1 THE ERP PROJECT 1.1 Business Process 1.1.1 Identify Process 1.1.2 Document Process 1.2 Software Develop RFP 1.2.1 1.2.2 Select ERP System 1.2.3 Sign Contract 1.2.4 Receive Software 1.3 Hardware Upgrade Hardware 1.3.1 1.3.2 Operation & Maintenace 1.4 ERP System Implementation 1.4.1 Documentation 1.4.1.1 Document Process Prepare End - User Documentation 1.4.1.2 1.4.2 Training 1.4.2.1 Conduct Level I Traning 1.4.2.2 Conduct Level II Traning 1.4.2.3 Conduct End - User Training 1.4.3 Configuration 1.4.3.1 Configure System Prepare Prototype 1.4.3.2 1.4.4 Data Migration 1.4.4.1 Determine Data Requirement 1.4.4.2 Prepare Data 1.4.4.3 Upload/Enter Data 1.4.5 Testing Preform Unit Tests 1.4.5.1 Perform Inegration Tests 1.4.5.2 Perform Stress Test 1.4.5.3 1.5 Support 1.5.1 Provide Support TATION DESCRIPTION RP PROJECT Creating a Set of Activities amining to achieve goals Prepared a sequence of the activities to be performed
IT helped to identify which vendor might be the best -
qualified to complete the project A ERP software is selected for Implementation Final Legal Conctact is Signed
System Hardware were upgraded according to Software
Requirement
A manual for the product which helped user to understand
all the information.
Trained few young professionals
Finalize training program, Training was provided to all the staffs in the organization
The process for Mappiing ERP to the Business process
A working model Which helped to demonstate , the functionality of the ERP System
Analyze Data which needs to be migrated
Master data conversion Final Data is uploaded to the new system
Unit Testing was done to test the functionlilty of the ERP
system and its various components. Integration test was done to check all the functionality were properly linked together A stress testing was done to check users response time and how it performs under load conditions