1ºSTRESS_Z+0.297ºWXNEG+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 -0.9 11 1.0 12 -1.0 13 1.0
LOAD COMB 3580 _: 16 0.297 -
1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 -0.9 11 1.0 12 -1.0 13 1.0 21 1.0
15 0.297 - *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC-
21 1.0 0.9ºT1+1.35ºSTRESS_Y-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC- *1.35ºSTRESS_X+1.35ºSTRESS_Z+0.495ºWZPOS+1.35ºPS
0.9ºT1+1.35ºSTRESS_Y- _1
*1.35ºSTRESS_X+1.35ºSTRESS_Z+0.495ºWXNEG+1.35ºPS LOAD COMB 3601 _:
_1 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -0.9 11 1.35 12 -
LOAD COMB 3583 _: 1.35 13 1.35 -
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -0.9 11 1.35 12 - 16 0.495 21 1.35
1.35 13 1.35 - *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC-
15 0.495 21 1.35 0.9ºT1+1ºSTRESS_Y-
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC- *1ºSTRESS_X+1ºSTRESS_Z+0.495ºWZPOS+1ºPS_1
0.9ºT1+1ºSTRESS_Y- LOAD COMB 3602 _:
*1ºSTRESS_X+1ºSTRESS_Z+0.495ºWXNEG+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -0.9 11 1.0 12 -1.0 13
LOAD COMB 3584 _: 1.0 16 0.495 -
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -0.9 11 1.0 12 -1.0 13 21 1.0
1.0 15 0.495 - *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+0.9ºT
21 1.0 1+1.35ºSTRESS_Y-
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+0.9ºT *1.35ºSTRESS_X+1.35ºSTRESS_Z+0.297ºWZNEG+1.35ºPS
1+1.35ºSTRESS_Y- _1
*1.35ºSTRESS_X+1.35ºSTRESS_Z+0.297ºWZPOS+1.35ºPS LOAD COMB 3609 _:
_1 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 0.9 11 1.35 12 -1.35
LOAD COMB 3591 _: 13 1.35 -
1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 0.9 11 1.35 12 -1.35 17 0.297 21 1.35
13 1.35 - *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+0.9ºT1+1ºSTRESS
16 0.297 21 1.35 _Y-
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+0.9ºT1+1ºSTRESS *1ºSTRESS_X+1ºSTRESS_Z+0.297ºWZNEG+1ºPS_1
_Y- LOAD COMB 3610 _:
*1ºSTRESS_X+1ºSTRESS_Z+0.297ºWZPOS+1ºPS_1 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 0.9 11 1.0 12 -1.0 13 1.0
LOAD COMB 3592 _: 17 0.297 -
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 295 de 463
(SUBJECT) (Page)

21 1.0 *1.35ºSTRESS_Z+0.495ºWXPOS+1.35ºPS_1
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+0.9º LOAD COMB 3631 _:
T1+1.35ºSTRESS_Y- 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 0.9 11 1.35 12 -
*1.35ºSTRESS_X+1.35ºSTRESS_Z+0.495ºWZNEG+1.35ºPS 1.35 13 -1.35 -
_1 14 0.495 21 1.35
LOAD COMB 3613 _: *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+0.9ºT1+1ºSTRE
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 0.9 11 1.35 12 - SS_Y-1ºSTRESS_X-
1.35 13 1.35 - *1ºSTRESS_Z+0.495ºWXPOS+1ºPS_1
17 0.495 21 1.35 LOAD COMB 3632 _:
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+0.9ºT1+1ºSTRE 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 0.9 11 1.0 12 -1.0 13 -
SS_Y- 1.0 14 0.495 -
*1ºSTRESS_X+1ºSTRESS_Z+0.495ºWZNEG+1ºPS_1 21 1.0
LOAD COMB 3614 _: *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 0.9 11 1.0 12 -1.0 13 0.9ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X-
1.0 17 0.495 - *1.35ºSTRESS_Z+0.297ºWXPOS+1.35ºPS_1
21 1.0 LOAD COMB 3633 _:
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC- 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 -0.9 11 1.35 12 -
0.9ºT1+1.35ºSTRESS_Y- 1.35 13 -1.35 -
*1.35ºSTRESS_X+1.35ºSTRESS_Z+0.297ºWZNEG+1.35ºPS 14 0.297 21 1.35
_1 *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC-
LOAD COMB 3615 _: 0.9ºT1+1ºSTRESS_Y-1ºSTRESS_X-
1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 -0.9 11 1.35 12 - *1ºSTRESS_Z+0.297ºWXPOS+1ºPS_1
1.35 13 1.35 - LOAD COMB 3634 _:
17 0.297 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 -0.9 11 1.0 12 -1.0 13 -
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC- 1.0 14 0.297 -
0.9ºT1+1ºSTRESS_Y- 21 1.0
*1ºSTRESS_X+1ºSTRESS_Z+0.297ºWZNEG+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC-
LOAD COMB 3616 _: 0.9ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 -0.9 11 1.0 12 -1.0 13 1.0 *1.35ºSTRESS_Z+0.495ºWXPOS+1.35ºPS_1
17 0.297 - LOAD COMB 3637 _:
21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -0.9 11 1.35 12 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC- 1.35 13 -1.35 -
0.9ºT1+1.35ºSTRESS_Y- 14 0.495 21 1.35
*1.35ºSTRESS_X+1.35ºSTRESS_Z+0.495ºWZNEG+1.35ºPS *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC-
_1 0.9ºT1+1ºSTRESS_Y-1ºSTRESS_X-
LOAD COMB 3619 _: *1ºSTRESS_Z+0.495ºWXPOS+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -0.9 11 1.35 12 - LOAD COMB 3638 _:
1.35 13 1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -0.9 11 1.0 12 -1.0 13 -
17 0.495 21 1.35 1.0 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC- 14 0.495 21 1.0
0.9ºT1+1ºSTRESS_Y- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+0.9ºT
*1ºSTRESS_X+1ºSTRESS_Z+0.495ºWZNEG+1ºPS_1 1+1.35ºSTRESS_Y-1.35ºSTRESS_X-
LOAD COMB 3620 _: *1.35ºSTRESS_Z+0.297ºWXNEG+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -0.9 11 1.0 12 -1.0 13 LOAD COMB 3645 _:
1.0 17 0.495 - 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 0.9 11 1.35 12 -1.35
21 1.0 13 -1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+0.9ºT 15 0.297 21 1.35
1+1.35ºSTRESS_Y-1.35ºSTRESS_X- *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+0.9ºT1+1ºSTRESS
*1.35ºSTRESS_Z+0.297ºWXPOS+1.35ºPS_1 _Y-1ºSTRESS_X-
LOAD COMB 3627 _: *1ºSTRESS_Z+0.297ºWXNEG+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 0.9 11 1.35 12 -1.35 LOAD COMB 3646 _:
13 -1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 0.9 11 1.0 12 -1.0 13 -1.0
14 0.297 21 1.35 15 0.297 -
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+0.9ºT1+1ºSTRESS 21 1.0
_Y-1ºSTRESS_X- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+0.9º
*1ºSTRESS_Z+0.297ºWXPOS+1ºPS_1 T1+1.35ºSTRESS_Y-1.35ºSTRESS_X-
LOAD COMB 3628 _: *1.35ºSTRESS_Z+0.495ºWXNEG+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 0.9 11 1.0 12 -1.0 13 -1.0 LOAD COMB 3649 _:
14 0.297 - 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 0.9 11 1.35 12 -
21 1.0 1.35 13 -1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+0.9º 15 0.495 21 1.35
T1+1.35ºSTRESS_Y-1.35ºSTRESS_X-
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 296 de 463
(SUBJECT) (Page)

*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+0.9ºT1+1ºSTRE 21 1.0
SS_Y-1ºSTRESS_X- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC-
*1ºSTRESS_Z+0.495ºWXNEG+1ºPS_1 0.9ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X-
LOAD COMB 3650 _: *1.35ºSTRESS_Z+0.297ºWZPOS+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 0.9 11 1.0 12 -1.0 13 - LOAD COMB 3669 _:
1.0 15 0.495 - 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 -0.9 11 1.35 12 -
21 1.0 1.35 13 -1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC- 16 0.297 21 1.35
0.9ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X- *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC-
*1.35ºSTRESS_Z+0.297ºWXNEG+1.35ºPS_1 0.9ºT1+1ºSTRESS_Y-1ºSTRESS_X-
LOAD COMB 3651 _: *1ºSTRESS_Z+0.297ºWZPOS+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 -0.9 11 1.35 12 - LOAD COMB 3670 _:
1.35 13 -1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 -0.9 11 1.0 12 -1.0 13 -
15 0.297 21 1.35 1.0 16 0.297 -
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC- 21 1.0
0.9ºT1+1ºSTRESS_Y-1ºSTRESS_X- *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC-
*1ºSTRESS_Z+0.297ºWXNEG+1ºPS_1 0.9ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X-
LOAD COMB 3652 _: *1.35ºSTRESS_Z+0.495ºWZPOS+1.35ºPS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 -0.9 11 1.0 12 -1.0 13 - LOAD COMB 3673 _:
1.0 15 0.297 - 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -0.9 11 1.35 12 -
21 1.0 1.35 13 -1.35 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC- 16 0.495 21 1.35
0.9ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X- *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC-
*1.35ºSTRESS_Z+0.495ºWXNEG+1.35ºPS_1 0.9ºT1+1ºSTRESS_Y-1ºSTRESS_X-
LOAD COMB 3655 _: *1ºSTRESS_Z+0.495ºWZPOS+1ºPS_1
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -0.9 11 1.35 12 - LOAD COMB 3674 _:
1.35 13 -1.35 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -0.9 11 1.0 12 -1.0 13 -
15 0.495 21 1.35 1.0 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC- 16 0.495 21 1.0
0.9ºT1+1ºSTRESS_Y-1ºSTRESS_X- *
*1ºSTRESS_Z+0.495ºWXNEG+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+0.9ºT
LOAD COMB 3656 _: 1+1.35ºSTRESS_Y-1.35ºSTRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -0.9 11 1.0 12 -1.0 13 - *1.35ºSTRESS_Z+0.297ºWZNEG+1.35ºPS_1
1.0 - LOAD COMB 3681 _:
15 0.495 21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 0.9 11 1.35 12 -1.35
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC+0.9ºT 13 -1.35 -
1+1.35ºSTRESS_Y-1.35ºSTRESS_X- 17 0.297 21 1.35
*1.35ºSTRESS_Z+0.297ºWZPOS+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+0.9ºT1+1ºSTRESS
LOAD COMB 3663 _: _Y-1ºSTRESS_X-
1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 0.9 11 1.35 12 -1.35 *1ºSTRESS_Z+0.297ºWZNEG+1ºPS_1
13 -1.35 - LOAD COMB 3682 _:
16 0.297 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 0.9 11 1.0 12 -1.0 13 -1.0
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC+0.9ºT1+1ºSTRESS 17 0.297 -
_Y-1ºSTRESS_X- 21 1.0
*1ºSTRESS_Z+0.297ºWZPOS+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+0.9º
LOAD COMB 3664 _: T1+1.35ºSTRESS_Y-1.35ºSTRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 0.9 11 1.0 12 -1.0 13 -1.0 *1.35ºSTRESS_Z+0.495ºWZNEG+1.35ºPS_1
16 0.297 - LOAD COMB 3685 _:
21 1.0 1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 0.9 11 1.35 12 -
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC+0.9º 1.35 13 -1.35 -
T1+1.35ºSTRESS_Y-1.35ºSTRESS_X- 17 0.495 21 1.35
*1.35ºSTRESS_Z+0.495ºWZPOS+1.35ºPS_1 *1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+0.9ºT1+1ºSTRE
LOAD COMB 3667 _: SS_Y-1ºSTRESS_X-
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 0.9 11 1.35 12 - *1ºSTRESS_Z+0.495ºWZNEG+1ºPS_1
1.35 13 -1.35 - LOAD COMB 3686 _:
16 0.495 21 1.35 1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 0.9 11 1.0 12 -1.0 13 -
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC+0.9ºT1+1ºSTRE 1.0 17 0.495 -
SS_Y-1ºSTRESS_X- 21 1.0
*1ºSTRESS_Z+0.495ºWZPOS+1ºPS_1 *1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.5ºLM+1.5ºLSC-
LOAD COMB 3668 _: 0.9ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 0.9 11 1.0 12 -1.0 13 - *1.35ºSTRESS_Z+0.297ºWZNEG+1.35ºPS_1
1.0 16 0.495 - LOAD COMB 3687 _:
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 297 de 463
(SUBJECT) (Page)

1 1.35 2 1.35 3 1.35 4 1.35 7 1.5 8 1.5 10 -0.9 11 1.35 12 - 7495 7497 7499 7501 7503 7505 7507 7509 7511 7513 7515
1.35 13 -1.35 - 7549 7555 7559 7561 -
17 0.297 21 1.35 7562 7564 7567 7576 7577 7583 7585 7605 7613 7615 7617
*1ºSD+1ºF+1ºCM+1ºPA+1.5ºLM+1.5ºLSC- TO 7619 7623 7624 -
0.9ºT1+1ºSTRESS_Y-1ºSTRESS_X- 7626 7628 7639 7641
*1ºSTRESS_Z+0.297ºWZNEG+1ºPS_1 UNL 1 MEMB 95 97 100 101 105 TO 108 110 111 447 987
LOAD COMB 3688 _: 993 997 1049 1054 1058 -
1 1.0 2 1.0 3 1.0 4 1.0 7 1.5 8 1.5 10 -0.9 11 1.0 12 -1.0 13 - 1213 1215 1217 1219 1229 1231 1233 1235 1237 1239 1241
1.0 17 0.297 - 1243 1245 1247 1249 -
21 1.0 1251 1253 1255 1257 1259 1261 1263 1753 1755 TO 1766
*1.35ºSD+1.35ºF+1.35ºCM+1.35ºPA+1.05ºLM+1.05ºLSC- 1781 TO 1784 -
0.9ºT1+1.35ºSTRESS_Y-1.35ºSTRESS_X- 1789 TO 1792 1794 TO 1798 1800 1803 TO 1808 1810 1813
*1.35ºSTRESS_Z+0.495ºWZNEG+1.35ºPS_1 TO 1817 1820 -
LOAD COMB 3691 _: 1823 TO 1856 1871 TO 1882 2188 2654 2656 TO 2666 2668
1 1.35 2 1.35 3 1.35 4 1.35 7 1.05 8 1.05 10 -0.9 11 1.35 12 - TO 2670 2672 TO 2719 -
1.35 13 -1.35 - 2728 2730 6395 6397 6427 TO 6429 6431 6573 6577
17 0.495 21 1.35 UNL 2.75 MEMB 321 322 324 325 327 328 331 TO 335 337
*1ºSD+1ºF+1ºCM+1ºPA+1.05ºLM+1.05ºLSC- 339 340 397 401 402 407 -
0.9ºT1+1ºSTRESS_Y-1ºSTRESS_X- 412 416 437 442 446 500 504 538 540 748 750 757 759 765
*1ºSTRESS_Z+0.495ºWZNEG+1ºPS_1 769 773 1297 1299 -
LOAD COMB 3692 _: 1300 TO 1301 1303 1307 1590 1592 1594 1613 1615 1617
1 1.0 2 1.0 3 1.0 4 1.0 7 1.05 8 1.05 10 -0.9 11 1.0 12 -1.0 13 - 1991 1993 1995 TO 1997 -
1.0 - 1999 2001 2002 2004 2006 2007 2009 2011 2012 2014 2016
17 0.495 21 1.0 2017 2019 2021 2022 -
*********************************************************************** 2024 2026 2027 2029 2108 2111 2129 2133 2135 2142 TO
***** 2144 2149 2150 2152 -
PERFORM ANALYSIS PRINT STATICS CHECK 2154 2157 2159 2162 2164 2165 2167 2169 2170 2172 2174
* 2175 2177 2191 2192 -
PARAMETER 1 2194 2197 2198 2200 2203 2205 2206 2208 2209 2245 2247
CODE EC3 2256 2258 2260 2262 -
BEAM 2 MEMB _STEEL 2264 2297 2304 2307 2323 2359 2361 7409 7412 7413 7415
SGR 0 MEMB _STEEL 7419 7422 7454 7459 -
TRACK 0 MEMB _STEEL 7549 7551 7566 7574 7575 7582 7587 7588 7596 7602 7604
KZ 2 MEMB 6434 6435 7612 7667 7668
LY 6 MEMB 38 TO 43 61 62 64 TO 67 1100 1282 1284 1286 UNL 3 MEMB 341 343 345 TO 348 350 TO 353 355 356 447
1288 TO 1293 2413 2425 - 450 451 453 454 456 1389 -
2581 2582 2591 2595 6500 6513 6527 6533 7451 7472 1395 1437 1439 2105 2147 2148 2219 2227 2266 2274 2345
LZ 6 MEMB 38 TO 43 61 62 64 TO 67 1100 1282 1284 1286 2346 2351 2578 2580 -
1288 TO 1293 1416 1417 - 2729 6523 6529 7242
1419 1420 1488 1489 1491 1492 1494 1495 1497 1498 1500 LY 4.7 MEMB 72 TO 74 77 78 81 TO 83 85 86 1056 1064
1501 1503 1504 2413 - 1072 1092 1094 1096 1098 -
2425 2581 2582 2591 2595 6500 6513 6527 6533 7451 7472 1281 1330 1333 1336 1359 2403 TO 2405 2647 2649 2651
LZ 7 MEMB 1410 1413 1471 1521 2565 7690 2653 2667 2723 2726 -
LY 7 MEMB 1410 1413 1471 1521 2565 7690 6393 7338 7341
LZ 4 MEMB 1469 1520 2241 TO 2243 7410 7414 7460 LZ 4.7 MEMB 72 TO 74 77 78 81 TO 83 85 86 1056 1064
LY 4 MEMB 1469 1520 1072 1092 1094 1096 1098 -
LY 1.25 MEMB 1406 1281 1330 1333 1336 1359 2403 TO 2405 2647 2649 2651
LZ 3 MEMB 358 549 751 754 1449 1451 TO 1453 1584 1586 2653 2667 2723 2726 -
1593 1595 1607 1609 - 6393 7338 7341
1616 1618 1715 1717 1992 1998 2003 2008 2013 2015 2018 UNL 6 MEMB 359 360 365 366 387 389 392 394 2069 2086
2023 2028 2031 2033 - 2098 2116 2121 -
2035 2037 2041 2043 2046 2048 2050 2052 2056 2058 2061 2566 TO 2569 2640 2641 7640 7642 7643 7646
2063 2082 2095 2113 - LZ 10 MEMB 407 412 416 437 442 446 500 504 769 773
2145 2146 2151 2153 2156 2161 2179 2180 2204 2210 2212 1297 1299 TO 1301 1303 -
TO 2216 2218 2221 - 1307 2142 TO 2144 2149 2150 2152 2154 2157 2159 2162
2222 2224 TO 2226 2248 2249 2254 2255 2261 2276 2277 2164 2165 2167 2169 -
2279 2281 2283 2287 - 2170 2172 2174 2175 2177 2191 2192 2194 2197 2198 2200
2289 2292 2293 2297 2302 2306 2309 2310 2318 2321 2325 2203 2205 2206 2208 -
2573 2613 2617 2620 - 2209 2245 2247 2256 2258 2260 2262 2264 2297 2304 2307
2621 TO 2622 2625 2626 2630 2632 7209 7241 7418 7429 2323 2359 2361 7409 -
7485 7487 7489 7491 7493 - 7412 7413 7415 7419 7422 7454 7459 7549 7551 7566 7574
7575 7582 7587 7588 -
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 298 de 463
(SUBJECT) (Page)

7596 7602 7604 7612 7667 7668 LZ 4.8 MEMB 2233 TO 2235 2271 TO 2275 2288 2290 2291
LZ 6 MEMB 359 360 365 366 387 389 392 394 447 451 454 7244 7558 7560 7586 7611
1725 1728 1737 2069 - LZ 6.7 MEMB 2267 TO 2272 2278 2280 2282 2284 2286
2086 2098 2116 2121 2147 2166 2168 2202 2216 2219 2223 2288 7600
2227 2251 2259 2285 - UNL 6.7 MEMB 2267 TO 2272 2278 2280 2282 2284 2286
2299 2313 2578 2612 2616 2627 2729 6523 6529 7396 7556 2288 7600
7593 7617 7640 7642 - LZ 5.8 MEMB 2236 TO 2240 7416 7420 7423 7455
7643 7646 7649 7656 UNL 5.8 MEMB 2236 TO 2240 7416 7420 7423 7455
LZ 4.7 MEMB 343 1733 1734 2040 2042 2044 2045 2055 LZ 5.2 MEMB 2228 TO 2232
2057 2059 2060 2072 2074 - LY 2.9 MEMB 2032 2034 2036 2038 TO 2040 2042 2044
2076 2077 2089 2091 2093 2094 7389 7392 7648 2045 2047 2049 2051 2053 -
LZ 5.3 MEMB 2032 2034 2036 2038 2039 2047 2049 2051 2054 TO 2055 2057 2059 2060 2062 2064 2066 2068 2070
2053 2054 2062 2064 2066 - 2072 2074 2076 2077 2079 -
2068 2070 2079 2081 2083 2085 2087 2228 TO 2232 2081 2083 2085 2087 2089 2091 2093 2094 7648
UNL 4.8 MEMB 2233 TO 2235 7586 LZ 3.3 MEMB 2273 2275 2290 2291 7244 7558 7560 7611
UNL 5.2 MEMB 2228 TO 2232 2236 TO 2239 2267 TO 2270 UNL 3.3 MEMB 2273 2275 2290 2291 7244 7558 7560 7611
2278 2280 2282 2284 2286 - CHECK CODE MEMB _DESIGN
7423 7600 FINISH

11.8.2 Staad input for foundation design

STAAD SPACE 1844 10 -2.1 -2.75; 1871 13 -2.1 14.75; 1884 13 -2.1 12; 1911
START JOB INFORMATION 13 -2.1 0;
JOB NAME REFINERIA CARTAGENA 1924 13 -2.1 -2.75; 2527 7 -2.1 6; 2856 13 -2.1 6; 3055 25.05
JOB CLIENT REPSOL -2.1 6;
JOB NO 1DD5524A 3285 18.25 -2.1 14.75; 3306 18.25 -2.1 12; 3325 18.25 -2.1 0;
JOB PART ESTRUCTURA P (UNIDAD DE VACIO) 3346 18.25 -2.1 -2.75; 3477 18.25 -2.1 6; 3478 -1.6 -2.1 0;
ENGINEER NAME EKACHAI M. 3479 -1.6 -2.1 -2.75; 3480 -1.2 -2.1 0; 3481 -1.2 -2.1 -2.75;
JOB REV B 3482 -0.8 -2.1 0;
ENGINEER DATE JULY-08 3483 -0.8 -2.1 -2.75; 3484 -0.4 -2.1 0; 3485 -0.4 -2.1 -2.75;
END JOB INFORMATION 3486 0.4 -2.1 0;
INPUT WIDTH 79 3487 0.4 -2.1 -2.75; 3488 0.8 -2.1 0; 3489 0.8 -2.1 -2.75; 3490
SET NL 90 1.2 -2.1 0;
SET SDAMP 1 3491 1.2 -2.1 -2.75; 3492 1.6 -2.1 0; 3493 1.6 -2.1 -2.75; 3494
*********************************************************************** -1.6 -2.1 6;
********* 3495 -1.2 -2.1 6; 3496 -0.8 -2.1 6; 3497 -0.4 -2.1 6; 3498 0.4 -
UNIT METER KN 2.1 6;
JOINT COORDINATES 3499 0.8 -2.1 6; 3500 1.2 -2.1 6; 3501 1.6 -2.1 6; 3502 -1.6 -
1 20 -2.1 12; 2 10 -2.1 12; 3 0 -2.1 12; 7 20 -2.1 6; 8 10 -2.1 6; 2.1 12;
9 0 -2.1 6; 3503 -1.2 -2.1 12; 3504 -0.8 -2.1 12; 3505 -0.4 -2.1 12; 3506
13 20 -2.1 0; 14 10 -2.1 0; 15 0 -2.1 0; 34 23.8 -2.1 12; 36 23.8 0.4 -2.1 12;
-2.1 6; 3507 0.8 -2.1 12; 3508 1.2 -2.1 12; 3509 1.6 -2.1 12; 3510 -1.6
38 23.8 -2.1 0; 692 23.8 0 12; 1275 10 0 12; 1279 0 0 12; -2.1 14.75;
1283 10 0 6; 3511 -1.2 -2.1 14.75; 3512 -0.8 -2.1 14.75; 3513 -0.4 -2.1
1287 0 0 6; 1291 20 0 0; 1295 10 0 0; 1299 0 1.00583e-007 0; 14.75;
1301 20 0 6; 3514 0.4 -2.1 14.75; 3515 0.8 -2.1 14.75; 3516 1.2 -2.1 14.75;
1305 23.8 0 0; 1309 23.8 0 6; 1312 20 0 12; 1493 23.8 -2.1 3517 1.6 -2.1 14.75; 3518 -1.6 -2.1 -0.5; 3520 -1.6 -2.1 -1;
14.75; 3522 -1.2 -2.1 -0.5; 3523 -1.2 -2.1 -1; 3524 -0.8 -2.1 -0.5; 3525
1501 25.05 -2.1 14.75; 1516 25.05 -2.1 12; 1524 25.05 -2.1 0; -0.8 -2.1 -1;
1537 23.8 -2.1 -2.75; 1540 25.05 -2.1 -2.75; 1541 20 -2.1 3526 -0.4 -2.1 -0.5; 3527 -0.4 -2.1 -1; 3528 0 -2.1 -0.5; 3529 0
14.75; -2.1 -1;
1585 20 -2.1 -2.75; 1620 0 -2.1 14.75; 1716 0 -2.1 -2.75; 1757 3530 0.4 -2.1 -0.5; 3531 0.4 -2.1 -1; 3532 0.8 -2.1 -0.5; 3533
7 -2.1 14.75; 0.8 -2.1 -1;
1778 7 -2.1 12; 1788 10 -2.1 14.75; 1801 7 -2.1 0; 1822 7 -2.1 3534 1.2 -2.1 -0.5; 3535 1.2 -2.1 -1; 3536 1.6 -2.1 -0.5; 3537
-2.75; 1.6 -2.1 -1;
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 299 de 463
(SUBJECT) (Page)

3540 -1.6 -2.1 13; 3542 -1.6 -2.1 12.5; 3544 -1.2 -2.1 13; 3545 3706 -1.2 -2.1 11; 3707 -1.2 -2.1 10.5; 3708 -1.2 -2.1 10; 3709
-1.2 -2.1 12.5; -1.2 -2.1 9.5;
3546 -0.8 -2.1 13; 3547 -0.8 -2.1 12.5; 3548 -0.4 -2.1 13; 3549 3710 -1.2 -2.1 9; 3711 -1.2 -2.1 8.5; 3712 -1.2 -2.1 8; 3713 -
-0.4 -2.1 12.5; 1.2 -2.1 7.5;
3550 0 -2.1 13; 3551 0 -2.1 12.5; 3552 0.4 -2.1 13; 3553 0.4 - 3714 -1.2 -2.1 7; 3715 -1.2 -2.1 6.5; 3716 -0.8 -2.1 11.5; 3717
2.1 12.5; -0.8 -2.1 11;
3554 0.8 -2.1 13; 3555 0.8 -2.1 12.5; 3556 1.2 -2.1 13; 3557 3718 -0.8 -2.1 10.5; 3719 -0.8 -2.1 10; 3720 -0.8 -2.1 9.5;
1.2 -2.1 12.5; 3721 -0.8 -2.1 9;
3558 1.6 -2.1 13; 3559 1.6 -2.1 12.5; 3562 -1.6 -2.1 5.5; 3564 3722 -0.8 -2.1 8.5; 3723 -0.8 -2.1 8; 3724 -0.8 -2.1 7.5; 3725 -
-1.6 -2.1 5; 0.8 -2.1 7;
3566 -1.6 -2.1 4.5; 3568 -1.6 -2.1 4; 3570 -1.6 -2.1 3.5; 3572 - 3726 -0.8 -2.1 6.5; 3727 -0.4 -2.1 11.5; 3728 -0.4 -2.1 11;
1.6 -2.1 3; 3729 -0.4 -2.1 10.5; 3730 -0.4 -2.1 10; 3731 -0.4 -2.1 9.5;
3574 -1.6 -2.1 2.5; 3576 -1.6 -2.1 2; 3578 -1.6 -2.1 1.5; 3580 - 3732 -0.4 -2.1 9;
1.6 -2.1 1; 3733 -0.4 -2.1 8.5; 3734 -0.4 -2.1 8; 3735 -0.4 -2.1 7.5; 3736 -
3582 -1.6 -2.1 0.500001; 3584 -1.2 -2.1 5.5; 3585 -1.2 -2.1 5; 0.4 -2.1 7;
3586 -1.2 -2.1 4.5; 3587 -1.2 -2.1 4; 3588 -1.2 -2.1 3.5; 3589 - 3737 -0.4 -2.1 6.5; 3738 0 -2.1 11.5; 3739 0 -2.1 11; 3740 0 -
1.2 -2.1 3; 2.1 10.5;
3590 -1.2 -2.1 2.5; 3591 -1.2 -2.1 2; 3592 -1.2 -2.1 1.5; 3593 - 3741 0 -2.1 10; 3742 0 -2.1 9.5; 3743 0 -2.1 9; 3744 0 -2.1 8.5;
1.2 -2.1 1; 3745 0 -2.1 8;
3594 -1.2 -2.1 0.500001; 3595 -0.8 -2.1 5.5; 3596 -0.8 -2.1 5; 3746 0 -2.1 7.5; 3747 0 -2.1 7; 3748 0 -2.1 6.5; 3749 0.4 -2.1
3597 -0.8 -2.1 4.5; 3598 -0.8 -2.1 4; 3599 -0.8 -2.1 3.5; 3600 - 11.5;
0.8 -2.1 3; 3750 0.4 -2.1 11; 3751 0.4 -2.1 10.5; 3752 0.4 -2.1 10; 3753
3601 -0.8 -2.1 2.5; 3602 -0.8 -2.1 2; 3603 -0.8 -2.1 1.5; 3604 - 0.4 -2.1 9.5;
0.8 -2.1 1; 3754 0.4 -2.1 9; 3755 0.4 -2.1 8.5; 3756 0.4 -2.1 8; 3757 0.4 -
3605 -0.8 -2.1 0.500001; 3606 -0.4 -2.1 5.5; 3607 -0.4 -2.1 5; 2.1 7.5;
3608 -0.4 -2.1 4.5; 3609 -0.4 -2.1 4; 3610 -0.4 -2.1 3.5; 3611 - 3758 0.4 -2.1 7; 3759 0.4 -2.1 6.5; 3760 0.8 -2.1 11.5; 3761
0.4 -2.1 3; 0.8 -2.1 11;
3612 -0.4 -2.1 2.5; 3613 -0.4 -2.1 2; 3614 -0.4 -2.1 1.5; 3615 - 3762 0.8 -2.1 10.5; 3763 0.8 -2.1 10; 3764 0.8 -2.1 9.5; 3765
0.4 -2.1 1; 0.8 -2.1 9;
3616 -0.4 -2.1 0.500001; 3617 0 -2.1 5.5; 3618 0 -2.1 5; 3619 3766 0.8 -2.1 8.5; 3767 0.8 -2.1 8; 3768 0.8 -2.1 7.5; 3769 0.8
0 -2.1 4.5; -2.1 7;
3620 0 -2.1 4; 3621 0 -2.1 3.5; 3622 0 -2.1 3; 3623 0 -2.1 2.5; 3770 0.8 -2.1 6.5; 3771 1.2 -2.1 11.5; 3772 1.2 -2.1 11; 3773
3624 0 -2.1 2; 1.2 -2.1 10.5;
3625 0 -2.1 1.5; 3626 0 -2.1 1; 3627 0 -2.1 0.500001; 3628 0.4 3774 1.2 -2.1 10; 3775 1.2 -2.1 9.5; 3776 1.2 -2.1 9; 3777 1.2 -
-2.1 5.5; 2.1 8.5;
3629 0.4 -2.1 5; 3630 0.4 -2.1 4.5; 3631 0.4 -2.1 4; 3632 0.4 - 3778 1.2 -2.1 8; 3779 1.2 -2.1 7.5; 3780 1.2 -2.1 7; 3781 1.2 -
2.1 3.5; 2.1 6.5;
3633 0.4 -2.1 3; 3634 0.4 -2.1 2.5; 3635 0.4 -2.1 2; 3636 0.4 - 3782 1.6 -2.1 11.5; 3783 1.6 -2.1 11; 3784 1.6 -2.1 10.5; 3785
2.1 1.5; 1.6 -2.1 10;
3637 0.4 -2.1 1; 3638 0.4 -2.1 0.500001; 3639 0.8 -2.1 5.5; 3786 1.6 -2.1 9.5; 3787 1.6 -2.1 9; 3788 1.6 -2.1 8.5; 3789 1.6
3640 0.8 -2.1 5; -2.1 8;
3641 0.8 -2.1 4.5; 3642 0.8 -2.1 4; 3643 0.8 -2.1 3.5; 3644 0.8 3790 1.6 -2.1 7.5; 3791 1.6 -2.1 7; 3792 1.6 -2.1 6.5; 3804
-2.1 3; 7.70833 -2.1 14.75;
3645 0.8 -2.1 2.5; 3646 0.8 -2.1 2; 3647 0.8 -2.1 1.5; 3648 0.8 3805 7.70833 -2.1 12; 3806 8.16667 -2.1 14.75; 3807 8.16667
-2.1 1; -2.1 12;
3649 0.8 -2.1 0.500001; 3650 1.2 -2.1 5.5; 3651 1.2 -2.1 5; 3808 8.625 -2.1 14.75; 3809 8.625 -2.1 12; 3810 9.08333 -2.1
3652 1.2 -2.1 4.5; 14.75;
3653 1.2 -2.1 4; 3654 1.2 -2.1 3.5; 3655 1.2 -2.1 3; 3656 1.2 - 3811 9.08333 -2.1 12; 3812 9.54167 -2.1 14.75; 3813 9.54167
2.1 2.5; -2.1 12;
3657 1.2 -2.1 2; 3658 1.2 -2.1 1.5; 3659 1.2 -2.1 1; 3660 1.2 - 3814 10.4583 -2.1 14.75; 3815 10.4583 -2.1 12; 3816 10.9167
2.1 0.500001; -2.1 14.75;
3661 1.6 -2.1 5.5; 3662 1.6 -2.1 5; 3663 1.6 -2.1 4.5; 3664 1.6 3817 10.9167 -2.1 12; 3818 11.375 -2.1 14.75; 3819 11.375 -
-2.1 4; 2.1 12;
3665 1.6 -2.1 3.5; 3666 1.6 -2.1 3; 3667 1.6 -2.1 2.5; 3668 1.6 3820 11.8333 -2.1 14.75; 3821 11.8333 -2.1 12; 3822 12.2917
-2.1 2; -2.1 14.75;
3669 1.6 -2.1 1.5; 3670 1.6 -2.1 1; 3671 1.6 -2.1 0.500001; 3823 12.2917 -2.1 12; 3824 7.70833 -2.1 6; 3825 8.16667 -2.1
3683 -1.6 -2.1 11.5; 3685 -1.6 -2.1 11; 3687 -1.6 -2.1 10.5; 6;
3689 -1.6 -2.1 10; 3826 8.625 -2.1 6; 3827 9.08333 -2.1 6; 3828 9.54167 -2.1 6;
3691 -1.6 -2.1 9.5; 3693 -1.6 -2.1 9; 3695 -1.6 -2.1 8.5; 3697 - 3829 10.4583 -2.1 6; 3830 10.9167 -2.1 6; 3831 11.375 -2.1 6;
1.6 -2.1 8; 3832 11.8333 -2.1 6; 3833 12.2917 -2.1 6; 3834 10.4583 -2.1
3699 -1.6 -2.1 7.5; 3701 -1.6 -2.1 7; 3703 -1.6 -2.1 6.5; 3705 - 0;
1.2 -2.1 11.5; 3835 10.9167 -2.1 0; 3836 11.375 -2.1 0; 3837 11.8333 -2.1 0;
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 300 de 463
(SUBJECT) (Page)

3838 12.2917 -2.1 0; 3839 7.70833 -2.1 0; 3840 8.16667 -2.1 3947 8.625 -2.1 7.5; 3948 8.625 -2.1 7; 3949 8.625 -2.1 6.5;
0; 3950 9.08333 -2.1 11.5; 3951 9.08333 -2.1 11; 3952 9.08333 -
3841 8.625 -2.1 0; 3842 9.08333 -2.1 0; 3843 9.54167 -2.1 0; 2.1 10.5;
3844 7.70833 -2.1 -2.75; 3845 8.16667 -2.1 -2.75; 3846 8.625 3953 9.08333 -2.1 10; 3954 9.08333 -2.1 9.5; 3955 9.08333 -
-2.1 -2.75; 2.1 9;
3847 9.08333 -2.1 -2.75; 3848 9.54167 -2.1 -2.75; 3849 3956 9.08333 -2.1 8.5; 3957 9.08333 -2.1 8; 3958 9.08333 -
10.4583 -2.1 -2.75; 2.1 7.5;
3850 10.9167 -2.1 -2.75; 3851 11.375 -2.1 -2.75; 3852 3959 9.08333 -2.1 7; 3960 9.08333 -2.1 6.5; 3961 9.54167 -
11.8333 -2.1 -2.75; 2.1 11.5;
3853 12.2917 -2.1 -2.75; 3854 7.70833 -2.1 13; 3855 7 -2.1 3962 9.54167 -2.1 11; 3963 9.54167 -2.1 10.5; 3964 9.54167 -
13; 2.1 10;
3856 7.70833 -2.1 12.5; 3857 7 -2.1 12.5; 3858 8.16667 -2.1 3965 9.54167 -2.1 9.5; 3966 9.54167 -2.1 9; 3967 9.54167 -
13; 2.1 8.5;
3859 8.16667 -2.1 12.5; 3860 8.625 -2.1 13; 3861 8.625 -2.1 3968 9.54167 -2.1 8; 3969 9.54167 -2.1 7.5; 3970 9.54167 -
12.5; 2.1 7;
3862 9.08333 -2.1 13; 3863 9.08333 -2.1 12.5; 3864 9.54167 - 3971 9.54167 -2.1 6.5; 3972 10 -2.1 11.5; 3973 10 -2.1 11;
2.1 13; 3974 10 -2.1 10.5;
3865 9.54167 -2.1 12.5; 3866 10 -2.1 13; 3867 10 -2.1 12.5; 3975 10 -2.1 10; 3976 10 -2.1 9.5; 3977 10 -2.1 9; 3978 10 -
3868 10.4583 -2.1 13; 3869 10.4583 -2.1 12.5; 3870 10.9167 - 2.1 8.5;
2.1 13; 3979 10 -2.1 8; 3980 10 -2.1 7.5; 3981 10 -2.1 7; 3982 10 -2.1
3871 10.9167 -2.1 12.5; 3872 11.375 -2.1 13; 3873 11.375 - 6.5;
2.1 12.5; 3983 10.4583 -2.1 11.5; 3984 10.4583 -2.1 11; 3985 10.4583 -
3874 11.8333 -2.1 13; 3875 11.8333 -2.1 12.5; 3876 12.2917 - 2.1 10.5;
2.1 13; 3986 10.4583 -2.1 10; 3987 10.4583 -2.1 9.5; 3988 10.4583 -
3877 12.2917 -2.1 12.5; 3878 13 -2.1 13; 3879 13 -2.1 12.5; 2.1 9;
3880 7.70833 -2.1 -0.5; 3881 7 -2.1 -0.5; 3882 7.70833 -2.1 - 3989 10.4583 -2.1 8.5; 3990 10.4583 -2.1 8; 3991 10.4583 -
1; 3883 7 -2.1 -1; 2.1 7.5;
3884 8.16667 -2.1 -0.5; 3885 8.16667 -2.1 -1; 3886 8.625 -2.1 3992 10.4583 -2.1 7; 3993 10.4583 -2.1 6.5; 3994 10.9167 -
-0.5; 2.1 11.5;
3887 8.625 -2.1 -1; 3888 9.08333 -2.1 -0.5; 3889 9.08333 -2.1 3995 10.9167 -2.1 11; 3996 10.9167 -2.1 10.5; 3997 10.9167 -
-1; 2.1 10;
3890 9.54167 -2.1 -0.5; 3891 9.54167 -2.1 -1; 3892 10 -2.1 - 3998 10.9167 -2.1 9.5; 3999 10.9167 -2.1 9; 4000 10.9167 -
0.5; 2.1 8.5;
3893 10 -2.1 -1; 3894 10.4583 -2.1 -0.5; 3895 10.4583 -2.1 -1; 4001 10.9167 -2.1 8; 4002 10.9167 -2.1 7.5; 4003 10.9167 -
3896 10.9167 -2.1 -0.5; 3897 10.9167 -2.1 -1; 3898 11.375 - 2.1 7;
2.1 -0.5; 4004 10.9167 -2.1 6.5; 4005 11.375 -2.1 11.5; 4006 11.375 -
3899 11.375 -2.1 -1; 3900 11.8333 -2.1 -0.5; 3901 11.8333 - 2.1 11;
2.1 -1; 4007 11.375 -2.1 10.5; 4008 11.375 -2.1 10; 4009 11.375 -2.1
3902 12.2917 -2.1 -0.5; 3903 12.2917 -2.1 -1; 3904 13 -2.1 - 9.5;
0.5; 4010 11.375 -2.1 9; 4011 11.375 -2.1 8.5; 4012 11.375 -2.1 8;
3905 13 -2.1 -1; 3906 7.70833 -2.1 11.5; 3907 7 -2.1 11.5; 4013 11.375 -2.1 7.5; 4014 11.375 -2.1 7; 4015 11.375 -2.1
3908 7.70833 -2.1 11; 3909 7 -2.1 11; 3910 7.70833 -2.1 10.5; 6.5;
3911 7 -2.1 10.5; 4016 11.8333 -2.1 11.5; 4017 11.8333 -2.1 11; 4018 11.8333 -
3912 7.70833 -2.1 10; 3913 7 -2.1 10; 3914 7.70833 -2.1 9.5; 2.1 10.5;
3915 7 -2.1 9.5; 4019 11.8333 -2.1 10; 4020 11.8333 -2.1 9.5; 4021 11.8333 -
3916 7.70833 -2.1 9; 3917 7 -2.1 9; 3918 7.70833 -2.1 8.5; 2.1 9;
3919 7 -2.1 8.5; 4022 11.8333 -2.1 8.5; 4023 11.8333 -2.1 8; 4024 11.8333 -
3920 7.70833 -2.1 8; 3921 7 -2.1 8; 3922 7.70833 -2.1 7.5; 2.1 7.5;
3923 7 -2.1 7.5; 4025 11.8333 -2.1 7; 4026 11.8333 -2.1 6.5; 4027 12.2917 -
3924 7.70833 -2.1 7; 3925 7 -2.1 7; 3926 7.70833 -2.1 6.5; 2.1 11.5;
3927 7 -2.1 6.5; 4028 12.2917 -2.1 11; 4029 12.2917 -2.1 10.5; 4030 12.2917 -
3928 8.16667 -2.1 11.5; 3929 8.16667 -2.1 11; 3930 8.16667 - 2.1 10;
2.1 10.5; 4031 12.2917 -2.1 9.5; 4032 12.2917 -2.1 9; 4033 12.2917 -
3931 8.16667 -2.1 10; 3932 8.16667 -2.1 9.5; 3933 8.16667 - 2.1 8.5;
2.1 9; 4034 12.2917 -2.1 8; 4035 12.2917 -2.1 7.5; 4036 12.2917 -
3934 8.16667 -2.1 8.5; 3935 8.16667 -2.1 8; 3936 8.16667 - 2.1 7;
2.1 7.5; 4037 12.2917 -2.1 6.5; 4038 13 -2.1 11.5; 4039 13 -2.1 11;
3937 8.16667 -2.1 7; 3938 8.16667 -2.1 6.5; 3939 8.625 -2.1 4040 13 -2.1 10.5;
11.5; 4041 13 -2.1 10; 4042 13 -2.1 9.5; 4043 13 -2.1 9; 4044 13 -
3940 8.625 -2.1 11; 3941 8.625 -2.1 10.5; 3942 8.625 -2.1 10; 2.1 8.5;
3943 8.625 -2.1 9.5; 3944 8.625 -2.1 9; 3945 8.625 -2.1 8.5; 4045 13 -2.1 8; 4046 13 -2.1 7.5; 4047 13 -2.1 7; 4048 13 -2.1
3946 8.625 -2.1 8; 6.5;
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 301 de 463
(SUBJECT) (Page)

4049 10.4583 -2.1 5.5; 4050 10 -2.1 5.5; 4051 10.4583 -2.1 5; 4155 8.16667 -2.1 2; 4156 8.16667 -2.1 1.5; 4157 8.16667 -
4052 10 -2.1 5; 2.1 1;
4053 10.4583 -2.1 4.5; 4054 10 -2.1 4.5; 4055 10.4583 -2.1 4; 4158 8.16667 -2.1 0.500001; 4159 8.625 -2.1 5.5; 4160 8.625
4056 10 -2.1 4; -2.1 5;
4057 10.4583 -2.1 3.5; 4058 10 -2.1 3.5; 4059 10.4583 -2.1 3; 4161 8.625 -2.1 4.5; 4162 8.625 -2.1 4; 4163 8.625 -2.1 3.5;
4060 10 -2.1 3; 4164 8.625 -2.1 3;
4061 10.4583 -2.1 2.5; 4062 10 -2.1 2.5; 4063 10.4583 -2.1 2; 4165 8.625 -2.1 2.5; 4166 8.625 -2.1 2; 4167 8.625 -2.1 1.5;
4064 10 -2.1 2; 4168 8.625 -2.1 1;
4065 10.4583 -2.1 1.5; 4066 10 -2.1 1.5; 4067 10.4583 -2.1 1; 4169 8.625 -2.1 0.500001; 4170 9.08333 -2.1 5.5; 4171
4068 10 -2.1 1; 9.08333 -2.1 5;
4069 10.4583 -2.1 0.500001; 4070 10 -2.1 0.500001; 4071 4172 9.08333 -2.1 4.5; 4173 9.08333 -2.1 4; 4174 9.08333 -
10.9167 -2.1 5.5; 2.1 3.5;
4072 10.9167 -2.1 5; 4073 10.9167 -2.1 4.5; 4074 10.9167 - 4175 9.08333 -2.1 3; 4176 9.08333 -2.1 2.5; 4177 9.08333 -
2.1 4; 2.1 2;
4075 10.9167 -2.1 3.5; 4076 10.9167 -2.1 3; 4077 10.9167 - 4178 9.08333 -2.1 1.5; 4179 9.08333 -2.1 1; 4180 9.08333 -
2.1 2.5; 2.1 0.500001;
4078 10.9167 -2.1 2; 4079 10.9167 -2.1 1.5; 4080 10.9167 - 4181 9.54167 -2.1 5.5; 4182 9.54167 -2.1 5; 4183 9.54167 -
2.1 1; 2.1 4.5;
4081 10.9167 -2.1 0.500001; 4082 11.375 -2.1 5.5; 4083 4184 9.54167 -2.1 4; 4185 9.54167 -2.1 3.5; 4186 9.54167 -
11.375 -2.1 5; 2.1 3;
4084 11.375 -2.1 4.5; 4085 11.375 -2.1 4; 4086 11.375 -2.1 4187 9.54167 -2.1 2.5; 4188 9.54167 -2.1 2; 4189 9.54167 -
3.5; 2.1 1.5;
4087 11.375 -2.1 3; 4088 11.375 -2.1 2.5; 4089 11.375 -2.1 2; 4190 9.54167 -2.1 1; 4191 9.54167 -2.1 0.500001; 4192 20 -
4090 11.375 -2.1 1.5; 4091 11.375 -2.1 1; 4092 11.375 -2.1 2.1 13;
0.500001; 4193 18.25 -2.1 13; 4194 20 -2.1 12.5; 4195 18.25 -2.1 12.5;
4093 11.8333 -2.1 5.5; 4094 11.8333 -2.1 5; 4095 11.8333 - 4196 20 -2.1 -0.5;
2.1 4.5; 4197 18.25 -2.1 -0.5; 4198 20 -2.1 -1; 4199 18.25 -2.1 -1;
4096 11.8333 -2.1 4; 4097 11.8333 -2.1 3.5; 4098 11.8333 - 4200 23.8 -2.1 13;
2.1 3; 4201 23.8 -2.1 12.5; 4202 23.8 -2.1 -0.5; 4203 23.8 -2.1 -1;
4099 11.8333 -2.1 2.5; 4100 11.8333 -2.1 2; 4101 11.8333 - 4204 25.05 -2.1 13; 4205 25.05 -2.1 12.5; 4206 25.05 -2.1 -
2.1 1.5; 0.5;
4102 11.8333 -2.1 1; 4103 11.8333 -2.1 0.500001; 4104 4207 25.05 -2.1 -1; 4208 20 -2.1 11.5; 4209 18.25 -2.1 11.5;
12.2917 -2.1 5.5; 4210 20 -2.1 11;
4105 12.2917 -2.1 5; 4106 12.2917 -2.1 4.5; 4107 12.2917 - 4211 18.25 -2.1 11; 4212 20 -2.1 10.5; 4213 18.25 -2.1 10.5;
2.1 4; 4214 20 -2.1 10;
4108 12.2917 -2.1 3.5; 4109 12.2917 -2.1 3; 4110 12.2917 - 4215 18.25 -2.1 10; 4216 20 -2.1 9.5; 4217 18.25 -2.1 9.5;
2.1 2.5; 4218 20 -2.1 9;
4111 12.2917 -2.1 2; 4112 12.2917 -2.1 1.5; 4113 12.2917 - 4219 18.25 -2.1 9; 4220 20 -2.1 8.5; 4221 18.25 -2.1 8.5; 4222
2.1 1; 20 -2.1 8;
4114 12.2917 -2.1 0.500001; 4115 13 -2.1 5.5; 4116 13 -2.1 5; 4223 18.25 -2.1 8; 4224 20 -2.1 7.5; 4225 18.25 -2.1 7.5; 4226
4117 13 -2.1 4.5; 20 -2.1 7;
4118 13 -2.1 4; 4119 13 -2.1 3.5; 4120 13 -2.1 3; 4121 13 -2.1 4227 18.25 -2.1 7; 4228 20 -2.1 6.5; 4229 18.25 -2.1 6.5; 4230
2.5; 20 -2.1 5.5;
4122 13 -2.1 2; 4123 13 -2.1 1.5; 4124 13 -2.1 1; 4125 13 -2.1 4231 18.25 -2.1 5.5; 4232 20 -2.1 5; 4233 18.25 -2.1 5; 4234
0.500001; 20 -2.1 4.5;
4126 7.70833 -2.1 5.5; 4127 7 -2.1 5.5; 4128 7.70833 -2.1 5; 4235 18.25 -2.1 4.5; 4236 20 -2.1 4; 4237 18.25 -2.1 4; 4238
4129 7 -2.1 5; 20 -2.1 3.5;
4130 7.70833 -2.1 4.5; 4131 7 -2.1 4.5; 4132 7.70833 -2.1 4; 4239 18.25 -2.1 3.5; 4240 20 -2.1 3; 4241 18.25 -2.1 3; 4242
4133 7 -2.1 4; 20 -2.1 2.5;
4134 7.70833 -2.1 3.5; 4135 7 -2.1 3.5; 4136 7.70833 -2.1 3; 4243 18.25 -2.1 2.5; 4244 20 -2.1 2; 4245 18.25 -2.1 2; 4246
4137 7 -2.1 3; 20 -2.1 1.5;
4138 7.70833 -2.1 2.5; 4139 7 -2.1 2.5; 4140 7.70833 -2.1 2; 4247 18.25 -2.1 1.5; 4248 20 -2.1 1; 4249 18.25 -2.1 1; 4250
4141 7 -2.1 2; 20 -2.1 0.500001;
4142 7.70833 -2.1 1.5; 4143 7 -2.1 1.5; 4144 7.70833 -2.1 1; 4251 18.25 -2.1 0.500001; 4252 23.8 -2.1 11.5; 4253 23.8 -2.1
4145 7 -2.1 1; 11;
4146 7.70833 -2.1 0.500001; 4147 7 -2.1 0.500001; 4148 4254 23.8 -2.1 10.5; 4255 23.8 -2.1 10; 4256 23.8 -2.1 9.5;
8.16667 -2.1 5.5; 4257 23.8 -2.1 9;
4149 8.16667 -2.1 5; 4150 8.16667 -2.1 4.5; 4151 8.16667 - 4258 23.8 -2.1 8.5; 4259 23.8 -2.1 8; 4260 23.8 -2.1 7.5; 4261
2.1 4; 23.8 -2.1 7;
4152 8.16667 -2.1 3.5; 4153 8.16667 -2.1 3; 4154 8.16667 - 4262 23.8 -2.1 6.5; 4263 23.8 -2.1 5.5; 4264 23.8 -2.1 5; 4265
2.1 2.5; 23.8 -2.1 4.5;
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 302 de 463
(SUBJECT) (Page)

4266 23.8 -2.1 4; 4267 23.8 -2.1 3.5; 4268 23.8 -2.1 3; 4269 4367 19.5625 -2.1 4; 4368 18.6875 -2.1 3.5; 4369 19.125 -2.1
23.8 -2.1 2.5; 3.5;
4270 23.8 -2.1 2; 4271 23.8 -2.1 1.5; 4272 23.8 -2.1 1; 4370 19.5625 -2.1 3.5; 4371 18.6875 -2.1 3; 4372 19.125 -2.1
4273 23.8 -2.1 0.500001; 4274 25.05 -2.1 11.5; 4275 25.05 - 3;
2.1 11; 4373 19.5625 -2.1 3; 4374 18.6875 -2.1 2.5; 4375 19.125 -2.1
4276 25.05 -2.1 10.5; 4277 25.05 -2.1 10; 4278 25.05 -2.1 9.5; 2.5;
4279 25.05 -2.1 9; 4280 25.05 -2.1 8.5; 4281 25.05 -2.1 8; 4376 19.5625 -2.1 2.5; 4377 18.6875 -2.1 2; 4378 19.125 -2.1
4282 25.05 -2.1 7.5; 2;
4283 25.05 -2.1 7; 4284 25.05 -2.1 6.5; 4285 25.05 -2.1 5.5; 4379 19.5625 -2.1 2; 4380 18.6875 -2.1 1.5; 4381 19.125 -2.1
4286 25.05 -2.1 5; 1.5;
4287 25.05 -2.1 4.5; 4288 25.05 -2.1 4; 4289 25.05 -2.1 3.5; 4382 19.5625 -2.1 1.5; 4383 18.6875 -2.1 1; 4384 19.125 -2.1
4290 25.05 -2.1 3; 1;
4291 25.05 -2.1 2.5; 4292 25.05 -2.1 2; 4293 25.05 -2.1 1.5; 4385 19.5625 -2.1 1; 4386 18.6875 -2.1 0.500001; 4387
4294 25.05 -2.1 1; 19.125 -2.1 0.500001;
4295 25.05 -2.1 0.500001; 4296 18.6875 -2.1 14.75; 4297 4388 19.5625 -2.1 0.500001; 4389 24.2167 -2.1 14.75; 4390
18.6875 -2.1 13; 24.2167 -2.1 13;
4298 19.125 -2.1 14.75; 4299 19.125 -2.1 13; 4300 19.5625 - 4391 24.6333 -2.1 14.75; 4392 24.6333 -2.1 13; 4393 24.2167
2.1 14.75; -2.1 12.5;
4301 19.5625 -2.1 13; 4302 18.6875 -2.1 12.5; 4303 19.125 - 4394 24.6333 -2.1 12.5; 4395 24.2167 -2.1 12; 4396 24.6333 -
2.1 12.5; 2.1 12;
4304 19.5625 -2.1 12.5; 4305 18.6875 -2.1 12; 4306 19.125 - 4397 24.2167 -2.1 0; 4398 24.2167 -2.1 -0.5; 4399 24.6333 -
2.1 12; 2.1 0;
4307 19.5625 -2.1 12; 4308 18.6875 -2.1 0; 4309 18.6875 -2.1 4400 24.6333 -2.1 -0.5; 4401 24.2167 -2.1 -1; 4402 24.6333 -
-0.5; 2.1 -1;
4310 19.125 -2.1 0; 4311 19.125 -2.1 -0.5; 4312 19.5625 -2.1 4403 24.2167 -2.1 -2.75; 4404 24.6333 -2.1 -2.75; 4405
0; 24.2167 -2.1 11.5;
4313 19.5625 -2.1 -0.5; 4314 18.6875 -2.1 -1; 4315 19.125 - 4406 24.6333 -2.1 11.5; 4407 24.2167 -2.1 11; 4408 24.6333 -
2.1 -1; 2.1 11;
4316 19.5625 -2.1 -1; 4317 18.6875 -2.1 -2.75; 4318 19.125 - 4409 24.2167 -2.1 10.5; 4410 24.6333 -2.1 10.5; 4411
2.1 -2.75; 24.2167 -2.1 10;
4319 19.5625 -2.1 -2.75; 4320 18.6875 -2.1 11.5; 4321 19.125 4412 24.6333 -2.1 10; 4413 24.2167 -2.1 9.5; 4414 24.6333 -
-2.1 11.5; 2.1 9.5;
4322 19.5625 -2.1 11.5; 4323 18.6875 -2.1 11; 4324 19.125 - 4415 24.2167 -2.1 9; 4416 24.6333 -2.1 9; 4417 24.2167 -2.1
2.1 11; 8.5;
4325 19.5625 -2.1 11; 4326 18.6875 -2.1 10.5; 4327 19.125 - 4418 24.6333 -2.1 8.5; 4419 24.2167 -2.1 8; 4420 24.6333 -
2.1 10.5; 2.1 8;
4328 19.5625 -2.1 10.5; 4329 18.6875 -2.1 10; 4330 19.125 - 4421 24.2167 -2.1 7.5; 4422 24.6333 -2.1 7.5; 4423 24.2167 -
2.1 10; 2.1 7;
4331 19.5625 -2.1 10; 4332 18.6875 -2.1 9.5; 4333 19.125 - 4424 24.6333 -2.1 7; 4425 24.2167 -2.1 6.5; 4426 24.6333 -
2.1 9.5; 2.1 6.5;
4334 19.5625 -2.1 9.5; 4335 18.6875 -2.1 9; 4336 19.125 -2.1 4427 24.2167 -2.1 6; 4428 24.6333 -2.1 6; 4429 24.2167 -2.1
9; 5.5;
4337 19.5625 -2.1 9; 4338 18.6875 -2.1 8.5; 4339 19.125 -2.1 4430 24.6333 -2.1 5.5; 4431 24.2167 -2.1 5; 4432 24.6333 -
8.5; 2.1 5;
4340 19.5625 -2.1 8.5; 4341 18.6875 -2.1 8; 4342 19.125 -2.1 4433 24.2167 -2.1 4.5; 4434 24.6333 -2.1 4.5; 4435 24.2167 -
8; 2.1 4;
4343 19.5625 -2.1 8; 4344 18.6875 -2.1 7.5; 4345 19.125 -2.1 4436 24.6333 -2.1 4; 4437 24.2167 -2.1 3.5; 4438 24.6333 -
7.5; 2.1 3.5;
4346 19.5625 -2.1 7.5; 4347 18.6875 -2.1 7; 4348 19.125 -2.1 4439 24.2167 -2.1 3; 4440 24.6333 -2.1 3; 4441 24.2167 -2.1
7; 2.5;
4349 19.5625 -2.1 7; 4350 18.6875 -2.1 6.5; 4351 19.125 -2.1 4442 24.6333 -2.1 2.5; 4443 24.2167 -2.1 2; 4444 24.6333 -
6.5; 2.1 2;
4352 19.5625 -2.1 6.5; 4353 18.6875 -2.1 6; 4354 19.125 -2.1 4445 24.2167 -2.1 1.5; 4446 24.6333 -2.1 1.5; 4447 24.2167 -
6; 2.1 1;
4355 19.5625 -2.1 6; 4356 18.6875 -2.1 5.5; 4357 19.125 -2.1 4448 24.6333 -2.1 1; 4449 24.2167 -2.1 0.500001; 4450
5.5; 24.6333 -2.1 0.500001;
4358 19.5625 -2.1 5.5; 4359 18.6875 -2.1 5; 4360 19.125 -2.1 4451 20.5429 -2.1 14.75; 4452 20.5429 -2.1 13; 4453 21.0857
5; -2.1 14.75;
4361 19.5625 -2.1 5; 4362 18.6875 -2.1 4.5; 4363 19.125 -2.1 4454 21.0857 -2.1 13; 4455 21.6286 -2.1 14.75; 4456 21.6286
4.5; -2.1 13;
4364 19.5625 -2.1 4.5; 4365 18.6875 -2.1 4; 4366 19.125 -2.1 4457 22.1714 -2.1 14.75; 4458 22.1714 -2.1 13; 4459 22.7143
4; -2.1 14.75;
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 303 de 463
(SUBJECT) (Page)

4460 22.7143 -2.1 13; 4461 23.2571 -2.1 14.75; 4462 23.2571 4553 20.5429 -2.1 7; 4554 21.0857 -2.1 7; 4555 21.6286 -2.1
-2.1 13; 7;
4463 20.5429 -2.1 12.5; 4464 21.0857 -2.1 12.5; 4465 4556 22.1714 -2.1 7; 4557 22.7143 -2.1 7; 4558 23.2571 -2.1
21.6286 -2.1 12.5; 7;
4466 22.1714 -2.1 12.5; 4467 22.7143 -2.1 12.5; 4468 4559 20.5429 -2.1 6.5; 4560 21.0857 -2.1 6.5; 4561 21.6286 -
23.2571 -2.1 12.5; 2.1 6.5;
4469 20.5429 -2.1 12; 4470 21.0857 -2.1 12; 4471 21.6286 - 4562 22.1714 -2.1 6.5; 4563 22.7143 -2.1 6.5; 4564 23.2571 -
2.1 12; 2.1 6.5;
4472 22.1714 -2.1 12; 4473 22.7143 -2.1 12; 4474 23.2571 - 4565 20.5429 -2.1 6; 4566 21.0857 -2.1 6; 4567 21.6286 -2.1
2.1 12; 6;
4475 20.5429 -2.1 0; 4476 20.5429 -2.1 -0.5; 4477 21.0857 - 4568 22.1714 -2.1 6; 4569 22.7143 -2.1 6; 4570 23.2571 -2.1
2.1 0; 6;
4478 21.0857 -2.1 -0.5; 4479 21.6286 -2.1 0; 4480 21.6286 - 4571 20.5429 -2.1 5.5; 4572 21.0857 -2.1 5.5; 4573 21.6286 -
2.1 -0.5; 2.1 5.5;
4481 22.1714 -2.1 0; 4482 22.1714 -2.1 -0.5; 4483 22.7143 - 4574 22.1714 -2.1 5.5; 4575 22.7143 -2.1 5.5; 4576 23.2571 -
2.1 0; 2.1 5.5;
4484 22.7143 -2.1 -0.5; 4485 23.2571 -2.1 0; 4486 23.2571 - 4577 20.5429 -2.1 5; 4578 21.0857 -2.1 5; 4579 21.6286 -2.1
2.1 -0.5; 5;
4487 20.5429 -2.1 -1; 4488 21.0857 -2.1 -1; 4489 21.6286 - 4580 22.1714 -2.1 5; 4581 22.7143 -2.1 5; 4582 23.2571 -2.1
2.1 -1; 5;
4490 22.1714 -2.1 -1; 4491 22.7143 -2.1 -1; 4492 23.2571 - 4583 20.5429 -2.1 4.5; 4584 21.0857 -2.1 4.5; 4585 21.6286 -
2.1 -1; 2.1 4.5;
4493 20.5429 -2.1 -2.75; 4494 21.0857 -2.1 -2.75; 4495 4586 22.1714 -2.1 4.5; 4587 22.7143 -2.1 4.5; 4588 23.2571 -
21.6286 -2.1 -2.75; 2.1 4.5;
4496 22.1714 -2.1 -2.75; 4497 22.7143 -2.1 -2.75; 4498 4589 20.5429 -2.1 4; 4590 21.0857 -2.1 4; 4591 21.6286 -2.1
23.2571 -2.1 -2.75; 4;
4499 20.5429 -2.1 11.5; 4500 21.0857 -2.1 11.5; 4501 4592 22.1714 -2.1 4; 4593 22.7143 -2.1 4; 4594 23.2571 -2.1
21.6286 -2.1 11.5; 4;
4502 22.1714 -2.1 11.5; 4503 22.7143 -2.1 11.5; 4504 4595 20.5429 -2.1 3.5; 4596 21.0857 -2.1 3.5; 4597 21.6286 -
23.2571 -2.1 11.5; 2.1 3.5;
4505 20.5429 -2.1 11; 4506 21.0857 -2.1 11; 4507 21.6286 - 4598 22.1714 -2.1 3.5; 4599 22.7143 -2.1 3.5; 4600 23.2571 -
2.1 11; 2.1 3.5;
4508 22.1714 -2.1 11; 4509 22.7143 -2.1 11; 4510 23.2571 - 4601 20.5429 -2.1 3; 4602 21.0857 -2.1 3; 4603 21.6286 -2.1
2.1 11; 3;
4511 20.5429 -2.1 10.5; 4512 21.0857 -2.1 10.5; 4513 4604 22.1714 -2.1 3; 4605 22.7143 -2.1 3; 4606 23.2571 -2.1
21.6286 -2.1 10.5; 3;
4514 22.1714 -2.1 10.5; 4515 22.7143 -2.1 10.5; 4516 4607 20.5429 -2.1 2.5; 4608 21.0857 -2.1 2.5; 4609 21.6286 -
23.2571 -2.1 10.5; 2.1 2.5;
4517 20.5429 -2.1 10; 4518 21.0857 -2.1 10; 4519 21.6286 - 4610 22.1714 -2.1 2.5; 4611 22.7143 -2.1 2.5; 4612 23.2571 -
2.1 10; 2.1 2.5;
4520 22.1714 -2.1 10; 4521 22.7143 -2.1 10; 4522 23.2571 - 4613 20.5429 -2.1 2; 4614 21.0857 -2.1 2; 4615 21.6286 -2.1
2.1 10; 2;
4523 20.5429 -2.1 9.5; 4524 21.0857 -2.1 9.5; 4525 21.6286 - 4616 22.1714 -2.1 2; 4617 22.7143 -2.1 2; 4618 23.2571 -2.1
2.1 9.5; 2;
4526 22.1714 -2.1 9.5; 4527 22.7143 -2.1 9.5; 4528 23.2571 - 4619 20.5429 -2.1 1.5; 4620 21.0857 -2.1 1.5; 4621 21.6286 -
2.1 9.5; 2.1 1.5;
4529 20.5429 -2.1 9; 4530 21.0857 -2.1 9; 4531 21.6286 -2.1 4622 22.1714 -2.1 1.5; 4623 22.7143 -2.1 1.5; 4624 23.2571 -
9; 2.1 1.5;
4532 22.1714 -2.1 9; 4533 22.7143 -2.1 9; 4534 23.2571 -2.1 4625 20.5429 -2.1 1; 4626 21.0857 -2.1 1; 4627 21.6286 -2.1
9; 1;
4535 20.5429 -2.1 8.5; 4536 21.0857 -2.1 8.5; 4537 21.6286 - 4628 22.1714 -2.1 1; 4629 22.7143 -2.1 1; 4630 23.2571 -2.1
2.1 8.5; 1;
4538 22.1714 -2.1 8.5; 4539 22.7143 -2.1 8.5; 4540 23.2571 - 4631 20.5429 -2.1 0.500001; 4632 21.0857 -2.1 0.500001;
2.1 8.5; 4633 21.6286 -2.1 0.500001; 4634 22.1714 -2.1 0.500001;
4541 20.5429 -2.1 8; 4542 21.0857 -2.1 8; 4543 21.6286 -2.1 4635 22.7143 -2.1 0.500001; 4636 23.2571 -2.1 0.500001;
8; 4637 7.35417 -2.1 14.75; 4638 7.35417 -2.1 13; 4639 7.35417
4544 22.1714 -2.1 8; 4545 22.7143 -2.1 8; 4546 23.2571 -2.1 -2.1 12.5;
8; 4640 7.35417 -2.1 12; 4641 12.6459 -2.1 14.75; 4642 12.6459
4547 20.5429 -2.1 7.5; 4548 21.0857 -2.1 7.5; 4549 21.6286 - -2.1 13;
2.1 7.5; 4643 12.6459 -2.1 12.5; 4644 12.6459 -2.1 12; 4645 7.35417 -
4550 22.1714 -2.1 7.5; 4551 22.7143 -2.1 7.5; 4552 23.2571 - 2.1 0;
2.1 7.5;
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 304 de 463
(SUBJECT) (Page)

4646 7.35417 -2.1 -0.5; 4647 7.35417 -2.1 -1; 4648 7.35417 - 5053 2 -2.1 10; 5054 2 -2.1 9.5; 5055 2 -2.1 9; 5056 2 -2.1 8.5;
2.1 -2.75; 5057 2 -2.1 8;
4649 12.6459 -2.1 0; 4650 12.6459 -2.1 -0.5; 4651 12.6459 - 5058 2 -2.1 7.5; 5059 2 -2.1 7; 5060 2 -2.1 6.5; 5061 -1.2 -2.1
2.1 -1; 14.3125;
4652 12.6459 -2.1 -2.75; 4653 7.35417 -2.1 11.5; 4654 5062 -1.6 -2.1 14.3125; 5063 -1.2 -2.1 13.875; 5064 -1.6 -2.1
7.35417 -2.1 11; 13.875;
4655 7.35417 -2.1 10.5; 4656 7.35417 -2.1 10; 4657 7.35417 - 5065 -1.2 -2.1 13.4375; 5066 -1.6 -2.1 13.4375; 5067 -0.8 -2.1
2.1 9.5; 14.3125;
4658 7.35417 -2.1 9; 4659 7.35417 -2.1 8.5; 4660 7.35417 - 5068 -0.8 -2.1 13.875; 5069 -0.8 -2.1 13.4375; 5070 -0.4 -2.1
2.1 8; 14.3125;
4661 7.35417 -2.1 7.5; 4662 7.35417 -2.1 7; 4663 7.35417 - 5071 -0.4 -2.1 13.875; 5072 -0.4 -2.1 13.4375; 5073 0 -2.1
2.1 6.5; 14.3125;
4664 7.35417 -2.1 6; 4665 12.6459 -2.1 11.5; 4666 12.6459 - 5074 0 -2.1 13.875; 5075 0 -2.1 13.4375; 5076 0.4 -2.1
2.1 11; 14.3125;
4667 12.6459 -2.1 10.5; 4668 12.6459 -2.1 10; 4669 12.6459 - 5077 0.4 -2.1 13.875; 5078 0.4 -2.1 13.4375; 5079 0.8 -2.1
2.1 9.5; 14.3125;
4670 12.6459 -2.1 9; 4671 12.6459 -2.1 8.5; 4672 12.6459 - 5080 0.8 -2.1 13.875; 5081 0.8 -2.1 13.4375; 5082 1.2 -2.1
2.1 8; 14.3125;
4673 12.6459 -2.1 7.5; 4674 12.6459 -2.1 7; 4675 12.6459 - 5083 1.2 -2.1 13.875; 5084 1.2 -2.1 13.4375; 5085 1.6 -2.1
2.1 6.5; 14.3125;
4676 12.6459 -2.1 6; 4677 12.6459 -2.1 5.5; 4678 12.6459 - 5086 1.6 -2.1 13.875; 5087 1.6 -2.1 13.4375; 5088 -2 -2.1
2.1 5; 14.3125;
4679 12.6459 -2.1 4.5; 4680 12.6459 -2.1 4; 4681 12.6459 - 5089 -2 -2.1 13.875; 5090 -2 -2.1 13.4375; 5091 2 -2.1
2.1 3.5; 14.3125;
4682 12.6459 -2.1 3; 4683 12.6459 -2.1 2.5; 4684 12.6459 - 5092 2 -2.1 13.875; 5093 2 -2.1 13.4375; 5094 -1.2 -2.1 -
2.1 2; 1.4375;
4685 12.6459 -2.1 1.5; 4686 12.6459 -2.1 1; 4687 12.6459 - 5095 -1.6 -2.1 -1.4375; 5096 -1.2 -2.1 -1.875; 5097 -1.6 -2.1 -
2.1 0.500001; 1.875;
4688 7.35417 -2.1 5.5; 4689 7.35417 -2.1 5; 4690 7.35417 - 5098 -1.2 -2.1 -2.3125; 5099 -1.6 -2.1 -2.3125; 5100 -0.8 -2.1 -
2.1 4.5; 1.4375;
4691 7.35417 -2.1 4; 4692 7.35417 -2.1 3.5; 4693 7.35417 - 5101 -0.8 -2.1 -1.875; 5102 -0.8 -2.1 -2.3125; 5103 -0.4 -2.1 -
2.1 3; 1.4375;
4694 7.35417 -2.1 2.5; 4695 7.35417 -2.1 2; 4696 7.35417 - 5104 -0.4 -2.1 -1.875; 5105 -0.4 -2.1 -2.3125; 5106 0 -2.1 -
2.1 1.5; 1.4375;
4697 7.35417 -2.1 1; 4698 7.35417 -2.1 0.500001; 4968 -2 - 5107 0 -2.1 -1.875; 5108 0 -2.1 -2.3125; 5109 0.4 -2.1 -
2.1 0; 1.4375;
4969 -2 -2.1 -0.5; 4970 -2 -2.1 -1; 4971 -2 -2.1 -2.75; 4976 -2 - 5110 0.4 -2.1 -1.875; 5111 0.4 -2.1 -2.3125; 5112 0.8 -2.1 -
2.1 14.75; 1.4375;
4977 -2 -2.1 13; 4978 -2 -2.1 12.5; 4979 -2 -2.1 12; 4984 -2 - 5113 0.8 -2.1 -1.875; 5114 0.8 -2.1 -2.3125; 5115 1.2 -2.1 -
2.1 6; 1.4375;
4985 -2 -2.1 5.5; 4986 -2 -2.1 5; 4987 -2 -2.1 4.5; 4988 -2 -2.1 5116 1.2 -2.1 -1.875; 5117 1.2 -2.1 -2.3125; 5118 1.6 -2.1 -
4; 1.4375;
4989 -2 -2.1 3.5; 4990 -2 -2.1 3; 4991 -2 -2.1 2.5; 4992 -2 -2.1 5119 1.6 -2.1 -1.875; 5120 1.6 -2.1 -2.3125; 5121 -2 -2.1 -
2; 1.4375;
4993 -2 -2.1 1.5; 4994 -2 -2.1 1; 4995 -2 -2.1 0.500001; 5008 - 5122 -2 -2.1 -1.875; 5123 -2 -2.1 -2.3125; 5124 2 -2.1 -1.4375;
2 -2.1 11.5; 5125 2 -2.1 -1.875; 5126 2 -2.1 -2.3125; 5127 8.16667 -2.1
5009 -2 -2.1 11; 5010 -2 -2.1 10.5; 5011 -2 -2.1 10; 5012 -2 - 14.3125;
2.1 9.5; 5128 7.70833 -2.1 14.3125; 5129 8.16667 -2.1 13.875; 5130
5013 -2 -2.1 9; 5014 -2 -2.1 8.5; 5015 -2 -2.1 8; 5016 -2 -2.1 7.70833 -2.1 13.875;
7.5; 5131 8.16667 -2.1 13.4375; 5132 7.70833 -2.1 13.4375; 5133
5017 -2 -2.1 7; 5018 -2 -2.1 6.5; 5030 2 -2.1 0; 5031 2 -2.1 - 8.625 -2.1 14.3125;
0.5; 5134 8.625 -2.1 13.875; 5135 8.625 -2.1 13.4375; 5136
5032 2 -2.1 -1; 5033 2 -2.1 -2.75; 5034 2 -2.1 14.75; 5035 2 - 9.08333 -2.1 14.3125;
2.1 13; 5137 9.08333 -2.1 13.875; 5138 9.08333 -2.1 13.4375; 5139
5036 2 -2.1 12.5; 5037 2 -2.1 12; 5038 2 -2.1 6; 5039 2 -2.1 9.54167 -2.1 14.3125;
5.5; 5140 9.54167 -2.1 13.875; 5141 9.54167 -2.1 13.4375; 5142
5040 2 -2.1 5; 5041 2 -2.1 4.5; 5042 2 -2.1 4; 5043 2 -2.1 3.5; 10 -2.1 14.3125;
5044 2 -2.1 3; 5143 10 -2.1 13.875; 5144 10 -2.1 13.4375; 5145 10.4583 -2.1
5045 2 -2.1 2.5; 5046 2 -2.1 2; 5047 2 -2.1 1.5; 5048 2 -2.1 1; 14.3125;
5049 2 -2.1 0.500001; 5050 2 -2.1 11.5; 5051 2 -2.1 11; 5052 5146 10.4583 -2.1 13.875; 5147 10.4583 -2.1 13.4375; 5148
2 -2.1 10.5; 10.9167 -2.1 14.3125;
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 305 de 463
(SUBJECT) (Page)

5149 10.9167 -2.1 13.875; 5150 10.9167 -2.1 13.4375; 5151 5242 24.6333 -2.1 -1.875; 5243 24.6333 -2.1 -2.3125; 5244
11.375 -2.1 14.3125; 25.05 -2.1 -1.4375;
5152 11.375 -2.1 13.875; 5153 11.375 -2.1 13.4375; 5154 5245 25.05 -2.1 -1.875; 5246 25.05 -2.1 -2.3125; 5247
11.8333 -2.1 14.3125; 20.5429 -2.1 14.3125;
5155 11.8333 -2.1 13.875; 5156 11.8333 -2.1 13.4375; 5157 5248 20.5429 -2.1 13.875; 5249 20.5429 -2.1 13.4375; 5250
12.2917 -2.1 14.3125; 21.0857 -2.1 14.3125;
5158 12.2917 -2.1 13.875; 5159 12.2917 -2.1 13.4375; 5160 5251 21.0857 -2.1 13.875; 5252 21.0857 -2.1 13.4375; 5253
8.16667 -2.1 -1.4375; 21.6286 -2.1 14.3125;
5161 7.70833 -2.1 -1.4375; 5162 8.16667 -2.1 -1.875; 5163 5254 21.6286 -2.1 13.875; 5255 21.6286 -2.1 13.4375; 5256
7.70833 -2.1 -1.875; 22.1714 -2.1 14.3125;
5164 8.16667 -2.1 -2.3125; 5165 7.70833 -2.1 -2.3125; 5166 5257 22.1714 -2.1 13.875; 5258 22.1714 -2.1 13.4375; 5259
8.625 -2.1 -1.4375; 22.7143 -2.1 14.3125;
5167 8.625 -2.1 -1.875; 5168 8.625 -2.1 -2.3125; 5169 5260 22.7143 -2.1 13.875; 5261 22.7143 -2.1 13.4375; 5262
9.08333 -2.1 -1.4375; 23.2571 -2.1 14.3125;
5170 9.08333 -2.1 -1.875; 5171 9.08333 -2.1 -2.3125; 5172 5263 23.2571 -2.1 13.875; 5264 23.2571 -2.1 13.4375; 5265
9.54167 -2.1 -1.4375; 20.5429 -2.1 -1.4375;
5173 9.54167 -2.1 -1.875; 5174 9.54167 -2.1 -2.3125; 5175 10 5266 20.5429 -2.1 -1.875; 5267 20.5429 -2.1 -2.3125; 5268
-2.1 -1.4375; 21.0857 -2.1 -1.4375;
5176 10 -2.1 -1.875; 5177 10 -2.1 -2.3125; 5178 10.4583 -2.1 5269 21.0857 -2.1 -1.875; 5270 21.0857 -2.1 -2.3125; 5271
-1.4375; 21.6286 -2.1 -1.4375;
5179 10.4583 -2.1 -1.875; 5180 10.4583 -2.1 -2.3125; 5181 5272 21.6286 -2.1 -1.875; 5273 21.6286 -2.1 -2.3125; 5274
10.9167 -2.1 -1.4375; 22.1714 -2.1 -1.4375;
5182 10.9167 -2.1 -1.875; 5183 10.9167 -2.1 -2.3125; 5184 5275 22.1714 -2.1 -1.875; 5276 22.1714 -2.1 -2.3125; 5277
11.375 -2.1 -1.4375; 22.7143 -2.1 -1.4375;
5185 11.375 -2.1 -1.875; 5186 11.375 -2.1 -2.3125; 5187 5278 22.7143 -2.1 -1.875; 5279 22.7143 -2.1 -2.3125; 5280
11.8333 -2.1 -1.4375; 23.2571 -2.1 -1.4375;
5188 11.8333 -2.1 -1.875; 5189 11.8333 -2.1 -2.3125; 5190 5281 23.2571 -2.1 -1.875; 5282 23.2571 -2.1 -2.3125; 5283
12.2917 -2.1 -1.4375; 7.35417 -2.1 14.3125;
5191 12.2917 -2.1 -1.875; 5192 12.2917 -2.1 -2.3125; 5193 5284 7 -2.1 14.3125; 5285 7.35417 -2.1 13.875; 5286 7 -2.1
18.6875 -2.1 14.3125; 13.875;
5194 18.25 -2.1 14.3125; 5195 18.6875 -2.1 13.875; 5196 5287 7.35417 -2.1 13.4375; 5288 7 -2.1 13.4375; 5289
18.25 -2.1 13.875; 12.6459 -2.1 14.3125;
5197 18.6875 -2.1 13.4375; 5198 18.25 -2.1 13.4375; 5199 5290 12.6459 -2.1 13.875; 5291 12.6459 -2.1 13.4375; 5292
19.125 -2.1 14.3125; 13 -2.1 14.3125;
5200 19.125 -2.1 13.875; 5201 19.125 -2.1 13.4375; 5202 5293 13 -2.1 13.875; 5294 13 -2.1 13.4375; 5295 7.35417 -2.1
19.5625 -2.1 14.3125; -1.4375;
5203 19.5625 -2.1 13.875; 5204 19.5625 -2.1 13.4375; 5205 5296 7 -2.1 -1.4375; 5297 7.35417 -2.1 -1.875; 5298 7 -2.1 -
20 -2.1 14.3125; 1.875;
5206 20 -2.1 13.875; 5207 20 -2.1 13.4375; 5208 18.6875 -2.1 5299 7.35417 -2.1 -2.3125; 5300 7 -2.1 -2.3125; 5301 12.6459
-1.4375; -2.1 -1.4375;
5209 18.25 -2.1 -1.4375; 5210 18.6875 -2.1 -1.875; 5211 5302 12.6459 -2.1 -1.875; 5303 12.6459 -2.1 -2.3125; 5304 13
18.25 -2.1 -1.875; -2.1 -1.4375;
5212 18.6875 -2.1 -2.3125; 5213 18.25 -2.1 -2.3125; 5214 5305 13 -2.1 -1.875; 5306 13 -2.1 -2.3125;
19.125 -2.1 -1.4375; ***********************************************************************
5215 19.125 -2.1 -1.875; 5216 19.125 -2.1 -2.3125; 5217 ******
19.5625 -2.1 -1.4375; MEMBER INCIDENCES
5218 19.5625 -2.1 -1.875; 5219 19.5625 -2.1 -2.3125; 5220 20 1 1 1312; 7 2 1275; 10 3 1279; 13 7 1301; 18 8 1283; 21 9
-2.1 -1.4375; 1287; 24 13 1291;
5221 20 -2.1 -1.875; 5222 20 -2.1 -2.3125; 5223 24.2167 -2.1 28 14 1295; 31 15 1299; 34 36 1309; 36 38 1305; 71 34 692;
14.3125; 6257 5038 2527;
5224 23.8 -2.1 14.3125; 5225 24.2167 -2.1 13.875; 5226 23.8 6258 5037 1778; 6259 1801 5030; 6260 1911 3325; 6261
-2.1 13.875; 2856 3477; 6262 1884 3306;
5227 24.2167 -2.1 13.4375; 5228 23.8 -2.1 13.4375; 5229 ELEMENT INCIDENCES SHELL
24.6333 -2.1 14.3125; 5042 3478 3480 3522 3518; 5043 3518 3522 3523 3520;
5230 24.6333 -2.1 13.875; 5231 24.6333 -2.1 13.4375; 5232 5045 3480 3482 3524 3522;
25.05 -2.1 14.3125; 5046 3522 3524 3525 3523; 5048 3482 3484 3526 3524;
5233 25.05 -2.1 13.875; 5234 25.05 -2.1 13.4375; 5235 5049 3524 3526 3527 3525;
24.2167 -2.1 -1.4375; 5051 3484 15 3528 3526; 5052 3526 3528 3529 3527; 5054
5236 23.8 -2.1 -1.4375; 5237 24.2167 -2.1 -1.875; 5238 23.8 - 15 3486 3530 3528;
2.1 -1.875; 5055 3528 3530 3531 3529; 5057 3486 3488 3532 3530;
5239 24.2167 -2.1 -2.3125; 5240 23.8 -2.1 -2.3125; 5241 5058 3530 3532 3533 3531;
24.6333 -2.1 -1.4375;
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 306 de 463
(SUBJECT) (Page)

5060 3488 3490 3534 3532; 5061 3532 3534 3535 3533; 5184 3639 3650 3651 3640; 5185 3640 3651 3652 3641;
5063 3490 3492 3536 3534; 5186 3641 3652 3653 3642;
5064 3534 3536 3537 3535; 5073 3540 3544 3545 3542; 5187 3642 3653 3654 3643; 5188 3643 3654 3655 3644;
5074 3542 3545 3503 3502; 5189 3644 3655 3656 3645;
5076 3544 3546 3547 3545; 5077 3545 3547 3504 3503; 5190 3645 3656 3657 3646; 5191 3646 3657 3658 3647;
5079 3546 3548 3549 3547; 5192 3647 3658 3659 3648;
5080 3547 3549 3505 3504; 5082 3548 3550 3551 3549; 5193 3648 3659 3660 3649; 5194 3649 3660 3490 3488;
5083 3549 3551 3 3505; 5195 3500 3501 3661 3650;
5085 3550 3552 3553 3551; 5086 3551 3553 3506 3; 5088 5196 3650 3661 3662 3651; 5197 3651 3662 3663 3652;
3552 3554 3555 3553; 5198 3652 3663 3664 3653;
5089 3553 3555 3507 3506; 5091 3554 3556 3557 3555; 5199 3653 3664 3665 3654; 5200 3654 3665 3666 3655;
5092 3555 3557 3508 3507; 5201 3655 3666 3667 3656;
5094 3556 3558 3559 3557; 5095 3557 3559 3509 3508; 5202 3656 3667 3668 3657; 5203 3657 3668 3669 3658;
5111 3494 3495 3584 3562; 5204 3658 3669 3670 3659;
5112 3562 3584 3585 3564; 5113 3564 3585 3586 3566; 5205 3659 3670 3671 3660; 5206 3660 3671 3492 3490;
5114 3566 3586 3587 3568; 5231 3502 3503 3705 3683;
5115 3568 3587 3588 3570; 5116 3570 3588 3589 3572; 5232 3683 3705 3706 3685; 5233 3685 3706 3707 3687;
5117 3572 3589 3590 3574; 5234 3687 3707 3708 3689;
5118 3574 3590 3591 3576; 5119 3576 3591 3592 3578; 5235 3689 3708 3709 3691; 5236 3691 3709 3710 3693;
5120 3578 3592 3593 3580; 5237 3693 3710 3711 3695;
5121 3580 3593 3594 3582; 5122 3582 3594 3480 3478; 5238 3695 3711 3712 3697; 5239 3697 3712 3713 3699;
5123 3495 3496 3595 3584; 5240 3699 3713 3714 3701;
5124 3584 3595 3596 3585; 5125 3585 3596 3597 3586; 5241 3701 3714 3715 3703; 5242 3703 3715 3495 3494;
5126 3586 3597 3598 3587; 5243 3503 3504 3716 3705;
5127 3587 3598 3599 3588; 5128 3588 3599 3600 3589; 5244 3705 3716 3717 3706; 5245 3706 3717 3718 3707;
5129 3589 3600 3601 3590; 5246 3707 3718 3719 3708;
5130 3590 3601 3602 3591; 5131 3591 3602 3603 3592; 5247 3708 3719 3720 3709; 5248 3709 3720 3721 3710;
5132 3592 3603 3604 3593; 5249 3710 3721 3722 3711;
5133 3593 3604 3605 3594; 5134 3594 3605 3482 3480; 5250 3711 3722 3723 3712; 5251 3712 3723 3724 3713;
5135 3496 3497 3606 3595; 5252 3713 3724 3725 3714;
5136 3595 3606 3607 3596; 5137 3596 3607 3608 3597; 5253 3714 3725 3726 3715; 5254 3715 3726 3496 3495;
5138 3597 3608 3609 3598; 5255 3504 3505 3727 3716;
5139 3598 3609 3610 3599; 5140 3599 3610 3611 3600; 5256 3716 3727 3728 3717; 5257 3717 3728 3729 3718;
5141 3600 3611 3612 3601; 5258 3718 3729 3730 3719;
5142 3601 3612 3613 3602; 5143 3602 3613 3614 3603; 5259 3719 3730 3731 3720; 5260 3720 3731 3732 3721;
5144 3603 3614 3615 3604; 5261 3721 3732 3733 3722;
5145 3604 3615 3616 3605; 5146 3605 3616 3484 3482; 5262 3722 3733 3734 3723; 5263 3723 3734 3735 3724;
5147 3497 9 3617 3606; 5264 3724 3735 3736 3725;
5148 3606 3617 3618 3607; 5149 3607 3618 3619 3608; 5265 3725 3736 3737 3726; 5266 3726 3737 3497 3496;
5150 3608 3619 3620 3609; 5267 3505 3 3738 3727;
5151 3609 3620 3621 3610; 5152 3610 3621 3622 3611; 5268 3727 3738 3739 3728; 5269 3728 3739 3740 3729;
5153 3611 3622 3623 3612; 5270 3729 3740 3741 3730;
5154 3612 3623 3624 3613; 5155 3613 3624 3625 3614; 5271 3730 3741 3742 3731; 5272 3731 3742 3743 3732;
5156 3614 3625 3626 3615; 5273 3732 3743 3744 3733;
5157 3615 3626 3627 3616; 5158 3616 3627 15 3484; 5159 9 5274 3733 3744 3745 3734; 5275 3734 3745 3746 3735;
3498 3628 3617; 5276 3735 3746 3747 3736;
5160 3617 3628 3629 3618; 5161 3618 3629 3630 3619; 5277 3736 3747 3748 3737; 5278 3737 3748 9 3497; 5279 3
5162 3619 3630 3631 3620; 3506 3749 3738;
5163 3620 3631 3632 3621; 5164 3621 3632 3633 3622; 5280 3738 3749 3750 3739; 5281 3739 3750 3751 3740;
5165 3622 3633 3634 3623; 5282 3740 3751 3752 3741;
5166 3623 3634 3635 3624; 5167 3624 3635 3636 3625; 5283 3741 3752 3753 3742; 5284 3742 3753 3754 3743;
5168 3625 3636 3637 3626; 5285 3743 3754 3755 3744;
5169 3626 3637 3638 3627; 5170 3627 3638 3486 15; 5171 5286 3744 3755 3756 3745; 5287 3745 3756 3757 3746;
3498 3499 3639 3628; 5288 3746 3757 3758 3747;
5172 3628 3639 3640 3629; 5173 3629 3640 3641 3630; 5289 3747 3758 3759 3748; 5290 3748 3759 3498 9; 5291
5174 3630 3641 3642 3631; 3506 3507 3760 3749;
5175 3631 3642 3643 3632; 5176 3632 3643 3644 3633; 5292 3749 3760 3761 3750; 5293 3750 3761 3762 3751;
5177 3633 3644 3645 3634; 5294 3751 3762 3763 3752;
5178 3634 3645 3646 3635; 5179 3635 3646 3647 3636; 5295 3752 3763 3764 3753; 5296 3753 3764 3765 3754;
5180 3636 3647 3648 3637; 5297 3754 3765 3766 3755;
5181 3637 3648 3649 3638; 5182 3638 3649 3488 3486; 5298 3755 3766 3767 3756; 5299 3756 3767 3768 3757;
5183 3499 3500 3650 3639; 5300 3757 3768 3769 3758;
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 307 de 463
(SUBJECT) (Page)

5301 3758 3769 3770 3759; 5302 3759 3770 3499 3498; 5498 3941 3952 3953 3942; 5499 3942 3953 3954 3943;
5303 3507 3508 3771 3760; 5500 3943 3954 3955 3944;
5304 3760 3771 3772 3761; 5305 3761 3772 3773 3762; 5501 3944 3955 3956 3945; 5502 3945 3956 3957 3946;
5306 3762 3773 3774 3763; 5503 3946 3957 3958 3947;
5307 3763 3774 3775 3764; 5308 3764 3775 3776 3765; 5504 3947 3958 3959 3948; 5505 3948 3959 3960 3949;
5309 3765 3776 3777 3766; 5506 3949 3960 3827 3826;
5310 3766 3777 3778 3767; 5311 3767 3778 3779 3768; 5507 3811 3813 3961 3950; 5508 3950 3961 3962 3951;
5312 3768 3779 3780 3769; 5509 3951 3962 3963 3952;
5313 3769 3780 3781 3770; 5314 3770 3781 3500 3499; 5510 3952 3963 3964 3953; 5511 3953 3964 3965 3954;
5315 3508 3509 3782 3771; 5512 3954 3965 3966 3955;
5316 3771 3782 3783 3772; 5317 3772 3783 3784 3773; 5513 3955 3966 3967 3956; 5514 3956 3967 3968 3957;
5318 3773 3784 3785 3774; 5515 3957 3968 3969 3958;
5319 3774 3785 3786 3775; 5320 3775 3786 3787 3776; 5516 3958 3969 3970 3959; 5517 3959 3970 3971 3960;
5321 3776 3787 3788 3777; 5518 3960 3971 3828 3827;
5322 3777 3788 3789 3778; 5323 3778 3789 3790 3779; 5519 3813 2 3972 3961; 5520 3961 3972 3973 3962; 5521
5324 3779 3790 3791 3780; 3962 3973 3974 3963;
5325 3780 3791 3792 3781; 5326 3781 3792 3501 3500; 5522 3963 3974 3975 3964; 5523 3964 3975 3976 3965;
5391 3854 3858 3859 3856; 5524 3965 3976 3977 3966;
5392 3856 3859 3807 3805; 5394 3858 3860 3861 3859; 5525 3966 3977 3978 3967; 5526 3967 3978 3979 3968;
5395 3859 3861 3809 3807; 5527 3968 3979 3980 3969;
5397 3860 3862 3863 3861; 5398 3861 3863 3811 3809; 5528 3969 3980 3981 3970; 5529 3970 3981 3982 3971;
5400 3862 3864 3865 3863; 5530 3971 3982 8 3828;
5401 3863 3865 3813 3811; 5403 3864 3866 3867 3865; 5531 2 3815 3983 3972; 5532 3972 3983 3984 3973; 5533
5404 3865 3867 2 3813; 3973 3984 3985 3974;
5406 3866 3868 3869 3867; 5407 3867 3869 3815 2; 5409 5534 3974 3985 3986 3975; 5535 3975 3986 3987 3976;
3868 3870 3871 3869; 5536 3976 3987 3988 3977;
5410 3869 3871 3817 3815; 5412 3870 3872 3873 3871; 5537 3977 3988 3989 3978; 5538 3978 3989 3990 3979;
5413 3871 3873 3819 3817; 5539 3979 3990 3991 3980;
5415 3872 3874 3875 3873; 5416 3873 3875 3821 3819; 5540 3980 3991 3992 3981; 5541 3981 3992 3993 3982;
5418 3874 3876 3877 3875; 5542 3982 3993 3829 8;
5419 3875 3877 3823 3821; 5426 3839 3840 3884 3880; 5543 3815 3817 3994 3983; 5544 3983 3994 3995 3984;
5427 3880 3884 3885 3882; 5545 3984 3995 3996 3985;
5429 3840 3841 3886 3884; 5430 3884 3886 3887 3885; 5546 3985 3996 3997 3986; 5547 3986 3997 3998 3987;
5432 3841 3842 3888 3886; 5548 3987 3998 3999 3988;
5433 3886 3888 3889 3887; 5435 3842 3843 3890 3888; 5549 3988 3999 4000 3989; 5550 3989 4000 4001 3990;
5436 3888 3890 3891 3889; 5551 3990 4001 4002 3991;
5438 3843 14 3892 3890; 5439 3890 3892 3893 3891; 5441 5552 3991 4002 4003 3992; 5553 3992 4003 4004 3993;
14 3834 3894 3892; 5554 3993 4004 3830 3829;
5442 3892 3894 3895 3893; 5444 3834 3835 3896 3894; 5555 3817 3819 4005 3994; 5556 3994 4005 4006 3995;
5445 3894 3896 3897 3895; 5557 3995 4006 4007 3996;
5447 3835 3836 3898 3896; 5448 3896 3898 3899 3897; 5558 3996 4007 4008 3997; 5559 3997 4008 4009 3998;
5450 3836 3837 3900 3898; 5560 3998 4009 4010 3999;
5451 3898 3900 3901 3899; 5453 3837 3838 3902 3900; 5561 3999 4010 4011 4000; 5562 4000 4011 4012 4001;
5454 3900 3902 3903 3901; 5563 4001 4012 4013 4002;
5471 3805 3807 3928 3906; 5472 3906 3928 3929 3908; 5564 4002 4013 4014 4003; 5565 4003 4014 4015 4004;
5473 3908 3929 3930 3910; 5566 4004 4015 3831 3830;
5474 3910 3930 3931 3912; 5475 3912 3931 3932 3914; 5567 3819 3821 4016 4005; 5568 4005 4016 4017 4006;
5476 3914 3932 3933 3916; 5569 4006 4017 4018 4007;
5477 3916 3933 3934 3918; 5478 3918 3934 3935 3920; 5570 4007 4018 4019 4008; 5571 4008 4019 4020 4009;
5479 3920 3935 3936 3922; 5572 4009 4020 4021 4010;
5480 3922 3936 3937 3924; 5481 3924 3937 3938 3926; 5573 4010 4021 4022 4011; 5574 4011 4022 4023 4012;
5482 3926 3938 3825 3824; 5575 4012 4023 4024 4013;
5483 3807 3809 3939 3928; 5484 3928 3939 3940 3929; 5576 4013 4024 4025 4014; 5577 4014 4025 4026 4015;
5485 3929 3940 3941 3930; 5578 4015 4026 3832 3831;
5486 3930 3941 3942 3931; 5487 3931 3942 3943 3932; 5579 3821 3823 4027 4016; 5580 4016 4027 4028 4017;
5488 3932 3943 3944 3933; 5581 4017 4028 4029 4018;
5489 3933 3944 3945 3934; 5490 3934 3945 3946 3935; 5582 4018 4029 4030 4019; 5583 4019 4030 4031 4020;
5491 3935 3946 3947 3936; 5584 4020 4031 4032 4021;
5492 3936 3947 3948 3937; 5493 3937 3948 3949 3938; 5585 4021 4032 4033 4022; 5586 4022 4033 4034 4023;
5494 3938 3949 3826 3825; 5587 4023 4034 4035 4024;
5495 3809 3811 3950 3939; 5496 3939 3950 3951 3940; 5588 4024 4035 4036 4025; 5589 4025 4036 4037 4026;
5497 3940 3951 3952 3941; 5590 4026 4037 3833 3832;
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 308 de 463
(SUBJECT) (Page)

5603 8 3829 4049 4050; 5604 4050 4049 4051 4052; 5605 5720 4167 4178 4179 4168; 5721 4168 4179 4180 4169;
4052 4051 4053 4054; 5722 4169 4180 3842 3841;
5606 4054 4053 4055 4056; 5607 4056 4055 4057 4058; 5723 3827 3828 4181 4170; 5724 4170 4181 4182 4171;
5608 4058 4057 4059 4060; 5725 4171 4182 4183 4172;
5609 4060 4059 4061 4062; 5610 4062 4061 4063 4064; 5726 4172 4183 4184 4173; 5727 4173 4184 4185 4174;
5611 4064 4063 4065 4066; 5728 4174 4185 4186 4175;
5612 4066 4065 4067 4068; 5613 4068 4067 4069 4070; 5729 4175 4186 4187 4176; 5730 4176 4187 4188 4177;
5614 4070 4069 3834 14; 5731 4177 4188 4189 4178;
5615 3829 3830 4071 4049; 5616 4049 4071 4072 4051; 5732 4178 4189 4190 4179; 5733 4179 4190 4191 4180;
5617 4051 4072 4073 4053; 5734 4180 4191 3843 3842;
5618 4053 4073 4074 4055; 5619 4055 4074 4075 4057; 5735 3828 8 4050 4181; 5736 4181 4050 4052 4182; 5737
5620 4057 4075 4076 4059; 4182 4052 4054 4183;
5621 4059 4076 4077 4061; 5622 4061 4077 4078 4063; 5738 4183 4054 4056 4184; 5739 4184 4056 4058 4185;
5623 4063 4078 4079 4065; 5740 4185 4058 4060 4186;
5624 4065 4079 4080 4067; 5625 4067 4080 4081 4069; 5741 4186 4060 4062 4187; 5742 4187 4062 4064 4188;
5626 4069 4081 3835 3834; 5743 4188 4064 4066 4189;
5627 3830 3831 4082 4071; 5628 4071 4082 4083 4072; 5744 4189 4066 4068 4190; 5745 4190 4068 4070 4191;
5629 4072 4083 4084 4073; 5746 4191 4070 14 3843;
5630 4073 4084 4085 4074; 5631 4074 4085 4086 4075; 5841 4193 4297 4302 4195; 5842 4297 4299 4303 4302;
5632 4075 4086 4087 4076; 5843 4299 4301 4304 4303;
5633 4076 4087 4088 4077; 5634 4077 4088 4089 4078; 5844 4301 4192 4194 4304; 5845 4195 4302 4305 3306;
5635 4078 4089 4090 4079; 5846 4302 4303 4306 4305;
5636 4079 4090 4091 4080; 5637 4080 4091 4092 4081; 5847 4303 4304 4307 4306; 5848 4304 4194 1 4307; 5849
5638 4081 4092 3836 3835; 3325 4308 4309 4197;
5639 3831 3832 4093 4082; 5640 4082 4093 4094 4083; 5850 4308 4310 4311 4309; 5851 4310 4312 4313 4311;
5641 4083 4094 4095 4084; 5852 4312 13 4196 4313;
5642 4084 4095 4096 4085; 5643 4085 4096 4097 4086; 5853 4197 4309 4314 4199; 5854 4309 4311 4315 4314;
5644 4086 4097 4098 4087; 5855 4311 4313 4316 4315;
5645 4087 4098 4099 4088; 5646 4088 4099 4100 4089; 5856 4313 4196 4198 4316; 5861 3306 4305 4320 4209;
5647 4089 4100 4101 4090; 5862 4305 4306 4321 4320;
5648 4090 4101 4102 4091; 5649 4091 4102 4103 4092; 5863 4306 4307 4322 4321; 5864 4307 1 4208 4322; 5865
5650 4092 4103 3837 3836; 4209 4320 4323 4211;
5651 3832 3833 4104 4093; 5652 4093 4104 4105 4094; 5866 4320 4321 4324 4323; 5867 4321 4322 4325 4324;
5653 4094 4105 4106 4095; 5868 4322 4208 4210 4325;
5654 4095 4106 4107 4096; 5655 4096 4107 4108 4097; 5869 4211 4323 4326 4213; 5870 4323 4324 4327 4326;
5656 4097 4108 4109 4098; 5871 4324 4325 4328 4327;
5657 4098 4109 4110 4099; 5658 4099 4110 4111 4100; 5872 4325 4210 4212 4328; 5873 4213 4326 4329 4215;
5659 4100 4111 4112 4101; 5874 4326 4327 4330 4329;
5660 4101 4112 4113 4102; 5661 4102 4113 4114 4103; 5875 4327 4328 4331 4330; 5876 4328 4212 4214 4331;
5662 4103 4114 3838 3837; 5877 4215 4329 4332 4217;
5687 3824 3825 4148 4126; 5688 4126 4148 4149 4128; 5878 4329 4330 4333 4332; 5879 4330 4331 4334 4333;
5689 4128 4149 4150 4130; 5880 4331 4214 4216 4334;
5690 4130 4150 4151 4132; 5691 4132 4151 4152 4134; 5881 4217 4332 4335 4219; 5882 4332 4333 4336 4335;
5692 4134 4152 4153 4136; 5883 4333 4334 4337 4336;
5693 4136 4153 4154 4138; 5694 4138 4154 4155 4140; 5884 4334 4216 4218 4337; 5885 4219 4335 4338 4221;
5695 4140 4155 4156 4142; 5886 4335 4336 4339 4338;
5696 4142 4156 4157 4144; 5697 4144 4157 4158 4146; 5887 4336 4337 4340 4339; 5888 4337 4218 4220 4340;
5698 4146 4158 3840 3839; 5889 4221 4338 4341 4223;
5699 3825 3826 4159 4148; 5700 4148 4159 4160 4149; 5890 4338 4339 4342 4341; 5891 4339 4340 4343 4342;
5701 4149 4160 4161 4150; 5892 4340 4220 4222 4343;
5702 4150 4161 4162 4151; 5703 4151 4162 4163 4152; 5893 4223 4341 4344 4225; 5894 4341 4342 4345 4344;
5704 4152 4163 4164 4153; 5895 4342 4343 4346 4345;
5705 4153 4164 4165 4154; 5706 4154 4165 4166 4155; 5896 4343 4222 4224 4346; 5897 4225 4344 4347 4227;
5707 4155 4166 4167 4156; 5898 4344 4345 4348 4347;
5708 4156 4167 4168 4157; 5709 4157 4168 4169 4158; 5899 4345 4346 4349 4348; 5900 4346 4224 4226 4349;
5710 4158 4169 3841 3840; 5901 4227 4347 4350 4229;
5711 3826 3827 4170 4159; 5712 4159 4170 4171 4160; 5902 4347 4348 4351 4350; 5903 4348 4349 4352 4351;
5713 4160 4171 4172 4161; 5904 4349 4226 4228 4352;
5714 4161 4172 4173 4162; 5715 4162 4173 4174 4163; 5905 4229 4350 4353 3477; 5906 4350 4351 4354 4353;
5716 4163 4174 4175 4164; 5907 4351 4352 4355 4354;
5717 4164 4175 4176 4165; 5718 4165 4176 4177 4166; 5908 4352 4228 7 4355; 5909 3477 4353 4356 4231; 5910
5719 4166 4177 4178 4167; 4353 4354 4357 4356;
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 309 de 463
(SUBJECT) (Page)

5911 4354 4355 4358 4357; 5912 4355 7 4230 4358; 5913 6010 4426 4284 3055 4428; 6011 36 4427 4429 4263; 6012
4231 4356 4359 4233; 4427 4428 4430 4429;
5914 4356 4357 4360 4359; 5915 4357 4358 4361 4360; 6013 4428 3055 4285 4430; 6014 4263 4429 4431 4264;
5916 4358 4230 4232 4361; 6015 4429 4430 4432 4431;
5917 4233 4359 4362 4235; 5918 4359 4360 4363 4362; 6016 4430 4285 4286 4432; 6017 4264 4431 4433 4265;
5919 4360 4361 4364 4363; 6018 4431 4432 4434 4433;
5920 4361 4232 4234 4364; 5921 4235 4362 4365 4237; 6019 4432 4286 4287 4434; 6020 4265 4433 4435 4266;
5922 4362 4363 4366 4365; 6021 4433 4434 4436 4435;
5923 4363 4364 4367 4366; 5924 4364 4234 4236 4367; 6022 4434 4287 4288 4436; 6023 4266 4435 4437 4267;
5925 4237 4365 4368 4239; 6024 4435 4436 4438 4437;
5926 4365 4366 4369 4368; 5927 4366 4367 4370 4369; 6025 4436 4288 4289 4438; 6026 4267 4437 4439 4268;
5928 4367 4236 4238 4370; 6027 4437 4438 4440 4439;
5929 4239 4368 4371 4241; 5930 4368 4369 4372 4371; 6028 4438 4289 4290 4440; 6029 4268 4439 4441 4269;
5931 4369 4370 4373 4372; 6030 4439 4440 4442 4441;
5932 4370 4238 4240 4373; 5933 4241 4371 4374 4243; 6031 4440 4290 4291 4442; 6032 4269 4441 4443 4270;
5934 4371 4372 4375 4374; 6033 4441 4442 4444 4443;
5935 4372 4373 4376 4375; 5936 4373 4240 4242 4376; 6034 4442 4291 4292 4444; 6035 4270 4443 4445 4271;
5937 4243 4374 4377 4245; 6036 4443 4444 4446 4445;
5938 4374 4375 4378 4377; 5939 4375 4376 4379 4378; 6037 4444 4292 4293 4446; 6038 4271 4445 4447 4272;
5940 4376 4242 4244 4379; 6039 4445 4446 4448 4447;
5941 4245 4377 4380 4247; 5942 4377 4378 4381 4380; 6040 4446 4293 4294 4448; 6041 4272 4447 4449 4273;
5943 4378 4379 4382 4381; 6042 4447 4448 4450 4449;
5944 4379 4244 4246 4382; 5945 4247 4380 4383 4249; 6043 4448 4294 4295 4450; 6044 4273 4449 4397 38; 6045
5946 4380 4381 4384 4383; 4449 4450 4399 4397;
5947 4381 4382 4385 4384; 5948 4382 4246 4248 4385; 6046 4450 4295 1524 4399; 6054 4192 4452 4463 4194;
5949 4249 4383 4386 4251; 6055 4452 4454 4464 4463;
5950 4383 4384 4387 4386; 5951 4384 4385 4388 4387; 6056 4454 4456 4465 4464; 6057 4456 4458 4466 4465;
5952 4385 4248 4250 4388; 6058 4458 4460 4467 4466;
5953 4251 4386 4308 3325; 5954 4386 4387 4310 4308; 6059 4460 4462 4468 4467; 6060 4462 4200 4201 4468;
5955 4387 4388 4312 4310; 6061 4194 4463 4469 1;
5956 4388 4250 13 4312; 5960 4200 4390 4393 4201; 5961 6062 4463 4464 4470 4469; 6063 4464 4465 4471 4470;
4390 4392 4394 4393; 6064 4465 4466 4472 4471;
5962 4392 4204 4205 4394; 5963 4201 4393 4395 34; 5964 6065 4466 4467 4473 4472; 6066 4467 4468 4474 4473;
4393 4394 4396 4395; 6067 4468 4201 34 4474;
5965 4394 4205 1516 4396; 5966 38 4397 4398 4202; 5967 6068 13 4475 4476 4196; 6069 4475 4477 4478 4476; 6070
4397 4399 4400 4398; 4477 4479 4480 4478;
5968 4399 1524 4206 4400; 5969 4202 4398 4401 4203; 6071 4479 4481 4482 4480; 6072 4481 4483 4484 4482;
5970 4398 4400 4402 4401; 6073 4483 4485 4486 4484;
5971 4400 4206 4207 4402; 5975 34 4395 4405 4252; 5976 6074 4485 38 4202 4486; 6075 4196 4476 4487 4198; 6076
4395 4396 4406 4405; 4476 4478 4488 4487;
5977 4396 1516 4274 4406; 5978 4252 4405 4407 4253; 6077 4478 4480 4489 4488; 6078 4480 4482 4490 4489;
5979 4405 4406 4408 4407; 6079 4482 4484 4491 4490;
5980 4406 4274 4275 4408; 5981 4253 4407 4409 4254; 6080 4484 4486 4492 4491; 6081 4486 4202 4203 4492;
5982 4407 4408 4410 4409; 6089 1 4469 4499 4208;
5983 4408 4275 4276 4410; 5984 4254 4409 4411 4255; 6090 4469 4470 4500 4499; 6091 4470 4471 4501 4500;
5985 4409 4410 4412 4411; 6092 4471 4472 4502 4501;
5986 4410 4276 4277 4412; 5987 4255 4411 4413 4256; 6093 4472 4473 4503 4502; 6094 4473 4474 4504 4503;
5988 4411 4412 4414 4413; 6095 4474 34 4252 4504;
5989 4412 4277 4278 4414; 5990 4256 4413 4415 4257; 6096 4208 4499 4505 4210; 6097 4499 4500 4506 4505;
5991 4413 4414 4416 4415; 6098 4500 4501 4507 4506;
5992 4414 4278 4279 4416; 5993 4257 4415 4417 4258; 6099 4501 4502 4508 4507; 6100 4502 4503 4509 4508;
5994 4415 4416 4418 4417; 6101 4503 4504 4510 4509;
5995 4416 4279 4280 4418; 5996 4258 4417 4419 4259; 6102 4504 4252 4253 4510; 6103 4210 4505 4511 4212;
5997 4417 4418 4420 4419; 6104 4505 4506 4512 4511;
5998 4418 4280 4281 4420; 5999 4259 4419 4421 4260; 6105 4506 4507 4513 4512; 6106 4507 4508 4514 4513;
6000 4419 4420 4422 4421; 6107 4508 4509 4515 4514;
6001 4420 4281 4282 4422; 6002 4260 4421 4423 4261; 6108 4509 4510 4516 4515; 6109 4510 4253 4254 4516;
6003 4421 4422 4424 4423; 6110 4212 4511 4517 4214;
6004 4422 4282 4283 4424; 6005 4261 4423 4425 4262; 6111 4511 4512 4518 4517; 6112 4512 4513 4519 4518;
6006 4423 4424 4426 4425; 6113 4513 4514 4520 4519;
6007 4424 4283 4284 4426; 6008 4262 4425 4427 36; 6009 6114 4514 4515 4521 4520; 6115 4515 4516 4522 4521;
4425 4426 4428 4427; 6116 4516 4254 4255 4522;
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 310 de 463
(SUBJECT) (Page)

6117 4214 4517 4523 4216; 6118 4517 4518 4524 4523; 6210 4596 4597 4603 4602; 6211 4597 4598 4604 4603;
6119 4518 4519 4525 4524; 6212 4598 4599 4605 4604;
6120 4519 4520 4526 4525; 6121 4520 4521 4527 4526; 6213 4599 4600 4606 4605; 6214 4600 4267 4268 4606;
6122 4521 4522 4528 4527; 6215 4240 4601 4607 4242;
6123 4522 4255 4256 4528; 6124 4216 4523 4529 4218; 6216 4601 4602 4608 4607; 6217 4602 4603 4609 4608;
6125 4523 4524 4530 4529; 6218 4603 4604 4610 4609;
6126 4524 4525 4531 4530; 6127 4525 4526 4532 4531; 6219 4604 4605 4611 4610; 6220 4605 4606 4612 4611;
6128 4526 4527 4533 4532; 6221 4606 4268 4269 4612;
6129 4527 4528 4534 4533; 6130 4528 4256 4257 4534; 6222 4242 4607 4613 4244; 6223 4607 4608 4614 4613;
6131 4218 4529 4535 4220; 6224 4608 4609 4615 4614;
6132 4529 4530 4536 4535; 6133 4530 4531 4537 4536; 6225 4609 4610 4616 4615; 6226 4610 4611 4617 4616;
6134 4531 4532 4538 4537; 6227 4611 4612 4618 4617;
6135 4532 4533 4539 4538; 6136 4533 4534 4540 4539; 6228 4612 4269 4270 4618; 6229 4244 4613 4619 4246;
6137 4534 4257 4258 4540; 6230 4613 4614 4620 4619;
6138 4220 4535 4541 4222; 6139 4535 4536 4542 4541; 6231 4614 4615 4621 4620; 6232 4615 4616 4622 4621;
6140 4536 4537 4543 4542; 6233 4616 4617 4623 4622;
6141 4537 4538 4544 4543; 6142 4538 4539 4545 4544; 6234 4617 4618 4624 4623; 6235 4618 4270 4271 4624;
6143 4539 4540 4546 4545; 6236 4246 4619 4625 4248;
6144 4540 4258 4259 4546; 6145 4222 4541 4547 4224; 6237 4619 4620 4626 4625; 6238 4620 4621 4627 4626;
6146 4541 4542 4548 4547; 6239 4621 4622 4628 4627;
6147 4542 4543 4549 4548; 6148 4543 4544 4550 4549; 6240 4622 4623 4629 4628; 6241 4623 4624 4630 4629;
6149 4544 4545 4551 4550; 6242 4624 4271 4272 4630;
6150 4545 4546 4552 4551; 6151 4546 4259 4260 4552; 6243 4248 4625 4631 4250; 6244 4625 4626 4632 4631;
6152 4224 4547 4553 4226; 6245 4626 4627 4633 4632;
6153 4547 4548 4554 4553; 6154 4548 4549 4555 4554; 6246 4627 4628 4634 4633; 6247 4628 4629 4635 4634;
6155 4549 4550 4556 4555; 6248 4629 4630 4636 4635;
6156 4550 4551 4557 4556; 6157 4551 4552 4558 4557; 6249 4630 4272 4273 4636; 6250 4250 4631 4475 13; 6251
6158 4552 4260 4261 4558; 4631 4632 4477 4475;
6159 4226 4553 4559 4228; 6160 4553 4554 4560 4559; 6252 4632 4633 4479 4477; 6253 4633 4634 4481 4479;
6161 4554 4555 4561 4560; 6254 4634 4635 4483 4481;
6162 4555 4556 4562 4561; 6163 4556 4557 4563 4562; 6255 4635 4636 4485 4483; 6256 4636 4273 38 4485; 6265
6164 4557 4558 4564 4563; 3855 4638 4639 3857;
6165 4558 4261 4262 4564; 6166 4228 4559 4565 7; 6167 6266 4638 3854 3856 4639; 6267 3857 4639 4640 1778;
4559 4560 4566 4565; 6268 4639 3856 3805 4640;
6168 4560 4561 4567 4566; 6169 4561 4562 4568 4567; 6271 3876 4642 4643 3877; 6272 4642 3878 3879 4643;
6170 4562 4563 4569 4568; 6273 3877 4643 4644 3823;
6171 4563 4564 4570 4569; 6172 4564 4262 36 4570; 6173 7 6274 4643 3879 1884 4644; 6275 1801 4645 4646 3881;
4565 4571 4230; 6276 4645 3839 3880 4646;
6174 4565 4566 4572 4571; 6175 4566 4567 4573 4572; 6277 3881 4646 4647 3883; 6278 4646 3880 3882 4647;
6176 4567 4568 4574 4573; 6281 3838 4649 4650 3902;
6177 4568 4569 4575 4574; 6178 4569 4570 4576 4575; 6282 4649 1911 3904 4650; 6283 3902 4650 4651 3903;
6179 4570 36 4263 4576; 6284 4650 3904 3905 4651;
6180 4230 4571 4577 4232; 6181 4571 4572 4578 4577; 6287 1778 4640 4653 3907; 6288 4640 3805 3906 4653;
6182 4572 4573 4579 4578; 6289 3907 4653 4654 3909;
6183 4573 4574 4580 4579; 6184 4574 4575 4581 4580; 6290 4653 3906 3908 4654; 6291 3909 4654 4655 3911;
6185 4575 4576 4582 4581; 6292 4654 3908 3910 4655;
6186 4576 4263 4264 4582; 6187 4232 4577 4583 4234; 6293 3911 4655 4656 3913; 6294 4655 3910 3912 4656;
6188 4577 4578 4584 4583; 6295 3913 4656 4657 3915;
6189 4578 4579 4585 4584; 6190 4579 4580 4586 4585; 6296 4656 3912 3914 4657; 6297 3915 4657 4658 3917;
6191 4580 4581 4587 4586; 6298 4657 3914 3916 4658;
6192 4581 4582 4588 4587; 6193 4582 4264 4265 4588; 6299 3917 4658 4659 3919; 6300 4658 3916 3918 4659;
6194 4234 4583 4589 4236; 6301 3919 4659 4660 3921;
6195 4583 4584 4590 4589; 6196 4584 4585 4591 4590; 6302 4659 3918 3920 4660; 6303 3921 4660 4661 3923;
6197 4585 4586 4592 4591; 6304 4660 3920 3922 4661;
6198 4586 4587 4593 4592; 6199 4587 4588 4594 4593; 6305 3923 4661 4662 3925; 6306 4661 3922 3924 4662;
6200 4588 4265 4266 4594; 6307 3925 4662 4663 3927;
6201 4236 4589 4595 4238; 6202 4589 4590 4596 4595; 6308 4662 3924 3926 4663; 6309 3927 4663 4664 2527;
6203 4590 4591 4597 4596; 6310 4663 3926 3824 4664;
6204 4591 4592 4598 4597; 6205 4592 4593 4599 4598; 6311 3823 4644 4665 4027; 6312 4644 1884 4038 4665;
6206 4593 4594 4600 4599; 6313 4027 4665 4666 4028;
6207 4594 4266 4267 4600; 6208 4238 4595 4601 4240; 6314 4665 4038 4039 4666; 6315 4028 4666 4667 4029;
6209 4595 4596 4602 4601; 6316 4666 4039 4040 4667;
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 311 de 463
(SUBJECT) (Page)

6317 4029 4667 4668 4030; 6318 4667 4040 4041 4668; 6816 5018 3703 3494 4984; 6840 3492 5030 5031 3536;
6319 4030 4668 4669 4031; 6842 3536 5031 5032 3537;
6320 4668 4041 4042 4669; 6321 4031 4669 4670 4032; 6848 3558 5035 5036 3559; 6850 3559 5036 5037 3509;
6322 4669 4042 4043 4670; 6852 3501 5038 5039 3661;
6323 4032 4670 4671 4033; 6324 4670 4043 4044 4671; 6854 3661 5039 5040 3662; 6856 3662 5040 5041 3663;
6325 4033 4671 4672 4034; 6858 3663 5041 5042 3664;
6326 4671 4044 4045 4672; 6327 4034 4672 4673 4035; 6860 3664 5042 5043 3665; 6862 3665 5043 5044 3666;
6328 4672 4045 4046 4673; 6864 3666 5044 5045 3667;
6329 4035 4673 4674 4036; 6330 4673 4046 4047 4674; 6866 3667 5045 5046 3668; 6868 3668 5046 5047 3669;
6331 4036 4674 4675 4037; 6870 3669 5047 5048 3670;
6332 4674 4047 4048 4675; 6333 4037 4675 4676 3833; 6872 3670 5048 5049 3671; 6874 3671 5049 5030 3492;
6334 4675 4048 2856 4676; 6876 3509 5037 5050 3782;
6335 3833 4676 4677 4104; 6336 4676 2856 4115 4677; 6878 3782 5050 5051 3783; 6880 3783 5051 5052 3784;
6337 4104 4677 4678 4105; 6882 3784 5052 5053 3785;
6338 4677 4115 4116 4678; 6339 4105 4678 4679 4106; 6884 3785 5053 5054 3786; 6886 3786 5054 5055 3787;
6340 4678 4116 4117 4679; 6888 3787 5055 5056 3788;
6341 4106 4679 4680 4107; 6342 4679 4117 4118 4680; 6890 3788 5056 5057 3789; 6892 3789 5057 5058 3790;
6343 4107 4680 4681 4108; 6894 3790 5058 5059 3791;
6344 4680 4118 4119 4681; 6345 4108 4681 4682 4109; 6896 3791 5059 5060 3792; 6898 3792 5060 5038 3501;
6346 4681 4119 4120 4682; 6899 3510 3511 5061 5062;
6347 4109 4682 4683 4110; 6348 4682 4120 4121 4683; 6900 5062 5061 5063 5064; 6901 5064 5063 5065 5066;
6349 4110 4683 4684 4111; 6902 5066 5065 3544 3540;
6350 4683 4121 4122 4684; 6351 4111 4684 4685 4112; 6903 3511 3512 5067 5061; 6904 5061 5067 5068 5063;
6352 4684 4122 4123 4685; 6905 5063 5068 5069 5065;
6353 4112 4685 4686 4113; 6354 4685 4123 4124 4686; 6906 5065 5069 3546 3544; 6907 3512 3513 5070 5067;
6355 4113 4686 4687 4114; 6908 5067 5070 5071 5068;
6356 4686 4124 4125 4687; 6357 4114 4687 4649 3838; 6909 5068 5071 5072 5069; 6910 5069 5072 3548 3546;
6358 4687 4125 1911 4649; 6911 3513 1620 5073 5070;
6359 2527 4664 4688 4127; 6360 4664 3824 4126 4688; 6912 5070 5073 5074 5071; 6913 5071 5074 5075 5072;
6361 4127 4688 4689 4129; 6914 5072 5075 3550 3548;
6362 4688 4126 4128 4689; 6363 4129 4689 4690 4131; 6915 1620 3514 5076 5073; 6916 5073 5076 5077 5074;
6364 4689 4128 4130 4690; 6917 5074 5077 5078 5075;
6365 4131 4690 4691 4133; 6366 4690 4130 4132 4691; 6918 5075 5078 3552 3550; 6919 3514 3515 5079 5076;
6367 4133 4691 4692 4135; 6920 5076 5079 5080 5077;
6368 4691 4132 4134 4692; 6369 4135 4692 4693 4137; 6921 5077 5080 5081 5078; 6922 5078 5081 3554 3552;
6370 4692 4134 4136 4693; 6923 3515 3516 5082 5079;
6371 4137 4693 4694 4139; 6372 4693 4136 4138 4694; 6924 5079 5082 5083 5080; 6925 5080 5083 5084 5081;
6373 4139 4694 4695 4141; 6926 5081 5084 3556 3554;
6374 4694 4138 4140 4695; 6375 4141 4695 4696 4143; 6927 3516 3517 5085 5082; 6928 5082 5085 5086 5083;
6376 4695 4140 4142 4696; 6929 5083 5086 5087 5084;
6377 4143 4696 4697 4145; 6378 4696 4142 4144 4697; 6930 5084 5087 3558 3556; 6931 4976 3510 5062 5088;
6379 4145 4697 4698 4147; 6932 5088 5062 5064 5089;
6380 4697 4144 4146 4698; 6381 4147 4698 4645 1801; 6933 5089 5064 5066 5090; 6934 5090 5066 3540 4977;
6382 4698 4146 3839 4645; 6935 3517 5034 5091 5085;
6722 4968 3478 3518 4969; 6724 4969 3518 3520 4970; 6936 5085 5091 5092 5086; 6937 5086 5092 5093 5087;
6736 4977 3540 3542 4978; 6938 5087 5093 5035 3558;
6738 4978 3542 3502 4979; 6746 4984 3494 3562 4985; 6939 3520 3523 5094 5095; 6940 5095 5094 5096 5097;
6748 4985 3562 3564 4986; 6941 5097 5096 5098 5099;
6750 4986 3564 3566 4987; 6752 4987 3566 3568 4988; 6942 5099 5098 3481 3479; 6943 3523 3525 5100 5094;
6754 4988 3568 3570 4989; 6944 5094 5100 5101 5096;
6756 4989 3570 3572 4990; 6758 4990 3572 3574 4991; 6945 5096 5101 5102 5098; 6946 5098 5102 3483 3481;
6760 4991 3574 3576 4992; 6947 3525 3527 5103 5100;
6762 4992 3576 3578 4993; 6764 4993 3578 3580 4994; 6948 5100 5103 5104 5101; 6949 5101 5104 5105 5102;
6766 4994 3580 3582 4995; 6950 5102 5105 3485 3483;
6768 4995 3582 3478 4968; 6794 4979 3502 3683 5008; 6951 3527 3529 5106 5103; 6952 5103 5106 5107 5104;
6796 5008 3683 3685 5009; 6953 5104 5107 5108 5105;
6798 5009 3685 3687 5010; 6800 5010 3687 3689 5011; 6954 5105 5108 1716 3485; 6955 3529 3531 5109 5106;
6802 5011 3689 3691 5012; 6956 5106 5109 5110 5107;
6804 5012 3691 3693 5013; 6806 5013 3693 3695 5014; 6957 5107 5110 5111 5108; 6958 5108 5111 3487 1716;
6808 5014 3695 3697 5015; 6959 3531 3533 5112 5109;
6810 5015 3697 3699 5016; 6812 5016 3699 3701 5017; 6960 5109 5112 5113 5110; 6961 5110 5113 5114 5111;
6814 5017 3701 3703 5018; 6962 5111 5114 3489 3487;
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 312 de 463
(SUBJECT) (Page)

6963 3533 3535 5115 5112; 6964 5112 5115 5116 5113; 7056 5187 5190 5191 5188; 7057 5188 5191 5192 5189;
6965 5113 5116 5117 5114; 7058 5189 5192 3853 3852;
6966 5114 5117 3491 3489; 6967 3535 3537 5118 5115; 7059 3285 4296 5193 5194; 7060 5194 5193 5195 5196;
6968 5115 5118 5119 5116; 7061 5196 5195 5197 5198;
6969 5116 5119 5120 5117; 6970 5117 5120 3493 3491; 7062 5198 5197 4297 4193; 7063 4296 4298 5199 5193;
6971 4970 3520 5095 5121; 7064 5193 5199 5200 5195;
6972 5121 5095 5097 5122; 6973 5122 5097 5099 5123; 7065 5195 5200 5201 5197; 7066 5197 5201 4299 4297;
6974 5123 5099 3479 4971; 7067 4298 4300 5202 5199;
6975 3537 5032 5124 5118; 6976 5118 5124 5125 5119; 7068 5199 5202 5203 5200; 7069 5200 5203 5204 5201;
6977 5119 5125 5126 5120; 7070 5201 5204 4301 4299;
6978 5120 5126 5033 3493; 6979 3804 3806 5127 5128; 7071 4300 1541 5205 5202; 7072 5202 5205 5206 5203;
6980 5128 5127 5129 5130; 7073 5203 5206 5207 5204;
6981 5130 5129 5131 5132; 6982 5132 5131 3858 3854; 7074 5204 5207 4192 4301; 7075 4199 4314 5208 5209;
6983 3806 3808 5133 5127; 7076 5209 5208 5210 5211;
6984 5127 5133 5134 5129; 6985 5129 5134 5135 5131; 7077 5211 5210 5212 5213; 7078 5213 5212 4317 3346;
6986 5131 5135 3860 3858; 7079 4314 4315 5214 5208;
6987 3808 3810 5136 5133; 6988 5133 5136 5137 5134; 7080 5208 5214 5215 5210; 7081 5210 5215 5216 5212;
6989 5134 5137 5138 5135; 7082 5212 5216 4318 4317;
6990 5135 5138 3862 3860; 6991 3810 3812 5139 5136; 7083 4315 4316 5217 5214; 7084 5214 5217 5218 5215;
6992 5136 5139 5140 5137; 7085 5215 5218 5219 5216;
6993 5137 5140 5141 5138; 6994 5138 5141 3864 3862; 7086 5216 5219 4319 4318; 7087 4316 4198 5220 5217;
6995 3812 1788 5142 5139; 7088 5217 5220 5221 5218;
6996 5139 5142 5143 5140; 6997 5140 5143 5144 5141; 7089 5218 5221 5222 5219; 7090 5219 5222 1585 4319;
6998 5141 5144 3866 3864; 7091 1493 4389 5223 5224;
6999 1788 3814 5145 5142; 7000 5142 5145 5146 5143; 7092 5224 5223 5225 5226; 7093 5226 5225 5227 5228;
7001 5143 5146 5147 5144; 7094 5228 5227 4390 4200;
7002 5144 5147 3868 3866; 7003 3814 3816 5148 5145; 7095 4389 4391 5229 5223; 7096 5223 5229 5230 5225;
7004 5145 5148 5149 5146; 7097 5225 5230 5231 5227;
7005 5146 5149 5150 5147; 7006 5147 5150 3870 3868; 7098 5227 5231 4392 4390; 7099 4391 1501 5232 5229;
7007 3816 3818 5151 5148; 7100 5229 5232 5233 5230;
7008 5148 5151 5152 5149; 7009 5149 5152 5153 5150; 7101 5230 5233 5234 5231; 7102 5231 5234 4204 4392;
7010 5150 5153 3872 3870; 7103 4203 4401 5235 5236;
7011 3818 3820 5154 5151; 7012 5151 5154 5155 5152; 7104 5236 5235 5237 5238; 7105 5238 5237 5239 5240;
7013 5152 5155 5156 5153; 7106 5240 5239 4403 1537;
7014 5153 5156 3874 3872; 7015 3820 3822 5157 5154; 7107 4401 4402 5241 5235; 7108 5235 5241 5242 5237;
7016 5154 5157 5158 5155; 7109 5237 5242 5243 5239;
7017 5155 5158 5159 5156; 7018 5156 5159 3876 3874; 7110 5239 5243 4404 4403; 7111 4402 4207 5244 5241;
7019 3882 3885 5160 5161; 7112 5241 5244 5245 5242;
7020 5161 5160 5162 5163; 7021 5163 5162 5164 5165; 7113 5242 5245 5246 5243; 7114 5243 5246 1540 4404;
7022 5165 5164 3845 3844; 7115 1541 4451 5247 5205;
7023 3885 3887 5166 5160; 7024 5160 5166 5167 5162; 7116 5205 5247 5248 5206; 7117 5206 5248 5249 5207;
7025 5162 5167 5168 5164; 7118 5207 5249 4452 4192;
7026 5164 5168 3846 3845; 7027 3887 3889 5169 5166; 7119 4451 4453 5250 5247; 7120 5247 5250 5251 5248;
7028 5166 5169 5170 5167; 7121 5248 5251 5252 5249;
7029 5167 5170 5171 5168; 7030 5168 5171 3847 3846; 7122 5249 5252 4454 4452; 7123 4453 4455 5253 5250;
7031 3889 3891 5172 5169; 7124 5250 5253 5254 5251;
7032 5169 5172 5173 5170; 7033 5170 5173 5174 5171; 7125 5251 5254 5255 5252; 7126 5252 5255 4456 4454;
7034 5171 5174 3848 3847; 7127 4455 4457 5256 5253;
7035 3891 3893 5175 5172; 7036 5172 5175 5176 5173; 7128 5253 5256 5257 5254; 7129 5254 5257 5258 5255;
7037 5173 5176 5177 5174; 7130 5255 5258 4458 4456;
7038 5174 5177 1844 3848; 7039 3893 3895 5178 5175; 7131 4457 4459 5259 5256; 7132 5256 5259 5260 5257;
7040 5175 5178 5179 5176; 7133 5257 5260 5261 5258;
7041 5176 5179 5180 5177; 7042 5177 5180 3849 1844; 7134 5258 5261 4460 4458; 7135 4459 4461 5262 5259;
7043 3895 3897 5181 5178; 7136 5259 5262 5263 5260;
7044 5178 5181 5182 5179; 7045 5179 5182 5183 5180; 7137 5260 5263 5264 5261; 7138 5261 5264 4462 4460;
7046 5180 5183 3850 3849; 7139 4461 1493 5224 5262;
7047 3897 3899 5184 5181; 7048 5181 5184 5185 5182; 7140 5262 5224 5226 5263; 7141 5263 5226 5228 5264;
7049 5182 5185 5186 5183; 7142 5264 5228 4200 4462;
7050 5183 5186 3851 3850; 7051 3899 3901 5187 5184; 7143 4198 4487 5265 5220; 7144 5220 5265 5266 5221;
7052 5184 5187 5188 5185; 7145 5221 5266 5267 5222;
7053 5185 5188 5189 5186; 7054 5186 5189 3852 3851; 7146 5222 5267 4493 1585; 7147 4487 4488 5268 5265;
7055 3901 3903 5190 5187; 7148 5265 5268 5269 5266;
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 313 de 463
(SUBJECT) (Page)

7149 5266 5269 5270 5267; 7150 5267 5270 4494 4493; _C1 5114 5126 5138 5150 5162 5174 5186 5198 5239 5251
7151 4488 4489 5271 5268; 5263 5275 5287 5299 -
7152 5268 5271 5272 5269; 7153 5269 5272 5273 5270; 5311 5323 6752 6810 6858 6892
7154 5270 5273 4495 4494; _C1L_1.25 5113 5125 5137 5149 5161 5173 5185 5197 6750
7155 4489 4490 5274 5271; 7156 5271 5274 5275 5272; 6856
7157 5272 5275 5276 5273; _C1L_1.75 5114 5126 5138 5150 5162 5174 5186 5198 6752
7158 5273 5276 4496 4495; 7159 4490 4491 5277 5274; 6858
7160 5274 5277 5278 5275; _C1R_1.25 5240 5252 5264 5276 5288 5300 5312 5324 6812
7161 5275 5278 5279 5276; 7162 5276 5279 4497 4496; 6894
7163 4491 4492 5280 5277; _C1R_1.75 5239 5251 5263 5275 5287 5299 5311 5323 6810
7164 5277 5280 5281 5278; 7165 5278 5281 5282 5279; 6892
7166 5279 5282 4498 4497; _C2 5479 5491 5503 5515 5527 5539 5551 5563 5575 5587
7167 4492 4203 5236 5280; 7168 5280 5236 5238 5281; 5606 5618 5630 5642 -
7169 5281 5238 5240 5282; 5654 5690 5702 5714 5726 5738 6303 6304 6327 6328 6341
7170 5282 5240 1537 4498; 7171 1757 4637 5283 5284; 6342 6365 6366
7172 5284 5283 5285 5286; _C2L_1.25 5605 5617 5629 5641 5653 5689 5701 5713 5725
7173 5286 5285 5287 5288; 7174 5288 5287 4638 3855; 5737 6339 6340 6363 6364
7175 4637 3804 5128 5283; _C2L_1.75 5606 5618 5630 5642 5654 5690 5702 5714 5726
7176 5283 5128 5130 5285; 7177 5285 5130 5132 5287; 5738 6341 6342 6365 6366
7178 5287 5132 3854 4638; _C2R_1.25 5480 5492 5504 5516 5528 5540 5552 5564 5576
7179 3822 4641 5289 5157; 7180 5157 5289 5290 5158; 5588 6305 6306 6329 6330
7181 5158 5290 5291 5159; _C2R_1.75 5479 5491 5503 5515 5527 5539 5551 5563 5575
7182 5159 5291 4642 3876; 7183 4641 1871 5292 5289; 5587 6303 6304 6327 6328
7184 5289 5292 5293 5290; _C3 5893 TO 5896 5921 TO 5924 5999 TO 6001 6020 TO
7185 5290 5293 5294 5291; 7186 5291 5294 3878 4642; 6022 6145 TO 6151 6194 -
7187 3883 4647 5295 5296; 6195 TO 6200
7188 5296 5295 5297 5298; 7189 5298 5297 5299 5300; _C3L_1.25 5917 TO 5920 6017 TO 6019 6187 TO 6193
7190 5300 5299 4648 1822; _C3L_1.75 5921 TO 5924 6020 TO 6022 6194 TO 6200
7191 4647 3882 5161 5295; 7192 5295 5161 5163 5297; _C3R_1.25 5897 TO 5900 6002 TO 6004 6152 TO 6158
7193 5297 5163 5165 5299; _C3R_1.75 5893 TO 5896 5999 TO 6001 6145 TO 6151
7194 5299 5165 3844 4648; 7195 3903 4651 5301 5190; _PLATE_BENDING 5042 5043 5045 5046 5048 5049 5052
7196 5190 5301 5302 5191; 5055 5057 5058 5060 5061 -
7197 5191 5302 5303 5192; 7198 5192 5303 4652 3853; 5063 5064 5073 5074 5076 5077 5079 5080 5082 5085 5088
7199 4651 3905 5304 5301; 5089 5091 5092 5094 -
7200 5301 5304 5305 5302; 7201 5302 5305 5306 5303; 5095 5111 TO 5146 5148 TO 5157 5160 TO 5169 5171 TO
7202 5303 5306 1924 4652; 5206 5231 TO 5266 5268 -
*********************************************************************** 5269 TO 5277 5280 TO 5289 5291 TO 5326 5391 5392 5394
**** 5395 5397 5398 5400 -
START USER TABLE 5401 5403 5406 5409 5410 5412 5413 5415 5416 5418 5419
TABLE 1 5426 5427 5429 5430 -
UNIT METER KN 5432 5433 5435 5436 5439 5442 5444 5445 5447 5448 5450
GENERAL 5451 5453 5454 5471 -
2HEB500 5472 TO 5518 5520 TO 5529 5532 TO 5541 5543 TO 5590
0.04772 0.5 0.04772 0.4999 0.04773 0.001198 0.001198 5604 TO 5613 5615 TO 5662 -
1.2e-005 0.004792 - 5687 TO 5734 5736 TO 5745 5841 TO 5847 5849 TO 5851
0.004792 0.03579 0.03579 0.006126 0.006114 1.2e-005 5853 TO 5856 -
0.40456 5861 TO 5863 5865 TO 5907 5909 TO 5911 5913 TO 5955
2HEA550 5960 TO 5971 -
0.04235 0.54 0.039213 0.54 0.039213 0.001228 0.001228 7e- 5975 TO 6046 6054 TO 6060 6062 TO 6067 6069 TO 6081
006 0.004546 - 6090 TO 6165 -
0.004546 0.031762 0.031762 0.005734 0.005735 7e-006 6167 TO 6172 6174 TO 6249 6251 TO 6256 6265 TO 6268
0.461574 6271 TO 6278 -
SADDLENVE51 6281 TO 6284 6287 TO 6382 6722 6724 6736 6738 6746
0.056 0.3 0.093333 1.3 0.021538 0.009807 0.000226 7e-006 6748 6750 6752 6754 6756 -
0.015087 - 6758 6760 6762 6764 6766 6768 6794 6796 6798 6800 6802
0.001506 0.042 0.042 0.019268 0.002372 7e-006 0.113333 6804 6806 6808 6810 -
END 6812 6814 6816 6840 6842 6848 6850 6852 6854 6856 6858
START GROUP DEFINITION 6860 6862 6864 6866 -
MEMBER 6868 6870 6872 6874 6876 6878 6880 6882 6884 6886 6888
_VC-1 6257 TO 6262 6890 6892 6894 6896 -
ELEMENT 6898 TO 7202
*
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 314 de 463
(SUBJECT) (Page)

_PC1_BENDING 5042 5043 5045 5046 5048 5049 5052 5055 DEFINE MATERIAL START
5057 5058 5060 5061 5063 - ISOTROPIC EQUIPMENT
5064 5073 5074 5076 5077 5079 5080 5082 5085 5088 5089 E 2e+008
5091 5092 5094 5095 - POISSON 0.3
5111 TO 5146 5148 TO 5157 5160 TO 5169 5171 TO 5206 DENSITY 0
5231 TO 5266 - ALPHA 1.2e-005
5268 TO 5277 5280 TO 5289 5291 TO 5326 6722 6724 6736 ISOTROPIC CONCRETE
6738 6746 6748 6750 - E 2.17185e+007
6752 6754 6756 6758 6760 6762 6764 6766 6768 6794 6796 POISSON 0.17
6798 6800 6802 6804 - DENSITY 25
6806 6808 6810 6812 6814 6816 6840 6842 6848 6850 6852 ALPHA 1e-005
6854 6856 6858 6860 - DAMP 0.05
6862 6864 6866 6868 6870 6872 6874 6876 6878 6880 6882 ISOTROPIC STEEL
6884 6886 6888 6890 - E 2.05e+008
6892 6894 6896 6898 TO 6978 POISSON 0.3
_PC2_BENDING 5391 5392 5394 5395 5397 5398 5400 5401 DENSITY 76.8195
5403 5406 5409 5410 5412 - ALPHA 1.2e-005
5413 5415 5416 5418 5419 5426 5427 5429 5430 5432 5433 DAMP 0.03
5435 5436 5439 5442 - END DEFINE MATERIAL
5444 5445 5447 5448 5450 5451 5453 5454 5471 TO 5518 ***********************************************************************
5520 TO 5529 - *****
5532 TO 5541 5543 TO 5590 5604 TO 5613 5615 TO 5662 MEMBER PROPERTY AMERICAN
5687 TO 5734 - 1 7 10 13 18 21 24 28 31 PRIS YD 1 ZD 1
5736 TO 5745 6265 TO 6268 6271 TO 6278 6281 TO 6284 34 36 PRIS YD 0.8 ZD 0.8
6287 TO 6382 - *_PEDE014AB TAPERED 1.35 0.035 1.35 0.45 0.035 0.45
6979 TO 7058 7171 TO 7202 0.035
_PC3_BENDING 5841 TO 5847 5849 TO 5851 5853 TO 5856 71 PRIS YD 0.8 ZD 0.8
5861 TO 5863 5865 TO 5907 - MEMBER PROPERTY SPANISH
5909 TO 5911 5913 TO 5955 5960 TO 5962 5964 5965 5967 6257 TO 6262 PRIS YD 0.4 ZD 0.4
TO 5971 5976 TO 6007 - ***********************************************************************
6009 6010 6012 TO 6043 6045 6046 6054 TO 6060 6062 TO **
6066 6069 TO 6073 6075 - CONSTANTS
6076 TO 6081 6090 TO 6094 6096 TO 6165 6167 TO 6171 MATERIAL CONCRETE ALL
6174 TO 6178 6180 TO 6249 - ***********************************************************************
6251 TO 6255 7059 TO 7170 **
END GROUP DEFINITION ***********************************************************************
*********************************************************************** **
******* SUPPORTS
ELEMENT PROPERTY 5042 5043 5045 5046 5048 5049 5051 5052 5054 5055 5057
5042 5043 5045 5046 5048 5049 5051 5052 5054 5055 5057 5058 5060 5061 5063 -
5058 5060 5061 5063 - 5064 5073 5074 5076 5077 5079 5080 5082 5083 5085 5086
5064 5073 5074 5076 5077 5079 5080 5082 5083 5085 5086 5088 5089 5091 5092 -
5088 5089 5091 5092 - 5094 5095 5111 TO 5206 5231 TO 5326 5391 5392 5394
5094 5095 5111 TO 5206 5231 TO 5326 5391 5392 5394 5395 5397 5398 5400 5401 -
5395 5397 5398 5400 5401 - 5403 5404 5406 5407 5409 5410 5412 5413 5415 5416 5418
5403 5404 5406 5407 5409 5410 5412 5413 5415 5416 5418 5419 5426 5427 5429 -
5419 5426 5427 5429 - 5430 5432 5433 5435 5436 5438 5439 5441 5442 5444 5445
5430 5432 5433 5435 5436 5438 5439 5441 5442 5444 5445 5447 5448 5450 5451 -
5447 5448 5450 5451 - 5453 5454 5471 TO 5590 5603 TO 5662 5687 TO 5746 5841
5453 5454 5471 TO 5590 5603 TO 5662 5687 TO 5746 5841 TO 5856 5861 TO 5956 -
TO 5856 5861 TO 5956 - 5960 TO 5971 5975 TO 6046 6054 TO 6081 6089 TO 6256
5960 TO 5971 5975 TO 6046 6054 TO 6081 6089 TO 6256 6265 TO 6268 -
6265 TO 6268 - 6271 TO 6278 6281 TO 6284 6287 TO 6382 6722 6724 6736
6271 TO 6278 6281 TO 6284 6287 TO 6382 6722 6724 6736 6738 6746 6748 6750 -
6738 6746 6748 6750 - 6752 6754 6756 6758 6760 6762 6764 6766 6768 6794 6796
6752 6754 6756 6758 6760 6762 6764 6766 6768 6794 6796 6798 6800 6802 6804 -
6798 6800 6802 6804 - 6806 6808 6810 6812 6814 6816 6840 6842 6848 6850 6852
6806 6808 6810 6812 6814 6816 6840 6842 6848 6850 6852 6854 6856 6858 6860 -
6854 6856 6858 6860 - 6862 6864 6866 6868 6870 6872 6874 6876 6878 6880 6882
6862 6864 6866 6868 6870 6872 6874 6876 6878 6880 6882 6884 6886 6888 6890 -
6884 6886 6888 6890 - 6892 6894 6896 6898 TO 7202 PLATE MAT DIRECT Y
6892 6894 6896 6898 TO 7202 THICKNESS 1.2 SUBGRADE 30000
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 315 de 463
(SUBJECT) (Page)

DEFINE WIND LOAD 14 FX 0.08 FY -280.52 FZ -1.98 MX -4.8 MY -0.11 MZ -0.28


TYPE 1 15 FX -4.21 FY -200.36 FZ -0.81 MX -2.39 MY -0.07 MZ 9.66
INT 1.247 1.32 1.379 1.438 1.526 1.599 1.658 1.716 1.775 34 FX 0.05 FY -13.3 FZ 0 MX -0.01 MY 0 MZ -0.13
1.819 1.848 1.922 - 36 FX 1.39 FY -4.31 FZ -0.08 MX 0 MY -0.08 MZ -2.99
1.995 2.039 2.098 2.142 2.244 2.332 2.406 2.479 2.538 38 FX 0.06 FY 4.18 FZ 0.08 MX 0.36 MY -0.08 MZ -0.16
2.596 HEIG 4.6 6.1 - *
7.6 9.1 12.2 15.2 18 21.3 24.4 27.4 30.5 36.6 42.7 LOAD 5 LOADTYPE None TITLE LP HYDRAULIC TEST
48.8 54.9 61 - (LIQUID ONLY)
76.2 91.4 106.7 121.9 137.2 152.4 JOINT LOAD
*********************************************************************** 1 FX 9.58 FY -173.11 FZ 2.41 MX 6.81 MY -0.19 MZ -22.92
* 2 FX 1.52 FY -332.94 FZ 4.17 MX 10.41 MY -0.11 MZ -4.53
CUT OFF MODE SHAPE 48 3 FX -7.93 FY -283 FZ 2.23 MX 5.51 MY -0.06 MZ 17.11
LOAD 1 LOADTYPE None TITLE SD STRUCTURE SELF 7 FX 15.43 FY -433 FZ 3.42 MX 9.09 MY -0.14 MZ -37.26
WT 8 FX 7.25 FY -916.07 FZ 9.28 MX 22.2 MY -0.11 MZ -18.17
SELFWEIGHT Y -1 9 FX -28.85 FY -654.89 FZ 4.13 MX 9.85 MY -0.08 MZ 64.9
JOINT LOAD 13 FX 16.17 FY -215.76 FZ -4.07 MX -8.5 MY -0.04 MZ -38.6
1 FX 25.53 FY -1370.24 FZ 9.35 MX 22.12 MY 0.03 MZ - 14 FX 6.88 FY -554.54 FZ -14.81 MX -33.34 MY -0.09 MZ -
59.18 17.57
2 FX -2.33 FY -2039.55 FZ 10.22 MX 24.5 MY 0.19 MZ 4.83 15 FX -24.9 FY -370.7 FZ -7.04 MX -15.87 MY -0.21 MZ 55.58
3 FX -20.98 FY -1438.42 FZ 8.16 MX 20.23 MY -0.03 MZ 34 FX 0.13 FY -14.53 FZ -0.01 MX 0 MY 0 MZ -0.51
48.35 36 FX 4.43 FY -15.29 FZ 0.11 MX 0.82 MY -0.05 MZ -10.19
7 FX 28.44 FY -2051.17 FZ 0.32 MX 1.23 MY 0.02 MZ -66.75 38 FX 0.28 FY 6.45 FZ 0.17 MX 0.92 MY -0.05 MZ -1.24
8 FX 0.2 FY -2832.19 FZ 2.77 MX 7.18 MY 0.15 MZ -0.77 ***********************************************************************
9 FX -39.28 FY -1876.39 FZ 1.34 MX 4.49 MY 0.15 MZ 90.63 *
13 FX 22.55 FY -1663.84 FZ -7.27 MX -16.52 MY 0.03 MZ - LOAD 6 LOADTYPE None TITLE LO EQUIPMENT (LIQUID
52.23 ONLY)
14 FX 2.12 FY -2204.57 FZ -14.68 MX -33.08 MY 0.26 MZ - JOINT LOAD
4.7 1 FX 1.15 FY -21.85 FZ 0.56 MX 2.23 MY -0.07 MZ -3.93
15 FX -29.1 FY -1459.86 FZ -9.72 MX -21.01 MY 0.15 MZ 2 FX 1.19 FY -44.62 FZ 1.72 MX 4.69 MY -0.06 MZ -4.07
67.43 3 FX -0.17 FY -18.77 FZ 0.17 MX 0.82 MY -0.08 MZ -0.96
34 FX 0.1 FY -150.32 FZ -0.09 MX -0.31 MY 0 MZ -0.36 7 FX 7.28 FY -142.01 FZ 3.44 MX 8.87 MY -0.06 MZ -18.47
36 FX 9.08 FY -551.6 FZ 0.88 MX 2.21 MY 0.04 MZ -20.58 8 FX 6.24 FY -380.92 FZ 8.52 MX 20.4 MY -0.06 MZ -16.01
38 FX 3.68 FY -521.43 FZ -1.29 MX -3.02 MY 0.1 MZ -8.78 9 FX -16.67 FY -166.54 FZ 4.68 MX 11.2 MY -0.06 MZ 36.78
* 13 FX 8.91 FY -81.9 FZ -2.95 MX -5.86 MY 0 MZ -22.05
LOAD 2 LOADTYPE None TITLE F FIREPROOFING WT 14 FX 6.3 FY -251.65 FZ -11.22 MX -25.12 MY -0.04 MZ -
* 16.27
LOAD 3 LOADTYPE None TITLE CM EQUIPMENT EMPTY 15 FX -16.48 FY -97.8 FZ -5.26 MX -11.69 MY -0.16 MZ 36.15
WT + PLATFORMS 34 FX 0.05 FY -2.96 FZ 0.01 MX 0.05 MY 0 MZ -0.24
JOINT LOAD 36 FX 2.07 FY -1.43 FZ 0.37 MX 1.22 MY 0.01 MZ -5.11
1 FX 0.69 FY -141.36 FZ 0.88 MX 2.59 MY -0.08 MZ -1.36 38 FX 0.13 FY 1.38 FZ -0.03 MX 0.29 MY 0.01 MZ -0.96
2 FX -0.1 FY -197.82 FZ 1.7 MX 4.37 MY -0.01 MZ 0.4 *
3 FX -0.26 FY -95.99 FZ 0.63 MX 1.77 MY 0.02 MZ 0.75 ***********************************************************************
7 FX 3.8 FY -333.28 FZ 0.96 MX 2.75 MY -0.05 MZ -8.73 LOAD 7 LOADTYPE None TITLE LM MAINTENANCE
8 FX 1.77 FY -636.34 FZ 3.43 MX 8.32 MY -0.03 MZ -4.05 JOINT LOAD
9 FX -6.56 FY -295.72 FZ 1.63 MX 4.05 MY -0.02 MZ 15.14 1 FX 2.74 FY -367.09 FZ 63.02 MX 299.02 MY 3.47 MZ -
13 FX 3.62 FY -132.12 FZ -1.43 MX -2.8 MY -0.01 MZ -8.27 14.65
14 FX 1.89 FY -295.3 FZ -5.07 MX -11.29 MY -0.02 MZ -4.37 2 FX 4.23 FY -414.57 FZ 72.71 MX 333.47 MY 3.14 MZ -
15 FX -6.34 FY -108.35 FZ -2.6 MX -5.69 MY -0.08 MZ 14.56 17.97
34 FX 0.03 FY -40.72 FZ -0.01 MX -0.04 MY 0 MZ -0.08 3 FX 2.57 FY -395.83 FZ 72.13 MX 344.08 MY 2.75 MZ -
36 FX 1.28 FY -77.72 FZ -0.37 MX -0.58 MY -0.03 MZ -2.86 14.04
38 FX 0.17 FY -25.67 FZ 0.26 MX 0.82 MY -0.02 MZ -0.37 7 FX 1.36 FY -36.74 FZ 83.63 MX 346.55 MY 2.9 MZ -4.22
*********************************************************************** 8 FX 0.86 FY -45.41 FZ 87.92 MX 368.76 MY 3.15 MZ -3.01
LOAD 4 LOADTYPE None TITLE PA PIPE OPERATION + 9 FX -2.03 FY -87.94 FZ 97.59 MX 402.67 MY 3.17 MZ 3.57
INSULATIONS 13 FX -4.7 FY 333.43 FZ 64.58 MX 302.64 MY 3.04 MZ 17.12
JOINT LOAD 14 FX -3.02 FY 418.74 FZ 72.08 MX 332.05 MY 3.23 MZ
1 FX 4.31 FY -127.63 FZ 0.87 MX 2.18 MY -0.13 MZ -9.46 13.15
2 FX -0.13 FY -209.76 FZ 1.4 MX 3.01 MY -0.1 MZ 0.67 15 FX -0.69 FY 466.21 FZ 72.76 MX 345.54 MY 3 MZ 7.76
3 FX -4.08 FY -88.83 FZ 0.93 MX 1.63 MY -0.05 MZ 9.71 34 FX 0.15 FY -119.74 FZ 1.19 MX 7.26 MY 0 MZ -0.98
7 FX 4.61 FY -182.17 FZ -0.08 MX -0.03 MY -0.12 MZ -10.57 36 FX 0.54 FY 38.92 FZ 26.78 MX 124.38 MY 0.85 MZ -1.73
8 FX 0.25 FY -394.18 FZ 0.63 MX 1.23 MY -0.1 MZ -0.45 38 FX -2.02 FY 135.02 FZ 25.62 MX 121.68 MY 0.83 MZ 7.3
9 FX -6.47 FY -226.09 FZ -0.12 MX -0.81 MY -0.08 MZ 15.01 ***********************************************************************
13 FX 4.15 FY -63.02 FZ -0.85 MX -1.94 MY -0.11 MZ -9.56
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 316 de 463
(SUBJECT) (Page)

LOAD 8 LOADTYPE None TITLE LSC ON BUILDING LOAD 12 LOADTYPE None TITLE STRESS_X(+/-)
PLATFORMS, STAIRS, PAVING TEMPERATURE LOAD IN OPERATION X
JOINT LOAD JOINT LOAD
1 FX 10.55 FY -503.86 FZ 3.76 MX 10.31 MY -0.19 MZ -24.7 1 FX 87.81 FY -45.52 FZ -0.48 MX -1.9 MY 0.57 MZ -399.76
2 FX -2.09 FY -802.18 FZ 5.49 MX 13.97 MY -0.01 MZ 4.18 2 FX 105.99 FY -5.2 FZ 0.21 MX 1.88 MY 0.59 MZ -441.99
3 FX -7.34 FY -402.03 FZ 3.28 MX 8.6 MY -0.12 MZ 16.54 3 FX 72.84 FY 218.1 FZ 0.3 MX 3.34 MY -0.09 MZ -366.07
7 FX 14.48 FY -859.86 FZ 2.18 MX 6.61 MY -0.09 MZ -34.63 7 FX 112.57 FY 146.28 FZ -1.27 MX -3.75 MY 0.65 MZ -
8 FX -2.46 FY -1442.3 FZ 5.08 MX 12.97 MY -0.06 MZ 4.85 455.86
9 FX -17.25 FY -712.34 FZ 1.88 MX 5.35 MY -0.04 MZ 39.17 8 FX 106.4 FY -23.54 FZ 0.78 MX 3.2 MY 0.46 MZ -441.98
13 FX 12.49 FY -477.85 FZ -4.78 MX -9.51 MY -0.06 MZ - 9 FX 75.81 FY 261.44 FZ 1 MX 5.05 MY 0.23 MZ -372.61
29.72 13 FX 107.66 FY 305.11 FZ -0.05 MX -0.87 MY 0.47 MZ -
14 FX -1.48 FY -879.09 FZ -11.12 MX -24.38 MY -0.04 MZ 443.75
2.49 14 FX 104.43 FY 10.78 FZ -1.55 MX -2.36 MY 0.44 MZ -
15 FX -12.01 FY -378.32 FZ -5.37 MX -11.34 MY -0.07 MZ 436.57
26.89 15 FX 74.95 FY 219.3 FZ 1.26 MX 5.94 MY 0.84 MZ -369.63
34 FX 0.1 FY -148.62 FZ 0 MX 0.05 MY 0 MZ -0.36 34 FX 3.96 FY -142.52 FZ -0.04 MX -0.18 MY 0 MZ -24.51
36 FX 4.22 FY -243.9 FZ -0.46 MX -0.45 MY 0.03 MZ -9.64 36 FX 45.91 FY -432.51 FZ -0.39 MX -1.7 MY 0.32 MZ -
38 FX 0.79 FY -109.45 FZ 0.04 MX 0.63 MY 0.04 MZ -2.29 188.25
* 38 FX 44.48 FY -511.73 FZ 0.22 MX -0.3 MY 0.41 MZ -184.29
LOAD 9 LOADTYPE None TITLE SL SNOW , ROOF LIVE *
LOAD ***********************************************************************
* *
LOAD 10 LOADTYPE None TITLE T1 ENVIRONMENTAL LOAD 13 LOADTYPE None TITLE STRESS_Z(+/-)
TEMPERATURE LOADING TEMPERATURE LOAD IN OPERATION Z
JOINT LOAD JOINT LOAD
1 FX 30.79 FY 13.7 FZ 30.2 MX 126.45 MY -1.66 MZ -128.04 1 FX 8.47 FY -426.08 FZ 94.6 MX 432.92 MY 11.01 MZ -
2 FX -9.38 FY 25.07 FZ 83.17 MX 235.96 MY 0.05 MZ 51.02 46.25
3 FX -58.73 FY -41.57 FZ 29.56 MX 126.66 MY 4.63 MZ 2 FX 13.62 FY -530.35 FZ 123.2 MX 539.21 MY 10.35 MZ -
250.01 57.41
7 FX 34.56 FY 80.87 FZ 2.03 MX 4.97 MY -0.7 MZ -130.25 3 FX 9.78 FY -543.86 FZ 128.21 MX 589.35 MY 9.28 MZ -
8 FX -15.54 FY 64.26 FZ -39.16 MX -86.74 MY 0.05 MZ 65.91 48.06
9 FX -54.72 FY 16.13 FZ 1.02 MX 3.55 MY -1.32 MZ 234.26 7 FX 3.41 FY -66.79 FZ 122.57 MX 497.34 MY 10.79 MZ -
13 FX 42.41 FY 11.78 FZ -37.97 MX -143.35 MY 6.3 MZ - 10.39
150.67 8 FX 1.94 FY -115.95 FZ 144.58 MX 588.83 MY 10.27 MZ -
14 FX -15.15 FY 25.82 FZ -36.93 MX -126.05 MY -0.17 MZ 6.94
65.52 9 FX -2.18 FY -209.14 FZ 167.82 MX 680.53 MY 10.01 MZ
15 FX -48.71 FY -51.61 FZ -21.82 MX -105.54 MY -1.59 MZ 2.47
227 13 FX -14.52 FY 401.12 FZ 97.07 MX 438.36 MY 11.53 MZ
34 FX 3.77 FY -79.02 FZ 2.26 MX 11.28 MY 0 MZ -20.71 55.28
36 FX 54.6 FY 1.72 FZ 9.18 MX 31.69 MY -7.52 MZ -171.13 14 FX -11.04 FY 646.35 FZ 121.85 MX 536.13 MY 10.47 MZ
38 FX 36.08 FY -67.14 FZ -21.54 MX -83.03 MY 6.61 MZ - 46.63
133.6 15 FX -5.3 FY 766.94 FZ 127.67 MX 588.11 MY 9.49 MZ
*********************************************************************** 32.93
***** 34 FX 0.51 FY -147.47 FZ 1.63 MX 9.78 MY 0 MZ -3.22
LOAD 11 LOADTYPE None TITLE STRESS_Y OPERATION 36 FX 1.17 FY 23.97 FZ 36.06 MX 164.55 MY 5.17 MZ -3.78
TEMPERATURE LOAD 38 FX -5.85 FY 201.25 FZ 34.38 MX 160.67 MY 5.02 MZ
JOINT LOAD 22.65
1 FX 5.28 FY -58.75 FZ 0.8 MX 1.74 MY -0.09 MZ -12.09 *
2 FX 0.19 FY -130.1 FZ 1.11 MX 2.24 MY -0.06 MZ -0.46 ***********************************************************************
3 FX -4.82 FY -83.11 FZ 0.91 MX 1.66 MY -0.02 MZ 11.01 *
7 FX 4.56 FY -89.33 FZ -0.1 MX -0.35 MY -0.06 MZ -10.76 LOAD 14 LOADTYPE None TITLE WXPOS WIND
8 FX 0.07 FY -197.79 FZ 0.05 MX -0.21 MY -0.05 MZ -0.31 DIRECTION +X
9 FX -6.71 FY -151.81 FZ -0.49 MX -1.58 MY -0.03 MZ 15.28 JOINT LOAD
13 FX 4.4 FY -56.46 FZ -0.39 MX -1.31 MY -0.04 MZ -10.31 1 FX 105.21 FY -35.99 FZ -2.5 MX -10.7 MY 1.69 MZ -478.99
14 FX -0.43 FY -183.01 FZ -1.34 MX -3.42 MY -0.07 MZ 0.72 2 FX 128.8 FY -10.01 FZ 0.12 MX 1.75 MY 1.88 MZ -533.57
15 FX -3.87 FY -140.65 FZ -0.48 MX -1.53 MY 0.01 MZ 8.75 3 FX 90.5 FY 235.42 FZ 2.84 MX 14.62 MY 1.28 MZ -445.86
34 FX 0.06 FY -0.51 FZ 0 MX 0 MY 0 MZ -0.19 7 FX 133.39 FY 183.15 FZ -3.61 MX -13.27 MY 1.67 MZ -
36 FX 1.24 FY 5.58 FZ 0 MX -0.01 MY -0.03 MZ -2.71 540.67
38 FX 0.04 FY 5.36 FZ -0.06 MX -0.14 MY -0.04 MZ -0.18 8 FX 126.02 FY -15.01 FZ 0.34 MX 2.28 MY 1.71 MZ -523.44
*********************************************************************** 9 FX 90.89 FY 268.75 FZ 4.41 MX 18.35 MY 1.72 MZ -443.06
* 13 FX 128.46 FY 356.16 FZ -2.11 MX -9.78 MY 1.3 MZ -
525.94
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 317 de 463
(SUBJECT) (Page)

14 FX 123.73 FY 20.26 FZ -0.63 MX 0.09 MY 1.65 MZ - 9 FX -80.35 FY -244.16 FZ -26.02 MX -105.4 MY -7.13 MZ -
514.29 397.45
15 FX 89.09 FY 240.69 FZ 3.29 MX 15.92 MY 2.12 MZ - 13 FX -116.66 FY -430.21 FZ -19.87 MX -87.55 MY -6.88 MZ -
434.66 481.06
34 FX 5.75 FY -158.6 FZ -0.09 MX -0.47 MY 0 MZ -32.35 14 FX -112.5 FY -113.88 FZ -14.83 MX -68.18 MY -7.08 MZ -
36 FX 55.98 FY -497.19 FZ -1.35 MX -6.12 MY 0.45 MZ - 471.18
226.49 15 FX -81.23 FY -298.54 FZ -19.64 MX -90.75 MY -6.93 MZ -
38 FX 54.81 FY -587.63 FZ -0.7 MX -4.65 MY 0.98 MZ -221.9 399.07
* 34 FX -4.26 FY -217.29 FZ -0.44 MX -2.52 MY 0 MZ -26.38
*********************************************************************** 36 FX -49.29 FY -477.11 FZ -9.58 MX -41.95 MY -2.74 MZ -
** 202.51
LOAD 15 LOADTYPE None TITLE WXNEG WIND 38 FX -49.31 FY -588.88 FZ -9.48 MX -41.69 MY -2.74 MZ -
DIRECTION -X 202.06
* Wind in direction -X
REPEAT LOAD LOAD 19 LOADTYPE None TITLE EZ(+/-) SEISMIC Z ON
14 -1.0 FLOOR & PIPERACKS
*********************************************************************** JOINT LOAD
** 1 FX -21.67 FY -440.46 FZ -97.03 MX -449.37 MY -20.29 MZ -
LOAD 16 LOADTYPE None TITLE WZPOS WIND 97.45
DIRECTION +Z 2 FX -26.47 FY -525.71 FZ -123.88 MX -553.48 MY -19.94 MZ
JOINT LOAD -108.6
1 FX -3.74 FY -424.05 FZ 110.02 MX 496.48 MY -0.71 MZ 3 FX -18.78 FY -613.04 FZ -138.13 MX -640.39 MY -19.4 MZ -
11.44 90.86
2 FX -2.74 FY -412.01 FZ 116.13 MX 505.28 MY -1.35 MZ 7 FX -16.56 FY -134.99 FZ -127.22 MX -518.95 MY -20.07 MZ
9.54 -69.58
3 FX -2.03 FY -406.55 FZ 103.83 MX 470.9 MY -1.92 MZ 8.22 8 FX -16.36 FY -195.66 FZ -147.7 MX -608.74 MY -19.84 MZ -
7 FX 2.25 FY -106.07 FZ 141.39 MX 568.78 MY -1.74 MZ -5.3 69.22
8 FX 0.65 FY -141.59 FZ 136.63 MX 552.83 MY -1.39 MZ -1.6 9 FX -14.15 FY -283.78 FZ -182.64 MX -742.85 MY -19.78 MZ
9 FX -1.71 FY -148.47 FZ 135.27 MX 543.28 MY -1.51 MZ -63.91
3.79 13 FX -37 FY -417.38 FZ -99.39 MX -454.64 MY -20.5 MZ -
13 FX -0.04 FY 465.39 FZ 111.75 MX 500.46 MY -1.65 MZ - 148.09
3.13 14 FX -34.06 FY -703.1 FZ -121.77 MX -548.6 MY -20.01 MZ -
14 FX 2.59 FY 551.74 FZ 113.92 MX 500.21 MY -1.34 MZ - 140.91
9.41 15 FX -22.45 FY -816.14 FZ -138.02 MX -640.01 MY -19.48
15 FX 3.91 FY 566.34 FZ 103.86 MX 470.95 MY -1.9 MZ - MZ -113.82
12.7 34 FX -0.99 FY -142.34 FZ -1.79 MX -10.71 MY 0 MZ -6.03
34 FX -0.12 FY -157.37 FZ 3.08 MX 15.37 MY 0 MZ 0.57 36 FX -6.92 FY -103.8 FZ -39.75 MX -180.75 MY -8.65 MZ -
36 FX 0.84 FY 44.19 FZ 49.31 MX 215.89 MY -1.18 MZ -2 29.1
38 FX 0.14 FY 168.45 FZ 47.26 MX 211.14 MY -1.15 MZ - 38 FX -15.45 FY -290.22 FZ -38.15 MX -177.01 MY -8.55 MZ -
1.63 61.87
*
*********************************************************************** LOAD 20 LOADTYPE None TITLE EY SEISMIC MASS
LOAD 17 LOADTYPE None TITLE WZNEG WIND ESTIMATION (Y)
DIRECTION -Z *SEISMIC MASS ESTIMATION (Y)
* Wind in direction -Z *********************************************************************
REPEAT LOAD LOAD 21 LOADTYPE None TITLE PS_1 SOIL WT CASE 1
16 -1.0 FOR COKER
********************************************************************** *-Soil weight
LOAD 18 LOADTYPE None TITLE EX(+/-) SEISMIC X ON LOAD 22 LOADTYPE None TITLE PS_2 SOIL WT CASE 2
FLOOR & PIPERACKS FOR COKER
JOINT LOAD SELFWEIGHT Y -1e-007
1 FX -91.47 FY -143.81 FZ -18.89 MX -85.43 MY -7.08 MZ - *
423.69 LOAD 23 LOADTYPE None TITLE PW_1 FLUID WT (FROM
2 FX -113.33 FY -69.77 FZ -15.51 MX -69.74 MY -7.19 MZ - SOIL OR OTHER)
474.37 *-Fluid water from soil or other
3 FX -78.18 FY -199.16 FZ -19.56 MX -90.45 MY -7.07 MZ - LOAD 24 LOADTYPE None TITLE HXPOS STATIC SOIL
393.76 PRESSURE OR EMPTY WALL +X
7 FX -118.46 FY -162.32 FZ -24.23 MX -97.7 MY -7 MZ - *-Static soil preassure in +X
485.11 LOAD 25 LOADTYPE None TITLE HXNEG STATIC SOIL
8 FX -112.2 FY -39.06 FZ -18.62 MX -76.96 MY -7.13 MZ - PRESSURE OR EMPTY WALL -X
470.57 *-Static soil preassure in -X
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 318 de 463
(SUBJECT) (Page)

LOAD 26 LOADTYPE None TITLE HXPOS STATIC SOIL SELFWEIGHT Y -1e-007


PRESSURE OR EMPTY WALL +Z *
*-Static soil preassure in +Z LOAD 42 LOADTYPE None TITLE ILY(+) IMPACT LOADS
LOAD 27 LOADTYPE None TITLE HZNEG STATIC SOIL ON Y
PRESSURE OR EMPTY WALL -Z *-impact loads on Y
*-Static soil preassure in -Z SELFWEIGHT Y -1e-007
LOAD 28 LOADTYPE None TITLE FLXPOS STATIC FLUID *
PRESSURE +X LOAD 43 LOADTYPE None TITLE VL VIBRATION
*-Static fluid preassure in +X From soil or other *-Vibration
LOAD 29 LOADTYPE None TITLE FLXNEG STATIC FLUID SELFWEIGHT Y -1e-007
PRESSURE -X *
*-Static fluid preassure in -X From soil or other LOAD 44 LOADTYPE None TITLE OPA IRREGULAR
LOAD 30 FLZPOSLOAD 30 LOADTYPE NONE TITLE OPERATION LOADS
FLZPOS STATIC FLUID PRESSURE +Z *-Irregular operation loads
*-Static fluid preassure in +Z From soil or other SELFWEIGHT Y -1e-007
LOAD 31 LOADTYPE None TITLE FLZNEG STATIC FLUID *
PRESSURE -Z LOAD 61 LOADTYPE Dead TITLE TOTAL DEAD LOAD
*-Static fluid preassure in -Z From soil or other REPEAT LOAD
LOAD 32 LOADTYPE None TITLE EHXPOS EMPTY WALL 1 1.0 3 1.0 4 1.0
VIBRATION +X LOAD 62 LOADTYPE None TITLE WIN + STRESS +X
*-Increase due to seismic pressure from soil or empty wall REPEAT LOAD
vibration in +X 12 1.0 14 1.0
LOAD 33 LOADTYPE None TITLE EHXNEG EMPTY WALL LOAD 63 LOADTYPE None TITLE WIND + STRESS -X
VIBRATION +X REPEAT LOAD
*-Increase due to seismic pressure from soil or empty wall 12 -1.0 15 1.0
vibration in -X LOAD 64 LOADTYPE None TITLE WIND + STRESS +Z
LOAD 34 LOADTYPE None TITLE EHZPOS EMPTY WALL REPEAT LOAD
VIBRATION +Z 13 1.0 16 1.0
SELFWEIGHT Y -1e-007 LOAD 65 LOADTYPE None TITLE WIND + STRESS -Z
*-Increase due to seismic pressure from soil or empty wall REPEAT LOAD
vibration in +Z 13 -1.0 17 1.0
LOAD 35 LOADTYPE None TITLE EHZNEG EMPTY WALL LOAD 66 LOADTYPE None TITLE TOTAL OPERATING
VIBRATION -Z WEIGHT
*-Increase due to seismic pressure from soil or empty wall REPEAT LOAD
vibration in -Z 1 1.0 3 1.0 4 1.0 6 1.0 8 1.0 11 1.0
LOAD 36 LOADTYPE None TITLE EFLXPOS DYNAMIC **** ERECTION CASES WIND
PRESSURE FROM FLUID +X ********************************************************
SELFWEIGHT Y -1e-007 * 1.0 SD + 1.0CM + 1.0Wx
*-Dynamic pressure from fluid in +X LOAD COMB 104 _: 1?SD+1?CM+1?WXPOS
LOAD 37 LOADTYPE None TITLE EFLXNEG DYNAMIC 1 1.0 3 1.0 14 1.0
PRESSURE FROM FLUID -X *
*-Dynamic pressure from fluid in -X * 1.0 SD + 1.0CM + 1.0(0.6)Ts + 0.6(1.0)W(x)
SELFWEIGHT Y -1e-007 LOAD COMB 105 _: 1?SD+1?CM+1?T1+0.6?WXPOS
* 1 1.0 3 1.0 10 1.0 14 0.6
LOAD 38 LOADTYPE None TITLE EFLZPOS DYNAMIC LOAD COMB 106 _: 1?SD+1?CM+0.6?T1+1?WXPOS
PRESSURE FROM FLUID +Z 1 1.0 3 1.0 10 0.6 14 1.0
*-Dynamic pressure from fluid in +Z LOAD COMB 107 _: 1?SD+1?CM-1?T1+0.6?WXPOS
SELFWEIGHT Y -1e-007 1 1.0 3 1.0 10 -1.0 14 0.6
* LOAD COMB 108 _: 1?SD+1?CM-0.6?T1+1?WXPOS
LOAD 39 LOADTYPE None TITLE EFLZNEG DYNAMIC 1 1.0 3 1.0 10 -0.6 14 1.0
PRESSURE FROM FLUID -Z *
*-Dynamic pressure from fluid in -Z * 1.0 SD + 1.0CM + 1.0W(-x)
SELFWEIGHT Y -1e-007 LOAD COMB 109 _: 1?SD+1?CM+1?WXNEG
* 1 1.0 3 1.0 15 1.0
LOAD 40 LOADTYPE None TITLE ILX(+/-) IMPACT LOADS *
ON X * 1.0 SD + 1.0CM + 1.0(0.6)Ts + 0.6(1.0)W(-x)
*-impact loads on X LOAD COMB 110 _: 1?SD+1?CM+1?T1+0.6?WXNEG
SELFWEIGHT Y -1e-007 1 1.0 3 1.0 10 1.0 15 0.6
* LOAD COMB 111 _: 1?SD+1?CM+0.6?T1+1?WXNEG
LOAD 41 LOADTYPE None TITLE ILZ(+/-) IMPACT LOADS 1 1.0 3 1.0 10 0.6 15 1.0
ON Z LOAD COMB 112 _: 1?SD+1?CM-1?T1+0.6?WXNEG
*-impact loads on Z 1 1.0 3 1.0 10 -1.0 15 0.6
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 319 de 463
(SUBJECT) (Page)

LOAD COMB 113 _: 1?SD+1?CM-0.6?T1+1?WXNEG LOAD COMB 215 _: 1?SD+1?CM+1?PA+1.0 ?WXPOS


1 1.0 3 1.0 10 -0.6 15 1.0 1 1.0 3 1.0 4 1.0 14 1.0
* *
* 1.0 SD + 1.0CM + 1.0W(z) * 1.0 SD + 1.0CM + 1.0PA + 1.0(0.6)Ts + 0.6(1.0)W(x)
LOAD COMB 114 _: 1?SD+1?CM+1?WZPOS LOAD COMB 216 _: 1?SD+1?CM+1?PA+1?T1+0.6?WXPOS
1 1.0 3 1.0 16 1.0 1 1.0 3 1.0 4 1.0 10 1.0 14 0.6
* 1.0 SD + 1.0CM + 1.0(0.6)Ts + 0.6(1.0)W(z) LOAD COMB 217 _:
LOAD COMB 115 _: 1?SD+1?CM+1?T1+0.6?WZPOS 1?SD+1?CM+1?PA+0.6?T1+1.0?WXPOS
1 1.0 3 1.0 10 1.0 16 0.6 1 1.0 3 1.0 4 1.0 10 0.6 14 1.0
LOAD COMB 116 _: 1?SD+1?CM+0.6?T1+1?WZPOS LOAD COMB 218 _: 1?SD+1?CM+1?PA-1?T1+0.6?WXPOS
1 1.0 3 1.0 10 0.6 16 1.0 1 1.0 3 1.0 4 1.0 10 -1.0 14 0.6
LOAD COMB 117 _: 1?SD+1?CM-1?T1+0.6?WZPOS LOAD COMB 219 _: 1?SD+1?CM+1?PA-
1 1.0 3 1.0 10 -1.0 16 0.6 0.6?T1+1.0?WXPOS
LOAD COMB 118 _: 1?SD+1?CM-0.6?T1+1?WZPOS 1 1.0 3 1.0 4 1.0 10 -0.6 14 1.0
1 1.0 3 1.0 10 -0.6 16 1.0 *
* * 1.0 SD + 1.0CM + 1.0PA + 1.0 W(-x)
* 1.0 SD + 1.0CM + 1.0W(-z) LOAD COMB 221 _: 1?SD+1?CM+1?PA+1.0?WXNEG
LOAD COMB 119 _: 1?SD+1?CM+1?WZNEG 1 1.0 3 1.0 4 1.0 15 1.0
1 1.0 3 1.0 17 1.0 *
* * 1.0 SD + 1.0CM + 1.0PA + 1.0(0.6)Ts + 0.6(1.0)W(-x)
* 1.0 SD + 1.0CM + 1.0(0.6)Ts + 0.6(1.0)W(-z) LOAD COMB 222 _: 1?SD+1?CM+1?PA+1?T1+0.6?WXNEG
LOAD COMB 120 _: 1?SD+1?CM+1?T1+0.6?WZNEG 1 1.0 3 1.0 4 1.0 10 1.0 15 0.6
1 1.0 3 1.0 10 1.0 17 0.6 LOAD COMB 223 _:
LOAD COMB 121 _: 1?SD+1?CM+0.6?T1+1?WZNEG 1?SD+1?CM+1?PA+0.6?T1+1.0?WXNEG
1 1.0 3 1.0 10 0.6 17 1.0 1 1.0 3 1.0 4 1.0 10 0.6 15 1.0
LOAD COMB 122 _: 1?SD+1?CM-1?T1+0.6?WZNEG LOAD COMB 224 _: 1?SD+1?CM+1?PA-1?T1+0.6?WXNEG
1 1.0 3 1.0 10 -1.0 17 0.6 1 1.0 3 1.0 4 1.0 10 -1.0 15 0.6
LOAD COMB 123 _: 1?SD+1?CM-0.6?T1+1?WZNEG LOAD COMB 225 _: 1?SD+1?CM+1?PA-
1 1.0 3 1.0 10 -0.6 17 1.0 0.6?T1+1.0?WXNEG
* 1 1.0 3 1.0 4 1.0 10 -0.6 15 1.0
**** ERECTION CASES SEISMIC ***** *
* 1.0 SD + 1.0CM + 1.0E(x) + 0.3E(z) * 1.0 SD + 1.0CM + 1.0PA + 1.0 W(z)
LOAD COMB 204 _: 1?SD+1?CM+1?EX+0.3?EZ LOAD COMB 226 _: 1?SD+1?CM+1?PA+1.0?WZPOS
1 1.0 3 1.0 18 1.0 19 0.3 1 1.0 3 1.0 4 1.0 16 1.0
LOAD COMB 205 _: 1?SD+1?CM+1?EX-0.3?EZ *
1 1.0 3 1.0 18 1.0 19 -0.3 * 1.0 SD + 1.0CM + 1.0PA + 1.0(0.6)Ts + 0.6 (1.0)W(z)
LOAD COMB 206 _: 1?SD+1?CM-1?EX+0.3?EZ LOAD COMB 227 _: 1?SD+1?CM+1?PA+1?T1+0.6?WZPOS
1 1.0 3 1.0 18 -1.0 19 0.3 1 1.0 3 1.0 4 1.0 10 1.0 16 0.6
LOAD COMB 207 _: 1?SD+1?CM-1?EX-0.3?EZ LOAD COMB 228 _:
1 1.0 3 1.0 18 -1.0 19 -0.3 1?SD+1?CM+1?PA+0.6?T1+1.0?WZPOS
* 1 1.0 3 1.0 4 1.0 10 0.6 16 1.0
* 1.0 SD + 1.0CM + 0.3E(x) + 1.0E(z) LOAD COMB 229 _: 1?SD+1?CM+1?PA-1?T1+0.6?WZPOS
LOAD COMB 208 _: 1?SD+1?CM+0.3?EX+0.3?EZ 1 1.0 3 1.0 4 1.0 10 -1.0 16 0.6
1 1.0 3 1.0 18 0.3 19 1.0 LOAD COMB 230 _: 1?SD+1?CM+1?PA-
LOAD COMB 209 _: 1?SD+1?CM+0.3?EX-0.3?EZ 0.6?T1+1.0?WZPOS
1 1.0 3 1.0 18 0.3 19 -1.0 1 1.0 3 1.0 4 1.0 10 -0.6 16 1.0
LOAD COMB 210 _: 1?SD+1?CM-0.3?EX+0.3?EZ *
1 1.0 3 1.0 18 -0.3 19 1.0 * 1.0 SD + 1.0CM + 1.0PA + 1.0 W(-z)
LOAD COMB 211 _: 1?SD+1?CM-0.3?EX-0.3?EZ LOAD COMB 231 _: 1?SD+1?CM+1?PA+1.0?WZNEG
1 1.0 3 1.0 18 -0.3 19 -1.0 1 1.0 3 1.0 4 1.0 17 1.0
* *
* 1.0 SD + 1.0CM + 1.0PA * 1.0 SD + 1.0CM + 1.0PA + 1.0(0.6)Ts + 0.6(1.0)W(-z)
LOAD COMB 212 _: 1?SD+1?CM+1?PA LOAD COMB 232 _: 1?SD+1?CM+1?PA+1?T1+0.6?WZNEG
1 1.0 3 1.0 4 1.0 1 1.0 3 1.0 4 1.0 10 1.0 17 0.6
* LOAD COMB 233 _:
* 1.0 SD + 1.0CM + 1.0PA + 1.0Ts 1?SD+1?CM+1?PA+0.6?T1+1.0?WZNEG
LOAD COMB 213 _: 1?SD+1?CM+1?PA+1?T1 1 1.0 3 1.0 4 1.0 10 0.6 17 1.0
1 1.0 3 1.0 4 1.0 10 1.0 LOAD COMB 234 _: 1?SD+1?CM+1?PA-1?T1+ 0.6?WZNEG
LOAD COMB 214 _: 1?SD+1?CM+1?PA-1?T1 1 1.0 3 1.0 4 1.0 10 -1.0 17 0.6
1 1.0 3 1.0 4 1.0 10 -1.0 LOAD COMB 235 _: 1?SD+1?CM+1?PA-
* 0.6?T1+1.0?WZNEG
* 1.0 SD + 1.0CM + 1.0PA + 1.0 W(x) 1 1.0 3 1.0 4 1.0 10 -0.6 17 1.0
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 320 de 463
(SUBJECT) (Page)

* *
**** HYDROTEST CASES *** 1.0 SD + 1.0CM + 1.0PA + 1.0(0.7)LP + 1.0(0.7)LSC +
************************************************************ 0.6(1.0)Ts +
* *** 0.3(0.5)W(z)
*** 1.0 SD + 1.0CM + 1.0PA + 1.0(0.7)LP + 1.0(0.7)LSC + LOAD COMB 290 _:
0.6(1.0)Ts 1?SD+1?CM+1?PA+1?LP+1?LSC+0.6?T1+0.3?WZPOS
LOAD COMB 250 _: 1 1.0 3 1.0 4 1.0 5 1.0 8 1.0 10 0.6 16 0.3
1?SD+1?CM+1?PA+1?LP+1?LSC+0.6?T1 LOAD COMB 291 _:
1 1.0 3 1.0 4 1.0 5 1.0 8 1.0 10 0.6 1?SD+1?CM+1?PA+0.7?LP+0.7?LSC+1?T1+0.3?WZPOS
LOAD COMB 251 _: 1 1.0 3 1.0 4 1.0 5 0.7 8 0.7 10 1.0 16 0.3
1?SD+1?CM+1?PA+0.7?LP+0.7?LSC+1?T1 LOAD COMB 292 _:
1 1.0 3 1.0 4 1.0 5 0.7 8 0.7 10 1.0 1?SD+1?CM+1?PA+0.7?LP+0.7?LSC+0.6?T1+0.5?WZPOS
LOAD COMB 252 _: 1?SD+1?CM+1?PA+1?LP+1?LSC- 1 1.0 3 1.0 4 1.0 5 0.7 8 0.7 10 0.6 16 0.5
0.6?T1 LOAD COMB 293 _: 1?SD+1?CM+1?PA+1?LP+1?LSC-
1 1.0 3 1.0 4 1.0 5 1.0 8 1.0 10 -0.6 0.6?T1+0.3?WZPOS
LOAD COMB 253 _: 1?SD+1?CM+1?PA+0.7?LP+0.7?LSC- 1 1.0 3 1.0 4 1.0 5 1.0 8 1.0 10 -0.6 16 0.3
1?T1 LOAD COMB 294 _: 1?SD+1?CM+1?PA+0.7?LP+0.7?LSC-
1 1.0 3 1.0 4 1.0 5 0.7 8 0.7 10 -1.0 1?T1+0.3?WZPOS
* 1 1.0 3 1.0 4 1.0 5 0.7 8 0.7 10 -1.0 16 0.3
*** 1.0 SD + 1.0CM + 1.0PA + 1.0(0.7)LP + 1.0(0.7)LSC + LOAD COMB 295 _: 1?SD+1?CM+1?PA+0.7?LP+0.7?LSC-
0.6(1.0)Ts + 0.6?T1+0.5?WZPOS
*** 0.3(0.5)W(x) 1 1.0 3 1.0 4 1.0 5 0.7 8 0.7 10 -0.6 16 0.5
LOAD COMB 272 _: *
1?SD+1?CM+1?PA+1?LP+1?LSC+0.6?T1+0.3?WXPOS *** 1.0SD + 1.0CM + 1.0PA + 1.0(0.7)LP + 1.0(0.7)LSC +
1 1.0 3 1.0 4 1.0 5 1.0 8 1.0 10 0.6 14 0.3 0.6(1.0)Ts +
LOAD COMB 273 _: *** 0.3(0.5)W(-z)
1?SD+1?CM+1?PA+0.7?LP+0.7?LSC+1?T1+0.3?WXPOS LOAD COMB 299 _:
1 1.0 3 1.0 4 1.0 5 0.7 8 0.7 10 1.0 14 0.3 1?SD+1?CM+1?PA+1?LP+1?LSC+0.6?T1+0.3?WZNEG
LOAD COMB 274 _: 1 1.0 3 1.0 4 1.0 5 1.0 8 1.0 10 0.6 17 0.3
1?SD+1?CM+1?PA+0.7?LP+0.7?LSC+0.6?T1+0.5?WXPOS LOAD COMB 300 _:
1 1.0 3 1.0 4 1.0 5 0.7 8 0.7 10 0.6 14 0.5 1?SD+1?CM+1?PA+0.7?LP+0.7?LSC+1?T1+0.3?WZNEG
LOAD COMB 275 _: 1?SD+1?CM+1?PA+1?LP+1?LSC- 1 1.0 3 1.0 4 1.0 5 0.7 8 0.7 10 1.0 17 0.3
0.6?T1+0.3?WXPOS LOAD COMB 301 _:
1 1.0 3 1.0 4 1.0 5 1.0 8 1.0 10 -0.6 14 0.3 1?SD+1?CM+1?PA+0.7?LP+0.7?LSC+0.6?T1+0.5?WZNEG
LOAD COMB 276 _: 1?SD+1?CM+1?PA+0.7?LP+0.7?LSC- 1 1.0 3 1.0 4 1.0 5 0.7 8 0.7 10 0.6 17 0.5
1?T1+0.3?WXPOS LOAD COMB 302 _: 1?SD+1?CM+1?PA+1?LP+1?LSC-
1 1.0 3 1.0 4 1.0 5 0.7 8 0.7 10 -1.0 14 0.3 0.6?T1+0.3?WZNEG
LOAD COMB 277 _: 1?SD+1?CM+1?PA+0.7?LP+0.7?LSC- 1 1.0 3 1.0 4 1.0 5 1.0 8 1.0 10 -0.6 17 0.3
0.6?T1+0.5?WXPOS LOAD COMB 303 _: 1?SD+1?CM+1?PA+0.7?LP+0.7?LSC-
1 1.0 3 1.0 4 1.0 5 0.7 8 0.7 10 -0.6 14 0.5 1?T1+0.3?WZNEG
* 1 1.0 3 1.0 4 1.0 5 0.7 8 0.7 10 -1.0 17 0.3
*** 1.0SD + 1.0CM + 1.0PA + 1.0(0.7)LP + 1.0(0.7)LSC + LOAD COMB 304 _: 1?SD+1?CM+1?PA+0.7?LP+0.7?LSC-
0.6(1.0)Ts + 0.6?T1+0.5?WZNEG
*** 0.3(0.5)W(-x) 1 1.0 3 1.0 4 1.0 5 0.7 8 0.7 10 -0.6 17 0.5
LOAD COMB 281 _: *
1?SD+1?CM+1?PA+1?LP+1?LSC+0.6?T1+0.3?WXNEG **** OPERATING CASES *****
1 1.0 3 1.0 4 1.0 5 1.0 8 1.0 10 0.6 15 0.3 *** 1.0 SD + 1.0CM + 1.0PA + 1.0(0.6)Ts + 0.6(1.0)W(x) +
LOAD COMB 282 _: 1.0STR(y) +
1?SD+1?CM+1?PA+0.7?LP+0.7?LSC+1?T1+0.3?WXNEG *** 1.0STR(x) + 1.0STR(z)
1 1.0 3 1.0 4 1.0 5 0.7 8 0.7 10 1.0 15 0.3 ***
LOAD COMB 283 _: 1?SD+1?F+1?CM+1?PA+1?T1+1?STR_Y+1?STR_X+1?STR
1?SD+1?CM+1?PA+0.7?LP+0.7?LSC+0.6?T1+0.5?WXNEG _Z+0.6?WXPOS
1 1.0 3 1.0 4 1.0 5 0.7 8 0.7 10 0.6 15 0.5 LOAD COMB 324 _:
LOAD COMB 284 _: 1?SD+1?CM+1?PA+1?LP+1?LSC- 1 1.0 2 1.0 3 1.0 4 1.0 10 1.0 11 1.0 12 1.0 13 1.0 14 0.6
0.6?T1+0.3?WXNEG *1?SD+1?F+1?CM+1?PA+0.6?T1+1?STR_Y+1?STR_X+1?S
1 1.0 3 1.0 4 1.0 5 1.0 8 1.0 10 -0.6 15 0.3 TR_Z+1?WXPOS
LOAD COMB 285 _: 1?SD+1?CM+1?PA+0.7?LP+0.7?LSC- LOAD COMB 325 _:
1?T1+0.3?WXNEG 1 1.0 2 1.0 3 1.0 4 1.0 10 0.6 11 1.0 12 1.0 13 1.0 14 1.0
1 1.0 3 1.0 4 1.0 5 0.7 8 0.7 10 -1.0 15 0.3 *1?SD+1?F+1?CM+1?PA+1?T1+1?STR_Y+1?STR_X-
LOAD COMB 286 _: 1?SD+1?CM+1?PA+0.7?LP+0.7?LSC- 1?STR_Z+0.6?WXPOS
0.6?T1+0.5?WXNEG LOAD COMB 326 _:
1 1.0 3 1.0 4 1.0 5 0.7 8 0.7 10 -0.6 15 0.5 1 1.0 2 1.0 3 1.0 4 1.0 10 1.0 11 1.0 12 1.0 13 -1.0 14 0.6
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 321 de 463
(SUBJECT) (Page)

*1?SD+1?F+1?CM+1?PA+0.6?T1+1?STR_Y+1?STR_X- *1?SD+1?F+1?CM+1?PA+0.6?T1+1?STR_Y+1?STR_X+1?S
1?STR_Z+1?WXPOS TR_Z+1?WXNEG
LOAD COMB 327 _: LOAD COMB 345 _:
1 1.0 2 1.0 3 1.0 4 1.0 10 0.6 11 1.0 12 1.0 13 -1.0 14 1.0 1 1.0 2 1.0 3 1.0 4 1.0 10 0.6 11 1.0 12 1.0 13 1.0 15 1.0
*1?SD+1?F+1?CM+1?PA+1?T1+1?STR_Y- *1?SD+1?F+1?CM+1?PA+1?T1+1?STR_Y+1?STR_X-
1?STR_X+1?STR_Z+0.6?WXPOS 1?STR_Z+0.6?WXNEG
LOAD COMB 328 _: LOAD COMB 346 _:
1 1.0 2 1.0 3 1.0 4 1.0 10 1.0 11 1.0 12 -1.0 13 1.0 14 0.6 1 1.0 2 1.0 3 1.0 4 1.0 10 1.0 11 1.0 12 1.0 13 -1.0 15 0.6
*1?SD+1?F+1?CM+1?PA+0.6?T1+1?STR_Y- *1?SD+1?F+1?CM+1?PA+0.6?T1+1?STR_Y+1?STR_X-
1?STR_X+1?STR_Z+1?WXPOS 1?STR_Z+1?WXNEG
LOAD COMB 329 _: LOAD COMB 347 _:
1 1.0 2 1.0 3 1.0 4 1.0 10 0.6 11 1.0 12 -1.0 13 1.0 14 1.0 1 1.0 2 1.0 3 1.0 4 1.0 10 0.6 11 1.0 12 1.0 13 -1.0 15 1.0
*1?SD+1?F+1?CM+1?PA+1?T1+1?STR_Y-1?STR_X- *1?SD+1?F+1?CM+1?PA+1?T1+1?STR_Y-
1?STR_Z+0.6?WXPOS 1?STR_X+1?STR_Z+0.6?WXNEG
LOAD COMB 330 _: LOAD COMB 348 _:
1 1.0 2 1.0 3 1.0 4 1.0 10 1.0 11 1.0 12 -1.0 13 -1.0 14 0.6 1 1.0 2 1.0 3 1.0 4 1.0 10 1.0 11 1.0 12 -1.0 13 1.0 15 0.6
*1?SD+1?F+1?CM+1?PA+0.6?T1+1?STR_Y-1?STR_X- *1?SD+1?F+1?CM+1?PA+0.6?T1+1?STR_Y-
1?STR_Z+1?WXPOS 1?STR_X+1?STR_Z+1?WXNEG
LOAD COMB 331 _: LOAD COMB 349 _:
1 1.0 2 1.0 3 1.0 4 1.0 10 0.6 11 1.0 12 -1.0 13 -1.0 14 1.0 1 1.0 2 1.0 3 1.0 4 1.0 10 0.6 11 1.0 12 -1.0 13 1.0 15 1.0
*1?SD+1?F+1?CM+1?PA- *1?SD+1?F+1?CM+1?PA+1?T1+1?STR_Y-1?STR_X-
1?T1+1?STR_Y+1?STR_X+1?STR_Z+0.6?WXPOS 1?STR_Z+0.6?WXNEG
LOAD COMB 332 _: LOAD COMB 350 _:
1 1.0 2 1.0 3 1.0 4 1.0 10 -1.0 11 1.0 12 1.0 13 1.0 14 0.6 1 1.0 2 1.0 3 1.0 4 1.0 10 1.0 11 1.0 12 -1.0 13 -1.0 15 0.6
*1?SD+1?F+1?CM+1?PA- *1?SD+1?F+1?CM+1?PA+0.6?T1+1?STR_Y-1?STR_X-
0.6?T1+1?STR_Y+1?STR_X+1?STR_Z+1?WXPOS 1?STR_Z+1?WXNEG
LOAD COMB 333 _: LOAD COMB 351 _:
1 1.0 2 1.0 3 1.0 4 1.0 10 -0.6 11 1.0 12 1.0 13 1.0 14 1.0 21 1 1.0 2 1.0 3 1.0 4 1.0 10 0.6 11 1.0 12 -1.0 13 -1.0 15 1.0
1.0 *1?SD+1?F+1?CM+1?PA-
*1?SD+1?F+1?CM+1?PA-1?T1+1?STR_Y+1?STR_X- 1?T1+1?STR_Y+1?STR_X+1?STR_Z+0.6?WXNEG
1?STR_Z+0.6?WXPOS LOAD COMB 352 _:
LOAD COMB 334 _: 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.0 11 1.0 12 1.0 13 1.0 15 0.6
1 1.0 2 1.0 3 1.0 4 1.0 10 -1.0 11 1.0 12 1.0 13 -1.0 14 0.6 21 *1?SD+1?F+1?CM+1?PA-
1.0 0.6?T1+1?STR_Y+1?STR_X+1?STR_Z+1?WXNEG
*1?SD+1?F+1?CM+1?PA-0.6?T1+1?STR_Y+1?STR_X- LOAD COMB 353 _:
1?STR_Z+1?WXPOS 1 1.0 2 1.0 3 1.0 4 1.0 10 -0.6 11 1.0 12 1.0 13 1.0 15 1.0
LOAD COMB 335 _: *1?SD+1?F+1?CM+1?PA-1?T1+1?STR_Y+1?STR_X-
1 1.0 2 1.0 3 1.0 4 1.0 10 -0.6 11 1.0 12 1.0 13 -1.0 14 1.0 1?STR_Z+0.6?WXNEG
*1?SD+1?F+1?CM+1?PA-1?T1+1?STR_Y- LOAD COMB 354 _:
1?STR_X+1?STR_Z+0.6?WXPOS 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.0 11 1.0 12 1.0 13 -1.0 15 0.6
LOAD COMB 336 _: *1?SD+1?F+1?CM+1?PA-0.6?T1+1?STR_Y+1?STR_X-
1 1.0 2 1.0 3 1.0 4 1.0 10 -1.0 11 1.0 12 -1.0 13 1.0 14 0.6 1?STR_Z+1?WXNEG
*1?SD+1?F+1?CM+1?PA-0.6?T1+1?STR_Y- LOAD COMB 355 _:
1?STR_X+1?STR_Z+1?WXPOS 1 1.0 2 1.0 3 1.0 4 1.0 10 -0.6 11 1.0 12 1.0 13 -1.0 15 1.0
LOAD COMB 337 _: *1?SD+1?F+1?CM+1?PA-1?T1+1?STR_Y-
1 1.0 2 1.0 3 1.0 4 1.0 10 -0.6 11 1.0 12 -1.0 13 1.0 14 1.0 1?STR_X+1?STR_Z+0.6?WXNEG
*1?SD+1?F+1?CM+1?PA-1?T1+1?STR_Y-1?STR_X- LOAD COMB 356 _:
1?STR_Z+0.6?WXPOS 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.0 11 1.0 12 -1.0 13 1.0 15 0.6
LOAD COMB 338 _: *1?SD+1?F+1?CM+1?PA-0.6?T1+1?STR_Y-
1 1.0 2 1.0 3 1.0 4 1.0 10 -1.0 11 1.0 12 -1.0 13 -1.0 14 0.6 1?STR_X+1?STR_Z+1?WXNEG
*1?SD+1?F+1?CM+1?PA-0.6?T1+1?STR_Y-1?STR_X- LOAD COMB 357 _:
1?STR_Z+1?WXPOS 1 1.0 2 1.0 3 1.0 4 1.0 10 -0.6 11 1.0 12 -1.0 13 1.0 15 1.0
LOAD COMB 339 _: *1?SD+1?F+1?CM+1?PA-1?T1+1?STR_Y-1?STR_X-
1 1.0 2 1.0 3 1.0 4 1.0 10 -0.6 11 1.0 12 -1.0 13 -1.0 14 1.0 1?STR_Z+0.6?WXNEG
* LOAD COMB 358 _:
** 1.0 SD + 1.0CM + 1.0PA + 1.0(0.6)Ts + 0.6(1.0)W(-x) + 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.0 11 1.0 12 -1.0 13 -1.0 15 0.6
1.0STR(y) + *1?SD+1?F+1?CM+1?PA-0.6?T1+1?STR_Y-1?STR_X-
** 1.0STR(x) + 1.0STR(z) 1?STR_Z+1?WXNEG
*1?SD+1?F+1?CM+1?PA+1?T1+1?STR_Y+1?STR_X+1?ST LOAD COMB 359 _:
R_Z+0.6?WXNEG 1 1.0 2 1.0 3 1.0 4 1.0 10 -0.6 11 1.0 12 -1.0 13 -1.0 15 1.0
LOAD COMB 344 _: *
1 1.0 2 1.0 3 1.0 4 1.0 10 1.0 11 1.0 12 1.0 13 1.0 15 0.6
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 322 de 463
(SUBJECT) (Page)

** 1.0 SD + 1.0CM + 1.0PA + 1.0(0.6)Ts + 0.6(1.0)W(z) + 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.0 11 1.0 12 -1.0 13 -1.0 16 0.6
1.0STR(y) + *1?SD+1?F+1?CM+1?PA-0.6?T1+1?STR_Y-1?STR_X-
** 1.0STR(x) + 1.0STR(z) 1?STR_Z+1?WZPOS
*1?SD+1?F+1?CM+1?PA+1?T1+1?STR_Y+1?STR_X+1?ST LOAD COMB 379 _:
R_Z+0.6?WZPOS 1 1.0 2 1.0 3 1.0 4 1.0 10 -0.6 11 1.0 12 -1.0 13 -1.0 16 1.0
LOAD COMB 364 _: *
1 1.0 2 1.0 3 1.0 4 1.0 10 1.0 11 1.0 12 1.0 13 1.0 16 0.6 ** 1.0 SD + 1.0CM + 1.0PA + 1.0(0.6)Ts + 0.6(1.0)W(-z) +
*1?SD+1?F+1?CM+1?PA+0.6?T1+1?STR_Y+1?STR_X+1?S 1.0STR(y) +
TR_Z+1?WZPOS ** 1.0STR(x) + 1.0STR(z)
LOAD COMB 365 _: *1?SD+1?F+1?CM+1?PA+1?T1+1?STR_Y+1?STR_X+1?ST
1 1.0 2 1.0 3 1.0 4 1.0 10 0.6 11 1.0 12 1.0 13 1.0 16 1.0 R_Z+0.6?WZNEG
*1?SD+1?F+1?CM+1?PA+1?T1+1?STR_Y+1?STR_X- LOAD COMB 384 _:
1?STR_Z+0.6?WZPOS 1 1.0 2 1.0 3 1.0 4 1.0 10 1.0 11 1.0 12 1.0 13 1.0 17 0.6
LOAD COMB 366 _: *1?SD+1?F+1?CM+1?PA+0.6?T1+1?STR_Y+1?STR_X+1?S
1 1.0 2 1.0 3 1.0 4 1.0 10 1.0 11 1.0 12 1.0 13 -1.0 16 0.6 TR_Z+1?WZNEG
*1?SD+1?F+1?CM+1?PA+0.6?T1+1?STR_Y+1?STR_X- LOAD COMB 385 _:
1?STR_Z+1?WZPOS 1 1.0 2 1.0 3 1.0 4 1.0 10 0.6 11 1.0 12 1.0 13 1.0 17 1.0
LOAD COMB 367 _: *1?SD+1?F+1?CM+1?PA+1?T1+1?STR_Y+1?STR_X-
1 1.0 2 1.0 3 1.0 4 1.0 10 0.6 11 1.0 12 1.0 13 -1.0 16 1.0 1?STR_Z+0.6?WZNEG
*1?SD+1?F+1?CM+1?PA+1?T1+1?STR_Y- LOAD COMB 386 _:
1?STR_X+1?STR_Z+0.6?WZPOS 1 1.0 2 1.0 3 1.0 4 1.0 10 1.0 11 1.0 12 1.0 13 -1.0 17 0.6
LOAD COMB 368 _: *1?SD+1?F+1?CM+1?PA+0.6?T1+1?STR_Y+1?STR_X-
1 1.0 2 1.0 3 1.0 4 1.0 10 1.0 11 1.0 12 -1.0 13 1.0 16 0.6 1?STR_Z+1?WZNEG
*1?SD+1?F+1?CM+1?PA+0.6?T1+1?STR_Y- LOAD COMB 387 _:
1?STR_X+1?STR_Z+1?WZPOS 1 1.0 2 1.0 3 1.0 4 1.0 10 0.6 11 1.0 12 1.0 13 -1.0 17 1.0
LOAD COMB 369 _: *1?SD+1?F+1?CM+1?PA+1?T1+1?STR_Y-
1 1.0 2 1.0 3 1.0 4 1.0 10 0.6 11 1.0 12 -1.0 13 1.0 16 1.0 1?STR_X+1?STR_Z+0.6?WZNEG
*1?SD+1?F+1?CM+1?PA+1?T1+1?STR_Y-1?STR_X- LOAD COMB 388 _:
1?STR_Z+0.6?WZPOS 1 1.0 2 1.0 3 1.0 4 1.0 10 1.0 11 1.0 12 -1.0 13 1.0 17 0.6
LOAD COMB 370 _: *1?SD+1?F+1?CM+1?PA+0.6?T1+1?STR_Y-
1 1.0 2 1.0 3 1.0 4 1.0 10 1.0 11 1.0 12 -1.0 13 -1.0 16 0.6 1?STR_X+1?STR_Z+1?WZNEG
*1?SD+1?F+1?CM+1?PA+0.6?T1+1?STR_Y-1?STR_X- LOAD COMB 389 _:
1?STR_Z+1?WZPOS 1 1.0 2 1.0 3 1.0 4 1.0 10 0.6 11 1.0 12 -1.0 13 1.0 17 1.0
LOAD COMB 371 _: *1?SD+1?F+1?CM+1?PA+1?T1+1?STR_Y-1?STR_X-
1 1.0 2 1.0 3 1.0 4 1.0 10 0.6 11 1.0 12 -1.0 13 -1.0 16 1.0 1?STR_Z+0.6?WZNEG
*1?SD+1?F+1?CM+1?PA- LOAD COMB 390 _:
1?T1+1?STR_Y+1?STR_X+1?STR_Z+0.6?WZPOS 1 1.0 2 1.0 3 1.0 4 1.0 10 1.0 11 1.0 12 -1.0 13 -1.0 17 0.6
LOAD COMB 372 _: *1?SD+1?F+1?CM+1?PA+0.6?T1+1?STR_Y-1?STR_X-
1 1.0 2 1.0 3 1.0 4 1.0 10 -1.0 11 1.0 12 1.0 13 1.0 16 0.6 1?STR_Z+1?WZNEG
*1?SD+1?F+1?CM+1?PA- LOAD COMB 391 _:
0.6?T1+1?STR_Y+1?STR_X+1?STR_Z+1?WZPOS 1 1.0 2 1.0 3 1.0 4 1.0 10 0.6 11 1.0 12 -1.0 13 -1.0 17 1.0
LOAD COMB 373 _: *1?SD+1?F+1?CM+1?PA-
1 1.0 2 1.0 3 1.0 4 1.0 10 -0.6 11 1.0 12 1.0 13 1.0 16 1.0 1?T1+1?STR_Y+1?STR_X+1?STR_Z+0.6?WZNEG
*1?SD+1?F+1?CM+1?PA-1?T1+1?STR_Y+1?STR_X- LOAD COMB 392 _:
1?STR_Z+0.6?WZPOS 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.0 11 1.0 12 1.0 13 1.0 17 0.6
LOAD COMB 374 _: *1?SD+1?F+1?CM+1?PA-
1 1.0 2 1.0 3 1.0 4 1.0 10 -1.0 11 1.0 12 1.0 13 -1.0 16 0.6 0.6?T1+1?STR_Y+1?STR_X+1?STR_Z+1?WZNEG
*1?SD+1?F+1?CM+1?PA-0.6?T1+1?STR_Y+1?STR_X- LOAD COMB 393 _:
1?STR_Z+1?WZPOS 1 1.0 2 1.0 3 1.0 4 1.0 10 -0.6 11 1.0 12 1.0 13 1.0 17 1.0
LOAD COMB 375 _: *1?SD+1?F+1?CM+1?PA-1?T1+1?STR_Y+1?STR_X-
1 1.0 2 1.0 3 1.0 4 1.0 10 -0.6 11 1.0 12 1.0 13 -1.0 16 1.0 1?STR_Z+0.6?WZNEG
*1?SD+1?F+1?CM+1?PA-1?T1+1?STR_Y- LOAD COMB 394 _:
1?STR_X+1?STR_Z+0.6?WZPOS 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.0 11 1.0 12 1.0 13 -1.0 17 0.6
LOAD COMB 376 _: *1?SD+1?F+1?CM+1?PA-0.6?T1+1?STR_Y+1?STR_X-
1 1.0 2 1.0 3 1.0 4 1.0 10 -1.0 11 1.0 12 -1.0 13 1.0 16 0.6 1?STR_Z+1?WZNEG
*1?SD+1?F+1?CM+1?PA-0.6?T1+1?STR_Y- LOAD COMB 395 _:
1?STR_X+1?STR_Z+1?WZPOS 1 1.0 2 1.0 3 1.0 4 1.0 10 -0.6 11 1.0 12 1.0 13 -1.0 17 1.0
LOAD COMB 377 _: *1?SD+1?F+1?CM+1?PA-1?T1+1?STR_Y-
1 1.0 2 1.0 3 1.0 4 1.0 10 -0.6 11 1.0 12 -1.0 13 1.0 16 1.0 1?STR_X+1?STR_Z+0.6?WZNEG
*1?SD+1?F+1?CM+1?PA-1?T1+1?STR_Y-1?STR_X- LOAD COMB 396 _:
1?STR_Z+0.6?WZPOS 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.0 11 1.0 12 -1.0 13 1.0 17 0.6
LOAD COMB 378 _:
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 323 de 463
(SUBJECT) (Page)

*1?SD+1?F+1?CM+1?PA-0.6?T1+1?STR_Y- LOAD COMB 462 _:


1?STR_X+1?STR_Z+1?WZNEG 1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 0.6 11 1.0 12 -1.0 13 -1.0
LOAD COMB 397 _: *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?T1+1?STR_Y
1 1.0 2 1.0 3 1.0 4 1.0 10 -0.6 11 1.0 12 -1.0 13 1.0 17 1.0 -1?STR_X-1?STR_Z
*1?SD+1?F+1?CM+1?PA-1?T1+1?STR_Y-1?STR_X- LOAD COMB 463 _:
1?STR_Z+0.6?WZNEG 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 1.0 11 1.0 12 -1.0 13 -1.0
LOAD COMB 398 _: *1?SD+1?F+1?CM+1?PA+1?LO+1?LSC-
1 1.0 2 1.0 3 1.0 4 1.0 10 -1.0 11 1.0 12 -1.0 13 -1.0 17 0.6 0.6?T1+1?STR_Y+1?STR_X+1?STR_Z
*1?SD+1?F+1?CM+1?PA-0.6?T1+1?STR_Y-1?STR_X- LOAD COMB 464 _:
1?STR_Z+1?WZNEG 1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 -0.6 11 1.0 12 1.0 13 1.0
LOAD COMB 399 _: *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC-
1 1.0 2 1.0 3 1.0 4 1.0 10 -0.6 11 1.0 12 -1.0 13 -1.0 17 1.0 1?T1+1?STR_Y+1?STR_X+1?STR_Z
* LOAD COMB 465 _:
** 1.0 SD. + 1.0CM + 1.0PA + 1.0LO + 1.0LSC + 1.0STR(y) + 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -1.0 11 1.0 12 1.0 13 1.0
1.0STR(x) + *1?SD+1?F+1?CM+1?PA+1?LO+1?LSC-
** 1.0STR(z) 0.6?T1+1?STR_Y+1?STR_X-1?STR_Z
*1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+1?STR_Y+1?STR_ LOAD COMB 466 _:
X+1?STR_Z 1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 -0.6 11 1.0 12 1.0 13 -1.0
LOAD COMB 448 _: *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 11 1.0 12 1.0 13 1.0 1?T1+1?STR_Y+1?STR_X-1?STR_Z
*1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+1?STR_Y+1?STR_ LOAD COMB 467 _:
X-1?STR_Z 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -1.0 11 1.0 12 1.0 13 -1.0
LOAD COMB 449 _: *1?SD+1?F+1?CM+1?PA+1?LO+1?LSC-0.6?T1+1?STR_Y-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 11 1.0 12 1.0 13 -1.0 1?STR_X+1?STR_Z
*1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+1?STR_Y- LOAD COMB 468 _:
1?STR_X+1?STR_Z 1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 -0.6 11 1.0 12 -1.0 13 1.0
LOAD COMB 450 _: *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC-1?T1+1?STR_Y-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 11 1.0 12 -1.0 13 1.0 1?STR_X+1?STR_Z
* LOAD COMB 469 _:
*1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+1?STR_Y- 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -1.0 11 1.0 12 -1.0 13 1.0
1?STR_X-1?STR_Z *1?SD+1?F+1?CM+1?PA+1?LO+1?LSC-0.6?T1+1?STR_Y-
LOAD COMB 451 _: 1?STR_X-1?STR_Z
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 11 1.0 12 -1.0 13 -1.0 LOAD COMB 470 _:
** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7)LO + 1.0(0.7)LSC + 1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 -0.6 11 1.0 12 -1.0 13 -
0.6(1.0)Ts + 1.0
** 1.0STR(y) + 1.0STR(x) + 1.0STR(z) *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC-1?T1+1?STR_Y-
*1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+0.6?T1+1?STR_Y+ 1?STR_X-1?STR_Z
1?STR_X+1?STR_Z LOAD COMB 471 _:
LOAD COMB 456 _: 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -1.0 11 1.0 12 -1.0 13 -
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 0.6 11 1.0 12 1.0 13 1.0 1.0
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?T1+1?STR_Y *
+1?STR_X+1?STR_Z ** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7)LO + 1.0(0.7)LSC +
LOAD COMB 457 _: 0.6(1.0)W(x) +
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 1.0 11 1.0 12 1.0 13 1.0 ** 1.0STR(y) + 1.0STR(x) + 1.0STR(z)
*1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+0.6?T1+1?STR_Y+ *1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+1?STR_Y+1?STR_
1?STR_X-1?STR_Z X+1?STR_Z+0.6?WXPOS
LOAD COMB 458 _: LOAD COMB 480 _:
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 0.6 11 1.0 12 1.0 13 -1.0 1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 11 1.0 12 1.0 13 1.0 14 0.6
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?T1+1?STR_Y *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?STR_Y+1?ST
+1?STR_X-1?STR_Z R_X+1?STR_Z+1?WXPOS
LOAD COMB 459 _: LOAD COMB 481 _:
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 1.0 11 1.0 12 1.0 13 -1.0 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 11 1.0 12 1.0 13 1.0 14 1.0
*1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+0.6?T1+1?STR_Y- *1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+1?STR_Y+1?STR_
1?STR_X+1?STR_Z X-1?STR_Z+0.6?WXPOS
LOAD COMB 460 _: LOAD COMB 482 _:
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 0.6 11 1.0 12 -1.0 13 1.0 1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 11 1.0 12 1.0 13 -1.0 14 0.6
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?T1+1?STR_Y *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?STR_Y+1?ST
-1?STR_X+1?STR_Z R_X-1?STR_Z+1?WXPOS
LOAD COMB 461 _: LOAD COMB 483 _:
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 1.0 11 1.0 12 -1.0 13 1.0 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 11 1.0 12 1.0 13 -1.0 14 1.0
*1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+0.6?T1+1?STR_Y- *1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+1?STR_Y-
1?STR_X-1?STR_Z 1?STR_X+1?STR_Z+0.6?WXPOS
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 324 de 463
(SUBJECT) (Page)

LOAD COMB 484 _: *1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+1?STR_Y+1?STR_


1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 11 1.0 12 -1.0 13 1.0 14 0.6 X-1?STR_Z+0.6?WZPOS
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?STR_Y- LOAD COMB 514 _:
1?STR_X+1?STR_Z+1?WXPOS 1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 11 1.0 12 1.0 13 -1.0 16 0.6
LOAD COMB 485 _: *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?STR_Y+1?ST
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 11 1.0 12 -1.0 13 1.0 14 1.0 R_X-1?STR_Z+1?WZPOS
*1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+1?STR_Y- LOAD COMB 515 _:
1?STR_X-1?STR_Z+0.6?WXPOS 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 11 1.0 12 1.0 13 -1.0 16 1.0
LOAD COMB 486 _: *1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+1?STR_Y-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 11 1.0 12 -1.0 13 -1.0 14 0.6 1?STR_X+1?STR_Z+0.6?WZPOS
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?STR_Y- LOAD COMB 516 _:
1?STR_X-1?STR_Z+1?WXPOS 1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 11 1.0 12 -1.0 13 1.0 16 0.6
LOAD COMB 487 _: *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?STR_Y-
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 11 1.0 12 -1.0 13 -1.0 14 1.0 1?STR_X+1?STR_Z+1?WZPOS
* LOAD COMB 517 _:
** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7)LO + 1.0(0.7)LSC + 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 11 1.0 12 -1.0 13 1.0 16 1.0
0.6(1.0)W(-x) + *1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+1?STR_Y-
** 1.0STR(y) + 1.0STR(x) + 1.0STR(z) 1?STR_X-1?STR_Z+0.6?WZPOS
*1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+1?STR_Y+1?STR_ LOAD COMB 518 _:
X+1?STR_Z+0.6?WXNEG 1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 11 1.0 12 -1.0 13 -1.0 16 0.6
LOAD COMB 496 _: *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?STR_Y-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 11 1.0 12 1.0 13 1.0 15 0.6 1?STR_X-1?STR_Z+1?WZPOS
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?STR_Y+1?ST LOAD COMB 519 _:
R_X+1?STR_Z+1?WXNEG 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 11 1.0 12 -1.0 13 -1.0 16 1.0
LOAD COMB 497 _: *
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 11 1.0 12 1.0 13 1.0 15 1.0 ** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7)LO + 1.0(0.7)LSC +
*1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+1?STR_Y+1?STR_ 0.6(1.0)W(-z) +
X-1?STR_Z+0.6?WXNEG ** 1.0STR(y) + 1.0STR(x) + 1.0STR(z)
LOAD COMB 498 _: *1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+1?STR_Y+1?STR_
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 11 1.0 12 1.0 13 -1.0 15 0.6 X+1?STR_Z+0.6?WZNEG
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?STR_Y+1?ST LOAD COMB 528 _:
R_X-1?STR_Z+1?WXNEG 1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 11 1.0 12 1.0 13 1.0 17 0.6
LOAD COMB 499 _: *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?STR_Y+1?ST
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 11 1.0 12 1.0 13 -1.0 15 1.0 R_X+1?STR_Z+1?WZNEG
*1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+1?STR_Y- LOAD COMB 529 _:
1?STR_X+1?STR_Z+0.6?WXNEG 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 11 1.0 12 1.0 13 1.0 17 1.0
LOAD COMB 500 _: *1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+1?STR_Y+1?STR_
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 11 1.0 12 -1.0 13 1.0 15 0.6 X-1?STR_Z+0.6?WZNEG
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?STR_Y- LOAD COMB 530 _:
1?STR_X+1?STR_Z+1?WXNEG 1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 11 1.0 12 1.0 13 -1.0 17 0.6
LOAD COMB 501 _: *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?STR_Y+1?ST
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 11 1.0 12 -1.0 13 1.0 15 1.0 R_X-1?STR_Z+1?WZNEG
*1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+1?STR_Y- LOAD COMB 531 _:
1?STR_X-1?STR_Z+0.6?WXNEG 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 11 1.0 12 1.0 13 -1.0 17 1.0
LOAD COMB 502 _: *1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+1?STR_Y-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 11 1.0 12 -1.0 13 -1.0 15 0.6 1?STR_X+1?STR_Z+0.6?WZNEG
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?STR_Y- LOAD COMB 532 _:
1?STR_X-1?STR_Z+1?WXNEG 1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 11 1.0 12 -1.0 13 1.0 17 0.6
LOAD COMB 503 _: *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?STR_Y-
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 11 1.0 12 -1.0 13 -1.0 15 1.0 1?STR_X+1?STR_Z+1?WZNEG
* LOAD COMB 533 _:
** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7)LO + 1.0(0.7)LSC + 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 11 1.0 12 -1.0 13 1.0 17 1.0
0.6(1.0)W(z) + *1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+1?STR_Y-
** 1.0STR(y) + 1.0STR(x) + 1.0STR(z) 1?STR_X-1?STR_Z+0.6?WZNEG
*1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+1?STR_Y+1?STR_ LOAD COMB 534 _:
X+1?STR_Z+0.6?WZPOS 1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 11 1.0 12 -1.0 13 -1.0 17 0.6
LOAD COMB 512 _: *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?STR_Y-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 11 1.0 12 1.0 13 1.0 16 0.6 1?STR_X-1?STR_Z+1?WZNEG
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?STR_Y+1?ST LOAD COMB 535 _:
R_X+1?STR_Z+1?WZPOS 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 11 1.0 12 -1.0 13 -1.0 17 1.0
LOAD COMB 513 _: *
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 11 1.0 12 1.0 13 1.0 16 1.0
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 325 de 463
(SUBJECT) (Page)

** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7)LO + 1.0(0.7)LSC + *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC-


0.6(1.0)Ts + 0.6?T1+1?STR_Y+1?STR_X+1?STR_Z+1?WXNEG
** 0.6(1.0)W(x) + 1.0STR(y) + 1.0STR(x) + 1.0STR(z) LOAD COMB 558 _:
*1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+0.6?T1+1?STR_Y+ 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -0.6 11 1.0 12 1.0 13 1.0
1?STR_X+1?STR_Z+0.6?WXPOS 15 1.0
LOAD COMB 544 _: *
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 0.6 11 1.0 12 1.0 13 1.0 ** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7)LO + 1.0(0.7)LSC +
14 0.6 0.6(1.0)Ts +
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?T1+1?STR_Y ** 0.6(1.0)W(z) + 1.0STR(y) + 1.0STR(x) + 1.0STR(z)
+1?STR_X+1?STR_Z+0.6?WXPOS *1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+0.6?T1+1?STR_Y+
LOAD COMB 545 _: 1?STR_X+1?STR_Z+0.6?WZPOS
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 1.0 11 1.0 12 1.0 13 1.0 LOAD COMB 562 _:
14 0.6 1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 0.6 11 1.0 12 1.0 13 1.0
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+0.6?T1+1?STR 16 0.6
_Y+1?STR_X+1?STR_Z+1?WXPOS *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?T1+1?STR_Y
LOAD COMB 546 _: +1?STR_X+1?STR_Z+0.6?WZPOS
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 0.6 11 1.0 12 1.0 13 1.0 LOAD COMB 563 _:
14 1.0 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 1.0 11 1.0 12 1.0 13 1.0
*1?SD+1?F+1?CM+1?PA+1?LO+1?LSC- 16 0.6
0.6?T1+1?STR_Y+1?STR_X+1?STR_Z+0.6?WXPOS *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+0.6?T1+1?STR
LOAD COMB 547 _: _Y+1?STR_X+1?STR_Z+1?WZPOS
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 -0.6 11 1.0 12 1.0 13 1.0 LOAD COMB 564 _:
14 0.6 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 0.6 11 1.0 12 1.0 13 1.0
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC- 16 1.0
1?T1+1?STR_Y+1?STR_X+1?STR_Z+0.6?WXPOS *1?SD+1?F+1?CM+1?PA+1?LO+1?LSC-
LOAD COMB 548 _: 0.6?T1+1?STR_Y+1?STR_X+1?STR_Z+0.6?WZPOS
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -1.0 11 1.0 12 1.0 13 1.0 LOAD COMB 565 _:
14 0.6 1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 -0.6 11 1.0 12 1.0 13 1.0
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC- 16 0.6
0.6?T1+1?STR_Y+1?STR_X+1?STR_Z+1?WXPOS *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC-
LOAD COMB 549 _: 1?T1+1?STR_Y+1?STR_X+1?STR_Z+0.6?WZPOS
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -0.6 11 1.0 12 1.0 13 1.0 LOAD COMB 566 _:
14 1.0 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -1.0 11 1.0 12 1.0 13 1.0
* 16 0.6
** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7)LO + 1.0(0.7)LSC + *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC-
0.6(1.0)Ts + 0.6?T1+1?STR_Y+1?STR_X+1?STR_Z+1?WZPOS
** 0.6(1.0)W(-x) + 1.0STR(y) + 1.0STR(x) + 1.0STR(z) LOAD COMB 567 _:
*1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+0.6?T1+1?STR_Y+ 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -0.6 11 1.0 12 1.0 13 1.0
1?STR_X+1?STR_Z+0.6?WXNEG 16 1.0
LOAD COMB 553 _: *
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 0.6 11 1.0 12 1.0 13 1.0 ** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7)LO + 1.0(0.7)LSC +
15 0.6 0.6(1.0)Ts +
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?T1+1?STR_Y ** 0.6(1.0)W(-z) + 1.0STR(y) + 1.0STR(x) + 1.0STR(z)
+1?STR_X+1?STR_Z+0.6?WXNEG *1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+0.6?T1+1?STR_Y+
LOAD COMB 554 _: 1?STR_X+1?STR_Z+0.6?WZNEG
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 1.0 11 1.0 12 1.0 13 1.0 LOAD COMB 571 _:
15 0.6 1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 0.6 11 1.0 12 1.0 13 1.0
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+0.6?T1+1?STR 17 0.6
_Y+1?STR_X+1?STR_Z+1?WXNEG *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?T1+1?STR_Y
LOAD COMB 555 _: +1?STR_X+1?STR_Z+0.6?WZNEG
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 0.6 11 1.0 12 1.0 13 1.0 LOAD COMB 572 _:
15 1.0 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 1.0 11 1.0 12 1.0 13 1.0
*1?SD+1?F+1?CM+1?PA+1?LO+1?LSC- 17 0.6
0.6?T1+1?STR_Y+1?STR_X+1?STR_Z+0.6?WXNEG *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+0.6?T1+1?STR
LOAD COMB 556 _: _Y+1?STR_X+1?STR_Z+1?WZNEG
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 -0.6 11 1.0 12 1.0 13 1.0 LOAD COMB 573 _:
15 0.6 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 0.6 11 1.0 12 1.0 13 1.0
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC- 17 1.0
1?T1+1?STR_Y+1?STR_X+1?STR_Z+0.6?WXNEG *1?SD+1?F+1?CM+1?PA+1?LO+1?LSC-
LOAD COMB 557 _: 0.6?T1+1?STR_Y+1?STR_X+1?STR_Z+0.6?WZNEG
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -1.0 11 1.0 12 1.0 13 1.0 LOAD COMB 574 _:
15 0.6
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 326 de 463
(SUBJECT) (Page)

1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 -0.6 11 1.0 12 1.0 13 1.0 LOAD COMB 591 _:
17 0.6 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 0.6 11 1.0 12 1.0 13 -1.0
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC- 15 1.0
1?T1+1?STR_Y+1?STR_X+1?STR_Z+0.6?WZNEG *1?SD+1?F+1?CM+1?PA+1?LO+1?LSC-
LOAD COMB 575 _: 0.6?T1+1?STR_Y+1?STR_X-1?STR_Z+0.6?WXNEG
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -1.0 11 1.0 12 1.0 13 1.0 LOAD COMB 592 _:
17 0.6 1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 -0.6 11 1.0 12 1.0 13 -1.0
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC- 15 0.6
0.6?T1+1?STR_Y+1?STR_X+1?STR_Z+1?WZNEG *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC-
LOAD COMB 576 _: 1?T1+1?STR_Y+1?STR_X-1?STR_Z+0.6?WXNEG
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -0.6 11 1.0 12 1.0 13 1.0 LOAD COMB 593 _:
17 1.0 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -1.0 11 1.0 12 1.0 13 -1.0
* 15 0.6
** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7)LO + 1.0(0.7)LSC + *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC-
0.6(1.0)Ts + 0.6?T1+1?STR_Y+1?STR_X-1?STR_Z+1?WXNEG
** 0.6(1.0)W(x) + 1.0STR(y) + 1.0STR(x) - 1.0STR(z) LOAD COMB 594 _:
*1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+0.6?T1+1?STR_Y+ 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -0.6 11 1.0 12 1.0 13 -1.0
1?STR_X-1?STR_Z+0.6?WXPOS 15 1.0
LOAD COMB 580 _: *
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 0.6 11 1.0 12 1.0 13 -1.0 ** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7)LO + 1.0(0.7)LSC +
14 0.6 0.6(1.0)Ts +
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?T1+1?STR_Y ** 0.6(1.0)W(z) + 1.0STR(y) + 1.0STR(x) - 1.0STR(z)
+1?STR_X-1?STR_Z+0.6?WXPOS *1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+0.6?T1+1?STR_Y+
LOAD COMB 581 _: 1?STR_X-1?STR_Z+0.6?WZPOS
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 1.0 11 1.0 12 1.0 13 -1.0 LOAD COMB 598 _:
14 0.6 1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 0.6 11 1.0 12 1.0 13 -1.0
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+0.6?T1+1?STR 16 0.6
_Y+1?STR_X-1?STR_Z+1?WXPOS *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?T1+1?STR_Y
LOAD COMB 582 _: +1?STR_X-1?STR_Z+0.6?WZPOS
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 0.6 11 1.0 12 1.0 13 -1.0 LOAD COMB 599 _:
14 1.0 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 1.0 11 1.0 12 1.0 13 -1.0
*1?SD+1?F+1?CM+1?PA+1?LO+1?LSC- 16 0.6
0.6?T1+1?STR_Y+1?STR_X-1?STR_Z+0.6?WXPOS *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+0.6?T1+1?STR
LOAD COMB 583 _: _Y+1?STR_X-1?STR_Z+1?WZPOS
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 -0.6 11 1.0 12 1.0 13 -1.0 LOAD COMB 600 _:
14 0.6 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 0.6 11 1.0 12 1.0 13 -1.0
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC- 16 1.0
1?T1+1?STR_Y+1?STR_X-1?STR_Z+0.6?WXPOS *1?SD+1?F+1?CM+1?PA+1?LO+1?LSC-
LOAD COMB 584 _: 0.6?T1+1?STR_Y+1?STR_X-1?STR_Z+0.6?WZPOS
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -1.0 11 1.0 12 1.0 13 -1.0 LOAD COMB 601 _:
14 0.6 1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 -0.6 11 1.0 12 1.0 13 -1.0
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC- 16 0.6
0.6?T1+1?STR_Y+1?STR_X-1?STR_Z+1?WXPOS *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC-
LOAD COMB 585 _: 1?T1+1?STR_Y+1?STR_X-1?STR_Z+0.6?WZPOS
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -0.6 11 1.0 12 1.0 13 -1.0 LOAD COMB 602 _:
14 1.0 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -1.0 11 1.0 12 1.0 13 -1.0
* 16 0.6
** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7)LO + 1.0(0.7)LSC + *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC-
0.6(1.0)Ts + 0.6?T1+1?STR_Y+1?STR_X-1?STR_Z+1?WZPOS
** 0.6(1.0)W(-x) + 1.0STR(y) + 1.0STR(x) - 1.0STR(z) LOAD COMB 603 _:
*1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+0.6?T1+1?STR_Y+ 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -0.6 11 1.0 12 1.0 13 -1.0
1?STR_X-1?STR_Z+0.6?WXNEG 16 1.0
LOAD COMB 589 _: *
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 0.6 11 1.0 12 1.0 13 -1.0 ** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7)LO + 1.0(0.7)LSC +
15 0.6 0.6(1.0)Ts +
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?T1+1?STR_Y ** 0.6(1.0)W(-z) + 1.0STR(y) + 1.0STR(x) - 1.0STR(z)
+1?STR_X-1?STR_Z+0.6?WXNEG *1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+0.6?T1+1?STR_Y+
LOAD COMB 590 _: 1?STR_X-1?STR_Z+0.6?WZNEG
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 1.0 11 1.0 12 1.0 13 -1.0 LOAD COMB 607 _:
15 0.6 1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 0.6 11 1.0 12 1.0 13 -1.0
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+0.6?T1+1?STR 17 0.6
_Y+1?STR_X-1?STR_Z+1?WXNEG
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 327 de 463
(SUBJECT) (Page)

*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?T1+1?STR_Y ** 0.6(1.0)W(-x) + 1.0STR(y) - 1.0STR(x) + 1.0STR(z)


+1?STR_X-1?STR_Z+0.6?WZNEG *1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+0.6?T1+1?STR_Y-
LOAD COMB 608 _: 1?STR_X+1?STR_Z+0.6?WXNEG
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 1.0 11 1.0 12 1.0 13 -1.0 LOAD COMB 625 _:
17 0.6 1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 0.6 11 1.0 12 -1.0 13 1.0
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+0.6?T1+1?STR 15 0.6
_Y+1?STR_X-1?STR_Z+1?WZNEG *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?T1+1?STR_Y
LOAD COMB 609 _: -1?STR_X+1?STR_Z+0.6?WXNEG
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 0.6 11 1.0 12 1.0 13 -1.0 LOAD COMB 626 _:
17 1.0 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 1.0 11 1.0 12 -1.0 13 1.0
*1?SD+1?F+1?CM+1?PA+1?LO+1?LSC- 15 0.6
0.6?T1+1?STR_Y+1?STR_X-1?STR_Z+0.6?WZNEG *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+0.6?T1+1?STR
LOAD COMB 610 _: _Y-1?STR_X+1?STR_Z+1?WXNEG
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 -0.6 11 1.0 12 1.0 13 -1.0 LOAD COMB 627 _:
17 0.6 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 0.6 11 1.0 12 -1.0 13 1.0
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC- 15 1.0
1?T1+1?STR_Y+1?STR_X-1?STR_Z+0.6?WZNEG *1?SD+1?F+1?CM+1?PA+1?LO+1?LSC-0.6?T1+1?STR_Y-
LOAD COMB 611 _: 1?STR_X+1?STR_Z+0.6?WXNEG
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -1.0 11 1.0 12 1.0 13 -1.0 LOAD COMB 628 _:
17 0.6 1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 -0.6 11 1.0 12 -1.0 13 1.0
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC- 15 0.6
0.6?T1+1?STR_Y+1?STR_X-1?STR_Z+1?WZNEG *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC-1?T1+1?STR_Y-
LOAD COMB 612 _: 1?STR_X+1?STR_Z+0.6?WXNEG
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -0.6 11 1.0 12 1.0 13 -1.0 LOAD COMB 629 _:
17 1.0 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -1.0 11 1.0 12 -1.0 13 1.0
* 15 0.6
** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7)LO + 1.0(0.7)LSC + *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC-
0.6(1.0)Ts + 0.6?T1+1?STR_Y-1?STR_X+1?STR_Z+1?WXNEG
** 0.6(1.0)W(x) + 1.0STR(y) - 1.0STR(x) + 1.0STR(z) LOAD COMB 630 _:
*1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+0.6?T1+1?STR_Y- 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -0.6 11 1.0 12 -1.0 13 1.0
1?STR_X+1?STR_Z+0.6?WXPOS 15 1.0
LOAD COMB 616 _: *
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 0.6 11 1.0 12 -1.0 13 1.0 ** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7)LO + 1.0(0.7)LSC +
14 0.6 0.6(1.0)Ts +
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?T1+1?STR_Y ** 0.6(1.0)W(z) + 1.0STR(y) - 1.0STR(x) + 1.0STR(z)
-1?STR_X+1?STR_Z+0.6?WXPOS *1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+0.6?T1+1?STR_Y-
LOAD COMB 617 _: 1?STR_X+1?STR_Z+0.6?WZPOS
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 1.0 11 1.0 12 -1.0 13 1.0 LOAD COMB 634 _:
14 0.6 1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 0.6 11 1.0 12 -1.0 13 1.0
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+0.6?T1+1?STR 16 0.6
_Y-1?STR_X+1?STR_Z+1?WXPOS *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?T1+1?STR_Y
LOAD COMB 618 _: -1?STR_X+1?STR_Z+0.6?WZPOS
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 0.6 11 1.0 12 -1.0 13 1.0 LOAD COMB 635 _:
14 1.0 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 1.0 11 1.0 12 -1.0 13 1.0
*1?SD+1?F+1?CM+1?PA+1?LO+1?LSC-0.6?T1+1?STR_Y- 16 0.6
1?STR_X+1?STR_Z+0.6?WXPOS *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+0.6?T1+1?STR
LOAD COMB 619 _: _Y-1?STR_X+1?STR_Z+1?WZPOS
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 -0.6 11 1.0 12 -1.0 13 1.0 LOAD COMB 636 _:
14 0.6 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 0.6 11 1.0 12 -1.0 13 1.0
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC-1?T1+1?STR_Y- 16 1.0
1?STR_X+1?STR_Z+0.6?WXPOS *1?SD+1?F+1?CM+1?PA+1?LO+1?LSC-0.6?T1+1?STR_Y-
LOAD COMB 620 _: 1?STR_X+1?STR_Z+0.6?WZPOS
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -1.0 11 1.0 12 -1.0 13 1.0 LOAD COMB 637 _:
14 0.6 1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 -0.6 11 1.0 12 -1.0 13 1.0
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC- 16 0.6
0.6?T1+1?STR_Y-1?STR_X+1?STR_Z+1?WXPOS *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC-1?T1+1?STR_Y-
LOAD COMB 621 _: 1?STR_X+1?STR_Z+0.6?WZPOS
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -0.6 11 1.0 12 -1.0 13 1.0 LOAD COMB 638 _:
14 1.0 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -1.0 11 1.0 12 -1.0 13 1.0
* 16 0.6
** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7)LO + 1.0(0.7)LSC + *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC-
0.6(1.0)Ts + 0.6?T1+1?STR_Y-1?STR_X+1?STR_Z+1?WZPOS
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 328 de 463
(SUBJECT) (Page)

LOAD COMB 639 _: *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC-1?T1+1?STR_Y-


1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -0.6 11 1.0 12 -1.0 13 1.0 1?STR_X-1?STR_Z+0.6?WXPOS
16 1.0 LOAD COMB 656 _:
* 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -1.0 11 1.0 12 -1.0 13 -
** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7)LO + 1.0(0.7)LSC + 1.0 14 0.6
0.6(1.0)Ts + *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC-
** 0.6(1.0)W(-z) + 1.0STR(y) - 1.0STR(x) + 1.0STR(z) 0.6?T1+1?STR_Y-1?STR_X-1?STR_Z+1?WXPOS
*1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+0.6?T1+1?STR_Y- LOAD COMB 657 _:
1?STR_X+1?STR_Z+0.6?WZNEG 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -0.6 11 1.0 12 -1.0 13 -
LOAD COMB 643 _: 1.0 14 1.0
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 0.6 11 1.0 12 -1.0 13 1.0 *
17 0.6 ** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7)LO + 1.0(0.7)LSC +
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?T1+1?STR_Y 0.6(1.0)Ts +
-1?STR_X+1?STR_Z+0.6?WZNEG ** 0.6(1.0)W(-x) + 1.0STR(y) - 1.0STR(x) - 1.0STR(z)
LOAD COMB 644 _: *1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+0.6?T1+1?STR_Y-
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 1.0 11 1.0 12 -1.0 13 1.0 1?STR_X-1?STR_Z+0.6?WXNEG
17 0.6 LOAD COMB 661 _:
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+0.6?T1+1?STR 1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 0.6 11 1.0 12 -1.0 13 -1.0
_Y-1?STR_X+1?STR_Z+1?WZNEG 15 0.6
LOAD COMB 645 _: *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?T1+1?STR_Y
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 0.6 11 1.0 12 -1.0 13 1.0 -1?STR_X-1?STR_Z+0.6?WXNEG
17 1.0 LOAD COMB 662 _:
*1?SD+1?F+1?CM+1?PA+1?LO+1?LSC-0.6?T1+1?STR_Y- 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 1.0 11 1.0 12 -1.0 13 -1.0
1?STR_X+1?STR_Z+0.6?WZNEG 15 0.6
LOAD COMB 646 _: *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+0.6?T1+1?STR
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 -0.6 11 1.0 12 -1.0 13 1.0 _Y-1?STR_X-1?STR_Z+1?WXNEG
17 0.6 LOAD COMB 663 _:
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC-1?T1+1?STR_Y- 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 0.6 11 1.0 12 -1.0 13 -1.0
1?STR_X+1?STR_Z+0.6?WZNEG 15 1.0
LOAD COMB 647 _: *1?SD+1?F+1?CM+1?PA+1?LO+1?LSC-0.6?T1+1?STR_Y-
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -1.0 11 1.0 12 -1.0 13 1.0 1?STR_X-1?STR_Z+0.6?WXNEG
17 0.6 LOAD COMB 664 _:
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC- 1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 -0.6 11 1.0 12 -1.0 13 -
0.6?T1+1?STR_Y-1?STR_X+1?STR_Z+1?WZNEG 1.0 15 0.6
LOAD COMB 648 _: *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC-1?T1+1?STR_Y-
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -0.6 11 1.0 12 -1.0 13 1.0 1?STR_X-1?STR_Z+0.6?WXNEG
17 1.0 LOAD COMB 665 _:
* 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -1.0 11 1.0 12 -1.0 13 -
** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7)LO + 1.0(0.7)LSC + 1.0 15 0.6
0.6(1.0)Ts + *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC-
** 0.6(1.0)W(x) + 1.0STR(y) - 1.0STR(x) - 1.0STR(z) 0.6?T1+1?STR_Y-1?STR_X-1?STR_Z+1?WXNEG
*1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+0.6?T1+1?STR_Y- LOAD COMB 666 _:
1?STR_X-1?STR_Z+0.6?WXPOS 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -0.6 11 1.0 12 -1.0 13 -
LOAD COMB 652 _: 1.0 15 1.0
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 0.6 11 1.0 12 -1.0 13 -1.0 *
14 0.6 ** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7)LO + 1.0(0.7)LSC +
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?T1+1?STR_Y 0.6(1.0)Ts +
-1?STR_X-1?STR_Z+0.6?WXPOS ** 0.6(1.0)W(z) + 1.0STR(y) - 1.0STR(x) - 1.0STR(z)
LOAD COMB 653 _: *1?SD+1?F+1?CM+1?PA+1?LO+1?LSC+0.6?T1+1?STR_Y-
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 1.0 11 1.0 12 -1.0 13 -1.0 1?STR_X-1?STR_Z+0.6?WZPOS
14 0.6 LOAD COMB 670 _:
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+0.6?T1+1?STR 1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 0.6 11 1.0 12 -1.0 13 -1.0
_Y-1?STR_X-1?STR_Z+1?WXPOS 16 0.6
LOAD COMB 654 _: *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+1?T1+1?STR_Y
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 0.6 11 1.0 12 -1.0 13 -1.0 -1?STR_X-1?STR_Z+0.6?WZPOS
14 1.0 LOAD COMB 671 _:
*1?SD+1?F+1?CM+1?PA+1?LO+1?LSC-0.6?T1+1?STR_Y- 1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 1.0 11 1.0 12 -1.0 13 -1.0
1?STR_X-1?STR_Z+0.6?WXPOS 16 0.6
LOAD COMB 655 _: *1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC+0.6?T1+1?STR
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 -0.6 11 1.0 12 -1.0 13 - _Y-1?STR_X-1?STR_Z+1?WZPOS
1.0 14 0.6 LOAD COMB 672 _:
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 329 de 463
(SUBJECT) (Page)

1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 0.6 11 1.0 12 -1.0 13 -1.0 *1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y+1?ST
16 1.0 R_X+1?STR_Z-1?EX+0.3?EZ
*1?SD+1?F+1?CM+1?PA+1?LO+1?LSC-0.6?T1+1?STR_Y- LOAD COMB 690 _:
1?STR_X-1?STR_Z+0.6?WZPOS 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 1.0 18 -1.0
LOAD COMB 673 _: 19 0.3
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 -0.6 11 1.0 12 -1.0 13 - *1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y+1?ST
1.0 16 0.6 R_X+1?STR_Z-1?EX-0.3?EZ
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC-1?T1+1?STR_Y- LOAD COMB 691 _:
1?STR_X-1?STR_Z+0.6?WZPOS 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 1.0 18 -1.0
LOAD COMB 674 _: 19 -0.3
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -1.0 11 1.0 12 -1.0 13 - *
1.0 16 0.6 *1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y+1?ST
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC- R_X+1?STR_Z+0.3?EX+1?EZ
0.6?T1+1?STR_Y-1?STR_X-1?STR_Z+1?WZPOS LOAD COMB 692 _:
LOAD COMB 675 _: 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 1.0 18 0.3
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -0.6 11 1.0 12 -1.0 13 - 19 1.0
1.0 16 1.0 *1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y+1?ST
* R_X+1?STR_Z+0.3?EX-1?EZ
** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7)LO + 1.0(0.7)LSC + LOAD COMB 693 _:
0.6(1.0)Ts + 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 1.0 18 0.3
** 0.6(1.0)W(-z) + 1.0STR(y) - 1.0STR(x) - 1.0STR(z) 19 -1.0
*1?SD+1?PA+1?LO+1?LSC+0.6?T1+1?STR_Y-1?STR_X- *1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y+1?ST
1?STR_Z+0.6?WZNEG R_X+1?STR_Z-0.3?EX+1?EZ
LOAD COMB 679 _: LOAD COMB 694 _:
1 1.0 4 1.0 6 1.0 8 1.0 10 0.6 11 1.0 12 -1.0 13 -1.0 17 0.6 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 1.0 18 -0.3
*1?SD+1?PA+0.7?LO+0.7?LSC+1?T1+1?STR_Y-1?STR_X- 19 1.0
1?STR_Z+0.6?WZNEG *1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y+1?ST
LOAD COMB 680 _: R_X+1?STR_Z-0.3?EX-1?EZ
1 1.0 4 1.0 6 0.7 8 0.7 10 1.0 11 1.0 12 -1.0 13 -1.0 17 0.6 LOAD COMB 695 _:
*1?SD+1?PA+0.7?LO+0.7?LSC+0.6?T1+1?STR_Y- 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 1.0 18 -0.3
1?STR_X-1?STR_Z+1?WZNEG 19 -1.0
LOAD COMB 681 _: *
1 1.0 4 1.0 6 0.7 8 0.7 10 0.6 11 1.0 12 -1.0 13 -1.0 17 1.0 ** 1.0 SD. + 1.0CM + 1.0PA + 0.6(0.7)LO + 0.3(0.7)LSC +
*1?SD+1?F+1?CM+1?PA+1?LO+1?LSC-0.6?T1+1?STR_Y- 1.0(0.3)E(x) +
1?STR_X-1?STR_Z+0.6?WZNEG ** 0.3(1.0)E(z)+ 1.0STR(y) + 1.0STR(x) - 1.0STR(z)
LOAD COMB 682 _: *1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y+1?ST
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 8 1.0 10 -0.6 11 1.0 12 -1.0 13 - R_X-1?STR_Z+1?EX+0.3?EZ
1.0 17 0.6 LOAD COMB 696 _:
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC-1?T1+1?STR_Y- 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 -1.0 18 1.0
1?STR_X-1?STR_Z+0.6?WZNEG 19 0.3
LOAD COMB 683 _: *1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y+1?ST
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -1.0 11 1.0 12 -1.0 13 - R_X-1?STR_Z+1?EX-0.3?EZ
1.0 17 0.6 LOAD COMB 697 _:
*1?SD+1?F+1?CM+1?PA+0.7?LO+0.7?LSC- 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 -1.0 18 1.0
0.6?T1+1?STR_Y-1?STR_X-1?STR_Z+1?WZNEG 19 -0.3
LOAD COMB 684 _: *1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y+1?ST
1 1.0 2 1.0 3 1.0 4 1.0 6 0.7 8 0.7 10 -0.6 11 1.0 12 -1.0 13 - R_X-1?STR_Z-1?EX+0.3?EZ
1.0 17 1.0 LOAD COMB 698 _:
* 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 -1.0 18 -1.0
** 1.0 SD. + 1.0CM + 1.0PA + 0.6(0.7)LO + 0.3(0.7)LSC + 19 0.3
1.0(0.3)E(x) + *1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y+1?ST
** 0.3(1.0)E(z)+ 1.0STR(y) + 1.0STR(x) + 1.0STR(z) R_X-1?STR_Z-1?EX-0.3?EZ
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y+1?ST LOAD COMB 699 _:
R_X+1?STR_Z+1?EX+0.3?EZ 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 -1.0 18 -1.0
LOAD COMB 688 _: 19 -0.3
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 1.0 18 1.0 *
19 0.3 *1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y+1?ST
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y+1?ST R_X-1?STR_Z+0.3?EX+1?EZ
R_X+1?STR_Z+1?EX-0.3?EZ LOAD COMB 700 _:
LOAD COMB 689 _: 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 -1.0 18 0.3
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 1.0 18 1.0 19 1.0
19 -0.3
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 330 de 463
(SUBJECT) (Page)

*1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y+1?ST ** 1.0 SD. + 1.0CM + 1.0PA + 0.6(0.7)LO + 0.3(0.7)LSC +


R_X-1?STR_Z+0.3?EX-1?EZ 1.0(0.3)E(x) +
LOAD COMB 701 _: ** 0.3(1.0)E(z)+ 1.0STR(y) - 1.0STR(x) - 1.0STR(z)
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 -1.0 18 0.3 *1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y-
19 -1.0 1?STR_X-1?STR_Z+1?EX+0.3?EZ
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y+1?ST LOAD COMB 712 _:
R_X-1?STR_Z-0.3?EX+1?EZ 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 -1.0 18 1.0
LOAD COMB 702 _: 19 0.3
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 -1.0 18 -0.3 *1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y-
19 1.0 1?STR_X-1?STR_Z+1?EX-0.3?EZ
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y+1?ST LOAD COMB 713 _:
R_X-1?STR_Z-0.3?EX-1?EZ 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 -1.0 18 1.0
LOAD COMB 703 _: 19 -0.3
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 1.0 13 -1.0 18 -0.3 *1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y-
19 -1.0 1?STR_X-1?STR_Z-1?EX+0.3?EZ
* LOAD COMB 714 _:
** 1.0 SD. + 1.0CM + 1.0PA + 0.6(0.7)LO + 0.3(0.7)LSC + 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 -1.0 18 -
1.0(0.3)E(x) + 1.0 19 0.3
** 0.3(1.0)E(z)+ 1.0STR(y) - 1.0STR(x) + 1.0STR(z) *1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y-
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y- 1?STR_X-1?STR_Z-1?EX-0.3?EZ
1?STR_X+1?STR_Z+1?EX+0.3?EZ+1?PS_1 LOAD COMB 715 _:
LOAD COMB 704 _: 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 -1.0 18 -
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 1.0 18 1.0 1.0 19 -0.3
19 0.3 *
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y- *1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y-
1?STR_X+1?STR_Z+1?EX-0.3?EZ 1?STR_X-1?STR_Z+0.3?EX+1?EZ
LOAD COMB 705 _: LOAD COMB 716 _:
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 1.0 18 1.0 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 -1.0 18 0.3
19 -0.3 19 1.0
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y- *1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y-
1?STR_X+1?STR_Z-1?EX+0.3?EZ 1?STR_X-1?STR_Z+0.3?EX-1?EZ
LOAD COMB 706 _: LOAD COMB 717 _:
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 1.0 18 -1.0 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 -1.0 18 0.3
19 0.3 19 -1.0
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y- *1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y-
1?STR_X+1?STR_Z-1?EX-0.3?EZ 1?STR_X-1?STR_Z-0.3?EX+1?EZ
LOAD COMB 707 _: LOAD COMB 718 _:
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 1.0 18 -1.0 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 -1.0 18 -
19 -0.3 0.3 19 1.0
* *1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y-
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y- 1?STR_X-1?STR_Z-0.3?EX-1?EZ
1?STR_X+1?STR_Z+0.3?EX+1?EZ LOAD COMB 719 _:
LOAD COMB 708 _: 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 -1.0 18 -
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 1.0 18 0.3 0.3 19 -1.0
19 1.0 *
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y- **** MAINTENANCE CASES *****
1?STR_X+1?STR_Z+0.3?EX-1?EZ **** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7) LM + 1.0(0.7) LSC+
LOAD COMB 709 _: 0.6(1.0) Ts +
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 1.0 18 0.3 ** 1.0STR(y) + 1.0STR(x) + 1.0STR(z)
19 -1.0 *1?SD+1?F+1?CM+1?PA+1?LM+1?LSC+0.6?T1+1?STR_Y+
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y- 1?STR_X+1?STR_Z
1?STR_X+1?STR_Z-0.3?EX+1?EZ LOAD COMB 760 _:
LOAD COMB 710 _: 1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 0.6 11 1.0 12 1.0 13 1.0
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 1.0 18 -0.3 *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+1?T1+1?STR_Y
19 1.0 +1?STR_X+1?STR_Z
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.3?LSC+1?STR_Y- LOAD COMB 761 _:
1?STR_X+1?STR_Z-0.3?EX-1?EZ 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 1.0 11 1.0 12 1.0 13 1.0
LOAD COMB 711 _: *1?SD+1?F+1?CM+1?PA+1.0?LM+1.0?LSC+0.6?T1+1?STR
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.3 11 1.0 12 -1.0 13 1.0 18 -0.3 _Y-1?STR_X-1?STR_Z
19 -1.0 LOAD COMB 762 _:
* 1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 0.6 11 1.0 12 -1.0 13 -1.0
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 331 de 463
(SUBJECT) (Page)

*1?SD+1?F+1?CM+1?PA+1?LM+1?LSC+0.6?T1+1?STR_Y+ *1?SD+1?F+1?CM+1?PA+1?LM+1?LSC+0.6?T1+1?STR_Y+
1?STR_X-1?STR_Z 1?STR_X+1?STR_Z+0.198?WXPOS
LOAD COMB 763 _: LOAD COMB 855 _:
1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 0.6 11 1.0 12 1.0 13 -1.0 1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 0.6 11 1.0 12 1.0 13 1.0
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+1?T1+1?STR_Y 14 0.198
+1?STR_X-1?STR_Z *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+1?T1+1?STR_Y
LOAD COMB 764 _: +1?STR_X+1?STR_Z+0.198?WXPOS
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 1.0 11 1.0 12 1.0 13 -1.0 LOAD COMB 856 _:
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+1.0?T1+1?STR 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 1.0 11 1.0 12 1.0 13 1.0
_Y-1?STR_X-1?STR_Z 14 0.198
LOAD COMB 765 _: *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+0.6?T1+1?STR
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 1.0 11 1.0 12 -1.0 13 -1.0 _Y+1?STR_X+1?STR_Z+0.33?WXPOS
*1?SD+1?F+1?CM+1?PA+1?LM+1?LSC+0.6?T1+1?STR_Y- LOAD COMB 857 _:
1?STR_X+1?STR_Z 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 0.6 11 1.0 12 1.0 13 1.0
LOAD COMB 766 _: 14 0.33
1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 0.6 11 1.0 12 -1.0 13 1.0 *1?SD+1?F+1?CM+1?PA+1?LM+1?LSC-
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+1?T1+1?STR_Y 0.6?T1+1?STR_Y+1?STR_X+1?STR_Z+0.198?WXPOS
-1?STR_X+1?STR_Z LOAD COMB 858 _:
LOAD COMB 767 _: 1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 -0.6 11 1.0 12 1.0 13 1.0
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 1.0 11 1.0 12 -1.0 13 1.0 14 0.198
* *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC-
**** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7) LM + 1.0(0.7) LSC - 1?T1+1?STR_Y+1?STR_X+1?STR_Z+0.198?WXPOS
**** 0.6(1.0) Ts + 1.0STR(y) + 1.0STR(x) + 1.0STR(z) LOAD COMB 859 _:
*1?SD+1?F+1?CM+1?PA+1?LM+1?LSC- 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -1.0 11 1.0 12 1.0 13 1.0
0.6?T1+1?STR_Y+1?STR_X+1?STR_Z 14 0.198
LOAD COMB 769 _: *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 -0.6 11 1.0 12 1.0 13 1.0 0.6?T1+1?STR_Y+1?STR_X+1?STR_Z+0.33?WXPOS
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC- LOAD COMB 860 _:
1?T1+1?STR_Y+1?STR_X+1?STR_Z 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -0.6 11 1.0 12 1.0 13 1.0
LOAD COMB 770 _: 14 0.33
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -1.0 11 1.0 12 1.0 13 1.0 *
*1?SD+1?F+1?CM+1?PA+1?LM+1?LSC- **** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7) LM + 1.0(0.7) LSC+ +
0.6?T1+1?STR_Y+1?STR_X-1?STR_Z 0.6(1.0) Ts+
LOAD COMB 772 _: **** 0.2(0.33) W(-x) + 1.0STR(y) + 1.0STR(x) + 1.0STR(z)
1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 -0.6 11 1.0 12 1.0 13 -1.0 *1?SD+1?F+1?CM+1?PA+1?LM+1?LSC+0.6?T1+1?STR_Y+
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC- 1?STR_X+1?STR_Z+0.198?WXNEG
1?T1+1?STR_Y+1?STR_X-1?STR_Z LOAD COMB 864 _:
LOAD COMB 774 _: 1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 0.6 11 1.0 12 1.0 13 1.0
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -1.0 11 1.0 12 1.0 13 -1.0 15 0.198
*1?SD+1?F+1?CM+1?PA+1?LM+1?LSC-0.6?T1+1?STR_Y- *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+1?T1+1?STR_Y
1?STR_X+1?STR_Z +1?STR_X+1?STR_Z+0.198?WXNEG
LOAD COMB 776 _: LOAD COMB 865 _:
1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 -0.6 11 1.0 12 -1.0 13 1.0 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 1.0 11 1.0 12 1.0 13 1.0
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC-1?T1+1?STR_Y- 15 0.198
1?STR_X+1?STR_Z *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+0.6?T1+1?STR
LOAD COMB 777 _: _Y+1?STR_X+1?STR_Z+0.33?WXNEG
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -1.0 11 1.0 12 -1.0 13 1.0 LOAD COMB 866 _:
*1?SD+1?F+1?CM+1?PA+1?LM+1?LSC-0.6?T1+1?STR_Y- 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 0.6 11 1.0 12 1.0 13 1.0
1?STR_X-1?STR_Z 15 0.33
LOAD COMB 778 _: *1?SD+1?F+1?CM+1?PA+1?LM+1?LSC-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 -0.6 11 1.0 12 -1.0 13 - 0.6?T1+1?STR_Y+1?STR_X+1?STR_Z+0.198?WXNEG
1.0 LOAD COMB 867 _:
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC-1?T1+1?STR_Y- 1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 -0.6 11 1.0 12 1.0 13 1.0
1?STR_X-1?STR_Z 15 0.198
LOAD COMB 779 _: *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC-
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -1.0 11 1.0 12 -1.0 13 - 1?T1+1?STR_Y+1?STR_X+1?STR_Z+0.198?WXNEG
1.0 LOAD COMB 868 _:
* 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -1.0 11 1.0 12 1.0 13 1.0
**** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7) LM + 1.0(0.7) LSC+ + 15 0.198
0.6(1.0) Ts+ *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC-
**** 0.2(0.33) W(x) + 1.0STR(y) + 1.0STR(x) + 1.0STR(z) 0.6?T1+1?STR_Y+1?STR_X+1?STR_Z+0.33?WXNEG
LOAD COMB 869 _:
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 332 de 463
(SUBJECT) (Page)

1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -0.6 11 1.0 12 1.0 13 1.0 LOAD COMB 886 _:
15 0.33 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -1.0 11 1.0 12 1.0 13 1.0
* 17 0.198
**** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7) LM + 1.0(0.7) LSC+ + *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC-
0.6(1.0) Ts+ 0.6?T1+1?STR_Y+1?STR_X+1?STR_Z+0.33?WZNEG
**** 0.2(0.33) W(z) + 1.0STR(y) + 1.0STR(x) + 1.0STR(z) LOAD COMB 887 _:
*1?SD+1?F+1?CM+1?PA+1?LM+1?LSC+0.6?T1+1?STR_Y+ 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -0.6 11 1.0 12 1.0 13 1.0
1?STR_X+1?STR_Z+0.198?WZPOS 17 0.33
LOAD COMB 873 _: *
1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 0.6 11 1.0 12 1.0 13 1.0 **** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7) LM + 1.0(0.7) LSC+ +
16 0.198 0.6(1.0) Ts+
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+1?T1+1?STR_Y **** 0.2(0.33) W(x) + 1.0STR(y) + 1.0STR(x) - 1.0STR(z)
+1?STR_X+1?STR_Z+0.198?WZPOS *1?SD+1?F+1?CM+1?PA+1?LM+1?LSC+0.6?T1+1?STR_Y+
LOAD COMB 874 _: 1?STR_X-1?STR_Z+0.198?WXPOS
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 1.0 11 1.0 12 1.0 13 1.0 LOAD COMB 891 _:
16 0.198 1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 0.6 11 1.0 12 1.0 13 -1.0
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+0.6?T1+1?STR 14 0.198
_Y+1?STR_X+1?STR_Z+0.33?WZPOS *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+1?T1+1?STR_Y
LOAD COMB 875 _: +1?STR_X-1?STR_Z+0.198?WXPOS
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 0.6 11 1.0 12 1.0 13 1.0 LOAD COMB 892 _:
16 0.33 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 1.0 11 1.0 12 1.0 13 -1.0
*1?SD+1?F+1?CM+1?PA+1?LM+1?LSC- 14 0.198
0.6?T1+1?STR_Y+1?STR_X+1?STR_Z+0.198?WZPOS *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+0.6?T1+1?STR
LOAD COMB 876 _: _Y+1?STR_X-1?STR_Z+0.33?WXPOS
1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 -0.6 11 1.0 12 1.0 13 1.0 LOAD COMB 893 _:
16 0.198 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 0.6 11 1.0 12 1.0 13 -1.0
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC- 14 0.33
1?T1+1?STR_Y+1?STR_X+1?STR_Z+0.198?WZPOS *1?SD+1?F+1?CM+1?PA+1?LM+1?LSC-
LOAD COMB 877 _: 0.6?T1+1?STR_Y+1?STR_X-1?STR_Z+0.198?WXPOS
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -1.0 11 1.0 12 1.0 13 1.0 LOAD COMB 894 _:
16 0.198 1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 -0.6 11 1.0 12 1.0 13 -1.0
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC- 14 0.198
0.6?T1+1?STR_Y+1?STR_X+1?STR_Z+0.33?WZPOS *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC-
LOAD COMB 878 _: 1?T1+1?STR_Y+1?STR_X-1?STR_Z+0.198?WXPOS
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -0.6 11 1.0 12 1.0 13 1.0 LOAD COMB 895 _:
16 0.33 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -1.0 11 1.0 12 1.0 13 -1.0
* 14 0.198
**** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7) LM + 1.0(0.7) LSC+ + *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC-
0.6(1.0) Ts+ 0.6?T1+1?STR_Y+1?STR_X-1?STR_Z+0.33?WXPOS
**** 0.2(0.33) W(-z) + 1.0STR(y) + 1.0STR(x) + 1.0STR(z) LOAD COMB 896 _:
*1?SD+1?F+1?CM+1?PA+1?LM+1?LSC+0.6?T1+1?STR_Y+ 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -0.6 11 1.0 12 1.0 13 -1.0
1?STR_X+1?STR_Z+0.198?WZNEG 14 0.33
LOAD COMB 882 _: *
1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 0.6 11 1.0 12 1.0 13 1.0 **** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7) LM + 1.0(0.7) LSC+ +
17 0.198 0.6(1.0) Ts+
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+1?T1+1?STR_Y **** 0.2(0.33) W(-x) + 1.0STR(y) + 1.0STR(x) - 1.0STR(z)
+1?STR_X+1?STR_Z+0.198?WZNEG *1?SD+1?F+1?CM+1?PA+1?LM+1?LSC+0.6?T1+1?STR_Y+
LOAD COMB 883 _: 1?STR_X-1?STR_Z+0.198?WXNEG
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 1.0 11 1.0 12 1.0 13 1.0 LOAD COMB 900 _:
17 0.198 1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 0.6 11 1.0 12 1.0 13 -1.0
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+0.6?T1+1?STR 15 0.198
_Y+1?STR_X+1?STR_Z+0.33?WZNEG *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+1?T1+1?STR_Y
LOAD COMB 884 _: +1?STR_X-1?STR_Z+0.198?WXNEG
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 0.6 11 1.0 12 1.0 13 1.0 LOAD COMB 901 _:
17 0.33 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 1.0 11 1.0 12 1.0 13 -1.0
*1?SD+1?F+1?CM+1?PA+1?LM+1?LSC- 15 0.198
0.6?T1+1?STR_Y+1?STR_X+1?STR_Z+0.198?WZNEG *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+0.6?T1+1?STR
LOAD COMB 885 _: _Y+1?STR_X-1?STR_Z+0.33?WXNEG
1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 -0.6 11 1.0 12 1.0 13 1.0 LOAD COMB 902 _:
17 0.198 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 0.6 11 1.0 12 1.0 13 -1.0
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC- 15 0.33
1?T1+1?STR_Y+1?STR_X+1?STR_Z+0.198?WZNEG
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 333 de 463
(SUBJECT) (Page)

*1?SD+1?F+1?CM+1?PA+1?LM+1?LSC- 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 1.0 11 1.0 12 1.0 13 -1.0
0.6?T1+1?STR_Y+1?STR_X-1?STR_Z+0.198?WXNEG 17 0.198
LOAD COMB 903 _: *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+0.6?T1+1?STR
1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 -0.6 11 1.0 12 1.0 13 -1.0 _Y+1?STR_X-1?STR_Z+0.33?WZNEG
15 0.198 LOAD COMB 920 _:
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC- 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 0.6 11 1.0 12 1.0 13 -1.0
1?T1+1?STR_Y+1?STR_X-1?STR_Z+0.198?WXNEG 17 0.33
LOAD COMB 904 _: *1?SD+1?F+1?CM+1?PA+1?LM+1?LSC-
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -1.0 11 1.0 12 1.0 13 -1.0 0.6?T1+1?STR_Y+1?STR_X-1?STR_Z+0.198?WZNEG
15 0.198 LOAD COMB 921 _:
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC- 1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 -0.6 11 1.0 12 1.0 13 -1.0
0.6?T1+1?STR_Y+1?STR_X-1?STR_Z+0.33?WXNEG 17 0.198
LOAD COMB 905 _: *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC-
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -0.6 11 1.0 12 1.0 13 -1.0 1?T1+1?STR_Y+1?STR_X-1?STR_Z+0.198?WZNEG
15 0.33 LOAD COMB 922 _:
* 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -1.0 11 1.0 12 1.0 13 -1.0
**** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7) LM + 1.0(0.7) LSC+ + 17 0.198
0.6(1.0) Ts+ *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC-
**** 0.2(0.33) W(z) + 1.0STR(y) + 1.0STR(x) - 1.0STR(z) 0.6?T1+1?STR_Y+1?STR_X-1?STR_Z+0.33?WZNEG
*1?SD+1?F+1?CM+1?PA+1?LM+1?LSC+0.6?T1+1?STR_Y+ LOAD COMB 923 _:
1?STR_X-1?STR_Z+0.198?WZPOS 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -0.6 11 1.0 12 1.0 13 -1.0
LOAD COMB 909 _: 17 0.33
1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 0.6 11 1.0 12 1.0 13 -1.0 *
16 0.198 **** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7) LM + 1.0(0.7) LSC+ +
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+1?T1+1?STR_Y 0.6(1.0) Ts+
+1?STR_X-1?STR_Z+0.198?WZPOS **** 0.2(0.33) W(x) + 1.0STR(y) - 1.0STR(x) + 1.0STR(z)
LOAD COMB 910 _: *1?SD+1?F+1?CM+1?PA+1?LM+1?LSC+0.6?T1+1?STR_Y-
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 1.0 11 1.0 12 1.0 13 -1.0 1?STR_X+1?STR_Z+0.198?WXPOS
16 0.198 LOAD COMB 927 _:
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+0.6?T1+1?STR 1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 0.6 11 1.0 12 -1.0 13 1.0
_Y+1?STR_X-1?STR_Z+0.33?WZPOS 14 0.198
LOAD COMB 911 _: *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+1?T1+1?STR_Y
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 0.6 11 1.0 12 1.0 13 -1.0 -1?STR_X+1?STR_Z+0.198?WXPOS
16 0.33 LOAD COMB 928 _:
*1?SD+1?F+1?CM+1?PA+1?LM+1?LSC- 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 1.0 11 1.0 12 -1.0 13 1.0
0.6?T1+1?STR_Y+1?STR_X-1?STR_Z+0.198?WZPOS 14 0.198
LOAD COMB 912 _: *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+0.6?T1+1?STR
1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 -0.6 11 1.0 12 1.0 13 -1.0 _Y-1?STR_X+1?STR_Z+0.33?WXPOS
16 0.198 LOAD COMB 929 _:
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC- 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 0.6 11 1.0 12 -1.0 13 1.0
1?T1+1?STR_Y+1?STR_X-1?STR_Z+0.198?WZPOS 14 0.33
LOAD COMB 913 _: *1?SD+1?F+1?CM+1?PA+1?LM+1?LSC-0.6?T1+1?STR_Y-
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -1.0 11 1.0 12 1.0 13 -1.0 1?STR_X+1?STR_Z+0.198?WXPOS
16 0.198 LOAD COMB 930 _:
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC- 1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 -0.6 11 1.0 12 -1.0 13 1.0
0.6?T1+1?STR_Y+1?STR_X-1?STR_Z+0.33?WZPOS 14 0.198
LOAD COMB 914 _: *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC-1?T1+1?STR_Y-
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -0.6 11 1.0 12 1.0 13 -1.0 1?STR_X+1?STR_Z+0.198?WXPOS
16 0.33 LOAD COMB 931 _:
* 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -1.0 11 1.0 12 -1.0 13 1.0
**** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7) LM + 1.0(0.7) LSC+ + 14 0.198
0.6(1.0) Ts+ *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC-
**** 0.2(0.33) W(-z) + 1.0STR(y) + 1.0STR(x) - 1.0STR(z) 0.6?T1+1?STR_Y-1?STR_X+1?STR_Z+0.33?WXPOS
*1?SD+1?F+1?CM+1?PA+1?LM+1?LSC+0.6?T1+1?STR_Y+ LOAD COMB 932 _:
1?STR_X-1?STR_Z+0.198?WZNEG 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -0.6 11 1.0 12 -1.0 13 1.0
LOAD COMB 918 _: 14 0.33
1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 0.6 11 1.0 12 1.0 13 -1.0 *
17 0.198 **** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7) LM + 1.0(0.7) LSC+ +
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+1?T1+1?STR_Y 0.6(1.0) Ts+
+1?STR_X-1?STR_Z+0.198?WZNEG **** 0.2(0.33) W(-x) + 1.0STR(y) - 1.0STR(x) + 1.0STR(z)
LOAD COMB 919 _: *1?SD+1?F+1?CM+1?PA+1?LM+1?LSC+0.6?T1+1?STR_Y-
1?STR_X+1?STR_Z+0.198?WXNEG
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 334 de 463
(SUBJECT) (Page)

LOAD COMB 937 _: *


1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 0.6 11 1.0 12 -1.0 13 1.0 **** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7) LM + 1.0(0.7) LSC+ +
15 0.198 0.6(1.0) Ts+
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+1?T1+1?STR_Y **** 0.2(0.33) W(-z) + 1.0STR(y) - 1.0STR(x) + 1.0STR(z)
-1?STR_X+1?STR_Z+0.198?WXNEG *1?SD+1?F+1?CM+1?PA+1?LM+1?LSC+0.6?T1+1?STR_Y-
LOAD COMB 938 _: 1?STR_X+1?STR_Z+0.198?WZNEG
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 1.0 11 1.0 12 -1.0 13 1.0 LOAD COMB 955 _:
15 0.198 1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 0.6 11 1.0 12 -1.0 13 1.0
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+0.6?T1+1?STR 17 0.198
_Y-1?STR_X+1?STR_Z+0.33?WXNEG *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+1?T1+1?STR_Y
LOAD COMB 939 _: -1?STR_X+1?STR_Z+0.198?WZNEG
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 0.6 11 1.0 12 -1.0 13 1.0 LOAD COMB 956 _:
15 0.33 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 1.0 11 1.0 12 -1.0 13 1.0
*1?SD+1?F+1?CM+1?PA+1?LM+1?LSC-0.6?T1+1?STR_Y- 17 0.198
1?STR_X+1?STR_Z+0.198?WXNEG *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+0.6?T1+1?STR
LOAD COMB 940 _: _Y-1?STR_X+1?STR_Z+0.33?WZNEG
1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 -0.6 11 1.0 12 -1.0 13 1.0 LOAD COMB 957 _:
15 0.198 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 0.6 11 1.0 12 -1.0 13 1.0
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC-1?T1+1?STR_Y- 17 0.33
1?STR_X+1?STR_Z+0.198?WXNEG *1?SD+1?F+1?CM+1?PA+1?LM+1?LSC-0.6?T1+1?STR_Y-
LOAD COMB 941 _: 1?STR_X+1?STR_Z+0.198?WZNEG
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -1.0 11 1.0 12 -1.0 13 1.0 LOAD COMB 958 _:
15 0.198 1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 -0.6 11 1.0 12 -1.0 13 1.0
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC- 17 0.198
0.6?T1+1?STR_Y-1?STR_X+1?STR_Z+0.33?WXNEG *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC-1?T1+1?STR_Y-
LOAD COMB 942 _: 1?STR_X+1?STR_Z+0.198?WZNEG
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -0.6 11 1.0 12 -1.0 13 1.0 LOAD COMB 959 _:
15 0.33 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -1.0 11 1.0 12 -1.0 13 1.0
* 17 0.198
**** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7) LM + 1.0(0.7) LSC+ + *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC-
0.6(1.0) Ts+ 0.6?T1+1?STR_Y-1?STR_X+1?STR_Z+0.33?WZNEG
**** 0.2(0.33) W(z) + 1.0STR(y) - 1.0STR(x) + 1.0STR(z) LOAD COMB 960 _:
*1?SD+1?F+1?CM+1?PA+1?LM+1?LSC+0.6?T1+1?STR_Y- 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -0.6 11 1.0 12 -1.0 13 1.0
1?STR_X+1?STR_Z+0.198?WZPOS 17 0.33
LOAD COMB 946 _: *
1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 0.6 11 1.0 12 -1.0 13 1.0 **** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7) LM + 1.0(0.7) LSC+ +
16 0.198 0.6(1.0) Ts+
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+1?T1+1?STR_Y **** 0.2(0.33) W(x) + 1.0STR(y) - 1.0STR(x) - 1.0STR(z)
-1?STR_X+1?STR_Z+0.198?WZPOS *1?SD+1?F+1?CM+1?PA+1?LM+1?LSC+0.6?T1+1?STR_Y-
LOAD COMB 947 _: 1?STR_X-1?STR_Z+0.198?WXPOS
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 1.0 11 1.0 12 -1.0 13 1.0 LOAD COMB 964 _:
16 0.198 1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 0.6 11 1.0 12 -1.0 13 -1.0
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+0.6?T1+1?STR 14 0.198
_Y-1?STR_X+1?STR_Z+0.33?WZPOS *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+1?T1+1?STR_Y
LOAD COMB 948 _: -1?STR_X-1?STR_Z+0.198?WXPOS
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 0.6 11 1.0 12 -1.0 13 1.0 LOAD COMB 965 _:
16 0.33 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 1.0 11 1.0 12 -1.0 13 -1.0
*1?SD+1?F+1?CM+1?PA+1?LM+1?LSC-0.6?T1+1?STR_Y- 14 0.198
1?STR_X+1?STR_Z+0.198?WZPOS *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+0.6?T1+1?STR
LOAD COMB 949 _: _Y-1?STR_X-1?STR_Z+0.33?WXPOS
1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 -0.6 11 1.0 12 -1.0 13 1.0 LOAD COMB 966 _:
16 0.198 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 0.6 11 1.0 12 -1.0 13 -1.0
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC-1?T1+1?STR_Y- 14 0.33
1?STR_X+1?STR_Z+0.198?WZPOS *1?SD+1?F+1?CM+1?PA+1?LM+1?LSC-0.6?T1+1?STR_Y-
LOAD COMB 950 _: 1?STR_X-1?STR_Z+0.198?WXPOS
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -1.0 11 1.0 12 -1.0 13 1.0 LOAD COMB 967 _:
16 0.198 1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 -0.6 11 1.0 12 -1.0 13 -
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC- 1.0 14 0.198
0.6?T1+1?STR_Y-1?STR_X+1?STR_Z+0.33?WZPOS *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC-1?T1+1?STR_Y-
LOAD COMB 951 _: 1?STR_X-1?STR_Z+0.198?WXPOS
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -0.6 11 1.0 12 -1.0 13 1.0 LOAD COMB 968 _:
16 0.33
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 335 de 463
(SUBJECT) (Page)

1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -1.0 11 1.0 12 -1.0 13 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 -0.6 11 1.0 12 -1.0 13 -
1.0 14 0.198 1.0 16 0.198
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC- *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC-1?T1+1?STR_Y-
0.6?T1+1?STR_Y-1?STR_X-1?STR_Z+0.33?WXPOS 1?STR_X-1?STR_Z+0.198?WZPOS
LOAD COMB 969 _: LOAD COMB 986 _:
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -0.6 11 1.0 12 -1.0 13 - 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -1.0 11 1.0 12 -1.0 13 -
1.0 14 0.33 1.0 16 0.198
* *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC-
**** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7) LM + 1.0(0.7) LSC+ + 0.6?T1+1?STR_Y-1?STR_X-1?STR_Z+0.33?WZPOS
0.6(1.0) Ts+ LOAD COMB 987 _:
**** 0.2(0.33) W(-x) + 1.0STR(y) - 1.0STR(x) - 1.0STR(z) 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -0.6 11 1.0 12 -1.0 13 -
*1?SD+1?F+1?CM+1?PA+1?LM+1?LSC+0.6?T1+1?STR_Y- 1.0 16 0.33
1?STR_X-1?STR_Z+0.198?WXNEG **** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7) LM + 1.0(0.7) LSC+ +
LOAD COMB 973 _: 0.6(1.0) Ts+
1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 0.6 11 1.0 12 -1.0 13 -1.0 **** 0.2(0.33) W(-z) + 1.0STR(y) - 1.0STR(x) - 1.0STR(z)
15 0.198 *1?SD+1?F+1?CM+1?PA+1?LM+1?LSC+0.6?T1+1?STR_Y-
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+1?T1+1?STR_Y 1?STR_X-1?STR_Z+0.198?WZNEG
-1?STR_X-1?STR_Z+0.198?WXNEG LOAD COMB 991 _:
LOAD COMB 974 _: 1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 0.6 11 1.0 12 -1.0 13 -1.0
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 1.0 11 1.0 12 -1.0 13 -1.0 17 0.198
15 0.198 *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+1?T1+1?STR_Y
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+0.6?T1+1?STR -1?STR_X-1?STR_Z+0.198?WZNEG
_Y-1?STR_X-1?STR_Z+0.33?WXNEG LOAD COMB 992 _:
LOAD COMB 975 _: 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 1.0 11 1.0 12 -1.0 13 -1.0
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 0.6 11 1.0 12 -1.0 13 -1.0 17 0.198
15 0.33 *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+0.6?T1+1?STR
*1?SD+1?F+1?CM+1?PA+1?LM+1?LSC-0.6?T1+1?STR_Y- _Y-1?STR_X-1?STR_Z+0.33?WZNEG
1?STR_X-1?STR_Z+0.198?WXNEG LOAD COMB 993 _:
LOAD COMB 976 _: 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 0.6 11 1.0 12 -1.0 13 -1.0
1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 -0.6 11 1.0 12 -1.0 13 - 17 0.33
1.0 15 0.198 *1?SD+1?F+1?CM+1?PA+1?LM+1?LSC-0.6?T1+1?STR_Y-
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC-1?T1+1?STR_Y- 1?STR_X-1?STR_Z+0.198?WZNEG
1?STR_X-1?STR_Z+0.198?WXNEG LOAD COMB 994 _:
LOAD COMB 977 _: 1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 -0.6 11 1.0 12 -1.0 13 -
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -1.0 11 1.0 12 -1.0 13 - 1.0 17 0.198
1.0 15 0.198 *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC-1?T1+1?STR_Y-
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC- 1?STR_X-1?STR_Z+0.198?WZNEG
0.6?T1+1?STR_Y-1?STR_X-1?STR_Z+0.33?WXNEG LOAD COMB 995 _:
LOAD COMB 978 _: 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -1.0 11 1.0 12 -1.0 13 -
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -0.6 11 1.0 12 -1.0 13 - 1.0 17 0.198
1.0 15 0.33 *1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC-
**** 1.0 SD. + 1.0CM + 1.0PA + 1.0(0.7) LM + 1.0(0.7) LSC+ + 0.6?T1+1?STR_Y-1?STR_X-1?STR_Z+0.33?WZNEG
0.6(1.0) Ts+ LOAD COMB 996 _:
**** 0.2(0.33) W(z) + 1.0STR(y) - 1.0STR(x) - 1.0STR(z) 1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 -0.6 11 1.0 12 -1.0 13 -
*1?SD+1?F+1?CM+1?PA+1?LM+1?LSC+0.6?T1+1?STR_Y- 1.0 17 0.33
1?STR_X-1?STR_Z+0.198?WZPOS ************************************************************
LOAD COMB 982 _: ***************************************************
1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 8 1.0 10 0.6 11 1.0 12 -1.0 13 -1.0 LOAD COMB 6002 _: 1?SD+1?CM+1?PS_1
16 0.198 1 1.0 3 1.0 21 1.0
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+1?T1+1?STR_Y *
-1?STR_X-1?STR_Z+0.198?WZPOS LOAD COMB 6004 _: 1?SD+1?CM+1.6?T1+1?PS_1
LOAD COMB 983 _: 1 1.0 3 1.0 10 1.6 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 1.0 11 1.0 12 -1.0 13 -1.0 *
16 0.198 LOAD COMB 6006 _: 1?SD+1?CM-1.6?T1+1?PS_1
*1?SD+1?F+1?CM+1?PA+0.7?LM+0.7?LSC+0.6?T1+1?STR 1 1.0 3 1.0 10 -1.6 21 1.0
_Y-1?STR_X-1?STR_Z+0.33?WZPOS *
LOAD COMB 984 _: LOAD COMB 6008 _: 1?SD+1?CM+1.6?WXPOS+1?PS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 0.7 8 0.7 10 0.6 11 1.0 12 -1.0 13 -1.0 1 1.0 3 1.0 14 1.6 21 1.0
16 0.33 *
*1?SD+1?F+1?CM+1?PA+1?LM+1?LSC-0.6?T1+1?STR_Y- LOAD COMB 6010 _:
1?STR_X-1?STR_Z+0.198?WZPOS 1?SD+1?CM+1.6?T1+0.96?WXPOS+1?PS_1
LOAD COMB 985 _: 1 1.0 3 1.0 10 1.6 14 0.96 21 1.0
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 336 de 463
(SUBJECT) (Page)

LOAD COMB 6012 _: LOAD COMB 6075 _:


1?SD+1?CM+0.96?T1+1.6?WXPOS+1?PS_1 1.5?SD+1.5?CM+1.6?LSC+0.96?T1+1.5?PS_1
1 1.0 3 1.0 10 0.96 14 1.6 21 1.0 1 1.5 3 1.5 8 1.6 10 0.96 21 1.5
LOAD COMB 6014 _: 1?SD+1?CM- LOAD COMB 6076 _:
1.6?T1+0.96?WXPOS+1?PS_1 1?SD+1?CM+1.6?LSC+0.96?T1+1?PS_1
1 1.0 3 1.0 10 -1.6 14 0.96 21 1.0 1 1.0 3 1.0 8 1.6 10 0.96 21 1.0
LOAD COMB 6016 _: 1?SD+1?CM- LOAD COMB 6077 _:
0.96?T1+1.6?WXPOS+1?PS_1 1.5?SD+1.5?CM+1.12?LSC+1.6?T1+1.5?PS_1
1 1.0 3 1.0 10 -0.96 14 1.6 21 1.0 1 1.5 3 1.5 8 1.12 10 1.6 21 1.5
* LOAD COMB 6078 _:
LOAD COMB 6018 _: 1?SD+1?CM+1.6?WXNEG+1?PS_1 1?SD+1?CM+1.12?LSC+1.6?T1+1?PS_1
1 1.0 3 1.0 15 1.6 21 1.0 1 1.0 3 1.0 8 1.12 10 1.6 21 1.0
* LOAD COMB 6079 _: 1.5?SD+1.5?CM+1.6?LSC-
LOAD COMB 6020 _: 0.96?T1+1.5?PS_1
1?SD+1?CM+1.6?T1+0.96?WXNEG+1?PS_1 1 1.5 3 1.5 8 1.6 10 -0.96 21 1.5
1 1.0 3 1.0 10 1.6 15 0.96 21 1.0 LOAD COMB 6080 _: 1?SD+1?CM+1.6?LSC-
LOAD COMB 6022 _: 0.96?T1+1?PS_1
1?SD+1?CM+0.96?T1+1.6?WXNEG+1?PS_1 1 1.0 3 1.0 8 1.6 10 -0.96 21 1.0
1 1.0 3 1.0 10 0.96 15 1.6 21 1.0 LOAD COMB 6081 _: 1.5?SD+1.5?CM+1.12?LSC-
LOAD COMB 6024 _: 1?SD+1?CM- 1.6?T1+1.5?PS_1
1.6?T1+0.96?WXNEG+1?PS_1 1 1.5 3 1.5 8 1.12 10 -1.6 21 1.5
1 1.0 3 1.0 10 -1.6 15 0.96 21 1.0 LOAD COMB 6082 _: 1?SD+1?CM+1.12?LSC-
LOAD COMB 6026 _: 1?SD+1?CM- 1.6?T1+1?PS_1
0.96?T1+1.6?WXNEG+1?PS_1 1 1.0 3 1.0 8 1.12 10 -1.6 21 1.0
1 1.0 3 1.0 10 -0.96 15 1.6 21 1.0 *
* LOAD COMB 6087 _:
LOAD COMB 6028 _: 1?SD+1?CM+1.6?WZPOS+1?PS_1 1.5?SD+1.5?CM+1.6?LSC+0.96?WXPOS+1.5?PS_1
1 1.0 3 1.0 16 1.6 21 1.0 1 1.5 3 1.5 8 1.6 14 0.96 21 1.5
* LOAD COMB 6088 _:
LOAD COMB 6030 _: 1?SD+1?CM+1.6?LSC+0.96?WXPOS+1?PS_1
1?SD+1?CM+1.6?T1+0.96?WZPOS+1?PS_1 1 1.0 3 1.0 8 1.6 14 0.96 21 1.0
1 1.0 3 1.0 10 1.6 16 0.96 21 1.0 LOAD COMB 6089 _:
LOAD COMB 6032 _: 1.5?SD+1.5?CM+1.12?LSC+1.6?WXPOS+1.5?PS_1
1?SD+1?CM+0.96?T1+1.6?WZPOS+1?PS_1 1 1.5 3 1.5 8 1.12 14 1.6 21 1.5
1 1.0 3 1.0 10 0.96 16 1.6 21 1.0 LOAD COMB 6090 _:
LOAD COMB 6034 _: 1?SD+1?CM- 1?SD+1?CM+1.12?LSC+1.6?WXPOS+1?PS_1
1.6?T1+0.96?WZPOS+1?PS_1 1 1.0 3 1.0 8 1.12 14 1.6 21 1.0
1 1.0 3 1.0 10 -1.6 16 0.96 21 1.0 *
LOAD COMB 6036 _: 1?SD+1?CM- LOAD COMB 6095 _:
0.96?T1+1.6?WZPOS+1?PS_1 1.5?SD+1.5?CM+1.6?LSC+0.96?WXNEG+1.5?PS_1
1 1.0 3 1.0 10 -0.96 16 1.6 21 1.0 1 1.5 3 1.5 8 1.6 15 0.96 21 1.5
* LOAD COMB 6096 _:
LOAD COMB 6038 _: 1?SD+1?CM+1.6?WZNEG+1?PS_1 1?SD+1?CM+1.6?LSC+0.96?WXNEG+1?PS_1
1 1.0 3 1.0 17 1.6 21 1.0 1 1.0 3 1.0 8 1.6 15 0.96 21 1.0
* LOAD COMB 6097 _:
LOAD COMB 6040 _: 1.5?SD+1.5?CM+1.12?LSC+1.6?WXNEG+1.5?PS_1
1?SD+1?CM+1.6?T1+0.96?WZNEG+1?PS_1 1 1.5 3 1.5 8 1.12 15 1.6 21 1.5
1 1.0 3 1.0 10 1.6 17 0.96 21 1.0 LOAD COMB 6098 _:
LOAD COMB 6042 _: 1?SD+1?CM+1.12?LSC+1.6?WXNEG+1?PS_1
1?SD+1?CM+0.96?T1+1.6?WZNEG+1?PS_1 1 1.0 3 1.0 8 1.12 15 1.6 21 1.0
1 1.0 3 1.0 10 0.96 17 1.6 21 1.0 *
LOAD COMB 6044 _: 1?SD+1?CM-1.6?T1+0.96?WZNEG LOAD COMB 6103 _:
1 1.0 3 1.0 10 -1.6 17 0.96 1.5?SD+1.5?CM+1.6?LSC+0.96?WZPOS+1.5?PS_1
LOAD COMB 6046 _: 1?SD+1?CM-0.96?T1+1.6?WZNEG 1 1.5 3 1.5 8 1.6 16 0.96 21 1.5
1 1.0 3 1.0 10 -0.96 17 1.6 LOAD COMB 6104 _:
**********************OPERETION********************************* 1?SD+1?CM+1.6?LSC+0.96?WZPOS+1?PS_1
* 1 1.0 3 1.0 8 1.6 16 0.96 21 1.0
LOAD COMB 6071 _: 1.5?SD+1.5?CM+1.6?LSC+1.5?PS_1 LOAD COMB 6105 _:
1 1.5 3 1.5 8 1.6 21 1.5 1.5?SD+1.5?CM+1.12?LSC+1.6?WZPOS+1.5?PS_1
LOAD COMB 6072 _: 1?SD+1?CM+1.6?LSC+1?PS_1 1 1.5 3 1.5 8 1.12 16 1.6 21 1.5
1 1.0 3 1.0 8 1.6 21 1.0 LOAD COMB 6106 _:
* 1?SD+1?CM+1.12?LSC+1.6?WZPOS+1?PS_1
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 337 de 463
(SUBJECT) (Page)

1 1.0 3 1.0 8 1.12 16 1.6 21 1.0 LOAD COMB 6139 _:


* 1.5?SD+1.5?CM+1.12?LSC+1.6?T1+0.96?WXNEG+1.5?PS_
LOAD COMB 6111 _: 1
1.5?SD+1.5?CM+1.6?LSC+0.96?WZNEG+1.5?PS_1 1 1.5 3 1.5 8 1.12 10 1.6 15 0.96 21 1.5
1 1.5 3 1.5 8 1.6 17 0.96 21 1.5 LOAD COMB 6140 _:
LOAD COMB 6112 _: 1?SD+1?CM+1.12?LSC+1.6?T1+0.96?WXNEG+1?PS_1
1?SD+1?CM+1.6?LSC+0.96?WZNEG+1?PS_1 1 1.0 3 1.0 8 1.12 10 1.6 15 0.96 21 1.0
1 1.0 3 1.0 8 1.6 17 0.96 21 1.0 LOAD COMB 6141 _:
LOAD COMB 6113 _: 1.5?SD+1.5?CM+1.12?LSC+0.96?T1+1.6?WXNEG+1.5?PS_
1.5?SD+1.5?CM+1.12?LSC+1.6?WZNEG+1.5?PS_1 1
1 1.5 3 1.5 8 1.12 17 1.6 21 1.5 1 1.5 3 1.5 8 1.12 10 0.96 15 1.6 21 1.5
LOAD COMB 6114 _: LOAD COMB 6142 _:
1?SD+1?CM+1.12?LSC+1.6?WZNEG+1?PS_1 1?SD+1?CM+1.12?LSC+0.96?T1+1.6?WXNEG+1?PS_1
1 1.0 3 1.0 8 1.12 17 1.6 21 1.0 1 1.0 3 1.0 8 1.12 10 0.96 15 1.6 21 1.0
* LOAD COMB 6143 _: 1.5?SD+1.5?CM+1.6?LSC-
LOAD COMB 6119 _: 0.96?T1+0.96?WXNEG+1.5?PS_1
1.5?SD+1.5?CM+1.6?LSC+0.96?T1+0.96?WXPOS+1.5?PS_ 1 1.5 3 1.5 8 1.6 10 -0.96 15 0.96 21 1.5
1 LOAD COMB 6144 _: 1?SD+1?CM+1.6?LSC-
1 1.5 3 1.5 8 1.6 10 0.96 14 0.96 21 1.5 0.96?T1+0.96?WXNEG+1?PS_1
LOAD COMB 6120 _: 1 1.0 3 1.0 8 1.6 10 -0.96 15 0.96 21 1.0
1?SD+1?CM+1.6?LSC+0.96?T1+0.96?WXPOS+1?PS_1 LOAD COMB 6145 _: 1.5?SD+1.5?CM+1.12?LSC-
1 1.0 3 1.0 8 1.6 10 0.96 14 0.96 21 1.0 1.6?T1+0.96?WXNEG+1.5?PS_1
LOAD COMB 6121 _: 1 1.5 3 1.5 8 1.12 10 -1.6 15 0.96 21 1.5
1.5?SD+1.5?CM+1.12?LSC+1.6?T1+0.96?WXPOS+1.5?PS_ LOAD COMB 6146 _: 1?SD+1?CM+1.12?LSC-
1 1.6?T1+0.96?WXNEG+1?PS_1
1 1.5 3 1.5 8 1.12 10 1.6 14 0.96 21 1.5 1 1.0 3 1.0 8 1.12 10 -1.6 15 0.96 21 1.0
LOAD COMB 6122 _: LOAD COMB 6147 _: 1.5?SD+1.5?CM+1.12?LSC-
1?SD+1?CM+1.12?LSC+1.6?T1+0.96?WXPOS+1?PS_1 0.96?T1+1.6?WXNEG+1.5?PS_1
1 1.0 3 1.0 8 1.12 10 1.6 14 0.96 21 1.0 1 1.5 3 1.5 8 1.12 10 -0.96 15 1.6 21 1.5
LOAD COMB 6123 _: LOAD COMB 6148 _: 1?SD+1?CM+1.12?LSC-
1.5?SD+1.5?CM+1.12?LSC+0.96?T1+1.6?WXPOS+1.5?PS_ 0.96?T1+1.6?WXNEG+1?PS_1
1 1 1.0 3 1.0 8 1.12 10 -0.96 15 1.6 21 1.0
1 1.5 3 1.5 8 1.12 10 0.96 14 1.6 21 1.5 *
LOAD COMB 6124 _: LOAD COMB 6155 _:
1?SD+1?CM+1.12?LSC+0.96?T1+1.6?WXPOS+1?PS_1 1.5?SD+1.5?CM+1.6?LSC+0.96?T1+0.96?WZPOS+1.5?PS_
1 1.0 3 1.0 8 1.12 10 0.96 14 1.6 21 1.0 1
LOAD COMB 6125 _: 1.5?SD+1.5?CM+1.6?LSC- 1 1.5 3 1.5 8 1.6 10 0.96 16 0.96 21 1.5
0.96?T1+0.96?WXPOS+1.5?PS_1 LOAD COMB 6156 _:
1 1.5 3 1.5 8 1.6 10 -0.96 14 0.96 21 1.5 1?SD+1?CM+1.6?LSC+0.96?T1+0.96?WZPOS+1?PS_1
LOAD COMB 6126 _: 1?SD+1?CM+1.6?LSC- 1 1.0 3 1.0 8 1.6 10 0.96 16 0.96 21 1.0
0.96?T1+0.96?WXPOS+1?PS_1 LOAD COMB 6157 _:
1 1.0 3 1.0 8 1.6 10 -0.96 14 0.96 21 1.0 1.5?SD+1.5?CM+1.12?LSC+1.6?T1+0.96?WZPOS+1.5?PS_
LOAD COMB 6127 _: 1.5?SD+1.5?CM+1.12?LSC- 1
1.6?T1+0.96?WXPOS+1.5?PS_1 1 1.5 3 1.5 8 1.12 10 1.6 16 0.96 21 1.5
1 1.5 3 1.5 8 1.12 10 -1.6 14 0.96 21 1.5 LOAD COMB 6158 _:
LOAD COMB 6128 _: 1?SD+1?CM+1.12?LSC- 1?SD+1?CM+1.12?LSC+1.6?T1+0.96?WZPOS+1?PS_1
1.6?T1+0.96?WXPOS+1?PS_1 1 1.0 3 1.0 8 1.12 10 1.6 16 0.96 21 1.0
1 1.0 3 1.0 8 1.12 10 -1.6 14 0.96 21 1.0 LOAD COMB 6159 _:
LOAD COMB 6129 _: 1.5?SD+1.5?CM+1.12?LSC- 1.5?SD+1.5?CM+1.12?LSC+0.96?T1+1.6?WZPOS+1.5?PS_
0.96?T1+1.6?WXPOS+1.5?PS_1 1
1 1.5 3 1.5 8 1.12 10 -0.96 14 1.6 21 1.5 1 1.5 3 1.5 8 1.12 10 0.96 16 1.6 21 1.5
LOAD COMB 6130 _: 1?SD+1?CM+1.12?LSC- LOAD COMB 6160 _:
0.96?T1+1.6?WXPOS+1?PS_1 1?SD+1?CM+1.12?LSC+0.96?T1+1.6?WZPOS+1?PS_1
1 1.0 3 1.0 8 1.12 10 -0.96 14 1.6 21 1.0 1 1.0 3 1.0 8 1.12 10 0.96 16 1.6 21 1.0
* LOAD COMB 6161 _: 1.5?SD+1.5?CM+1.6?LSC-
LOAD COMB 6137 _: 0.96?T1+0.96?WZPOS+1.5?PS_1
1.5?SD+1.5?CM+1.6?LSC+0.96?T1+0.96?WXNEG+1.5?PS_ 1 1.5 3 1.5 8 1.6 10 -0.96 16 0.96 21 1.5
1 LOAD COMB 6162 _: 1?SD+1?CM+1.6?LSC-
1 1.5 3 1.5 8 1.6 10 0.96 15 0.96 21 1.5 0.96?T1+0.96?WZPOS+1?PS_1
LOAD COMB 6138 _: 1 1.0 3 1.0 8 1.6 10 -0.96 16 0.96 21 1.0
1?SD+1?CM+1.6?LSC+0.96?T1+0.96?WXNEG+1?PS_1 LOAD COMB 6163 _: 1.5?SD+1.5?CM+1.12?LSC-
1 1.0 3 1.0 8 1.6 10 0.96 15 0.96 21 1.0 1.6?T1+0.96?WZPOS+1.5?PS_1
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 338 de 463
(SUBJECT) (Page)

1 1.5 3 1.5 8 1.12 10 -1.6 16 0.96 21 1.5 1 1.0 3 1.0 8 0.6 18 -1.0 19 -0.3 21 1.0
LOAD COMB 6164 _: 1?SD+1?CM+1.12?LSC- LOAD COMB 6195 _:
1.6?T1+0.96?WZPOS+1?PS_1 1?SD+1?CM+0.6?LSC+0.3?EX+1?EZ+1?PS_1
1 1.0 3 1.0 8 1.12 10 -1.6 16 0.96 21 1.0 1 1.0 3 1.0 8 0.6 18 0.3 19 1.0 21 1.0
LOAD COMB 6165 _: 1.5?SD+1.5?CM+1.12?LSC- LOAD COMB 6196 _: 1?SD+1?CM+0.6?LSC+0.3?EX-
0.96?T1+1.6?WZPOS+1.5?PS_1 1?EZ+1?PS_1
1 1.5 3 1.5 8 1.12 10 -0.96 16 1.6 21 1.5 1 1.0 3 1.0 8 0.6 18 0.3 19 -1.0 21 1.0
LOAD COMB 6166 _: 1?SD+1?CM+1.12?LSC- LOAD COMB 6197 _: 1?SD+1?CM+0.6?LSC-
0.96?T1+1.6?WZPOS+1?PS_1 0.3?EX+1?EZ+1?PS_1
1 1.0 3 1.0 8 1.12 10 -0.96 16 1.6 21 1.0 1 1.0 3 1.0 8 0.6 18 -0.3 19 1.0 21 1.0
* LOAD COMB 6198 _: 1?SD+1?CM+0.6?LSC-0.3?EX-
LOAD COMB 6173 _: 1?EZ+1?PS_1
1.5?SD+1.5?CM+1.6?LSC+0.96?T1+0.96?WZNEG+1.5?PS_ 1 1.0 3 1.0 8 0.6 18 -0.3 19 -1.0 21 1.0
1 **********************ERECTION*********************************
1 1.5 3 1.5 8 1.6 10 0.96 17 0.96 21 1.5 *
LOAD COMB 6174 _: LOAD COMB 6199 _: 1?SD+1?CM+1?EX+0.3?EZ+1?PS_1
1?SD+1?CM+1.6?LSC+0.96?T1+0.96?WZNEG+1?PS_1 1 1.0 3 1.0 18 1.0 19 0.3 21 1.0
1 1.0 3 1.0 8 1.6 10 0.96 17 0.96 21 1.0 LOAD COMB 6200 _: 1?SD+1?CM+1?EX-0.3?EZ+1?PS_1
LOAD COMB 6175 _: 1 1.0 3 1.0 18 1.0 19 -0.3 21 1.0
1.5?SD+1.5?CM+1.12?LSC+1.6?T1+0.96?WZNEG+1.5?PS_ LOAD COMB 6201 _: 1?SD+1?CM-1?EX+0.3?EZ+1?PS_1
1 1 1.0 3 1.0 18 -1.0 19 0.3 21 1.0
1 1.5 3 1.5 8 1.12 10 1.6 17 0.96 21 1.5 LOAD COMB 6202 _: 1?SD+1?CM-1?EX-0.3?EZ+1?PS_1
LOAD COMB 6176 _: 1 1.0 3 1.0 18 -1.0 19 -0.3 21 1.0
1?SD+1?CM+1.12?LSC+1.6?T1+0.96?WZNEG+1?PS_1 LOAD COMB 6203 _: 1?SD+1?CM+0.3?EX+1?EZ+1?PS_1
1 1.0 3 1.0 8 1.12 10 1.6 17 0.96 21 1.0 1 1.0 3 1.0 18 0.3 19 1.0 21 1.0
LOAD COMB 6177 _: LOAD COMB 6204 _: 1?SD+1?CM+0.3?EX-1?EZ+1?PS_1
1.5?SD+1.5?CM+1.12?LSC+0.96?T1+1.6?WZNEG+1.5?PS_ 1 1.0 3 1.0 18 0.3 19 -1.0 21 1.0
1 LOAD COMB 6205 _: 1?SD+1?CM-0.3?EX+1?EZ+1?PS_1
1 1.5 3 1.5 8 1.12 10 0.96 17 1.6 21 1.5 1 1.0 3 1.0 18 -0.3 19 1.0 21 1.0
LOAD COMB 6178 _: LOAD COMB 6206 _: 1?SD+1?CM-0.3?EX-1?EZ+1?PS_1
1?SD+1?CM+1.12?LSC+0.96?T1+1.6?WZNEG+1?PS_1 1 1.0 3 1.0 18 -0.3 19 -1.0 21 1.0
1 1.0 3 1.0 8 1.12 10 0.96 17 1.6 21 1.0 *
LOAD COMB 6179 _: 1.5?SD+1.5?CM+1.6?LSC- LOAD COMB 6207 _: 1.5?SD+1.5?CM+1.5?PA+1.5?PS_1
0.96?T1+0.96?WZNEG+1.5?PS_1 1 1.5 3 1.5 4 1.5 21 1.5
1 1.5 3 1.5 8 1.6 10 -0.96 17 0.96 21 1.5 LOAD COMB 6208 _: 1?SD+1?CM+1?PA+1?PS_1
LOAD COMB 6180 _: 1?SD+1?CM+1.6?LSC- 1 1.0 3 1.0 4 1.0 21 1.0
0.96?T1+0.96?WZNEG+1?PS_1 *
1 1.0 3 1.0 8 1.6 10 -0.96 17 0.96 21 1.0 LOAD COMB 6209 _:
LOAD COMB 6181 _: 1.5?SD+1.5?CM+1.12?LSC- 1.5?SD+1.5?CM+1.5?PA+1.6?T1+1.5?PS_1
1.6?T1+0.96?WZNEG+1.5?PS_1 1 1.5 3 1.5 4 1.5 10 1.6 21 1.5
1 1.5 3 1.5 8 1.12 10 -1.6 17 0.96 21 1.5 LOAD COMB 6210 _: 1?SD+1?CM+1?PA+1.6?T1+1?PS_1
LOAD COMB 6182 _: 1?SD+1?CM+1.12?LSC- 1 1.0 3 1.0 4 1.0 10 1.6 21 1.0
1.6?T1+0.96?WZNEG+1?PS_1 LOAD COMB 6211 _: 1.5?SD+1.5?CM+1.5?PA-
1 1.0 3 1.0 8 1.12 10 -1.6 17 0.96 21 1.0 1.6?T1+1.5?PS_1
LOAD COMB 6183 _: 1.5?SD+1.5?CM+1.12?LSC- 1 1.5 3 1.5 4 1.5 10 -1.6 21 1.5
0.96?T1+1.6?WZNEG+1.5?PS_1 LOAD COMB 6212 _: 1?SD+1?CM+1?PA-1.6?T1+1?PS_1
1 1.5 3 1.5 8 1.12 10 -0.96 17 1.6 21 1.5 1 1.0 3 1.0 4 1.0 10 -1.6 21 1.0
LOAD COMB 6184 _: 1?SD+1?CM+1.12?LSC- *
0.96?T1+1.6?WZNEG+1?PS_1 LOAD COMB 6213 _:
1 1.0 3 1.0 8 1.12 10 -0.96 17 1.6 21 1.0 1.5?SD+1.5?CM+1.5?PA+0.8?WXPOS+1.5?PS_1
* 1 1.5 3 1.5 4 1.5 14 0.8 21 1.5
LOAD COMB 6191 _: LOAD COMB 6214 _:
1?SD+1?CM+0.6?LSC+1?EX+0.3?EZ+1?PS_1 1?SD+1?CM+1?PA+0.8?WXPOS+1?PS_1
1 1.0 3 1.0 8 0.6 18 1.0 19 0.3 21 1.0 1 1.0 3 1.0 4 1.0 14 0.8 21 1.0
LOAD COMB 6192 _: 1?SD+1?CM+0.6?LSC+1?EX- *
0.3?EZ+1?PS_1 LOAD COMB 6215 _:
1 1.0 3 1.0 8 0.6 18 1.0 19 -0.3 21 1.0 1.5?SD+1.5?CM+1.5?PA+1.6?T1+0.48?WXPOS+1.5?PS_1
LOAD COMB 6193 _: 1?SD+1?CM+0.6?LSC- 1 1.5 3 1.5 4 1.5 10 1.6 14 0.48 21 1.5
1?EX+0.3?EZ+1?PS_1 LOAD COMB 6216 _:
1 1.0 3 1.0 8 0.6 18 -1.0 19 0.3 21 1.0 1?SD+1?CM+1?PA+1.6?T1+0.48?WXPOS+1?PS_1
LOAD COMB 6194 _: 1?SD+1?CM+0.6?LSC-1?EX- 1 1.0 3 1.0 4 1.0 10 1.6 14 0.48 21 1.0
0.3?EZ+1?PS_1
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 339 de 463
(SUBJECT) (Page)

LOAD COMB 6217 _: 1 1.0 3 1.0 4 1.0 16 0.8 21 1.0


1.5?SD+1.5?CM+1.5?PA+0.96?T1+0.8?WXPOS+1.5?PS_1 *
1 1.5 3 1.5 4 1.5 10 0.96 14 0.8 21 1.5 LOAD COMB 6237 _:
LOAD COMB 6218 _: 1.5?SD+1.5?CM+1.5?PA+1.6?T1+0.48?WZPOS+1.5?PS_1
1?SD+1?CM+1?PA+0.96?T1+0.8?WXPOS+1?PS_1 1 1.5 3 1.5 4 1.5 10 1.6 16 0.48 21 1.5
1 1.0 3 1.0 4 1.0 10 0.96 14 0.8 21 1.0 LOAD COMB 6238 _:
LOAD COMB 6219 _: 1.5?SD+1.5?CM+1.5?PA- 1?SD+1?CM+1?PA+1.6?T1+0.48?WZPOS+1?PS_1
1.6?T1+0.48?WXPOS+1.5?PS_1 1 1.0 3 1.0 4 1.0 10 1.6 16 0.48 21 1.0
1 1.5 3 1.5 4 1.5 10 -1.6 14 0.48 21 1.5 LOAD COMB 6239 _:
LOAD COMB 6220 _: 1?SD+1?CM+1?PA- 1.5?SD+1.5?CM+1.5?PA+0.96?T1+0.8?WZPOS+1.5?PS_1
1.6?T1+0.48?WXPOS+1?PS_1 1 1.5 3 1.5 4 1.5 10 0.96 16 0.8 21 1.5
1 1.0 3 1.0 4 1.0 10 -1.6 14 0.48 21 1.0 LOAD COMB 6240 _:
LOAD COMB 6221 _: 1.5?SD+1.5?CM+1.5?PA- 1?SD+1?CM+1?PA+0.96?T1+0.8?WZPOS+1?PS_1
0.96?T1+0.8?WXPOS+1.5?PS_1 1 1.0 3 1.0 4 1.0 10 0.96 16 0.8 21 1.0
1 1.5 3 1.5 4 1.5 10 -0.96 14 0.8 21 1.5 LOAD COMB 6241 _: 1.5?SD+1.5?CM+1.5?PA-
LOAD COMB 6222 _: 1?SD+1?CM+1?PA- 1.6?T1+0.48?WZPOS+1.5?PS_1
0.96?T1+0.8?WXPOS+1?PS_1 1 1.5 3 1.5 4 1.5 10 -1.6 16 0.48 21 1.5
1 1.0 3 1.0 4 1.0 10 -0.96 14 0.8 21 1.0 LOAD COMB 6242 _: 1?SD+1?CM+1?PA-
* 1.6?T1+0.48?WZPOS+1?PS_1
LOAD COMB 6223 _: 1 1.0 3 1.0 4 1.0 10 -1.6 16 0.48 21 1.0
1.5?SD+1.5?CM+1.5?PA+0.48?WXNEG+1.5?PS_1 LOAD COMB 6243 _: 1.5?SD+1.5?CM+1.5?PA-
1 1.5 3 1.5 4 1.5 15 0.48 21 1.5 0.96?T1+0.8?WZPOS+1.5?PS_1
LOAD COMB 6224 _: 1 1.5 3 1.5 4 1.5 10 -0.96 16 0.8 21 1.5
1?SD+1?CM+1?PA+0.48?WXNEG+1?PS_1 LOAD COMB 6244 _: 1?SD+1?CM+1?PA-
1 1.0 3 1.0 4 1.0 15 0.48 21 1.0 0.96?T1+0.8?WZPOS+1?PS_1
LOAD COMB 6225 _: 1 1.0 3 1.0 4 1.0 10 -0.96 16 0.8 21 1.0
1.5?SD+1.5?CM+1.5?PA+0.8?WXNEG+1.5?PS_1 *
1 1.5 3 1.5 4 1.5 15 0.8 21 1.5 LOAD COMB 6245 _:
LOAD COMB 6226 _: 1.5?SD+1.5?CM+1.5?PA+0.8?WZNEG+1.5?PS_1
1?SD+1?CM+1?PA+0.8?WXNEG+1?PS_1 1 1.5 3 1.5 4 1.5 17 0.8 21 1.5
1 1.0 3 1.0 4 1.0 15 0.8 21 1.0 LOAD COMB 6246 _:
* 1?SD+1?CM+1?PA+0.8?WZNEG+1?PS_1
LOAD COMB 6227 _: 1 1.0 3 1.0 4 1.0 17 0.8 21 1.0
1.5?SD+1.5?CM+1.5?PA+1.6?T1+0.48?WXNEG+1.5?PS_1 *
1 1.5 3 1.5 4 1.5 10 1.6 15 0.48 21 1.5 LOAD COMB 6247 _:
LOAD COMB 6228 _: 1.5?SD+1.5?CM+1.5?PA+1.6?T1+0.48?WZNEG+1.5?PS_1
1?SD+1?CM+1?PA+1.6?T1+0.48?WXNEG+1?PS_1 1 1.5 3 1.5 4 1.5 10 1.6 17 0.48 21 1.5
1 1.0 3 1.0 4 1.0 10 1.6 15 0.48 21 1.0 LOAD COMB 6248 _:
LOAD COMB 6229 _: 1?SD+1?CM+1?PA+1.6?T1+0.48?WZNEG+1?PS_1
1.5?SD+1.5?CM+1.5?PA+0.96?T1+0.8?WXNEG+1.5?PS_1 1 1.0 3 1.0 4 1.0 10 1.6 17 0.48 21 1.0
1 1.5 3 1.5 4 1.5 10 0.96 15 0.8 21 1.5 LOAD COMB 6249 _:
LOAD COMB 6230 _: 1.5?SD+1.5?CM+1.5?PA+0.96?T1+0.8?WZNEG+1.5?PS_1
1?SD+1?CM+1?PA+0.96?T1+0.8?WXNEG+1?PS_1 1 1.5 3 1.5 4 1.5 10 0.96 17 0.8 21 1.5
1 1.0 3 1.0 4 1.0 10 0.96 15 0.8 21 1.0 LOAD COMB 6250 _:
LOAD COMB 6231 _: 1.5?SD+1.5?CM+1.5?PA- 1?SD+1?CM+1?PA+0.96?T1+0.8?WZNEG+1?PS_1
1.6?T1+0.48?WXNEG+1.5?PS_1 1 1.0 3 1.0 4 1.0 10 0.96 17 0.8 21 1.0
1 1.5 3 1.5 4 1.5 10 -1.6 15 0.48 21 1.5 LOAD COMB 6251 _: 1.5?SD+1.5?CM+1.5?PA-
LOAD COMB 6232 _: 1?SD+1?CM+1?PA- 1.6?T1+0.48?WZNEG+1.5?PS_1
1.6?T1+0.48?WXNEG+1?PS_1 1 1.5 3 1.5 4 1.5 10 -1.6 17 0.48 21 1.5
1 1.0 3 1.0 4 1.0 10 -1.6 15 0.48 21 1.0 LOAD COMB 6252 _: 1?SD+1?CM+1?PA-
LOAD COMB 6233 _: 1.5?SD+1.5?CM+1.5?PA- 1.6?T1+0.48?WZNEG+1?PS_1
0.96?T1+0.8?WXNEG+1.5?PS_1 1 1.0 3 1.0 4 1.0 10 -1.6 17 0.48 21 1.0
1 1.5 3 1.5 4 1.5 10 -0.96 15 0.8 21 1.5 LOAD COMB 6253 _: 1.5?SD+1.5?CM+1.5?PA-
LOAD COMB 6234 _: 1?SD+1?CM+1?PA- 0.96?T1+0.8?WZNEG+1.5?PS_1
0.96?T1+0.8?WXNEG+1?PS_1 1 1.5 3 1.5 4 1.5 10 -0.96 17 0.8 21 1.5
1 1.0 3 1.0 4 1.0 10 -0.96 15 0.8 21 1.0 LOAD COMB 6254 _: 1?SD+1?CM+1?PA-
* 0.96?T1+0.8?WZNEG+1?PS_1
LOAD COMB 6235 _: 1 1.0 3 1.0 4 1.0 10 -0.96 17 0.8 21 1.0
1.5?SD+1.5?CM+1.5?PA+0.8?WZPOS+1.5?PS_1 **********************TEST*********************************
1 1.5 3 1.5 4 1.5 16 0.8 21 1.5 *
LOAD COMB 6236 _:
1?SD+1?CM+1?PA+0.8?WZPOS+1?PS_1
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 340 de 463
(SUBJECT) (Page)

LOAD COMB 6283 _: *1.5?SD+1.5?CM+1.5?PA+1.12?LP+1.12?LSC-


1.5?SD+1.5?CM+1.5?PA+1.6?LP+1.6?LSC+0.96?T1+1.5?PS 1.6?T1+0.48?WXNEG+1.5?PS_1
_1 LOAD COMB 6353 _:
1 1.5 3 1.5 4 1.5 5 1.6 8 1.6 10 0.96 21 1.5 1 1.5 3 1.5 4 1.5 5 1.12 8 1.12 10 -1.6 15 0.48 21 1.5
LOAD COMB 6285 _: *1.5?SD+1.5?CM+1.5?PA+1.12?LP+1.12?LSC-
1.5?SD+1.5?CM+1.5?PA+1.12?LP+1.12?LSC+1.6?T1+1.5?P 0.96?T1+0.8?WXNEG+1.5?PS_1
S_1 LOAD COMB 6355 _:
1 1.5 3 1.5 4 1.5 5 1.12 8 1.12 10 1.6 21 1.5 1 1.5 3 1.5 4 1.5 5 1.12 8 1.12 10 -0.96 15 0.8 21 1.5
LOAD COMB 6287 _: *
1.5?SD+1.5?CM+1.5?PA+1.6?LP+1.6?LSC- *1.5?SD+1.5?CM+1.5?PA+1.6?LP+1.6?LSC+0.96?T1+0.48?
0.96?T1+1.5?PS_1 WZPOS+1.5?PS_1
1 1.5 3 1.5 4 1.5 5 1.6 8 1.6 10 -0.96 21 1.5 LOAD COMB 6363 _:
LOAD COMB 6289 _: 1 1.5 3 1.5 4 1.5 5 1.6 8 1.6 10 0.96 16 0.48 21 1.5
1.5?SD+1.5?CM+1.5?PA+1.12?LP+1.12?LSC- *1.5?SD+1.5?CM+1.5?PA+1.12?LP+1.12?LSC+1.6?T1+0.48
1.6?T1+1.5?PS_1 ?WZPOS+1.5?PS_1
1 1.5 3 1.5 4 1.5 5 1.12 8 1.12 10 -1.6 21 1.5 LOAD COMB 6365 _:
LOAD COMB 6317 _: 1 1.5 3 1.5 4 1.5 5 1.12 8 1.12 10 1.6 16 0.48 21 1.5
1.5?SD+1.5?CM+1.5?PA+1.12?LP+1.12?LSC+0.8?WZPOS+ *1.5?SD+1.5?CM+1.5?PA+1.12?LP+1.12?LSC+0.96?T1+0.8
1.5?PS_1 ?WZPOS+1.5?PS_1
1 1.5 3 1.5 4 1.5 5 1.12 8 1.12 16 0.8 21 1.5 LOAD COMB 6367 _:
*1.5?SD+1.5?CM+1.5?PA+1.6?LP+1.6?LSC+0.96?T1+0.48? 1 1.5 3 1.5 4 1.5 5 1.12 8 1.12 10 0.96 16 0.8 21 1.5
WXPOS+1.5?PS_1 *1.5?SD+1.5?CM+1.5?PA+1.6?LP+1.6?LSC-
LOAD COMB 6327 _: 0.96?T1+0.48?WZPOS+1.5?PS_1
1 1.5 3 1.5 4 1.5 5 1.6 8 1.6 10 0.96 14 0.48 21 1.5 LOAD COMB 6369 _:
*1.5?SD+1.5?CM+1.5?PA+1.12?LP+1.12?LSC+1.6?T1+0.48 1 1.5 3 1.5 4 1.5 5 1.6 8 1.6 10 -0.96 16 0.48 21 1.5
?WXPOS+1.5?PS_1 *1.5?SD+1.5?CM+1.5?PA+1.12?LP+1.12?LSC-
LOAD COMB 6329 _: 1.6?T1+0.48?WZPOS+1.5?PS_1
1 1.5 3 1.5 4 1.5 5 1.12 8 1.12 10 1.6 14 0.48 21 1.5 LOAD COMB 6371 _:
*1.5?SD+1.5?CM+1.5?PA+1.12?LP+1.12?LSC+0.96?T1+0.8 1 1.5 3 1.5 4 1.5 5 1.12 8 1.12 10 -1.6 16 0.48 21 1.5
?WXPOS+1.5?PS_1 *1.5?SD+1.5?CM+1.5?PA+1.12?LP+1.12?LSC-
LOAD COMB 6331 _: 0.96?T1+0.8?WZPOS+1.5?PS_1
1 1.5 3 1.5 4 1.5 5 1.12 8 1.12 10 0.96 14 0.8 21 1.5 LOAD COMB 6373 _:
*1.5?SD+1.5?CM+1.5?PA+1.6?LP+1.6?LSC- 1 1.5 3 1.5 4 1.5 5 1.12 8 1.12 10 -0.96 16 0.8 21 1.5
0.96?T1+0.48?WXPOS+1.5?PS_1 *
LOAD COMB 6333 _: *1.5?SD+1.5?CM+1.5?PA+1.6?LP+1.6?LSC+0.96?T1+0.48?
1 1.5 3 1.5 4 1.5 5 1.6 8 1.6 10 -0.96 14 0.48 21 1.5 WZNEG+1.5?PS_1
*1.5?SD+1.5?CM+1.5?PA+1.12?LP+1.12?LSC- LOAD COMB 6381 _:
1.6?T1+0.48?WXPOS+1.5?PS_1 1 1.5 3 1.5 4 1.5 5 1.6 8 1.6 10 0.96 17 0.48 21 1.5
LOAD COMB 6335 _: *1.5?SD+1.5?CM+1.5?PA+1.12?LP+1.12?LSC+1.6?T1+0.48
1 1.5 3 1.5 4 1.5 5 1.12 8 1.12 10 -1.6 14 0.48 21 1.5 ?WZNEG+1.5?PS_1
*1.5?SD+1.5?CM+1.5?PA+1.12?LP+1.12?LSC- LOAD COMB 6383 _:
0.96?T1+0.8?WXPOS+1.5?PS_1 1 1.5 3 1.5 4 1.5 5 1.12 8 1.12 10 1.6 17 0.48 21 1.5
LOAD COMB 6337 _: *1.5?SD+1.5?CM+1.5?PA+1.12?LP+1.12?LSC+0.96?T1+0.8
1 1.5 3 1.5 4 1.5 5 1.12 8 1.12 10 -0.96 14 0.8 21 1.5 ?WZNEG+1.5?PS_1
* LOAD COMB 6385 _:
*1.5?SD+1.5?CM+1.5?PA+1.6?LP+1.6?LSC+0.96?T1+0.48? 1 1.5 3 1.5 4 1.5 5 1.12 8 1.12 10 0.96 17 0.8 21 1.5
WXNEG+1.5?PS_1 *1.5?SD+1.5?CM+1.5?PA+1.6?LP+1.6?LSC-
LOAD COMB 6345 _: 0.96?T1+0.48?WZNEG+1.5?PS_1
1 1.5 3 1.5 4 1.5 5 1.6 8 1.6 10 0.96 15 0.48 21 1.5 LOAD COMB 6387 _:
*1.5?SD+1.5?CM+1.5?PA+1.12?LP+1.12?LSC+1.6?T1+0.48 1 1.5 3 1.5 4 1.5 5 1.6 8 1.6 10 -0.96 17 0.48 21 1.5
?WXNEG+1.5?PS_1 *1.5?SD+1.5?CM+1.5?PA+1.12?LP+1.12?LSC-
LOAD COMB 6347 _: 1.6?T1+0.48?WZNEG+1.5?PS_1
1 1.5 3 1.5 4 1.5 5 1.12 8 1.12 10 1.6 15 0.48 21 1.5 LOAD COMB 6389 _:
*1.5?SD+1.5?CM+1.5?PA+1.12?LP+1.12?LSC+0.96?T1+0.8 1 1.5 3 1.5 4 1.5 5 1.12 8 1.12 10 -1.6 17 0.48 21 1.5
?WXNEG+1.5?PS_1 *1.5?SD+1.5?CM+1.5?PA+1.12?LP+1.12?LSC-
LOAD COMB 6349 _: 0.96?T1+0.8?WZNEG+1.5?PS_1
1 1.5 3 1.5 4 1.5 5 1.12 8 1.12 10 0.96 15 0.8 21 1.5 LOAD COMB 6391 _:
*1.5?SD+1.5?CM+1.5?PA+1.6?LP+1.6?LSC- 1 1.5 3 1.5 4 1.5 5 1.12 8 1.12 10 -0.96 17 0.8 21 1.5
0.96?T1+0.48?WXNEG+1.5?PS_1 *
LOAD COMB 6351 _: *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?T1+1.5?STRESS_Y+1.
1 1.5 3 1.5 4 1.5 5 1.6 8 1.6 10 -0.96 15 0.48 21 1.5 5?STRESS_X+1.5?STRESS_Z+1.5?PS_1
LOAD COMB 6407 _:
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 341 de 463
(SUBJECT) (Page)

1 1.5 2 1.5 3 1.5 4 1.5 10 1.6 11 1.5 12 1.5 13 1.5 21 1.5 LOAD COMB 6422 _:
*1?SD+1?F+1?CM+1?PA+1.6?T1+1?STRESS_Y+1?STRES 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.6 11 1.0 12 -1.0 13 -1.0 21 1.0
S_X+1?STRESS_Z+1?PS_1 *
LOAD COMB 6408 _: *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?T1+1.5?STRESS_Y+1.
1 1.0 2 1.0 3 1.0 4 1.0 10 1.6 11 1.0 12 1.0 13 1.0 21 1.0 5?STRESS_X+1.5?STRESS_Z+0.96?WXPOS+1.
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?T1+1.5?STRESS_Y+1. *5?PS_1
5?STRESS_X-1.5?STRESS_Z+1.5?PS_1 LOAD COMB 6431 _:
LOAD COMB 6409 _: 1 1.5 2 1.5 3 1.5 4 1.5 10 1.6 11 1.5 12 1.5 13 1.5 14 0.96 21
1 1.5 2 1.5 3 1.5 4 1.5 10 1.6 11 1.5 12 1.5 13 -1.5 21 1.5 1.5
*1?SD+1?F+1?CM+1?PA+1.6?T1+1?STRESS_Y+1?STRES *1?SD+1?F+1?CM+1?PA+1.6?T1+1?STRESS_Y+1?STRES
S_X-1?STRESS_Z+1?PS_1 S_X+1?STRESS_Z+0.96?WXPOS+1?PS_1
LOAD COMB 6410 _: LOAD COMB 6432 _:
1 1.0 2 1.0 3 1.0 4 1.0 10 1.6 11 1.0 12 1.0 13 -1.0 21 1.0 1 1.0 2 1.0 3 1.0 4 1.0 10 1.6 11 1.0 12 1.0 13 1.0 14 0.96 21
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?T1+1.5?STRESS_Y- 1.0
1.5?STRESS_X+1.5?STRESS_Z+1.5?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+0.96?T1+1.5?STRESS_Y+
LOAD COMB 6411 _: 1.5?STRESS_X+1.5?STRESS_Z+1.6?WXPOS+1.
1 1.5 2 1.5 3 1.5 4 1.5 10 1.6 11 1.5 12 -1.5 13 1.5 21 1.5 *5?PS_1
*1?SD+1?F+1?CM+1?PA+1.6?T1+1?STRESS_Y- LOAD COMB 6433 _:
1?STRESS_X+1?STRESS_Z+1?PS_1 1 1.5 2 1.5 3 1.5 4 1.5 10 0.96 11 1.5 12 1.5 13 1.5 14 1.6 21
LOAD COMB 6412 _: 1.5
1 1.0 2 1.0 3 1.0 4 1.0 10 1.6 11 1.0 12 -1.0 13 1.0 21 1.0 *1?SD+1?F+1?CM+1?PA+0.96?T1+1?STRESS_Y+1?STRES
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?T1+1.5?STRESS_Y- S_X+1?STRESS_Z+1.6?WXPOS+1?PS_1
1.5?STRESS_X-1.5?STRESS_Z+1.5?PS_1 LOAD COMB 6434 _:
LOAD COMB 6413 _: 1 1.0 2 1.0 3 1.0 4 1.0 10 0.96 11 1.0 12 1.0 13 1.0 14 1.6 21
1 1.5 2 1.5 3 1.5 4 1.5 10 1.6 11 1.5 12 -1.5 13 -1.5 21 1.5 1.0
*1?SD+1?F+1?CM+1?PA+1.6?T1+1?STRESS_Y- *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?T1+1.5?STRESS_Y+1.
1?STRESS_X-1?STRESS_Z+1?PS_1 5?STRESS_X-
LOAD COMB 6414 _: *1.5?STRESS_Z+0.96?WXPOS+1.5?PS_1
1 1.0 2 1.0 3 1.0 4 1.0 10 1.6 11 1.0 12 -1.0 13 -1.0 21 1.0 LOAD COMB 6435 _:
*1.5?SD+1.5?F+1.5?CM+1.5?PA- 1 1.5 2 1.5 3 1.5 4 1.5 10 1.6 11 1.5 12 1.5 13 -1.5 14 0.96 21
1.6?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z+1. 1.5
5?PS_1 *1?SD+1?F+1?CM+1?PA+1.6?T1+1?STRESS_Y+1?STRES
LOAD COMB 6415 _: S_X-1?STRESS_Z+0.96?WXPOS+1?PS_1
1 1.5 2 1.5 3 1.5 4 1.5 10 -1.6 11 1.5 12 1.5 13 1.5 21 1.5 LOAD COMB 6436 _:
*1?SD+1?F+1?CM+1?PA- 1 1.0 2 1.0 3 1.0 4 1.0 10 1.6 11 1.0 12 1.0 13 -1.0 14 0.96 21
1.6?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+1?PS_ 1.0
1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+0.96?T1+1.5?STRESS_Y+
LOAD COMB 6416 _: 1.5?STRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 10 -1.6 11 1.0 12 1.0 13 1.0 21 1.0 *1.5?STRESS_Z+1.6?WXPOS+1.5?PS_1
*1.5?SD+1.5?F+1.5?CM+1.5?PA- LOAD COMB 6437 _:
1.6?T1+1.5?STRESS_Y+1.5?STRESS_X- 1 1.5 2 1.5 3 1.5 4 1.5 10 0.96 11 1.5 12 1.5 13 -1.5 14 1.6 21
1.5?STRESS_Z+1.5?PS_1 1.5
LOAD COMB 6417 _: *1?SD+1?F+1?CM+1?PA+0.96?T1+1?STRESS_Y+1?STRES
1 1.5 2 1.5 3 1.5 4 1.5 10 -1.6 11 1.5 12 1.5 13 -1.5 21 1.5 S_X-1?STRESS_Z+1.6?WXPOS+1?PS_1
*1?SD+1?F+1?CM+1?PA- LOAD COMB 6438 _:
1.6?T1+1?STRESS_Y+1?STRESS_X-1?STRESS_Z+1?PS_1 1 1.0 2 1.0 3 1.0 4 1.0 10 0.96 11 1.0 12 1.0 13 -1.0 14 1.6 21
LOAD COMB 6418 _: 1.0
1 1.0 2 1.0 3 1.0 4 1.0 10 -1.6 11 1.0 12 1.0 13 -1.0 21 1.0 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?T1+1.5?STRESS_Y-
*1.5?SD+1.5?F+1.5?CM+1.5?PA-1.6?T1+1.5?STRESS_Y- *1.5?STRESS_X+1.5?STRESS_Z+0.96?WXPOS+1.5?PS_1
1.5?STRESS_X+1.5?STRESS_Z+1.5?PS_1 LOAD COMB 6439 _:
LOAD COMB 6419 _: 1 1.5 2 1.5 3 1.5 4 1.5 10 1.6 11 1.5 12 -1.5 13 1.5 14 0.96 21
1 1.5 2 1.5 3 1.5 4 1.5 10 -1.6 11 1.5 12 -1.5 13 1.5 21 1.5 1.5
*1?SD+1?F+1?CM+1?PA-1.6?T1+1?STRESS_Y- *1?SD+1?F+1?CM+1?PA+1.6?T1+1?STRESS_Y-
1?STRESS_X+1?STRESS_Z+1?PS_1 1?STRESS_X+1?STRESS_Z+0.96?WXPOS+1?PS_1
LOAD COMB 6420 _: LOAD COMB 6440 _:
1 1.0 2 1.0 3 1.0 4 1.0 10 -1.6 11 1.0 12 -1.0 13 1.0 21 1.0 1 1.0 2 1.0 3 1.0 4 1.0 10 1.6 11 1.0 12 -1.0 13 1.0 14 0.96 21
*1.5?SD+1.5?F+1.5?CM+1.5?PA-1.6?T1+1.5?STRESS_Y- 1.0
1.5?STRESS_X-1.5?STRESS_Z+1.5?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+0.96?T1+1.5?STRESS_Y-
LOAD COMB 6421 _: *1.5?STRESS_X+1.5?STRESS_Z+1.6?WXPOS+1.5?PS_1
1 1.5 2 1.5 3 1.5 4 1.5 10 -1.6 11 1.5 12 -1.5 13 -1.5 21 1.5 LOAD COMB 6441 _:
*1?SD+1?F+1?CM+1?PA-1.6?T1+1?STRESS_Y- 1 1.5 2 1.5 3 1.5 4 1.5 10 0.96 11 1.5 12 -1.5 13 1.5 14 1.6 21
1?STRESS_X-1?STRESS_Z+1?PS_1 1.5
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 342 de 463
(SUBJECT) (Page)

*1?SD+1?F+1?CM+1?PA+0.96?T1+1?STRESS_Y- 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.6 11 1.0 12 1.0 13 -1.0 14 0.96 21
1?STRESS_X+1?STRESS_Z+1.6?WXPOS+1?PS_1 1.0
LOAD COMB 6442 _: *1.5?SD+1.5?F+1.5?CM+1.5?PA-
1 1.0 2 1.0 3 1.0 4 1.0 10 0.96 11 1.0 12 -1.0 13 1.0 14 1.6 21 0.96?T1+1.5?STRESS_Y+1.5?STRESS_X-
1.0 *1.5?STRESS_Z+1.6?WXPOS+1.5?PS_1
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?T1+1.5?STRESS_Y- LOAD COMB 6453 _:
1.5?STRESS_X- 1 1.5 2 1.5 3 1.5 4 1.5 10 -0.96 11 1.5 12 1.5 13 -1.5 14 1.6 21
*1.5?STRESS_Z+0.96?WXPOS+1.5?PS_1 1.5
LOAD COMB 6443 _: *1?SD+1?F+1?CM+1?PA-
1 1.5 2 1.5 3 1.5 4 1.5 10 1.6 11 1.5 12 -1.5 13 -1.5 14 0.96 21 0.96?T1+1?STRESS_Y+1?STRESS_X-
1.5 1?STRESS_Z+1.6?WXPOS+1?PS_1
*1?SD+1?F+1?CM+1?PA+1.6?T1+1?STRESS_Y- LOAD COMB 6454 _:
1?STRESS_X-1?STRESS_Z+0.96?WXPOS+1?PS_1 1 1.0 2 1.0 3 1.0 4 1.0 10 -0.96 11 1.0 12 1.0 13 -1.0 14 1.6 21
LOAD COMB 6444 _: 1.0
1 1.0 2 1.0 3 1.0 4 1.0 10 1.6 11 1.0 12 -1.0 13 -1.0 14 0.96 21 *1.5?SD+1.5?F+1.5?CM+1.5?PA-1.6?T1+1.5?STRESS_Y-
1.0 *1.5?STRESS_X+1.5?STRESS_Z+0.96?WXPOS+1.5?PS_1
*1.5?SD+1.5?F+1.5?CM+1.5?PA+0.96?T1+1.5?STRESS_Y- LOAD COMB 6455 _:
1.5?STRESS_X- 1 1.5 2 1.5 3 1.5 4 1.5 10 -1.6 11 1.5 12 -1.5 13 1.5 14 0.96 21
*1.5?STRESS_Z+1.6?WXPOS+1.5?PS_1 1.5
LOAD COMB 6445 _: *1?SD+1?F+1?CM+1?PA-1.6?T1+1?STRESS_Y-
1 1.5 2 1.5 3 1.5 4 1.5 10 0.96 11 1.5 12 -1.5 13 -1.5 14 1.6 21 1?STRESS_X+1?STRESS_Z+0.96?WXPOS+1?PS_1
1.5 LOAD COMB 6456 _:
*1?SD+1?F+1?CM+1?PA+0.96?T1+1?STRESS_Y- 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.6 11 1.0 12 -1.0 13 1.0 14 0.96 21
1?STRESS_X-1?STRESS_Z+1.6?WXPOS+1?PS_1 1.0
LOAD COMB 6446 _: *1.5?SD+1.5?F+1.5?CM+1.5?PA-0.96?T1+1.5?STRESS_Y-
1 1.0 2 1.0 3 1.0 4 1.0 10 0.96 11 1.0 12 -1.0 13 -1.0 14 1.6 21 *1.5?STRESS_X+1.5?STRESS_Z+1.6?WXPOS+1.5?PS_1
1.0 LOAD COMB 6457 _:
*1.5?SD+1.5?F+1.5?CM+1.5?PA- 1 1.5 2 1.5 3 1.5 4 1.5 10 -0.96 11 1.5 12 -1.5 13 1.5 14 1.6 21
*1.6?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z+ 1.5
0.96?WXPOS+1.5?PS_1 *1?SD+1?F+1?CM+1?PA-0.96?T1+1?STRESS_Y-
LOAD COMB 6447 _: 1?STRESS_X+1?STRESS_Z+1.6?WXPOS+1?PS_1
1 1.5 2 1.5 3 1.5 4 1.5 10 -1.6 11 1.5 12 1.5 13 1.5 14 0.96 21 LOAD COMB 6458 _:
1.5 1 1.0 2 1.0 3 1.0 4 1.0 10 -0.96 11 1.0 12 -1.0 13 1.0 14 1.6 21
*1?SD+1?F+1?CM+1?PA- 1.0
1.6?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+0.96? *1.5?SD+1.5?F+1.5?CM+1.5?PA-1.6?T1+1.5?STRESS_Y-
WXPOS+1?PS_1 1.5?STRESS_X-
LOAD COMB 6448 _: *1.5?STRESS_Z+0.96?WXPOS+1.5?PS_1
1 1.0 2 1.0 3 1.0 4 1.0 10 -1.6 11 1.0 12 1.0 13 1.0 14 0.96 21 LOAD COMB 6459 _:
1.0 1 1.5 2 1.5 3 1.5 4 1.5 10 -1.6 11 1.5 12 -1.5 13 -1.5 14 0.96
*1.5?SD+1.5?F+1.5?CM+1.5?PA- 21 1.5
*0.96?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z *1?SD+1?F+1?CM+1?PA-1.6?T1+1?STRESS_Y-
+1.6?WXPOS+1.5?PS_1 1?STRESS_X-1?STRESS_Z+0.96?WXPOS+1?PS_1
LOAD COMB 6449 _: LOAD COMB 6460 _:
1 1.5 2 1.5 3 1.5 4 1.5 10 -0.96 11 1.5 12 1.5 13 1.5 14 1.6 21 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.6 11 1.0 12 -1.0 13 -1.0 14 0.96
1.5 21 1.0
*1?SD+1?F+1?CM+1?PA- *1.5?SD+1.5?F+1.5?CM+1.5?PA-0.96?T1+1.5?STRESS_Y-
0.96?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+1.6? 1.5?STRESS_X-
WXPOS+1?PS_1 *1.5?STRESS_Z+1.6?WXPOS+1.5?PS_1
LOAD COMB 6450 _: LOAD COMB 6461 _:
1 1.0 2 1.0 3 1.0 4 1.0 10 -0.96 11 1.0 12 1.0 13 1.0 14 1.6 21 1 1.5 2 1.5 3 1.5 4 1.5 10 -0.96 11 1.5 12 -1.5 13 -1.5 14 1.6
1.0 21 1.5
*1.5?SD+1.5?F+1.5?CM+1.5?PA- *1?SD+1?F+1?CM+1?PA-0.96?T1+1?STRESS_Y-
1.6?T1+1.5?STRESS_Y+1.5?STRESS_X- 1?STRESS_X-1?STRESS_Z+1.6?WXPOS+1?PS_1
*1.5?STRESS_Z+0.96?WXPOS+1.5?PS_1 LOAD COMB 6462 _:
LOAD COMB 6451 _: 1 1.0 2 1.0 3 1.0 4 1.0 10 -0.96 11 1.0 12 -1.0 13 -1.0 14 1.6
1 1.5 2 1.5 3 1.5 4 1.5 10 -1.6 11 1.5 12 1.5 13 -1.5 14 0.96 21 21 1.0
1.5 *
*1?SD+1?F+1?CM+1?PA- *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?T1+1.5?STRESS_Y+1.
1.6?T1+1?STRESS_Y+1?STRESS_X- 5?STRESS_X+1.5?STRESS_Z+0.96?WXNEG+1.
1?STRESS_Z+0.96?WXPOS+1?PS_1 *5?PS_1
LOAD COMB 6452 _: LOAD COMB 6471 _:
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 343 de 463
(SUBJECT) (Page)

1 1.5 2 1.5 3 1.5 4 1.5 10 1.6 11 1.5 12 1.5 13 1.5 15 0.96 21 *1.5?STRESS_Z+0.96?WXNEG+1.5?PS_1
1.5 LOAD COMB 6483 _:
*1?SD+1?F+1?CM+1?PA+1.6?T1+1?STRESS_Y+1?STRES 1 1.5 2 1.5 3 1.5 4 1.5 10 1.6 11 1.5 12 -1.5 13 -1.5 15 0.96 21
S_X+1?STRESS_Z+0.96?WXNEG+1?PS_1 1.5
LOAD COMB 6472 _: *1?SD+1?F+1?CM+1?PA+1.6?T1+1?STRESS_Y-
1 1.0 2 1.0 3 1.0 4 1.0 10 1.6 11 1.0 12 1.0 13 1.0 15 0.96 21 1?STRESS_X-1?STRESS_Z+0.96?WXNEG+1?PS_1
1.0 LOAD COMB 6484 _:
*1.5?SD+1.5?F+1.5?CM+1.5?PA+0.96?T1+1.5?STRESS_Y+ 1 1.0 2 1.0 3 1.0 4 1.0 10 1.6 11 1.0 12 -1.0 13 -1.0 15 0.96 21
1.5?STRESS_X+1.5?STRESS_Z+1.6?WXNEG+1. 1.0
*5?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+0.96?T1+1.5?STRESS_Y-
LOAD COMB 6473 _: 1.5?STRESS_X-
1 1.5 2 1.5 3 1.5 4 1.5 10 0.96 11 1.5 12 1.5 13 1.5 15 1.6 21 *1.5?STRESS_Z+1.6?WXNEG+1.5?PS_1
1.5 LOAD COMB 6485 _:
*1?SD+1?F+1?CM+1?PA+0.96?T1+1?STRESS_Y+1?STRES 1 1.5 2 1.5 3 1.5 4 1.5 10 0.96 11 1.5 12 -1.5 13 -1.5 15 1.6 21
S_X+1?STRESS_Z+1.6?WXNEG+1?PS_1 1.5
LOAD COMB 6474 _: *1?SD+1?F+1?CM+1?PA+0.96?T1+1?STRESS_Y-
1 1.0 2 1.0 3 1.0 4 1.0 10 0.96 11 1.0 12 1.0 13 1.0 15 1.6 21 1?STRESS_X-1?STRESS_Z+1.6?WXNEG+1?PS_1
1.0 LOAD COMB 6486 _:
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?T1+1.5?STRESS_Y+1. 1 1.0 2 1.0 3 1.0 4 1.0 10 0.96 11 1.0 12 -1.0 13 -1.0 15 1.6 21
5?STRESS_X- 1.0
*1.5?STRESS_Z+0.96?WXNEG+1.5?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA-
LOAD COMB 6475 _: *1.6?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z+
1 1.5 2 1.5 3 1.5 4 1.5 10 1.6 11 1.5 12 1.5 13 -1.5 15 0.96 21 0.96?WXNEG+1.5?PS_1
1.5 LOAD COMB 6487 _:
*1?SD+1?F+1?CM+1?PA+1.6?T1+1?STRESS_Y+1?STRES 1 1.5 2 1.5 3 1.5 4 1.5 10 -1.6 11 1.5 12 1.5 13 1.5 15 0.96 21
S_X-1?STRESS_Z+0.96?WXNEG+1?PS_1 1.5
LOAD COMB 6476 _: *1?SD+1?F+1?CM+1?PA-
1 1.0 2 1.0 3 1.0 4 1.0 10 1.6 11 1.0 12 1.0 13 -1.0 15 0.96 21 1.6?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+0.96?
1.0 WXNEG+1?PS_1
*1.5?SD+1.5?F+1.5?CM+1.5?PA+0.96?T1+1.5?STRESS_Y+ LOAD COMB 6488 _:
1.5?STRESS_X- 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.6 11 1.0 12 1.0 13 1.0 15 0.96 21
*1.5?STRESS_Z+1.6?WXNEG+1.5?PS_1 1.0
LOAD COMB 6477 _: *1.5?SD+1.5?F+1.5?CM+1.5?PA-
1 1.5 2 1.5 3 1.5 4 1.5 10 0.96 11 1.5 12 1.5 13 -1.5 15 1.6 21 *0.96?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z
1.5 +1.6?WXNEG+1.5?PS_1
*1?SD+1?F+1?CM+1?PA+0.96?T1+1?STRESS_Y+1?STRES LOAD COMB 6489 _:
S_X-1?STRESS_Z+1.6?WXNEG+1?PS_1 1 1.5 2 1.5 3 1.5 4 1.5 10 -0.96 11 1.5 12 1.5 13 1.5 15 1.6 21
LOAD COMB 6478 _: 1.5
1 1.0 2 1.0 3 1.0 4 1.0 10 0.96 11 1.0 12 1.0 13 -1.0 15 1.6 21 *1?SD+1?F+1?CM+1?PA-
1.0 0.96?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+1.6?
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?T1+1.5?STRESS_Y- WXNEG+1?PS_1
*1.5?STRESS_X+1.5?STRESS_Z+0.96?WXNEG+1.5?PS_1 LOAD COMB 6490 _:
LOAD COMB 6479 _: 1 1.0 2 1.0 3 1.0 4 1.0 10 -0.96 11 1.0 12 1.0 13 1.0 15 1.6 21
1 1.5 2 1.5 3 1.5 4 1.5 10 1.6 11 1.5 12 -1.5 13 1.5 15 0.96 21 1.0
1.5 *1.5?SD+1.5?F+1.5?CM+1.5?PA-
*1?SD+1?F+1?CM+1?PA+1.6?T1+1?STRESS_Y- 1.6?T1+1.5?STRESS_Y+1.5?STRESS_X-
1?STRESS_X+1?STRESS_Z+0.96?WXNEG+1?PS_1 *1.5?STRESS_Z+0.96?WXNEG+1.5?PS_1
LOAD COMB 6480 _: LOAD COMB 6491 _:
1 1.0 2 1.0 3 1.0 4 1.0 10 1.6 11 1.0 12 -1.0 13 1.0 15 0.96 21 1 1.5 2 1.5 3 1.5 4 1.5 10 -1.6 11 1.5 12 1.5 13 -1.5 15 0.96 21
1.0 1.5
*1.5?SD+1.5?F+1.5?CM+1.5?PA+0.96?T1+1.5?STRESS_Y- *1?SD+1?F+1?CM+1?PA-
*1.5?STRESS_X+1.5?STRESS_Z+1.6?WXNEG+1.5?PS_1 1.6?T1+1?STRESS_Y+1?STRESS_X-
LOAD COMB 6481 _: 1?STRESS_Z+0.96?WXNEG+1?PS_1
1 1.5 2 1.5 3 1.5 4 1.5 10 0.96 11 1.5 12 -1.5 13 1.5 15 1.6 21 LOAD COMB 6492 _:
1.5 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.6 11 1.0 12 1.0 13 -1.0 15 0.96 21
*1?SD+1?F+1?CM+1?PA+0.96?T1+1?STRESS_Y- 1.0
1?STRESS_X+1?STRESS_Z+1.6?WXNEG+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA-
LOAD COMB 6482 _: 0.96?T1+1.5?STRESS_Y+1.5?STRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 10 0.96 11 1.0 12 -1.0 13 1.0 15 1.6 21 *1.5?STRESS_Z+1.6?WXNEG+1.5?PS_1
1.0 LOAD COMB 6493 _:
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?T1+1.5?STRESS_Y- 1 1.5 2 1.5 3 1.5 4 1.5 10 -0.96 11 1.5 12 1.5 13 -1.5 15 1.6 21
1.5?STRESS_X- 1.5
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 344 de 463
(SUBJECT) (Page)

*1?SD+1?F+1?CM+1?PA- *5?PS_1
0.96?T1+1?STRESS_Y+1?STRESS_X- LOAD COMB 6513 _:
1?STRESS_Z+1.6?WXNEG+1?PS_1 1 1.5 2 1.5 3 1.5 4 1.5 10 0.96 11 1.5 12 1.5 13 1.5 16 1.6 21
LOAD COMB 6494 _: 1.5
1 1.0 2 1.0 3 1.0 4 1.0 10 -0.96 11 1.0 12 1.0 13 -1.0 15 1.6 21 *1?SD+1?F+1?CM+1?PA+0.96?T1+1?STRESS_Y+1?STRES
1.0 S_X+1?STRESS_Z+1.6?WZPOS+1?PS_1
*1.5?SD+1.5?F+1.5?CM+1.5?PA-1.6?T1+1.5?STRESS_Y- LOAD COMB 6514 _:
*1.5?STRESS_X+1.5?STRESS_Z+0.96?WXNEG+1.5?PS_1 1 1.0 2 1.0 3 1.0 4 1.0 10 0.96 11 1.0 12 1.0 13 1.0 16 1.6 21
LOAD COMB 6495 _: 1.0
1 1.5 2 1.5 3 1.5 4 1.5 10 -1.6 11 1.5 12 -1.5 13 1.5 15 0.96 21 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?T1+1.5?STRESS_Y+1.
1.5 5?STRESS_X-
*1?SD+1?F+1?CM+1?PA-1.6?T1+1?STRESS_Y- *1.5?STRESS_Z+0.96?WZPOS+1.5?PS_1
1?STRESS_X+1?STRESS_Z+0.96?WXNEG+1?PS_1 LOAD COMB 6515 _:
LOAD COMB 6496 _: 1 1.5 2 1.5 3 1.5 4 1.5 10 1.6 11 1.5 12 1.5 13 -1.5 16 0.96 21
1 1.0 2 1.0 3 1.0 4 1.0 10 -1.6 11 1.0 12 -1.0 13 1.0 15 0.96 21 1.5
1.0 *1?SD+1?F+1?CM+1?PA+1.6?T1+1?STRESS_Y+1?STRES
*1.5?SD+1.5?F+1.5?CM+1.5?PA-0.96?T1+1.5?STRESS_Y- S_X-1?STRESS_Z+0.96?WZPOS+1?PS_1
*1.5?STRESS_X+1.5?STRESS_Z+1.6?WXNEG+1.5?PS_1 LOAD COMB 6516 _:
LOAD COMB 6497 _: 1 1.0 2 1.0 3 1.0 4 1.0 10 1.6 11 1.0 12 1.0 13 -1.0 16 0.96 21
1 1.5 2 1.5 3 1.5 4 1.5 10 -0.96 11 1.5 12 -1.5 13 1.5 15 1.6 21 1.0
1.5 *1.5?SD+1.5?F+1.5?CM+1.5?PA+0.96?T1+1.5?STRESS_Y+
*1?SD+1?F+1?CM+1?PA-0.96?T1+1?STRESS_Y- 1.5?STRESS_X-
1?STRESS_X+1?STRESS_Z+1.6?WXNEG+1?PS_1 *1.5?STRESS_Z+1.6?WZPOS+1.5?PS_1
LOAD COMB 6498 _: LOAD COMB 6517 _:
1 1.0 2 1.0 3 1.0 4 1.0 10 -0.96 11 1.0 12 -1.0 13 1.0 15 1.6 21 1 1.5 2 1.5 3 1.5 4 1.5 10 0.96 11 1.5 12 1.5 13 -1.5 16 1.6 21
1.0 1.5
*1.5?SD+1.5?F+1.5?CM+1.5?PA-1.6?T1+1.5?STRESS_Y- *1?SD+1?F+1?CM+1?PA+0.96?T1+1?STRESS_Y+1?STRES
1.5?STRESS_X- S_X-1?STRESS_Z+1.6?WZPOS+1?PS_1
*1.5?STRESS_Z+0.96?WXNEG+1.5?PS_1 LOAD COMB 6518 _:
LOAD COMB 6499 _: 1 1.0 2 1.0 3 1.0 4 1.0 10 0.96 11 1.0 12 1.0 13 -1.0 16 1.6 21
1 1.5 2 1.5 3 1.5 4 1.5 10 -1.6 11 1.5 12 -1.5 13 -1.5 15 0.96 1.0
21 1.5 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?T1+1.5?STRESS_Y-
*1?SD+1?F+1?CM+1?PA-1.6?T1+1?STRESS_Y- *1.5?STRESS_X+1.5?STRESS_Z+0.96?WZPOS+1.5?PS_1
1?STRESS_X-1?STRESS_Z+0.96?WXNEG+1?PS_1 LOAD COMB 6519 _:
LOAD COMB 6500 _: 1 1.5 2 1.5 3 1.5 4 1.5 10 1.6 11 1.5 12 -1.5 13 1.5 16 0.96 21
1 1.0 2 1.0 3 1.0 4 1.0 10 -1.6 11 1.0 12 -1.0 13 -1.0 15 0.96 1.5
21 1.0 *1?SD+1?F+1?CM+1?PA+1.6?T1+1?STRESS_Y-
*1.5?SD+1.5?F+1.5?CM+1.5?PA-0.96?T1+1.5?STRESS_Y- 1?STRESS_X+1?STRESS_Z+0.96?WZPOS+1?PS_1
1.5?STRESS_X- LOAD COMB 6520 _:
*1.5?STRESS_Z+1.6?WXNEG+1.5?PS_1 1 1.0 2 1.0 3 1.0 4 1.0 10 1.6 11 1.0 12 -1.0 13 1.0 16 0.96 21
LOAD COMB 6501 _: 1.0
1 1.5 2 1.5 3 1.5 4 1.5 10 -0.96 11 1.5 12 -1.5 13 -1.5 15 1.6 *1.5?SD+1.5?F+1.5?CM+1.5?PA+0.96?T1+1.5?STRESS_Y-
21 1.5 *1.5?STRESS_X+1.5?STRESS_Z+1.6?WZPOS+1.5?PS_1
*1?SD+1?F+1?CM+1?PA-0.96?T1+1?STRESS_Y- LOAD COMB 6521 _:
1?STRESS_X-1?STRESS_Z+1.6?WXNEG+1?PS_1 1 1.5 2 1.5 3 1.5 4 1.5 10 0.96 11 1.5 12 -1.5 13 1.5 16 1.6 21
LOAD COMB 6502 _: 1.5
1 1.0 2 1.0 3 1.0 4 1.0 10 -0.96 11 1.0 12 -1.0 13 -1.0 15 1.6 *1?SD+1?F+1?CM+1?PA+0.96?T1+1?STRESS_Y-
21 1.0 1?STRESS_X+1?STRESS_Z+1.6?WZPOS+1?PS_1
* LOAD COMB 6522 _:
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?T1+1.5?STRESS_Y+1. 1 1.0 2 1.0 3 1.0 4 1.0 10 0.96 11 1.0 12 -1.0 13 1.0 16 1.6 21
5?STRESS_X+1.5?STRESS_Z+0.96?WZPOS+1. 1.0
*5?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?T1+1.5?STRESS_Y-
LOAD COMB 6511 _: 1.5?STRESS_X-
1 1.5 2 1.5 3 1.5 4 1.5 10 1.6 11 1.5 12 1.5 13 1.5 16 0.96 21 *1.5?STRESS_Z+0.96?WZPOS+1.5?PS_1
1.5 LOAD COMB 6523 _:
*1?SD+1?F+1?CM+1?PA+1.6?T1+1?STRESS_Y+1?STRES 1 1.5 2 1.5 3 1.5 4 1.5 10 1.6 11 1.5 12 -1.5 13 -1.5 16 0.96 21
S_X+1?STRESS_Z+0.96?WZPOS+1?PS_1 1.5
LOAD COMB 6512 _: *1?SD+1?F+1?CM+1?PA+1.6?T1+1?STRESS_Y-
1 1.0 2 1.0 3 1.0 4 1.0 10 1.6 11 1.0 12 1.0 13 1.0 16 0.96 21 1?STRESS_X-1?STRESS_Z+0.96?WZPOS+1?PS_1
1.0 LOAD COMB 6524 _:
*1.5?SD+1.5?F+1.5?CM+1.5?PA+0.96?T1+1.5?STRESS_Y+ 1 1.0 2 1.0 3 1.0 4 1.0 10 1.6 11 1.0 12 -1.0 13 -1.0 16 0.96 21
1.5?STRESS_X+1.5?STRESS_Z+1.6?WZPOS+1. 1.0
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 345 de 463
(SUBJECT) (Page)

*1.5?SD+1.5?F+1.5?CM+1.5?PA+0.96?T1+1.5?STRESS_Y- 1 1.5 2 1.5 3 1.5 4 1.5 10 -1.6 11 1.5 12 -1.5 13 1.5 16 0.96 21
1.5?STRESS_X- 1.5
*1.5?STRESS_Z+1.6?WZPOS+1.5?PS_1 *1?SD+1?F+1?CM+1?PA-1.6?T1+1?STRESS_Y-
LOAD COMB 6525 _: 1?STRESS_X+1?STRESS_Z+0.96?WZPOS+1?PS_1
1 1.5 2 1.5 3 1.5 4 1.5 10 0.96 11 1.5 12 -1.5 13 -1.5 16 1.6 21 LOAD COMB 6536 _:
1.5 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.6 11 1.0 12 -1.0 13 1.0 16 0.96 21
*1?SD+1?F+1?CM+1?PA+0.96?T1+1?STRESS_Y- 1.0
1?STRESS_X-1?STRESS_Z+1.6?WZPOS+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA-0.96?T1+1.5?STRESS_Y-
LOAD COMB 6526 _: *1.5?STRESS_X+1.5?STRESS_Z+1.6?WZPOS+1.5?PS_1
1 1.0 2 1.0 3 1.0 4 1.0 10 0.96 11 1.0 12 -1.0 13 -1.0 16 1.6 21 LOAD COMB 6537 _:
1.0 1 1.5 2 1.5 3 1.5 4 1.5 10 -0.96 11 1.5 12 -1.5 13 1.5 16 1.6 21
*1.5?SD+1.5?F+1.5?CM+1.5?PA- 1.5
*1.6?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z+ *1?SD+1?F+1?CM+1?PA-0.96?T1+1?STRESS_Y-
0.96?WZPOS+1.5?PS_1 1?STRESS_X+1?STRESS_Z+1.6?WZPOS+1?PS_1
LOAD COMB 6527 _: LOAD COMB 6538 _:
1 1.5 2 1.5 3 1.5 4 1.5 10 -1.6 11 1.5 12 1.5 13 1.5 16 0.96 21 1 1.0 2 1.0 3 1.0 4 1.0 10 -0.96 11 1.0 12 -1.0 13 1.0 16 1.6 21
1.5 1.0
*1?SD+1?F+1?CM+1?PA- *1.5?SD+1.5?F+1.5?CM+1.5?PA-1.6?T1+1.5?STRESS_Y-
1.6?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+0.96? 1.5?STRESS_X-
WZPOS+1?PS_1 *1.5?STRESS_Z+0.96?WZPOS+1.5?PS_1
LOAD COMB 6528 _: LOAD COMB 6539 _:
1 1.0 2 1.0 3 1.0 4 1.0 10 -1.6 11 1.0 12 1.0 13 1.0 16 0.96 21 1 1.5 2 1.5 3 1.5 4 1.5 10 -1.6 11 1.5 12 -1.5 13 -1.5 16 0.96
1.0 21 1.5
*1.5?SD+1.5?F+1.5?CM+1.5?PA- *1?SD+1?F+1?CM+1?PA-1.6?T1+1?STRESS_Y-
*0.96?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z 1?STRESS_X-1?STRESS_Z+0.96?WZPOS+1?PS_1
+1.6?WZPOS+1.5?PS_1 LOAD COMB 6540 _:
LOAD COMB 6529 _: 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.6 11 1.0 12 -1.0 13 -1.0 16 0.96
1 1.5 2 1.5 3 1.5 4 1.5 10 -0.96 11 1.5 12 1.5 13 1.5 16 1.6 21 21 1.0
1.5 *1.5?SD+1.5?F+1.5?CM+1.5?PA-0.96?T1+1.5?STRESS_Y-
*1?SD+1?F+1?CM+1?PA- 1.5?STRESS_X-
0.96?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+1.6? *1.5?STRESS_Z+1.6?WZPOS+1.5?PS_1
WZPOS+1?PS_1 LOAD COMB 6541 _:
LOAD COMB 6530 _: 1 1.5 2 1.5 3 1.5 4 1.5 10 -0.96 11 1.5 12 -1.5 13 -1.5 16 1.6
1 1.0 2 1.0 3 1.0 4 1.0 10 -0.96 11 1.0 12 1.0 13 1.0 16 1.6 21 21 1.5
1.0 *1?SD+1?F+1?CM+1?PA-0.96?T1+1?STRESS_Y-
*1.5?SD+1.5?F+1.5?CM+1.5?PA- 1?STRESS_X-1?STRESS_Z+1.6?WZPOS+1?PS_1
1.6?T1+1.5?STRESS_Y+1.5?STRESS_X- LOAD COMB 6542 _:
*1.5?STRESS_Z+0.96?WZPOS+1.5?PS_1 1 1.0 2 1.0 3 1.0 4 1.0 10 -0.96 11 1.0 12 -1.0 13 -1.0 16 1.6
LOAD COMB 6531 _: 21 1.0
1 1.5 2 1.5 3 1.5 4 1.5 10 -1.6 11 1.5 12 1.5 13 -1.5 16 0.96 21 *
1.5 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?T1+1.5?STRESS_Y+1.
*1?SD+1?F+1?CM+1?PA- 5?STRESS_X+1.5?STRESS_Z+0.96?WZNEG+1.
1.6?T1+1?STRESS_Y+1?STRESS_X- *5?PS_1
1?STRESS_Z+0.96?WZPOS+1?PS_1 LOAD COMB 6551 _:
LOAD COMB 6532 _: 1 1.5 2 1.5 3 1.5 4 1.5 10 1.6 11 1.5 12 1.5 13 1.5 17 0.96 21
1 1.0 2 1.0 3 1.0 4 1.0 10 -1.6 11 1.0 12 1.0 13 -1.0 16 0.96 21 1.5
1.0 *1?SD+1?F+1?CM+1?PA+1.6?T1+1?STRESS_Y+1?STRES
*1.5?SD+1.5?F+1.5?CM+1.5?PA- S_X+1?STRESS_Z+0.96?WZNEG+1?PS_1
0.96?T1+1.5?STRESS_Y+1.5?STRESS_X- LOAD COMB 6552 _:
*1.5?STRESS_Z+1.6?WZPOS+1.5?PS_1 1 1.0 2 1.0 3 1.0 4 1.0 10 1.6 11 1.0 12 1.0 13 1.0 17 0.96 21
LOAD COMB 6533 _: 1.0
1 1.5 2 1.5 3 1.5 4 1.5 10 -0.96 11 1.5 12 1.5 13 -1.5 16 1.6 21 *1.5?SD+1.5?F+1.5?CM+1.5?PA+0.96?T1+1.5?STRESS_Y+
1.5 1.5?STRESS_X+1.5?STRESS_Z+1.6?WZNEG+1.
*1?SD+1?F+1?CM+1?PA- *5?PS_1
0.96?T1+1?STRESS_Y+1?STRESS_X- LOAD COMB 6553 _:
1?STRESS_Z+1.6?WZPOS+1?PS_1 1 1.5 2 1.5 3 1.5 4 1.5 10 0.96 11 1.5 12 1.5 13 1.5 17 1.6 21
LOAD COMB 6534 _: 1.5
1 1.0 2 1.0 3 1.0 4 1.0 10 -0.96 11 1.0 12 1.0 13 -1.0 16 1.6 21 *1?SD+1?F+1?CM+1?PA+0.96?T1+1?STRESS_Y+1?STRES
1.0 S_X+1?STRESS_Z+1.6?WZNEG+1?PS_1
*1.5?SD+1.5?F+1.5?CM+1.5?PA-1.6?T1+1.5?STRESS_Y- LOAD COMB 6554 _:
*1.5?STRESS_X+1.5?STRESS_Z+0.96?WZPOS+1.5?PS_1 1 1.0 2 1.0 3 1.0 4 1.0 10 0.96 11 1.0 12 1.0 13 1.0 17 1.6 21
LOAD COMB 6535 _: 1.0
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 346 de 463
(SUBJECT) (Page)

*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?T1+1.5?STRESS_Y+1. 1 1.0 2 1.0 3 1.0 4 1.0 10 0.96 11 1.0 12 -1.0 13 -1.0 17 1.6 21
5?STRESS_X- 1.0
*1.5?STRESS_Z+0.96?WZNEG+1.5?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA-
LOAD COMB 6555 _: *1.6?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z+
1 1.5 2 1.5 3 1.5 4 1.5 10 1.6 11 1.5 12 1.5 13 -1.5 17 0.96 21 0.96?WZNEG+1.5?PS_1
1.5 LOAD COMB 6567 _:
*1?SD+1?F+1?CM+1?PA+1.6?T1+1?STRESS_Y+1?STRES 1 1.5 2 1.5 3 1.5 4 1.5 10 -1.6 11 1.5 12 1.5 13 1.5 17 0.96 21
S_X-1?STRESS_Z+0.96?WZNEG+1?PS_1 1.5
LOAD COMB 6556 _: *1?SD+1?F+1?CM+1?PA-
1 1.0 2 1.0 3 1.0 4 1.0 10 1.6 11 1.0 12 1.0 13 -1.0 17 0.96 21 1.6?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+0.96?
1.0 WZNEG+1?PS_1
*1.5?SD+1.5?F+1.5?CM+1.5?PA+0.96?T1+1.5?STRESS_Y+ LOAD COMB 6568 _:
1.5?STRESS_X- 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.6 11 1.0 12 1.0 13 1.0 17 0.96 21
*1.5?STRESS_Z+1.6?WZNEG+1.5?PS_1 1.0
LOAD COMB 6557 _: *1.5?SD+1.5?F+1.5?CM+1.5?PA-
1 1.5 2 1.5 3 1.5 4 1.5 10 0.96 11 1.5 12 1.5 13 -1.5 17 1.6 21 *0.96?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z
1.5 +1.6?WZNEG+1.5?PS_1
*1?SD+1?F+1?CM+1?PA+0.96?T1+1?STRESS_Y+1?STRES LOAD COMB 6569 _:
S_X-1?STRESS_Z+1.6?WZNEG+1?PS_1 1 1.5 2 1.5 3 1.5 4 1.5 10 -0.96 11 1.5 12 1.5 13 1.5 17 1.6 21
LOAD COMB 6558 _: 1.5
1 1.0 2 1.0 3 1.0 4 1.0 10 0.96 11 1.0 12 1.0 13 -1.0 17 1.6 21 *1?SD+1?F+1?CM+1?PA-
1.0 0.96?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+1.6?
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?T1+1.5?STRESS_Y- WZNEG+1?PS_1
*1.5?STRESS_X+1.5?STRESS_Z+0.96?WZNEG+1.5?PS_1 LOAD COMB 6570 _:
LOAD COMB 6559 _: 1 1.0 2 1.0 3 1.0 4 1.0 10 -0.96 11 1.0 12 1.0 13 1.0 17 1.6 21
1 1.5 2 1.5 3 1.5 4 1.5 10 1.6 11 1.5 12 -1.5 13 1.5 17 0.96 21 1.0
1.5 *1.5?SD+1.5?F+1.5?CM+1.5?PA-
*1?SD+1?F+1?CM+1?PA+1.6?T1+1?STRESS_Y- 1.6?T1+1.5?STRESS_Y+1.5?STRESS_X-
1?STRESS_X+1?STRESS_Z+0.96?WZNEG+1?PS_1 *1.5?STRESS_Z+0.96?WZNEG+1.5?PS_1
LOAD COMB 6560 _: LOAD COMB 6571 _:
1 1.0 2 1.0 3 1.0 4 1.0 10 1.6 11 1.0 12 -1.0 13 1.0 17 0.96 21 1 1.5 2 1.5 3 1.5 4 1.5 10 -1.6 11 1.5 12 1.5 13 -1.5 17 0.96 21
1.0 1.5
*1.5?SD+1.5?F+1.5?CM+1.5?PA+0.96?T1+1.5?STRESS_Y- *1?SD+1?F+1?CM+1?PA-
*1.5?STRESS_X+1.5?STRESS_Z+1.6?WZNEG+1.5?PS_1 1.6?T1+1?STRESS_Y+1?STRESS_X-
LOAD COMB 6561 _: 1?STRESS_Z+0.96?WZNEG+1?PS_1
1 1.5 2 1.5 3 1.5 4 1.5 10 0.96 11 1.5 12 -1.5 13 1.5 17 1.6 21 LOAD COMB 6572 _:
1.5 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.6 11 1.0 12 1.0 13 -1.0 17 0.96 21
*1?SD+1?F+1?CM+1?PA+0.96?T1+1?STRESS_Y- 1.0
1?STRESS_X+1?STRESS_Z+1.6?WZNEG+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA-
LOAD COMB 6562 _: 0.96?T1+1.5?STRESS_Y+1.5?STRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 10 0.96 11 1.0 12 -1.0 13 1.0 17 1.6 21 *1.5?STRESS_Z+1.6?WZNEG+1.5?PS_1
1.0 LOAD COMB 6573 _:
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?T1+1.5?STRESS_Y- 1 1.5 2 1.5 3 1.5 4 1.5 10 -0.96 11 1.5 12 1.5 13 -1.5 17 1.6 21
1.5?STRESS_X- 1.5
*1.5?STRESS_Z+0.96?WZNEG+1.5?PS_1 *1?SD+1?F+1?CM+1?PA-
LOAD COMB 6563 _: 0.96?T1+1?STRESS_Y+1?STRESS_X-
1 1.5 2 1.5 3 1.5 4 1.5 10 1.6 11 1.5 12 -1.5 13 -1.5 17 0.96 21 1?STRESS_Z+1.6?WZNEG+1?PS_1
1.5 LOAD COMB 6574 _:
*1?SD+1?F+1?CM+1?PA+1.6?T1+1?STRESS_Y- 1 1.0 2 1.0 3 1.0 4 1.0 10 -0.96 11 1.0 12 1.0 13 -1.0 17 1.6 21
1?STRESS_X-1?STRESS_Z+0.96?WZNEG+1?PS_1 1.0
LOAD COMB 6564 _: *1.5?SD+1.5?F+1.5?CM+1.5?PA-1.6?T1+1.5?STRESS_Y-
1 1.0 2 1.0 3 1.0 4 1.0 10 1.6 11 1.0 12 -1.0 13 -1.0 17 0.96 21 *1.5?STRESS_X+1.5?STRESS_Z+0.96?WZNEG+1.5?PS_1
1.0 LOAD COMB 6575 _:
*1.5?SD+1.5?F+1.5?CM+1.5?PA+0.96?T1+1.5?STRESS_Y- 1 1.5 2 1.5 3 1.5 4 1.5 10 -1.6 11 1.5 12 -1.5 13 1.5 17 0.96 21
1.5?STRESS_X- 1.5
*1.5?STRESS_Z+1.6?WZNEG+1.5?PS_1 *1?SD+1?F+1?CM+1?PA-1.6?T1+1?STRESS_Y-
LOAD COMB 6565 _: 1?STRESS_X+1?STRESS_Z+0.96?WZNEG+1?PS_1
1 1.5 2 1.5 3 1.5 4 1.5 10 0.96 11 1.5 12 -1.5 13 -1.5 17 1.6 21 LOAD COMB 6576 _:
1.5 1 1.0 2 1.0 3 1.0 4 1.0 10 -1.6 11 1.0 12 -1.0 13 1.0 17 0.96 21
*1?SD+1?F+1?CM+1?PA+0.96?T1+1?STRESS_Y- 1.0
1?STRESS_X-1?STRESS_Z+1.6?WZNEG+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA-0.96?T1+1.5?STRESS_Y-
LOAD COMB 6566 _: *1.5?STRESS_X+1.5?STRESS_Z+1.6?WZNEG+1.5?PS_1
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 347 de 463
(SUBJECT) (Page)

LOAD COMB 6577 _: 1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 0.96 11 1.0 12 1.0 13 -
1 1.5 2 1.5 3 1.5 4 1.5 10 -0.96 11 1.5 12 -1.5 13 1.5 17 1.6 21 1.0 21 1.0
1.5 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+1.6?T
*1?SD+1?F+1?CM+1?PA-0.96?T1+1?STRESS_Y- 1+1.5?STRESS_Y+1.5?STRESS_X-
1?STRESS_X+1?STRESS_Z+1.6?WZNEG+1?PS_1 *1.5?STRESS_Z+1.5?PS_1
LOAD COMB 6578 _: LOAD COMB 6701 _:
1 1.0 2 1.0 3 1.0 4 1.0 10 -0.96 11 1.0 12 -1.0 13 1.0 17 1.6 21 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 1.6 11 1.5 12 1.5 13 -
1.0 1.5 21 1.5
*1.5?SD+1.5?F+1.5?CM+1.5?PA-1.6?T1+1.5?STRESS_Y- *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+1.6?T1+1?ST
1.5?STRESS_X- RESS_Y+1?STRESS_X-1?STRESS_Z+1?PS_1
*1.5?STRESS_Z+0.96?WZNEG+1.5?PS_1 LOAD COMB 6702 _:
LOAD COMB 6579 _: 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 1.6 11 1.0 12 1.0 13 -
1 1.5 2 1.5 3 1.5 4 1.5 10 -1.6 11 1.5 12 -1.5 13 -1.5 17 0.96 1.0 21 1.0
21 1.5 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC+0.96?T1
*1?SD+1?F+1?CM+1?PA-1.6?T1+1?STRESS_Y- +1.5?STRESS_Y-
1?STRESS_X-1?STRESS_Z+0.96?WZNEG+1?PS_1 *1.5?STRESS_X+1.5?STRESS_Z+1.5?PS_1
LOAD COMB 6580 _: LOAD COMB 6703 _:
1 1.0 2 1.0 3 1.0 4 1.0 10 -1.6 11 1.0 12 -1.0 13 -1.0 17 0.96 1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 0.96 11 1.5 12 -1.5 13
21 1.0 1.5 21 1.5
*1.5?SD+1.5?F+1.5?CM+1.5?PA-0.96?T1+1.5?STRESS_Y- *1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC+0.96?T1+1?ST
1.5?STRESS_X- RESS_Y-1?STRESS_X+1?STRESS_Z+1?PS_1
*1.5?STRESS_Z+1.6?WZNEG+1.5?PS_1 LOAD COMB 6704 _:
LOAD COMB 6581 _: 1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 0.96 11 1.0 12 -1.0 13
1 1.5 2 1.5 3 1.5 4 1.5 10 -0.96 11 1.5 12 -1.5 13 -1.5 17 1.6 1.0 21 1.0
21 1.5 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+1.6?T
*1?SD+1?F+1?CM+1?PA-0.96?T1+1?STRESS_Y- 1+1.5?STRESS_Y-
1?STRESS_X-1?STRESS_Z+1.6?WZNEG+1?PS_1 *1.5?STRESS_X+1.5?STRESS_Z+1.5?PS_1
LOAD COMB 6582 _: LOAD COMB 6705 _:
1 1.0 2 1.0 3 1.0 4 1.0 10 -0.96 11 1.0 12 -1.0 13 -1.0 17 1.6 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 1.6 11 1.5 12 -1.5 13
21 1.0 1.5 21 1.5
* *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+1.6?T1+1?ST
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC+0.96?T1 RESS_Y-1?STRESS_X+1?STRESS_Z+1?PS_1
+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS LOAD COMB 6706 _:
*_Z+1.5?PS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 1.6 11 1.0 12 -1.0 13
LOAD COMB 6695 _: 1.0 21 1.0
1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 0.96 11 1.5 12 1.5 13 1.5 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC+0.96?T1
21 1.5 +1.5?STRESS_Y-1.5?STRESS_X-
*1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC+0.96?T1+1?ST *1.5?STRESS_Z+1.5?PS_1
RESS_Y+1?STRESS_X+1?STRESS_Z+1?PS_1 LOAD COMB 6707 _:
LOAD COMB 6696 _: 1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 0.96 11 1.5 12 -1.5 13 -
1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 0.96 11 1.0 12 1.0 13 1.0 1.5 21 1.5
21 1.0 *1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC+0.96?T1+1?ST
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+1.6?T RESS_Y-1?STRESS_X-1?STRESS_Z+1?PS_1
1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRES LOAD COMB 6708 _:
*S_Z+1.5?PS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 0.96 11 1.0 12 -1.0 13 -
LOAD COMB 6697 _: 1.0 21 1.0
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 1.6 11 1.5 12 1.5 13 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+1.6?T
1.5 21 1.5 1+1.5?STRESS_Y-1.5?STRESS_X-
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+1.6?T1+1?ST *1.5?STRESS_Z+1.5?PS_1
RESS_Y+1?STRESS_X+1?STRESS_Z+1?PS_1 LOAD COMB 6709 _:
LOAD COMB 6698 _: 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 1.6 11 1.5 12 -1.5 13 -
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 1.6 11 1.0 12 1.0 13 1.5 21 1.5
1.0 21 1.0 *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+1.6?T1+1?ST
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC+0.96?T1 RESS_Y-1?STRESS_X-1?STRESS_Z+1?PS_1
+1.5?STRESS_Y+1.5?STRESS_X- LOAD COMB 6710 _:
*1.5?STRESS_Z+1.5?PS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 1.6 11 1.0 12 -1.0 13 -
LOAD COMB 6699 _: 1.0 21 1.0
1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 0.96 11 1.5 12 1.5 13 - *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC-
1.5 21 1.5 *0.96?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z
*1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC+0.96?T1+1?ST +1.5?PS_1
RESS_Y+1?STRESS_X-1?STRESS_Z+1?PS_1 LOAD COMB 6711 _:
LOAD COMB 6700 _:
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 348 de 463
(SUBJECT) (Page)

1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 -0.96 11 1.5 12 1.5 13 *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC-
1.5 21 1.5 1.6?T1+1?STRESS_Y-1?STRESS_X+1?STRESS_Z+1?PS_1
*1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC- LOAD COMB 6722 _:
0.96?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+1?PS 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -1.6 11 1.0 12 -1.0 13
_1 1.0 21 1.0
LOAD COMB 6712 _: *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 -0.96 11 1.0 12 1.0 13 0.96?T1+1.5?STRESS_Y-1.5?STRESS_X-
1.0 21 1.0 *1.5?STRESS_Z+1.5?PS_1
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC- LOAD COMB 6723 _:
*1.6?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z+ 1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 -0.96 11 1.5 12 -1.5 13 -
1.5?PS_1 1.5 21 1.5
LOAD COMB 6713 _: *1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC-
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -1.6 11 1.5 12 1.5 13 0.96?T1+1?STRESS_Y-1?STRESS_X-
1.5 21 1.5 1?STRESS_Z+1?PS_1
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC- LOAD COMB 6724 _:
1.6?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+1?PS_ 1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 -0.96 11 1.0 12 -1.0 13 -
1 1.0 21 1.0
LOAD COMB 6714 _: *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -1.6 11 1.0 12 1.0 13 1.6?T1+1.5?STRESS_Y-1.5?STRESS_X-
1.0 21 1.0 *1.5?STRESS_Z+1.5?PS_1
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC- LOAD COMB 6725 _:
0.96?T1+1.5?STRESS_Y+1.5?STRESS_X- 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -1.6 11 1.5 12 -1.5 13 -
*1.5?STRESS_Z+1.5?PS_1 1.5 21 1.5
LOAD COMB 6715 _: *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC-
1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 -0.96 11 1.5 12 1.5 13 - 1.6?T1+1?STRESS_Y-1?STRESS_X-1?STRESS_Z+1?PS_1
1.5 21 1.5 LOAD COMB 6726 _:
*1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC- 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -1.6 11 1.0 12 -1.0 13 -
0.96?T1+1?STRESS_Y+1?STRESS_X- 1.0 21 1.0
1?STRESS_Z+1?PS_1 *
LOAD COMB 6716 _: *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC+0.96?T1
1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 -0.96 11 1.0 12 1.0 13 - +1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS
1.0 21 1.0 *_Z+0.96?WXPOS+1.5?PS_1
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC- LOAD COMB 6871 _:
1.6?T1+1.5?STRESS_Y+1.5?STRESS_X- 1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 0.96 11 1.5 12 1.5 13 1.5
*1.5?STRESS_Z+1.5?PS_1 14 0.96 -
LOAD COMB 6717 _: 21 1.5
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -1.6 11 1.5 12 1.5 13 - *1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC+0.96?T1+1?ST
1.5 21 1.5 RESS_Y+1?STRESS_X+1?STRESS_Z+0.96?WXPOS+
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC- *1?PS_1
1.6?T1+1?STRESS_Y+1?STRESS_X-1?STRESS_Z+1?PS_1 LOAD COMB 6872 _:
LOAD COMB 6718 _: 1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 0.96 11 1.0 12 1.0 13 1.0
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -1.6 11 1.0 12 1.0 13 - 14 0.96 -
1.0 21 1.0 21 1.0
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC- *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+1.6?T
0.96?T1+1.5?STRESS_Y- 1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRES
*1.5?STRESS_X+1.5?STRESS_Z+1.5?PS_1 *S_Z+0.96?WXPOS+1.5?PS_1
LOAD COMB 6719 _: LOAD COMB 6873 _:
1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 -0.96 11 1.5 12 -1.5 13 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 1.6 11 1.5 12 1.5 13
1.5 21 1.5 1.5 14 0.96 -
*1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC- 21 1.5
0.96?T1+1?STRESS_Y- *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+1.6?T1+1?ST
1?STRESS_X+1?STRESS_Z+1?PS_1 RESS_Y+1?STRESS_X+1?STRESS_Z+0.96?WXPOS
LOAD COMB 6720 _: *+1?PS_1
1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 -0.96 11 1.0 12 -1.0 13 LOAD COMB 6874 _:
1.0 21 1.0 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 1.6 11 1.0 12 1.0 13
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC- 1.0 14 0.96 -
1.6?T1+1.5?STRESS_Y- 21 1.0
*1.5?STRESS_X+1.5?STRESS_Z+1.5?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+0.96?
LOAD COMB 6721 _: T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRE
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -1.6 11 1.5 12 -1.5 13 *SS_Z+1.6?WXPOS+1.5?PS_1
1.5 21 1.5 LOAD COMB 6875 _:
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 349 de 463
(SUBJECT) (Page)

1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 0.96 11 1.5 12 1.5 13 *1?PS_1
1.5 14 1.6 - LOAD COMB 6890 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 0.96 11 1.0 12 1.0 13 1.0
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+0.96?T1+1?S 15 0.96 -
TRESS_Y+1?STRESS_X+1?STRESS_Z+1.6?WXPOS 21 1.0
*+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+1.6?T
LOAD COMB 6876 _: 1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRES
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 0.96 11 1.0 12 1.0 13 *S_Z+0.96?WXNEG+1.5?PS_1
1.0 14 1.6 - LOAD COMB 6891 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 1.6 11 1.5 12 1.5 13
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC- 1.5 15 0.96 -
*0.96?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z 21 1.5
+0.96?WXPOS+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+1.6?T1+1?ST
LOAD COMB 6877 _: RESS_Y+1?STRESS_X+1?STRESS_Z+0.96?WXNEG
1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 -0.96 11 1.5 12 1.5 13 *+1?PS_1
1.5 14 0.96 - LOAD COMB 6892 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 1.6 11 1.0 12 1.0 13
*1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC- 1.0 15 0.96 -
*0.96?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+0.96 21 1.0
?WXPOS+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+0.96?
LOAD COMB 6878 _: T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRE
1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 -0.96 11 1.0 12 1.0 13 *SS_Z+1.6?WXNEG+1.5?PS_1
1.0 14 0.96 - LOAD COMB 6893 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 0.96 11 1.5 12 1.5 13
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC- 1.5 15 1.6 -
*1.6?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z+ 21 1.5
0.96?WXPOS+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+0.96?T1+1?S
LOAD COMB 6879 _: TRESS_Y+1?STRESS_X+1?STRESS_Z+1.6?WXNEG
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -1.6 11 1.5 12 1.5 13 *+1?PS_1
1.5 14 0.96 - LOAD COMB 6894 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 0.96 11 1.0 12 1.0 13
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC- 1.0 15 1.6 -
*1.6?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+0.96? 21 1.0
WXPOS+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC-
LOAD COMB 6880 _: *0.96?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -1.6 11 1.0 12 1.0 13 +0.96?WXNEG+1.5?PS_1
1.0 14 0.96 - LOAD COMB 6895 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 -0.96 11 1.5 12 1.5 13
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC- 1.5 15 0.96 -
*0.96?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z 21 1.5
+1.6?WXPOS+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC-
LOAD COMB 6881 _: *0.96?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+0.96
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -0.96 11 1.5 12 1.5 13 ?WXNEG+1?PS_1
1.5 14 1.6 - LOAD COMB 6896 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 -0.96 11 1.0 12 1.0 13
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC- 1.0 15 0.96 -
*0.96?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+1.6? 21 1.0
WXPOS+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC-
LOAD COMB 6882 _: *1.6?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z+
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -0.96 11 1.0 12 1.0 13 0.96?WXNEG+1.5?PS_1
1.0 14 1.6 - LOAD COMB 6897 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -1.6 11 1.5 12 1.5 13
* 1.5 15 0.96 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC+0.96?T1 21 1.5
+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC-
*_Z+0.96?WXNEG+1.5?PS_1 *1.6?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+0.96?
LOAD COMB 6889 _: WXNEG+1?PS_1
1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 0.96 11 1.5 12 1.5 13 1.5 LOAD COMB 6898 _:
15 0.96 - 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -1.6 11 1.0 12 1.0 13
21 1.5 1.0 15 0.96 -
*1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC+0.96?T1+1?ST 21 1.0
RESS_Y+1?STRESS_X+1?STRESS_Z+0.96?WXNEG+ *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC-
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 350 de 463
(SUBJECT) (Page)

*0.96?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z 21 1.5
+1.6?WXNEG+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC-
LOAD COMB 6899 _: *0.96?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+0.96
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -0.96 11 1.5 12 1.5 13 ?WZPOS+1?PS_1
1.5 15 1.6 - LOAD COMB 6914 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 -0.96 11 1.0 12 1.0 13
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC- 1.0 16 0.96 -
*0.96?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+1.6? 21 1.0
WXNEG+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC-
LOAD COMB 6900 _: *1.6?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z+
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -0.96 11 1.0 12 1.0 13 0.96?WZPOS+1.5?PS_1
1.0 15 1.6 - LOAD COMB 6915 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -1.6 11 1.5 12 1.5 13
* 1.5 16 0.96 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC+0.96?T1 21 1.5
+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC-
*_Z+0.96?WZPOS+1.5?PS_1 *1.6?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+0.96?
LOAD COMB 6907 _: WZPOS+1?PS_1
1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 0.96 11 1.5 12 1.5 13 1.5 LOAD COMB 6916 _:
16 0.96 - 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -1.6 11 1.0 12 1.0 13
21 1.5 1.0 16 0.96 -
*1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC+0.96?T1+1?ST 21 1.0
RESS_Y+1?STRESS_X+1?STRESS_Z+0.96?WZPOS+ *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC-
*1?PS_1 *0.96?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z
LOAD COMB 6908 _: +1.6?WZPOS+1.5?PS_1
1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 0.96 11 1.0 12 1.0 13 1.0 LOAD COMB 6917 _:
16 0.96 - 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -0.96 11 1.5 12 1.5 13
21 1.0 1.5 16 1.6 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+1.6?T 21 1.5
1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRES *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC-
*S_Z+0.96?WZPOS+1.5?PS_1 *0.96?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+1.6?
LOAD COMB 6909 _: WZPOS+1?PS_1
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 1.6 11 1.5 12 1.5 13 LOAD COMB 6918 _:
1.5 16 0.96 - 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -0.96 11 1.0 12 1.0 13
21 1.5 1.0 16 1.6 -
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+1.6?T1+1?ST 21 1.0
RESS_Y+1?STRESS_X+1?STRESS_Z+0.96?WZPOS *
*+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC+0.96?T1
LOAD COMB 6910 _: +1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 1.6 11 1.0 12 1.0 13 *_Z+0.96?WZNEG+1.5?PS_1
1.0 16 0.96 - LOAD COMB 6925 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 0.96 11 1.5 12 1.5 13 1.5
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+0.96? 17 0.96 -
T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRE 21 1.5
*SS_Z+1.6?WZPOS+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC+0.96?T1+1?ST
LOAD COMB 6911 _: RESS_Y+1?STRESS_X+1?STRESS_Z+0.96?WZNEG+
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 0.96 11 1.5 12 1.5 13 *1?PS_1
1.5 16 1.6 - LOAD COMB 6926 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 0.96 11 1.0 12 1.0 13 1.0
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+0.96?T1+1?S 17 0.96 -
TRESS_Y+1?STRESS_X+1?STRESS_Z+1.6?WZPOS 21 1.0
*+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+1.6?T
LOAD COMB 6912 _: 1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRES
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 0.96 11 1.0 12 1.0 13 *S_Z+0.96?WZNEG+1.5?PS_1
1.0 16 1.6 - LOAD COMB 6927 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 1.6 11 1.5 12 1.5 13
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC- 1.5 17 0.96 -
*0.96?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z 21 1.5
+0.96?WZPOS+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+1.6?T1+1?ST
LOAD COMB 6913 _: RESS_Y+1?STRESS_X+1?STRESS_Z+0.96?WZNEG
1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 -0.96 11 1.5 12 1.5 13 *+1?PS_1
1.5 16 0.96 - LOAD COMB 6928 _:
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 351 de 463
(SUBJECT) (Page)

1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 1.6 11 1.0 12 1.0 13 *1.5?STRESS_Z+0.96?WXPOS+1.5?PS_1
1.0 17 0.96 - LOAD COMB 6943 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 0.96 11 1.5 12 1.5 13 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+0.96? 1.5 14 0.96 -
T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRE 21 1.5
*SS_Z+1.6?WZNEG+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC+0.96?T1+1?ST
LOAD COMB 6929 _: RESS_Y+1?STRESS_X-
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 0.96 11 1.5 12 1.5 13 *1?STRESS_Z+0.96?WXPOS+1?PS_1
1.5 17 1.6 - LOAD COMB 6944 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 0.96 11 1.0 12 1.0 13 -
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+0.96?T1+1?S 1.0 14 0.96 -
TRESS_Y+1?STRESS_X+1?STRESS_Z+1.6?WZNEG 21 1.0
*+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+1.6?T
LOAD COMB 6930 _: 1+1.5?STRESS_Y+1.5?STRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 0.96 11 1.0 12 1.0 13 *1.5?STRESS_Z+0.96?WXPOS+1.5?PS_1
1.0 17 1.6 - LOAD COMB 6945 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 1.6 11 1.5 12 1.5 13 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC- 1.5 14 0.96 -
*0.96?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z 21 1.5
+0.96?WZNEG+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+1.6?T1+1?ST
LOAD COMB 6931 _: RESS_Y+1?STRESS_X-
1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 -0.96 11 1.5 12 1.5 13 *1?STRESS_Z+0.96?WXPOS+1?PS_1
1.5 17 0.96 - LOAD COMB 6946 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 1.6 11 1.0 12 1.0 13 -
*1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC- 1.0 14 0.96 -
*0.96?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+0.96 21 1.0
?WZNEG+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+0.96?
LOAD COMB 6932 _: T1+1.5?STRESS_Y+1.5?STRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 -0.96 11 1.0 12 1.0 13 *1.5?STRESS_Z+1.6?WXPOS+1.5?PS_1
1.0 17 0.96 - LOAD COMB 6947 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 0.96 11 1.5 12 1.5 13 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC- 1.5 14 1.6 -
*1.6?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z+ 21 1.5
0.96?WZNEG+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+0.96?T1+1?S
LOAD COMB 6933 _: TRESS_Y+1?STRESS_X-
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -1.6 11 1.5 12 1.5 13 *1?STRESS_Z+1.6?WXPOS+1?PS_1
1.5 17 0.96 - LOAD COMB 6948 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 0.96 11 1.0 12 1.0 13 -
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC- 1.0 14 1.6 -
*1.6?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+0.96? 21 1.0
WZNEG+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC-
LOAD COMB 6934 _: 0.96?T1+1.5?STRESS_Y+1.5?STRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -1.6 11 1.0 12 1.0 13 *1.5?STRESS_Z+0.96?WXPOS+1.5?PS_1
1.0 17 0.96 - LOAD COMB 6949 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 -0.96 11 1.5 12 1.5 13 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC- 1.5 14 0.96 -
*0.96?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z 21 1.5
+1.6?WZNEG+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC-
LOAD COMB 6935 _: 0.96?T1+1?STRESS_Y+1?STRESS_X-
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -0.96 11 1.5 12 1.5 13 *1?STRESS_Z+0.96?WXPOS+1?PS_1
1.5 17 1.6 - LOAD COMB 6950 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 -0.96 11 1.0 12 1.0 13 -
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC- 1.0 14 0.96 -
*0.96?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+1.6? 21 1.0
WZNEG+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC-
LOAD COMB 6936 _: 1.6?T1+1.5?STRESS_Y+1.5?STRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -0.96 11 1.0 12 1.0 13 *1.5?STRESS_Z+0.96?WXPOS+1.5?PS_1
1.0 17 1.6 - LOAD COMB 6951 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -1.6 11 1.5 12 1.5 13 -
* 1.5 14 0.96 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC+0.96?T1 21 1.5
+1.5?STRESS_Y+1.5?STRESS_X-
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 352 de 463
(SUBJECT) (Page)

*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC- 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 0.96 11 1.0 12 1.0 13 -
1.6?T1+1?STRESS_Y+1?STRESS_X- 1.0 15 1.6 -
*1?STRESS_Z+0.96?WXPOS+1?PS_1 21 1.0
LOAD COMB 6952 _: *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -1.6 11 1.0 12 1.0 13 - 0.96?T1+1.5?STRESS_Y+1.5?STRESS_X-
1.0 14 0.96 - *1.5?STRESS_Z+0.96?WXNEG+1.5?PS_1
21 1.0 LOAD COMB 6967 _:
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC- 1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 -0.96 11 1.5 12 1.5 13 -
0.96?T1+1.5?STRESS_Y+1.5?STRESS_X- 1.5 15 0.96 -
*1.5?STRESS_Z+1.6?WXPOS+1.5?PS_1 21 1.5
LOAD COMB 6953 _: *1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC-
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -0.96 11 1.5 12 1.5 13 0.96?T1+1?STRESS_Y+1?STRESS_X-
-1.5 14 1.6 - *1?STRESS_Z+0.96?WXNEG+1?PS_1
21 1.5 LOAD COMB 6968 _:
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC- 1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 -0.96 11 1.0 12 1.0 13 -
0.96?T1+1?STRESS_Y+1?STRESS_X- 1.0 15 0.96 -
*1?STRESS_Z+1.6?WXPOS+1?PS_1 21 1.0
LOAD COMB 6954 _: *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -0.96 11 1.0 12 1.0 13 1.6?T1+1.5?STRESS_Y+1.5?STRESS_X-
-1.0 14 1.6 - *1.5?STRESS_Z+0.96?WXNEG+1.5?PS_1
21 1.0 LOAD COMB 6969 _:
* 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -1.6 11 1.5 12 1.5 13 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC+0.96?T1 1.5 15 0.96 -
+1.5?STRESS_Y+1.5?STRESS_X- 21 1.5
*1.5?STRESS_Z+0.96?WXNEG+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC-
LOAD COMB 6961 _: 1.6?T1+1?STRESS_Y+1?STRESS_X-
1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 0.96 11 1.5 12 1.5 13 - *1?STRESS_Z+0.96?WXNEG+1?PS_1
1.5 15 0.96 - LOAD COMB 6970 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -1.6 11 1.0 12 1.0 13 -
*1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC+0.96?T1+1?ST 1.0 15 0.96 -
RESS_Y+1?STRESS_X- 21 1.0
*1?STRESS_Z+0.96?WXNEG+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC-
LOAD COMB 6962 _: 0.96?T1+1.5?STRESS_Y+1.5?STRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 0.96 11 1.0 12 1.0 13 - *1.5?STRESS_Z+1.6?WXNEG+1.5?PS_1
1.0 15 0.96 - LOAD COMB 6971 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -0.96 11 1.5 12 1.5 13
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+1.6?T -1.5 15 1.6 -
1+1.5?STRESS_Y+1.5?STRESS_X- 21 1.5
*1.5?STRESS_Z+0.96?WXNEG+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC-
LOAD COMB 6963 _: 0.96?T1+1?STRESS_Y+1?STRESS_X-
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 1.6 11 1.5 12 1.5 13 - *1?STRESS_Z+1.6?WXNEG+1?PS_1
1.5 15 0.96 - LOAD COMB 6972 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -0.96 11 1.0 12 1.0 13
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+1.6?T1+1?ST -1.0 15 1.6 -
RESS_Y+1?STRESS_X- 21 1.0
*1?STRESS_Z+0.96?WXNEG+1?PS_1 *
LOAD COMB 6964 _: *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC+0.96?T1
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 1.6 11 1.0 12 1.0 13 - +1.5?STRESS_Y+1.5?STRESS_X-
1.0 15 0.96 - *1.5?STRESS_Z+0.96?WZPOS+1.5?PS_1
21 1.0 LOAD COMB 6979 _:
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+0.96? 1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 0.96 11 1.5 12 1.5 13 -
T1+1.5?STRESS_Y+1.5?STRESS_X- 1.5 16 0.96 -
*1.5?STRESS_Z+1.6?WXNEG+1.5?PS_1 21 1.5
LOAD COMB 6965 _: *1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC+0.96?T1+1?ST
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 0.96 11 1.5 12 1.5 13 - RESS_Y+1?STRESS_X-
1.5 15 1.6 - *1?STRESS_Z+0.96?WZPOS+1?PS_1
21 1.5 LOAD COMB 6980 _:
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+0.96?T1+1?S 1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 0.96 11 1.0 12 1.0 13 -
TRESS_Y+1?STRESS_X- 1.0 16 0.96 -
*1?STRESS_Z+1.6?WXNEG+1?PS_1 21 1.0
LOAD COMB 6966 _: *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+1.6?T
1+1.5?STRESS_Y+1.5?STRESS_X-
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 353 de 463
(SUBJECT) (Page)

*1.5?STRESS_Z+0.96?WZPOS+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC-
LOAD COMB 6981 _: 0.96?T1+1?STRESS_Y+1?STRESS_X-
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 1.6 11 1.5 12 1.5 13 - *1?STRESS_Z+1.6?WZPOS+1?PS_1
1.5 16 0.96 - LOAD COMB 6990 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -0.96 11 1.0 12 1.0 13
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+1.6?T1+1?ST -1.0 16 1.6 -
RESS_Y+1?STRESS_X- 21 1.0
*1?STRESS_Z+0.96?WZPOS+1?PS_1 *
LOAD COMB 6982 _: *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC+0.96?T1
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 1.6 11 1.0 12 1.0 13 - +1.5?STRESS_Y+1.5?STRESS_X-
1.0 16 0.96 - *1.5?STRESS_Z+0.96?WZNEG+1.5?PS_1
21 1.0 LOAD COMB 6997 _:
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+0.96? 1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 0.96 11 1.5 12 1.5 13 -
T1+1.5?STRESS_Y+1.5?STRESS_X- 1.5 17 0.96 -
*1.5?STRESS_Z+1.6?WZPOS+1.5?PS_1 21 1.5
LOAD COMB 6983 _: *1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC+0.96?T1+1?ST
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 0.96 11 1.5 12 1.5 13 - RESS_Y+1?STRESS_X-
1.5 16 1.6 - *1?STRESS_Z+0.96?WZNEG+1?PS_1
21 1.5 LOAD COMB 6998 _:
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+0.96?T1+1?S 1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 0.96 11 1.0 12 1.0 13 -
TRESS_Y+1?STRESS_X- 1.0 17 0.96 -
*1?STRESS_Z+1.6?WZPOS+1?PS_1 21 1.0
LOAD COMB 6984 _: *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+1.6?T
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 0.96 11 1.0 12 1.0 13 - 1+1.5?STRESS_Y+1.5?STRESS_X-
1.0 16 1.6 - *1.5?STRESS_Z+0.96?WZNEG+1.5?PS_1
21 1.0 LOAD COMB 6999 _:
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC- 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 1.6 11 1.5 12 1.5 13 -
0.96?T1+1.5?STRESS_Y+1.5?STRESS_X- 1.5 17 0.96 -
*1.5?STRESS_Z+0.96?WZPOS+1.5?PS_1 21 1.5
LOAD COMB 6985 _: *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+1.6?T1+1?ST
1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 -0.96 11 1.5 12 1.5 13 - RESS_Y+1?STRESS_X-
1.5 16 0.96 - *1?STRESS_Z+0.96?WZNEG+1?PS_1
21 1.5 LOAD COMB 7000 _:
*1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC- 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 1.6 11 1.0 12 1.0 13 -
0.96?T1+1?STRESS_Y+1?STRESS_X- 1.0 17 0.96 -
*1?STRESS_Z+0.96?WZPOS+1?PS_1 21 1.0
LOAD COMB 6986 _: *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+0.96?
1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 -0.96 11 1.0 12 1.0 13 - T1+1.5?STRESS_Y+1.5?STRESS_X-
1.0 16 0.96 - *1.5?STRESS_Z+1.6?WZNEG+1.5?PS_1
21 1.0 LOAD COMB 7001 _:
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC- 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 0.96 11 1.5 12 1.5 13 -
1.6?T1+1.5?STRESS_Y+1.5?STRESS_X- 1.5 17 1.6 -
*1.5?STRESS_Z+0.96?WZPOS+1.5?PS_1 21 1.5
LOAD COMB 6987 _: *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+0.96?T1+1?S
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -1.6 11 1.5 12 1.5 13 - TRESS_Y+1?STRESS_X-
1.5 16 0.96 - *1?STRESS_Z+1.6?WZNEG+1?PS_1
21 1.5 LOAD COMB 7002 _:
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC- 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 0.96 11 1.0 12 1.0 13 -
1.6?T1+1?STRESS_Y+1?STRESS_X- 1.0 17 1.6 -
*1?STRESS_Z+0.96?WZPOS+1?PS_1 21 1.0
LOAD COMB 6988 _: *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -1.6 11 1.0 12 1.0 13 - 0.96?T1+1.5?STRESS_Y+1.5?STRESS_X-
1.0 16 0.96 - *1.5?STRESS_Z+0.96?WZNEG+1.5?PS_1
21 1.0 LOAD COMB 7003 _:
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC- 1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 -0.96 11 1.5 12 1.5 13 -
0.96?T1+1.5?STRESS_Y+1.5?STRESS_X- 1.5 17 0.96 -
*1.5?STRESS_Z+1.6?WZPOS+1.5?PS_1 21 1.5
LOAD COMB 6989 _: *1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC-
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -0.96 11 1.5 12 1.5 13 0.96?T1+1?STRESS_Y+1?STRESS_X-
-1.5 16 1.6 - *1?STRESS_Z+0.96?WZNEG+1?PS_1
21 1.5 LOAD COMB 7004 _:
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 354 de 463
(SUBJECT) (Page)

1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 -0.96 11 1.0 12 1.0 13 - *1.5?STRESS_X+1.5?STRESS_Z+1.6?WXPOS+1.5?PS_1
1.0 17 0.96 - LOAD COMB 7019 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 0.96 11 1.5 12 -1.5 13
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC- 1.5 14 1.6 -
1.6?T1+1.5?STRESS_Y+1.5?STRESS_X- 21 1.5
*1.5?STRESS_Z+0.96?WZNEG+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+0.96?T1+1?S
LOAD COMB 7005 _: TRESS_Y-
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -1.6 11 1.5 12 1.5 13 - *1?STRESS_X+1?STRESS_Z+1.6?WXPOS+1?PS_1
1.5 17 0.96 - LOAD COMB 7020 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 0.96 11 1.0 12 -1.0 13
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC- 1.0 14 1.6 -
1.6?T1+1?STRESS_Y+1?STRESS_X- 21 1.0
*1?STRESS_Z+0.96?WZNEG+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC-
LOAD COMB 7006 _: 0.96?T1+1.5?STRESS_Y-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -1.6 11 1.0 12 1.0 13 - *1.5?STRESS_X+1.5?STRESS_Z+0.96?WXPOS+1.5?PS_1
1.0 17 0.96 - LOAD COMB 7021 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 -0.96 11 1.5 12 -1.5 13
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC- 1.5 14 0.96 -
0.96?T1+1.5?STRESS_Y+1.5?STRESS_X- 21 1.5
*1.5?STRESS_Z+1.6?WZNEG+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC-
LOAD COMB 7007 _: 0.96?T1+1?STRESS_Y-
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -0.96 11 1.5 12 1.5 13 *1?STRESS_X+1?STRESS_Z+0.96?WXPOS+1?PS_1
-1.5 17 1.6 - LOAD COMB 7022 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 -0.96 11 1.0 12 -1.0 13
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC- 1.0 14 0.96 -
0.96?T1+1?STRESS_Y+1?STRESS_X- 21 1.0
*1?STRESS_Z+1.6?WZNEG+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC-
LOAD COMB 7008 _: 1.6?T1+1.5?STRESS_Y-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -0.96 11 1.0 12 1.0 13 *1.5?STRESS_X+1.5?STRESS_Z+0.96?WXPOS+1.5?PS_1
-1.0 17 1.6 - LOAD COMB 7023 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -1.6 11 1.5 12 -1.5 13
* 1.5 14 0.96 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC+0.96?T1 21 1.5
+1.5?STRESS_Y- *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC-
*1.5?STRESS_X+1.5?STRESS_Z+0.96?WXPOS+1.5?PS_1 1.6?T1+1?STRESS_Y-
LOAD COMB 7015 _: *1?STRESS_X+1?STRESS_Z+0.96?WXPOS+1?PS_1
1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 0.96 11 1.5 12 -1.5 13 LOAD COMB 7024 _:
1.5 14 0.96 - 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -1.6 11 1.0 12 -1.0 13
21 1.5 1.0 14 0.96 -
*1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC+0.96?T1+1?ST 21 1.0
RESS_Y- *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC-
*1?STRESS_X+1?STRESS_Z+0.96?WXPOS+1?PS_1 0.96?T1+1.5?STRESS_Y-
LOAD COMB 7016 _: *1.5?STRESS_X+1.5?STRESS_Z+1.6?WXPOS+1.5?PS_1
1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 0.96 11 1.0 12 -1.0 13 LOAD COMB 7025 _:
1.0 14 0.96 - 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -0.96 11 1.5 12 -1.5 13
21 1.0 1.5 14 1.6 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+1.6?T 21 1.5
1+1.5?STRESS_Y- *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC-
*1.5?STRESS_X+1.5?STRESS_Z+0.96?WXPOS+1.5?PS_1 0.96?T1+1?STRESS_Y-
LOAD COMB 7017 _: *1?STRESS_X+1?STRESS_Z+1.6?WXPOS+1?PS_1
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 1.6 11 1.5 12 -1.5 13 LOAD COMB 7026 _:
1.5 14 0.96 - 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -0.96 11 1.0 12 -1.0 13
21 1.5 1.0 14 1.6 -
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+1.6?T1+1?ST 21 1.0
RESS_Y- *
*1?STRESS_X+1?STRESS_Z+0.96?WXPOS+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC+0.96?T1
LOAD COMB 7018 _: +1.5?STRESS_Y-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 1.6 11 1.0 12 -1.0 13 *1.5?STRESS_X+1.5?STRESS_Z+0.96?WXNEG+1.5?PS_1
1.0 14 0.96 - LOAD COMB 7033 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 0.96 11 1.5 12 -1.5 13
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+0.96? 1.5 15 0.96 -
T1+1.5?STRESS_Y- 21 1.5
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 355 de 463
(SUBJECT) (Page)

*1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC+0.96?T1+1?ST 21 1.0
RESS_Y- *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC-
*1?STRESS_X+1?STRESS_Z+0.96?WXNEG+1?PS_1 0.96?T1+1.5?STRESS_Y-
LOAD COMB 7034 _: *1.5?STRESS_X+1.5?STRESS_Z+1.6?WXNEG+1.5?PS_1
1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 0.96 11 1.0 12 -1.0 13 LOAD COMB 7043 _:
1.0 15 0.96 - 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -0.96 11 1.5 12 -1.5 13
21 1.0 1.5 15 1.6 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+1.6?T 21 1.5
1+1.5?STRESS_Y- *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC-
*1.5?STRESS_X+1.5?STRESS_Z+0.96?WXNEG+1.5?PS_1 0.96?T1+1?STRESS_Y-
LOAD COMB 7035 _: *1?STRESS_X+1?STRESS_Z+1.6?WXNEG+1?PS_1
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 1.6 11 1.5 12 -1.5 13 LOAD COMB 7044 _:
1.5 15 0.96 - 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -0.96 11 1.0 12 -1.0 13
21 1.5 1.0 15 1.6 -
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+1.6?T1+1?ST 21 1.0
RESS_Y- *
*1?STRESS_X+1?STRESS_Z+0.96?WXNEG+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC+0.96?T1
LOAD COMB 7036 _: +1.5?STRESS_Y-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 1.6 11 1.0 12 -1.0 13 *1.5?STRESS_X+1.5?STRESS_Z+0.96?WZPOS+1.5?PS_1
1.0 15 0.96 - LOAD COMB 7051 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 0.96 11 1.5 12 -1.5 13
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+0.96? 1.5 16 0.96 -
T1+1.5?STRESS_Y- 21 1.5
*1.5?STRESS_X+1.5?STRESS_Z+1.6?WXNEG+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC+0.96?T1+1?ST
LOAD COMB 7037 _: RESS_Y-
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 0.96 11 1.5 12 -1.5 13 *1?STRESS_X+1?STRESS_Z+0.96?WZPOS+1?PS_1
1.5 15 1.6 - LOAD COMB 7052 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 0.96 11 1.0 12 -1.0 13
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+0.96?T1+1?S 1.0 16 0.96 -
TRESS_Y- 21 1.0
*1?STRESS_X+1?STRESS_Z+1.6?WXNEG+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+1.6?T
LOAD COMB 7038 _: 1+1.5?STRESS_Y-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 0.96 11 1.0 12 -1.0 13 *1.5?STRESS_X+1.5?STRESS_Z+0.96?WZPOS+1.5?PS_1
1.0 15 1.6 - LOAD COMB 7053 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 1.6 11 1.5 12 -1.5 13
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC- 1.5 16 0.96 -
0.96?T1+1.5?STRESS_Y- 21 1.5
*1.5?STRESS_X+1.5?STRESS_Z+0.96?WXNEG+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+1.6?T1+1?ST
LOAD COMB 7039 _: RESS_Y-
1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 -0.96 11 1.5 12 -1.5 13 *1?STRESS_X+1?STRESS_Z+0.96?WZPOS+1?PS_1
1.5 15 0.96 - LOAD COMB 7054 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 1.6 11 1.0 12 -1.0 13
*1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC- 1.0 16 0.96 -
0.96?T1+1?STRESS_Y- 21 1.0
*1?STRESS_X+1?STRESS_Z+0.96?WXNEG+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+0.96?
LOAD COMB 7040 _: T1+1.5?STRESS_Y-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 -0.96 11 1.0 12 -1.0 13 *1.5?STRESS_X+1.5?STRESS_Z+1.6?WZPOS+1.5?PS_1
1.0 15 0.96 - LOAD COMB 7055 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 0.96 11 1.5 12 -1.5 13
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC- 1.5 16 1.6 -
1.6?T1+1.5?STRESS_Y- 21 1.5
*1.5?STRESS_X+1.5?STRESS_Z+0.96?WXNEG+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+0.96?T1+1?S
LOAD COMB 7041 _: TRESS_Y-
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -1.6 11 1.5 12 -1.5 13 *1?STRESS_X+1?STRESS_Z+1.6?WZPOS+1?PS_1
1.5 15 0.96 - LOAD COMB 7056 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 0.96 11 1.0 12 -1.0 13
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC- 1.0 16 1.6 -
1.6?T1+1?STRESS_Y- 21 1.0
*1?STRESS_X+1?STRESS_Z+0.96?WXNEG+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC-
LOAD COMB 7042 _: 0.96?T1+1.5?STRESS_Y-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -1.6 11 1.0 12 -1.0 13 *1.5?STRESS_X+1.5?STRESS_Z+0.96?WZPOS+1.5?PS_1
1.0 15 0.96 - LOAD COMB 7057 _:
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 356 de 463
(SUBJECT) (Page)

1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 -0.96 11 1.5 12 -1.5 13 *1?STRESS_X+1?STRESS_Z+0.96?WZNEG+1?PS_1
1.5 16 0.96 - LOAD COMB 7072 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 1.6 11 1.0 12 -1.0 13
*1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC- 1.0 17 0.96 -
0.96?T1+1?STRESS_Y- 21 1.0
*1?STRESS_X+1?STRESS_Z+0.96?WZPOS+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+0.96?
LOAD COMB 7058 _: T1+1.5?STRESS_Y-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 -0.96 11 1.0 12 -1.0 13 *1.5?STRESS_X+1.5?STRESS_Z+1.6?WZNEG+1.5?PS_1
1.0 16 0.96 - LOAD COMB 7073 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 0.96 11 1.5 12 -1.5 13
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC- 1.5 17 1.6 -
1.6?T1+1.5?STRESS_Y- 21 1.5
*1.5?STRESS_X+1.5?STRESS_Z+0.96?WZPOS+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+0.96?T1+1?S
LOAD COMB 7059 _: TRESS_Y-
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -1.6 11 1.5 12 -1.5 13 *1?STRESS_X+1?STRESS_Z+1.6?WZNEG+1?PS_1
1.5 16 0.96 - LOAD COMB 7074 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 0.96 11 1.0 12 -1.0 13
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC- 1.0 17 1.6 -
1.6?T1+1?STRESS_Y- 21 1.0
*1?STRESS_X+1?STRESS_Z+0.96?WZPOS+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC-
LOAD COMB 7060 _: 0.96?T1+1.5?STRESS_Y-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -1.6 11 1.0 12 -1.0 13 *1.5?STRESS_X+1.5?STRESS_Z+0.96?WZNEG+1.5?PS_1
1.0 16 0.96 - LOAD COMB 7075 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 -0.96 11 1.5 12 -1.5 13
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC- 1.5 17 0.96 -
0.96?T1+1.5?STRESS_Y- 21 1.5
*1.5?STRESS_X+1.5?STRESS_Z+1.6?WZPOS+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC-
LOAD COMB 7061 _: 0.96?T1+1?STRESS_Y-
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -0.96 11 1.5 12 -1.5 13 *1?STRESS_X+1?STRESS_Z+0.96?WZNEG+1?PS_1
1.5 16 1.6 - LOAD COMB 7076 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 -0.96 11 1.0 12 -1.0 13
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC- 1.0 17 0.96 -
0.96?T1+1?STRESS_Y- 21 1.0
*1?STRESS_X+1?STRESS_Z+1.6?WZPOS+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC-
LOAD COMB 7062 _: 1.6?T1+1.5?STRESS_Y-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -0.96 11 1.0 12 -1.0 13 *1.5?STRESS_X+1.5?STRESS_Z+0.96?WZNEG+1.5?PS_1
1.0 16 1.6 - LOAD COMB 7077 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -1.6 11 1.5 12 -1.5 13
* 1.5 17 0.96 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC+0.96?T1 21 1.5
+1.5?STRESS_Y- *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC-
*1.5?STRESS_X+1.5?STRESS_Z+0.96?WZNEG+1.5?PS_1 1.6?T1+1?STRESS_Y-
LOAD COMB 7069 _: *1?STRESS_X+1?STRESS_Z+0.96?WZNEG+1?PS_1
1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 0.96 11 1.5 12 -1.5 13 LOAD COMB 7078 _:
1.5 17 0.96 - 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -1.6 11 1.0 12 -1.0 13
21 1.5 1.0 17 0.96 -
*1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC+0.96?T1+1?ST 21 1.0
RESS_Y- *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC-
*1?STRESS_X+1?STRESS_Z+0.96?WZNEG+1?PS_1 0.96?T1+1.5?STRESS_Y-
LOAD COMB 7070 _: *1.5?STRESS_X+1.5?STRESS_Z+1.6?WZNEG+1.5?PS_1
1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 0.96 11 1.0 12 -1.0 13 LOAD COMB 7079 _:
1.0 17 0.96 - 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -0.96 11 1.5 12 -1.5 13
21 1.0 1.5 17 1.6 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+1.6?T 21 1.5
1+1.5?STRESS_Y- *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC-
*1.5?STRESS_X+1.5?STRESS_Z+0.96?WZNEG+1.5?PS_1 0.96?T1+1?STRESS_Y-
LOAD COMB 7071 _: *1?STRESS_X+1?STRESS_Z+1.6?WZNEG+1?PS_1
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 1.6 11 1.5 12 -1.5 13 LOAD COMB 7080 _:
1.5 17 0.96 - 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -0.96 11 1.0 12 -1.0 13
21 1.5 1.0 17 1.6 -
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+1.6?T1+1?ST 21 1.0
RESS_Y- *
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 357 de 463
(SUBJECT) (Page)

*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC+0.96?T1 21 1.5
+1.5?STRESS_Y-1.5?STRESS_X- *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC-
*1.5?STRESS_Z+0.96?WXPOS+1.5?PS_1 1.6?T1+1?STRESS_Y-1?STRESS_X-
LOAD COMB 7087 _: *1?STRESS_Z+0.96?WXPOS+1?PS_1
1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 0.96 11 1.5 12 -1.5 13 - LOAD COMB 7096 _:
1.5 14 0.96 - 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -1.6 11 1.0 12 -1.0 13 -
21 1.5 1.0 14 0.96 -
*1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC+0.96?T1+1?ST 21 1.0
RESS_Y-1?STRESS_X- *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC-
*1?STRESS_Z+0.96?WXPOS+1?PS_1 0.96?T1+1.5?STRESS_Y-1.5?STRESS_X-
LOAD COMB 7088 _: *1.5?STRESS_Z+1.6?WXPOS+1.5?PS_1
1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 0.96 11 1.0 12 -1.0 13 - LOAD COMB 7097 _:
1.0 14 0.96 - 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -0.96 11 1.5 12 -1.5 13
21 1.0 -1.5 14 1.6 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+1.6?T 21 1.5
1+1.5?STRESS_Y-1.5?STRESS_X- *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC-
*1.5?STRESS_Z+0.96?WXPOS+1.5?PS_1 0.96?T1+1?STRESS_Y-1?STRESS_X-
LOAD COMB 7089 _: *1?STRESS_Z+1.6?WXPOS+1?PS_1
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 1.6 11 1.5 12 -1.5 13 - LOAD COMB 7098 _:
1.5 14 0.96 - 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -0.96 11 1.0 12 -1.0 13
21 1.5 -1.0 14 1.6 -
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+1.6?T1+1?ST 21 1.0
RESS_Y-1?STRESS_X- *
*1?STRESS_Z+0.96?WXPOS+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC+0.96?T1
LOAD COMB 7090 _: +1.5?STRESS_Y-1.5?STRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 1.6 11 1.0 12 -1.0 13 - *1.5?STRESS_Z+0.96?WXNEG+1.5?PS_1
1.0 14 0.96 - LOAD COMB 7105 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 0.96 11 1.5 12 -1.5 13 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+0.96? 1.5 15 0.96 -
T1+1.5?STRESS_Y-1.5?STRESS_X- 21 1.5
*1.5?STRESS_Z+1.6?WXPOS+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC+0.96?T1+1?ST
LOAD COMB 7091 _: RESS_Y-1?STRESS_X-
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 0.96 11 1.5 12 -1.5 13 *1?STRESS_Z+0.96?WXNEG+1?PS_1
-1.5 14 1.6 - LOAD COMB 7106 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 0.96 11 1.0 12 -1.0 13 -
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+0.96?T1+1?S 1.0 15 0.96 -
TRESS_Y-1?STRESS_X- 21 1.0
*1?STRESS_Z+1.6?WXPOS+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+1.6?T
LOAD COMB 7092 _: 1+1.5?STRESS_Y-1.5?STRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 0.96 11 1.0 12 -1.0 13 *1.5?STRESS_Z+0.96?WXNEG+1.5?PS_1
-1.0 14 1.6 - LOAD COMB 7107 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 1.6 11 1.5 12 -1.5 13 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC- 1.5 15 0.96 -
0.96?T1+1.5?STRESS_Y-1.5?STRESS_X- 21 1.5
*1.5?STRESS_Z+0.96?WXPOS+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+1.6?T1+1?ST
LOAD COMB 7093 _: RESS_Y-1?STRESS_X-
1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 -0.96 11 1.5 12 -1.5 13 - *1?STRESS_Z+0.96?WXNEG+1?PS_1
1.5 14 0.96 - LOAD COMB 7108 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 1.6 11 1.0 12 -1.0 13 -
*1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC- 1.0 15 0.96 -
0.96?T1+1?STRESS_Y-1?STRESS_X- 21 1.0
*1?STRESS_Z+0.96?WXPOS+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+0.96?
LOAD COMB 7094 _: T1+1.5?STRESS_Y-1.5?STRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 -0.96 11 1.0 12 -1.0 13 - *1.5?STRESS_Z+1.6?WXNEG+1.5?PS_1
1.0 14 0.96 - LOAD COMB 7109 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 0.96 11 1.5 12 -1.5 13
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC- -1.5 15 1.6 -
1.6?T1+1.5?STRESS_Y-1.5?STRESS_X- 21 1.5
*1.5?STRESS_Z+0.96?WXPOS+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+0.96?T1+1?S
LOAD COMB 7095 _: TRESS_Y-1?STRESS_X-
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -1.6 11 1.5 12 -1.5 13 - *1?STRESS_Z+1.6?WXNEG+1?PS_1
1.5 14 0.96 - LOAD COMB 7110 _:
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 358 de 463
(SUBJECT) (Page)

1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 0.96 11 1.0 12 -1.0 13 *1.5?STRESS_Z+0.96?WZPOS+1.5?PS_1
-1.0 15 1.6 - LOAD COMB 7125 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 1.6 11 1.5 12 -1.5 13 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC- 1.5 16 0.96 -
0.96?T1+1.5?STRESS_Y-1.5?STRESS_X- 21 1.5
*1.5?STRESS_Z+0.96?WXNEG+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+1.6?T1+1?ST
LOAD COMB 7111 _: RESS_Y-1?STRESS_X-
1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 -0.96 11 1.5 12 -1.5 13 - *1?STRESS_Z+0.96?WZPOS+1?PS_1
1.5 15 0.96 - LOAD COMB 7126 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 1.6 11 1.0 12 -1.0 13 -
*1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC- 1.0 16 0.96 -
0.96?T1+1?STRESS_Y-1?STRESS_X- 21 1.0
*1?STRESS_Z+0.96?WXNEG+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+0.96?
LOAD COMB 7112 _: T1+1.5?STRESS_Y-1.5?STRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 -0.96 11 1.0 12 -1.0 13 - *1.5?STRESS_Z+1.6?WZPOS+1.5?PS_1
1.0 15 0.96 - LOAD COMB 7127 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 0.96 11 1.5 12 -1.5 13
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC- -1.5 16 1.6 -
1.6?T1+1.5?STRESS_Y-1.5?STRESS_X- 21 1.5
*1.5?STRESS_Z+0.96?WXNEG+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC+0.96?T1+1?S
LOAD COMB 7113 _: TRESS_Y-1?STRESS_X-
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -1.6 11 1.5 12 -1.5 13 - *1?STRESS_Z+1.6?WZPOS+1?PS_1
1.5 15 0.96 - LOAD COMB 7128 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 0.96 11 1.0 12 -1.0 13
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC- -1.0 16 1.6 -
1.6?T1+1?STRESS_Y-1?STRESS_X- 21 1.0
*1?STRESS_Z+0.96?WXNEG+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC-
LOAD COMB 7114 _: 0.96?T1+1.5?STRESS_Y-1.5?STRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -1.6 11 1.0 12 -1.0 13 - *1.5?STRESS_Z+0.96?WZPOS+1.5?PS_1
1.0 15 0.96 - LOAD COMB 7129 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 -0.96 11 1.5 12 -1.5 13 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC- 1.5 16 0.96 -
0.96?T1+1.5?STRESS_Y-1.5?STRESS_X- 21 1.5
*1.5?STRESS_Z+1.6?WXNEG+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC-
LOAD COMB 7115 _: 0.96?T1+1?STRESS_Y-1?STRESS_X-
1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -0.96 11 1.5 12 -1.5 13 *1?STRESS_Z+0.96?WZPOS+1?PS_1
-1.5 15 1.6 - LOAD COMB 7130 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 -0.96 11 1.0 12 -1.0 13 -
*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC- 1.0 16 0.96 -
0.96?T1+1?STRESS_Y-1?STRESS_X- 21 1.0
*1?STRESS_Z+1.6?WXNEG+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC-
LOAD COMB 7116 _: 1.6?T1+1.5?STRESS_Y-1.5?STRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -0.96 11 1.0 12 -1.0 13 *1.5?STRESS_Z+0.96?WZPOS+1.5?PS_1
-1.0 15 1.6 - LOAD COMB 7131 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -1.6 11 1.5 12 -1.5 13 -
* 1.5 16 0.96 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LO+1.6?LSC+0.96?T1 21 1.5
+1.5?STRESS_Y-1.5?STRESS_X- *1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC-
*1.5?STRESS_Z+0.96?WZPOS+1.5?PS_1 1.6?T1+1?STRESS_Y-1?STRESS_X-
LOAD COMB 7123 _: *1?STRESS_Z+0.96?WZPOS+1?PS_1
1 1.5 2 1.5 3 1.5 4 1.5 6 1.6 8 1.6 10 0.96 11 1.5 12 -1.5 13 - LOAD COMB 7132 _:
1.5 16 0.96 - 1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -1.6 11 1.0 12 -1.0 13 -
21 1.5 1.0 16 0.96 -
*1?SD+1?F+1?CM+1?PA+1.6?LO+1.6?LSC+0.96?T1+1?ST 21 1.0
RESS_Y-1?STRESS_X- *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC-
*1?STRESS_Z+0.96?WZPOS+1?PS_1 0.96?T1+1.5?STRESS_Y-1.5?STRESS_X-
LOAD COMB 7124 _: *1.5?STRESS_Z+1.6?WZPOS+1.5?PS_1
1 1.0 2 1.0 3 1.0 4 1.0 6 1.6 8 1.6 10 0.96 11 1.0 12 -1.0 13 - LOAD COMB 7133 _:
1.0 16 0.96 - 1 1.5 2 1.5 3 1.5 4 1.5 6 1.12 8 1.12 10 -0.96 11 1.5 12 -1.5 13
21 1.0 -1.5 16 1.6 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LO+1.12?LSC+1.6?T 21 1.5
1+1.5?STRESS_Y-1.5?STRESS_X-
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 359 de 463
(SUBJECT) (Page)

*1?SD+1?F+1?CM+1?PA+1.12?LO+1.12?LSC- *1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y+
0.96?T1+1?STRESS_Y-1?STRESS_X- 1?STRESS_X-1?STRESS_Z+1?EX-0.3?EZ+1?PS_1
*1?STRESS_Z+1.6?WZPOS+1?PS_1 LOAD COMB 7168 _:
LOAD COMB 7134 _: 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 1.0 13 -1.0 18 1.0
1 1.0 2 1.0 3 1.0 4 1.0 6 1.12 8 1.12 10 -0.96 11 1.0 12 -1.0 13 19 -0.3 -
-1.0 16 1.6 - 21 1.0
21 1.0 *1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y+
* 1?STRESS_X-1?STRESS_Z-1?EX+0.3?EZ+1?PS_1
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y+ LOAD COMB 7169 _:
1?STRESS_X+1?STRESS_Z+1?EX+0.3?EZ+1?PS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 1.0 13 -1.0 18 -1.0
LOAD COMB 7159 _: 19 0.3 -
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 1.0 13 1.0 18 1.0 21 1.0
19 0.3 - *1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y+
21 1.0 1?STRESS_X-1?STRESS_Z-1?EX-0.3?EZ+1?PS_1
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y+ LOAD COMB 7170 _:
1?STRESS_X+1?STRESS_Z+1?EX-0.3?EZ+1?PS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 1.0 13 -1.0 18 -1.0
LOAD COMB 7160 _: 19 -0.3 -
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 1.0 13 1.0 18 1.0 21 1.0
19 -0.3 - *1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y+
21 1.0 1?STRESS_X-1?STRESS_Z+0.3?EX+1?EZ+1?PS_1
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y+ LOAD COMB 7171 _:
1?STRESS_X+1?STRESS_Z-1?EX+0.3?EZ+1?PS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 1.0 13 -1.0 18 0.3
LOAD COMB 7161 _: 19 1.0 -
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 1.0 13 1.0 18 -1.0 21 1.0
19 0.3 - *1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y+
21 1.0 1?STRESS_X-1?STRESS_Z+0.3?EX-1?EZ+1?PS_1
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y+ LOAD COMB 7172 _:
1?STRESS_X+1?STRESS_Z-1?EX-0.3?EZ+1?PS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 1.0 13 -1.0 18 0.3
LOAD COMB 7162 _: 19 -1.0 -
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 1.0 13 1.0 18 -1.0 21 1.0
19 -0.3 - *1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y+
21 1.0 1?STRESS_X-1?STRESS_Z-0.3?EX+1?EZ+1?PS_1
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y+ LOAD COMB 7173 _:
1?STRESS_X+1?STRESS_Z+0.3?EX+1?EZ+1?PS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 1.0 13 -1.0 18 -0.3
LOAD COMB 7163 _: 19 1.0 -
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 1.0 13 1.0 18 0.3 21 1.0
19 1.0 - *1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y+
21 1.0 1?STRESS_X-1?STRESS_Z-0.3?EX-1?EZ+1?PS_1
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y+ LOAD COMB 7174 _:
1?STRESS_X+1?STRESS_Z+0.3?EX-1?EZ+1?PS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 1.0 13 -1.0 18 -0.3
LOAD COMB 7164 _: 19 -1.0 -
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 1.0 13 1.0 18 0.3 21 1.0
19 -1.0 - *1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y-
21 1.0 1?STRESS_X+1?STRESS_Z+1?EX+0.3?EZ+1?PS_1
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y+ LOAD COMB 7175 _:
1?STRESS_X+1?STRESS_Z-0.3?EX+1?EZ+1?PS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 -1.0 13 1.0 18 1.0
LOAD COMB 7165 _: 19 0.3 -
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 1.0 13 1.0 18 -0.3 21 1.0
19 1.0 - *1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y-
21 1.0 1?STRESS_X+1?STRESS_Z+1?EX-0.3?EZ+1?PS_1
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y+ LOAD COMB 7176 _:
1?STRESS_X+1?STRESS_Z-0.3?EX-1?EZ+1?PS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 -1.0 13 1.0 18 1.0
LOAD COMB 7166 _: 19 -0.3 -
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 1.0 13 1.0 18 -0.3 21 1.0
19 -1.0 - *1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y-
21 1.0 1?STRESS_X+1?STRESS_Z-1?EX+0.3?EZ+1?PS_1
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y+ LOAD COMB 7177 _:
1?STRESS_X-1?STRESS_Z+1?EX+0.3?EZ+1?PS_1 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 -1.0 13 1.0 18 -1.0
LOAD COMB 7167 _: 19 0.3 -
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 1.0 13 -1.0 18 1.0 21 1.0
19 0.3 - *1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y-
21 1.0 1?STRESS_X+1?STRESS_Z-1?EX-0.3?EZ+1?PS_1
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 360 de 463
(SUBJECT) (Page)

LOAD COMB 7178 _: 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 -1.0 13 -1.0 18 0.3
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 -1.0 13 1.0 18 -1.0 19 -1.0 -
19 -0.3 - 21 1.0
21 1.0 *1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y-
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y- 1?STRESS_X-1?STRESS_Z-0.3?EX+1?EZ+1?PS_1
1?STRESS_X+1?STRESS_Z+0.3?EX+1?EZ+1?PS_1 LOAD COMB 7189 _:
LOAD COMB 7179 _: 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 -1.0 13 -1.0 18 -
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 -1.0 13 1.0 18 0.3 0.3 19 1.0 -
19 1.0 - 21 1.0
21 1.0 *1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y-
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y- 1?STRESS_X-1?STRESS_Z-0.3?EX-1?EZ+1?PS_1
1?STRESS_X+1?STRESS_Z+0.3?EX-1?EZ+1?PS_1 LOAD COMB 7190 _:
LOAD COMB 7180 _: 1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 -1.0 13 -1.0 18 -
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 -1.0 13 1.0 18 0.3 0.3 19 -1.0 -
19 -1.0 - 21 1.0
21 1.0 *
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y- **********************MAINTENANCE******************************
1?STRESS_X+1?STRESS_Z-0.3?EX+1?EZ+1?PS_1 ***
LOAD COMB 7181 _: *
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 -1.0 13 1.0 18 -0.3 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC+1.5?STR
19 1.0 - ESS_Y+1.5?STRESS_X+1.5?STRESS_Z+1.5?P
21 1.0 *S_1
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y- LOAD COMB 7223 _:
1?STRESS_X+1?STRESS_Z-0.3?EX-1?EZ+1?PS_1 1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 11 1.5 12 1.5 13 1.5 21 1.5
LOAD COMB 7182 _: *1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC+1?STRESS_Y+
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 -1.0 13 1.0 18 -0.3 1?STRESS_X+1?STRESS_Z+1?PS_1
19 -1.0 - LOAD COMB 7224 _:
21 1.0 1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 11 1.0 12 1.0 13 1.0 21 1.0
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y- *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC+1.5?STR
1?STRESS_X-1?STRESS_Z+1?EX+0.3?EZ+1?PS_1 ESS_Y+1.5?STRESS_X-
LOAD COMB 7183 _: *1.5?STRESS_Z+1.5?PS_1
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 -1.0 13 -1.0 18 1.0 LOAD COMB 7225 _:
19 0.3 - 1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 11 1.5 12 1.5 13 -1.5 21 1.5
21 1.0 *1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC+1?STRESS_Y+
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y- 1?STRESS_X-1?STRESS_Z+1?PS_1
1?STRESS_X-1?STRESS_Z+1?EX-0.3?EZ+1?PS_1 LOAD COMB 7226 _:
LOAD COMB 7184 _: 1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 11 1.0 12 1.0 13 -1.0 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 -1.0 13 -1.0 18 1.0 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC+1.5?STR
19 -0.3 - ESS_Y-
21 1.0 *1.5?STRESS_X+1.5?STRESS_Z+1.5?PS_1
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y- LOAD COMB 7227 _:
1?STRESS_X-1?STRESS_Z-1?EX+0.3?EZ+1?PS_1 1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 11 1.5 12 -1.5 13 1.5 21 1.5
LOAD COMB 7185 _: *1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC+1?STRESS_Y-
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 -1.0 13 -1.0 18 - 1?STRESS_X+1?STRESS_Z+1?PS_1
1.0 19 0.3 - LOAD COMB 7228 _:
21 1.0 1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 11 1.0 12 -1.0 13 1.0 21 1.0
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y- *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC+1.5?STR
1?STRESS_X-1?STRESS_Z-1?EX-0.3?EZ+1?PS_1 ESS_Y-1.5?STRESS_X-
LOAD COMB 7186 _: *1.5?STRESS_Z+1.5?PS_1
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 -1.0 13 -1.0 18 - LOAD COMB 7229 _:
1.0 19 -0.3 - 1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 11 1.5 12 -1.5 13 -1.5 21 1.5
21 1.0 *1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC+1?STRESS_Y-
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y- 1?STRESS_X-1?STRESS_Z+1?PS_1
1?STRESS_X-1?STRESS_Z+0.3?EX+1?EZ+1?PS_1 LOAD COMB 7230 _:
LOAD COMB 7187 _: 1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 11 1.0 12 -1.0 13 -1.0 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 6 0.6 8 0.6 11 1.0 12 -1.0 13 -1.0 18 0.3 *
19 1.0 - *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC+0.96?T1
21 1.0 +1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS
*1?SD+1?F+1?CM+1?PA+0.6?LO+0.6?LSC+1?STRESS_Y- *_Z+1.5?PS_1
1?STRESS_X-1?STRESS_Z+0.3?EX-1?EZ+1?PS_1 LOAD COMB 7239 _:
LOAD COMB 7188 _: 1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 0.96 11 1.5 12 1.5 13 1.5
21 1.5
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 361 de 463
(SUBJECT) (Page)

*1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC+0.96?T1+1?ST *0.96?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z
RESS_Y+1?STRESS_X+1?STRESS_Z+1?PS_1 +1.5?PS_1
LOAD COMB 7240 _: LOAD COMB 7251 _:
1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 0.96 11 1.0 12 1.0 13 1.0 1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 -0.96 11 1.5 12 1.5 13
21 1.0 1.5 21 1.5
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+1.6?T *1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC-
1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRES 0.96?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+1?PS
*S_Z+1.5?PS_1 _1
LOAD COMB 7241 _: LOAD COMB 7252 _:
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 1.6 11 1.5 12 1.5 13 1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 -0.96 11 1.0 12 1.0 13
1.5 21 1.5 1.0 21 1.0
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+1.6?T1+1?ST *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC-
RESS_Y+1?STRESS_X+1?STRESS_Z+1?PS_1 *1.6?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z+
LOAD COMB 7242 _: 1.5?PS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 1.6 11 1.0 12 1.0 13 LOAD COMB 7253 _:
1.0 21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -1.6 11 1.5 12 1.5 13
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC+0.96?T1 1.5 21 1.5
+1.5?STRESS_Y+1.5?STRESS_X- *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC-
*1.5?STRESS_Z+1.5?PS_1 1.6?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+1?PS_
LOAD COMB 7243 _: 1
1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 0.96 11 1.5 12 1.5 13 - LOAD COMB 7254 _:
1.5 21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -1.6 11 1.0 12 1.0 13
*1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC+0.96?T1+1?ST 1.0 21 1.0
RESS_Y+1?STRESS_X-1?STRESS_Z+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC-
LOAD COMB 7244 _: 0.96?T1+1.5?STRESS_Y+1.5?STRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 0.96 11 1.0 12 1.0 13 - *1.5?STRESS_Z+1.5?PS_1
1.0 21 1.0 LOAD COMB 7255 _:
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+1.6?T 1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 -0.96 11 1.5 12 1.5 13 -
1+1.5?STRESS_Y+1.5?STRESS_X- 1.5 21 1.5
*1.5?STRESS_Z+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC-
LOAD COMB 7245 _: 0.96?T1+1?STRESS_Y+1?STRESS_X-
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 1.6 11 1.5 12 1.5 13 - 1?STRESS_Z+1?PS_1
1.5 21 1.5 LOAD COMB 7256 _:
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+1.6?T1+1?ST 1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 -0.96 11 1.0 12 1.0 13 -
RESS_Y+1?STRESS_X-1?STRESS_Z+1?PS_1 1.0 21 1.0
LOAD COMB 7246 _: *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 1.6 11 1.0 12 1.0 13 - 1.6?T1+1.5?STRESS_Y+1.5?STRESS_X-
1.0 21 1.0 *1.5?STRESS_Z+1.5?PS_1
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC+0.96?T1 LOAD COMB 7257 _:
+1.5?STRESS_Y- 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -1.6 11 1.5 12 1.5 13 -
*1.5?STRESS_X+1.5?STRESS_Z+1.5?PS_1 1.5 21 1.5
LOAD COMB 7247 _: *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC-
1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 0.96 11 1.5 12 -1.5 13 1.6?T1+1?STRESS_Y+1?STRESS_X-1?STRESS_Z+1?PS_1
1.5 21 1.5 LOAD COMB 7258 _:
*1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC+0.96?T1+1?ST 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -1.6 11 1.0 12 1.0 13 -
RESS_Y-1?STRESS_X+1?STRESS_Z+1?PS_1 1.0 21 1.0
LOAD COMB 7248 _: *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 0.96 11 1.0 12 -1.0 13 0.96?T1+1.5?STRESS_Y-
1.0 21 1.0 *1.5?STRESS_X+1.5?STRESS_Z+1.5?PS_1
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+1.6?T LOAD COMB 7259 _:
1+1.5?STRESS_Y- 1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 -0.96 11 1.5 12 -1.5 13
*1.5?STRESS_X+1.5?STRESS_Z+1.5?PS_1 1.5 21 1.5
LOAD COMB 7249 _: *1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC-
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 1.6 11 1.5 12 -1.5 13 0.96?T1+1?STRESS_Y-
1.5 21 1.5 1?STRESS_X+1?STRESS_Z+1?PS_1
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+1.6?T1+1?ST LOAD COMB 7260 _:
RESS_Y-1?STRESS_X+1?STRESS_Z+1?PS_1 1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 -0.96 11 1.0 12 -1.0 13
LOAD COMB 7250 _: 1.0 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 1.6 11 1.0 12 -1.0 13 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC-
1.0 21 1.0 1.6?T1+1.5?STRESS_Y-
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC- *1.5?STRESS_X+1.5?STRESS_Z+1.5?PS_1
LOAD COMB 7261 _:
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 362 de 463
(SUBJECT) (Page)

1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -1.6 11 1.5 12 -1.5 13 LOAD COMB 7415 _:
1.5 21 1.5 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 0.96 11 1.5 12 1.5 13
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC- 1.5 14 0.528 -
1.6?T1+1?STRESS_Y-1?STRESS_X+1?STRESS_Z+1?PS_1 21 1.5
LOAD COMB 7262 _: *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+0.96?T1+1?S
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -1.6 11 1.0 12 -1.0 13 TRESS_Y+1?STRESS_X+1?STRESS_Z+0.528?WXP
1.0 21 1.0 *OS+1?PS_1
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC- LOAD COMB 7416 _:
0.96?T1+1.5?STRESS_Y-1.5?STRESS_X- 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 0.96 11 1.0 12 1.0 13
*1.5?STRESS_Z+1.5?PS_1 1.0 14 0.528 -
LOAD COMB 7263 _: 21 1.0
1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 -0.96 11 1.5 12 -1.5 13 - *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC-
1.5 21 1.5 *0.96?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z
*1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC- +0.3168?WXPOS+1.5?PS_1
0.96?T1+1?STRESS_Y-1?STRESS_X- LOAD COMB 7417 _:
1?STRESS_Z+1?PS_1 1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 -0.96 11 1.5 12 1.5 13
LOAD COMB 7264 _: 1.5 14 0.3168 -
1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 -0.96 11 1.0 12 -1.0 13 - 21 1.5
1.0 21 1.0 *1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC-
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC- *0.96?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+0.31
1.6?T1+1.5?STRESS_Y-1.5?STRESS_X- 68?WXPOS+1?PS_1
*1.5?STRESS_Z+1.5?PS_1 LOAD COMB 7418 _:
LOAD COMB 7265 _: 1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 -0.96 11 1.0 12 1.0 13
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -1.6 11 1.5 12 -1.5 13 - 1.0 14 0.3168 -
1.5 21 1.5 21 1.0
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC- *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC-
1.6?T1+1?STRESS_Y-1?STRESS_X-1?STRESS_Z+1?PS_1 *1.6?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z+
LOAD COMB 7266 _: 0.3168?WXPOS+1.5?PS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -1.6 11 1.0 12 -1.0 13 - LOAD COMB 7419 _:
1.0 21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -1.6 11 1.5 12 1.5 13
* 1.5 14 0.3168 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC+0.96?T1 21 1.5
+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC-
*_Z+0.3168?WXPOS+1.5?PS_1 *1.6?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+0.316
LOAD COMB 7411 _: 8?WXPOS+1?PS_1
1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 0.96 11 1.5 12 1.5 13 1.5 LOAD COMB 7420 _:
14 0.3168 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -1.6 11 1.0 12 1.0 13
21 1.5 1.0 14 0.3168 -
*1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC+0.96?T1+1?ST 21 1.0
RESS_Y+1?STRESS_X+1?STRESS_Z+0.3168?WXPO *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC-
*S+1?PS_1 *0.96?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z
LOAD COMB 7412 _: +0.528?WXPOS+1.5?PS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 0.96 11 1.0 12 1.0 13 1.0 LOAD COMB 7421 _:
14 0.3168 - 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -0.96 11 1.5 12 1.5 13
21 1.0 1.5 14 0.528 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+1.6?T 21 1.5
1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRES *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC-
*S_Z+0.3168?WXPOS+1.5?PS_1 *0.96?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+0.52
LOAD COMB 7413 _: 8?WXPOS+1?PS_1
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 1.6 11 1.5 12 1.5 13 LOAD COMB 7422 _:
1.5 14 0.3168 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -0.96 11 1.0 12 1.0 13
21 1.5 1.0 14 0.528 -
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+1.6?T1+1?ST 21 1.0
RESS_Y+1?STRESS_X+1?STRESS_Z+0.3168?WXP *
*OS+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC+0.96?T1
LOAD COMB 7414 _: +1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 1.6 11 1.0 12 1.0 13 *_Z+0.3168?WXNEG+1.5?PS_1
1.0 14 0.3168 - LOAD COMB 7429 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 0.96 11 1.5 12 1.5 13 1.5
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+0.96? 15 0.3168 -
T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRE 21 1.5
*SS_Z+0.528?WXPOS+1.5?PS_1
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 363 de 463
(SUBJECT) (Page)

*1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC+0.96?T1+1?ST 21 1.0
RESS_Y+1?STRESS_X+1?STRESS_Z+0.3168?WXNE *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC-
*G+1?PS_1 *0.96?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z
LOAD COMB 7430 _: +0.528?WXNEG+1.5?PS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 0.96 11 1.0 12 1.0 13 1.0 LOAD COMB 7439 _:
15 0.3168 - 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -0.96 11 1.5 12 1.5 13
21 1.0 1.5 15 0.528 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+1.6?T 21 1.5
1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRES *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC-
*S_Z+0.3168?WXNEG+1.5?PS_1 *0.96?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+0.52
LOAD COMB 7431 _: 8?WXNEG+1?PS_1
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 1.6 11 1.5 12 1.5 13 LOAD COMB 7440 _:
1.5 15 0.3168 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -0.96 11 1.0 12 1.0 13
21 1.5 1.0 15 0.528 -
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+1.6?T1+1?ST 21 1.0
RESS_Y+1?STRESS_X+1?STRESS_Z+0.3168?WXN *
*EG+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC+0.96?T1
LOAD COMB 7432 _: +1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 1.6 11 1.0 12 1.0 13 *_Z+0.3168?WZPOS+1.5?PS_1
1.0 15 0.3168 - LOAD COMB 7447 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 0.96 11 1.5 12 1.5 13 1.5
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+0.96? 16 0.3168 -
T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRE 21 1.5
*SS_Z+0.528?WXNEG+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC+0.96?T1+1?ST
LOAD COMB 7433 _: RESS_Y+1?STRESS_X+1?STRESS_Z+0.3168?WZPO
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 0.96 11 1.5 12 1.5 13 *S+1?PS_1
1.5 15 0.528 - LOAD COMB 7448 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 0.96 11 1.0 12 1.0 13 1.0
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+0.96?T1+1?S 16 0.3168 -
TRESS_Y+1?STRESS_X+1?STRESS_Z+0.528?WXN 21 1.0
*EG+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+1.6?T
LOAD COMB 7434 _: 1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRES
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 0.96 11 1.0 12 1.0 13 *S_Z+0.3168?WZPOS+1.5?PS_1
1.0 15 0.528 - LOAD COMB 7449 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 1.6 11 1.5 12 1.5 13
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC- 1.5 16 0.3168 -
*0.96?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z 21 1.5
+0.3168?WXNEG+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+1.6?T1+1?ST
LOAD COMB 7435 _: RESS_Y+1?STRESS_X+1?STRESS_Z+0.3168?WZP
1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 -0.96 11 1.5 12 1.5 13 *OS+1?PS_1
1.5 15 0.3168 - LOAD COMB 7450 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 1.6 11 1.0 12 1.0 13
*1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC- 1.0 16 0.3168 -
*0.96?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+0.31 21 1.0
68?WXNEG+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+0.96?
LOAD COMB 7436 _: T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRE
1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 -0.96 11 1.0 12 1.0 13 *SS_Z+0.528?WZPOS+1.5?PS_1
1.0 15 0.3168 - LOAD COMB 7451 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 0.96 11 1.5 12 1.5 13
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC- 1.5 16 0.528 -
*1.6?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z+ 21 1.5
0.3168?WXNEG+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+0.96?T1+1?S
LOAD COMB 7437 _: TRESS_Y+1?STRESS_X+1?STRESS_Z+0.528?WZP
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -1.6 11 1.5 12 1.5 13 *OS+1?PS_1
1.5 15 0.3168 - LOAD COMB 7452 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 0.96 11 1.0 12 1.0 13
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC- 1.0 16 0.528 -
*1.6?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+0.316 21 1.0
8?WXNEG+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC-
LOAD COMB 7438 _: *0.96?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -1.6 11 1.0 12 1.0 13 +0.3168?WZPOS+1.5?PS_1
1.0 15 0.3168 - LOAD COMB 7453 _:
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 364 de 463
(SUBJECT) (Page)

1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 -0.96 11 1.5 12 1.5 13 *EG+1?PS_1
1.5 16 0.3168 - LOAD COMB 7468 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 1.6 11 1.0 12 1.0 13
*1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC- 1.0 17 0.3168 -
*0.96?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+0.31 21 1.0
68?WZPOS+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+0.96?
LOAD COMB 7454 _: T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRE
1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 -0.96 11 1.0 12 1.0 13 *SS_Z+0.528?WZNEG+1.5?PS_1
1.0 16 0.3168 - LOAD COMB 7469 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 0.96 11 1.5 12 1.5 13
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC- 1.5 17 0.528 -
*1.6?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z+ 21 1.5
0.3168?WZPOS+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+0.96?T1+1?S
LOAD COMB 7455 _: TRESS_Y+1?STRESS_X+1?STRESS_Z+0.528?WZN
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -1.6 11 1.5 12 1.5 13 *EG+1?PS_1
1.5 16 0.3168 - LOAD COMB 7470 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 0.96 11 1.0 12 1.0 13
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC- 1.0 17 0.528 -
*1.6?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+0.316 21 1.0
8?WZPOS+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC-
LOAD COMB 7456 _: *0.96?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -1.6 11 1.0 12 1.0 13 +0.3168?WZNEG+1.5?PS_1
1.0 16 0.3168 - LOAD COMB 7471 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 -0.96 11 1.5 12 1.5 13
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC- 1.5 17 0.3168 -
*0.96?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z 21 1.5
+0.528?WZPOS+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC-
LOAD COMB 7457 _: *0.96?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+0.31
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -0.96 11 1.5 12 1.5 13 68?WZNEG+1?PS_1
1.5 16 0.528 - LOAD COMB 7472 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 -0.96 11 1.0 12 1.0 13
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC- 1.0 17 0.3168 -
*0.96?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+0.52 21 1.0
8?WZPOS+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC-
LOAD COMB 7458 _: *1.6?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z+
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -0.96 11 1.0 12 1.0 13 0.3168?WZNEG+1.5?PS_1
1.0 16 0.528 - LOAD COMB 7473 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -1.6 11 1.5 12 1.5 13
* 1.5 17 0.3168 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC+0.96?T1 21 1.5
+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC-
*_Z+0.3168?WZNEG+1.5?PS_1 *1.6?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+0.316
LOAD COMB 7465 _: 8?WZNEG+1?PS_1
1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 0.96 11 1.5 12 1.5 13 1.5 LOAD COMB 7474 _:
17 0.3168 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -1.6 11 1.0 12 1.0 13
21 1.5 1.0 17 0.3168 -
*1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC+0.96?T1+1?ST 21 1.0
RESS_Y+1?STRESS_X+1?STRESS_Z+0.3168?WZNE *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC-
*G+1?PS_1 *0.96?T1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRESS_Z
LOAD COMB 7466 _: +0.528?WZNEG+1.5?PS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 0.96 11 1.0 12 1.0 13 1.0 LOAD COMB 7475 _:
17 0.3168 - 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -0.96 11 1.5 12 1.5 13
21 1.0 1.5 17 0.528 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+1.6?T 21 1.5
1+1.5?STRESS_Y+1.5?STRESS_X+1.5?STRES *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC-
*S_Z+0.3168?WZNEG+1.5?PS_1 *0.96?T1+1?STRESS_Y+1?STRESS_X+1?STRESS_Z+0.52
LOAD COMB 7467 _: 8?WZNEG+1?PS_1
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 1.6 11 1.5 12 1.5 13 LOAD COMB 7476 _:
1.5 17 0.3168 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -0.96 11 1.0 12 1.0 13
21 1.5 1.0 17 0.528 -
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+1.6?T1+1?ST 21 1.0
RESS_Y+1?STRESS_X+1?STRESS_Z+0.3168?WZN *
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 365 de 463
(SUBJECT) (Page)

*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC+0.96?T1 14 0.3168 21 1.5


+1.5?STRESS_Y+1.5?STRESS_X- *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC-
*1.5?STRESS_Z+0.3168?WXPOS+1.5?PS_1 1.6?T1+1?STRESS_Y+1?STRESS_X-
LOAD COMB 7483 _: *1?STRESS_Z+0.3168?WXPOS+1?PS_1
1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 0.96 11 1.5 12 1.5 13 - LOAD COMB 7492 _:
1.5 14 0.3168 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -1.6 11 1.0 12 1.0 13 -
21 1.5 1.0 -
*1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC+0.96?T1+1?ST 14 0.3168 21 1.0
RESS_Y+1?STRESS_X- *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC-
*1?STRESS_Z+0.3168?WXPOS+1?PS_1 0.96?T1+1.5?STRESS_Y+1.5?STRESS_X-
LOAD COMB 7484 _: *1.5?STRESS_Z+0.528?WXPOS+1.5?PS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 0.96 11 1.0 12 1.0 13 - LOAD COMB 7493 _:
1.0 14 0.3168 - 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -0.96 11 1.5 12 1.5 13
21 1.0 -1.5 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+1.6?T 14 0.528 21 1.5
1+1.5?STRESS_Y+1.5?STRESS_X- *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC-
*1.5?STRESS_Z+0.3168?WXPOS+1.5?PS_1 0.96?T1+1?STRESS_Y+1?STRESS_X-
LOAD COMB 7485 _: *1?STRESS_Z+0.528?WXPOS+1?PS_1
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 1.6 11 1.5 12 1.5 13 - LOAD COMB 7494 _:
1.5 14 0.3168 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -0.96 11 1.0 12 1.0 13
21 1.5 -1.0 -
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+1.6?T1+1?ST 14 0.528 21 1.0
RESS_Y+1?STRESS_X- *
*1?STRESS_Z+0.3168?WXPOS+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC+0.96?T1
LOAD COMB 7486 _: +1.5?STRESS_Y+1.5?STRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 1.6 11 1.0 12 1.0 13 - *1.5?STRESS_Z+0.3168?WXNEG+1.5?PS_1
1.0 14 0.3168 - LOAD COMB 7501 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 0.96 11 1.5 12 1.5 13 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+0.96? 1.5 15 0.3168 -
T1+1.5?STRESS_Y+1.5?STRESS_X- 21 1.5
*1.5?STRESS_Z+0.528?WXPOS+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC+0.96?T1+1?ST
LOAD COMB 7487 _: RESS_Y+1?STRESS_X-
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 0.96 11 1.5 12 1.5 13 - *1?STRESS_Z+0.3168?WXNEG+1?PS_1
1.5 14 0.528 - LOAD COMB 7502 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 0.96 11 1.0 12 1.0 13 -
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+0.96?T1+1?S 1.0 15 0.3168 -
TRESS_Y+1?STRESS_X- 21 1.0
*1?STRESS_Z+0.528?WXPOS+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+1.6?T
LOAD COMB 7488 _: 1+1.5?STRESS_Y+1.5?STRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 0.96 11 1.0 12 1.0 13 - *1.5?STRESS_Z+0.3168?WXNEG+1.5?PS_1
1.0 14 0.528 - LOAD COMB 7503 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 1.6 11 1.5 12 1.5 13 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC- 1.5 15 0.3168 -
0.96?T1+1.5?STRESS_Y+1.5?STRESS_X- 21 1.5
*1.5?STRESS_Z+0.3168?WXPOS+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+1.6?T1+1?ST
LOAD COMB 7489 _: RESS_Y+1?STRESS_X-
1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 -0.96 11 1.5 12 1.5 13 - *1?STRESS_Z+0.3168?WXNEG+1?PS_1
1.5 14 0.3168 - LOAD COMB 7504 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 1.6 11 1.0 12 1.0 13 -
*1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC- 1.0 15 0.3168 -
0.96?T1+1?STRESS_Y+1?STRESS_X- 21 1.0
*?STRESS_Z+0.3168?WXPOS+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+0.96?
LOAD COMB 7490 _: T1+1.5?STRESS_Y+1.5?STRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 -0.96 11 1.0 12 1.0 13 - *1.5?STRESS_Z+0.528?WXNEG+1.5?PS_1
1.0 14 0.3168 - LOAD COMB 7505 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 0.96 11 1.5 12 1.5 13 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC- 1.5 15 0.528 -
1.6?T1+1.5?STRESS_Y+1.5?STRESS_X- 21 1.5
*1.5?STRESS_Z+0.3168?WXPOS+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+0.96?T1+1?S
LOAD COMB 7491 _: TRESS_Y+1?STRESS_X-
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -1.6 11 1.5 12 1.5 13 - *1?STRESS_Z+0.528?WXNEG+1?PS_1
1.5 - LOAD COMB 7506 _:
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 366 de 463
(SUBJECT) (Page)

1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 0.96 11 1.0 12 1.0 13 - *1.5?STRESS_Z+0.3168?WZPOS+1.5?PS_1
1.0 15 0.528 - LOAD COMB 7521 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 1.6 11 1.5 12 1.5 13 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC- 1.5 16 0.3168 -
0.96?T1+1.5?STRESS_Y+1.5?STRESS_X- 21 1.5
*1.5?STRESS_Z+0.3168?WXNEG+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+1.6?T1+1?ST
LOAD COMB 7507 _: RESS_Y+1?STRESS_X-
1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 -0.96 11 1.5 12 1.5 13 - *1?STRESS_Z+0.3168?WZPOS+1?PS_1
1.5 15 0.3168 - LOAD COMB 7522 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 1.6 11 1.0 12 1.0 13 -
*1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC- 1.0 16 0.3168 -
0.96?T1+1?STRESS_Y+1?STRESS_X- 21 1.0
*1?STRESS_Z+0.3168?WXNEG+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+0.96?
LOAD COMB 7508 _: T1+1.5?STRESS_Y+1.5?STRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 -0.96 11 1.0 12 1.0 13 - *1.5?STRESS_Z+0.528?WZPOS+1.5?PS_1
1.0 15 0.3168 - LOAD COMB 7523 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 0.96 11 1.5 12 1.5 13 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC- 1.5 16 0.528 -
1.6?T1+1.5?STRESS_Y+1.5?STRESS_X- 21 1.5
*1.5?STRESS_Z+0.3168?WXNEG+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+0.96?T1+1?S
LOAD COMB 7509 _: TRESS_Y+1?STRESS_X-
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -1.6 11 1.5 12 1.5 13 - *1?STRESS_Z+0.528?WZPOS+1?PS_1
1.5 - LOAD COMB 7524 _:
15 0.3168 21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 0.96 11 1.0 12 1.0 13 -
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC- 1.0 16 0.528 -
1.6?T1+1?STRESS_Y+1?STRESS_X- 21 1.0
*1?STRESS_Z+0.3168?WXNEG+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC-
LOAD COMB 7510 _: 0.96?T1+1.5?STRESS_Y+1.5?STRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -1.6 11 1.0 12 1.0 13 - *1.5?STRESS_Z+0.3168?WZPOS+1.5?PS_1
1.0 - LOAD COMB 7525 _:
15 0.3168 21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 -0.96 11 1.5 12 1.5 13 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC- 1.5 16 0.3168 -
0.96?T1+1.5?STRESS_Y+1.5?STRESS_X- 21 1.5
*1.5?STRESS_Z+0.528?WXNEG+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC-
LOAD COMB 7511 _: 0.96?T1+1?STRESS_Y+1?STRESS_X-
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -0.96 11 1.5 12 1.5 13 *1?STRESS_Z+0.3168?WZPOS+1?PS_1
-1.5 - LOAD COMB 7526 _:
15 0.528 21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 -0.96 11 1.0 12 1.0 13 -
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC- 1.0 16 0.3168 -
0.96?T1+1?STRESS_Y+1?STRESS_X- 21 1.0
*1?STRESS_Z+0.528?WXNEG+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC-
LOAD COMB 7512 _: 1.6?T1+1.5?STRESS_Y+1.5?STRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -0.96 11 1.0 12 1.0 13 *1.5?STRESS_Z+0.3168?WZPOS+1.5?PS_1
-1.0 - LOAD COMB 7527 _:
15 0.528 21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -1.6 11 1.5 12 1.5 13 -
* 1.5 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC+0.96?T1 16 0.3168 21 1.5
+1.5?STRESS_Y+1.5?STRESS_X- *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC-
*1.5?STRESS_Z+0.3168?WZPOS+1.5?PS_1 1.6?T1+1?STRESS_Y+1?STRESS_X-
LOAD COMB 7519 _: *1?STRESS_Z+0.3168?WZPOS+1?PS_1
1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 0.96 11 1.5 12 1.5 13 - LOAD COMB 7528 _:
1.5 16 0.3168 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -1.6 11 1.0 12 1.0 13 -
21 1.5 1.0 -
*1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC+0.96?T1+1?ST 16 0.3168 21 1.0
RESS_Y+1?STRESS_X- *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC-
*1?STRESS_Z+0.3168?WZPOS+1?PS_1 0.96?T1+1.5?STRESS_Y+1.5?STRESS_X-
LOAD COMB 7520 _: *1.5?STRESS_Z+0.528?WZPOS+1.5?PS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 0.96 11 1.0 12 1.0 13 - LOAD COMB 7529 _:
1.0 16 0.3168 - 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -0.96 11 1.5 12 1.5 13
21 1.0 -1.5 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+1.6?T 16 0.528 21 1.5
1+1.5?STRESS_Y+1.5?STRESS_X-
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 367 de 463
(SUBJECT) (Page)

*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC- 1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 -0.96 11 1.0 12 1.0 13 -
0.96?T1+1?STRESS_Y+1?STRESS_X- 1.0 17 0.3168 -
*1?STRESS_Z+0.528?WZPOS+1?PS_1 21 1.0
LOAD COMB 7530 _: *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -0.96 11 1.0 12 1.0 13 1.6?T1+1.5?STRESS_Y+1.5?STRESS_X-
-1.0 - *1.5?STRESS_Z+0.3168?WZNEG+1.5?PS_1
16 0.528 21 1.0 LOAD COMB 7545 _:
* 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -1.6 11 1.5 12 1.5 13 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC+0.96?T1 1.5 -
+1.5?STRESS_Y+1.5?STRESS_X- 17 0.3168 21 1.5
*1.5?STRESS_Z+0.3168?WZNEG+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC-
LOAD COMB 7537 _: 1.6?T1+1?STRESS_Y+1?STRESS_X-
1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 0.96 11 1.5 12 1.5 13 - *1?STRESS_Z+0.3168?WZNEG+1?PS_1
1.5 17 0.3168 - LOAD COMB 7546 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -1.6 11 1.0 12 1.0 13 -
*1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC+0.96?T1+1?ST 1.0 -
RESS_Y+1?STRESS_X- 17 0.3168 21 1.0
*1?STRESS_Z+0.3168?WZNEG+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC-
LOAD COMB 7538 _: 0.96?T1+1.5?STRESS_Y+1.5?STRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 0.96 11 1.0 12 1.0 13 - *1.5?STRESS_Z+0.528?WZNEG+1.5?PS_1
1.0 17 0.3168 - LOAD COMB 7547 _:
21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -0.96 11 1.5 12 1.5 13
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+1.6?T -1.5 -
1+1.5?STRESS_Y+1.5?STRESS_X- 17 0.528 21 1.5
*1.5?STRESS_Z+0.3168?WZNEG+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC-
LOAD COMB 7539 _: 0.96?T1+1?STRESS_Y+1?STRESS_X-
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 1.6 11 1.5 12 1.5 13 - *1?STRESS_Z+0.528?WZNEG+1?PS_1
1.5 17 0.3168 - LOAD COMB 7548 _:
21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -0.96 11 1.0 12 1.0 13
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+1.6?T1+1?ST -1.0 -
RESS_Y+1?STRESS_X- 17 0.528 21 1.0
*1?STRESS_Z+0.3168?WZNEG+1?PS_1 *
LOAD COMB 7540 _: *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC+0.96?T1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 1.6 11 1.0 12 1.0 13 - +1.5?STRESS_Y-
1.0 17 0.3168 - *1.5?STRESS_X+1.5?STRESS_Z+0.3168?WXPOS+1.5?PS_
21 1.0 1
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+0.96? LOAD COMB 7555 _:
T1+1.5?STRESS_Y+1.5?STRESS_X- 1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 0.96 11 1.5 12 -1.5 13
*1.5?STRESS_Z+0.528?WZNEG+1.5?PS_1 1.5 14 0.3168 -
LOAD COMB 7541 _: 21 1.5
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 0.96 11 1.5 12 1.5 13 - *1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC+0.96?T1+1?ST
1.5 17 0.528 - RESS_Y-
21 1.5 *1?STRESS_X+1?STRESS_Z+0.3168?WXPOS+1?PS_1
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+0.96?T1+1?S LOAD COMB 7556 _:
TRESS_Y+1?STRESS_X- 1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 0.96 11 1.0 12 -1.0 13
*1?STRESS_Z+0.528?WZNEG+1?PS_1 1.0 14 0.3168 -
LOAD COMB 7542 _: 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 0.96 11 1.0 12 1.0 13 - *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+1.6?T
1.0 17 0.528 - 1+1.5?STRESS_Y-
21 1.0 *1.5?STRESS_X+1.5?STRESS_Z+0.3168?WXPOS+1.5?PS_
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC- 1
0.96?T1+1.5?STRESS_Y+1.5?STRESS_X- LOAD COMB 7557 _:
*1.5?STRESS_Z+0.3168?WZNEG+1.5?PS_1 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 1.6 11 1.5 12 -1.5 13
LOAD COMB 7543 _: 1.5 14 0.3168 -
1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 -0.96 11 1.5 12 1.5 13 - 21 1.5
1.5 17 0.3168 - *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+1.6?T1+1?ST
21 1.5 RESS_Y-
*1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC- *1?STRESS_X+1?STRESS_Z+0.3168?WXPOS+1?PS_1
0.96?T1+1?STRESS_Y+1?STRESS_X- LOAD COMB 7558 _:
*1?STRESS_Z+0.3168?WZNEG+1?PS_1 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 1.6 11 1.0 12 -1.0 13
LOAD COMB 7544 _: 1.0 14 0.3168 -
21 1.0
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 368 de 463
(SUBJECT) (Page)

*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+0.96? *1.5?STRESS_X+1.5?STRESS_Z+0.3168?WXNEG+1.5?PS_
T1+1.5?STRESS_Y- 1
*1.5?STRESS_X+1.5?STRESS_Z+0.528?WXPOS+1.5?PS_1 LOAD COMB 7573 _:
LOAD COMB 7559 _: 1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 0.96 11 1.5 12 -1.5 13
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 0.96 11 1.5 12 -1.5 13 1.5 15 0.3168 -
1.5 14 0.528 - 21 1.5
21 1.5 *1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC+0.96?T1+1?ST
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+0.96?T1+1?S RESS_Y-
TRESS_Y- *1?STRESS_X+1?STRESS_Z+0.3168?WXNEG+1?PS_1
*1?STRESS_X+1?STRESS_Z+0.528?WXPOS+1?PS_1 LOAD COMB 7574 _:
LOAD COMB 7560 _: 1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 0.96 11 1.0 12 -1.0 13
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 0.96 11 1.0 12 -1.0 13 1.0 15 0.3168 -
1.0 14 0.528 - 21 1.0
21 1.0 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+1.6?T
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC- 1+1.5?STRESS_Y-
0.96?T1+1.5?STRESS_Y- *1.5?STRESS_X+1.5?STRESS_Z+0.3168?WXNEG+1.5?PS_
*1.5?STRESS_X+1.5?STRESS_Z+0.3168?WXPOS+1.5?PS_ 1
1 LOAD COMB 7575 _:
LOAD COMB 7561 _: 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 1.6 11 1.5 12 -1.5 13
1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 -0.96 11 1.5 12 -1.5 13 1.5 15 0.3168 -
1.5 14 0.3168 - 21 1.5
21 1.5 *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+1.6?T1+1?ST
*1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC- RESS_Y-
0.96?T1+1?STRESS_Y- *1?STRESS_X+1?STRESS_Z+0.3168?WXNEG+1?PS_1
*1?STRESS_X+1?STRESS_Z+0.3168?WXPOS+1?PS_1 LOAD COMB 7576 _:
LOAD COMB 7562 _: 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 1.6 11 1.0 12 -1.0 13
1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 -0.96 11 1.0 12 -1.0 13 1.0 15 0.3168 -
1.0 14 0.3168 - 21 1.0
21 1.0 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+0.96?
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC- T1+1.5?STRESS_Y-
1.6?T1+1.5?STRESS_Y- *1.5?STRESS_X+1.5?STRESS_Z+0.528?WXNEG+1.5?PS_1
*1.5?STRESS_X+1.5?STRESS_Z+0.3168?WXPOS+1.5?PS_ LOAD COMB 7577 _:
1 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 0.96 11 1.5 12 -1.5 13
LOAD COMB 7563 _: 1.5 15 0.528 -
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -1.6 11 1.5 12 -1.5 13 21 1.5
1.5 - *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+0.96?T1+1?S
14 0.3168 21 1.5 TRESS_Y-
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC- *1?STRESS_X+1?STRESS_Z+0.528?WXNEG+1?PS_1
1.6?T1+1?STRESS_Y- LOAD COMB 7578 _:
*1?STRESS_X+1?STRESS_Z+0.3168?WXPOS+1?PS_1 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 0.96 11 1.0 12 -1.0 13
LOAD COMB 7564 _: 1.0 15 0.528 -
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -1.6 11 1.0 12 -1.0 13 21 1.0
1.0 - *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC-
14 0.3168 21 1.0 0.96?T1+1.5?STRESS_Y-
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC- *1.5?STRESS_X+1.5?STRESS_Z+0.3168?WXNEG+1.5?PS_
0.96?T1+1.5?STRESS_Y- 1
*1.5?STRESS_X+1.5?STRESS_Z+0.528?WXPOS+1.5?PS_1 LOAD COMB 7579 _:
LOAD COMB 7565 _: 1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 -0.96 11 1.5 12 -1.5 13
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -0.96 11 1.5 12 -1.5 13 1.5 15 0.3168 -
1.5 - 21 1.5
14 0.528 21 1.5 *1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC-
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC- 0.96?T1+1?STRESS_Y-
0.96?T1+1?STRESS_Y- *1?STRESS_X+1?STRESS_Z+0.3168?WXNEG+1?PS_1
*1?STRESS_X+1?STRESS_Z+0.528?WXPOS+1?PS_1 LOAD COMB 7580 _:
LOAD COMB 7566 _: 1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 -0.96 11 1.0 12 -1.0 13
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -0.96 11 1.0 12 -1.0 13 1.0 15 0.3168 -
1.0 - 21 1.0
14 0.528 21 1.0 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC-
* 1.6?T1+1.5?STRESS_Y-
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC+0.96?T1 *1.5?STRESS_X+1.5?STRESS_Z+0.3168?WXNEG+1.5?PS_
+1.5?STRESS_Y- 1
LOAD COMB 7581 _:
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 369 de 463
(SUBJECT) (Page)

1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -1.6 11 1.5 12 -1.5 13 *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+0.96?T1+1?S
1.5 - TRESS_Y-
15 0.3168 21 1.5 *1?STRESS_X+1?STRESS_Z+0.528?WZPOS+1?PS_1
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC- LOAD COMB 7596 _:
1.6?T1+1?STRESS_Y- 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 0.96 11 1.0 12 -1.0 13
*1?STRESS_X+1?STRESS_Z+0.3168?WXNEG+1?PS_1 1.0 16 0.528 -
LOAD COMB 7582 _: 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -1.6 11 1.0 12 -1.0 13 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC-
1.0 - 0.96?T1+1.5?STRESS_Y-
15 0.3168 21 1.0 *1.5?STRESS_X+1.5?STRESS_Z+0.3168?WZPOS+1.5?PS_
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC- 1
0.96?T1+1.5?STRESS_Y- LOAD COMB 7597 _:
*1.5?STRESS_X+1.5?STRESS_Z+0.528?WXNEG+1.5?PS_1 1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 -0.96 11 1.5 12 -1.5 13
LOAD COMB 7583 _: 1.5 16 0.3168 -
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -0.96 11 1.5 12 -1.5 13 21 1.5
1.5 - *1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC-
15 0.528 21 1.5 0.96?T1+1?STRESS_Y-
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC- *1?STRESS_X+1?STRESS_Z+0.3168?WZPOS+1?PS_1
0.96?T1+1?STRESS_Y- LOAD COMB 7598 _:
*1?STRESS_X+1?STRESS_Z+0.528?WXNEG+1?PS_1 1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 -0.96 11 1.0 12 -1.0 13
LOAD COMB 7584 _: 1.0 16 0.3168 -
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -0.96 11 1.0 12 -1.0 13 21 1.0
1.0 - *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC-
15 0.528 21 1.0 1.6?T1+1.5?STRESS_Y-
* *1.5?STRESS_X+1.5?STRESS_Z+0.3168?WZPOS+1.5?PS_
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC+0.96?T1 1
+1.5?STRESS_Y- LOAD COMB 7599 _:
*1.5?STRESS_X+1.5?STRESS_Z+0.3168?WZPOS+1.5?PS_ 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -1.6 11 1.5 12 -1.5 13
1 1.5 -
LOAD COMB 7591 _: 16 0.3168 21 1.5
1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 0.96 11 1.5 12 -1.5 13 *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC-
1.5 16 0.3168 - 1.6?T1+1?STRESS_Y-
21 1.5 *1?STRESS_X+1?STRESS_Z+0.3168?WZPOS+1?PS_1
*1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC+0.96?T1+1?ST LOAD COMB 7600 _:
RESS_Y- 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -1.6 11 1.0 12 -1.0 13
*1?STRESS_X+1?STRESS_Z+0.3168?WZPOS+1?PS_1 1.0 -
LOAD COMB 7592 _: 16 0.3168 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 0.96 11 1.0 12 -1.0 13 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC-
1.0 16 0.3168 - 0.96?T1+1.5?STRESS_Y-
21 1.0 *1.5?STRESS_X+1.5?STRESS_Z+0.528?WZPOS+1.5?PS_1
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+1.6?T LOAD COMB 7601 _:
1+1.5?STRESS_Y- 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -0.96 11 1.5 12 -1.5 13
*1.5?STRESS_X+1.5?STRESS_Z+0.3168?WZPOS+1.5?PS_ 1.5 -
1 16 0.528 21 1.5
LOAD COMB 7593 _: *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC-
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 1.6 11 1.5 12 -1.5 13 0.96?T1+1?STRESS_Y-
1.5 16 0.3168 - *1?STRESS_X+1?STRESS_Z+0.528?WZPOS+1?PS_1
21 1.5 LOAD COMB 7602 _:
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+1.6?T1+1?ST 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -0.96 11 1.0 12 -1.0 13
RESS_Y- 1.0 -
*1?STRESS_X+1?STRESS_Z+0.3168?WZPOS+1?PS_1 16 0.528 21 1.0
LOAD COMB 7594 _: *
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 1.6 11 1.0 12 -1.0 13 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC+0.96?T1
1.0 16 0.3168 - +1.5?STRESS_Y-
21 1.0 *1.5?STRESS_X+1.5?STRESS_Z+0.3168?WZNEG+1.5?PS_
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+0.96? 1
T1+1.5?STRESS_Y- LOAD COMB 7609 _:
*1.5?STRESS_X+1.5?STRESS_Z+0.528?WZPOS+1.5?PS_1 1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 0.96 11 1.5 12 -1.5 13
LOAD COMB 7595 _: 1.5 17 0.3168 -
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 0.96 11 1.5 12 -1.5 13 21 1.5
1.5 16 0.528 - *1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC+0.96?T1+1?ST
21 1.5 RESS_Y-
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 370 de 463
(SUBJECT) (Page)

*1?STRESS_X+1?STRESS_Z+0.3168?WZNEG+1?PS_1 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -1.6 11 1.0 12 -1.0 13
LOAD COMB 7610 _: 1.0 -
1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 0.96 11 1.0 12 -1.0 13 17 0.3168 21 1.0
1.0 17 0.3168 - *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC-
21 1.0 0.96?T1+1.5?STRESS_Y-
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+1.6?T *1.5?STRESS_X+1.5?STRESS_Z+0.528?WZNEG+1.5?PS_1
1+1.5?STRESS_Y- LOAD COMB 7619 _:
*1.5?STRESS_X+1.5?STRESS_Z+0.3168?WZNEG+1.5?PS_ 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -0.96 11 1.5 12 -1.5 13
1 1.5 -
LOAD COMB 7611 _: 17 0.528 21 1.5
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 1.6 11 1.5 12 -1.5 13 *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC-
1.5 17 0.3168 - 0.96?T1+1?STRESS_Y-
21 1.5 *1?STRESS_X+1?STRESS_Z+0.528?WZNEG+1?PS_1
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+1.6?T1+1?ST LOAD COMB 7620 _:
RESS_Y- 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -0.96 11 1.0 12 -1.0 13
*1?STRESS_X+1?STRESS_Z+0.3168?WZNEG+1?PS_1 1.0 -
LOAD COMB 7612 _: 17 0.528 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 1.6 11 1.0 12 -1.0 13 *
1.0 17 0.3168 - *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC+0.96?T1
21 1.0 +1.5?STRESS_Y-1.5?STRESS_X-
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+0.96? *1.5?STRESS_Z+0.3168?WXPOS+1.5?PS_1
T1+1.5?STRESS_Y- LOAD COMB 7627 _:
*1.5?STRESS_X+1.5?STRESS_Z+0.528?WZNEG+1.5?PS_1 1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 0.96 11 1.5 12 -1.5 13 -
LOAD COMB 7613 _: 1.5 14 0.3168 -
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 0.96 11 1.5 12 -1.5 13 21 1.5
1.5 17 0.528 - *1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC+0.96?T1+1?ST
21 1.5 RESS_Y-1?STRESS_X-
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+0.96?T1+1?S *1?STRESS_Z+0.3168?WXPOS+1?PS_1
TRESS_Y- LOAD COMB 7628 _:
*1?STRESS_X+1?STRESS_Z+0.528?WZNEG+1?PS_1 1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 0.96 11 1.0 12 -1.0 13 -
LOAD COMB 7614 _: 1.0 14 0.3168 -
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 0.96 11 1.0 12 -1.0 13 21 1.0
1.0 17 0.528 - *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+1.6?T
21 1.0 1+1.5?STRESS_Y-1.5?STRESS_X-
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC- *1.5?STRESS_Z+0.3168?WXPOS+1.5?PS_1
0.96?T1+1.5?STRESS_Y- LOAD COMB 7629 _:
*1.5?STRESS_X+1.5?STRESS_Z+0.3168?WZNEG+1.5?PS_ 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 1.6 11 1.5 12 -1.5 13 -
1 1.5 -
LOAD COMB 7615 _: 14 0.3168 21 1.5
1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 -0.96 11 1.5 12 -1.5 13 *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+1.6?T1+1?ST
1.5 17 0.3168 - RESS_Y-1?STRESS_X-
21 1.5 *1?STRESS_Z+0.3168?WXPOS+1?PS_1
*1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC- LOAD COMB 7630 _:
0.96?T1+1?STRESS_Y- 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 1.6 11 1.0 12 -1.0 13 -
*1?STRESS_X+1?STRESS_Z+0.3168?WZNEG+1?PS_1 1.0 -
LOAD COMB 7616 _: 14 0.3168 21 1.0
1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 -0.96 11 1.0 12 -1.0 13 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+0.96?
1.0 17 0.3168 - T1+1.5?STRESS_Y-1.5?STRESS_X-
21 1.0 *1.5?STRESS_Z+0.528?WXPOS+1.5?PS_1
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC- LOAD COMB 7631 _:
1.6?T1+1.5?STRESS_Y- 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 0.96 11 1.5 12 -1.5 13
*1.5?STRESS_X+1.5?STRESS_Z+0.3168?WZNEG+1.5?PS_ -1.5 -
1 14 0.528 21 1.5
LOAD COMB 7617 _: *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+0.96?T1+1?S
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -1.6 11 1.5 12 -1.5 13 TRESS_Y-1?STRESS_X-
1.5 - *1?STRESS_Z+0.528?WXPOS+1?PS_1
17 0.3168 21 1.5 LOAD COMB 7632 _:
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC- 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 0.96 11 1.0 12 -1.0 13
1.6?T1+1?STRESS_Y- -1.0 -
*1?STRESS_X+1?STRESS_Z+0.3168?WZNEG+1?PS_1 14 0.528 21 1.0
LOAD COMB 7618 _: *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC-
0.96?T1+1.5?STRESS_Y-1.5?STRESS_X-
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 371 de 463
(SUBJECT) (Page)

*1.5?STRESS_Z+0.3168?WXPOS+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+1.6?T1+1?ST
LOAD COMB 7633 _: RESS_Y-1?STRESS_X-
1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 -0.96 11 1.5 12 -1.5 13 - *1?STRESS_Z+0.3168?WXNEG+1?PS_1
1.5 - LOAD COMB 7648 _:
14 0.3168 21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 1.6 11 1.0 12 -1.0 13 -
*1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC- 1.0 -
0.96?T1+1?STRESS_Y-1?STRESS_X- 15 0.3168 21 1.0
*1?STRESS_Z+0.3168?WXPOS+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+0.96?
LOAD COMB 7634 _: T1+1.5?STRESS_Y-1.5?STRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 -0.96 11 1.0 12 -1.0 13 - *1.5?STRESS_Z+0.528?WXNEG+1.5?PS_1
1.0 - LOAD COMB 7649 _:
14 0.3168 21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 0.96 11 1.5 12 -1.5 13
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC- -1.5 -
1.6?T1+1.5?STRESS_Y-1.5?STRESS_X- 15 0.528 21 1.5
*1.5?STRESS_Z+0.3168?WXPOS+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+0.96?T1+1?S
LOAD COMB 7635 _: TRESS_Y-1?STRESS_X-
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -1.6 11 1.5 12 -1.5 13 - *1?STRESS_Z+0.528?WXNEG+1?PS_1
1.5 - LOAD COMB 7650 _:
14 0.3168 21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 0.96 11 1.0 12 -1.0 13
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC- -1.0 -
1.6?T1+1?STRESS_Y-1?STRESS_X- 15 0.528 21 1.0
*1?STRESS_Z+0.3168?WXPOS+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC-
LOAD COMB 7636 _: 0.96?T1+1.5?STRESS_Y-1.5?STRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -1.6 11 1.0 12 -1.0 13 - *1.5?STRESS_Z+0.3168?WXNEG+1.5?PS_1
1.0 - LOAD COMB 7651 _:
14 0.3168 21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 -0.96 11 1.5 12 -1.5 13 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC- 1.5 -
0.96?T1+1.5?STRESS_Y-1.5?STRESS_X- 15 0.3168 21 1.5
*1.5?STRESS_Z+0.528?WXPOS+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC-
LOAD COMB 7637 _: 0.96?T1+1?STRESS_Y-1?STRESS_X-
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -0.96 11 1.5 12 -1.5 13 *1?STRESS_Z+0.3168?WXNEG+1?PS_1
-1.5 - LOAD COMB 7652 _:
14 0.528 21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 -0.96 11 1.0 12 -1.0 13 -
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC- 1.0 -
0.96?T1+1?STRESS_Y-1?STRESS_X- 15 0.3168 21 1.0
*1?STRESS_Z+0.528?WXPOS+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC-
LOAD COMB 7638 _: 1.6?T1+1.5?STRESS_Y-1.5?STRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -0.96 11 1.0 12 -1.0 13 *1.5?STRESS_Z+0.3168?WXNEG+1.5?PS_1
-1.0 - LOAD COMB 7653 _:
14 0.528 21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -1.6 11 1.5 12 -1.5 13 -
* 1.5 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC+0.96?T1 15 0.3168 21 1.5
+1.5?STRESS_Y-1.5?STRESS_X- *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC-
*1.5?STRESS_Z+0.3168?WXNEG+1.5?PS_1 1.6?T1+1?STRESS_Y-1?STRESS_X-
LOAD COMB 7645 _: *1?STRESS_Z+0.3168?WXNEG+1?PS_1
1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 0.96 11 1.5 12 -1.5 13 - LOAD COMB 7654 _:
1.5 15 0.3168 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -1.6 11 1.0 12 -1.0 13 -
21 1.5 1.0 -
*1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC+0.96?T1+1?ST 15 0.3168 21 1.0
RESS_Y-1?STRESS_X- *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC-
*1?STRESS_Z+0.3168?WXNEG+1?PS_1 0.96?T1+1.5?STRESS_Y-1.5?STRESS_X-
LOAD COMB 7646 _: *1.5?STRESS_Z+0.528?WXNEG+1.5?PS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 0.96 11 1.0 12 -1.0 13 - LOAD COMB 7655 _:
1.0 15 0.3168 - 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -0.96 11 1.5 12 -1.5 13
21 1.0 -1.5 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+1.6?T 15 0.528 21 1.5
1+1.5?STRESS_Y-1.5?STRESS_X- *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC-
*1.5?STRESS_Z+0.3168?WXNEG+1.5?PS_1 0.96?T1+1?STRESS_Y-1?STRESS_X-
LOAD COMB 7647 _: *1?STRESS_Z+0.528?WXNEG+1?PS_1
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 1.6 11 1.5 12 -1.5 13 - LOAD COMB 7656 _:
1.5 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -0.96 11 1.0 12 -1.0 13
15 0.3168 21 1.5 -1.0 -
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 372 de 463
(SUBJECT) (Page)

15 0.528 21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -1.6 11 1.5 12 -1.5 13 -
* 1.5 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC+0.96?T1 16 0.3168 21 1.5
+1.5?STRESS_Y-1.5?STRESS_X- *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC-
*1.5?STRESS_Z+0.3168?WZPOS+1.5?PS_1 1.6?T1+1?STRESS_Y-1?STRESS_X-
LOAD COMB 7663 _: *1?STRESS_Z+0.3168?WZPOS+1?PS_1
1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 0.96 11 1.5 12 -1.5 13 - LOAD COMB 7672 _:
1.5 16 0.3168 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -1.6 11 1.0 12 -1.0 13 -
21 1.5 1.0 -
*1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC+0.96?T1+1?ST 16 0.3168 21 1.0
RESS_Y-1?STRESS_X- *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC-
*1?STRESS_Z+0.3168?WZPOS+1?PS_1 0.96?T1+1.5?STRESS_Y-1.5?STRESS_X-
LOAD COMB 7664 _: *1.5?STRESS_Z+0.528?WZPOS+1.5?PS_1
1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 0.96 11 1.0 12 -1.0 13 - LOAD COMB 7673 _:
1.0 16 0.3168 - 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -0.96 11 1.5 12 -1.5 13
21 1.0 -1.5 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+1.6?T 16 0.528 21 1.5
1+1.5?STRESS_Y-1.5?STRESS_X- *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC-
*1.5?STRESS_Z+0.3168?WZPOS+1.5?PS_1 0.96?T1+1?STRESS_Y-1?STRESS_X-
LOAD COMB 7665 _: *1?STRESS_Z+0.528?WZPOS+1?PS_1
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 1.6 11 1.5 12 -1.5 13 - LOAD COMB 7674 _:
1.5 - 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -0.96 11 1.0 12 -1.0 13
16 0.3168 21 1.5 -1.0 -
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+1.6?T1+1?ST 16 0.528 21 1.0
RESS_Y-1?STRESS_X- *
*1?STRESS_Z+0.3168?WZPOS+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC+0.96?T1
LOAD COMB 7666 _: +1.5?STRESS_Y-1.5?STRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 1.6 11 1.0 12 -1.0 13 - *1.5?STRESS_Z+0.3168?WZNEG+1.5?PS_1
1.0 - LOAD COMB 7681 _:
16 0.3168 21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 0.96 11 1.5 12 -1.5 13 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+0.96? 1.5 17 0.3168 -
T1+1.5?STRESS_Y-1.5?STRESS_X- 21 1.5
*1.5?STRESS_Z+0.528?WZPOS+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC+0.96?T1+1?ST
LOAD COMB 7667 _: RESS_Y-1?STRESS_X-
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 0.96 11 1.5 12 -1.5 13 *1?STRESS_Z+0.3168?WZNEG+1?PS_1
-1.5 - LOAD COMB 7682 _:
16 0.528 21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 0.96 11 1.0 12 -1.0 13 -
*1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+0.96?T1+1?S 1.0 17 0.3168 -
TRESS_Y-1?STRESS_X- 21 1.0
*1?STRESS_Z+0.528?WZPOS+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+1.6?T
LOAD COMB 7668 _: 1+1.5?STRESS_Y-1.5?STRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 0.96 11 1.0 12 -1.0 13 *1.5?STRESS_Z+0.3168?WZNEG+1.5?PS_1
-1.0 - LOAD COMB 7683 _:
16 0.528 21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 1.6 11 1.5 12 -1.5 13 -
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC- 1.5 -
0.96?T1+1.5?STRESS_Y-1.5?STRESS_X- 17 0.3168 21 1.5
*1.5?STRESS_Z+0.3168?WZPOS+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+1.6?T1+1?ST
LOAD COMB 7669 _: RESS_Y-1?STRESS_X-
1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 -0.96 11 1.5 12 -1.5 13 - *1?STRESS_Z+0.3168?WZNEG+1?PS_1
1.5 - LOAD COMB 7684 _:
16 0.3168 21 1.5 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 1.6 11 1.0 12 -1.0 13 -
*1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC- 1.0 -
0.96?T1+1?STRESS_Y-1?STRESS_X- 17 0.3168 21 1.0
*1?STRESS_Z+0.3168?WZPOS+1?PS_1 *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC+0.96?
LOAD COMB 7670 _: T1+1.5?STRESS_Y-1.5?STRESS_X-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 -0.96 11 1.0 12 -1.0 13 - *1.5?STRESS_Z+0.528?WZNEG+1.5?PS_1
1.0 - LOAD COMB 7685 _:
16 0.3168 21 1.0 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 0.96 11 1.5 12 -1.5 13
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC- -1.5 -
1.6?T1+1.5?STRESS_Y-1.5?STRESS_X- 17 0.528 21 1.5
*1.5?STRESS_Z+0.3168?WZPOS+1.5?PS_1 *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC+0.96?T1+1?S
LOAD COMB 7671 _: TRESS_Y-1?STRESS_X-
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 373 de 463
(SUBJECT) (Page)

*1?STRESS_Z+0.528?WZNEG+1?PS_1 17 0.3168 21 1.5


LOAD COMB 7686 _: *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 0.96 11 1.0 12 -1.0 13 1.6?T1+1?STRESS_Y-1?STRESS_X-
-1.0 - *1?STRESS_Z+0.3168?WZNEG+1?PS_1
17 0.528 21 1.0 LOAD COMB 7690 _:
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.6?LM+1.6?LSC- 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -1.6 11 1.0 12 -1.0 13 -
0.96?T1+1.5?STRESS_Y-1.5?STRESS_X- 1.0 -
*1.5?STRESS_Z+0.3168?WZNEG+1.5?PS_1 17 0.3168 21 1.0
LOAD COMB 7687 _: *1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC-
1 1.5 2 1.5 3 1.5 4 1.5 7 1.6 8 1.6 10 -0.96 11 1.5 12 -1.5 13 - 0.96?T1+1.5?STRESS_Y-1.5?STRESS_X-
1.5 - *1.5?STRESS_Z+0.528?WZNEG+1.5?PS_1
17 0.3168 21 1.5 LOAD COMB 7691 _:
*1?SD+1?F+1?CM+1?PA+1.6?LM+1.6?LSC- 1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -0.96 11 1.5 12 -1.5 13
0.96?T1+1?STRESS_Y-1?STRESS_X- -1.5 -
*1?STRESS_Z+0.3168?WZNEG+1?PS_1 17 0.528 21 1.5
LOAD COMB 7688 _: *1?SD+1?F+1?CM+1?PA+1.12?LM+1.12?LSC-
1 1.0 2 1.0 3 1.0 4 1.0 7 1.6 8 1.6 10 -0.96 11 1.0 12 -1.0 13 - 0.96?T1+1?STRESS_Y-1?STRESS_X-
1.0 - *1?STRESS_Z+0.528?WZNEG+1?PS_1
17 0.3168 21 1.0 LOAD COMB 7692 _:
*1.5?SD+1.5?F+1.5?CM+1.5?PA+1.12?LM+1.12?LSC- 1 1.0 2 1.0 3 1.0 4 1.0 7 1.12 8 1.12 10 -0.96 11 1.0 12 -1.0 13
1.6?T1+1.5?STRESS_Y-1.5?STRESS_X- -1.0 -
*1.5?STRESS_Z+0.3168?WZNEG+1.5?PS_1 17 0.528 21 1.0
LOAD COMB 7689 _: *
1 1.5 2 1.5 3 1.5 4 1.5 7 1.12 8 1.12 10 -1.6 11 1.5 12 -1.5 13 - PERFORM ANALYSIS PRINT STATICS CHECK
1.5 - FINISH
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 374 de 463
(SUBJECT) (Page)

11.9 Equipment data


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 375 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 376 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 377 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 378 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 379 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 380 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 381 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 382 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 383 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 384 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 385 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 386 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 387 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 388 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 389 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 390 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 391 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 392 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 393 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 394 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 395 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 396 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 397 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 398 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 399 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 400 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 401 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 402 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 403 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 404 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 405 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 406 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 407 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 408 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 409 de 463
(SUBJECT) (Page)

11.10 Stress report SC-008


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 410 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 411 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 412 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 413 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 414 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 415 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 416 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 417 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 418 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 419 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 420 de 463
(SUBJECT) (Page)

11.11 Stress report SC-025


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 421 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 422 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 423 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 424 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 425 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 426 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 427 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 428 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 429 de 463
(SUBJECT) (Page)

.
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 430 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 431 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 432 de 463
(SUBJECT) (Page)

11.12 Stress report SC-026


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 433 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 434 de 463
(SUBJECT) (Page)

11.13 Stress report SC-041


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 435 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 436 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 437 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 438 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 439 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 440 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 441 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 442 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 443 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 444 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 445 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 446 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 447 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 448 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 449 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 450 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 451 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 452 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 453 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 454 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 455 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 456 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 457 de 463
(SUBJECT) (Page)

11.14 Stress report SC-042


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 458 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 459 de 463
(SUBJECT) (Page)

11.15 Stress report SC-044


CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 460 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 461 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 462 de 463
(SUBJECT) (Page)
CONTRATO FW N° : 1DD5524A
(CONTRACT FW Nº)
CLIENTE : REPSOL Rev. :0
(CLIENT) (Rev)
PROYECTO : C-10. AMPLIACION REFINERIA CARTAGENA Fecha : 03-08-09
(PROJECT) (DATE)
ASUNTO : MEMORIA DE CÁLCULO ESTRUCTURA P Pág. : 463 de 463
(SUBJECT) (Page)

S-ar putea să vă placă și