Sunteți pe pagina 1din 4

v Execution

Execution

Foundation Exterior Interior

Excavation

Digging

Leveling

Frame

Post Installation of
wood
Installation of
steal Preparing wood

leveling Wood measurement

digging Wood cutting

Preparation of steel
Steel measurement Stir

Concrete Steel cutting Pour


Execution
v

Interior

Plumbing Electrical Installation of pipe Flooring

Power Installation of Floor leveling


Sanitary toilet bowl

Drainage Panel Board concrete Sand

Septic Vault Switches and outlets Stir Gravel

Pour Cement
Waterline Waterline Polish

Tiles

Stir Pour Fishing Installation of


tiles
Cement
Closing

Finishing Cleaning

Swifting Keeping of
materials

Putting of
garbage/scrap
on trash bin
Public Toilet Construction

Initiation Planning Execution Closing

Feasibility Study

Site preparation Project Setup


Situation Application
Analysis Set objectives/scope
Meeting Measures and set
boundaries of the land
Identify team
Land survey Presentation of
conditions for
Secure the site Assign roles
implementation

Presentation of design

Budgeting

S-ar putea să vă placă și