0 Alternate action already taken due to Hold in drawing
0 Owners request 0 Wrong shipment or fabrication by vendor 0 P & ID Field Change Follow-up 0 Obstructed with adjacent foundation I structure due to overlapping 0 Constructability related change notice 0 Wrong Construct ion I installation at site 0 Any Others - Refer enclosed note
3. CONSTRUCT ION STAT US:
0 Before Fabrication 0 Before Installation
0 After Fabrication 0 After Installation 0 Under Fabrication 0 Under Installation
4. Revised IFC Drawing Required - YES/NO
As Build to be Done by (name of Contractor) - I NO
5. DESCRIPTION OF CHANGES :
6.ATTACHMENT:
7. SIGNATURE (Sign/Name/Date) :
INITIATED By I PROPOSED(TP) CHECKED & VALIDATED By (T P) APPROVED BY (JBF)