Sunteți pe pagina 1din 36

Line List

User Advisory - Each individual sheet of this Excel Workbook "Tool" is locked and password protected. The
user may only enter date in the "yellow" cells of the blank form.

Instruction # 1
Before starting, study the Form with the sample data. Consider the header data, the line data columns and the
number of lines for the largest Unit.
Instruction # 2
If you need to add columns or additional data boxes in the header area then you must unlock the form. The
password is jop
Instruction # 3
Make whatever changes to the header block data fields and columns. Changes you may require is Deg. C vs.
Deg F or Bar vs. psig.
Instruction # 4
Add additional line number rows by copy and paste at the bottom of the current form.

Instruction # 5
If you made modifications to the blank form it is recommended that the same changes be made to
the "Sample" sheet also.
Instruction #6
After you have completed the modifications required to fit your project, select a new password and protect the
new "Project" or "Company" version.form.
sword protected. The

e data columns and the

unlock the form. The

y require is Deg. C vs.

changes be made to

ssword and protect the


Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 3 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 4 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 5 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 6 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 7 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 8 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 9 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 10 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 11 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 12 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 13 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 14 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 15 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 16 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 17 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 18 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 19 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 20 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 21 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 22 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 23 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 24 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 25 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 26 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 27 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 28 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 29 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 30 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 31 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 32 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 33 of 36
Project Name: PME: Date:

Proj. Number: PIPING LINE LIST CKR: Date:


Unit Number: Revision: By:

Insulation
Line Size
Design Design Stress
P&ID

Line Tracing Phase


REV.

Type
Line Class Service or Commodity Line origin Line Destination Press Temp Anal. PWHT Req'd.
Number Type Gas/Liq
(PSIG) (oF) Req'd.

Page 34 of 36
Project Name: Jamnagar Cumine Upgrade

Proj. Number: 2007-123455 PIPING LINE LIST


Unit Number: 20 (And prefix for all line Numbers)

Insulation
Line Size
P&ID Service or Phase
REV.

Type
Line Number Line Class Tracing Type
Commodity Gas/Liq

20-21 2001 AGL1 3" Ih Unit Feed L

20-21 2002 AGL1 3" Ih Reactor #1 F L

20-21 2003 AGL1 3" Ih Reactor #2 F L

20-21 2004 AGL1 3" Ih Reactor #3 F L

3 20-21 2005 AGL1 2"& 1" Nitrogen Gas

20-21 2006 AGL1 6" Ih Product Liq

20-21 2007 AGL1 16" Process Vent Gas

SAMPLE
PME: JOP Date: 17/10/07

PIPING LINE LIST CKR: ARL Date: 17/10/07

Revision: 3 By: JOP

Design Design Stress


Line PWHT
Line origin Press Temp Anal.
Destination Req'd.
(PSIG) (oF) Req'd.

Battery Reactor
100 300
Limits Feed
Line 20-
Reactor #1 100 300
2001AGL1
Line 20-
Reactor #2 100 300
2001AGL1
Line 20-
Reactor #3 100 300
2001AGL1
Line 20- Reactor #1,2
100 300
2110AGL1 &3
Line 20-
Reactor #1 100 300
2007AGL1
Unit Relief
Line 20- Header -
90 350 Yes
2006AGL1 Line 20-
2120AGL2

MPLE

S-ar putea să vă placă și