Sunteți pe pagina 1din 29

WISMA GLOBAL GLOBE

NO. 341 B&C, LORONG SARAWAK


TAMAN MELAWATI URBAN 1
53100 KUALA LUMPUR

M&E AND ARCHITECTURAL COORDINATION


Planning & Design
When There Is No M&E Coordination At Design Stage …

Hacking Caused Rectification Works


Items to consider (M&E) :

•M&E riser openings


•M&E services openings at wall, beam & slab
•Under floor trunking
•Service & Bomba Lift
•Lift core dimensioning, recess & opening
•Earthing system (lightning arrestor)
•Power point & switches positioning
•Air-cond ducting & piping
Items to consider (Architecture) :

•Headroom clearance
•Column positioning & orientation
•Arch features i.e. sill, cornice & fa çade
•Internal wall type & arrangement
•RWDP locations
•Wall & slab finishes
•Water Tank & Lift Motor Room detail & position
•Staircase types & detail
•Door & window frames detail for PC Wall
IBS Shopdrawing – Kelas F
LKIM - IBU PEJABAT
BUILDING SECTION
headroom clearance..
from architectural drawing…
to IBS shopdrawing …
aircond ducting from M&E
consultant …
coordinate & incor porate to IBS
shopdrawing ….
lift supplier’s drawing …
lift supplier’s drawing …
coordinate & incor porate to IBS
shopdrawing ….
M&E services d rawing …
M&E services d rawing …
M&E services d rawing …
M&E services d rawing …
precast wall shodra wing …
Columnless & beamless, spacious
Typical M&E Shop Drawing
Typical M&E Shop Drawing
Typical M&E Shop Drawing
Typical M&E Shop Drawing
Typical M&E Shop Drawing
Many Thanks
‘Simple the best’

S-ar putea să vă placă și