Documente Academic
Documente Profesional
Documente Cultură
SCL
Borrow AREA Summary (PACKAGE-3 Usargaon to Bimsen
Grain Size Analysis Atterberg Limits
Distance Date of
Location of sample Date of
Sl No Source Chainage/Offset from RLY taking Testing FSI (%) Silt &
Track sample Gravel % Sand % LL (%) PL (%) PI
Clay %
1 B.A.NO.-01 BR 127/2 3 KM 12.01.19 15.03.19 32 39.67 30.33 30.00 26.33 18.33 8.00
2 B.A.NO.-02 1301+900 R/S 2 KM 16.01.19 15.03.19 20 5.50 15.00 79.50 32.00 20.00 12.00
3 B.A.NO.-03 1301+900 R/S 3 KM 19.01.19 15.03.19 18.5 1.00 6.00 93.50 32.50 20.50 12.00
4 B.A.NO.-04 - - -
5 B.A.NO.-05 1291+300 R/S 2 KM 03.02.19 15.03.19 17.6 3.00 6.40 89.00 33.20 20.60 12.60
6 B.A.NO.-05 A 1278+700 500 meter 04.02.19 19.02.19 20 5.72 11.85 82.40 30.29 18.97 11.32
9 B.A.NO.-08 1289+900 R/S 4.5 Km 16.02.19 19.02.19 15.91 4.10 11.68 84.22 32.63 19.32 13.31
10 B.A.NO.-09 1274+700 R/S 0.800 KM 20.02.19 28.02.19 20.91 3.03 8.81 88.16 33.20 20.87 12.33
11 B.A.NO.-10 1278+100 R/S 0.700 Km 28.02.19 02.03.19 28.72 28.75 25.56 45.70 32.90 20.52 12.38
12 B.A.NO.-11 -
13 B.A.N0.-12 LC GATE 229, 1325+100 1.2 KM 04.03.19 …. 34.00 20.99 36.41 41.12 31.8 20.76 11.04
14 B.A.NO.-13 1301+200 R/S 2 KM 08.03.19 - 33.41 19.19 47.56 33.25 34.50 22.33 12.17
15 B.A.NO.-14 1325+000 R/S 1.1 Km 09.02.19 13.03.19 30.15 19.42 52.08 28.41 33.17 21.24 11.93
16 B.A.NO.-15 3.5 Km 09.03.19 11.03.19 34.09 4.91 20.87 74.22 33.5 21.91 11.59
1300+600 R/S
17 B.A.NO.-16 - - - -
19 B.A.NO.-18 1302+100 R/S 4 KM - - 29.32 10.50 23.15 66.35 33.5 22.07 11.44
21 B.A.NO.-20
22 B.A.NO.-21
B.A.NO.-22
B.A.NO.-23
ECT
sargaon to Bimsen)
Proctor Density
Soil Status/
MDD OMC ( %)
CBR (%) classifica
tion
Tested
Qty(Cum) Comments
From RVNL
Remarks
(gm/CC)
Not Available
- - - - - Not Available
- - - - - - Not Available
progress