Erosion is a process of detaching soil particles from the land surface of one place and their transportation
and deposition to another place.
Three Processes of Erosion :
1. Detachment
Process depends upon type of soil, OM, moisture, nature of detaching agents (energy).
2. Transportation
Process depends upon size, density and shape of detached materials and velocity of the
transporting agent.
3. Deposition
Soil that is eroded from the original location is always deposited somewhere else. This may be
close to its place of origin position, it may be the longest distance down to the sea or at any point
between the place of origin to the sea.
Process depends upon soil particles and velocity of the agent.
Example: -- Coarse sand particles in eroded soil move the shortest distance and deposit first.
-- Fine sand and silt deposit next as run-off water slows down.
-- Some very fine silts settle out only in standing water.
-- Very fine clay and colloidal humus will not settle out even in standing water but stay
suspended in the water indefinitely
Geological ( Natural/ normal ) erosion are caused by : action of water, geology, wind,
temperature, gravity, glaciers, earth quakes.
Examples are : Naturally wearing away of hills and mountains: sculptured hills/
mountains, canyons/gorge , stream channels, deltas etc.
Man-made ( Accelerated )
Agents responsible for Soil Erosion are : Water, Wind and Gavity
Main types
1. Rain Drop / Splash Erosion. Rain drops falling into ground cause splash, detach, carry water
soil particles with small film of water into air in horizontal/vertical directions. The splash
soil particles may move as much as 2 ft. into the air and simultaneously more horizontally as
much as 5 ft on level surface. On level surface, the splashed soil particles scatter all over the
land surface. The smashed up soil particles disperse and cause surface sealing and reduces
infiltration capacity of land surface. Besides, the impact of kinetic energy of raindrops on
land surface compacts the soil and further help reduce infiltration capacity of soil. These
activities of raindrops increase the runoff, which starts moving down to the slope due to
gravitational force causing surface erosion.
The bigger the size of rain drops, the greater the kinetic energy and greater will be the rain
drop erosion. Direction and strength of wind velocity deflect the rain drops and reduces their
kinetic energy and there by reduces rain drop erosion.
(Figure : Splash of soil particles by raindrop erosion on a level and sloping surface)
2. Sheet Erosion ( Inter-rill erosion). When the rate of rainfall exceeds the rate of infiltration of
water into the soil, water starts to flow over sloping surface carrying detached particles in a
form of thin sheet or layer. They carry organic matter and fertile top soil. Such a removal of
more or less uniform thin layer or sheet of soil from a given area of land surface by the
action of rain drop is called sheet erosion or inter-rill erosion. The appearance of light color
soil on the land surface, after the removal of thin layer of dark color soil rich in organic
matter, is the sign of sheet erosion after rain fall events. The sheet erosion cause loss of
organic matter, expose light color sub-soil and eventually cause loss in productivity of
surface soil.
The sheet erosion occurs in smooth and uniform sloping surface and it removes only the top
layer of soil. It is a thin surface flow rather than runoff. Sheet erosion is a function of depth
and velocity of run-off for a given size, shape and aggregates of soil particles.
Sheet erosion is better termed as "inter-rill" erosion which means detached soil particles by
raindrop are moved and transported by thin surface flow of water, the capacity of which to
sheet erosion is increased by raindrop impact turbulence.
3. Rill Erosion. As discussed earlier, sheet erosion occurs mainly on the smooth and uniform
sloping land. When the land surface is irregular, the irregularity of land surface force the
flowing water to flow through a certain well defined direction, which then form small
channels called rills. So rill erosion is a removal of soil by water from small but well defined
channel. The size of rills vary from minute channels to a size that is easily observed. Rills
can easily be broken by tilling operations. Detachment and transportation of rill erosion are
always greater than sheet erosion. In rill erosion, the detachment of soil particles are from
energy of flowing water and not by the raindrop impact as in the case of sheet erosion.
Detachment of soil particles by flowing water in rill erosion (D) varies with square of
velocity of flowing water ( V2 )and ability of flowing water to transport soil particles (T)
varies with fifth power to the velocity of flowing water (V5). If continues, can extend up to
sub-soil.
D ∞ V 2 and T ∞V 5
4. Gully Erosion (Channel erosion). Gully erosion is an advanced form of rill erosion. It is a
channel erosion that cuts so deeply into the soil that the ground cannot be smoothed out by
ordinary operations. It often follows sheet and rill erosion. If rill erosion is unchecked and
allow water to move continuously in the channel developed by rill, then gully erosion
occurs. Gully erosion can be of V- shaped, if the soil strata at the bottom of gully is strong
and gully slopes are weak to erosion and U-shaped gullies are formed, if the soil strata at the
slopes of gully are strong and bottom are weak to erosion. Rate and extent of gully erosion is
related with amount and velocity of run-off water.
Dimension of gully
5. Stream bank Erosion: This is erosion caused by scoring and cutting of river bank due to
flooding of river.
-- Wave erosion
-- Rock erosion
-- Waterfall erosion
-- Tunnel erosion
-- Pothole erosion
-- Snow slide
Agents active in water erosion are : Rainfall intensity and pattern, soil structure and soil erodibility, type
and density of vegetation, slope factor, slope length factor, slope gradient factor, cropping management
factor and erosion control practice factor
1. Vegetation : vegetation plays important roles in water erosion. It has great importance in
controlling erosion because of the following reasons :
i) Vegetation intercepts raindrop reduce its energy and impact on land surface.
Raindrops that could have reached in the soil would be quickly taken by leaf
litter. Lands without vegetation will be vulnerable to raindrop, sheet and gully
erosions.
ii) Vegetation improves the soil structures by adding organic matter into the soil.
High organic matter content soil will be more pores and, which in turn helps
increase the infiltration and water holding capacity of soil. Further, the humus
layer itself acts as a sponges and absorbs moisture and allows it to enter into the
soil. Soil having low organic matter and humus layer are susceptible to erosions
because of increased runoff.
iii) In the vegetative areas, the root network, the channels of root decay, animal
burrows help dissipated runoff water.
iv) The root systems below the soil surface binds and aggregates the soil through
the mechanical actions and prevent from erosion and landslide.
v) High surface friction due to leaf litter and increased roughness of the ground in
vegetative land tends to spread out the runoff laterally and thus dissipates its
energy
2. Soil : Soil particles and their sizes are important factors for soil erosion. The detachability
and transportability of soil in the erosion process increase or decrease based on kind and
size of soil particles. In fact, detachability of flowing water or runoff decrease with
increase of size of soil particles and transportability of flowing water or runoff increases
with decreases of soil particle size. For example, the clay particles difficult to detach than
sand but easier to transport. Soil with large stable particles such as sand grains or iron
cemented soil particles are difficult to detached and transported, which seldom erode.
Infiltration capacity of soil play important role in soil erosion. Infiltration which is
indirectly affected by permeability of different soil horizon is factor governing runoff and
then to erosion. Soil erosion by water occurs when there is runoff or overland flow. When
rainfall intensity exceeds the infiltration capacity of soil then runoff or overland flow
occurs, which causes erosion. If the infiltration capacity of soil is higher than the intensity
of rainfall, then the runoff or overland flow will be lower and less erosion occurs.
3. Climate : In climate, the rainfall and teh temperature play important role in erosion.
There is a direct relationship between the amount of rainfall and erosion. Rainfall
intensity influences both the rate and volume of runoff and then to scale of erosion.
Temperature affects climatic type, which governs the types of crop grown and the amount
of ground cover that exists. Temperature is important in producing desired level of
ground cover to protect soil from erosion. In highlands, maintenance of desired level of
ground cover is difficult because of low temperature and short growing season of plants.
In such areas, the intense rain can cause severe erosion. Similarly, the soils of the arid
regions are low in organic matter because warm temperature have resulted in more rapid
decomposition of organic matter. This lower organic matter content in soil makes the soil
more susceptible to erosion during intense rains.
Slopes facing south gets more sun directly than the slopes of other aspects. Because of
high radiation and temperature in southern aspects, soils of southern aspects are lower in
organic matter than those facing in northern slopes. Because of the low organic matter
content in soil and sparse vegetation cover in southern aspects, the southern aspects are
more susceptible to erosion than other aspects.
4. Physiographic : Slope steepness is one of the important factors in soil erosion. Greater
the slope more is the erosion. Slope steepness influences erosion in several ways. The
increased velocity of runoff water in steep slopes allows more soil to be detached and
transported, where surface detention of water is low and breaking of rain drop energy
cannot form in steep slopes. Therefore, steep slopes are susceptible to erosion.
The slope length is also an important factor affecting soil erosion. If the slope is longer, a
large quantity of rain will fall on it and if the rate of rainfall exceeds the rate of
infiltration, there will be large accumulation of water at the base. Therefore longer the
slope length more is the erosion. There is a relationship between soil loss ( erosion ) and
slope length, which states that erosion ( E ) is approximately equal to the square root of
the slope length (L1/2 ) . Soil loss varies with square root of slope length.
1. Water-flow
2. Lubrication of slope layers
3. Saturation of soil
4. Weathering and dissolving of minerals
1. Water-flow = Physical force of water-flow (run-off) causes flow-erosion ( sheet erosion, rill erosion,
gully erosion ). Flow-erosion is proportional to water depth ( channel ) and slope gradient and inversely
proportional to size or strength of the eroded materials. Flow erosion starts when flow energy surpasses
slope resistance and increase with increasing run-off. The bigger the water flow, the bigger the flow-
erosion.
2.Water- lubrication = It causes slide- erosion on slopes. Water seepage and infiltration reduces friction
between soil and rock or between two rocks layers. The bigger the seepage/ infiltration, the more likely
the occurrence of slides. Seepage/ infiltration of rail increases more with duration than intensity. Heavy
rains of long duration produce more slides than short rain of very high intensity. Yield of underground
sources like springs also increases more with high duration of rain than intensity also helps increasing
slides. Heavy permeable strata on top almost impermeable ones provide for maximum lubrication ones
provide for maximum lubrication of the slide plane and are very susceptible to sliding.
3.Water- saturation = Water- saturation of slopes of deep soil leads to the reduction of angle of repose and
liquification of the soil and to slope failure. Highly permeable layers form "pressure tanks" on top of soil
layers of little permeability. The soil layers near the surface of little permeability gradually saturates and
loose strength while the weight of the pressure tanks increases. When the soil layers near the little
permeability strata` becomes weak to support the increasing weight of permeable layers slope failure
occurs.
4.Weathering = It converts rock into gravel or soil, reduces slope strength and supports erosion of any
form. Dissolving of easily soluble minerals leads to the formation of under-ground cavities and later by
their breaking in leads to erosion
A = R K LS C P where as,
A = Soil loss per unit area, it is an estimate of soil loss from sheet and rill erosion from rain fall events. It
does not include the estimation from stream bank erosion, landslides, gully erosion, snowmelt erosion.
R = rainfall factor, K = soil erodibility factor, L = slope length factor, S = slope gradient factor, C =
cropping management factor, P = erosion control practice factor.
R (rainfall factor) = This is determined from the product of the kinetic energy of an individual storm (E)
times the maximum 30-minute intensity for the storm (I), that is EI. Summation of all storms in a year is
the annual value of the R factor. E is calculated according to:
E = 916 + 331 (log I) foot-tons/acre/inch of rain and I in inches/hour, this in metric unit is E = 210.1 + 89(
log I) joules/ sq.m/cm of rain and I in cm./hour.
Erodibility factor is the susceptibility of soil to erosion. So it is a function of soil containing percent of
silt, fine sand, organic matter, soil structure, soil permeability.
Slope Length Factor ( L ) = It refers to overland flow or run-off from where it originates to and where
deposition begins. Maximum slope lengths are seldom longer than 600ft. or shorter than 15 to 20 ft.
However, it requires judgments and on-site inspection.
L = ( ^ / 22.1 ) m ( meter )
Slope gradient factor (S) = It is a ratio of soil loss from a given slope steepness to that from a 9% slope
under the same condition . It will be evaluated as: ( 0.43 + 0.30 s + 0.043 s 2 ) / soil loss from 9 % slope
under the same condition, where as s = slope gradient (%) .
Cropping Management Factor (C) = It is a ratio of soil loss from the condition of interest to that from
tilled continuous fallow . This is an integration of several factors that affects erosion, vegetation ( plant
canopy), binding effects of plants roots, soil surface, cropping patterns, plant residue, land use/ land
management etc. C factor describes the total effects of vegetation, plant residue, soil surface and land
management on soil erosion The value of C factor is not constant over the year. Therefore, the value of C
factor need to be determined experimentally.
Erosion Control Practice Factor (P) = It is a ratio of the soil loss with the control measures ( Ex :
contouring, strip cropping, terracing, etc. ) to that with farming up and down the slope. The value for P
are usually based on judgment and experience obtained from non-crop situation.
Modified equation is :
Wind acts on the soil surface the same way as flowing water. Gusty winds are able to dislodge small soil
particles, lift them upward and carry them away.
Wind can move larger soil particles by making them jump along the ground. The jumping particles also
apply energy to the soil surface each time they hit the ground and dislodge other particles so that they too
can be moved by the wind. This process is called saltation.
The largest soil particles that can be moved by wind are about 1 mm. Very fine clay and silt particles (
less than 0.02 mm ) are lifted into the air and carried away as wind blown dust. Sand dunes are severe
stage of wind erosion.
The erosive power of wind, as that of water, increases exponentially with velocity, but is not affected by
gravity. The erosive power of wind in wet soil condition and vegetation covered soil is slow.
Slope inclination is not a factor in wind erosion, except where slopping terrain may form barriers to wind.
However, the length of unobstructed terrain over which the wind flows is important in allowing the wind
to gain momentum and increase erosive power. Winds with velocity less than about 12 to 19 km/ hr. at
one meter above the ground not quite often dislodge and put into motion sand size particles.
Potential average annual soil loss (tons / acre / year) is a function of
I = soil erodibility
L = field length
V = vegetative cover
Symbolically, the average annual soil loss due to wind, E =ƒ( I K C L V )tons/acre/yr.
Effluxion : Soil particles of intermediate size carried off by the bouncing action of wind.
Detrusion : Wearing away of rock and land projection by soil particles carried in suspension, this is a
result of efflation .
Abrasion : Wearing away of rock and land projection by larger soil particles moving as bouncing, rolling
and sliding which is the result of extrusion and effluxsion
Retaining wall : These are structures to protect the gully and torrent banks against lateral
erosion and undercutting. Concrete ( porous/ non- porous), gabion and loose stones are used
for the construction. If loose stones are to be constructed large-sized stones must be used.
Checkdam : Most important device to control torrent and gully erosions is the check dam.
This is most common and effective mechanical means of stabilizing active gully
erosion.Structures built across stream channels or gullies to stop the lateral and horizontal
gully/ channel erosion and to stabilize and stabilizing them by retaining bed load and other
debris.
Its purpose is to reduce the gradient and break the velocity of flow/ runoff.
Check dam guide the water flow/ runoff from a higher point to lower point without causing
erosion at the gully bed and banks. In general, there are two types of check dam.
1. Non- porous with no weep holes
2. Porous dams which release part of the water flow to reduce hydro-static
pressure
Concrete (porous/ non-porous), gabion, loose stone, brush wood or wooden check dams
are used depending upon site condition, objectives of gully control, availability of
construction materials and cost effectiveness.
a) to raise the bed level up to a height where safe support is provided for the slopes
b) to reduce the gradient of the channel / increase resistance of the channel bed
c) to reduce the water depth by widening the gully/ channel bed
Spur and Embankment: These mechanical measures are used to control torrent/stream/river bank
erosions or bank cutting by diverting flowing water
1. Concrete/ Masonry check dam : This is built, where higher structures are required. weep holes
are provided to release hydrostatic pressure.
2. Gabion check dam : This is constructed from gabion boxes with appopriate wire mesh.
Usually 10 and 8 gauge GI wire of mesh size 10 by 10 cm. or 15 by 15 cm. size of the stone
which is used in gabion should be large enough than size of the mesh. The maximum hieght of
the gabion check dam should not be more than 5 m. for mountain gullies and torrents.
3. Loose Stone check dam : Big loose stones are used in this type of check dam. The quality,
shape, size of the stones used affect the success of the check dam.
4. Brushwood Check dam : Logs, branches bamboos are used in this type of check dam. They are
piled across the cross-section of gullies. Series of such structures can be installed to plough the
gully erosion.
i ) General formula :
V= velocity of flowing water ( m/sec), which can be obtained from Manning,s formula
Manning,s formula = V = ( R 2/3 *S 1/2)/n, where as V = velocity of flow
R = Hydraulic radius in meters = Area/wetted perimeter (surface in contact with water)
S = Water surface slope = ratio of vertical drop to the length of the stream
R = roughness coefficient ( obtain from table for major rivers, floodplain, excavated channel at
different land condition)
ii ) Rational formula :
C = catchments characteristics constant which varies from 0.4 to 0.95 depending upon types of
land
I = intensity of rainfall (mm/hr) for the designed return period and for a duration equal to the time
of concentration of the watershed.
The time of concentration (Tc) is defined as the longest time taken for water to travel by overland
flow from any point in the watershed. It is a storm duration that produce max. rate of runoff or the
storm duration which will correspond with the max rate of runoff to the outlet. The time of
concentration (Tc) can be calculated by Kirpich method, which is :
S = watershed gradient or the difference in elevation between the outlet and the most remote point
divided by the length L (m)
After the calculation of Q max , the spillway or notch of the check dam need to be designed, using the
following formula :
i. Spillway formula :
Here, since the gully width or torrent width is known, the length of spillway need to be assumed. Then
substituting the known value in the spillway formula, the height of checkdam can be determined. After
calculating the actual spillway height, certain free board usually 5 to 30 cm. need to be added in the actual
height of checkdam.
Example : ( Numerical )
Calculate the time of concentration, intensity of rainfall and Runoff discharge for a return period of 20
years.
Here, Time of Concentration ( T ) = 0.0195 L 0. 7 7 × S -0. 385 = X ( m)
Intensity of Rainfall for a return period of 20 years,
Therefore, I x = a/ ( b + T )
= 2850 / (10 + X ) mm/hr
= Y mm/hr
0.03 ×Y × 2.1
_______________
Q max = cumecs ( m3/sec )
360
The values of intensity constants "a" and "b" are either given or supplied in a table :
1 year 830 5
2 year 1400 7
5 years 2100 9
10 years 2590 10
20 years 2850 10
After calculating the Qmax, calculate the design of spillway of a check dam as follows :
Qmax = CLH 3/2,
Here, Qmax is calculated from the given example above, C is given, assume L and caculate H. After the
calculation of H, place the value in the equation. Manupulate the value of L and H until the Qmax
(calculated) comes to equal or more than given Qmax ( discharge) to pass through the spillway.
Intensity of Rainfall can also be calculated from Return Period conversion factor as follows :
Years Factor
2 0.90
Rainfall ( max ) in 4 yrs = 247 mm
5 0.95 Rainfall ( max ) in a return period of 25
years ( I ) = 247 × 1.25/ 0.93 = 13.8 mm/hr.
= 247 × Return period constant factor /
Return period conversion factor in 4years 10
1.00
Placing the value of intensity of rainfall( I),
25 1.25 in above mentioned formula, we can calculate Q max.
50 1.50
Raifall Data :
Years Rainfall max. in 24 hrs (mm).
________________________________________
1972 168
1973 176
1974 247
i ) Spacing method :
In most of the gully slopes, the spacing of check dam is arranged in such a way that the top of the lower
check dam should be at level with the bottom of the upper check dam. By this spacing method, many
check dams are required in steep gully slopes. Therefore, a compensation gradient is required to minimize
the number of check dams and then to the cost involved. Compensation gradient is the slope between the
top of the lower check dam and the bottom of the upper one. Compensation gradient of about 3 to 5
percent is provided between two check dams.
Check dam
Compensation gradient
Check dam
Compensation gradient
Check dam
Gully bed
Number of check dams = A ÷ H or A/H. If compensation gradient is used, then the number of check
dams = (A-B) ÷ H or ( A-B)/H, where as
A= the total vertical distance between the first and the last check dam in that particular portion of the
gully or torrent.
B = the total vertical distance calculated according to compensation gradient for that particular portion of
the gully or torrent.
H = average height of the check dams.
d ) Base width of check dam : The base width of the check dam can be calculated by using following
formula:
i ) Kronfellner - Kraus formula : Here the base width of the check dam is calculated if the check dam has
a height of less than 8m. The base width is :
D1 = 0.35 ( H + U ), where as D1 = base width (m).
H = difference between the crest of the spillway and the base of the check dam (m).
U = depth of the spillway (m).
If the height of the check dam is between 2 to 6m, then the Hoffmann formula may be used to
calculate the base width.
ii ) Hoffmann formula :
D1 = 0. 462 H, where as D1 = base width (m).
H = difference between the crest of the spillway and the base of the check dam (m).
e) Top width of the check dam ( Crest thickness) : Following empirical formula can be used to calculate the top
width of the check dam or crest thickness, if the height of a check dam is between 6m to 7m.
D2 = 1 + H/10, where as D2 = top width or crest thickness of the check dam (m)
H = height of the check dam including foundation (difference between the water level upstream and water
level downstream of the check dam (m).
f) Scouring depth: The depth of foundation of the check dam must be deeper than the bottom of the
scouring zone below the check dam. Therefore, it is necessary to find the scouring depth before deciding
the foundation of the check dam. To calculate the scouring depth of the check dam, following formula
can be used:
Schocklitsch's formula :
Check dam has many elements and various forces are acting on it .
A
B R
W
Z= 2/3 of B
P = lateral thrust
μ = coefficient of friction ( Table.........)
W= weight of check dam
w = specific weight of soil ( Table.........)
H = height of check dam
Y = specific weight of check dam material
A = top width of spillway section
B = bottom width of check dam
Ø = angle of internal friction of soil ( Table........)
Z = distance of intersection point of resultant of P and WU
The check dam may not slide forward if the lateral pressure (P) is less than the product of weight of check
dam and coefficient of friction (W×U) , i.e P < W×U. The lateral thrust ( P ) can be calculated as follows:
W = Y{( A + B)/2 )} H
The resultant of P and WU should passed within 2/3 of the bottom widthor base of the foundation of
checkdam. That is
Z < or = 2/3 B, where as Z = distance of intersection point of resultant of P and WU, which can be
calculated as:
In order avoid crushing of a checkdam, the maximum compresive stress at the base of a checkdam should
be less than the allowable working stress for acheckdam. In this case the maximum compressive stress
Pmax. should be less than the allowable working stress
Pallowable or Pmax < Pallowable
Numericals :
1. Check the stability of a check dam against sliding and bearing pressure based on the following
information :
Here P > uW, so design is not safe. Increase the value of W by increasing size of the checkdam.
W = Y{( a + B)/2 )} H
Pallowable = 10 t/m2
= 2.6/3.5 (1 + 6e/B)
= 0.70 (1 + 6 *0.58/3.5) = 0.70 * 2.9 = 2.069
Here, P max < P allowable
2. calculate the depth of scour to be considered for the check dam having 5mt long spill way with the total
discharge of 6.25 m3/sec with 15 mm grain diameter with 2 m. water level difference above and below the
check dam
Solution :
Here, dm = grain diameter = 15mm,
h= 2m. = water level difference between the water level upstream and water level downstream of the
check dam
q = specific runoff, which is the runoff that passes through a section of 1m. of the spillway ( m /sec).
Therefore, q = 6.25/5 = 1.25 m3/sec
Apply Schocklitsch's formula :
4.75 × h 0.2 × q 0..57
S (d 90) = -----------------------
dm
4.75 × 2 0.2 × 1.25 0..57
= ------------------------
15
= 0.42 m
Therefore, the foundation of check dam should be > 0.42. We can add some more for the further safety (
20-30%)
3. Find the spacing of check dam provided the height of 1m. on the gully bed having 15 % slope in which
5 % compensation gradient is to be maintained.
Solution :
Given h = 1 m
slope = 15%
compensation gradient = 5 %
1 * 100
= ----------- = 10 m
15 – 5
4. Calculate the number of check dam in a 300 m. long sloping gully having the vertical distance between
the Ist and last check dam is 21 m. and 3% compensation gradient is to be mentioned after construction of
1.5 m height of check dams
Given :
Vertical distance between the two check dams = 21m
Length of gully = 300m
Height of check dam = 1.5m
Compensation graidient to be maintained = 3 %
Number of check dams = A ÷ H or A/H. If compensation gradient is used, then the number of check
dams = (A-B) ÷ H or (A-B)/H, where as
A= the total vertical distance between the first and the last check dam in that particular portion of the
gully or torrent.
B = the total vertical distance calculated according to compensation gradient for that particular portion
of the gully or torrent.
The compensation gradient has to be maintained as 3 % through out the 300 m long sloping terrace
therefore B = 300 * .03 = 9 m
H = average height of the checkdams.
Number of check dams = (A-B)/H=(21-9)/1.5=12/1.5 = 8
Other Numerical :
Given : L = 1.2 Km. ( max. length of flow )
A = 2.1 Km2 (Area of watershed)
S = 15 m ( watershed gradient or difference in elevation between the outlet and the most remote point
divided by L)
C = 0.03 ( catchments characteristics constants )
Calculate the time of concentration, intensity of rainfall and Runoff discharge for a return period of 20
years.
Here,
Time of Concentration (T) = 0.0195 L0. 7 7× S -0. 385 = X (m)
0.03 ×Y × 2.1
_______________
Q max = cumecs ( m3/sec )
360
The values of intensity constants "a" and "b" are either given or supplied in a table :
1 year 830 5
2 year 1400 7
5 years 2100 9
10 years 2590 10
20 years 2850 10
2.2.2 Terraces
Terracing : Terraces are the oldest structural conservation measure applied in sloping lands. They are
essentially level or nearly level strips running across the slope. These strips are supported by risers in
down hill sides and the whole system looks like a series of steps. Terracing is practiced in many
countries for thousand of years.
Objectives :
-- to reduce runoff and velocity of flowing water and thereby minimizing erosion from the land and
preventing heavy sedimentation to the streams and low land below.
-- to conserve soil moisture and soil fertility, thus increasing farm production.
-- to facilitate farming practices such as mechanization on steep slopes and there by increasing the
arable land.
-- to promote proper land use in hilly regions and to reclaim eroded slopes
There are several types of terraces with paticular objectives, functions, climate and crop conditions.
Commonly used terraces are :
a ) Level Bench Terraces: This is completely a level terraces i.e all points of the surface is at
the same height. The bench is surrounded by a dyke of about 20 cm. height to retain water
and a notch can be cut in the dyke to flow water in the next terrace or bench. Terraces to grow
paddy belongs to this type and also useful in low rainfall areas and highly permeable.
b) Outward Sloping Terraces : These terraces slope outwards. A drain is usually dug either
along the top line or at the toe of the riser to collect runoff. This type of terraces are useful in
semi-arid areas where rainfall intensity is not high. The amount of earthwork in this type is
less than for the level terrace. Here, runoff flows down the filled portion of riser of next
terrace so terraces are usually easily eroded.
a) Conservation Bench Terraces : Level contour benches are built at intervals on the
slopes to catch and hold runoff water from the land above. A terrace ridge is built on the
lower side of the bench to hold runoff water. This type of terraces are used in arid or semi-
arid countries.
d) Reverse Sloped Terraces: Here the terraces are built sloping inwardly towards the toe.
The runoff will first be collected at the toe of the bench then gradually drained to a protected
waterway. The riser will be kept free from over flowing water and is protected usually by
grass cover. This type of terrace is suitable in heavy rainfall regions and on soils with low
permeability.
Benefits of Terraces :
The design includes : Width, Vertical Interval ( V I ), Lengths and Grades, Riser and Reverse
Height, Net Area, Cross-section and Volume of Terraces
In designing the terraces, the Width of Terraces must first be decided.
Wb Cut
Area loss Fill
Wr(width of riser)
Wt
Width :
The width of terraces are determined by many factors : soil depth, slope, the crop, farming
methods, tools to be used and farmers choice and preference. The thumb rule is for manually
cultivated terraces, the range of terrace width is about 2mt. to 5mt and for tractor cultivation,
the range of terrace width is about 4mt. to 8mt. depending upon soil depth and degree of slope.
Vertical Interval :
This is a elevation difference between two succeeding terraces, which is determined by the
slope and desired width of the terraces. VI is important to determine since it gives the approx.
height of riser and basic information for calculating cross-section and volume of soil to be cut
and moved about.
V I = S x Wb / 100- S x U, where
Example : Terrace of 3mt. width to be built on average land slope of 20 % with riser slope of
1:1. Find the vertical interval
The length of a terrace is influenced by size, shape and degree of fragmentation of land and
permeability and erodibility of soil, the cross-section of terrace and outlets.
The length of terrace should not be very long in one direction as the velocity of flowing water
may cause surface erosion. A maximum of 100 mt. in one direction is considered effective.
The grade of terrace should vary from 0.1 % to 1% that is 1/10 to 1 mt. fall per 100 mt.
running length.
In the case of longer terrace = variable grades should be used e.i 0.25 % for the first part from the
top, 0.5% for the second part and 1 % for the last part towards the outlet
Lay-out :
Needs careful field observations of topography, slope, soil depth,texture erosion, presence of
rocks, vegetation, landuse, future cropping plan. After the careful observations of above
mentioned factors decisions should be taken on the proper type of terraces, their width and tools
to be used. The vertical interval, the height and width of riser can be obtained either using
above mentioned formula or or prepared specification table (attached ). Before staking out the
layout of terrace, it is necessary to decide the site and waterway system. Wind breaks if
necessary should also be located. All of these should be integrated into the terracing plan with
sketches.
Survey and stakeout the central line of the terraces. This central line stakes should be retained
as a guide for the non-cut and and non-fill line during construction. The area above this central
line is cut line and down is fill out area.
The second method is to survey and stake both the upper and bottom lines as determined by
width of the terrace. Make sure that the space staked out between two lines will give the width
of the terrace needed.
General Guidelines :
2.1.7.3 Stability/Protection :
1) New terraces should be protected at its riser, outlets and waterways. Should be carefully protected
for at least 2 years.
2) After construction, the riser should be shaped and planted with grasses. Sod forming or rhizome
types of grass prefered than tall or bunch types. Although some tall grass like Napier, Setaria can
be used but they need frequent cutting. and care. Carpet grass found very useful in protecting riser
3) Terrace outlets (point where the runoff leaves the terrace and goes into the waterways) needs to be
protected by sodding, bricks, stones
4) Keep the toe-drain open, and do not permit any accumulation of water in any part of the terrace
5) Allow all runoff to collect in the toe drain for safe disposal of water into protected waterway. Any
kind of obstruction in the toe drain should be taken out.
6) Ploughing should be done carefully not to destroy the toe drains and the reverse grades.
7) Do not allow runoff flow over the risers. If necessary dyke along the edge of bench should be
built.
8) Keep grasses growing well on the risers. Weeds and vines which kills grasses should be cleared.
Numerical :
1. A 15% hilly land is proposed for construction of bench terrace. Calculate the
following parameter of bench terrace using 2.5 m as vertical interval and 1:1 is batter
slope. Here calculate the following parameters :
a) Total width of the bench ( Wt)
b) Length/ha
c) Earth work
d) Area lost
Solution :
VI = (S x Wb) / (100 – S x U)
or (15 x Wb) / (100 – 15 x 1) = 2.5
Wb ( Width of bench) = 14.16
Wr ( Width of riser ) = Hr x U = 2.5 x 1 = 2.5 m
2. If the vertical interval of bench terrace is 1.5 m, land slope is 25% and riser slope is
0.50 Compute the width of the terrace
3. Calculate V.Iof terrace, if width of terrace =3m; land slope = 20%; riser slope=1:1
Solution : V.I = (S x Wb) / (100 – S x U)
= (20 x 3)/(100 – 20 x 1) = 0 .75m
2.2.3 : Waterways
Grass waterways : These are grass waterways in which a parabolic or slightly trapezoidal shaped
channel are made and planted with low height rhizome type perennial grass. Grass turfing at the
bottom and at the sides of the channel will be more advantageous in vegetative waterways. However,
it has some limitations such as it can not be used where the velocity of water flow is more than 2m /
sec, it is not safe in steep slopes of more than 10 degree, it needs drop structures if the length is
longer than 35m, it is not safe in the area where there is a continuous flow of water, it can't be used
until the grasses are well established at the canal course.
Stone-lined waterways: In this case, flat stones or stones of 15-20 cm diameter are pitched and
keyed at the bottom and on sides of the channel. This is used if the slopes are steep and volume of
runoff is large. In some cases, wire mesh filled with stones are also used.
Concrete waterways: A parabolic or V-shaped waterways can be costructed at the middle of channel
with grassed channel slopes in the sites with steep slope, frequent rainfall, seepage sites.
Stepped grass waterways : This is a parabolic grass waterway which is cut by number of steps or
drop structures to control the channel flow and to protect the riser and bottom of steps. This is
commonly used in steep slopes giving channel slope between 3 - 4 %.
Design of hydraulic channels is applied in selecting a structure which will pass the design flow through
the cannels without excessive headwater elevation. In designing the hydraulic channels, It is necessary to
determine the peak discharge for the area to be drained. The peak discharge or maximum rate of runoff
can be calculated by using Rational Formula i.e
After determination of peak discharge, allowable velocity of flow for vegetative or non-vegetative
channels are fixed using the figures given in the table:
Table: Maximum allowable velocities for non-vegetative channels having different channel materials
After fixing the allowable velocity of flow, then calculate the cross-section area of hydraulic channel to
carry out the calculated maximum discharge or runoff by using the formula :
Qmax = a × V or a = Qmax / V, where as
After calculating the cross-section area of channel using above mentioned formula, then calculate
manually the cross-section area of channel by adjusting dimensions like debth and width of the channel in
order to make the manually calculated cross-section area of the channel equals to the cross-section area as
calculated from the formula. In other words,
Cross-section area from formula (a = Qmax / V) = calculated cross-section area.
After determining the cross-section area or height and width of the channel, now calculate the gradient or
slope of the channel to be maintained. This can be evaluated by using Manning's Formula, which is :
V = ( R 2/3 × S 1/2 ) / n
or,
S = ( nV / R 2/3 ) 1/2, where as
R = hydraulic radius (m), which is cross-section area divided by wetted perimeter i.e
a / p and wetted perimeter ( p) is the length of line of inter section of the plane of the cross-section with
the wetted surface of the channel. In general, wetted perimeter can be considered as width of the channel.
If the hydraulic properties of the channel such as width, depth and slope are known, the Manning's
formula can be used to determine Qmax ( cumecs), which is
In the case of bank full discharge of channel, the hydraulic properties can be related with channel
discharge as :
b ∞ Qmax × b 1/ 2
d ∞ Qmax × b 1/ 3
s ∞ 1/ Qmax × b 1/ 6
The calculated runoff (Qmax ) should be more than or equal to given runoff ( Qmax ) to accept that
the design of waterway or channel is safe.
Storm water drains are waterways, drainage and watercourse in which the runoff occurs and
drains during the rainfall or storm . It is important to guide the storm water drain to certain safe
point in order protect the land from erosion. The purpose of designing storm water drains are :
The storm water drain can be managed by several means. The mostly used techniques are
constructing waterways or drainage or diversion ditches. These techniques can be used at places
depending upon availability of construction materials, purposes and structures that can be
constructed. Before selecting the techniques and designing the structures for the management of
storm water drain, it is necessary to know the hydrological elements of storm water such as quantity
of peak discharge, velocity of runoff, slope of land, volume of runoff, soil and vegetation conditions
and land-use. Waterways are classified into two : Vegetative(Grass) and Non-vegetative or structural
waterways.
Based on the site condition, objectives and availability of materials, the shapes of water ways can be
chosen. Normally, the shapes are:
-- Trapezoidal
-- Parabolic and
-- Triangular or V- shaped
Having calculated the Qmax , cross-section area , velocity of flow and surface slope
following the steps as described aboveve, the side slope, bottom width and the depth of the
channel can be calculated for different shapes of waterways.
l
d
Z
b = Bottom width
b = Bottom width
a = 2/3 Td
Wetted perimeter (P) = T + ( 8/3) × (d 2 / T)
Top width (T) = Top width
T= top width
b) Triangular or V-shaped cross-section : For triangular or V- shaped of the channel, the cross-
section area (a )
a=Z×d2
Wetted perimeter (P) = 2 d ×(l + Z 2)
Top width (T) = 2 d Z
T= top width
d
Downloaded From: www.singhranendra.com.np 37
Notes on Soil Conservation Engineering and Watershed Management BSc Third year first Semester
Numericals (Examples) :
A = b × d + Z d 2 = 2 × 1+ 2 × 1 2 = 4 m2
V = ( R 2/3 × S 1/2 ) / n, R = hydraulic radius and S = channel slope
R = Cross-section area of channel (A ) / wetted perimeter ( P)
P = b + 2 d ( 1+ Z 2 ) 1/2 = 2 + 2 ×1 ( 1 + 2 2 ) 1/2 = 6.47 m 2
Here, calculated Qmax > given Qmax , so design is safe and acceptable.
In this way, we can calculate the safety or acceptance or rejection of channel cross-section of
parabolic, triangular or V-shaped channels. If there is rejection,
we can adjust either breadth (b) or height (h) of the channel cross-section and bring it to the
acceptable level.
c) For triangular or v-shaped cross-section : top breadth ( width ), height (depth ), side
slope, canal gradient are provided.
2.2.4 Bunds
Bunds are structures constructed across the land slope to reduce the length of slope and velocity
of runoff in down hill side for agricultural operation. Bunds are generally preferred to construct
in the slope between 2 -10 % slope and soil depth ranging from shallow to medium.
Its main purpose are :
b) Cox’s Formula :
VI = ( X *S + Y) 0.3 where X = Rainfall factor, S= land slope in % and Y = infiltration and crop cover
factor. The value of X and Y can be received from the following table :
Bunds height depends on : Depth of water storing, highest flood level, free board, soil infiltration and
vertical interval
Water storage
d
Free Board
VI Water impound
Ht. of
bund
HI
a) Cross-section area of Bund=(base width + top width)* Ht/2
b) Bund height = (24 hr. Rainfall storage * VI/50)1/2
Numerical : Calculate the VI of contour bunds on a 4.5 % land slope. The rainfall is moderate with
average infiltration and good coverage of land with vegetation
Solution : a) Using Ramsar formula
V I = 0.3 ( S/3 + 2) where S = Land slope (%)
= 0.3 ( 4.5/3 + 2) = 1.05 m
Add 25% extra spacing because the ground cover is good
Therefore, VI = 1.05 + 0.26 = 1.31 m
b) Using Cox’s formula VI = ( X *S + Y) 0.3
= ( 0.6*4.5+2)0.3
= 1.41 m
3.1 Spurs :
Spurs are structures/ obstructions constructed in rever banks to divert water away from a specific location
(eroding river bank ). Spurs are used to deflect flow into a preferred path.
Spurs are constructed perpendicular to the river bank. Constructed in series of three or more from a
varieties of materials and requires toe protection ( apron) at their ends or noses to protect against scouring.
The purpose of these structures are to protect the river banks from the direct impact of the water flow and
to train the river by deflecting its flow. These structures are constructed into the river banks with some
extension across the river flow.
c) Deflector Spurs
d) Retarder Spurs
a) Deflector Spurs : Impermeable, which function by diverting the flow of water away from the
bank.
b) Retarder Spurs : Permeable, which function by retarding flow velocity at the bank and diverting
away from the bank.
Specific Types :
a) Bar spur
b) T- head spur
c) Sloping spur
d) Timber / bamboo crib spur
e) Round nose spur
f) Hockey spur
g) J- head spur
Main functions :
Spur Length : Projected length of spur should be perpendicular to the bank or flow direction.
Normally, length of spur should be within 20 % of the channel width for both
Spur Spacing : Normally 2 to 3 times the length of spurs. In fact, the spacing of spurs is a function of
spur length, spur angle to river bank, permeability and degree of curvature of the bed.
The spur angle or flow expansion angle is an angle at which flow expand towards the
down stream bank of spur .Spur angle or the flow expansion angle is a function of
spur permeability and the ratio of spur length to channel width. As permeability
increases, the flow expansion angle or spur angle increases, similarly as length of
spur increases the expansion angle or spur angle increases. The expansion angle for
impermeable spurs is constant i.e 17 o. Therefore the spacing of spurs can be
determined by,
S = L cot Ø, where as
S = spacing of spurs, L = length of aspur, and Ø = expansion or spur angle.
Spur Orientation: Spurs are normally placed at normal to the bank/ flow of water. Spur angle < 90
degree ( acute angle ) oriented towards upstream and > 90 degree oriented
towards downstream. Bank erosion is more severe if the spur is oriented in the
downstream. Spur orientation affects spur spacing, degree of flow control,
scouring depth at the nose of spur.
Spur Permeability : Deflector spurs can be used on sharp bends to divert water flow away from the
bank. It can cause erosion of stream bank at the spur root, if the height of spurs
are lower than the height of bank. Under sub-merged condition flow passes
over the height of the spurs generally perpendicular to the spurs. Retarder spurs
can be used where bends are mild and small reduction in velocity are required.
Spur Height : Height of Deflector spurs should not exceeded the height of river bank. If the flood
height is > or = bank height, deflector spur height should be equal to the bank height.
If the flood height is lower than the bank height, the height of deflector spurs should
be designed not to overtopping occur at bank. For deflectors, the crest profile should
slope downward away from the bank line, which will avoid the possibility of stream
bank erosion and overtopping of flood water.The crest profile of retarders is
generally level.
Design discharge:
Before designing a spur, it is necessary to calculate design discharge of flood. The design discharge
can be calculated using the following formula:
b and c are coefficient which can be fixed from the table as given below.
___________________________________________________________
Regions Coefficients
b c
_____________________________________________________________
Hydraulic depth is calculated by dividing average cross-srction area by average width of the river i.e
R = A / W, where W is average width of the river. The Manning's roughness coefficient should be
fixed as per the width of a river from the table as given below :
Flood plains
Excavated Channel
b. Earth, recently completed ----- 0.016 to 0.020
c. Earth with grass ----- 0.018 to 0.033
d. Rock, smooth ----- 0.025 to 0.040
e. Rock, jagged ----- 0.035 to 0.050
Surface Condition
a. Smooth and impervious surface ---------- 0.02
b. Smooth and bare surface ---------- 0.10
c. Cultivated row crops moderate rough surface --- 0.20
d. Pasture or average grassed surface ---------- 0.40
e. Forest area with dense cover ---------- 0.80
Flow Velocity :The flow velocity of a river is calculated from the following formula:
Design Discharge
____________________________________
Average flow velocity ( Va ) =
Average cross-section area of river
If the river is approximately straight and as a thumb rule, the velocity of flow that hits a spur on
the river bank can be considered as, V1 = Va, whereas V1 is velocity of flow that hits a spur and
Va is average is average flow velocity. If there is a sharp bend, then the velocity of that hits a spur
on the river bank can be considered as, V1 = 4/3 Va.
S = Mean hydraulic depth ( d ) × scour or z factor ( Z ) for bank full condition. Z factor
can be assumed from the table as given below.
Mean hydraulic depth = Cross-section area (A) Average width (W) of a river at bank full condition
As a thumb rule, if the angle of flow to the bank of river is 30o, 45o, 90o, the Z value can be taken as
2, 3 and 4 respectively.
Return Period : Return period of a flood does not mean that this flood will only occur once in that
return period. It is a probability or chance that the flood can occur within that period.
For example, if the return period is 50 years, it does not mean that the similar kind of
flood will occur once in 50 years. What it mean is there is probability of having a
similar flood 1 in 50 or 2 % risk of occurrence every year. Similarly, if the return
period is 10 years, there is a probability of having a similar flood 1 in 10 or 10 % risk
of occurrence every year.
Degradation : Bed falling ( Drop in average bed level ). It is also downstream and upstream
progressing degradation. It occurs when bed materials load is reduced by a dam,
when water discharge increases from a diversion, bed materials size reduces along a
river.
Aggradation : Bed rising ( sediment deposition). It occurs due to deposition of bed materials along the
central portion of river. Due to aggradations, outside banks are attack and bank
erosion occurs. It causes several channels in the river bed and river is braided. It
normally occurs in alluvial fans of river.
--- Spurs should be tied in bank and normally be perpendicular to the bank/flow
3.2 Embankments :
Embankmens are the oldest and most widely used structures to check bank erosion, minimize
flooding on the alluvial fans. These structures are constructed on the river banks parallel to the river
banks.Embankments are also levees or dykes or revetments. However, these structures should be
constructed along the whole eroded length of the river bank with well keyed inthe bank.
These structures are generally made from concreate, gabions filled with stones, earthern and stones,
sand bags and logs. Hydraulic properties of river and river characteristics such as:
River discharge can be calculated from Manning's formula and other parameters such bankfull
discharge, width or cross-section of river, water depth, hydraulic radius, river slope, scouring depth
and Manning's roughness coefficient can be calculated as explained earlier.
A free board of about 1mt. should be provided at the top of a embankment to protect against over
flow of river and an apron should be provided with 1.5m.horizontal and 1.0 m. vertical and should be
larger than the scouring depth. However, the size of apron and free board depends upon the design
and type of embankment.
The river characteristics such as width ( b), depth (d), and slope of river (S) are directly related with
bankfull discharge. Their relationships are:
b ∞ Q b 1/2
d ∞ Q b 1/3
S ∞ 1 / Q b 1/6
Bolsters are tubes of gabion wire or jute net filled with stones are placed along the counter or laid in
shallow trenches across the slopes, which act as scour checks and reduce surface movement of debris and
prevent the down slope movement of debris while vegetation cover is established. Common type bolsters
are : a) wire
c) Hessian and d) Jute bolsters
Tubes of 30 cm diameter are made from gabion wire and laid in shallow trenches across the slope. They
act to prevent the down slope movement of debris and also prevent the surface scour and gullying. They
are constructed and laid down on most long exposed slopes where there is a danger of scour or gullying
on the slope
Materials :
a) Woven gabion panel ( 5*1m or 5*2m), 10 gauge wire
b) 12 mm mild steel rod cut into 2m length
c) Digging and binding tools
d) Skilled and Unskilled labor
Water Harvesting :
Rainwater harvesting is the accumulating and storing , utilizing of rainwater for reuse, before it reaches
the aquifer and loss due to overland flow. It means capturing rain water where it falls or capturing the run
off in the houses, village or town The harvested rain can be used for drinking water, irrigation, water for
livestock etc. depending upon the level of pollution in the water.
In general, water harvesting is the activity of direct collection of rainwater. The rainwater collected can be
stored for direct use or can be recharged into the groundwater. Rain is the first form of water that we
know in the hydrological cycle, hence is a primary source of water for us. Rivers, lakes and groundwater
are all secondary sources of water. In present times, we depend entirely on such secondary sources of
water. In the process, it is forgotten that rain is the ultimate source that feeds all these secondary sources
and remain ignorant of its value. Water harvesting means to understand the value of rain, and to make
optimum use of the rainwater at the place where it falls.
The total amount of water that is received in the form of rainfall over an area is called the rainwater
endowment of the area. Out of this, the amount that can be effectively harvested is called the water
harvesting potential.
The collection efficiency accounts for the fact that all the rainwater falling over an area cannot be
effectively harvested, because of evaporation, spillage loss etc. Factors like runoff coefficient and the
first-flush wastage are taken into account when estimated the collection efficiency.
The following is an illustrative theoretical calculation that highlights the enormous potential for water
harvesting. The same procedure can be applied to get the potential for any plot of land or rooftop area,
using rainfall data for that area..
Consider your own building with a flat terrace area of 100 sq m. Assume the average annual rainfall in
your area is approximately 600 mm (24 inches). In simple terms, this means that if the terrace floor is
assumed to be impermeable, and all the rain that falls on it is retained without evaporation, then, in one
year, there will be rainwater on the terrace floor to a height of 600 mm.
This volume is about twice the annual drinking water requirement of a 5-member family. The average
daily drinking water requirement per person is 10 litres.
Figure 3 Different parts of collection system of rain water harvest from roof
Catchment Area : zinc sheet roof or Concrete roof ( size depends on the size of house
Gutter : Size depends. Normally 3”*3”or 4”* 4” size
Water delivery pipes : 4”* 4” size
Water filter tank : size depends
Water collection tank : size depends on water demand, household water consumption/day, rainfall
intensity, roof area ( catchment), Dry season period
Water pump : hand pump or electric pump
Water availability for agriculture, home garden can be improved by harvesting runoff water. Small scale
catchment pond or impoundments or reservoir are constructed to capture and store rainfall runoff within
the catchment area. Amount of runoff generated depends on the catchment characteristics (area and size,
type of vegetation, land use, soil, topography, etc.) and rainfall and intensity pattern (amount, duration
and intensity)
Small-farm reservoirs sites in elevated or depressed areas (valley) where irrigation is possible are suitable
sites. Sites that are commonly owned should be properly managed to ensure sharing among the intended
beneficiaries. Places with springs or flowing streams to ensure a year round water supply are good sites
for reservoirs. Topography that undulating or rolling with slopes of 2 to 18 % is desirable. The size of
catchment pond or impoundments or reservoir depend upon the objectives of water harvesting, financial
resources and labor availability
Design consideration :
Following points should be considered in the design of water harvesting ponds. They are ;
2) Water is the main agent of erosion and landslides in the hills. Storage of water in the pond could
threat or cause damage in the certain situation
3) If the water over flow the pond during summer, the overflow water can cause scouring of the side
of the pond and gully may form which ultimately can lead to sudden burst of the pond.
4) Therefore, ensure that the feed drains in the pond are well protected against erosion.
Layout procedure :
The layout procedure of water harvesting pond depends on a) site of the structures to be constructed and
b) surveying and pegging of the water harvesting structures
1. Pond must be located to gain the maximum amount of water storage for the designed size
of the dam
2. The seepage from the pond should be checked or check the soil strata of the bottom so
that the seepage will not take place in future
3. The dam and the bottom of the pond with core of clay soil is desirable
4. The top width of the earthen dam should be at least 1m wide and side slope at 1:2. This
means 2 m high will be at least 1m wide at the bottom.
5. Never built pond if there is adanger of slope failure or any evidence of slope
movement/failure
6. Do not built pond less than 50m upslope from a house
7. Core overflow area area should be well protected
8. Stone pittiching in the side slope of the pond if the slope is > 50
9. For the embankment to be constructed in the pond, use top width , W = 1.105 H0.5 + 0.91,
where W = top width and H = height of dam. In general, up to 5m height of embankment
a minimum width of 2.5m is recommended
10. Always built emergency spillway in the pond using weir formula Q = CLH3/2
Types of Ponds :
1. If the embankment type of ponds have to be built, consider the design storage capacity on the
basis of requirement and available surface runoff.
2. Earthen embankment in the shape of semi circle can also be built
3. Trapezoidal bunds can also be used
4. Graded bunds can also be considered between the slope 0.5 -2.0 % slope
5. Catchment storage tank of 100m2 –30,000m2 are also constructed
For long term storage, the most common runoff harvesting tank are :
1. Dugout ponds/conservation ponds/farm ponds : These ponds are constructed by excavating the
soil from ground surface. Here ground water or surface runoff are collected
2. Embankment type reservoir; In this kind of pond a dam or embankment around the valley or
depression or a creek
c. Flood water harvesting : Flood water can be diverted from river and store in a pond. Diversion
structure, diversion channels are used to divert the river flood. Structure such as spurs and
diversion channels are made at the bank of the river to divert the water into the ponds, This water
can be used during the water deficiency period.
High Initial investment Costs - The main cost of a rainwater collection system generally occurs
during the initial construction phase and no benefit is derived until the system is completed.
Requires large number of labor
High seepage and evaporation losses are possible
Floating vegetation may infest reservoir
Regular Maintenance - Regular maintenance, cleaning and repair will be required for the
operation of a successful rainwater collection system.
Vulnerable Water Quality - The quality of rainwater can be affected by air pollution, insects,
and dirt or organic matter. The type and kind of construction materials used can also adversely
affect water quality.
Water Supply is Climate Dependent - Droughts or long periods of time with little or no rain can
cause serious problems with your supply of water.
Storage Capacity Limits Supply - The supply of water from a rainwater collection system is
not only limited by the amount of rainfall but also by the size of the collection area and your
storage facilities.
Additional power cost require to pump the water
Unit 5 Bio-Enginering Techniques
Definition / Concept :
Various definitions and concepts of bio-engineering are being used. This is besause to suit and specific
objective for stabilizing and protecting unstable/degraded slopes, landslides and erosion.
In general, the term bio-engineering is a technique where living vegetation (plant) provides engineering
functions to stabilize degraded slope. This can be administered with living vegetation alone or in
combination with non-living plant materials or soft engineering to stabilize / protect degraded slopes. In
other word, bio-engineering practice can also be administered through the integration of vegetative
methods with soft/ normal engineering practices in order to protect/stabilize degraded slopes, land slides
and erosion.
Terms like bio-engineering , vegetative engineering or vegetative structures are commonly used by
implementers / users.
Why Bio-Engineering ?
--- engineering practices alone are not always the solution.
--- engineering practices are expensive.
--- needs high skills and tecnology.
--- not always affodable by users due to resource constraints.
--- living vegetation has many functions ( hydrological, ecological and engineering ) where they grow.
--- living vegetation provides additional strength to the engineering structures in integration.
Bio-Engineering technology emerged based on the above mentioned reasons
Catch : Process for holding thin layer of moving soil particles /debris by multi stemmed shrubs
and bamboos.
Armour : Process for protecting soil surface and soil particles from movement by providing
protective cover.
Reinforce : Mechanism for providing strength to bind the soil particles by densely rooted trees and
grass.
Anchor : Process for firmly fixing the soil particles and debris by anchoring action of deep / long
and strong roots of trees and shrubs.
Support : Mechanism for providing support to soil mass and rocks from the mechanical action of
root system of plants.
Therefore the engineering functions of vegetation are compatible with the functions of engineering
structures and are co-existence, because engineering structure protects vegetation and vegetation protects
engineering structure. In some cases, vegetation replace engineering structure.
Engineering structures for slope stabilization works are also designed to meet the purposes of catch,
armour, reinforce, anchor and support.
Catch
Armour
Vegetation Reinforce support Engineering
Structure
(Bio-engineering) Anchor Support
b) Hydrological function :
Interception
Leaf drip
Stem flow
Evaporation
Transpiration
Infiltration
Soil water storage
Overland flow
Sub-surface flow
c) Ecological functions :
--- Improves harsh environment of degraded slopes into better ecological condition.
--- Improves soil and moisture conditions and generates better micro climate for the establishment
and growth of plants
--- Encourage micro-organism and small animals and helps increase the bio-diversity.
Diagram of Life span / Longevity of Bio-Engineering versus Engineering Structures is given below:
Engineering structure
Time
Bio-engineering
Longevity
Various Forms of Bio-Engineering Techniques : Various techniques can be used based on purpose, site
conditions and availability of resources
a) Planting trees, shrubs and grasses : alone or in combination of two or all. Develops dense network of
roots in soil and dense canopy of plants helps protect the slope from erosion. Contour line planting
at regular interval is general practice in Nepal
b) Planting Stumps / woody stems : Stumps / woody stems can be planted along the contour lines to
trap soil particles and debris falling down the slopes. Sprouting stumps / stems are more preferred.
c) Seeding grass, trees and shrubs : Seeds can broadcasted manually to cover large areas in short time
and with low cost. This can be done in a very steep unstable slopes and rocky areas where seedlings
and stumps/ woody stem can not be planted directly.
d) Contour Strip planting : Plants are planted in strips along the contour in order to reduce erosion.
Strips are left or strips interval are selected in the slope and plants are planted along the contour.
Strip intervals depend upon the slope of the field. Cuttings or pot plants are planted. Plant
composition may include grass, fruit plants and trees. Only one or two species of plants can be
planted if the area is small. This is similar to palisade method
e) Brush Layering: It is a method of planting branches of sprouting living woody plants making small
individual terraces in the slope along the terraces. Small terraces of 15 to 100 cm wide are dug at the
toe of the slope with inward inclination of 10 % and the branches are placed crosswise at the
terraces and well covered with soil and pressed so that the individual branches are completely
embedded and covered by soil thus encouraging root formation. The construction of brush layering
should start from bottom of the slope. The distance of individual terrace should be less than 1.5 m to
reduce possibilities of slope failure
f) Turfing/Sodding ; This is a method to turf or sod fresh cutting soil and check erosion. To hold and
mat the soil surface by roots, rhizome and stolons of grass and other plants is sodding. Turf and sod
consisting of shallow rooting grass slab with soil, rhizome or stolon is placed on the fresh cutting
slope and cover by 1-5 cm of soil layer . The size of turf or sod slab of 30 cm square or the size of
30cm * 60 cm are easy to handle. The turf or sod should be kept moist and should be planted when
the soil surface is moist. The turfing/sodding should be done on gentle slope less than 350 slope.
Watering should be done after plannting. Examples of turf grass are : Cynodon dactylon (dubo) ;
Trifolium species (clover)
g) Palisade : Woody cuttings are planted in lines across the slope or along the counters. It forms a
strong barrier and trap soil and derbies moving down the slopes. Shrubs and trees suitable are :
Adhatoda vasica ; Ipomoea fistula ; Vitex negundo and other fodder trees are also suitable. This can
h) Fascine : Also called contour wattling. It involves the bundling of branches of sprouting types of
live plants and laying them in shallow trenches below the soil surface. After laying them in the
trench, they should well cover by soil. After trenching them well inside the trench and cover by soil
roots and shoots sprouts after the monsoon. They form a strong line of vegetation and traps the soil
and debris moving from the upstream. This technique is suitable for the site having good soil depth
and soft cut slopes. This needs live branch cutting of one meter length of sprouting type of species.
Bundle of 5 to 6 branches with minimum diameter one cm. are needed. Pegs of living or dead plant
should be inserted inside the surface to hold the bundles of branches trenched in the soil. The
recommended slope for this technique is about 45 %. Species suitable for this purpose are Vitex
negundo ( simali), Pennisetum purpureum ( Napier)
i) Bamboos / Amliso planting : Rooted clum cutting, rhizomes, wild or nursery plants of bamboos or
amliso can be planted directly on slopes. These plants perform the slope stabilization effectively
once they are established.
j) Wattling : Bundles of live branches with buds are put in the trench along the contour and covered
with thin layer of soil. When the branches put out roots and shoots it forms a strong vegetative
barriers for holding soil particles moving down the slope. However, this technique is expensive and
suitable for gentle to moderate slopes.
k) Brush wood check dams : Brush wood check dams using bamboos and woods are commonly used
to stabilize gullies on slopes. Grass and shrubs are planted down stream of check dam and on slopes
os gullies.
l) Vegetated rip- rap : This is a method to strengthen slopes by a combination of dry stone walling and
planting vegetation or broadcasting seeds in the gaps between the stones. Side slopes of gullies and
gullies bed are some time protected by constructing dry stone walls and grass seeds are sown in
gaps between the stones in order to reinforce toe walls and gully beds. Plants to be planted in this
technique are either grass or small shrubs with strong root system. Broadcasting or sowing seeds of
Acaica pennata (Areri) and Butea minor ( Bhujetro) are recommended. Cuttings of Vitex negundo
(Simali), Napier and Broom grasses are also recommended. Plants of big trees are not recommended
in this method.
m) Loose stone and Gabion check dams : Seedlings of trees, shrubs and grasses are planted either
seperately or in combination on gully heads, side slopes, gully bed, in and around the structure to
reinforce the structure.
n) Brush wood embankment / spurs : Bamboos and woods are used to construct embankment and spur
to protect stream bank erosion. On the back side of the structures, trees, shrubs, grass seedlings and
woody cuttings are planted to provide vigor and anchorage to the structures. These techniques have
been effective in the torrents and small rivers of Churia and Terai.
o) Jute netting : Jute netting is another way to protect the slopes using woven jute netting and planting
grass slips or seedlings. Its main functions are: protection of slopes, by allowing seeds to hold and
germinate; improvement of micro-climate on the slope surface by holding moisture and increasing
infiltration ; act as mulch for the vegetation when the jute net is decay. It is useful on steep and hard
slopes where establishment of vegetation is difficult due to harsh environment. Surface of the slope
should be cleaned and smoothed, cover the slope with net and peg the net at different points to support
the net. Netting should be done just before the rain starts and planting of grass slips or cutting or
planting or showing of seeds should be done during rainy season. This method is very useful on steep
and hard slopes where establishment of plants is difficult due to steep and harsh environment. Acaica
pennata (Areri) and Butea minor ( Bhujetro) are recommended. Cuttings of Vitex negundo (Simali),
Napier and Broom grasses are also recommended. Plants of big trees are not recommended in this
method. However, this method is expensive, needs skills and cautious mind.
Application of Bio-Engineering :
Where to apply ? :
Rill erosion, shallow rock failure, shallow mass movement, small gully and small river/ stream bank
erosion
Condition of Hazards
(erosion/ landslide) Practice of Bio-engineering
Limitations of Bio-engineering
--- it has some limitations on dimension of slope, nature of landslides and erosion,
Support : shrubs, large trees ( deep, dense root systems forming a soil cylinder)
Importance of Different Types of Plants in Bio- engineering
Woody Non-Woody
Improve * ** - - - ***
Pioner - * - ** * ***
*** Excellent
** Very Good
* Good
- Poor
Improved plants : Leguminous plants able to extract nitrogen from air and converts into nitrogen
compound, which increases the level of nitrates in the soil and helps plant growth
Pioneer Plants : Plants which establish easily in harsh environment . Produce better conditions to
establish successive plants
Pioneer/ Colonizing versus Climax Species :
1. Stems and trunks trap materials that are moving down the slope Good
2. Roots bind soil particles of the ground surface and reduce their Good
susceptibility to erosion.
4. Woody roots may open the rock joints due to thickening as they grow Bad
6. Tap root or near vertical roots penetrate into the firmer stratum below
and pin down the overlying materials Good
Bad
Hydrological Effects
6. Stems and roots increase the roughness of the ground surface and Site
infiltration of soil dependent
7. Roots extract moisture from soil which is then released to the Weather
atmosphere through transpiration dependent
effect
Trees: Trees can permanently stabilize the soil horizon up to main rooting zone (2 mt.). Soil srtucture and
organic matter content Improves. Provide shelter to the top soil, reduces KE of falling water, reduce peak
run-off and surface erosion, riverbed scouring decreases risk of mass wasting.
Disadvantage : Trees can not prevent natural landslides with deep sliding zones. Trees can not prevent
on-going sliding and slipping processes. It takes 5-10 years until a dense rooting system developed Huge
and heavy trees increase the risk of sliding due to addiitional weight.
Bushes/ Shrubs : reduce splash erosion, top soil movement. faster react to rill and gully erosions because
of dense root system. Stabililize soil within their rooting zone (1mt.). mechanical strees in sliding and
steep sloping areas.
Disadvantage : Can not help to stabilize land slides or slopes below the main rooting zone (1mt).
Bamboos: help stabilize slopes / soil horizon within the reach of their main rooting zone of 2m. Under
normal condition, can reach up to 2/3 the ht. of culms. Rooting systems extraordinary dense and more or
less uniform. Best retaining quality, able to survive in smoothly sliding zones. rooting system extremely
resistant to mechanical stress and force in sliding areas. Dense culms prevents all kinds surface erosion
however.
Disadvantage: It can not rapidly develop their soil conservation abilities and takes 3 to 6 years to fully
expand and grow.
Grasses: can permanently conserve the top soil within the reach their main rooting zone of 25 cm. Protect
surface soil, improves the micro-climate at top soil. Establishment of grass layer withen one or maimum
two rainy seasons.
Disadvantage : Can not contribute to protect sliding due to shallow root system.
Herbs/ Legumes : contribute by improving soil fertility by adding fixing nitrogen dense rooting species.
Extra-ordinary quality as pioneer plants. Provide synergetic effects with other plants.
Biological or Vegetative measures : need time to establish, low cost , less maintenance, use of local
materials, once establish it guarantees for permanent cure provided there is no natural havocs and abuse
by people.
Agronomic Practices:
---- Crop Rotation ( maintain soil structure, less erodable than poorly
structured soil )
---- Cover Cropping ( used to prevent erosion, use permanent crops such as
orchard, horticulture crops, helps add OM through roots, residues/
remnant of plants, when legumes are used adds nitrogen, improves soil
physical condition )
---- Mulching ( covers soil, prevent from splash erosion, affords infiltration,
regulate soil temperature, improves moisture and reduced evaporation
---- Composting/ Farm Manuring ( resuses from animals on the farm, consists
of solid and liquid in a ratio of 3:1, contains N, P, K
Planting materials : trees, shrubs, grasses, seeds that can stand in harsh
environment .
Forests : helps controlling erosion. Protects soil from water and wind erosion. The vegetation on
forest acts as shield against splash/ raindrop impacts. The root system binds the soil and decreases the
erosive power of running water. The OM content of forest soil helps soil infiltration capacity and
reduces overland flow / runoff.
Tree canopy intercepts the rainfall, which would have direct impact on soil causing splash erosion.
Tree increases the evapo-transpiration. Under growth or ground vegetation acts as blanket to soil
surface, intercepts rain drops and protects soil from direct impact of rainfall. Under growth or ground
vegetation helps infiltration capacity of soil and breaks water velocity. The root system binds the soil
particles and protects against running with water.
Lack of vegetation intensifies erosion through the structural weakness and absence of armouring of
the soil surface. Therefore, forests need to be managed not only for productive point of view but also
for protective purposes. The forests of steep slopes, fragile lands, near river bank/ stream should
strickly be managed under protection.
In Nepal, erosion in forest lands are mainly due to: heavy felling of trees, over grazing of forests
floor, forests fire, excessive removal of leaf litters/ fodder /undergrowth, shifting cultivation and
encroachment. These factors cause degradation of forest and degraded forests are vulnerable to
erosion.
Structural measures (Curative): Check dams, runoff diversion channel, wattlings, fascines,
conservation pond, retaining wall, terracing, bunding, trenching, foot trail improvement.
Vegetative measures : conservation plantation ( trees, shrubs, grasses, seedings ), forest management
Preventive measures : prevent over grazing and over felling of trees, practice stall feeding, reduce
unproductive cattle, prevent forest fire, shifting cultivation and forest encroachment, avoid
unsustainable use of forests resources.
Control measures :
Structural measures (Curative): Check dams, runoff diversion channel, wattlings, conservation pond,
retaining wall, terracing, bunding, trenching, foot trail improvement.
Vegetative measures : palatable grass and shrub planting, seeding improved varieties of grass, control
undesirable/ unpalatable invader plants.
Preventive measures : avoid overgrazing and over stocking, adopt rotational/ diferred grazing, control
fire, adopt stall feeding, fencing.
--- ability to grow on poor site condition (exposed, water logged degraded, dry, harsh environment)
--- fast growing/ high rate of biomass production
--- nitrogen fixing
--- coppicing ability
--- preferred by the local communities
Degraded slopes :
--- improve pits soil by adding compost/farm yard manure/humus rich forest soil
--- established vegetation along the contours ( if slopes are too steep use contour trenching,
bunding, terracing, wattling etc.)
--- encourage natural regeneration.
Landslide treatment :
Landslide treatment refers to the vegetative and structural measures applied in the landslide area
and its catchment. These activities are generally done to reduce soil erosion and mass movement
from landslide and reduce devastating effects on the downstream and surroundings, where
landslide occurs threatening the life and property. The activities under the landslide treatment are:
Construction of diversion channels around the landslide area to drain water or to stop
water to enter into the landslide
Structural erosion control measures such as construction of retaining wall/breast wall and
check dam
Landslide stabilization through bio-engineering practices
Conservation ponds to store and divert excess runoff
Appropriate land use practice in the gully catchments
Fencing the gully periphery and its catchment to prevent from cattle grazing
Slope stabilization refers to the vegetative and structural measures applied to stabilize degraded
slope and reduce erosion. This activity include :
Tree and grass planting with necessary conservation measures using bioengineering techniques
Erosion control measures such as micro-gully plugging, contour wattling and structures such as
check dam, retaining wall etc.
Improvement of drainage system
Silvi-pasture management
Fencing the slope to check livestock grazing
Stream/River bank erosion control measures refers to prevent stream / river bank erosion or
bank cuttings through vegetative and structural measures. Its main aim is to prevent bank
erosion and protect the land from stream/river cutting. The activities under the Stream/River
bank erosion control include :
Construction of embankment/revetment
Construction of spurs
Construction of water flow retarding structures
Channelization efforts to manage discharge
Flood plain stabilization through bio-engineering measures
Vegetative measures
Silvi-pastoral management in the catchment
The road slope erosion control measure refers to vegetative and structural measures applied in
the road slope to reduce erosion and protect the road from erosion and landslides and to
improve the road for general traffic. It is similar to slope stabilization to maintain stability of
the slope. The activities under this programme are :
Trees and grass planting with necessary conservation measures such as contour
terracing, cotour trenching, contour bunding
Retaining/breast walls with planting bio-engineering plants
Erosion control measures such as micro gully plugging, contour wattling, and
structure like check dam
Improvement of roadside drainage system
Fencing road slopes for livestock control
Mulching : It is a method of spreading mulches above the ground to keep the soil
cool during warm and warm during cold and moist. It also conserve moisture in
the soil and root zone of the plant. Mulching enhance the rate of growth of plant
by providing moisture to the plant. Mulching materials are leaves, straw, sawdust
and other organic materials. Mulch reduce the rain drop erosion, surface flow and
increases infiltration. Mulching should be done during dry season to conserve
moisture and reduce evaporation loss.
High density planting : To cover the ground as quickly and as densely possible
Multiple cropping : it includes crop rotation and strip cropping
Forests land : Forests vegetation has played various roles in controlling erosion. Causes of erosion in
forest area :
Heavy felling
Heavy grazing
Shifting cultivation
Lack of mixed vegetation
Roles of forest in soil conservation:
Three roles of forests
Canopy level : intercepts rainfall and increase evapo-transpiration
Ground level : intercept the rain, increase evapo-transpiration, litters at ground acts as sponge for
water retention and reduce run-off
Root level : Root system of vegetation helps to bind the soil and increase the infiltration rate
Pasture lands :
Problems of erosion :
Overgrazing
Premature grazing
Continuous grazing
Trampling
Soil conservation measures :
Reduction of number of livestock
7.2 Hedgerows:
These are simple erosion control practices on sloping land. In these practices nitrogen fixing
trees, shrubs, grass, fruit trees and other crops are planted as hedge in a rows along the contour.
Various trees and crop species are established in the hedgerows to enhance farm income and
diversity. Trees, shrubs horticulture plants, grasses are planted in the outer edges of strip. Food
crops are planted in the strip between the rows . These practices help slow down the passage of
rain water and trap soil to gradually form natural terraces. These practices also improve soil
fertility and crop production. Contour hedgerows are indigenous practices, which are adopted in
many developing countries. These activities Include :
Planting of fruit, grass, trees, grass in the strip of rows along the contour
Plantation of food crops between the rows
Advantages :
Reduces soil erosion
Improves soil fertility and soil moisture
Provides biomass for green leaf manure
Provides shading for young plants
Serves as a source of fodder, fuelwood and light construction materials
Improves soil structure and water infiltration
Provides a source of mulch
Limitations :
Loss of land for cultivation due to establishment of contour hedgerow
Hedge rows compete with food crops planted between the rows
Hedgerow plants may be host to pests
Advantages :
Lessens the direct impacts of raindrops on bare soil, thus minimizing soil erosion
Minimizes degradation of soil structure
Slows down the rate of mineralization, leading to more sustained use of nutrient in the
organic matter
Requires less labor than full tillage
Can be practiced on marginal soil/land that might not otherwise be fisible to cultivate
Limitations :
Inadequate seed bed preparation may lead to poor establishment and low yield of crops
Rooting volume may be restricted in soils.
Advantages :
Improves soil fertility, physical and chemical properties of soil
Reduces soil erosion and water loss
Suppress weeds
Reduces need for fertilizer and herbicides
Provides human food and animal forage
Increases soil organic matter
Helps retain moisture in the soil and prevent soil from drying
Limitations :
May compete for soil moisture and nutrients with the perennial plants
Involves additional farm labor and inputs
May result in weed problems
May be alternate host for pest
Some cover crop species may contain chemicals which inhibit subsequent crop
growth
7.9 Mulching
Mulching is a soil and water conservation practice in which a covering of cut grass, crop
residues or other organic matters is spread over the ground between rows of crops or around the
plants. This practice helps to retain soil moisture, prevents weed growth and enhances the soil
structure. It is commonly used in areas subject to drought and weed infestation. The choice of
mulch depends on locally available materials. The optimum density of soil cover ranges
between 30% to 70%
Advantages :
Intercepts the direct impacts of rain drop on bare soil and reduces runoff and soil loss
Suppresses weeds and reduces labor costs of weeding
Increases soil organic matter
Improves soil chemical and physical properties
Increases the moisture holding capacity of soil
Helps to regulate soil temperature
Limitations :
Possible habitats for pests and diseases
Not applicable in wet condition
Difficult to spread evenly on steep land
Lack of available materials suitable for mulching
Some grass species used as mulch can root and become a weed problem
Advantages :
Generates nutrients for crop
Generates heat and maintain temperature
Maintains soil structure and increases soil infiltration
Minimize soil pollution
Limitations :
Compost making requires a large quantity of plant materials or biomass
Limited use in low land where severe weed infestation is a problem
Difficult to practiced on steep slopes
High labor requirement to harvest, haul and distribute
Contour strip-two or more crops are grown along the contours in alternative strips.
Field strip cropping- The alternative strips are uniform widths across the field and not necessarily
curved to conform to the contour.
Wind strip cropping- Tall wind resistant crops and normal crops are planted alternatively in narrow
strips perpendicular to the direction of prevailing winds.
7.5 Relay cropping
Growing of another crop before harvesting the main crop. There is no need of tillage operation.
Example: Paddy-lentil
Growing of two or more crops together at the same time in same land. Example: wheat +
mustard, wheat + peas etc.
Erodibility of soil is defined as the resistance of soil to erosion. In other terms, it is termed as
resistance of soil to both detachment and transport against the detachment and transporting agents.
In erodibility of soil, the properties of soil are most determinant and important factors. Erodibility
of soil varies with soil texture, aggregate stability, shear strength, infiltration capacity and organic
and chemical content of soil. Erodibility of soil also depends in part on topography, slope
steepness, and level of disturbances imposed on soil by human activities.
In the case of soil texture, soil having large particles are resistant to detach and transport, since it
requires greater raindrop kinetic energy and greater force for transport. Similarly, fine particles of
soil also resistance to detachment because of their cohesiveness. The least resistant particles are
silts and fine sands. Thus soil with a high silt and sand content are more erodible. By experiment,
it was observed that soils with 40-6-% silt content are most erodible and soils with 9-30% clay
content are also found most susceptibility to erosion. However, the range of different soil textures
susceptible to erodibility are found different in different studies.
In terms of aggregate of soil, for example, clay particles combine with organic matter to form soil
aggregate or clods is more stable to erosion. Erodibility of soil also depends on types of clay
materials content on soil aggregates. Soil with high content of base minerals are more stable to
erosion as they contribute to chemical bonding of the aggregates. The greater the proportion of soil
aggregates, the more resistant to erosion
In shear strength of soil, which is a measure of its cohisiveness and resistance to shearing forces,
the more shear strength of soil, the less is erodibility, but it can cause mass movement of land.
The infiltration capacity is influenced by soil pore space or size, pore stability and form of soil
profile. Soil with stable aggregates maintain their pore space better and is less erodible than the
soils with swelling clays and minerals because of having low infiltration capacity.
The organic and chemical contents of soil are important because of their influences on aggregatee
stability. It has been found that that soils with 0-4% organic matter content can be considered
erodible.
In the case of wind erosion, the erodibility of soil depends upon wet and dry aggregate stability and
moisture content of soil. Wet soil is less erodible to wind than dry soil with low aggregates. Other
elements of erodibility of soil by wind erosion are same as the elements discussed above in water
erosion.
Soil Erodibility Factor ( K) : The soil erodibility factor (K) reflects the susceptability of soil to erosion.
The soil erodibility factor ( K) is a function of soil's percent silt and very fine sand, percent sand,
percent organic matter, index of soil structure, index of soil permeability. K value can be obtained if
grain size distribution, organic content, soil structures and permeability are known.
Particle Size : Soil particle size is a major determinate of soil erodibility, which is defined as the
products of % silt and and very fine sand % sand
Organic Matter : This is combination of organic matter contents in top soil and subsoil. OM in the range
of 0 - 4% is inversely related to erodibility or succeptable to erosion
Soil Structures : Soil structures such as type of soil and size particles of are important in determining
erodibility. Structures are:
5. Slow
6. Very slow
Erodibility also depends on slope steepness, slope length, velocity and volume of surface runoff. As
these factors increases, the erodibility of soil increases. The relationship between erosion , slope
steepness and slope can be expressed by an equation :
Q ∞ tan m A x Ln , where as Q = erodibility per unit area, A = gradient angle, L = slope length, m and n
are factors, which values depends upon interaction of other factors in the erosion - slope relationship.
These factors are : grain size of materials, rainfall, slope and its shape, surface runoff, type of
vegetation cover, processes of erosion.
Slope length also affects erodibilty. Longer the slope, more will be the erosion. As slope increases, the
land surface catch large amount of rain. If the infiltration capacity of land surface is slower than the
intensity of rainfall then overland flow occurs. As slope gradient increases, the detention of water on
land surface becomes less, the velocity of flowing water will be high, which in turn, will detached and
transport more soil causing erosion.
2 ) Vegetation :
The major role of vegetation is to intercept raindrops so that their kinetic energy is dissipated by the plants. The
effectiveness of vegetation cover in reducing erosion depends upon the height and continuity of
canopy, the density of plant cover and the root density. Ground cover by vegetation not only intercepts
the rain but also dissipitates the energy of flowing water and wind, imparts roughness to the flow and
thereby reduces the velocity Erosion rates varies cube or fifth power of velocity, V 3 or V 5. The effect
of root network of the vegetation is in openning up the soil, thereby enabling water to penetrate and
increasing infiltration capacity. Generally, forests are the most effective in reducing erosion because of
their canopy. A dense growth of grass may be also efficient as forests. It has been noted that for
adequate protection of erosion 70 % of the ground surface must be covered by vegetation. Mechanical
binding of soil particles by the net work of root. Vegetation improves the soil structures by adding
organic matter. Humas layer acts as sponges and absorbs enough water and moisture which helps water
to enter into the soil. Vegetation obstruct the velocity of flowing water and helps dissipitate energy of
running water and sometime hold the soil particles flowing through the running water. However, the
rain drops interceptd and collected by the canopy may form larger drop which when drops on the
ground are more erosive
To compute the KE of the storm, a trace of the rainfall from automatically recorded rain gauge is
analyzed and the storm divided into small time increments of uniform intensity. For each time period,
knowing the intensity of the rain, the KE of rain at that intensity is estimated from one of the above
equations and this multiplied by the amount rain received gives the KE for that time period. The sum of
the KE values for all time periods gives the total KE of the storm.
Calculation of erosivity :
Time from Rainfall Intensity KE Total KE
2
start (min) (mm) ( mm/hr) ( J/m /mm) ( col. 2 × col. 4 )
(Justification/ Importance)
Erosion monitoring is a continuous process for studying the level of erosion and runoff from a paticular
land-use, where the maximum sustained productivity is threatened by excessive soil loss or erosion. Such
study should aim at collecting information on erosion and runoff by allocating an area into different plots
having different land use.
Nepal has serious erosion problems in almost all ecological regions. It has caused serious on and off site
environmental, economic and social impacts. The main causes of soil erosion in Nepal are due to fragile
geology of mountains, high erosivity of vaused by monsoon rain and unsustainable human activities.
Land degradation, gully formation, landslides, riverbank erosion, floods are prevelant. Therefore, studies
on soil erosion are of great importance to understand such problems. In addition, the runoff and soil loss
behaviors are different in different land use type, condition and treatments. Therefore the basic
information on the runoff and soil loss patterns under different land use types is needed for better
watershed management. Erosion monitoring entails how effectively the government resources and efforts
are being utilized to minimize erosion. Information received from erosion monitoring can be taken as a
basis for future planning of sustainable soil conservation interventions. In other word, erosion monitoring
gives insight for better land use recommendations and justify the implications of conservation activities.
Erosion monitoring is a technique to enclose a part of land and monitoring the surface erosion and
runoff from the enclosed area by collecting the overland flow in tanks placed at the bottom of the
enclosure. This technique is known as runoff plot or erosion plot (EP) monitoring, which has been
used extensively all over the world to measure runoff and soil erosion from small areas.
A number of such run-off plot monitoring works has been carried out in the different parts of
middle mountain physiographic zone of Nepal by different organizations at different times.
Such organizations are Department of Soil Conservation and watershed Management
(DSCWM), National Agricultural Research Council ( NARC ) and International Centre for
Integrated Mountain Development (ICIMOD).
Methodology : Run-off or erosion plot (EP) monitoring consists of studying surface runoff
and soil erosion with corresponding rainfalls for the land type where the EP is located.
Through the size of EP varied from 48-100m2 , the lay-outs of the EPs were almost the same
that is it could be rectangular and elongated towards the land slope. In most of the cases, EPs
size were 100m2 in size, 20m along the slope and 5m across. EPs were bordened on all sides
with metal sheets buried in the ground and a gutter was set up at the bottom to direct the
runoff and its contents to the collection tank system. The parameters studied in the EPs
technique are related with rainfall pattern, a meteorological station was installed near the EP
to record rainfall data.
For each rainfall day or event, runoff volume was measured from the water collected in the
tanks/drums. Sediment samples were collected from the tanks containing runoff volume by
agtating the water in the tanks. A sample bottle of known volume, usually 500 or 1000ml.
was used for this purpose. After the sample was filtered, oven-dry and weighed, the amount
of sediment in the sample bottle was determined. Based on this figure, the actual sediment in
the tank and drum was calculated, and by summing the quantities of sediments from all the
tanks or drums, the total soil loss from the particular event or day was determined.
The Tistung site represented outward sloping rainfed agricultural terraces. The major crops
grown in the treatments were potato, maize and mustard
Examples :
The EPs were located at an altitude of 1650m in Markhu village of Kulekhani watershed,
Markhu district. The plots were laid on the former grazing land with very shallow and stony
soil. The soil texture was clay to clay loam with very low humus content. The original
gradient of the plot ranged from 14% to 22%. The major cropping pattern was maize
followed by mustard. The following four treatments were applied in the EPs :
The rainfall, runoff percent and soil loss in the above treatments from 1985 to 1990 are presented in
Tables 1 and 2. These figures and information on EP have been obtained from Kulekhani Erosion Plot
Annual Reports of DSCWM.
Table : Rainfall and runoff percent for different treatments, 1985-1990, Kulekhani.
Applying the same procedures, techniques and principles as explained above but with different treaments,
various EP sites at Tistung (Makwanpur district), Subbakuna (Surkhet district), Jhikukhola
1. Plot design : Size of EPs varies, however DSCWM used 16m by 5m ( 80m2 ) EP. EP are
bordered with metal sheet extending 40-50cm. above surface and 25 cm. buried in the ground.
2. Runoff Tank design : For collection of runoff and sediments that produced by rainfall event,
two metal tanks ( A and B ) are installed for each EP. The maximum capacities of A tank was
3m3 and that of B tank was 1.5m3. Tank A consists a divisor that allows about 1/4 of the
overflow into tank B. The effective capacity of two tanks per treatment with two replications is
9m3 However, the size of tanks should be designed in such a that they can accommodate
maximum 24 hr. rainfall of that area.
3. Replication design : EP plots can be divided into blocks. Selection of replications for each
treatment is determined by random selection from each block. Although three replication for
each treatments is desirable, there were only two replications in each treatment.
1. Field measurement : The average water depth in the tank is computed by taking water depth at
four corners of the tank and averaged them. The volume of the runoff water in the tank is
directly determined by taking reading from the Calibrating Chart. The water depth is measured
every morning at 9 AM. The amount of rainfall is recorded by both a standard rain gauge and
an automatic rain gauge. Both the rain gauge should be placed near the EP. Intensities of
rainfall are calculated on the basis of the recorded marking on the chart. Water samples for
sediment analysis are to collected in plastic bottles and be taken in the laboratory for analysis.
2. Laboratory Procedures : About 500mm of water sample need to be taken for filtration. Filter
the water carefully and oven dry the sediments to calculate its amount by the use of physical
balance.
3. Calculation Procedures :
Total Runoff in litres = Volume of water tank A (litres) + Volume of water outflow from tank
A
Volume of water outflow from tank A (litres) = Reciprocal of ratio water inflow from tank A
to Tank B × volume ofwaterin TankB ( litres).
Sediment weight ( gm) / litre = Volume of water in Tank A (litres) × Average sediment weight (gm)/ litre
for tank A + Volume of water outflow from Tank A ( litres) × average sediment weight (gm)/litre for tank
B.
2. Generalization of erosion and runoff of a paticular land use system using the information produced
from such a small scale plot level studies can produce insignificant and meaningless results.
3. Extreme variation of biophysical conditions for a given land use type often poses problems in
interpreting the EP data.
4. Plot level studies of soil loss and runoff is limited within the enclose or plot but not associated with
upland runoff outside the boundary, which have implications on soil loss and runoff on paticular
land use or treatment. Therefore, soil loss and runoff obtained from EPs might be very low than from
the whole landscape
5. Sediment sampling is taken by stirring water contents in the collection tank in order to make all the
contents in the tank homogenous. This is only true if the sediment consists of clay, silt and very fine
sand. The coarser and heavy particles will be found on or near the bottom of the tank. Sediment
sampling may not content the samples of all kinds of soil particles that brings by runoff.
6. EPs are located to represent the surrounding land, the soil of which tend to be less disturbed as
compared to the surrounding areas. So, soil loss figures may be less compared to the actual situation
in the given land use.
7. Displacement of plot borders, occasional leakage from gutter, overland flow from the tanks during
extreme events of rainfall and keakage from sediment collection bottles during transportation to
laboratory could also lead to some errors
Another way of erosion monitoring is paired catchment studies. In run-off or erosion plot
study, only a small area or plot are used to monitor erosion of that particular land, which does
not represent the erosion problems in real field practices. Therefore, to reflect the erosion
status or problem to some extent to field reality, paired catchment studies are being carried out.
In this case, paired catchments are taken, in which one is treated and another is controlled.
These pairs are studies with and without treatments or one is left in natural system and another
receive some treatments.
Paired catchments studies aims at monitoring the erosion in the aspects of land-use, hydrology,
micro-catchment, soil and water conditions, socio-economic, agriculture and livestock.
Paired catchment study needs ( Components) : Paired catchments ( treated and natural ),
hydrological and meteorological stations, Stream gauging station.
Such paired catchments are located in Kulekhani and Phewa Tal with differently treated and
control environment. In the paired catchment studies, the information such as areas, soil,
gradient, aspects, land-use, vegetation types and covered, runoff, rainfall are taken. Based on
these factors sediment and runoff are calculated.
8.4.3. Sedimentation Survey :
Sedimentation survey is another way erosion monitoring. Sedimentation survey of Phewa
Lake, Kulekhani Reservoir, Begnas Lake and Rupa Lake are carried out. These sedimentation
surveys involved measurements of water and sediments in the lakes using boat and echo-
sounding instruments , which is a micro-processor-controlled depth recorder. This is based on
the fact that decrease in water depth indicates deposition or sedimentation in the lakes and
increase in water depth indicates erosion in the lake bottom. In Nepal, two methods are
generally being used in sedimentary survey. In Method I, sediment deposition and erosion at
lake bottom are calculated by multiplying the mean of the average water depths of two cross-
sections by the area of the lake surface between these two cross-sections. In this method,
benchmarks and survey lines are fixed between the bench marks. The measurements are taken
in the fixed survey lines repeatedly. The survey lines are marked at several places with known
and fixed intervals and these positions are recorded in the chart at the time of echo sounding
survey. The distance and water depth are recorded manually from the sounding profile and
processed to estimate the average water depth using Microsoft Excel Spread Sheet Software. If
sounding profile is not clear, the water depth can be measured manually using boat and rope
tied with stone and incorporated with the echo sounding graph for the analysis. In Method II,
A bathymatic map is prepared, water depths of two contour lines are taken and averaged. This
averaged water depth is multiplied by the area of the lake surface between these two contours
using the bathymatic map for the calculations of sediment deposition and erosion at lake
bottom
The End
Additional informations
Water Climate
Water Climate : Water climate is a sum or integration of all weather conditions including solar
radiation, precipitation ( rainfall and snow ), cloud, temperature, relative humidity and wind
pressure over a given period of time.
Solar energy : Of the above mentioned elements of water climate solar rediation plays principle
role in water climate, since sunshine decides the solar energy that reach to the ground through
which the hydrological regime is affected.
Cloud cover : cloud cover is second important element of water climate, since it entails the
quantity and intensity of solar radiation that reaches in the ground and reflects back to space.
This also has some implication in hydrological regime or cycle.
Temperature: This is impatacted and influenced by radiation, cloud cover and humidity.
Wind and its pressure : wind represents the air movement where as pressure represents weight
of air in the atmosphere.
Precipitation : This is amount of rainfall and snow that fall in the ground.
All the above mentioned elements constitute water climate. However, the amount and quantities
of the elements that reaches in the ground depends on latitude, longitude aspects wind direction
and barriers. Understanding water climate is important, since all its elements affect the
hydrological cycle and regime.
Because of wide and varied topography of Nepal, a wide range of climates have been
identified. The followings are broad climatic zones of Nepal :
Sub-Tropical Zone -- This is a hot monsoon zone below 2000m., in which summer is hot and
wet and winter mild and dry. The Terai, Bhabar, Siwaliks and Inner Terai zones have this type
of climate
Warm temperate Zone -- The lower middle mountains up to an elevation of 2100m have this
type of climate. The summer is warm and wet and winter cool and dry.
Cool temperate Zone -- This type of climate prevails in the higher middle mountains up to an
elevation of 3300 m. The summer is mild and wet and the winter is cool and dry.
Alpine Zone-- In the high mountains, up to an elevation of 4800 m, the summer is cool and the
winter is extremely frosty
Arctic or Tundra Zone-- This type of " arctic or tundra" climate prevails in the high himal
above the snow-line where there is perpetual frost, snow and low precipitation.
2) Growing season of agricultural crop is based on temperature and rainfall. Plants grow
slow and growing season of crop are short in areas having low temperature. Areas having
high temperature and low rainfall also affects the agricultural crops. However,
temperature plays vital role in the growth of agricultural crops. Based on temperature,
seven mean monthly air temperature zones are recognized through which agro-climatic
zones are classified.
-- temperature > 22 c
-- "" 20- 22 c
-- "" 16- 20 c
-- "" 10-16c
-- "" 4- 10c
-- "" <0c
There is a strong relationship between mean annual air temperature and elevation. As
elevation increases, mean annual air temperature decreases. A regression model showing the
relationship between mean annual air temperature (T) and elevation (E) has been developed.
This relationship is:
T = 25.3822 - 0.0054 E
3) Agriculture needs various forms of energy, to produce food, fodder, fiber and other
agricultural crops. Out of which, solar energy is a major part of energy inputs among all .
These energy needs are :
Natural inputs such as : solar radiation, temperature, rainfall, snow, relative humidity are equally
important and play vital role in agriculture production.
Agro-climatic classification are generally based on the number of rainfall months, mean monthly
temperature and annual rainfall. Based on these factors, agro-climatic zones are classified as follows :
Agro-climatic Zones :
1. Lower Sub-Tropical Monsoon Zone: the altitude is < 800m., mean annual temp. is > 21c and
rainfall is >1000mm
2. Upper Sub-tropical monsoon Zone : altitude varies from 800-1200m, mean annual temp. is 19-21c
and rainfall >1000mm
3. Warm temperate Monsoon Zone : altitude varies from 1200-1900m, mean annual temp.is 15-19c
and rainfall > 1000mm
4. Cool temperate Monsoon Zone : altitude varies from1900-2800m, mean annual temp. is 10-15c and
rainfall < or >500 mm.
5. Subalpine Monsoon Zone : altitude varies from 2800-4100 m. mean annual temp.is 3-10c and
rainfall < or >500 mm.
6. Alpine monsoon Zone : altitude varies from 4100 - 4700 m. mean annual temp. is 0-3c and rainfall
scattered
7. Aractic Zone : altitude > 4700 m. Mean annual temp. < 0c, rainfall is scattered and snowfall.
Micro-Climate :
This is a local climatic condition of a given pocket or specific area, which is based on great variations
of land use, land form and physiography. In Nepal, there is a great variety in microclimate because of
vast changes in land-use, land form and physiography. It has been said that at each 100 m. elevation
differences in mountain and hills in Nepal, there is a change in micro-climate. Variation of florestic
composition at altitudinal change reflects the variation in micro climate. There are several factors
affecting micro climatic condition of a given area.
The most influential factors for creating variation of micro climate are light / radiation ( temperature),
humidity, wind and frost. Where as the factors that create the micro climate are : air drainage, aspect,
slope, vegetation, soil etc.
Light/ Radiation : Southern aspect receive more light and radiation than northern aspect. Reaching light
and radiation also vary in east west faces and ridges
Slope : Steeper the slope, more pronounce are the variation of light and radiation, evapo-transpiration,
soil moisture content and so on.
Air/wind : In deep valleys and shallow basins , the drainage of air/wind is limited or poor and fluctuates
. These areas are usually foggy and temperature also tend to fall than the normal mountain slope. Local
wind in mountain region varies, which affects temperature in the areas and there by affects the
suitability of crops.
Vegetation : Vegetation patterns changes as micro climate changes and vice-versa. Areas having
vegetation and water source are generally cool and humid than the area where vegetation and water
source are absent. Temperature, humidity also differs and makes the area different from other.
Soil : Stand of vegetation and types differs according to the condition of soil. As vegetation patterns
changes, there will be change in micro climate.
Frost/ hailstone : Occurrence and frequency of frost and hailstone is different and random in different
physiographic zones, districts, valleys and bottoms which also affects micro climate.
NATURAL DISASTER.
Flood :
By definition, a flood is " an overflow of lands used by man and not normally covered by
water ". What causes the overflow obviously is more water than than the river's channel
can carry. However, nature of river channel itself is responsible for over-flow of river
channel. The main source of the excess water is rainfall. In the case of snow-fed rivers,
excessive snow-melt could swell up the streams. Obviously, flood is basically the result of
rainfall runoff, which is too great to be supported by the existing river channels. This
uncontrolled high runoff overtops the natural or artificial banks and starts spreading over
the flood plain causing damage and threatening the property in the vicinity of the flood
plain.
Flood can't be controlled but one can prevent damage likely to be caused by the flood, by
manipulation of the components of land resources from where the flood originates.
Causes of flood : Man's interferences with the natural ecosystem has crucially modified the
existing hydrological regime and the water balance. Interferences like uncontrolled and
destructive harvesting of timber and fuel wood, clearing forests to give ways to shifting
cultivation / settlement and over grazing have greatly decreased the water holding capacity
of the land, the consequences of which is increased runoff. During heavy rains, the runoff
so produced is often not retained by the land. It just moves down through many steep,
barren, eroded slopes and reaches down into small narrow streams and rivers. These
streams and rivers in the hills carrying sand, silt, water surges, which erode their own
banks, have a tendency to deposit the sediments they carry on the main rivers beds
increasing the bed load and resulting in the spread and surge of water over the flood plains.
Virtually, it is a flat land where peak runoff turns into floods, which suffers the greatest
damage. Flooding of the main rivers of Nepal are the clear examples of having an immense
volume of runoff and the bed load being transported from its tributaries.
Effects of Floods :
Floods affect and damage property mainly through the process of inundation in low-lying
areas, backed by up-stream destruction, river bank erosion and the shifting of river
channels. The surrounding areas of flood plains and valleys may suffer heavily from
floods, since the flood plains and valleys created a long time ago by the rivers, have
become the centers of economic growth and are heavily populated and exploited for
agriculture.
However, the effect and the problem of flooding in developing countries has largely been
aggravated by the socio- economic problems and environmental factors. Increased
population has left no alternatives except for people to occupy and migrate to highly
fragile lands. In developing countries, 50 to 80 % of the population occupy fragile lands,
and 10% of the world's population live in the steep and fragile lands of the earth. Cultural
practices on these lands have destroyed and inhibited the natural protective means, which
would have prevented flood erosion.
Loss and siltation of prime agricultural land, siltation and destruction of lakes, reservoir
and irrigation structures, water pollution, and the destruction of settlements and
communications are the principal damage brought by floods.
The meandering and shifting problems of rivers may create legal problems. Meandering
and shifting of rivers causes damages on one bank leaving the fertile alluvial land on the
opposite bank having different land rights. This problem may cause serious disputes in the
community, where the availability of flat land is scarce.
Preventing Flood :
Flood is largely a result of abuse of land, natural resources and hydrological function. To
prevent primary damage of flood to some extent, a three phase action program has to be
carried out simultaneously :
a) Treatment of watershed :
c) Treatment of main rivers : This is treatments in which big structures are usually built
in the main rivers in order to prevent the flood hazards. In this treatment emphasis is
given in to river training by stabilizing the river channel. The objectives of this
measures are:
--- to prevent the tendency of channel shift or changing the river course.
--- to maintain the river channel capacity for the transportation of sediment load and
excess runoff.
--- to protect the bank cutting.
--- to protect the flood plain from flooding.
For channel stabilization, following river training works are usually warrented :
--- river training work to prevent the river from mentaring and causing bank erosion
--- river training work to to provide sufficient cross-section area fro easy flow of sediments.
--- river training work to keep sufficient depth of water for navigation.
Following are engineering structures widely used for channel stabilization or river training works:
--- Guide banks ( are structures usually constructed to confine the river flow in a certain
direction in order to protect other structures, like bridge or a weir from damage. this
structure are built in banks in parallel to flow ).
--- Pitching on bank slopes ( this is done on the banks of the river, parrellel to the river
flow. Its purpose is to check the erosion on banks due to direct impact by the river,
and to check the sliding of banks due to the scouring action of the water. bank
slopes can be pitched by laying loose boulders, concreate blocks or even grass
turfing ).
--- Cut-offs ( An artificial cutoff can be made in order to make river flow straight
from its mendering position and reclaim the land. this is a very simple and
temporary measure of channel stabilization work and shortening of the river
channel ).
In addition to above mentioned measures, flood prevention measures also includes the
integration of following practices :
e) Flood Prevention : This is simply a watching, guarding and alerting from excessive rain. If
excessive rain is occuring since long duration, preventive measures need to be applied in
order make safe from flood damage.
f) Flood Prediction : With the data and information of past discharge and rainfall record and
rise and fall of river level up stream gauges, chances of occurring flood can be predicted, or
flood warning can be predicted. Flood prediction can help us to take timely action for
minimizing the flood damage. This is a flood warning system, if there is such warning, quick
communication to the community should be done to make them alert from the likely damage
that can happen from the flood.
c) Flood Plane Zoning : Zoning of flood plane should be made in order to minimize the risk
from flood. Basically this is categorized into three zones. They are :
Critical Zone : This is a zone of river channel, which gets flooding in every monsoon. In
such a zone, no human settlement and any infrastructure should be planned.
Restrictive Zone : This zone is very close or adjoining area to critical zone. This area may
get flooding when there is a big flood. Construction of infrastucture should be avoided
except some agriculture practices.
Warning Zone : This zone falls adjoining to restrictive Zone. This zone will have a
chance of flooding if there is largest and unprecedented flood. Construction of
infrastructures need necessary precaution.
Flash flood :
Flash floods are events with very little time lapsing between the start of the flood and peak discharge.
They are often associated with short intervals between storm incidence and arrival of the flood wave, but
this is not always the case. Floods of this type are particularly dangerous because of the suddenness and
speed with which they occur. Flash floods are more common with isolated and localized intense rain fall
originating from thunderstorms.
Landslides :
The term landslide is used to denote the downward and outward movements of slope forming materials
along surface of separation. They are mass movements of land caused by various factors such as heavy
rain, earthquake, or geological factors. Landslides are rather quick mass wasting processes. Mass wasting
or movement are generally : debris slides, rock slides, debris flows and deep seated rotational slides.
Plane rock slides occur on steep slopes where bed rock is close to the surface. Debris and soil slides occur
on steep slopes that are deeply weather residual soils. Landslide causes damage to cultivated land,
settlements, roads and other infrastructures.
Types of movement : Rock falls, topples, slides ( debris, rock slides ) and flows
Types of materials : Bedrocks, soils
Rock falls : They are movement of masses of geologic materials detached from slopes or cliffs. they occur
by free fall, bouncing and rolling. Depending upon the type of materials, they are referred as rock falls,
soil fall, debris fall earth fall etc.
Topples : Block of rock that falls, tilt or rotate forward on a pivot or hinge point and then separates from
the main mass and falling and rolling down to the slopes.
Slides : Movement of soils or rocks along a distinct surface of rupture which seperates the slide materials
from more stable underlying materials. Two major types are : rotational and translational slides.
Rotational : In this type, the surface of rupture is curved concavely upwards and the slide movement is
more or less rotational in an axis that is parallel to the contour of the slope.
Translational : In this case, the mass moves out or down and outwards and slides out on top of the original
ground surface. Such a slide may progress over great area. Slide material may range from loose
unconsolidated soils extensive slabs of rock.
Flows: Flows are many kinds such as : Creep, Debris, Debris avalanche, Earth flow, Mud flow, Lahar.
Creep flow : This is steady downward movement of slope forming materials. Creep is indicated by curved
tree trunk, bent fences or retaining wall, tilled poles or fences and small soil ripples.
Debris flow : This is a rapid mass movement in which loose soils, rocks and organic matter combine with
air and water to form a slurry that then flows down slope. Debris flow areas are usually associated with
steep gullies and drainage basin.
Debris avalanche : This is a varieties of very rapid to extremely rapid debris flow.
Earth flow : In this case, a bowl depression forms at the head of land slope. The central area is narrow and
usually becomes wider as it reaches the valley floor. This type of flow generally ocurs in fine- grained
materials or clay- bearing rocks on moderate slopes and with saturated conditions.
Mud flow : This is an earth flow that contains of materials that is wet enough to flow rapidly and that
contains at least 50 % sand, silt and clay-sized particles.
Lahar : A lahar is a mud flow or debris that originates on the slope of volcano. Lahar are usually by heavy
rainfall eroding volcanic deposits, sudden melting of snow and ice due to heat from volcanic events or by
the breakout of water from glaciers, crater lakes dammed by volcanic eruptions.
Causes of Landslides :
Several factors like geology, geomorphology, hydrology, climate and vegetation, which interact each
other in a complex ways are responsible for landslide or slope stability.
Geology : The composition, texture, physical and chemical content of rock and soil as well as the shear
strength of particles, permeability, structures, weathering and other characteristics of rock and soil play
important roles in landslide. The solid constituents, mineral content and their distribution in rocks and
soil such as grain, size, distribution, shape, area, surface characteristics, amount of cement, mechanical
strength of particles, clay minerals, inter particle bonds, presence of water and chemicals, nature of
bedding planes, joints, faults, folds, fractures and their orientation etc. are important factors, which play
vital role in landslides or slope stability.
Geomorphology : Steepness of slope, strength of slope forming materials, relationship between slope and
stability, presence or absence of former landslides also is a basis to analyze scope of landslide.
Hydrology : Hydrology of a particular area is another factor in landslide and slope stability. Amount and
source of water, water movement, ground water flow and pressure of water are equally important factors
to be considered in landslides and slope stability.
Climate : Climate such as temperature and precipitation are important factors to be considered in
landslides and slope stability. These two elements vary from region to region, which in turn, makes
variation in the scale and the severity of landslides that may occur in different regions. In temperate
regions, with moderate rainfall and change in ground water flow and water pressure may activate
landslides. Similarly, in semi-arid regions with heavy rainfall and in temperate and tropical regions,
where monsoons or cyclonic storm occurs may have debris landslide.
Vegetation : The mechanical action of root network for holding the rock mass as well as its role for
controlling direct water movement or permeability and ground water movement in the land mass are
imperative in landslide.
In addition to the factors responsible for landslides or slope stability as mentioned earlier, there are some
more factors, which backup landslide or slope failure. If there is a abrupt or gradual variation or change in
shearing stress and strength of materials and water content in the geological mass, landslide may occur.
The elements that alters the shearing stress and strength of materials are : vibration, absence of lateral
support, weight, water pressure and friction, weathering ( physical and chemical actions).
Vibration : Vibration from earthquake, blasting, traffic, thunder storm weaken the shearing stress and
strength of materials of geological mass and may cause landslides.
Absence of lateral support : The removal of lateral support by erosions, quarries, previous slope failure,
constructions etc. also affect shearing stress and strength of geological mass and help causing landslide.
Weight : Weight of rain, snow, hailstone, accumulation of debris, loose rock materials, volcanic
materials, waste piles, weight of physical infra-structures etc. may enhance the landslide.
Water pressure and friction : Water pressure in the rock pores and frictional changes in the rock
fractures due to water help change and affect the shearing stress and strength of geological mass and may
cause landslides.
Weathering : The weathering of rock mass due to physical and chemical actions also affect the shearing
stress and strength of rock mass and help enhance landslides.
Mitigation Measures :
Since landslide falls under one of the natural hazards, its mitigation measures needs combination or
integration of several interventions. Curative/ rehabilitative, preventive measures and public awareness
programs need to be incorporated.
Curative/ Rehabilitative measures : These are measures, where immediate actions are administered in
landslide that are already occurred in order to safe-guard the property and people from the further effect
of landslide. These measures need high level of investment and technology. Retaining walls, breast walls,
gully control ( check-dams), water diversion structures, river training works and re-vegetation are some of
the important curative measures to control landslides.
Preventive measures : Preventive measures are those interventions that need to be administered in an
area where landslides are likely to occur or there are high possibility to occur landslide in future. This
measures are applied before landslides occur. Preventive measures help people to be alert from the effect
of landslide damage that may occur in future. Drainage improvement, terrace improvement, gully control,
plantation of trees and grasses, catchment ponds, trail improvement, slope stabilization, water source
protection, forest protection, grazing management, fodder management, fruit tree plantation, agro-
forestry, improved agriculture practice are some of the preventive measures.
Public awareness programs: Local people may not be aware of landslide, how they occur, how to
recognize the landslide prone areas, what will be their impacts in daily life, what precaution measures
need to be taken for prevention and rehabilitation, technical know-how, social and economic implications.
Therefore, it is very urgent to carry out awareness program in the local community. Interactions programs
in academic institutions, open discussion and interactions in public gathering, field demonstration,
observation tours, newsletter, film strips, documentary, slide show, slogans, early warning process and
system, extension works, motivation etc. are some of the effective public awareness programs. Public
awareness program also help mobilize and generate public participation.
Fire : Fire as a natural disaster, has affected a substantial portion of forests of the world.
Although it is a disaster, fire has been a powerful natural factor affecting forests, wildlife and
rangeland. Lowlands such as swamps, maeshes, prairies and semitropical forests of high
humidity also have been burned and their vegetation markedly affected.
Fire plays several major roles in fire dependent ecosystem around the world. Fire has always been a
natural and extremely important environmental factor since it has influence on species traits and life
history as well as ecosystem characteristics and processes such as carbon, nutrient, water cycling,
productivity succession and diversity.
Fire is irregular in frequency, intensity and burning pattern. These characteristics are primarily controlled
by climate, fuel accumulation and flammability, soil site condition and topography. Fire frequency is
greatest in grasslands, grasslands usually burn every 2 to 3 years.
Causes of Fires :
x. Lightning
y. Meteorites
z. Volcanic eruption
aa. Sparks from falling quartzite rocks
bb. Human activities
Kinds of Fires : Three kinds of fires are recognized according to the level at which they burn. They are :
Ground fires, Surface fires and Crown fires
Ground fires : Fires sweeping the forests floor may generate or called ground fires. In ground fires,
the thick accumulations of organic matter burns, which overlies mineral soil. This is flameless and may
kill most plants with roots growing in organic matter. Ground fires burn slowly and usually generate very
high temperatures. Ground fires tend to serve as ignition sources for surface fires.
Surface fires : This is a most common type of fire. It burns over the forests floor and range
consuming litter, humus and killing herbaceous plants, shrubs and fauna. The greater the fuel
accumulated on the surface, the greater the mortality of plants and fauna. The amount of mortality
depends on the species, the age and rooting habits. For example, the young pines succumb to a surface
fire, where as older individual of the same species survive due to thicker bark protecting the cambium
layer from heat damage. A shallow rooting plant will be more susceptibility to fire injury compared to
that of deep rooting plants. However, surface fires tend to kill young trees of all species and most of the
trees of less fire resistant species of all sizes (often just the above ground portion ). The pole-size to
mature trees of fire -resistant species survive light surface fires. Killing of plants by surface fires are due
to damage of cambium, root injury and scorching of the crowns by hot gases rising above the flame.
Crown Fires : Surface fires fueled by accumulations of organic matter and whipped by winds may
scorch and ignite crowns of trees, thus generating a crown fires. Crown fires travels from one crown to
another and kills most trees in its path. Conifers are most susceptible to crown fires because of the high
flammability of their foliage and occurrence in pure stand than broad leafed species.
Fire is one of the management tools of vegetation and wildlife, however wildfires are always harmful
and detrimental to the environment than controlled fire or burning.
Please refer report on "Salient Indegenous Technology Practices for Watershed Management in
Nepal " by D. D. Kandel and M.P. Wagley. (Copy available in Library)
Desertification
Please refer Policy and Programme Responses for Combating Desetification by M.P. Wagley in "
Combating Desertification - A national report of the National Seminar on Desertification and Land
Improvement ". (Copy available in Library)