33 EXTERIOR

CISTERNA EXTERIOR GRANDE.-


Fecha: Tuesday, April 02, 2019

No. DESCRIPCION CANTIDAD UNIDAD PRECIO

CISTERNA:
Tipo de block: 0.20 mt.
Ancho interno: 2.65 ml.
Largo interno: 3.00 ml.
Altura interno: 2.40 ml.
Ancho externo: 3.05 ml.
Largo externo: 3.40 ml.
Altura total: 2.95 ml.
Espesor losa de fondo: 0.20 mt.
Espesor losa de techo: 0.15 ml.
h flotador de cisterna: 0.30 mt.
Espesor de telford: 0.20 mt.
Sobre ancho para excavación: 0.30 mt.
h dentellón de vigas H.A. 0.25 mt.
h viga de amarre perimetral: 0.20 mt.
Capacidad de la cisterna: 4,407 mt.

1.1 REPLANTEO
a Replanteo 1.00 p.a. $2,000.00

TOTAL RD$

1.2 MOVIMIENTO DE TIERRA


a Excavación en material suelto con equipos 45.26 mt3 $217.12
b Nivelación de terreno a mano 16.50 mt3 $250.00
Bote de materiales a 5.00 kilómetros; Fabult. =
c 56.58 mt3 $258.61
1.25
d Telford en asiento de arena 2.92 mt3 $1,050.00

TOTAL RD$

1.3 HORMIGON ARMADO


a Losa de fondo t = 0.20 mts. 2.92 mt3 $8,449.10
b Dentellón de vigas en H. A. (0.30 x 0.25) 1.20 mt3 $10,098.40
c Losa de techo t = 0.15 mts. 1.56 mt3 $10,879.14
34 EXTERIOR
d Viga de amarre perimetral (0.20 x 0.20) 0.77 mt3 $22,472.05

TOTAL RD$

1.4 MUROS y TERMINACIONES


a Muros de 8" B.N.P. 24.375 mt2 $2,032.18
b Fraguache con escobas 31.19 mt2 $61.93
c Pañete pulido 27.12 mt2 $288.91
d Zabaleta 20.90 ml. $98.08
e Fino en losa inferior 7.95 mt2 $508.69

TOTAL RD$

SUB-TOTAL OBRA GRIS RD$

1.5 ACCESORIOS DE CISTERNA


a Tanque de presion - 300 galones 1.00 p.a. $17,451.26
b Bomba de 2" H.P. 1.00 p.a. $19,421.62
c Piezas y P.V.C. 1.00 p.a. $5,000.00
d Tapa p/cisterna acer. inox. 24 x 24 x 21 1.00 unidad $5,081.67
e Mano de Obra 1.00 p.a. $6,000.00

TOTAL RD$

TOTAL CISTERNA RD$


35 EXTERIOR

.-
il 02, 2019

VALOR

$2,000.00

2,000.00

$9,826.90
$4,125.00

$14,630.68

$3,066.00

31,648.57

$24,671.38
$12,080.21
$16,922.51
36 EXTERIOR
$17,393.36

71,067.46

$49,534.38
$1,931.60
$7,835.32
$2,049.90
$4,044.05

65,395.25

170,111.29

$17,451.26
$19,421.62
$5,000.00
$5,081.67
$6,000.00

52,954.55

223,065.84
LISTADO DE INSUMOS PROMEDIO.-

NO. PARTIDA CANTIDAD UNIDAD P.U. RD$


ACERO ESTRUCTURAL y ALAMBRE GALVANIZADO.-
Acero estructural Ø 3/8" x 20' - G40° 22.26 quintales $51,198.00
Acero estructural Ø 1/2" x 20' - G40° 22.26 quintales $51,198.00
Alambre galvanizado liso cal 18 100.00 libra $45.00

EQUIPOS DE CONTRUCCION.-
Pala cuadrada "Tramontina" 1.00 unidad $352.64
Pico c/mango "Tramontina" 1.00 unidad $527.22

CEMENTOS, CAL, ADITIVOS.-


Agua potable 1.00 galón $5.00
Cal viva pomier (50 libras) 1.00 funda $180.00
Cemento gris "Titán" tipo portland (42.5 kgs.) 1.00 funda $310.00

MADERAS.-
Madera pino americano bruta - 1" x 4" 1.00 pie2 $55.00
Madera pino americano cepillada - 1" x 4" 1.00 pie2 $55.00

COMBUSTIBLES.-
Gasolina regular, fecha: 13-04-2018 1.00 galón $223.20

ALBAÑILERIAS.-
Escoba 1.00 unidad $20.00

AGREGADOS.-
Arena fina (para pañete) 1.00 mt3 $1,000.00
Arena gruesa "Itabo" (de mina) 1.00 mt 3
$900.00
Arena gruesa "Itabo" lavada (de planta) 1.00 mt3 $1,100.00
Gravilla 3/4" @ 1/2" triturada 1.00 mt3 $1,100.00

BLOQUES DE HORMIGON.-
Bloque de 0.20 mts. (8") "Ochoa" 1.00 unidad $35.00
OMEDIO.-
I.T.B.I.S 18.00%

VALOR UNIDAD PRECIO

$2,300.00 quintal $2,300.00


$2,300.00 quintal $2,300.00
$4,500.00 quintal

$352.64
$527.22

$5.00
$180.00
$310.00

$55.00
$55.00

$223.20

$20.00

$1,000.00
$900.00
$1,100.00
$1,100.00

$35.00
LISTADO MANO DE OBRA
MANO DE OBRA GENERAL.-

NO. PARTIDA

TARIFA DE ALBANILERIA.-
ALB-001 Trabajador no calificado (TNC)
ALB-002 Trabajador calificado (TC)
ALB-003 Ayudante de albañilería (AY)
ALB-004 Albañil de tercera categoría (AT) - operario
ALB-005 Albañil de segunda categoría (AS) - operario
ALB-006 Albañil de primera categoría (AP) - operario
ALB-007 Maestro de albañilería (MA) - maestro de cada una de las áreas

COSTO
NO. PARTIDA
UNIT. RD$
MUROS DE BLOQUES.-
1 Bloque de 8 x 8 x 16 pulgs. $18.19
2 Llenado de huecos de bloques, bastones a 0.20 mts. $5.46
3 Corte y amarre de varillas en bloques, bastones a 0.20 mts. $2.19

COSTO
NO. PARTIDA
UNIT. RD$
EMPAÑETE Y TERMINACION DE PAREDES Y PLAFONES.-
1 Fraguache con escoba $19.76
2 Pañete pulido sin color $143.55

COSTO
NO. PARTIDA
UNIT. RD$
TERMINACION DE TECHOS E IMPERMEABILIZACION.-
1 Zabaleta en pisos $40.63
2 Fino en techo horizontal sin incluir subida de materiales $114.27

COSTO
NO. PARTIDA
UNIT. RD$
TARIFA DE VARILLA.-
1 Varillas trabajada $289.89
Dinteles y vigas de amarre con altura máxima no mayor de 40 x 20
2 $94.62
cms., (varillas Ø 1/2" Ø 3/4")

COSTO
NO. PARTIDA
UNIT. RD$
TARIFA DE CARPINTERIA.-
VIGAS DE AMARRE.-
1 Encofrado en viga de amarre (0.20 x 0.20) mts., A.T.C. $250.00
LOSAS.-
1 Encofrado de losa (e = 0.13) mts., A.T.C. $260.00

COSTO
NO. PARTIDA
UNIT. RD$
ACARREOS.-
1 Arranque $18.29
2 Regado y nivelado de relleno de reposición $76.00
3 Acarreo de materiales (distancia desde 0.00 kms., hasta 5.00 kms.). $21.34

COSTO
NO. PARTIDA
UNIT. RD$
ACARREOS y SUBIDAS DE MATERIALES-
1 Acarreo interno en bloques de 0.20 mts. $1.38

COSTO
NO. PARTIDA
UNIT. RD$
ANDAMIOS.-
1 Confección de andamios interiores $0.23

COSTO
NO. PARTIDA
UNIT. RD$
LABORES VARIAS.-
1 M.O. mezclado $200.00
E OBRA
NERAL.-
FECHA: 11/28/2017

RESOLUCION TARIFA POR


UNIDAD
01/2016 HORA

Día $572.64 $71.58


Día $626.76 $78.35
Día $736.63 $92.08
Día $956.17 $119.52
Día $1,091.63 $136.45
Día $1,363.99 $170.50
Día $1,719.25 $214.91

RESOLUCION
18/2017
UNIDAD DE COMPOSICION VALOR
RENDIMIENTO
MEDIDA BRIGADA RD$/Día

unidad 1AS + 1AY + 1TC $2,455.02 135.00


unidad 1AS + TC $1,718.39 315.0
unidad 1AS + TC $1,718.39 785.0

UNIDAD DE COMPOSICION VALOR


RENDIMIENTO
MEDIDA BRIGADA RD$/Día

mt2 1AY + 1TC $1,363.39 69.00


mt 2
1AP + 1AY + 1TC $2,727.38 19.00

UNIDAD DE COMPOSICION VALOR


RENDIMIENTO
MEDIDA BRIGADA RD$/Día

ml. 1AS + 1 AY $1,828.26 45.00


mt 2
1AS + 1 AY $1,828.26 16.00

UNIDAD DE

MEDIDA
quintal
ml.

UNIDAD DE

MEDIDA

ml.

mt2

UNIDAD DE

MEDIDA

km.
mt3
mt3n/km.

UNIDAD DE

MEDIDA

unidad

UNIDAD DE

MEDIDA

mt2

UNIDAD DE

MEDIDA

mt3
TARIFA DE EQUIPOS PARA LA
CONSTRUCCION.-
EQUIPOS ALQUILER TARIFA UNIDAD COSTO/DIA COSTO/HORA
Ligadora de 2 fundas $4,000.00 día $4,000.00 $500.00
TARIFA DE EQUIPOS PESADOS PARA LA CON

ALQUILER TARIFA ALQUILER +


EQUIPOS MODELOS HP
01-2-2014 18% ITBIS
TRACTORES D9L-CAT 460 $6,050.00 $7,139.00
D9H-CAT 410 $4,294.82 $5,067.89
D8R-CAT 310 $5,500.00 $6,490.00
D8LCAT 335 $3,630.52 $4,284.01
D155A-KOM 320 $3,460.58 $4,083.48
D8K-CAT 300 $3,352.43 $3,955.87
D8H-46A-CAT 270 $2,935.31 $3,463.67
D8H-36A-CAT 235 $2,672.68 $3,153.76
D85-A-KOM 220 $2,209.21 $2,606.87
D7G-CAT 200 $2,301.90 $2,716.24
D7F-CAT 180 $2,131.96 $2,515.71
D7E-CAT 160 $1,637.56 $1,932.32
D65-A-KOM 140 $1,838.43 $2,169.35
D6D-CAT 140 $1,745.74 $2,059.97
D6C-CAT 140 $1,637.69 $1,932.47
TD-15C-INT 140 $1,745.74 $2,059.97
D60-A-KOM 140 $1,529.45 $1,804.75
D5B-CAT 105 $1,328.61 $1,567.76
D4E-CAT 75 $973.29 $1,148.48

MOTONIVELADORAS
140 H 165 $2,100.00 $2,478.00
(GREDER)
12 H 140 $1,825.00 $2,153.50
12G-CAT 135 $1,606.70 $1,895.91
GD-37-KOM 125 $1,825.00 $2,153.50
12F-CAT 125 $1,498.55 $1,768.29
120-OG-CAT 125 $1,483.10 $1,750.06
12E-CAT 115 $1,220.47 $1,440.15
14 G 220 $1,767.37 $2,085.50
16 275 $1,944.10 $2,294.04
12-8T-CAT 100 $1,019.63 $1,203.16

RETROEXCAVADORAS 235-CAT 215 $3,336.98 $3,937.64


225-CAT 145 $2,209.21 $2,606.87
320-CAT 215 $2,670.20 $3,150.84
320B-CAT 128 $3,051.18 $3,600.39
330 247 $3,356.30 $3,960.43
345 321 $5,500.00 $6,490.00
365 B-L 404 $7,800.00 $9,204.00
416 80 $1,060.00 $1,250.80

CARGADORES
988B-CAT 375 $3,600.45 $4,248.53
FRONTALES
980C-CAT 270 $2,966.21 $3,500.13
980-CAT 235 $2,827.17 $3,336.06
966 G 235 $2,827.17 $3,336.06
966 F 220 $2,600.00 $3,068.00
960 F 200 $2,500.00 $2,950.00
966D-CAT 200 $2,564.53 $3,026.15
966C-CAT 170 $2,240.11 $2,643.33
60C-TEREX 168 $1,992.92 $2,351.65
530-INTER 160 $1,977.47 $2,333.41
950B-CAT 155 $1,884.78 $2,224.04
936 E 135 $1,725.25 $2,035.80
950-CAT 130 $1,637.59 $1,932.36
CARGADORES
W70-KOM 105 $1,498.55
FRONTALES $1,768.29
930-CAT 100 1390.41 $1,640.68
510-INTER 85 $1,235.92 $1,458.39
920-CAT 80 $1,220.47 $1,440.15
MINICBOBCAT 54 $700.00 $826.00

CARGADORES DE
D755-KOM 200 $2,085.62 $2,461.03
ORUGA
977L-CAT 190 $2,023.62 $2,387.87
955L-CAT 130 $1,699.39 $2,005.28
955K-CAT 115 $1,405.86 $1,658.91

MOTOTRAILLA 631-CAT 450 $4,124.88 $4,867.36


631B-CAT 420 $3,105.25 $3,664.20
621-CAT 300 $2,579.88 $3,044.26
DW-21-CAT 300 $2,487.29 $2,935.00

COMPACTADORES Y
825C-CAT 310 $2,641.78 $3,117.30
RODILLOS
ESTATICOS 815-CAT 200 $2,209.21 $2,606.87
DW-20A-CAT 300 $1,326.61 $1,565.40
CAT-45BUF 150 $1,251.37 $1,476.62
LISO GALION $250.00 $295.00

RODILLOS 600-RAIC 235 $1,560.35 $1,841.21


VIBRADORES CA-25-DINAPAC 125 $1,483.10 $1,750.06
VDS-84-GALION 120 $1,483.10 $1,750.06
SD-100-ING.RAN 180 $1,483.10 $1,750.06
ARA LA CONSTRUCCION.-

COMBUSTIBLE 0.04 LUBRICANTE COSTO


x PREC. COMB. 0.20 COMB. RD$
$4,106.88 $821.38 $12,067.26
$3,660.48 $732.10 $9,460.46
$2,767.68 $553.54 $9,811.22
$2,990.88 $598.18 $7,873.07
$2,856.96 $571.39 $7,511.84
$2,678.40 $535.68 $7,169.95
$2,410.56 $482.11 $6,356.34
$2,098.08 $419.62 $5,671.46
$1,964.16 $392.83 $4,963.86
$1,785.60 $357.12 $4,858.96
$1,607.04 $321.41 $4,444.16
$1,428.48 $285.70 $3,646.50
$1,249.92 $249.98 $3,669.25
$1,249.92 $249.98 $3,559.88
$1,249.92 $249.98 $3,432.38
$1,249.92 $249.98 $3,559.88
$1,249.92 $249.98 $3,304.66
$937.44 $187.49 $2,692.69
$669.60 $133.92 $1,952.00

$1,473.12 $294.62 $4,245.74

$1,249.92 $249.98 $3,653.40


$1,205.28 $241.06 $3,342.24
$1,116.00 $223.20 $3,492.70
$1,116.00 $223.20 $3,107.49
$1,116.00 $223.20 $3,089.26
$1,026.72 $205.34 $2,672.22
$1,964.16 $392.83 $4,442.49
$2,455.20 $491.04 $5,240.28
$892.80 $178.56 $2,274.52

$1,919.52 $383.90 $6,241.06


$1,294.56 $258.91 $4,160.34
$1,919.52 $383.90 $5,454.26
$1,142.78 $228.56 $4,971.73
$2,205.22 $441.04 $6,606.69
$2,865.89 $573.18 $9,929.07
$3,606.91 $721.38 $13,532.29
$714.24 $142.85 $2,107.89

$3,348.00 $669.60 $8,266.13


$2,410.56 $482.11 $6,392.80
$2,098.08 $419.62 $5,853.76
$2,098.08 $419.62 $5,853.76
$1,964.16 $392.83 $5,424.99
$1,785.60 $357.12 $5,092.72
$1,785.60 $357.12 $5,168.87
$1,517.76 $303.55 $4,464.64
$1,499.90 $299.98 $4,151.53
$1,428.48 $285.70 $4,047.59
$1,383.84 $276.77 $3,884.65
$1,205.28 $241.06 $3,482.13
$1,160.64 $232.13 $3,325.12
$937.44 $187.49 $2,893.22

$892.80 $178.56 $2,712.04


$758.88 $151.78 $2,369.04
$714.24 $142.85 $2,297.24
$482.11 $96.42 $1,404.53

$1,785.60 $357.12 $4,603.75


$1,696.32 $339.26 $4,423.46
$1,160.64 $232.13 $3,398.05
$1,026.72 $205.34 $2,890.98

$4,017.60 $803.52 $9,688.48


$3,749.76 $749.95 $8,163.91
$2,678.40 $535.68 $6,258.34
$2,678.40 $535.68 $6,149.08

$2,767.68 $553.54 $6,438.52


$1,785.60 $357.12 $4,749.59
$2,678.40 $535.68 $4,779.48
$1,339.20 $267.84 $3,083.66
$0.00 $0.00 $295.00

$2,098.08 $419.62 $4,358.91


$1,116.00 $223.20 $3,089.26
$1,071.36 $214.27 $3,035.69
$1,607.04 $321.41 $3,678.51
ANALISIS PRECIOS UNITARIOS.-
ANALISIS DE COSTOS.-

ANALISIS DE MOVIMIENTOS DE TIERRA.-


UNIDAD DE
NO. PARTIDA CANTIDAD
MEDIDA

MOV-1 Excavación material inservible con retro excavadora (hasta 1.50 mts. de profundidad)
Retro Excavadora, 320-CAT costo/mt3n =
rend. = 35 mt3/hr

Carguío: 950-CAT costo/mt3e =


rend. = 95 mt3/hr

Arranque costo/mt3n =
coef. esponj. = 1.15

MOV-2 Bote de material a 5.00 kms., con carguío mecánico.


Carguío con: cargador frontal 950-CAT costo/mt3n =
rend. = 55 mt3/hr

Arranque 5.00 mt3e

Transporte 5.00 mt3n/km

MOV-3 Asiento de arena.


1 Pala cuadrada "Tramontina" 0.01 unidad
2 Pico c/mango "Tramontina" 0.01 unidad
3 Arena gruesa "Itabo" (de mina) 1.00 mt3
4 M.O. regado y nivelado de relleno de reposición. 1.20 mt3
5 Herramientas (5%). 5.00 %
RIOS.-

COSTO UNIT.
TOTAL/P.U.
RD$

mts. de profundidad)
$155.84

$40.25

$21.03

costo/mt3n $217.12

$60.46

$18.29 $91.45

$21.34 $106.70
costo/mt3e $258.61

$352.64 $3.53
$527.22 $5.27
$900.00 $900.00
$76.00 $91.20
$50.00 $50.00
costo/mt3 $1,050.00
LISTADO MANO DE OBRA
ANALISIS DE COSTOS.-

MEZCLAS o MORTEROS.-
UNIDAD DE COSTO
NO. PARTIDA CANTIDAD
MEDIDA UNIT. RD$

MEZ-1 Mezcla 1:3


1 Cemento gris "Titán" tipo portland (42.5 kgs.) 11.51 fundas $310.00
2 Arena gruesa "Itabo" (de mina) 1.05 mt3 $900.00
3 Agua potable 69.04 galones $5.00
4 M.O. mezclado 1.05 mt3 $200.00
costo/mt3

MEZ-2 Mezcla 1:3-A


1 Cemento gris "Titán" tipo portland (42.5 kgs.) 11.51 fundas $310.00
2 Arena gruesa "Itabo" lavada (de planta) 1.05 mt3
$1,100.00
3 Agua potable 69.04 galones $5.00
4 M.O. mezclado 1.05 mt3 $200.00
costo/mt3

MEZ-3 Mezcla 1:6


1 Cemento gris "Titán" tipo portland (42.5 kgs.) 6.46 fundas $310.00
2 Arena gruesa "Itabo" (de mina) 1.12 mt3
$900.00
3 Agua potable 67.72 galones $5.00
4 M.O. mezclado 1.05 mt3 $200.00
costo/mt3

MEZ-4 Mezcla 1:1.5:5 (pañete)


1 Cemento gris "Titán" tipo portland (42.5 kgs.) 9.46 fundas $310.00
2 Arena fina (para pañete) 0.91 mt3 $1,000.00
3 Cal viva (50 libras) 6.29 fundas $180.00
4 Agua potable 45.24 galones $5.00
5 M.O. mezclado 1.05 mt3 $200.00
costo/mt3
TOTAL/P.U.

$3,568.10
$945.00
$345.20
$210.00
$5,068.30

$3,568.10
$1,155.00
$345.20
$210.00
$5,278.30

$2,002.60
$1,008.00
$338.60
$210.00
$3,559.20

$2,932.60
$910.00
$1,132.20
$226.20
$210.00
$5,411.00
ANALISIS PRECIOS UNITARIOS.-
ANALISIS DE COSTOS.-

HORMIGONES SIMPLE.-
UNIDAD COSTO
NO. PARTIDA CANTIDAD DE
MEDIDA UNIT. RD$

HOR-1 Hormigón Fc' = 140 kg/cm2 (con ligadora)


Materiales:
1 Cemento gris "Titán" tipo portland (42.5 kgs.) 7.53 fundas $310.00
2 Arena gruesa "Itabo" lavada (de planta) 0.52 mt3 $1,100.00
3 Gravilla 3/4" @ 3/8" 0.73 mt 3
$1,100.00
4 Agua potable 54.65 galones $5.00
Total de materiales:

Mano de obra:
1 Albañil de primera categoría (AP) (1) 1.00 hora $170.50
2 Ayudante de albañil (AY) (1) 1.00 hora $92.08
3 Trabajador no calificado (TNC) - peones (4) 1.00 hora $71.58
Sub-total de mano de obra:

Rendimiento: 1.75 mt3/hora

Total mano de obra:

Equipos:
1 Ligadora de 2 fundas 1.00 hora $500.00

Rendimiento: 1.75 mt3/hora

Sub-total de equipos:
Herramientas: 5% M.O.:

Total de equipos:
costo/mt3

HOR-2 Hormigón Fc' = 210 kg/cm2 (ligadora)


Materiales:
1 Cemento gris "Titán" tipo portland (42.5 kgs.) 8.94 fundas $310.00
2 Arena gruesa "Itabo" lavada (de planta) 0.51 mt 3
$1,100.00
3 Gravilla 3/4" @ 3/8" 0.70 mt3 $1,100.00
4 Agua potable 51.22 galones $5.00
Total de materiales:

Mano de obra:
1 Albañil de primera categoría (AP) (1) 1.00 hora $170.50
2 Ayudante de albañil (AY) (1) 1.00 hora $92.08
3 Trabajador no calificado (TNC) - peones (4) 1.00 hora $71.58
Sub-total de mano de obra:

Rendimiento: 1.75 mt3/hora

Total mano de obra:

Equipos:
1 Ligadora de 2 fundas 1.00 hora $500.00

Rendimiento: 1.75 mt3/hora

Sub-total de equipos:
Herramientas: 5% M.O.:

Total de equipos:

costo/mt3
S.-

TOTAL/P.U.

$2,334.30
$572.00
$803.00
$273.25
$3,982.55

$170.50
$92.08
$286.32
$548.90

$313.66

$500.00

$285.71
$27.44

$313.16
$4,609.36

$2,771.40
$561.00
$770.00
$256.10
$4,358.50

$170.50
$92.08
$286.32
$548.90

$313.66

$500.00

$285.71
$27.44

$313.16

$4,985.31
ANALISIS DE COSTOS.-
Hoja No. 1 Fecha:

CODIGO D ESCRIPCION CANTIDAD. UNIDAD PRECIO

Losa de fondo en cisternas Ø 3/8" @ 0.15 y 0.20 (t = 0.20 mts.)


Hormigón Fc' = 210 kg/cm2 (con ligadora) 1.10 mt3 $4,985.31
Acero estructural Ø 3/8" x 20' - G40° 0.98 qq $2,300.00
Alambre galvanizado liso cal 18 1.96 libra $45.00
M.O. varillero / acero qq 0.98 qq $289.89
M.O. / colocación de plantilla 0.35 p.a. $40.00
Costo de equipos menores 4.00 % $324.97

Total del análisis en .:. mt3

Losa de techo en cisternas Ø 3/8" @ 0.15 y 0.20 (t = 0.15 mts.)


Hormigón Fc' = 210 kg/cm2 (con ligadora) 1.10 mt3 $4,985.31
Acero estructural Ø 3/8" x 20' - G40° 1.21 qq $2,300.00
Alambre galvanizado liso cal 18 2.42 libras $45.00
M.O. varillero / acero qq 1.21 qq $289.89
M.O. carpintero / encofrado mt2 6.67 mt2 $260.00
Costo de equipos menores 4.00 % $418.43

Total del análisis en .:. mt3

Dentellón de vigas en H.A. (0.30 x 0.25) 6 Ø 1/2", est Ø 3/8" 25 cms.)


Hormigón Fc' = 210 kg/cm2 (con ligadora) 1.05 mt3 $4,985.31
Acero estructural Ø 1/2" x 20' - G40° 1.38 qq $2,300.00
Acero estructural Ø 3/8" x 20' - G40° 0.29 qq $2,300.00
Alambre galvanizado liso cal 18 3.34 libras $45.00
M.O. varillero / acero qq 1.67 qq $289.89
Costo de equipos menores 4.00 % $388.40

Total del análisis en .:. mt3

Viga de amarre A.N. losa (0.20 x 0.20) 2 Ø 3/8" + 2 Ø 3/8"


ancho altura
Sección: 0.20 0.20
Espesor de losa: 0.15
No. de varillas longitudinales: 4.00 Ø 0.375
Estribos: 0.20 Ø 0.375
Longitud de estribos: 1.07 Ø 0.375

Hormigón Fc' = 210 kg/cm2 (con ligadora) 1.10 mt3 $4,985.31


Acero estructural Ø 3/8" x 20' - G40° - long. 1.35 qq $2,300.00
Acero estructural Ø 3/8" x 20' - G40° - transv 1.80 qq $2,300.00
Alambre galvanizado liso cal 18 6.28 libras $45.00
M.O. varillero / acero ml. 25.00 ml. $94.62
M.O. carpintero / vigas ml. 25.00 ml. $250.00
Costo de equipos menores 4.00 % $864.31

Total del análisis en .:. mt3


Feb. 2018

VALOR

$5,483.85
$2,254.00
$88.20
$284.09
$14.00
$324.97

$8,449.10

$5,483.85
$2,783.00
$108.90
$350.77
$1,734.20
$418.43

$10,879.14

$5,234.58
$3,174.00
$667.00
$150.30
$484.12
$388.40

$10,098.40
78.00 ml.
78.00 ml.
78.00 ml.

$5,483.85
$3,096.15
$4,129.50
$282.74
$2,365.50
$6,250.00
$864.31

$22,472.05
ANALISIS PRECIOS UNITARIOS.-
ANALISIS DE COSTOS.-

ANALISIS ALBAÑILERIA.-
UNIDAD COSTO
NO. PARTIDA CANTIDAD DE
MEDIDA UNIT. RD$
ANDAMIOS.
AND-1 Andamios interiores.
1 Madera pino americano bruta - 1" x 4" 0.182 pie2 $55.00
2 M.O. confección de andamios interiores 1.00 mt2 $0.23
3 Herramientas (5%) 5.00 % $0.51
costo/mt2
OS.-

TOTAL/P.U.

$10.01
$0.23
$0.51
$10.75
ANALISIS PRECIOS UNITARIOS.-
ANALISIS DE COSTOS.-

ANALISIS ALBAÑILERIA.-
UNIDAD DE
NO. PARTIDA CANTIDAD
MEDIDA
MUROS DE HORMIGON.-

MUR-1 Muros de block 0.20 mts. c/cruce Ø 3/8" @ 0.20 mts. B.N.P. (sin serpentinas).
1 Bloques de 0.20 mts. (8") "Ochoa", + 4% desp. 13.00 unidad
Acero estructural Ø 3/8" x 20' - G40° + 0.40 mts., solape
2 0.089 quintales
y traslape
3 Alambre galvanizado #18 - (2 libras/qq) 0.178 libras
4 Mezcla 1:3 0.039 mt3
5 Hormigón simple Fc' = 140 kg/cm2 (con ligadora) 0.089 mt3
6 M.O. colocación en bloques de 8 x 8 x 16 pulgs. (8") 13.00 unidad
M.O. llenado de huecos de bloques, bastones a 0.20
7 13.00 unidad
mts.
M.O. corte y amarre de varillas en bloques, bastones a
8 13.00 unidad
0.20 mts.
9 Acarreo de block 8" "Ochoa" 13.00 unidad
10 Herramientas (5%) 5.00 %

TERMINACION DE SUPERFICIE.
TER-1 Pañete en muros y H.A. - pulido (interior).
1 Madera pino americano cepillada - 1" x 4" 0.033 pie2
2 Mezcla 1:1.5:5 (pañete) 0.022 mt3
M.O. pañete en muros interiores, maestriado y a plomo.
3 1.00 mt2
(pulido)
4 M.O. andamios interiores 1.00 mt2
5 Herramientas (5%) 5.00 %

TER-2 Fraguache en muros y techos.


1 Escoba 0.01 unidad
2 Mezcla 1:6 0.008 mt3
3 M.O. fraguache con escoba 1.00 mt2
4 M.O. andamios interiores 1.00 mt2
5 Herramientas (5%) 5.00 %
TERMINACION DE TECHOS.
TER-1 Zabaleta de cemento.
1 Mortero 1:3-A 0.010 mt3
2 M.O. zabaleta en pisos 1.00 ml.
3 Herramientas (5%) 5.00 %

TER-2 Fino de mezcla en techo plano.


1 Madera pino americano bruta - 1" x 4" 0.013 pie2
2 Mezcla 1:3-A 0.07 mt3
3 M.O. fino en techo horiz. sin incl., subida de materiales 1.00 mt2
4 Herramientas (5%) 5.00 %
ARIOS.-

COSTO UNIT.
TOTAL/P.U.
RD$

rpentinas).
$35.00 $455.00
$2,300.00 $204.70
$45.00 $8.01
$5,068.30 $197.66
$4,609.36 $410.23
$18.19 $236.41
$5.46 $70.92

$2.19 $28.46

$1.38 $17.94
$80.57 $402.85
costo/mt2 $2,032.18

$55.00 $1.82
$5,411.00 $119.04
$143.55 $143.55

$10.75 $10.75
$13.76 $13.76
costo/mt2 $288.91

$20.00 $0.20
$3,559.20 $28.47
$19.76 $19.76
$10.75 $10.75
$2.95 $2.95
costo/mt2 $61.93
$5,278.30 $52.78
$40.63 $40.63
$4.67 $4.67
costo/ml. $98.08

$55.00 $0.72
$5,278.30 $369.48
$114.27 $114.27
$24.22 $24.22
costo/mt2 $508.69