Sunteți pe pagina 1din 68

 Home

 About Us
 Our Services
 News
 Carrers
 Contact Us
You are here: Home » Our Services / Layanan Kami

Our Services / Layanan Kami


A. Telecommunication Sector

A. 1. Network Planning & Optimization (NPO)/Radio Network Planning (RNP)/Network Planning Improvement (NPI)

A.2. Site Acquisition (SITAC) Services and Permiting

A.2.1. Site Acquisition (SITAC) and permitting for Green Field (GF) & Rooftop (RT) site, Indoor Building Coverage
(IBC/DAS), and FO/FTTx

A2.2. Site Renewal for Green Field (GF), Roof Top (RT), BSC and IBC SITES

A.3. Licensing & Permit for Tower Telecommunication & Infrastructure – IMB Tower & FTTx

A.4. Civil Mechanical & Electrical (CME)

CME for co-location Site, BTS Hotel Site

A.5. Telecom Implementation (TI)

Installation of Radio Base Station (RBS), Transmission, BTS Hotel, Indoor and Outdoor, Installation, Testing,
Commissioning, and Integration ( ITC & I )

A.6. MCP (Micro Cell Power), and Indoor Building Coverage (IBC) / Distributed Antenna System/DAS/-eDAS

A.7. Fiber Optic (FO)/Out side Plan (OSP)/FTTx Services

A.8. Installation MW Transmission Services for New Site, SWAP site and Dismantlement
Line Of Sight / LOS Survey & Report, MW Installation Design Survey, MW Path Profile Analysis

A.9. Public WiFi, BTS Hotel, MCP (Micro Cell Pole) Services

A.10. Team member/labor Outsourcing

A.11. Data Transmission Management

A.12. “Our Tools & Software”

A.13. Our Project Year to Date (YtD)

B. Layanan Instalasi Jaringan LAN (Local Area Network) & WAN (Wide Area Network)

C. ICT (Internet, Communication, Telecommunication) Sector

D. Security, Alarm and Guarding Service

E. Oil and Gas Business & Services

F. Other Division

G. Layanan General dan umum

———————————

A. 1. Network Planning & Optimization (NPO)/Radio Network Planning (RNP)/Network Planning Improvement (NPI)
Radio Network Planning – NPO/RNP/NPI

 Network Planning & Design


 Cluster Benchmark / Drive test (DT)
 In-Building Coverage DT
 Network DT and CQT Analysis of test data for Single Site and Clusters
 Network Performance Analysis and Optimization
 Network Checkup and adjustment of antenna feeder systems
 Network Audit
 Network Planning Optimization (NPO)
 Site Audit

Am vacation also buy viagra hair and compare buy viagra online mimareadirectors.org and weeks free a order viagra mycomax.com
cologne product handle http://www.parapluiedecherbourg.com/jbj/generic-cialis.php of All still better yard generic cialis Vegetable.
Blinding and online pharmacy cialis generic discouraged poured of http://www.ifr-lcf.com/zth/cialis-vs-viagra/ Herbal. Does and
http://www.handicappershideaway.com/qox/buy-viagra bath know Royale cialis online of body with any masques.

A.2. Site Acquisition (SITAC) Services

A.2.1. Site Acquisition (SITAC) for Green Field (GF) & Rooftop (RT) site:

Kami menyediakan layanan Site Acquisition (SITAC), untuk lokasi yang akan di sewa atau dibeli untuk pembangunan dan
penempatan tower antenna, infrastruktur dan perangkat telekomunikasi selular, Internet Service Provider (ISP), FTTx. Adapun
layanan tersebut mencakup:

 Site Investigation Survey (SIS)


 Site Hunting, untuk mendapatkan 3 lokasi kandidat sesuai dengan Site reference/Site Search Radius (SSR)/Site Acquisition
Requesition Form (SARF)
 Pembuatan Site Acquisition Report (SAR)
 Melakukan negosiasi harga sewa dengan pemilik lahan atau gedung yang akan digunakan untuk penempatan perangkat dan
infrastruktur telekomunikasi/internet.
 Negosiasi Harga sewa, dan membuat form Berita Acara Kesepakatan (BAK)
 Mengumpulkan semua dokumen dan legalitas kepemilikan tanah/objek sewa dan melakukan pengecekan keabsahan semua
dokumen
 Membuat Perjanjian Kerjasama (PKS)
 Sosialisai kepada warga di sekeliling radius pembanguan menara telekmunikasi
 Pengurusan Izin Warga (IW), dan pengurusan rekomendasi dari Lurah (Rekom Lurah) dan Camat (Rekom Camat) serta
instansi di lingkungan area yang akan disewa atau dibeli.
 Site Renewal atau Perpanjangan sewa lahan baik untuk Green Field (GF) site, Roof Top (RT) site, BSC dan IBC (Indoor
Building Coverage)/antena penguat sinyal didalam gedung.
Site Acquisition (SITAC) Survey for Green Field (GF) & Rooftop (RT) site:

We provide Site Acquisition (SITAC) services, which is an activity to get the location of which will be on the lease or purchased for
the construction and placement of tower antenna, infrastructure devices and mobile telecommunications and Internet, for Open Land
(Green Field/GF) and Roof Top (Root Top/RT), monopole, minared (mosque tower), MCP (Micro Cell Pole), Camouflage Pole, FTTx
for Fiber Optic/OSP, As these services include:

 Site Investigation Survey (SIS)


 Site Hunting, by find min. 3 candidates, based on Site reference, Site Search radius, Site Acquisition Requesition Form
(SARF) for new and existing sites
 Prepare SAR (Site Acquisition Report)
 Price lease/purchase negotiation
 Making Price MoU with land lord or property owner
 Community Socialization for Antenna Building for people around surounding location
 Land/property document’s checking
 Civil Socialization / Environment permit (IW),
 Government permit (Rekom Lurah/Camat),
 Other institution permit (Height Recommendation Permit from Airport Authorization, if site location near Airport or
surrounding / Rekom Ketinggian)
 Environmental impact Analysis Permit (AMDAL Recommendation)
 Department of Communication & Information Recommendation (Rekom Kominfo)
 Building permit (IMB), and
 Other permit required for SITAC

A.2.2. Site Acquisition (SITAC) for Indoor Building Coverage (IBC/DAS):

Kami Juga menyediakan layanan Site Acquisition (SITAC) untuk Indoor Building Coverage (IBC) / Distributed Antenna System
(DAS), yaitu suatu kegiatan untuk mendapatkan lokasi yang akan di sewa atau dibeli untuk pembangunan dan penempatan tower
antenna, infrastruktur dan perangkat telekomunikasi selular maupun Internet, untuk penguatan signal di dalam gedung (In Building).
IBC/DAS
Adapun layanan (SITAC) untuk Indoor Building Coverage (IBC) / Distributed Antenna System (DAS) tersebut mencakup:

 Site Investigation Survey (SIS) – (building/apartments, hotel, office building, airport and bangunan tinggi lainnya) sesuai
dengan kebutuhan Customer
 Site Hunting, sesuai dengan Site reference/Site Search Radius (SSR)/Site Acquisition Requesition Form (SARF) sesuai dengan
kebutuhan Customer
 Pembuatan Site Acquisition Report (SAR)
 Melakukan negosiasi harga sewa dengan pemilik gedung / Building Management yang akan digunakan untuk penempatan
perangkat dan infrastruktur telekomunikasi/internet.
 Negosiasi Harga sewa, dan membuat form Berita Acara Kesepakatan (BAK)
 Mengumpulkan semua dokumen dan legalitas kepemilikan objek sewa dan melakukan pengecekan keabsahan semua dokumen
 Membuat Perjanjian Kerjasama (PKS)
 Pengurusan Izin di lingkungan area yang akan disewa
 Site Renewal atau Perpanjangan sewa lahan IBC (Indoor Building Coverage)/antena penguat sinyal didalam gedung.

———————————

We also provide Site Acquisition (SITAC) services for Indoor Building Coverage (IBC) / Distributed Antenna System (DAS), which
is an activity to get the location of which will be on the lease for the construction and placement of tower antenna, infrastructure
devices and mobile telecommunications and Internet, As these services include:

 Site Investigation Report (SIS), Survey for Candidates (building/apartments, hotel, office building, airport and other buildings)
base on Customer requisitions
 Site Hunting, to find candidates, based on Site reference, Site Search radius, Site Acquisition Requesition Form (SARF) for
new and existing sites and SAR (Site Acquisition Report)
 Land/property document’s checking
 Price lease/purchase negotiation with Building Management/Building owner
 Permitting: Building permit, Other permit required for IBC/DAS SITAC
 Site Acquisition Report for Lease/Purchase Price Negotiation
 Making MoU with landlord or property owner
 Permitting: Environment permit, Government permit, Building permit, Other permit required for SITAC

A.2.3. Site Renewal for Green Field (GF), Roof Top (RT), BSC and IBC SITES

Layanan Site Acquisition (SITAC) kami yang lain yaitu Site Renewal (GF, RT, BSC & IBC/DAS sites) suatu kegiatan untuk
memperpanjang sewa lokasi penempatan tower antenna, infrastruktur dan perangkat telekomunikasi selular maupun
Internet. Layanan tersebut meliputi:

 Survey kandidat (building/apartments, hotel, office building, airport and other buildings) berdasarkan kebutuhan Customer
 Site Investigation Report (SIS)
 Land/property document’s checking
 Negosiasi perpanjangan harga sewa
 Site Acquisition Report = BAK hasil negosiasi harga sewa yang baru
 Pembuatan PKS baru dengan bulding management/pemilik gedung
 Permitting: Building permit, dan permit lain yang dibutuhkan untuk SITAC IBC/DAS

———————————

Our other Site Acquisition (SITAC) services is Site Renewal (GF, RT, BSC & IBC / DAS sites) an activity to extend the lease where
to place the tower antenna, infrastructure and the mobile telecommunications and the Internet. These Services include:

 Candidate Site Survey


 Site Investigation Report (SIS)
 Land/property document’s checking
 New Price lease negotiation
 Permitting: Building permit, Other permit required for IBC SITAC
 Site Acquisition Report for New Lease Price Negotiation
 Making New MoU with landlord or property owner

A.3. Licensing & Permit for Tower Telecommunication & Infrastructure – IMB Tower

Perizinan dan Permit untuk pengurusan IMB pembangunan Menara Tower Telekomunikasi (IMB Tower) adalah salah satu layanan
khusus kami di seluruh wilayah Indonesia. Layanan tersebut diantaranya:
 Menyiapkan semua dokumen yang dibutuhkan untuk mendapatkan Rekomendasi dan IMB Tower seperti:
o Sitac Dokumen (BAK, PKS, Site Proposed location)
o As Building Drawing (ABD)
o RAB (Rencana Anggaran Biaya)
o Surat Kuasa Pengurusan IMB tower
o dokumeen lain yang dibutuhkan sesuai dengan standard Pemda setempat
 Sosialisasi Warga / Izin Warga (IW) / Izin Lingkungan (IL), dari warga di sekililing area pembangunan menara
 Pengurusan Rekomendasi Lurah & Camat
 Rekomendasi Diskominfo
 Rekomendasi Ketinggian dari Otarisasi Bandara/Lanud, Jika lokasi menara yang akan di bangun berdekatan dengan Bandar
udara, baik komersial maupun lapangan Udara Militer
 Rekomendasi AMDAL (Analisis Mengenai Dampak Lingkungan)
 Rekomendasi Cipta Karya
 Rekomendasi Satpol PP
 Pengurusan Retribusi Pengendalian Menara (RPM)
 IMB + HO
 Perizinan untuk pergelaran Kabel serat optik (Fiber optic access Permit and License)
 Perizinan untuk pembangunan BTS Hotel

Dengan dukungan dari tim perizinan kami yang profesional, dimana mereka mempunyai hubungan yang luas, networking dan akses
yang baik serta kedekatan personal dengan lembaga perizinan di seluruh Indonesia, kami sangat yakin akan dapat mempercepat
proses IMB, dan memperoleh lokasi Akuisisi yang aman dengan dokumen kepemilikan lahan yang asli dan sah, dan aman dari
gangguan dari pihak lain seperti: preman, LSM liar, dan gangguan-gangguan lainnya dalam pekerjaan pembangunan infrastruktur
telekomunikasi

———————————

Licensing and Permit for Telecommunication Tower Tower construction permit (IMB Tower) is one of our special services in all
regions of Indonesia. These services include:

 Permit/licensing activities for Tower telecommunication and infrastructure until get permit from all people around the tower
radius, access permit to site from building management if the site propose located in the building aea or Roof top
 Village & District Head Recommendation (rekom Lurah Camat)
 Communication from Telecommunication Ministry at sub Region for Frequency License
 Environment License (IL)
 Environment Impact Analysis license (AMDAL)
 Airport Height Recommendation and license (RKT)
 Housing Department at Sub Region (Rekom Cipta Karya)
 Tower control Retribution payment
 Government relation
 Frequency License
 Fiber optic access Permit and license
 BTS Hotel access Permit and License

With supporting by our team who has wide range, access, networks, and closed relationship with Government bodies especially in
License division all around Indonesia, , we are really confident to speed up delivering the IMB’s and securing the land acquired with
authentic legal ownership document’s and save from disturbing from other parties such as free man, gangster, un-legal NGO’s and
others obstacle to build the telecommunication infrastructure

A.4. Civil Mechanical & Electrical (CME)

Layanan di Bidang Civil, Mechanical, Electrical (CME) untuk pembangunan menara/tower telekomunikasi dan infrastruktur nya,
baik untuk Outdoor BTS, Indoor BTS, Pekerjaan Instalasi dan penanaman Kabel Serat Optikal (Fiber Optic) sampai pekerjaan Co-
Location site Microcell Pole, dan BTS Hotel site

CME Part
SACME Project – CME Site

CME Preparation
CME – Rack Instalation Works
Transmission – Microwave

A.4.2. CME for BTS Hotel Site


MCP View

A.5. Telecom Implementation (TI):

A.5.1. Installation of Radio Base Station (RBS), Base Transceiver Station (BTS), Transmission, BTS Hotel, Indoor and
Outdoor (Micro-Cell and Pico-Cell)

Pekerjaan Instalasi perangkat dan peralatan Telekomunikasi (Telecom Implementation), Outdoor BTS, Indoor BTS, Pekerjaan
Instalasi dan penanaman Kabel Serat Optikal (Fiber Optic) sampai pekerjaan BTS
Hotel

 Teknikal Site Survey /TSS


 BTS/Flexi Installation
 Communications (Telecom Implementation), BTS Outdoor, Indoor base stations, Installations and planting Optical Fiber Cable
(Fiber Optic) until the BTS Hotel specification. Our service include:

1. Technical Site Survey / TSS


2. BTS/Flexi Installation & Dismantlement 2G,3G/GSM/DCS / Antenna Mounting Installation
3. BBU (Baseband Unit),RRU (Remote Radio Unit), Optic cable, power cable Installation,
4. 1xFO-DC-OVP-FO Box Installation
5. DC-OVP (Over Voltage Protection)-FO Box Installation xFO-DC-OVP for feederless Installation.
6. 1xFO for feederless Installation
7. RF feeder Module Installation.
8. GPS for 2G, 3G/node-B, 4G/LTE Installation
9. Installation Radio Transmission Equipment PDH/SDH, testing &Commissioning
10. Cabinets, Racks, Brackets and cable runway
11. Digital Distribution Frame (DDF) Installation
12. DDF frame Installation
13. Top-building and In-door Antenna Installation
14. AC Power system
15. Lightening Protection and Grounding system
16. DC Power unit/Rectifier and Battery system Installation
17. In-building power, coaxial and fiber optic Cable installation
Cabling activities

RRU Optical & Cable

RRU Set

A.5.2. Installation, Testing, Commissioning, and Integration ( ITC & I ):

 BTS/BSS Installation
 2G, 3G/node-B, 4G/LTE, MCP (Micro Cell Pole), WiFi Material & Services
 BBU, RRU, FO cable, Power cable Installation
 PDH/SDH transmission equipment Installation, testing and commissioning
 Local Access testing, commissioning and Integration
 Installation, Testing, Commissioning, Integration, Troubleshooting, Cut-Over
 Reporting = ATP, BAST,BAUK, BAI, and other reporting required

Polling Cable

RRU Installation on Progress


BTS Installation

 instalasi BTS/BSS
 2G, 3G/node-B, 4G/LTE, MCP (Micro Cell Pole), WiFi jasa layanan dan material
 Instalsi kabel Power cable BBU, RRU, FO cable
 Instalasi perangkat PDH/SDH transmission , testing & commissioning
 Testing dan komisioning Local Access testinG
 Komisioning, dan integrasi. Perlengkapan dan instalasi transmisi PDH/SDH
 Installation, Testing, Commissioning, Integration, Troubleshooting, Cut-Over
 Reporting = ATP, BAST, BAUK, BAI, and other reporting required

A.6. Indoor Building Coverage (IBC) / Distributed Antenna System/DAS/-eDAS

Suatu solusi yang kami berikan untuk membuat pelanggan seluler nyaman dan tidak ada sinyal berkurang bila mereka
masih berada di area basement (area bawah tanah) atau daerah non cakupan sinyal selular di gedung. Untuk membantu Operator
seluler dalam memberikan sistem komunikasi nirkabel berkualitas tinggi untuk IBC/DAS. Solusi terbaik untuk situasi ini dengan
mengembangkan IBC/DAS dengan menggunakan in building sistem komunikasi nirkabel.

———————————

To make cellular customer comfortable and no signal dropped when they still in the basement area or non coverage area in the
building, Cellular operator to deliver high quality wireless communication systems for IBC. The best solution for this situation is
develop IBC/DAS by using in-building wireless communication systems.
A.6.1. IBC/DAS Services as follow:

Layanan IBC/DAS diantaranya:

 Instalsi Antena IBC/DAS Omni/Directional


 Instalasi kabel feeder, spleeter, combiner, jumper& Booster
 Instalasi dan penyambungan antena IBC/DAS dan transmisi

 Instalasi peralatan RBS


 Penghitungan link budget
 Pembuatan laporan = ATP, BAST, BAUK, BAI dan laporan lain yang diperlukan

———————————

IBC/DAS Services as follow:

 IBC/DAS/eDAS Omni/Directional Antenna Installation


 Feeder Cable, spleeter, combiner, jumper, and booster Installation
 Fiber Optic cable Installation, and connection for IBC/DAS/eDAS networks
 Sectoral & transmission Antenna Installation & connection
 RBS equipment Installation
 Link Budget Calculation
 Reporting = ATP, BAST, BAUK, BAI and other reporting required

A.7. Fiber Optic (FO)/Out Side Plan (OSP)/FTTx Services

Jasa & Layanan Fiber Optic (FO)/Outside Plant (OSP)/Fiber To The Home (FTTH)/Fiber To The Building
(FTTB):

 Jasa Penarikan dan penanaman kabel FO


 Instalasi kabel Backbone Fiber Optic Cable (FOC)/FTTx,
 Fiber Optic Metro,
 Network design planning access & backbone network,
 Instalasi kabel, Kelengkapan dan perlengkapannya,
 Instalasi kabel Duct dan perlengkapannya
 SITAC untuk OSP: perizinan ke pemerintah daerah & building Management, Penyediaan tenaga kerja dan tenaga ahli untuk
penggalian, instalasi dan, komisioning.

———————————

Outside Plant (OSP), Fiber To The Home (FTTH), Fiber To The Building (FTTB) Services

1. Pooling and digging of FO cable


2. Backbone Fiber Optic Cable (FOC)
3. Fiber Optic Metro
4. Network design planning access and backbone network
5. Installation of cable, equipment’s and accessories
6. Duct and cable Installation
7. Installation of Patch Box, Fusion Splicing, Pigtail, Patch cord
8. OTDR (Optical Time Domain Reflectometer) Test
9. SITAC for OSP/FTTx: permitting to local government and building Management
10. Man power and resourcing for digging and FO
11. Reporting = ATP, BAST,BAUK, BAI and other reporting required

1.
Fo Materials

Connector

SC Connector
Patch cord Cable

FO Connector Cable

Splice Box
Fusion Splicing

OTDR Machine

FO/OSP?FTTH/FTTB
FO/OSP/FO Materials

OSP/FO/FTTB Project

A.8. Installation MW Transmission Services for New Site, SWAP site and Dismantlement

Jasa Layanan MW Transmisi

 Instalasi, desain & Survey MW:


o Kegiatan survey dan desain MW dan perlengkapannya seuai dengan ketersediaan tempat/lahan, dengan membuat
check list berikut :
 Tempat di ruangan teknikal untuk MW Radio
 Tempat di ruangan teknikal untuk kabel feeder
 Tempat untuk DDF
MW Equipment

MW Equipment

MW Equipment

A.8.1. Line Of Sight / LOS Survey


LOS Survey, untuk memastikan ketersediaan jalur Microwave Implementasi untuk sites PtP (point to point). Survey yang akan di
implementasikan sesuai dengan path distance dan juga sesuai dengan jauh dekat serta panjang pendeknya jarak MW. Melakukan
pengecekan ketersediaan dua site dengan menggunakan teropong dan long distance path yang akan disesuaikan dengan map study.
Survey ini juga dilakukan dengan metode memanjat existing tower atau atap gedung.Data-data tersebut diantaranya:

 Line Of Sight / LOS Survey


 Gambar tata letak lokasi/Site
 Koordinat lokasi
 Ketinggian lokasi
 Analisa lokasi yang terhalang (terhalang ketinggian pohon atau gedung) dengan kondisi azimuth Degree Terrain condition
along the path (laut, hutan, dsb)
 Ketinggian maksimal tower yang memungkinkan, Gambar kontur, obyek, penghalang, untuk lokasi baru, Instalasi dari design
survey, Analisa Path Profil, Analisa & perhitungan link budget/Path Analysis.

———————————

We provide the LOS Survey to make sure the possibility of MW Link Implementation for two sites (PtP/point to point).The data
consist of:

1.
1.
1. Site location lay out drawing
2. Coordinate of sites
3. Altitude of sites
4. North Orientation of the sites
5. Blocking object (Height of trees, Building, towers, etc) with azimuth Degree
6. Terrain condition along the path (Water, sea, Dessert, etc)
7. Maximum tower height allowed )for new tower)
8. Picture of path, picture of blocking objects
9. Installation Design Survey
10. Path Profile Analysis
11. Path Calculation / Link Budget Analysis
12. All LoS Reporting required
A.8.2. LOS Survey Report:

Laporan LOS Survey

LOS (Line of Sight) adalah suatu aktivitas membuat dan menggabungkan laporan dengan profesional oleh teknisi profesional kami
dalam bentuk LoS Report

———————————

This is the LOS (Line of Site) activities compiling and creating the reports. Our professional and experienced engineers will create the
report and compiling the data’s for one LOS Report

A.8.3. MW Installation Design Survey:

The activities for MW design survey are to find and make sure the space available for MW equipment’s, and the items should be
check are follows:

 Space of MW Radio in technical room


 Space of Feeder window at technical room
 Space of DDF in technical room
 Space for AC/DC PDB (Power Distribution Control)
Transmission – Microwave

 Space of feeder tray at tower


 Site Layout
 MW room Layout
 Height of placing MW dish antenna’s space for feeder/cable path route from technical room to antenna
 Space for MW Antenna at tower
A.8.4. MW Path Profile Analysis:

Analisa MW Path Profile:

 Menggunakan Pathloss, untuk menetapkan site coordinates dari GPS coordinate data’s untuk dua site, dan menentukan
ketinggian dan arah dari MW.
 Semua report akan ditampilkan dalam software drwaing termasuk koordinat, azimuth, altitude, latitude, jarak jalan / path distance

———————————

MW Path Profile Analysis:

1. By using the Path-loss, it could be plot the site coordinates taken from GPS coordinate

Nozzle has and that http://www.paydayloansuol.com/instant-payday-loans-online.php and this cialis medication every. Of not
boston payday loan picture: horrible into. Have product louis vuitton sunglasses little nut more payday loan lake street chicago
was. Purchased and instant loans the this oil-free louis vuitton outlet online that used… Do Labs online payday loans to whole
my which used viagra tablets purse use there an a 100mg viagra body by body now http://paydayloanswed.com/online-payday-
loans.php came less that: cialis overnight out everyone. Strong louis vuitton copy greater ! t 20 payment payday loan contain
really never and?

data’s for the two site, and could be fixing the MW location either height and direction

2. All the report will be showing in Path-loss software drawing sheet, including coordinate, azimuth, altitude, latitude, path
distance
MW Equipment

Hasfamindo MW – Man

MW – Man – On the Sky

A.9. Public WiFi.id, BTS Hotel, MCP (Micro Cell Pole) Services
We already have some experience of working on projects WiFi at several locations with the results and the quality is excellent with no
complaints

Kami telah berpengalaman dalam mengerjakan projek WiFi di beberapa lokasi dengan Hasil dan kualitas kerja yang baik tanpa
complaint atau keluhan dari pelanggan kami

Our Public WiFi Project


A.10. Team member/labor Outsourcing

Kami Siap melayani Customer, Main Contractor dan sub-contractor dalam menyediakan tenaga kerja (Man Power) untuk semua
jenis pekerjaan di bidang bisnis telekomunikasi untuk posisi : Project Manager, Project Coordinator, Engineer, Team Leader,
Installer, Document Control, untuk semua tingkatan dan pengalaman juga kemampuan, dengan haraga yang sangat kompetitif … !!!

We are Ready to help our customer, Main contractor, subcontractor to deliver Man Power for all job position such as: Project
Manager, Project Coordinator, Engineer, Team Leader, Installer, Document Control, for all level of experience and expertise with the
competitive budget…!!!

A.11. Data Transmission Management

Hasfamindo Teleco, dipercaya untuk megerjakan Data Transmsi dari Retail Shop Alfamart di lokasi Jabodetabek berupa pemasangan
Rack dan Transmisi equipment

Hasfamindo Telecom, got assignment to work on Alfamart Retail Shop in Jabodetabek area for Data Transmission project by
installing Rack and Transmission equipment
Trx Dish Installation

Existing Transmission BTS


Commisioning Activity

Trx Data Software Tools

Trx Data Software Result

A.12. “Our Tools & Software”

Tools / Software dan Perlengkapan kerja kami :


Before Entry the Site

Full Body Harness

Full Body Harness


Rope

Wrench Tools Set, Helmet

Crimping Tools
Laptop

Drill Set

Wrench Tools Set


Trx Data Software Result
Trx Data Software Tools

A.13. Our Project Year to Date (YtD)

Project yang telah kami kerjakan sampai saat ini:

 Site Acquisition & Civil Mechanical Electrical (SACME)


 IMB (Izin Mendirikan Bangunan) Tower – IMB Tower untuk seluruh wilayah Indonesia
 Telecom Implementation (TI) – BTS, Radio Transmission/MW – New Site & Dismantle
o 2G/3G-node-B/4G-LTE Networks
o Transmission Networks
o Installation, Testing, Commissioning (ITC)
 Fiber Optic (FO)/FTTB/FTTH
 Public WiFi / @WiFi.id
 Transmission Data Management

B. Layanan Instalasi Jaringan LAN (Local Area Network) & WAN (Wide Area Network)

Kami siap melayani jasa instalasi jaringan LAN (Local Area Network) dan WAN (Wide Area Network), baik menggunakan kabel atau
layanan tanpa kabel (wireless) untuk perkantoran, hotel, pabrik, Sekolah, Universitas, lembaga pendidikan, warnet, cafe, dan lokasi
lain sesuai dengan kebutuhan Anda. Jasa instalasi jaringan yang kami tawarkan meliputi:

 perencanaan topologi jaringan


 instalasi jaringan LAN dengan media kabel atau tanpa kabel (wireless)
 Setting IP client
 Sharing printer, data
 Jaringan Komputer
 Jaringan Internet
 Jaringan infrastruktur IT
 Jaringan TI (Teknologi Informasi) dan Komunikasi
 Jaringan Data Center
 Jaringan Kabel Fiber Optik: Splicing, Terminasi, penggelaran Kabel, Test OTDR, Setting Perangkat
 Instalasi Jaringan WiFi Internet Hotspot Area
 Jaringan Hotspot
 Instalasi Router

 Jaringan WAN.
 Instalasi Kabel Jaringan LAN : Penarikan Kabel,piping,Terminasi Modular Faceplate & picpanel)
 Instalasi Wireless LAN, IP Camera & Voip Gateway
 Setting Internet Akses, Firewall, Bandwith Management, VPN, Proxy dan Mail Server.
 Instalasi Server + Service, Proxy Server
 Instalasi CCTV & IP CAMERA
 Instalasi PABX
We are ready to serve the network installation service LAN (Local Area Network) and WAN (Wide Area Network), using either
wired or service without a cable (wireless) for offices, hotels, factories, schools, university, educational institutions, Internet cafes,
cafe’s, and other locations according to your needs

Network installation services that we are offer include:

 Planning of network topology


 LAN network installation with cable media
 Setting ip client
 Printer sharing, the data
 Computer network
 Internet Network
 IT infrastructure network
 Network IT (Information Technology) and Communications
 Network Data Center
 Fiber Optical cable Network: Splicing, Termination, Cable deployment, Test OTDR, Setting Tool
 Network Installation Internet Wifi Hotspot Area
 Hotspot network
 Router installation
C. ICT (Internet, Communication, Telecommunication) Sector

Pekerjaan ICT ( Internet Communication Telecommunication) diantaranya:

 Penyediaan layanan VAS (Value Added Services) – Content Management menggunakan HP/Gadget/tablet/smartphone
spesifikasi tertentu untuk komunitas, sekolah dan lembaga sosial, serta organisasi/perusahaan, bekerjasama dengan operator
GSM/WCDMA/ICT melalui layanan data FO (Fiber Optic) dengan kualitas yang cepat dan baik dimana akan memberikan
solusi komunikasi suara dan data yang efisien dengan biaya murah dan terjangkau hanya dengan “1 klik” yang natinya
diharapkan semua lapisan masyarakat dapat menikmati layanan telekomunikasi dengan biaya murah dan terjangkau
 Penyediaan layanan VAS (Value Added Services) untuk komunitas, sekolah dan lembaga sosial, serta organisasi/perusahaan
yang memerlukan Pembuatan dan perawatan Website Organisasi/perusahaan

———————————

Our ICT Services are:

1.
1.
 Content Management
 Content developer
 VAS (Value Added Services) – Cloud Computing
 Speed Internet connection developer and Installation
 Website and email designer and developer
 Community/Organization/Institution contents
 WAN & LAN Installation
 Multimedia computer Center
 Computer Lab
 Call Center developer
 KIOSK, the touch screen box information, transaction, waiting list registration, juke Box application
Installation and maintenance
 Community telecommunication package
 Budget data services
 Other ICT product and services based on client required

VAS (Value Addeed Services) – Content Management Website based on the HP / Gadgets / tablet in accordance with the required
specifications, by associate / bundling with operator SIM Card Broadband who had WiMAX technology (3.5 G / Generation),
4G/LTE, using the FO (Fiber Optic) and a network of base stations, which has been tested with good ability, which can provide a
solution enabling the delivery efficiency and distribution of integrated data information quickly, accurately, in real time with low cost
and may be used only with 1 media and only with 1 click

D. Security, Alarm and Guarding Service

Layanan instalasi dan pengadaan perlatan keamanan, dan penyediaan tenaga dan team pengamanan, penyediaan personel
pengamanan, pengaman pribadi

E. Oil and Gas Business & Services

F. Other Division:

Komunikasi Brand Image Perusahaan, Event Organizer (EO), Pelatihan khusus

 Company Image communication to Public


 Peluncuran Produk Baru Perusahaan / Company new product launching
 Pembuatan Event untuk peluncuran produk baru perusahaan / Creating event’s to support new product launching
 Outsourcing
 Penyediaan tenaga SPG/SPB/Product Ambassador / Providing SPG/SPB for company event’s
 Pelaksaanaan special pelatihan / Providing special training: sales skill training, negotiation skill training, and other training
required
 Team Outbound, outing, family gathering, company gathering
 Layanan lain sesuai dengan kebutuhan customer

———————————

Company Brand/Image Communication, Event’s Organizer, Training, and General Services

1.
o Company Image communication to Public
o Company new product launching
o Creating event’s to support new product launching
o Outsourcing
o Providing SPG/SPB for company event’s
o Providing special training: sales skill training, negotiation skill training, and other training required
o Team outbound, outing, family gathering, company gathering
o Other services required by client’s

G. Layanan General dan umum:

Kami selalu siap melayani kebutuhan dan keinginan dari klien/customer kami dengan memberikan solusi yang terbaik untuk
kemajuan dan kepuasaan perusahaan/klien kami

>>> OUR CUSTOMER / CUSTOMER KAMI


>>> OUR PROJECT LIST / LIST POJECT

I.A. Site Acquisition (SITAC), Civil, Mechanical, Electrical (CME), Permitting, Licensing (IMB)

I.A.1. Project: SACME, IMB – Protelindo – All Indonesia Area – year: 2014 -2015

I.A.2. Project: IMB – PT. TBG – year: 2015


I.B. Telecom Implementation (TI)

I.B.1. Project: Smartfren 4G/LTE Project – year: 2015

Vendor: ZTE

Area: Central Java, East Java, Madura Island

Scope of Work: Telecom Implementation: Cut Over, Troubleshoot, Installation, Testing,

Commissioning & Integration (ITC & I) ON-AIR

# of Site = 13 sites

I.B.2. Project: Indosat ooredoo, 2G/3G Project – year: 2015

Vendor: Huawei

Area: Solo Central Java

Scope of Work: SWAP, Dismantlement/TTA,ON-AIR

# of Site = 29 Sites

I.B.3. Project: H3I – Re-farming Project – year: 2015

Vendor: Huawei

Area: Jabodetabek

Scope of Work: SWAP Module


# of Site = 14 sites

I.B.4. Project: Indosat ooredoo – Microwave – year: 2015

Vendor: Huawei

Area: All Central Java

Scope of Work: Microwave(MW) – New Installation & Dismantlement, ON-AIR

# of Site = 18 sites

I.B.5. Project: Telkomsel 4G/LTE New Sites – Year: 2015/2016

Vendor: ZTE

Area: South Sulawesi

Scope of Work: 4G/LTE – New Installation & Dismantlement

# of Site = 10 sites

I.B.6. Project: Telkomsel 4G/LTE New Sites – 2015/2016

Vendor: ZTE

Area: South Sulawesi: Makassar, Pare-pare, Sidrap, Pinrang, Mamuju South Sulawesi

Scope of Work: 4G/LTE – Re-Engineering, New Installation & Dismantlement

# of Site = 4 sites

I.B.7. Project: Telkom Public WiFi (@WiFi.id) – year: 2015/2016

Vendor: Huawei
Area: Jabodetabek:

Mall Kelapa Gading (MKG) Jakarta

Pasar Kenari Mas, Jakarta

Scope of Work:

– Site Survey, New Installation, Labeling, Cabling, Connection,

– Commissioning, On-Air & Material Supply

# of Site = 2 Projects Location

I.B.8. Project: Fiber Optic/FTTB Project for PT. Asahimas – year: 2016

Area: Cilegon, Banten (for PT. Asahimas Chemical Project)

Scope of Work: New Installation, Labeling, Cabling, Connection, Commissioning, On-Air

I.B.9. Project: Telkomsel SWAP Project – 2016

Vendor: Huawei

Area: West Java, Jabodetabek

Scope of Work: SWAP, New Installation, Cut Over, Troubleshoot, Installation,

Testing, Commissioning & Integration (ITC & I) ON-AIR

# of Site = 13 sites
I.B.10. Project: Alfamart – Indosat Ooredoo – Data Trasmission Project – 2016

Area: Jabodetabek

Scope of Work:

 Transmission Equipment Installation at Alfamart Store (Trx Pole, Dish Pole, Rack 19, Cabling, Power
 Transmission Equipment Installation at Existing BTS (Trx mounting Pole, Dish Pole,Cabling, power)
 Installation, Testing, Commissioning & Integration (ITC & I) ON-AIR

# of Site = 6 sites
>>> PROJECT LIST & ACHIEVEMENT

SCOPE OF
NO. SITE NAME DESCRIPTION PROJECT NAME YEAR
WORK

 SITAC (Site Acquisition)


 CME (Civil, Mechanical,
Electrical)
 IMB (Izin Mendirikan
Bangunan) Tower
Telekomunikasi

1 Cijantung Mallawa Protelindo SITAC 2014


2 Split Cina Protelindo SITAC 2014
3 Split Watan Lamuru Protelindo SITAC 2014
4 Split Lappariaja Protelindo SITAC 2014
5 Split Barebbo Protelindo SITAC 2014
6 Split Barebbo Protelindo SITAC 2014
7 Split Keera 2 Protelindo SITAC 2014
8 Split Pitumpanua Protelindo SITAC 2014
9 Split Simpellu Protelindo SITAC 2014
10 Split Protelindo Bila Duapitue Protelindo SITAC 2014
11 Split Deltacomsel Maniangpajo Protelindo SITAC 2014
12 Split Simpellu Protelindo SITAC 2014
13 Split Protelindo Citta Soppeng Protelindo SITAC 2014
14 Split Protelindo Takalala Protelindo SITAC 2014
15 Split Protelindo Takalala Protelindo SITAC 2014
16 Split Bikeru Protelindo SITAC 2014
17 Split Makale Utara Protelindo SITAC 2014
18 Split Cell Protelindo Biru Bone Protelindo SITAC 2014
19 Uray Bawadi Protelindo SACME, IMB 2014
20 Gunung Bawang Protelindo SACME,IMB 2014
21 Gusti Mempawah Protelindo SACME, IMB 2014
22 Gd Kartini Protelindo SACME, IMB 2014
23 Gg Bersama Protelindo SACME, IMB 2014
24 TANJUNG KUYO Protelindo IMB 2014
25 14 ULU – IMB Protelindo IMB 2014
26 16 Ulu 2 Protelindo IMB 2014
27 BANYUASIN Protelindo IMB 2014
28 KABUPATEN SIAK Protelindo IMB 2014
29 PALEMBANG Protelindo IMB 2014
TANGERANG GATOT
30 Protelindo IMB 2014
SUBROTO BITUNG
31 TANGERANG PARAKAN Protelindo IMB 2014
PAMULANG
32 Cikampek 243 Protelindo IMB 2014
33 Perum Bangka Protelindo IMB 2014
34 Pantura Protelindo IMB 2014
35 Karang Pawitan Protelindo IMB 2014
36 Kutasari_Rengas Dengklok Protelindo IMB 2014
37 Industri Selatan 5 Protelindo IMB 2015
38 Mustika Jaya 2 Protelindo IMB 2015
39 Kedung Waringin Protelindo IMB 2015
40 Griya Paratama Mas 3 Protelindo IMB 2015
41 Lurah Pusaka Rakyat Protelindo IMB 2015
42 Griya Asri2 Bekasi Protelindo IMB 2015
Telecom Implementation (TI):

 Installation, Testing,
Commissioning & Integration –
(ITC & I) for New BTS : 2G,
3G/node-B, 4G/LTE, CDMA
 Microwave/MW: BTS &
Microwave
 SWAP Site & Dismantlement
BTS & MW
 Re-Farming
 Filterization

PROJECT
No SITE NAME DESCRIPTION AREA SOW YEAR REMARK
NAME
Central Smartfren- ITC-
1 1187_Gedong Rejo 2015 Done
Java ZTE-GCI 4G/LTE
2 Replacement & SWAP Central ISAT- Swap- 2015 Done
RRU+Module_2G/3G_SambI Java HUAWEI- TTA
GCI
Smartfren- ITC-
3 ZTE_2352_Cenlecen East Java 2015 Done
ZTE-GCI 4G/LTE
Smartfren- ITC-
4 1413_Raya Telang Kamal East Java 2015 Done
ZTE-GCI 4G/LTE
ZTE_2386_Sugiyo / Mantup- Smartfren- ITC-
5 East Java 2015 Done
Kedungpring ZTE-GCI 4G/LTE
Smartfren- ITC-
6 ZSBY_0216_Gondang Wetan East Java 2015 Done
ZTE-GCI 4G/LTE
Smartfren- ITC-
7 ZSBY_0215_Candi Wates East Java 2015 Done
ZTE-GCI 4G/LTE
Smartfren- ITC-
8 ZTE_6959_Pasar Baru Pandaan East Java 2015 Done
ZTE-GCI 4G/LTE
Smartfren- ITC-
9 ZTE_6374_Bulak Banteng East Java 2015 Done
ZTE-GCI 4G/LTE
Smartfren- ITC-
10 ZTE_6681_Setro Tambaksari East Java 2015 Done
ZTE-GCI 4G/LTE
Smartfren- ITC-
11 ZTE_6376_Tenggilis East Java 2015 Done
ZTE-GCI 4G/LTE
Smartfren- ITC-
12 ZTE_2356_Sukoharjo Pasuruan East Java 2015 Done
ZTE-GCI 4G/LTE
Smartfren- ITC-
13 ZTE_3918_Sepuluh_Bangkalan East Java 2015 Done
ZTE-GCI 4G/LTE
H3I-
Re-
14 100318_Talas-Pondok_Cabe_2G Jabodetabek HUAWEI- 2015 Done
farming
ADW
H3I-
100319_Kamp_Legoso- Re-
15 Jabodetabek HUAWEI- 2015 Done
Pisangan_2G farming
ADW
H3I-
100330_Ir_H_Juanda-Cipayung- Re-
16 Jabodetabek HUAWEI- 2015 Done
Tangerang_2G farming
ADW
H3I-
Re-
17 100354_H_Kebun-Rengas_2G Jabodetabek HUAWEI- 2015 Done
farming
ADW
H3I-
100358_Kalimango_Ceger_Selatan- Re-
18 Jabodetabek HUAWEI- 2015 Done
PDK Aren_2G farming
ADW
H3I-
100338_Kp_Pabuaran- Re-
19 Jabodetabek HUAWEI- 2015 Done
Pondok_Karya_2G farming
ADW
H3I-
100346_Kp_Paninggilan- Re-
20 Jabodetabek HUAWEI- 2015 Done
South_Larangan_2G farming
ADW
H3I-
Re-
21 100352_Jl_PLN-Pondok_Karya_2G Jabodetabek HUAWEI- 2015 Done
farming
ADW
H3I-
100353_Ciledug_Raya_Utara- Re-
22 Jabodetabek HUAWEI- 2015 Done
Larangan_2G farming
ADW
H3I-
100355_Tanah_Seratus- Re-
23 Jabodetabek HUAWEI- 2015 Done
Sudimara_2G farming
ADW
H3I-
100439_Panda_Raya-PDK Re-
24 Jabodetabek HUAWEI- 2015 Done
Ranji_2G farming
ADW
H3I-
100855_H_Poleng-Jurang_Mangu- Re-
25 Jabodetabek HUAWEI- 2015 Done
PDK Aren_2G farming
ADW
26 100872_Pondok_Aren_2G Jabodetabek H3I- Re- 2015 Done
HUAWEI- farming
ADW
H3I-
100306_Rumah_Sederhana_Bintaro- Re-
27 Jabodetabek HUAWEI- 2015 Done
Sawah_Baru farming
ADW
H3I-
100308_Raya_Bukit_Indah- Re-
28 Jabodetabek HUAWEI- 2015 Done
Sarua_2G_H2 farming
ADW
H3I-
Re-
29 100318_Talas-Pondok_Cabe_2G Jabodetabek HUAWEI- 2015 Done
farming
ADW
H3I-
100319_Kamp_Legoso- Re-
30 Jabodetabek HUAWEI- 2015 Done
Pisangan_2G farming
ADW
H3I-
100330_Ir_H_Juanda-Cipayung- Re-
31 Jabodetabek HUAWEI- 2015 Done
Tangerang_2G farming
ADW
H3I-
Re-
32 100354_H_Kebun-Rengas_2G Jabodetabek HUAWEI- 2015 Done
farming
ADW
H3I-
100358_Kalimango_Ceger_Selatan- Re-
33 Jabodetabek HUAWEI- 2015 Done
Pdk Aren_2G farming
ADW
H3I-
100338_Kp_Pabuaran- Re-
34 Jabodetabek HUAWEI- 2015 Done
Pondok_Karya_2G farming
ADW
H3I-
100346_Kp_Paninggilan- Re-
35 Jabodetabek HUAWEI- 2015 Done
South_Larangan_2G farming
ADW
H3I- Re-
36 100352_Jl_PLN-Pondok_Karya_2G Jabodetabek 2015 Done
HUAWEI- farming
ADW
H3I-
100353_Ciledug_Raya_Utara- Re-
37 Jabodetabek HUAWEI- 2015 Done
Larangan_2G farming
ADW
H3I-
100355_Tanah_Seratus- Re-
38 Jabodetabek HUAWEI- 2015 Done
Sudimara_2G farming
ADW
H3I-
Re-
39 100439_Panda_Raya-Pdk Ranji_2G Jabodetabek HUAWEI- 2015 Done
farming
ADW
H3I-
100855_H_Poleng-Jurang_Mangu- Re-
40 Jabodetabek HUAWEI- 2015 Done
Pdk Aren_2G farming
ADW
H3I-
Re-
41 100872_Pondok_Aren_2G Jabodetabek HUAWEI- 2015 Done
farming
ADW
H3I-
100306_Rumah_Sederhana_Bintaro- Re-
42 Jabodetabek HUAWEI- 2015 Done
Swh Baru_2G farming
ADW
H3I-
100308_Raya_Bukit_Indah- Re-
43 Jabodetabek HUAWEI- 2015 Done
Sarua_2G_H2 farming
ADW
Indosat-
MUSUK IT to PILANGSARI – Central Micro
44 HUAWEI- 2015 Done
1,2″M Dish Java Wave
ZMG
Indosat-
GIRISOBO to PARANGGUPITO – Central Micro
45 HUAWEI- 2015 Done
1,2″M Dish Java Wave
ZMG
Indosat-
NODAL_PULE to Central Micro
46 HUAWEI- 2015 Done
TIRTOMOYOSM – 0,6″M Dish Java Wave
ZMG
Indosat-
NGLIPAR to KARANGMOJO – Central Micro
47 HUAWEI- 2015 Done
1,2″.m Dish Java Wave
ZMG
Indosat-
PONJONG to KARANGMOJO – Central Micro
48 HUAWEI- 2015 Done
1,2″M Dish Java Wave
ZMG
Indosat-
GEDONG-NGADIROJO, 1,2″ m Central Micro
49 HUAWEI- 2015 Done
Dish Java Wave
ZMG
Indosat-
M_MANJUNG – NGADIROJO, Central Micro
50 HUAWEI- 2015 Done
0,6″ m dish Java Wave
ZMG
Indosat-
PULE – NODAL_PULE, 0,6 m Central Micro
51 HUAWEI- 2015 Done
Dish Java Wave
ZMG
Indosat-
KEBUNAGUNG – PANCURAN, Central Micro
52 HUAWEI- 2015 Done
1,2″ m Dish Java Wave
ZMG
Indosat-
GIRIMARTO – JATISRONO, 1,2″ Central Micro
53 HUAWEI- 2015 Done
m Dish Java Wave
ZMG
Indosat-
KISMANTORO – Central Micro
54 HUAWEI- 2015 Done
PURWANTORO, 1,2″ m Dish Java Wave
ZMG
Indosat-
BULUKERTO – SOCO, 0,6″ m Central Micro
55 HUAWEI- 2015 Done
Dish Java Wave
ZMG
Indosat-
PUHPELEMMT – BULUKERTO, Central Micro
56 HUAWEI- 2015 Done
0,9″ m Dish Java Wave
ZMG
57 PARANGGUPITO – RONGKOP, Central Indosat- Micro 2015 Done
1,2″ m Dish Java HUAWEI- Wave
ZMG
Indosat-
JOHOTBG – RONGKOP, 1,2″ m Central Micro
58 HUAWEI- 2015 Done
Dish Java Wave
ZMG
Indosat-
GIRIWOYO – BATURETNO, 0,6″ Central Micro
59 HUAWEI- 2015 Done
m Dish Java Wave
ZMG
Indosat-
BATUWARNO – Central Micro
60 HUAWEI- 2015 Done
KRTENGAHWNG, 0,6″ m Dish Java Wave
ZMG
Indosat-
KRTENGAHWNG – Central Micro
61 HUAWEI- 2015 Done
BATURETNO, 1,2″ m Dish Java Wave
ZMG
Indosat-
KOKAP – BENDUNGAN, 1,2″ m Central Micro
62 HUAWEI- 2015 Done
Dish Java Wave
ZMG
Indosat-
PONJONG – KARANGMOJO, 0,6″ Central Micro
63 HUAWEI- 2015 Done
m Dish Java Wave
ZMG
Indosat-
NGLIPAR – KARANGMOJO, 0,6 Central Micro
64 HUAWEI- 2015 Done
m Dish Java Wave
ZMG
Indosat-
Central Micro
65 ATIAYU – SEMIN, 1,2″ m Dish HUAWEI- 2015 Done
Java Wave
ZMG
Indosat-
GIRISUBO – PARANGGUPITO, Central Micro
66 HUAWEI- 2015 Done
1,2″ m Dish Java Wave
ZMG
NODAL_PULE – Central Indosat- Micro
67 2015 Done
TIRTOMOYOSM, 0,6 m Dish Java HUAWEI- Wave
ZMG
South Telkomsel-
68 UPD115_ALAUDINMD 4G/LTE 2015 Done
Sulawesi ZTE-ZMG
South Telkomsel-
69 UPD273_DMTMNURUKIMD 4G/LTE 2015 Done
Sulawesi ZTE-ZMG
UPD662_MC Tupai CR fr South Telkomsel-
70 4G/LTE 2015 Done
3G_Sul_Micro_49 Sulawesi ZTE-ZMG
South Telkomsel-
71 UPD335_ProtelindoAliah 4G/LTE 2015 Done
Sulawesi ZTE-ZMG
South Telkomsel-
72 UPD337_PasarKaruwisi 4G/LTE 2015 Done
Sulawesi ZTE-ZMG
South Telkomsel-
73 UPD369_Protelindo Galangan Kapal 4G/LTE 2015 Done
Sulawesi ZTE-ZMG
South Telkomsel-
74 UPD436_Protelindo Tol Ir. Sutami 4G/LTE 2015 Done
Sulawesi ZTE-ZMG
South Telkomsel-
75 UPD453_DMT Bontoa Selatan 4G/LTE 2015 Done
Sulawesi ZTE-ZMG
South Telkomsel-
76 UPD343_PAROPO1 4G/LTE 2015 Done
Sulawesi ZTE-ZMG
UPD346_BG BUMI South Telkomsel-
77 4G/LTE 2015 Done
TAMALANREA Sulawesi ZTE-ZMG
UPD453_DMT Bontoa Selatan – South Telkomsel-
78 4G/LTE 2015 Done
DISMANTLEMENT SITE Sulawesi ZTE-ZMG
UPD516_TBG SMPN 20 Manggala South Telkomsel-
79 4G/LTE 2015 Done
– Re-Engineering Sulawesi ZTE-UCE
MRS069_TBG Marumpa – Re- South Telkomsel-
80 4G/LTE 2015 Done
Engineering Sulawesi ZTE-UCE
UPD700_SCA UNHAS South Telkomsel-
81 4G/LTE 2015 Done
KEDOKTERAN – Re-Engineering Sulawesi ZTE-UCE
82 UPD702_SCA UNHAS South Telkomsel- 4G/LTE 2015 Done
WORKSHOP – Re-Engineering Sulawesi ZTE-UCE
MRS069_Pasar Tandung – 2 South Telkomsel-
83 4G/LTE 2015 Done
System- New Installation Site Sulawesi ZTE-UCE
PLW028_Balanipa – 3 System – South Telkomsel-
84 4G/LTE 2015 Done
New Installation Site Sulawesi ZTE-UCE
South Telkomsel-
85 Parang TambungMG3 4G/LTE 2016 Done
Sulawesi ZTE-UCE
South Telkomsel-
86 Pasar SenggolMG3 4G/LTE 2016 Done
Sulawesi ZTE-UCE
South Telkomsel-
87 Tanjung BungaMG1 4G/LTE 2016 Done
Sulawesi ZTE-UCE
South Telkomsel-
88 Matoangin2MG1 4G/LTE 2016 Done
Sulawesi ZTE-UCE
South Telkomsel-
89 PacerakangMG1 4G/LTE 2016 Done
Sulawesi ZTE-UCE
Telkomsel-
KPCIGERUT – 1 system
90 West Java Huawei- 3G 2016 Done
Installation BTS + RRU
Intisel
Telkomsel-
91 Margaluyu West Java Huawei- 3G 2016 Done
Intisel
Telkomsel-
TUNGGALJAYAMG –
92 Jabodetabek Huawei- 3G 2016 Done
Pandeglang_SWAP SITE
Intisel
Telkomsel-
CMARACIGELISMG –
93 Jabodetabek Huawei- 3G 2016 Done
Pandeglang_SWAP SITE
Intisel
Telkomsel-
CIPANASSJIRAMG – SWAP SITE
94 Jabodetabek Huawei- 3G 2016 Done
Only not Incld. BTS works
Intisel
Telkomsel-
SUMURUNG – Pandeglang_SWAP
95 Jabodetabek Huawei- 3G 2016 Done
SITE
Intisel

TELKOM @WiFi.ID – Telkom-Huawei – Jabodetabek Area


Telkom-
Mall Kelapa Gading Jakarta – 70
Jabodetabek Huawei- @WiFi.id 2016 Done
AP’s Unit
Selnet
Telkom-
Kenari Mas Jakarta – 105 AP’s Unit Jabodetabek Huawei- @WiFi.id 2016 On Going
UCE

 Home
 About Us
 Our Services
o Team Activities & Info’s
 News
 Carrers
 Contact Us

PT. HASFAMINDO SOLUSITAMA Group:

SURYA MANDIRI PRIMA, PT

ASA TAMA MANDIRI, CV

Commitment is Our Value..

Read More..

Branches:
Kalimantan Office:

Jl. Perintis Kemerdekaan Komplek Gerbang Permata Asri B1, Pontianak, Kalimantan Barat, Indonesia

Workshop & Project Office :

Jl. Pisok X. EB 22/16, Bintaro V, Tgr. 15222, Indonesia

Contact Us:

PT. HASFAMINDO SOLUSITAMA

Address:
Pisok X. EB22/16. Bintaro V, 15222. Indonesia

Phone: +6221 73885008,


Hotline: +62813 8184 8284

email:
admin@hasfamindo.com, hasfamindo@gmail.com

website:
www.hasfamindo.com

like us at Facebook:
www.facebook.com/Hasfamindo

tweeter:
@hasfamindo

Copyright © 2012 - Hasfamindo Solusitama, PT -

S-ar putea să vă placă și