Documente Academic
Documente Profesional
Documente Cultură
1. GIS is composite of
a) Software b) Hardware
c) People d) All of the above
8. Google Earth and smart phones are programmed for the following datum/geoid _____.
a) WGS b) WGS84
c) WGS72 d) None of the above
9. Conformal projections preserve the _______ related information in the best way.
a) Area b) Shape
c) Direction d) All of the above
10. UTM is a ______
a) Cylindrical Projection b) Conical Projection
c) Azimutal Projection d) None of the above
18. Whenever the GCPs are collected using highly precise instruments then one of the following
transformation is highly recommended.
a) Polynomial Transformation b) Adjust
c) Spline d) All of these
2) During editing of shapefile we can add any field in attribute table of shapefile.
2) Write down the formula to calculate the number of minimum required GCPs for polynomial
transformation and calculate the minimum number of GCPs for zero order, 1st order and 3rd order
polynomials using its formula.
3) Enlist the most necessary three supporting files (i.e. extensions) and their uses and abbreviations for
shapefile.
4) How many types of co-ordinate systems are and describe their measuring units?
5) Describe the particular uses of adjust and spline transformation methods and minimum number of
GCPs to execute these transformations.