Sunteți pe pagina 1din 11

FORM TECH-6

Position Title and No: Deputy Team Leader - Electrical

Name of Expert: Jose Antonio García Fernández

Date of Birth:

Country of Citizenship / Residence: Spain

Education:

S.No. Degree College/university Completion Year

1. B Tech Electrical PreEngineering College, Politécnico Nacional


1981
Engineering Burgos
2. Master of
Engineers Battalion School, Madrid Spain 1985
Engineering

SUMMARY : Expérience and Compétence in the Field of Railway Electrification System

► involving, in the expérience terms, the main characteristics :


- over …. years in Infrastructure Projects
- over …. years in Management Positions for Railway Systems Projects
- over …. years in Management of Large Electrification Company
- over …. years in Scientific Research
- Any other ?
- International expérience - Ecuador, China, Saudi Arabia, Spain, any other

► involving, in the technical terms, all the main type of systems :


- Catenary / OCS / OHL / Power Line & Networks
- Traction Power Supply / Transformer Station / Substation / Sectioning Post / Grid
- SCADA / Command-Control / Monitoring / Metering
- Auxiliaire Infra Rail Power Supply &Distribution / Lighting / Ventilation / Emergency / Safety

► involving, in the functional terms, all the main positions :


- from Client/Beneficiary side - Director / Head of PIU
- from Contractor/Constructor side - Manager / Head of Electrification Department
- from Consultant side - Key Expert, Project Manager, Interface Manager, Site manager

► involving, in the development programs/projects terms, all the main types :


- impact, feasibility studies
- design, implementation projects
- modernisation, réhabilitation programs
- assistance, forecasting, consulting, supervision
- strategy, planning, design, coordination
- maintenance, exploitation management
- testing, commissioning management
- interface, quantity, quality, safety management

1
Feasibility, Design, Implementation, Consulting, Supervision, Coordination,
Management Experience:
 Mention the name of the projects in bullets below

SUMMARY : Job-related Skills


- Organizing, coordinating, planning and managing directly the activities of programmes, projects,
supervisions, diagnostics, maintenance, repair and modernization of railway electrification
installations involving teams of specialists and distributed work teams in a range of activities
extended to the typical demands direct involvement in the safety and regularity of traffic;
- Development and implementation of hardware-software computer applications for increasing
the quality, efficacity, precision, operability, safety in the exercise of leadership for Railway
Projects
- Developing the new conceptions, methodologies, procedures and management solutions applied
in technical and economic organization of maintenance, repair and modernization

Employment record relevant to the assignment:


Period Employer & position. Country Summary of activities performed relevant to the
Contact info. for Assignment
references
June 2017 – Employer : Ayesa Quito Project : Fiscalization project. Quito Metro
Present International Ecuador 1 line. (Ecuador) (Full name of assignment)
Electrification Length :
Position : Fiscalization Technology :
(1 Year 10 Team Leader Commented [CS1]: Please mention only that designation for
Project Cost (USD): which you have supporting document that you would be including.
Months)
Contact info. for
Client : Client tends to cross verify from the supporting document
Team size supervised : submitted.
references

 Providing strategic oversight and direction


to the onsite technical multidisciplinary
staff
 Explain any specific technical role
performed and disciplines covered (OHE,
Traction, general power supply, SCADA
etc) .
 also explain where scope included design
reviews and approval of contractor’s
design/technical
reports/specifications/manuals/interface
reports/management plans etc
 Coordinating with client and resolving
Project related issues
 Resource planning and control
 Leading site supervision ensuring quality,
providing advanced technical solutions.

2
Period Employer & position. Country Summary of activities performed relevant to the
Contact info. for Assignment
references
 Responsible of cost forecasting,
estimation and projects’ planning and
scheduling
 Preparing project initiation
documentation.
 Maintaining and completing project
key performance indicators.
 Writing detailed and/or summarized
project progress’ reports.
 Identifying, costing and processing any
contract variations
 Tracking activities against the
detailed project plans. Updating project
plans to include agreed changes.
 Approving Work methodology Statement
and project schedule
 Leading interfaces and resolving conflicts.
 Monitoring actual expenditure
figures against project budgets.
Organising and facilitating project steering
/ operating committees meetings.
 Ensuring HSE compliance

Mar 2015 – Jun Employer : DB- Qujing, Project : Railway electrification supervision project.
2017 International China (Write project full name and emphasize 2*25 kv, where
applicable) Hu-Kun project, HS PDL, Lot-I. 102 Km,
(2 Years 3 Position : Supervision Technology :
Months) Team Leader Project Cost (USD):
Client : Chinese Ministry of Railways
Team size supervised :
Contact info. for
references
 Providing strategic oversight and direction
to the onsite technical multidisciplinary
staff
 Provide technical expertise for review and
clarifications of technical specification
documents (descriptions / diagrams) to
the specifications for the development of
project / design for the electric traction
and railway electrification
 Provide expertise and project
management for the technical fields of

3
Period Employer & position. Country Summary of activities performed relevant to the
Contact info. for Assignment
references
Catenary, Power Supply, Distribution,
Metering, Lighting, Ventilation,
Emergency, SCADA, for design and works
 also explain where scope included design
reviews and approval of contractor’s
design/technical
reports/specifications/manuals/interface
reports/management plans etc
 Preparation of technical documentation
of SAT and functional tests for
commissioning program
 Coordinating with client and resolving
Project related issues
 Resource planning and control
 Leading site supervision ensuring quality,
providing advanced technical solutions.
 Responsible of cost forecasting,
estimation and projects’ planning and
scheduling
 Preparing project initiation
documentation.
 Maintaining and completing project
key performance indicators.
 Writing detailed and/or summarized
project progress’ reports.
 Identifying, costing and processing any
contract variations
 Tracking activities against the
detailed project plans. Updating project
plans to include agreed changes.
 Approving Work methodology Statement
and project schedule
 Interface Management and resolving
conflicts.
 Monitoring actual expenditure
figures against project budgets.
Organising and facilitating project steering
/ operating committees meetings.
 Ensuring HSE compliance

Mar 2014 – Mar Employer : Al-Mobty Damman &  Project : Construction project, working for
2015 Co Al Riad, single track duplication and speed increase

4
Period Employer & position. Country Summary of activities performed relevant to the
Contact info. for Assignment
references
(1 Year) Position : PROJECT Saudi 200 km / h. “Doubling main line 2”, Al Hofuf –
MANAGER Arabia Al Kharj, 214 Km, SAR 391M,
 Client
Contact info. for  Write project full name and emphasize 2*25
references kv, where applicable)
 Technology :
 Project Cost (USD):
 Client : SRO. (Write full name)
 Team size supervised :

 Preparing project Initial documentation.


 Responsible for project planning, monitoring
and scheduling.

 Maintaining and completing project key


performance indicators.
 Identifying, costing and processing any
contract variations.
 Monitoring actual expenditure figures against
project budgets.
 Managed the project team including any
subcontractor and providers.
 Undertaking all monthly projects financial cost
reporting.
 Escalating issues and areas of concern to
senior managers.
 Generating work packages and work
instructions.
Mar 2013 – Mar Employer : Obermeyer Xinhua, Project : Railway electrification supervision project,
2014 Planner China working to ensure quality, providing advanced
technical solutions. Changsha-Kunming HS project, Lot
(1 Year) Position : Supervision II, 98 Km.
Team Leader Write project full name and emphasize 2*25 kv, where
applicable)
Contact info. for Technology :
references Project Cost (USD):

Client: Chinese Railway Ministry


Team size supervised :

Managed the project team including subcontractor and


providers. Ensuring projects and programmers are
executed using client standards & processes. Reviewed
and approved all supervision project documentation.
Resolution of any problems and issues that arose.
Preparing status reports to use them for effective
communication with stakeholders. Escalating issues

5
Period Employer & position. Country Summary of activities performed relevant to the
Contact info. for Assignment
references
and areas of concern to senior managers. Generating
Work Packages and Work Instructions.

Mar 2012- Mar Employer : PÖYRY Linfen, Project 1 : Railway electrification supervision project, I
2013 Engineering China was working to ensure quality and providing advanced
technical solutions. Da-Xi HS PDL project, Lot II, 207 Km.
(1 Year) Position : Supervision Write project full name and emphasize 2*25 kv, where
Team Leader applicable)
Technology :
Contact info. for Project Cost (USD):
references
Client: Chinese Railway Ministry
Team size supervised :

 Providing strategic oversight and direction


to the onsite technical multidisciplinary
staff
 Provide technical expertise for review and
clarifications of technical specification
documents (descriptions / diagrams) to
the specifications for the development of
project / design for the electric traction
and railway electrification
 Provide expertise and project
management for the technical fields of
Catenary, Power Supply, Distribution,
Metering, Lighting, Ventilation,
Emergency, SCADA, for design and works
 also explain where scope included design
reviews and approval of contractor’s
design/technical
reports/specifications/manuals/interface
reports/management plans etc
 Preparation of technical documentation
of SAT and functional tests for
commissioning program

Responsible of cost forecasting, estimating and


planning projects. Responsible of ensuring the best
value is obtained for the project, including supplier
base and usage of internal and external resources.
Writing detailed and/or summarized project progress
reports.Tracking activities against the detailed project
plans. Managed the project team including any

6
Period Employer & position. Country Summary of activities performed relevant to the
Contact info. for Assignment
references
subcontractor and providers. Reviewed and approved
all supervision project documentation

Jan 2011- Mar Employer : COALVI Zaragoza, Project : Guaranteeing the continuity and the yield of
2012 (ALDESA Group) Spain department, into the commercial line of the company
with very positive results. Controlling the design,
(1 Year 2 Position : Railway implementation and economic monitoring every
Months) Electrification project
Department Director (Please highlight if 2*25kv projects included)

Contact info. for Technology :


references Appox no. of projects and Project
Cost handles(USD):
Client : Chinese Railway Ministry
Team size supervised :

Conception, preparation, lead development and


implementation of reorganization, optimization,
improvement of the management
Economic management, commercial catchment and
clients “customer service”. General budgeting, costs
forecasting and tracking and tender packages. Get
commercial line with quality agreed
July 2008- Jan Employer : GPO Madrid, Project : Madrid-Chamartin Station to T-4 Airport
2011 Engineering Spain (530M€), versatile dual track, Three-rail system,
Client: Spanish Development Ministry, (with
(2 Year 6 Position : Risk Advisor satisfaction client letter from Spanish Minister).
Months) & Senior Transportes Metropolitanos de Barcelona (Gisa), Línea
Consultant/Design -9 metro de Barcelona, Viaduct Stretch Alicante Tram
Manager ? (Workshop & líne).Extremadura High Speed stretch.
Asturias High Speed.
Contact info. for
references Write project full name and emphasize 2*25 kv, where
applicable)
Technology :
Project Cost (USD):

Client:
Team size supervised :

Working as a design manager, supervising projects and


technology development of catenary projects. I headed
the TA team, and was a consultant of Spanish
Development Ministry.

7
Period Employer & position. Country Summary of activities performed relevant to the
Contact info. for Assignment
references
To drive the design and implementation. Keep
satisfactory relationship with the client. Costs planning
& tender packages. Contribute with 27 years of
experience to the catenary design
Dec 2004 – July Employer : Alstom Madrid, Project : Power traction 1x25, 2x25, Barcelona. €137,3
2008 Transport Spain M€. Client, TMB Barcelona. Madrid, €207,4M€, Client
Adif HS. Barcelona. €111,5M€ in Suburban. Client,
(3 Year 7 Position : Railway ADIF. Barcelona. €263,2M€ in Suburban. Client, FGC.
Months) Electrification Project Write project full name and emphasize 2*25 kv, where
Manager, Projects applicable)
Supervisor Technology :
Project Cost (USD):

Contact info. for Client:


references Team size supervised :

 Management initiatives and solutions


applied towards modernization activities
 Conception, préparation, lead
development and implémentation of
reorganization, optimization,
improvement of the management

Working monitoring, implementing, designing, and


supervising traction power projects. I joined Alstom
Transport where I worked with technologies and
solutions for high speed, tram and suburban
Economic supervision, Technical Supervision & Design
approval. Managed the project team including any
subcontractor and providers. Client meetings tracing
&Traceability projects approval. Contribute with my 23
years of experience to projects’ enhancement.
Construction methods monitoring

 Provide advice and expertise to client for


electrification project to ensure that the
design, works, installation, test,
commissioning of OCS, Power Supply and
SCADA systems is carried out completed
operational in parameters.
 Provide technical and contractual
management expertise, including
supervision, and reviewing design and

8
Period Employer & position. Country Summary of activities performed relevant to the
Contact info. for Assignment
references
consulting in site, for the Power Supply /
SCADA / Catenary
 Approving programs and methods of
work, ensuring the conditions for the
works without disrupting railway traffic
 The responsibility for checking and
approval of all equipment materials
proposed by the contractor,
responsibilities for the acceptance tests
FAT, SAT

July 1985 – Dec Employer : ADIF, Burgos, Design approbation. Managed the project team as
2004 Maintenance & Spain subcontractor & providers. Contractors meetings
Infrastructure tracing & traceability approval. Construction methods
(19 Year 5 monitoring.
Months) Position : Railway Locations: 1988–2004 Burgos Headquarters 6ª Zone,
Electrification Project traction power operation. 1986–1988 Bilbao.
Engineer & Projects Headquarters 6ª Zone, traction power operation.
supervisor. Economic & 1985–1986 Territorial Technical, Lerida. Headquarters
technical supervision. 5ª Zone, traction power operation.

Contact info. for (Elaborate roles performed)


references Also, mention nos. And total length of 2 * 25kv
electrification projects handled

 Ensuring the unimpeded traffic flow and


safety on more ……. km of electrified
railway lines with ….. electric traction
substations
 Elaboration of maintenance documents
and operation manuals for OCS, TSS, SP,
SCADA
 Technical coordination of the
electrification works for operation and
maintenance / emergency remediations
to the national railway electric system
(catenary, substation power supply,
power grid, lighting, signalling, telecom,
metering, SCADA).

9
Period Employer & position. Country Summary of activities performed relevant to the
Contact info. for Assignment
references
 Elaboration of detailed program of execution of
the sequencing / determinant phases /
verification during works/ testing for
implementation of the projects in time and
costs expected
 Evaluation and reporting quantity and quality
of the performed all activities on site, to the
Project Manager
 Implementing FAT / SAT (Review FAT / SAT
Proposals, prepare and carry out FAT / SAT,
prepare FAT / SAT documentation)
 Preparing inspection meetings, reports,
forecasts and resource planning
 Checking, review, preparation and approval the
method statements and materials
 Conducting overall interfacing, quantity,
quality safety management
 Coordination of the tests and commissioning of
new railway electrification projects OCS,
traction substations, sectioning posts, SCADA,
metering systems on the Romanian Rail
Infrastructure
 Verification and approval of the technical
specifications for the electrical traction system
 Review of basic design and of detail design for
upgrading works on railway electrical network
 Verification and approval of all equipment
proposed by the Contractor and responsible
for the FAT,SAT and functional tests

Language Skills (indicate only languages in which you can work):


Languages Read Write Speak

English   

Spanish   

10
Languages Read Write Speak

Any other   

Expert’s contact information : Email : jagalstom@hotma il.com Phone: +593 992530310


Certification:
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my
qualifications, and my experience, and I am available to undertake the assignment in case of an award. I
understand that any misstatement or misrepresentation described herein may lead to my disqualification or
dismissal by the Client, and/or sanctions by the Bank.

Name of Expert: Jose Antonio García Fernández Signature Date: 01-04-2019

Name of authorized Signature Date


Representative of the Consultant
(The same who signs the Proposal)

Electronic signature of the expert is also permitted provided it has been used with the permission of
concerned experts and his services is available for the project.

11

S-ar putea să vă placă și