DELIVERABLES AND ESTIMATED MAN-HOURS


DISCIPLINE PROJECT TITLE: EXPANSION OF EAST PUMP STATION-MARAFIQ ORIGINATOR IM DATE: 14-Nov-12 Revision
PROCESS ENGINEERING PACKAGE REVIEW DISC. SUP. MTQ DATE: 14-Nov-12 A
DRAWING CLASSIFICATIONS MAN-HOURS
DELIVERABLES
Existing

No. of Drawings Eng'g Design CADD Total Hours NEW EXISTING NEW EXISTING
New

"A" "B" "C" "E"


size size size
"D" size
size DRAFTED DRAWINGS Per Dwg.
A B C D E TOTAL A B C D E TOTAL A B C D E TOTAL A B C D E TOTAL

TOTAL MAN-HOURS (FROM OTHER SHEETS) 0 0 0 0 ### 0.0 0.0 0.0 0.0 0.0
NON-DRAFTED DRAWINGS 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Non-Deliverables 0 0.0 0.0 0.0
Design Basis/Technical Narrative 80 80

PEP method statement 60 60


0.0 0.0

Design Verification plan. 20 20


0.0
Review of vendor data and provision of same (Assupmtion-2) 100 100

Process description and Block flow diagram (Assupmtion-2) 80 80

Equipment (summary) list (Assupmtion-2) 60 60

Process Flow Diagrams (Assupmtion-5) 80 80

System descriptions (Assupmtion-2) 100 100

Utility Flow Diagrams (Assupmtion-6) 50 50


Material selection philosophy/report & material selection diagrams
60 60
(Assupmtion-2)

P&ID Legends and Symbols (1 P&ID) 10 10

Process & Utility Studies (Assupmtion-2) 150 150


Process Engineering Flow Sheets (PEFS, P&IDs, UDDs, UEFS) etc 100 100
(Assupmtion-12)

Drainage and Effluent Summary (Assupmtion-2) 60 60

Cause and Effect Matrix (Assupmtion-2) 50 50


Process Control Logic Diagrams (Assupmtion-2) 60 60
Interface Schedule (Assupmtion-2) 30 30

Battery limit conditions summary (Assupmtion-2) 40 40


Hydraulic Calcs, basic and overcapacity analysis, surge
200 200
analysis (Assupmtion-2)
Utilities Summary (Assumption-6) 40 40
Pump calculation data sheets (Assupmtion-2) 20 20
Appropriate supporting calculations, line size,
60 60
overpressure etc (Assupmtion-2)
Control valve and inline instrument data sheets (IPDS sheets)
40 40
(Assupmtion-2)

Analyser data sheets (Residual Chlorine Analyzer) 20 20


Relief valve list/specifications (Assupmtion-11) 20 20
Relief load study (Assupmtion-11) 40 40
Process Sizing Criteria (Assupmtion-2) 30 30
Process Control and Instrumented Protection Function (IPF)
80 80
Philosophy (Assupmtion-2)
Tie in' Isolation and Battery Limits Lists and philosophy (Assupmtion-
40 40
2)
Emergency Shutdown Philosophy (Assumption-2) 60 60
Drainage and Effluent Philosophy (Assupmtion-2) 50 50
Sparing Philosophy (Assupmtion-2) 30 30
Operation Philosophies Start up, Shutdown and Upset philosophy
100 100
(Assupmtion-2)
Relief valve sizing philosophy(Assupmtion-11) 50 50

Maintenance Philosophy, reliability and plant availability (Assupmtion-


60 60
2)

Commissioning Manual input, commissioning systems definition 60 60


Operating manual with developed vendor data (Assupmtion-2) 80 80
Performance Test Procedures and acceptance criteria (Assupmtion-
50 50
2)
Verification attendance and reports for: 0
Process safety review 30 30
Selected DHSE reviews in DHSE section (HAZOP) 30 30
Plot Plan review 30 30
Final documentation dossier 40 40
FAT visits (02 Visits in Middle East,1 Engineer) 40 40
Visit to site for Kick Off Meeting (02 Visits) 20 20

Assumptions:
1 Only compliance with contract scope and specification/code
requirements.
2. The system to be reviewed will only consisted of new pump
station ( Phase-I (6+2 pumps) & Phase-II (6+1 pumps) with
auxilliaries like chlorine injection points, flow meter & Air Release
Valves)

3. Only potable water stream & chlorine feed is considered.

4. Only pumping station will be considered. No evaluation for


perfomance of SWRO plant.

5. 4 PFDs are considered (2 for phase-I & 2 for phase-II).

6.Utilities required for new pumping station is considered.

7. Only two reviews ('for comment' and ‘for approval’)


are considered.
8. Assume that the submittals received have the supporting
information with them in order to undertake the review.

9. Assume that contractor has a basic level of engineering


competence and no engineering will be done.

10. Assume that the submittals received have the supporting


information with them in order to undertake the review.

11. Thermal/Pressure Relief Valves on the discharge lines of pumps


are considrered. Relief valves on the Storage Tanks are not
considered.

NON-DRAFTED DRAWINGS Total Hrs :--------------------> 2510.0 0.0 0.0 2510.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
MAN-HOUR DISTRIBUTION Hrs CHECK LIST: Please Check all the following items are taken care or not. Yes No ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
MUHAMMAD TARIQ 800 1.All New Dwg. Covered P ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
BASSIM ALHAMOUD 500 2.All Exsisting Dwg. Covered P ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
HUSSAIN ALKHUDAIR 500 3.Field Visit & Dwg. Search P ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
IMTINAN MOHSIN 710 4.Sub Contract P ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5.Requisitions P ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6.Data Sheets P ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7.Calculations P ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8.Materials Take Offs P ### 0.0 0.0 0.0 0.0 0.0

9.Man-Hour Distribution P ### 0.0 0.0 0.0 0.0 0.0


10. Misc.any other Items P ### 0.0 0.0
### 0.0
Dwg. Size New Qty Exist Qty New Eq "A" Ext .Eq "A" Total Eq "A" ### 0.0
SIZE "A" 0.0 0.0 0.00 0.00 0.00 ###
SIZE "B" 0.0 0.0 0.00 0.00 ###
SIZE "C" 0.0 0.0 0.00 0.00 0.00 ###
Cross Check SIZE "D" 0.0 0.0 0.00 0.00 0.00 ###
0 OK SIZE "E" 0.0 0.0 0.00 0.00 0.00 ###
TOTAL 0.0 0.0 0.0 0.0 0.00

Total Man-Hours ( All Sheets) :-------------------> 2510 0 0 2,510.0


TOTAL AV. MHRS/ "A" SIZE DWG.--------------------------> #DIV/0! A B C D E TOTAL A B C D E TOTAL A B C D E TOTAL A B C D E TOTAL

0.0 0.0 0.0 0


### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0


### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0 0.0 0.0 0.0 0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

PM-DEM-20/01 (04-10)
Page 1 of 1

S-ar putea să vă placă și