Sunteți pe pagina 1din 6

CV Format.

CURRICULAM VITAE

Full Name : Sanjib Ghosh


Date of Birth : 27/12/1976
Nationality : Indian

Contact No : 0091-7605842649 / 9007040479

Email ID : sanjib_civ2003@yahoo.co.uk

Proposed Position : Project Manager

Qualification:
 Bachelor of Engineering (Civil)

Trainings:
 Fundamentals of FIDIC Contracts, 2015
 Reviewing PCI Standards, Dubai, UAE, 2004
 Quality Management Training of JAM CPP, Dubai, UAE, 2003
 Safety Training of JAM CPP, Dubai, UAE, 2003
 Quality Management policies of NTPC Rihand, India, 2002
 Safety Training of IOCL, Haldia, India, 2001

Work Experience: - Totalling 18 Years 06 Month

From June 2018 – till Date : M/s. Kuber Dutt Construction Pvt. Ltd.
POSITION : Head (Projects)

PROJECT : 1) Mani Vista, residential Tower B+G+32


storied.
2) Aqua Phase-2, B+G+5 storied
Residential Tower

CLIENT : 1) Mani Group


2) Purti Group

RESPONSIBILITIES: 
 Project Structuring, budget monitoring, project control & project planning
including resource planning.
 Project Management, Project Delivery and its approach, Financials &
Benefits realisation.
 Ensuring proper Cash Flow, Fund allocation and utilisation.
 Contracts Administration & Management.
Page 1 of 6
CV Format.

 Monitoring and supervising Project team, approving monthly targets to


each team and monitoring them weekly/monthly basis.
 Expertise in selecting proper tools, equipments & materials, reviewing
method of statements/procedures and job-safety analysis.
 Checking and approving the site reports, field designs and drawings.
 Ability in assessing and minimising risk
 Responsible for monitoring all activities of Engineering, procurement &
Construction
 Sub-Contracts Management.
 Chairing meetings, controlling the contractor and dealing with the clients.
 Responsible of completion of the project within safety, quality & time
schedule.

From Feb 2016 - May 2018 : M/s. Galfar Al Misnad Engg. & Contg. W.L.L.
POSITION : Project Manager

PROJECT : 3) Waste Water Recycle Reduction


Project, Qatar Gas, RAS-Laffan
Industrial Project, Qatar Doha
4) Engineering, Procurement &
Construction of 8 New Kinder
Garden School, Doha, Qatar

CLIENT : 3) Qatar Gas, Qatar


4) Ashgal, Qatar

RESPONSIBILITIES: 
 Project Structuring, budget monitoring, project control & project planning
including resource planning.
 Supervising and overseeing the direction of the project, ensuring that the
client’s specifications and requirements are met, reviewing progress and
liaising with quantity surveyors to monitor costs
 Coordinating and supervising construction team, providing monthly targets
to each team and monitoring them daily basis.
 Expertise in selecting proper tools, equipments & materials, reviewing
method of statements/procedures and job-safety analysis.
 Checking and approving the site reports, field designs and drawings.
 Ensure proper safety inspections and maintaining construction site safety
at high priority. Ensure maintaining of quality control procedures as per
the standard.
 Ability in assessing and minimising risk
 Finding ways to prevent problems and to solve any that crop up

Page 2 of 6
CV Format.

 Responsible for handling all activities of Engineering, procurement &


Construction
 Managing Sub-Contracts, billing and all related jobs.
 Involved in logistics, Internal Audit, project management, Pre & Post Order
Management, Vendor negotiation & management and Contract &
Commercial
 Active participation in various meetings, controlling the contractor and
dealing with the clients.
 Project cost control and budget monitoring.
 Responsible of completion of the project within safety, quality & time
schedule.
 Has the ability to handle crew of 20000 construction workers.

From Sep 2008 - Jan 2016 : Reliance Infrastructure Ltd, India

POSITION : General Manager

PROJECT : 1) 2x600 MW Mega Power Plant at


Raghunathpur, West Bengal
2) 4000MW Ultra Mega Plant -
Thermal Power Plant -
Krishnapatnam, Andhra Pradesh

CLIENT : Damodar Valley Corporation

RESPONSIBILITIES: 
 Responsible for handling Project Management of 2x600 MW Mega Power
Plant at Raghunathpur, West Bengal
 Construction supervision of all Civil structures which includes main plant
excavation, piling, heavy and equipment foundation, composite structure,
equipment platform, area grading, roads & drains, ash dyke, chimney,
NDCT, non plant buildings by proper planning, scheduling, budgeting and
implementing of work as per specification, drawings. Leaded the Civil
Construction team by managing 50 crew members and completed the
project with safety & high-quality, on time & within the budget.

 Responsible for custom clearance of import & Re-export consignments in


co-ordination with Customs & Custom Handling Agent which includes
Project registration, Essential/Recommendation Certificate, item
registration, High Sea Sale Agreement, Statutory Clearance, and logistics &
Project Re-conciliation. Also responsible to interact with Central Excise
department for duty free indigenous project materials and reconcile
project benefit materials.
 Active participation in various meetings, controlling the contractor and
dealing with the clients.
 Project cost control and budget monitoring.

Page 3 of 6
CV Format.

From Jan 2008 - Sept 2008 : Petron Civil Engineering Pvt. Ltd,
India
POSITION : Deputy Manager
PROJECT : 2X250 MW Thermal Power Plant –
Kasimpur, Aligarh
CLIENT : Uttar Pradesh Rajya Vidyut Nigam Limited
RESPONSIBILITIES:
 Prepared and implemented Project Quality Plan and involved in the Mix
Design
 Functioned as Management representative and conducted internal Audit and
Management review Meeting
 Responsible for setting and analyzing Quality Objectives
 Monitored Progress on Quality Management System, System implementation,
Orientation on Quality Matters, ISO regards and Training on Quality matters.
 Involved in the Quality Assurance, Preparation of Inspection Tests Plan and
implementation of the same, Preparation of method statement for critical
activities.
 Ensured Customer satisfaction and analyzed Customer feedback and managed
Site Execution related activities

From Jan 2007 - Jan 2008 : Bureau Veritas (India) Limited,


India
POSITION : Sr. Surveyor
PROJECT : 5) Bhusan Power Steel Plant at
Jharsuguda, Orrissa
6) Vedanta Alumina Limited at
Jharsuguda, Orrissa
7) West Bengal Waste Water
Management Limited at Haldia West
Bengal
RESPONSIBILITIES:
 Responsible for the Third party Inspection of various civil structures as per
drawings, standards, quality procedures, relevant codes and preparation of
Inspection report.
 Conducted Technical Audit, Inspection of supply material at the vendors
premises.

From Aug 2005 - Jan 2007 : Larsen & Toubro (Oman) LLC

POSITION : Quality Control In-Charge

PROJECT : MHEW – Ministry of Health Environment


and Water Supply. It’s a water supply

Page 4 of 6
CV Format.

project for two wilayats – Saham &


Khaburah, Consists of 5-Elevated Water
Tanks (42mts in height) among which 3nos
are 2000cum capacity and 2nos are
1500cum capacity. Pipeline, total 700kms,
connected to supply to the nearby localities

CLIENT : Ministry of Health Environment and Water


Supply (OMAN)
RESPONSIBILITIES:
 Involved in the preparation of Project Quality Plan and implementing.
 Prepared Mix Design and conducted internal Audit and Management review
Meeting and setting of Quality Objectives and analysis.
 Monitored progress on Quality Management System, System implementation,
Orientation on Quality Matters, ISO regards, Training on Quality matters.
 Managed Quality Assurance, Preparation of Inspection Tests Plan and
implementation and preparation of method statement for critical activities.
 Ensure customer satisfaction.

From Jul 2003 - Apr 2005 : Juma Al Majid Concrete Products


And Plants, Dubai UAE
POSITION : Quality Control In-Charge
PROJECT : 1) Emaar towers is one of the 4th
largest chain of construction company
in UAE, with its main focus on
developing and establishing high-rise
buildings, shopping malls,
multiplexes, etc
2) Dubai international airport terminal
III, Expansion Project (Precast
Columns & Slabs
3) Project: Precast Trough - DEWA
RESPONSIBILITIES:
 Inspection of materials such as aggregate : which includes physical and
laboratory tests like, sieve analysis, flakiness index, dust content; cement :
initial setting , final setting time, normal consistency and compressive
strength; and steel : diameter, elongation, rebend tests ;recommending
proper admixture depending upon the demoulding time ; initiation in making
quality mix design for better and sound concrete.
 Inspection and checking of mould : which includes rigidity, stability,
cleanliness, dimensionally it should be according to the shop drawing, skew
ness, etc ; steel reinforcement : bar bending schedule, laying and quality of
steel, size spacing and cover according to recommendations, lifting & fixing
socket , channels, deha suspension system, and other details related to
erection of precast concrete panels, etc; concrete : checking workability by
taking slump, cubes for detecting the demoulding strength and long term
Page 5 of 6
CV Format.

strength, checking the temperature of the concrete and taking special


measures for reducing shrinkage and temperature stress when the
temperature of the concrete gets much higher than the ambient temperature
also checking of curing temperature and curing time.
 Quality policies, plans and implementing them in a proper and useful way.
Active initiation in planning production process.
 Active participation in various meetings, fulfilling clients’ requirement
technically.
 Assuring high quality deliverables to the client by proper checking while
stacking, and loading, usage of double layer bituminous paint, proper curing
recommending proper repair material for greater surface longevity and
reducing surface shrinkage.
 Controlling documentation recommending by ISO stds such as mould
inspection report, steel reinforcement, method of statement, rejection report
and lots more

From Sept 2000 - Jul 2002 : LG Engineering &Construction Ltd.,


Kolkata, India
POSITION : Civil Engineer
PROJECT : Catalytic Dewaxing Unit,
Indian Oil Corporation Limited, India
RESPONSIBILITIES:
 Responsible for handling substation of proposed Catalytic Dewaxing Unit,
IOCL Haldia project
 Planning, scheduling and implementing of work as per ISI recommendations,
reviewing site drawings.
 Active participation in various meetings, controlling the contractor and dealing
with the clients.
 Preparation of quality policy and safety policies and reached the goal with
customers satisfaction. Main area of work is substation building which
includes interior, equipment foundation, and MEP openings.

Page 6 of 6

S-ar putea să vă placă și