Pipeline Engineering

API RP 1102 Pipeline Crossing Calculations ver 0.0


https://pipeeng.com/pipeline_crossing.html

Project GAS LINE Developer YMN


Date 2019-03-06 Approver GP
Revision A Reviewer GU

Input Data
Pipe Outside Diameter, D in 6.625
Pipe Wall Thickness, t in 0.280
Pipe SMYS, Pa psi 35000
Design Pressure, P psi 270.00
Installation Temperature, T1 °F 60.00
Max. or Min. Design Temperature, T2 °F 100.00
Depth of Cover, H ft 4.00
Bored Diameter, Bd inch 8.63
Soil Unit Weight, Y lb/ft³ 120.00
Modulus of Soil Reaction, E' ksi 0.50
Resilient Modulus of Soil, Er ksi 5.00
Applied Design Surface Pressure, w psi 83.30
Impact Factor, Fi - 1.50
Design Factor, F - 0.72
Longitudinal Joint Factor, E - 1.00
Temperature Derating Factor, T - 1.00

API 1102 Parameters


Earth Load Stiffness factor, KHe - 600.31
Earth Load Burial Factor, Be - 1.1184
Earth Load Excavation factor, Ee - 1.3977
Cyclic Hoop Road Stiffness Factor, KHh - 7.87
Cyclic Hoop Road Geometry Factor, GHh - 1.4522
Road Pavement Type Factor, R - 1.10
Road Axle Configuration Factor, L - 0.65
Cyclic Longitudinal Road Stiffness Factor, KLh - 9.32
Cyclic Longitudinal Road Geometry Factor, GLh - 1.48
Fatigue Endurance Limit of Girth Yield, SFG psi 12000
Fatigue Endurance Limit of Longitudinal Weld, SFL psi 21000

Downloaded on 6/3/2019 02:18:10 from pipeeng.com Page 1 of 2


Pipeline Engineering

Result
Earth Load Stress psi 432
Cyclic Circumferential Stress psi 1022
Cyclic Longitudinal Stress psi 1229
Internal Pressure Hoop Stress psi 3194
Maximum Circumferential Stress psi 4648
API 1102 Maximum Longitudinal Stress psi -5223
API 1102 Maximum Radial Stress psi -270
API 1102 Effective Stress psi 8549

API RP 1102 Stress Check


Item Stress Limit Analysis Pass/ Fail
(psi) Results (psi)
Hoop Stress (Barlow) 25,200 3,194 Pass
Total Effective Stress 25,200 8,549 Pass
Girth Weld Fatigue 8,640 1,229 Pass
Longitudinal Weld Fatigue 15,120 1,022 Pass