Sunteți pe pagina 1din 5

0 1 2 3 4 5 6 7 8 9

L1 L1
L1 / 2.0
L2 L2
L2 /
L3 L3
L3 /
N / 2.0

1 3 5 1 3 5
KF01 KF02

/2.4

/2.4
I> I> I> I> I> I>
2 4 6 2 4 6
L1

T1/1

T2/1

T3/1
L2

L3
1 3 5
N K01
/3.6 2 4 6

L1/1

L2/1

L3/1

L1/2

L2/2

L3/2
10 10

KR02 KR03
/4.2 6 /4.4 6

1 3 5
G01
L1 L2 L3 PE 12 27 29
24V START STOP
S00 I> I> I>
MCCB NS25N
2 4 6 FREQUENCY CONVERTER
DANFOSS
0.75kW
10V IN GND A IN
U V W PE 53 55 60

R S T N PE
-PE

-W0000

W1

W2
U1

U2
V1

V2
4x15 mm²
X1 U1 V1 W1 PE X1 U2 V2 W2 PE
X0 R S T N PE

W1 4x2.5 mm² W1 4x1.5 mm²

-IN1 1 2 3 4 5 1 2 3

380 V 50Hz
3 Ph+PE 75 kW HT01 M
1.5kW M01
SUPPLY BY CUSTOMER Heater 0.75kW 3
Agitator

+1/ii 2
Date 08/07/2018 PT. Yakult Indonesia Main Power =
Ed. HARDI + 2
Appr Melting Tank YK-01 Page 1
Modification Date Name Original Replacement of Replaced by Page 7
0 1 2 3 4 5 6 7 8 9

L1
1.9 / L1 P1 / 3.8
N
1.9 / N N / 3.1

1
KF03
2A 2

U03

N
L N

PS01
SIEMENS
2.5A
+V -V PE
U01

1
KF04
2A 2
P10

0V

P10 /

Emergency stop
S01
KF01 KF02
x1
13 14
H01 P15 / 3.1
x2 /1.4 /1.6

0V / 3.1

24VDC ON SAFETY
LAMP CONTROL

1 3
Date 08/07/2018 PT. Yakult Indonesia DC Power Supply, AC Power =
Ed. HARDI + 2
Appr Melting Tank YK-01 Page 2
Modification Date Name Original Replacement of Replaced by Page 7
0 1 2 3 4 5 6 7 8 9

/ L1 L1 P1 / 2.8
2.8 / P15 P15 / 4.1

1 1
PB01 KF04
STOP 2 2A 2

1
TC01
5 9 10
Temp. Control 6
PB02 KR01 OMRON
Start KR01
2 /3.2 9 E5CN /3.2 10
21 3 4 5 6 7 8

A B

TT01
PT100

13 A1
KR01 K01
14 A2

2.8 / 0V 0V / 4.1
2.8 / N N/
5 9 /3.2 1 2 /1.4
6 10 /3.6
3 4 /1.4

5 6 /1.4

HEATING HEATING HEATING


CONTROL CONTACTOR

2 4
Date 08/07/2018 PT. Yakult Indonesia Heating =
Ed. HARDI + 2
Appr Melting Tank YK-01 Page 3
Modification Date Name Original Replacement of Replaced by Page 7
0 1 2 3 4 5 6 7 8 9

3.8 / P15 P15 / 5.1

1
PB03 X2:1 2
STOP 2

1 5 + - 5
PB04 KR02 LEVEL KR03
Start 2 /4.2 Sensor /4.4 9
9
21

3
KR03
/4.4 11

13 13 x1
KR02 KR03 H02
14 14 x2

3.8 / 0V 0V / 5.1

5 9 /4.2 3 11 /4.2
10 6 /1.7 5 9 /4.5
10 6 /1.8

AGITATOR LOW LEVEL LOW LEVEL


TANK LAMP

3 5
Date 08/07/2018 PT. Yakult Indonesia Agitator =
Ed. HARDI + 2
Appr Melting Tank YK-01 Page 4
Modification Date Name Original Replacement of Replaced by Page 7
0 1 2 3 4 5 6 7 8 9

4.8 / P15 P15 /

1
PB05 X2:3 4
STOP 2

1 5 5
PB06 KR04 KR05
Start 2 /5.2 1 2 /5.4 9
9
21 High Level
FILLER

3
KR05
/5.4 11

13 13 x1
KR04 KR05 H03
14 14 x2

4.8 / 0V 0V /

5 9 /5.2 3 11 /5.2
5 9 /5.5

TRANSFER/DOSING HIGH LEVEL HIGH LEVEL


PUMP FILLER LAMP

4
Date 08/07/2018 PT. Yakult Indonesia Transfer/Dosing =
Ed. HARDI + 2
Appr Melting Tank YK-01 Page 5
Modification Date Name Original Replacement of Replaced by Page 7

S-ar putea să vă placă și