Sunteți pe pagina 1din 40

UNO – For the monolithic construction method

Same building structure quickly and efficiently


formed – horizontally and vertically in one step
Edition 09 | 2015

PERI GmbH
Formwork Scaffolding Engineering
Rudolf-Diesel-Strasse 19
89264 Weissenhorn
Germany
Tel. +49 (0)7309.950-0
Fax +49 (0)7309.951-0
info@peri.com
www.peri.com

Important Notes

All current safety regulations and guidelines must be observed in those countries where our
products are used.

The photos shown in this brochure feature construction sites in progress. For this reason, safety
and anchor details in particular cannot always be considered as conclusive or final. These are
subject to the risk assessment carried out by the contractor.

In addition, computer graphics are used which are to be understood as system representations.
For ensuring a better understanding, these and the detailed illustrations shown have been par-
tially reduced to certain aspects. The safety installations which have possibly not been shown in
these detailed descriptions must nevertheless be available.

The systems or items shown might not be available in every country.

Safety instructions and load specifications are to be strictly observed at all times. Separate
structural calculations are required for any deviations from the standard design data.

The information contained herein is subject to technical changes in the interests of progress.
Errors and typographical mistakes reserved.
Content

UNO – For the monolithic construction method


2 Same building structure quickly and efficiently formed –
horizontally and vertically in one step

The monolithic construction


4 Systematizing and accelerating processes

Efficient working procedures


6 Lightweight elements, ingenious technology and
only a minimum of accessory components

Innovative anchoring technology


8 Installation from one side only, re-usable ties and few tie points

Fast and simple striking


10 Well thought-out transition between wall and slab formwork
as well as the drophead solution

System overview
12 UNO at a glance

Standard applications with UNO
14 Setting of stopends, beams, door openings, attica and
stairways
16 Multi-storey buildings, additional accessories

Safe working conditions in all situations
18 Guardrails and working scaffolds

References
19 PERI UNO project examples

25 UNO components
UNO – For the monolithic construction method
Same building structure quickly and efficiently
formed – horizontally and vertically in one step

With the UNO Monolithic Housing Tie installation from one side only, the
Formwork, walls, columns, slabs, drophead system and low number of ac-
beams and stairways are concreted cessory parts accelerate working opera-
simultaneously using the monolithic tions with UNO. In addition, these
construction method. UNO is the fast advantages simplify on-site material
and cost-effective solution for form- requirements and the logistics.
ing residential structures with fre-
quently repeated floor plans – both PERI manufactures the individual UNO
horizontally and vertically. elements on a project-related basis and
in compliance with high quality stand-
With the monolithic construction meth- ards. As a result, all dimensions and
od, formwork, reinforcement and instal- structural forms are possible.
lation operations as well as finishing
work are systematized and thus made Optimal application of the system is
more efficient. UNO provides project- achieved when the casting segments for
specific customized elements that are the respective daily cycle have been
used to realize repetitive floor plans decided.
whilst always applying the same system-
atic approach.

All UNO formwork elements are made


of aluminum and thus very light, a crane
is therefore not required. After a short
orientation period, inexperienced users
can also easily and quickly work with
UNO.

■■ Efficientworking procedures ■■ Innovative anchoring technology ■■ Faststriking


with lightweight elements, ingen- with installation from one side with a well thought-out transition
ious technology and very few only, re-usable ties as well as up between wall and slab formwork
accessory components to 70 % fewer tie pointscompared as well as the drophead solution
to other comparable systems

2
3
The monolithic construction method
Systematizing and accelerating processes

The monolithic construction method cluding the entire formwork planning. As set of formwork each time, have been
is the orientation towards increasingly a result, close cooperation between the achieved to date without difficulty.
industrialized construction of a build- planners and the executing contractor,
ing´s shell. Installing the reinforcement including formwork suppliers, is abso-
as well as the electrical and other in- lutely necessary.
stallation work can be covered at the
same time. Monolithic construction is particularly
suitable for multiple repetitions of the
Monolithic construction requires thor- same structural forms – for single-storey
ough planning of all processes involved as well as multi-storey buildings. Several
in realisation of the shell structure, in- hundred forming operations, with one

4
UNO is the customized solution for geometry and the requirements of the Customers receive exactly the kind of
all building geometries. PERI thereby contractor. All window and door open- help they need from experienced super-
is responsible for the formwork plan- ings, attica and other details are integrat- visors or special training can be arranged
ning, the manufacture of the individu- ed into the solution. for the construction team.
al formwork elements and, if neces-
sary, any required on-site support. PERI supplies the pre-assembled UNO
elements as well as the complete range
UNO is always a customized solution of accessories, and also provides all nec-
which is adapted to match the building essary support during construction.

Formwork planning for UNO is carried out individu- The PERI assembly plan shows the UNO formwork Each element is allocated an item number and can
ally on the basis of the construction plans. elements and their positioning. be quickly and correctly placed using the respective
positioning plan.

Production of the UNO formwork final quality control procedure, including


elements takes place at different a test set-up of the complete formwork,
PERI locations around the world. is carried out.

The manufacturing facilities are well


equipped for the production of UNO
formwork elements. Specially trained
employees ensure the high quality of
the elements. Prior to delivery, the

5
Efficient working procedures
Lightweight elements, ingenious technology and only
a minimum of accessory components

The lightweight elements and the in- nents and required accessory parts is
geniuos technology make forming ­reduced to a minimum. This simplifies
with UNO very efficient. In addition, a handling as well as logistics, and reduc-
minimum of individual components es time-consuming searching and mate-
ensure fast working operations. rial losses on the construction site.

UNO panels are made of aluminium and Height adjustment of the wall elements
are particularly light. They can be moved is carried out without any further action
quickly by hand without the use of a through the pre-assembled anchor
crane. The number of individual compo- sleeves.

The Slab Panels UNO are quickly mounted: hook


in, swivel up, position props, install Slab Coupler
UNO – ready.

6
All UNO connections have been de-
signed to ensure that element joints
are tightly closed.

With the monolithic construction method,


free-flowing concrete is normally used.
The element joints with UNO connec-
tions tightly close. This avoids any leak-
age of the relatively fluid concrete and
guarantees excellent concrete surfaces.

Easy and simple element connections


The Wall Coupler UNO as well as the
Slab Coupler UNO are easily and quickly
fixed in position using a hammer.

Automatic height adjustment of the


panels
Through the pre-assembly of the coun-
ter sleeve or anchor, the height of the
Wall Panels UNO can be adjusted when
arranged in a row without any additional
measures.

7
Innovative anchoring technology
Installation from one side only, re-usable ties and few
tie points

The conical-shaped tie, which is in-


stalled from one side only, can often
be re-used. Through the low number
of tie points, this results in large time
and cost savings.

The special tie technology has many ad-


vantages. The ties are conical in shape;
no spacer tubes nor cones are required.
They can easily be removed from the
hardened concrete; time-consuming re-
moval of embedded anchors is therefore
unnecessary.

In addition, the ties are operated from


one side only which also reduces both
personnel and working time require-
ments.

Compared to other monolithic formwork


systems with conventional anchors, up
to 70 % fewer tie points are needed. Sliding piece, Alu

Sliding piece, Alu

Counter sleeve

Conical tie

Tie head

The tie head and counter sleeve can easily be Only when tightening the tie a wrench (SW 19) is The lowering of the aluminum sliding pieces
attached to the edge profile of the element by hand. needed. ­ensures a pressure-resistant connection of the
anchor / panel.

8
Fast and simple striking
Well thought-out transition between wall and slab
formwork as well as the drophead solution

Striking is especially quick and easy – system allows early striking: long beams
particularly through the ingenious and slab panels can be struck after only
connection area between the wall one day and used in the next concreting
and slab formwork. In addition, the section. Only the slab props with Drop
slab can be usually stripped after only Heads UNO remain in position as tem-
one day due to the drophead system. porary props.

Striking begins with the wall panels.


After removing the Spacer Couplers,
they are simply swung out of the Transi-
tion Panel UNO. The Wall panels UNO
can then be immediately used in the
next concreting section.
Subsequently, the transition as well as
the slab formwork elements are re-
moved. In the process, the drophead

Through the well thought-out design of the transi-


tion area between the wall and slab, the Wall Panels
can easily be swung out.

The striking procedure in detail

With the Striking Tool, the wall elements can easily The wall panels can easily be removed from the wall The wall - slab Transition panel UNO is subsequently
be loosened from the concreted wall after the Wall - slab Transition Panel UNO. released using the Striking Tool, and then removed.
Couplers and ties have been removed.

10
Early striking with the Drop Head
UNO
The upper part of the Drop Head UNO
and Slab Girders UNO are lowered by
means of a hammer blow on the C-pin
of the Drop Head UNO. Only the slab
props remain in position as temporary
props and transfer the loads during the
required hardening process of the con-
crete. The Slab Panels and the Slab Gird-
ers are immediately ready for use in the
next casting segment.

The striking of the slab begins with the outer slab In the internal slab fields, the Drop Heads UNO are ... and the slab beams and elements are subse-
panels. lowered by means of a hammer blow... quently removed. Props with the Drop Heads UNO
remain as temporary props.

11
System overview
UNO at a glance

Transition Panel Drop Head Slab Girder Slab Panel

Wall Coupler Stopend Waler Stopend Profile Internal Corner


Profile

12
Handrail Post UNO

Wall Panel

13
Standard applications with UNO
Setting of stopends, beams, door openings,
attica and stairways

With UNO, almost any structural


shape and geometrical requirement
can be realized.

Attica, cantilevers, wall and door open-


ings as well as beams can easily be
formed with UNO by means of accurate-
ly fabricated elements.

Stopends Beams Door openings


Stopend Profiles with Stopend Walers The bottom formwork of the beams is Door openings are braced with additional
on the Edge Profiles form the closure on also realized using the Stopend Profile. Spacer Spindles.
box-outs. Adapting to suit the respective The combination of soffit and side form-
wall thickness is possible in 10 mm in- work results in a rigid, self-supporting
crements. In addition, the integrated form.
toothed rack of the Stopend Profile
transfers the loads from the fresh con-
5
45

crete pressure which means no form-


work ties are necessary in the edge
­areas of the box-outs.
265

160
275
185

80
45

14
Cantilevers and attica
UNO also provides practical solutions for
cantilevers, attica or other building
geometries.

Attica, for example, can be constructed


on the inside by means of small-sized
wall elements or long, horizontally-posi-
tioned elements. The external formwork
is installed up to the top edge of the
attica. Anchors fix the internal formwork
in place.

Stairs
Stairs can be monolithically concreted
with the walls. Alternatively, construc-
tion of the stairs can take place in a
separate working step.

15
Standard applications with UNO
Multi-storey buildings, additional accessories

UNO is also suitable for realizing Alternatively the panels of the next floor The UNO Kicker Profile is mounted on the top edge
of the wall formwork and subsequently remains on
­multi-storey buildings. There are ­ are positioned directly on the UNO the hardened wall. Then it serves as a support for
two options for the execution. Brackets. the wall formwork of the next concreting section.

If UNO is used for constructing multi-


storey buildings, the UNO Kicker Profile
can serve as a support for the wall form-
work of the next concreting section.

If necessary, the Wall Panels can also be aligned by If required, the corner area is secured with Push-
means of a profile. Pull Props which are connected to the wall element
using Brace Connectors.

16
Inclined top sides of the walls can also
easily be realized with UNO.

Before delivery of each formwork unit,


a trial assembly is carried out at PERI.
Any possible visible defects are thus
identified and eliminated.

17
Safe working conditions in all situations
Guardrails and working scaffolds

For ensuring safe working conditions


at any height, corresponding safety
accessories are available.

Brackets and Guardrail Posts guarantee


that users can always work under very
safe conditions.

With Brackets, Guardrail Posts and timber, a three- The UNO Guardrail Post Kicker can be mounted on
part guardrail construction can be realized. Planking the wall element, and concrete loads are transferred
serves as a working surface. directly.

UNO has been designed to accommo-


date a fresh concrete pressure of up
to 80 kN/m². This facilitates rapid con-
creting operations.

Due to the fast concreting operations,


construction progress is accelerated
With the UNO system, good concrete
surface finishes are realized with only
very few tie holes. This ensures rework-
ing operations are kept to a minimum.

18
References
PERI UNO project examples

19
References
PERI UNO project examples

Real Carbayllo Saglemi Housing


Residential complex in Lima, Peru 180 buildings with social housing units in Saglemi, Ghana
33 buildings with up to 5 storeys (520 housing units) 180 houses with 3 storeys (house types A, B and C)
4 housing units per storey á 70 m² floor space 2 to 3 apartments a 40 m² - 80 m² floor space per storey

Forming in use Forming in use


1 set of formwork with approx. 300 m² surface area Type A: 2 sets of formwork with 1,770 m² surface area |
(for 1 housing unit) Type C: 4 sets of formwork with 4,130 m² surface area |
4 concreting steps per storey Type B: 3 sets of formwork with 385 m² surface area |
520 uses 1 concreting step per storey
Approx. 80 uses (Type C) (as of March 2015)

Viviendas Pro.Cre.Ar Sauce


Housing development in Rio Gallegos, Santa Cruz, Mazatlán residential complex / Sinaloa, Mexico
Argentina 1,500 houses with 2 storeys respectively
509 houses with 2 storeys 75 m² floor space
40 m² - 80 m² floor space per storey
Forming in use
Forming in use 1 set of formwork with approx. 315 m² surface area
6,271 m² formwork area in total 1 concreting step per storey
2 concreting steps per storey
Approx. 610 uses in total

20
Bahía Show House / Peninsula Show House Polonio
Residential complex in La Paz / Baja California Sur, Mexico Residential complex in Chiapas, Mexico
1,200 Bahía type houses | 2,000 Península type houses 400 houses with 2 storeys respectively
1 storey with 45 m² or 55 m² floor space per house 75 m² floor space per storey

Forming in use Forming in use


Bahía: 1 set of formwork with 247 m² surface area | Península: 1 set of formwork with 380 m² formwork surface
1 set of formwork with 103 m² surface area (in addition to the 1 concreting step per storey
Bahía type formwork) 1 concreting step per house Approx. 800 uses per set of formwork planned
Approx. 800 uses per set planned

Residential complex Residential complex in Mazatlán, Mexico


Social housing units in Tampico, Mexico Residential district housing
1,500 single-storey homes 2.40 m high reinforced concrete walls
45 m² floor space per house, remaining visible surfaces Execution with 12 m long concreting steps

Forming in use Forming in use


1 set of formwork with 219 m² formwork surface 1 concreting 2 sets of formwork for each 12 m lengths
step per storey (approx. 28 m² formwork surface respectively)
150 uses (planned) Approx. 300 uses per set of formwork (as of March 2015)

21
References
PERI UNO project examples

Las Bienaventuranzas Cumbres de las Rastas


Residential complex in Modelo, Dominican Republic Residential complex in Talca / Maule Region, Chile
16 buildings with 4 storeys (2nd construction phase) 6 houses with 5 storeys
4 housing units per storey a 60 m² floor space 125 m² floor space per storey

Forming in use Forming in use


2 sets of formwork with a total of 928 m² formwork surface 3 sets of formwork with a total of 550 m² formwork surface
2 concreting steps per storey 2 concreting steps per storey
128 uses per set of formwork 25 uses per set of formwork (as of March 2015)

Las Brisas de Chicureo Lomas de Papudo


Exclusive residential complex with golf course in Chi- Residential complex in Papudo, Chile
cureo, Chile 86 houses with 4 storeys respectively
256 houses with 2 storeys 81 m² floor space per storey
Floor space from 140 m² to 170 m²

Forming in use Forming in use


2 sets of formwork with a total of 1,358 m² formwork surface 2 sets of formwork with a total of 450 m² formwork surface
1 concreting step per storey 3 concreting steps per storey
60 uses per set of formwork (as of March 2015) Over 190 uses per set of formwork (as of March 2015)

22
Terrazas de Chicureo Casas Rehue
Exclusive residential complex in Chicureo, Chile Residential complex in Talca / Maule Region, Chile
256 houses with 2 storeys 350 houses with 2 storeys
Floor space from 140 m² to 170 m² Ground floor with 68 m² floor space in concrete design

Forming in use Forming in use


2 sets of formwork with a total of approx. 1,358 m² formwork 1 set of formwork with approx. 183 m² formwork surface
surface 1 concreting step per house
1 concreting step per storey 110 uses (as of March 2015)
Almost 60 uses per set of formwork (as of March 2015)

Casas Los Robles San Andres del Valle


Residential complex in Pucon / Araucanía Region, Chile Residential complex with houses in Concepción, Chile
200 houses with 2 storeys respectively 455 houses with 2 storeys
Ground floor with 43 m² floor space in concrete design Ground floor with 78 m² floor space in concrete design

Forming in use Forming in use


1 set of formwork with approx. 304 m² formwork surface 2 sets of formwork with a total of 522 m² formwork surface
1 concreting step per house 1 concreting step per storey
Over 150 uses (as of March 2015) Approx. 10 uses per set of formwork (as of March 2015)

23
References
PERI UNO project examples

Brisas de Chicureo Casas Torcaza Cormoran


Exclusive residential complex in Chicureo, Chile Residential complex in Curauma / V Region, Chile
Project with several construction phases and a total of 500 Project with several construction phases and a total of 250
residential units in various towns and cities residential units in various towns and cities.
Approx. 140 m2 floor space per house Ground floor with 68 m² floor space in concrete design

Forming in use Forming in use


1 set of formwork with approx. 492 m² surface area 1 set of formwork with approx. 1,240 m² surface area
1 concreting step per storey 1 concreting step per house
Approx. 30 uses (As of July 2015) Approx. 100 uses (As of March 2015)

Sol de Miraflores Portones de Linares


Residential complex in Penaflor, Metropolitana Region, Residential complex in Linares, Chile
Chile 450 houses with 2 storeys respectively
100 houses with 2 storeys respectively Ground floor with 58 m² floor space in concrete design
Ground floor with floor spaces 62 m2 to 81 m2 in concrete
­design

Forming in use Forming in use


3 sets of formwork with 200 m2 formwork surface each 1 set of formwork with 190 m2 formwork surface,
1 concreting step per house 1 set of formwork with 250 m2 formwork surface
Over 100 uses per set of formwork 1 concreting step per house
Approx. 200 uses per set of formwork

24
Altos del Mirador Altos del Mirador
Residential complex in Coquimbo / IV Region, Chile Residential complex in Coquimbo / IV Region, Chile
200 houses with 2 storeys respectively 100 houses with 1 storey each
Ground floor with 58 m² floor space in concrete design Approx. 58 m² floor space

Forming in use Forming in use


2 sets of formwork with approx. 250 m2 formwork 1 set of formwork with 180 m² surface area
surface each Approx. 100 uses
1 concreting step per house
Over 200 uses per set of formwork

Terrazas del Puerto Edificio Las Palmas


Residential complex, Colombia Residential complex in Santiago, Chile
10 Buildings with 15 storeys each Buildings with 25 storeys
1,200 m2 floor space per storey Over 2,500 m2 walls and slabs per storey

Forming in use Forming in use


1 set of formwork with 600 m² surface area 1 set of formwork with 700 m² surface area
2 concreting steps per storey 6 concreting steps per storey
Over 150 uses

25
UNO Monolithic Housing Formwork
Item no. Weight kg
   Wall Panel UNO Note
h = variable
b = 120 - 600 m

h
b

  Internal Corner UNO Note


h = variable
a, b = 100 x 100 - 400 x 400

a b

  External Corner Profile UNO Note


h = variable
h

52,5
52,5

26
UNO Monolithic Housing Formwork
Item no. Weight kg
  Slab Panel UNO Note
l = variable
b = 120 - 600 mm

b
l

  Transition Panel UNO Note


l = variable
h = 115 - 300 mm

h
l

Transition Corner UNO Note


h = 115 - 300
a, b = 100 x 100 - 1500 x 1500

h
a b

Transition Profile UNO FS


53

l 93

27
UNO Monolithic Housing Formwork
Item no. Weight kg
Stopend Profiles UNO L
Stopend Profile UNO 100 - 180 295
Stopend Profile UNO 140 - 220 335
Stopend Profile UNO 220 - 300 415
For openings and beams. Note
h = variable

h
L

   Slab Girder UNO

L 110

122;5
118422   0,183 Girder Head UNO Note
l = variable

L 30
42
53

35
72

126747   0,128 Girder Head UNO FS

L
28
78
50

53

128383   0,046 Screw Sleeve B15 UNO


Ø15
Ø25

55

28
UNO Monolithic Housing Formwork
Item no. Weight kg
Tie Rods UNO L X
124614   2,480 Tie Rod UNO 8 278 80
117882   2,520 Tie Rod UNO 10 298 100
117883   2,540 Tie Rod UNO 11 308 110
117884   2,560 Tie Rod UNO 12 318 120
117885   2,580 Tie Rod UNO 13 328 130
117886   2,600 Tie Rod UNO 14 338 140
117887   2,620 Tie Rod UNO 15 348 150
117888   2,640 Tie Rod UNO 16 358 160
117889   2,660 Tie Rod UNO 17 368 170
117890   2,680 Tie Rod UNO 18 378 180
117891   2,700 Tie Rod UNO 19 388 190
117055   2,720 Tie Rod UNO 20 398 200
117893   2,740 Tie Rod UNO 21 408 210
117894   2,760 Tie Rod UNO 22 418 220
117895   2,780 Tie Rod UNO 23 428 230
117896   2,800 Tie Rod UNO 24 438 240
117897   2,820 Tie Rod UNO 25 448 250
117898   2,840 Tie Rod UNO 26 458 260
117899   2,860 Tie Rod UNO 27 468 270
117900   2,880 Tie Rod UNO 28 478 280
117901   2,900 Tie Rod UNO 29 488 290
117902   2,920 Tie Rod UNO 30 498 300

80
64
52,5 X 52,5
L

127393   2,460 Adjustable Tie 8 – 13 UNO

366 83
64

29
UNO Monolithic Housing Formwork
Item no. Weight kg
127389   2,500 Adjustable Tie 10 – 15 UNO

386 83

64
117908   1,800 Wall Coupler UNO

47
62

250
160

124000   0,460 Slab Coupler UNO

19
49

80 145

123718   0,500 Spacer Coupler UNO


19
49

130

80

124014   0,610 Screw Coupler UNO

27
49

44 148

30
UNO Monolithic Housing Formwork
Item no. Weight kg
123945   2,650 Alignment Coupler 80 UNO

62

47
160

231

264
250
126722   0,663 Edge Coupler FS UNO

110
95

123559   2,830 Brace Connector UNO

47
62
142

250
160

Stop End Walers UNO L


117905   1,500 Stop End Waler 100 - 180
360
117906   1,620 Stop End Waler 140 - 220
400
118752   1,730 Stop End Waler 220 - 300
480
42

L 140

31
UNO Monolithic Housing Formwork
Item no. Weight kg
118071   4,100 Drop Head UNO

110

210
234 120

118787   1,000 Striking Tool W/S UNO

146
102

67
30
60
120

127023   1,620 Prop Head UNO

84

37
120

124068   4,910 Ladder Connector UNO


244

250

356

32
UNO Monolithic Housing Formwork
Item no. Weight kg
123688   7,770 Handrail Post UNO

140
450
1160
65 35

1505
119

823912   8,200 Handrail Post for Kicker UNO 2

140
450
1282
65 35

1960

124187   1,990 Striking Tool W/S UNO


To strike wall and slab panels.
67

603
105

33
UNO Monolithic Housing Formwork
Item no. Weight kg
125998   0,940 Setting Lever Slab UNO

37
600

40
127294   4,040 Striking Tool-2 TR UNO

863

43
177

Spindle Units UNO


123562   0,450 Spindle Unit UNO right
123565   0,450 Spindle Unit UNO left
Ø45

136

123570   0,820 Spacer Connector UNO


83

44

M 16x45

100 75

34
UNO Monolithic Housing Formwork
Item no. Weight kg
123574   2,850 Waler Spacer Connector UNO 650

64

56
650 106

026415   3,550 Scaff. Tube Steel Ø 48.3 x 3.2, special length

124341   1,120 Mounting Tie UNO

100
380 60

124566   13,300 Climbing Bracket 1.00 B UNO

Ø9
805

1173 90

35
UNO Monolithic Housing Formwork
Item no. Weight kg
124861   12,700 Adapter Corner Bracket UNO

582

582
750
582

124567   0,012 Recess Disc UNO 50/5

Ø 50 5

Positioning Cones UNO


124568   0,056 Positioning Cone UNO 100
124569   0,068 Positioning Cone UNO 120
124570   0,081 Positioning Cone UNO 100 – 150
124571   0,111 Positioning Cone UNO 150 – 200
124572   0,142 Positioning Cone UNO 200 – 250
124573   0,172 Positioning Cone UNO 250 – 300
Ø20

Ø25

100

116292   4,730 Guardrail Post HSGP-2


As guardrail for different systems.
120
450
1050
1300

65 35

36
UNO Monolithic Housing Formwork
Item no. Weight kg
061260   6,150 Guardrail Post SGP
As guardrail for different systems.

120
433
1438
433

1768
35 65

37
The optimal System for every
Project and every Requirement

Wall Formwork Column Formwork

Slab Formwork Climbing Systems Tunnel Formwork Bridge Formwork

Shoring Systems Construction Scaffold Facade Scaffold Industrial Scaffold

DE en 09 | 2015 792693 © PERI GmbH

Access Protection Scaffold System-Independent Accessories Services

PERI GmbH
Formwork Scaffolding Engineering
Rudolf-Diesel-Strasse 19
89264 Weissenhorn
Germany
Tel. +49 (0)7309.950-0
Fax +49 (0)7309.951-0
info@peri.com
www.peri.com

S-ar putea să vă placă și