Documente Academic
Documente Profesional
Documente Cultură
D60079GC10
Edition 1.0
August 2011
D73723
Copyright © 2011, Oracle. All rights reserved.
This document contains proprietary information and is protected by copyright and other intellectual property laws. You may copy and
print this document solely for your own use in an Oracle training course. The document may not be modified or altered in any way.
Except where your use constitutes "fair use" under copyright law, you may not use, share, download, upload, copy, print, display,
perform, reproduce, publish, license, post, transmit, or distribute this document in whole or in part without the express authorization
of Oracle.
The information contained in this document is subject to change without notice. If you find any problems in the document, please
report them in writing to: Oracle University, 500 Oracle Parkway, Redwood Shores, California 94065 USA. This document is not
warranted to be error-free.
If this documentation is delivered to the United States Government or anyone using the documentation on behalf of the United
States Government, the following notice is applicable:
Oracle, JD Edwards, PeopleSoft, and Siebel are registered trademarks of Oracle Corporation and/or its affiliates. Other names may
be trademarks of their respective owners.
Author
Jason Lansdowne
Profile
Prerequisites
Oracle Publications
Title Part Number
Oracle Advanced Planning Implementation and User’s Guide, Release 12 B31553-01
Notations:
(N) = Navigator
(M) = Menu
(T) = Tab
(B) = Button
(I) = Icon
(H) = Hyperlink
(ST) = Sub Tab
1. In this practice you make your own copy of an existing unconstrained plan. Your
Instructor will:
• Assign station names or numbers to each classroom computer station. Substitute that
station identifier wherever you see “XX” in these instructions.
• Demonstrate how to log on to the Oracle e-Business Suite.
• Provide the User Name and Password.
2. In the Applications Navigator, from the Advanced Supply Chain Planner responsibility,
navigate to the Supply Chain Plan Names form.
• Click on the Advanced Supply Chain Planner link from the list of responsibilities
in the Navigator. The center portion of the page will display the menu that is
accessible to the Advanced Supply Chain Planner responsibility. (N) Supply
Chain Plan > Names
• The Organizations window appears in front of the Navigator – Advanced Supply
Chain Planner window.
6. In the Destination region , enter the following information for your copy of the plan:
− Name: XX_Unconst
− Descripition: XX_Unconstrained Plan
− Plan Type: Manufacturing Plan
7. Click OK.
The Note window appears.
This practice covers finding and recording information about material and labor.
Tasks
1. From the Advanced Supply Chain Planner responsibility, navigate to the Planner
Workbench in the Instance: Organization TST:M1.
2. Select your plan xx_Unconst.
Notes:
Notes:
Notes:
Notes:
Notes:
Notes:
14. What are the components that make up SB66328 at M2 and S1 and what are their
quantities per?
Copyright © Oracle Corporation, 2011. All rights reserved.
Notes:
Notes:
17. View components information for some assemblies in the supply chain.
Select AS66311 in org TST:M1.
Use Planner Workbench context window Components.
Click OK
The Components (TST:M1) window appears.
Notes:
19. View resource information for some assemblies in the supply chain.
Use Planner Workbench context window Resources.
Tasks
1. From the Advanced Supply Chain Planner responsibility, navigate to the Planner
Workbench in the Instance:Organization TST:M1.
− (N) Supply Chain Plan > Workbench
2. Select plan XX_Unconstr.
Notes:
Additional information:
− Item AS66311 item category is COMPUTER.VPADELITE
− Item CM66321 item category is COMPONENT.ELECTRICAL
− Item CM66326 item category is COMPONENT.MECHANICAL
− Item CM66331 item category is COMPONENT.ELECTRICAL
Supplier Plan
9. Click on a row in the Supply/Demand form for an item with a planned order and then select
the Pegging Supply icon, which is the second icon from the left.
Notes:
Right click the Order Number column, and the select Folder > Show Field from the right-
click menu.
In the Show Field window, set Find = %dat%
Click Find.
The Show Field window lists available fields.
17. View safety stock information for item AS66311 in organization D2.
Use Planner Workbench context window Safety Stock. Select a supply/demand row,
right click, and select Items.
The Safety Stock window is accessible from the Items window, click Safety Stock.
Tasks
Instance:Organization TST:M1
1. From the Advanced Supply Chain Planner responsibility, navigate to the Plan Options
Instance:Organization = TST:M1
1. From the Advanced Supply Chain Planner responsibility, navigate to the Plan Options
window in the TST:M1 Instance:Organization.
(N) Supply Chain Plan > Options
2. On the Find Plan window, select your plan XX_Unconst.
Click OK.
Organizations _________________
Net WIP _________________
Net Reservations _________________
Net Purchases _________________
Plan Safety Stock _________________
Demand Schedules _________________
Tasks
Instance:Organization = TST:M1
1. Navigate to the Planner Workbench window.
Tasks
Instance:Organization TST:M1
1. From the Advanced Supply Chain Planner Responsibility, navigate to the Item Attributes
Mass Maintenance window.
2. Create a new simulation set. Navigate to return to the Item Attributes Mass Maintenance
4. In the Find Items window, set the following Criteria / Condition / From values:
− Original Make or Buy / Equals / Buy
5. In the selection table, select several items, such as CM66321, CM66333, and CM66326.
6. In the Item attributes available for update region, set the following Attribute Name /
Condition / Attribute Values:
− Processing LT / Increase by Percentage / 20
Click (B) Apply.
Close the Item Attributes Maintenance window.
8. Use Query functionality to find your existing Item Simulation Set Name.
Press the <F11> key.
In the Item Simulation Set Name field, type “%”.
The magenta text font color indicates that these records have already been modified.
For example, the original Processing Lead Time for several items is 20. The Processing
LT for this simulation set for those same items is 24, which is a 20% increase in lead
time.
9. You can modify this simulation set. Select the check box for a few items, such as CM66321
and CM66331.
10. In the Item attributes available for update region enter the Attribute Name for an attribute
that you want to update, such as:
− Attribute Name: Post processing. LT.
− Condition: Set value to
− Attribute Value: 6
Click Apply.
The attribute values are modified for this simulation set. The Original value is not
11. Close the Item Attributes Mass Maintenance window. From the Advanced Supply Chain
Planner responsibility, navigate to the Plan Options for your XX_Uncontr plan in
Instance:Organization TST:M1.
− Supply Chain Plan > Options
Tasks
1. Navigate to the Planner Workbench form:
(N) Supply Chain Plan > Workbench
2. Select the Plan Tab.
View by = Organizations
Sourcing Splits
9. Specify the sourcing Allocation Percentages in the Sourcing Rule form using the
Allocation % field.
10. Review some of the System Profile Options that impact sourcing.
Change your responsibility to System Administrator.
(N) Profile > System.
When the Find System Profile Values window opens, enter MSO%Sourcing% in the
Profile field and click (B) Find.
One of the profile options that you will retrieve will be MSO: Sourcing Allocation
Window. The default is set to 7 days. The Sourcing Allocation Window profile is used
to specify a length of time (in days) used to satisfy allocation percentages. The
sourcing constraints are enforced in a rolling horizon manner, in multiples of the
Sourcing Allocation Window.
Tasks
Instance:Organization = TST:M1
1. View instance/organization codes.
Instance:Organization = TST:M1
1. View instance/organization codes.
(N) Other > Change Instance/Organization
The practices in this course are designed to work with Instance: Organization TST:M1.
Select TST:M1.
(B) Click OK.
2. View collected data for some of the entities in the SB66328 supply chain:
Navigate to the Planner Workbench navigator. (N) Supply Chain Plan > Workbench.
3. Select the Plans Tab.
View by = Organizations
Expand:
− Plans directory
− Plan XX_Unconst
− Instance:Organization TST:D2
Notes:
10. What type of rule sets this sourcing and what is its name?
Sourcing tabbed region > Source Type = ___________________
Assignment Information tabbed region > Sourcing Rule Type = __________________
Assignment Information tabbed region > Sourcing Rule Name = __________________
(M) File > Close Form, and then to click OK when prompted to Close the Workbench.
Notes:
Notes:
Notes:
Notes:
21. View destination information for some items in the supply chain.
Use Planner Workbench context window Destinations, accessible from the Items
22. View the supplier capacity against CM66321 and any other items that you want.
Navigate to the Planner Workbench navigator
View by = Items
24. View time fences for items in the AS66311 supply chain.
Navigate to the Planner Workbench navigator
View by = Items
Expand directory Plans
Expand plan XX_Unconst
Copyright © Oracle Corporation, 2011. All rights reserved.
25. View in-transit lead times for the organizations in the AS66311 supply chain.
(N) Setup > Transit Times
Organization = TST:D2
Click Find
In the Shipping Networks region, select From Org = TST:M1
View details in the Ship Methods region.
Tasks
Instance:Organization = TST:M1
1. Navigate to Collections Workbench.
Instance:Organization = TST:M1
1. Navigate to Collections Workbench.
(N) Collections > View Collected Data
2. View the collected data for some of the entities in the SB66328 supply chain.
View by = Items
Expand Plans > Collection > ASSEMBLY.SUBASSY > SB66328 > TST:M1
3. Review the resource availability and resource requirements information that has been
collected.
Tasks
Instance:Organization = TST:M1
1. Navigate to the Planner Workbench window.
Instance:Organization = M1
10. View exception sets.
11. In addition to exception sets, what other setting need to be in place for the planning engine
to issue exception messages?
Instance:Organization = TST:M1
12. View unconstrained exception messages Resource overloaded for resource CHIPMOUNT1
in organization S1. How often do the exception messages appear? When does the first
exception message occur?
13. Resolve one Resource overloaded exception message.
14. View unconstrained exception messages Supplier capacity overloaded for item CM66321 in
organization M1. How often do the exception messages appear? When does the first
exception message occur?
15. Resolve one Supplier capacity overloaded exception message.
Instance:Organization = TST:M1
1. Navigate to the Planner Workbench window.
(N) Supply Chain Plan > Workbench
2. Select plan XX_Unconstrnd.
View by = Items
Expand directory Plans
10. In addition to defining the exception sets, what other setting need to be in place for the
planning engine to issue exception messages?
Each item assigned to an exception set.
Each resource assigned to an exception set.
13. View unconstrained exception messages Supplier capacity overloaded for item CM66321 in
organization M1. How often do the exception messages appear? When does the first
exception message occur?
(N) Supply Chain Plan > Workbench
Select tab Plans.
View By = Actions
Expand directory Plans.
Select plan XX_Unconst.
Expand version Current.
Expand exception group Material and Resource Capacity Exceptions.
Expand exception message Supplier capacity overloaded.
Expand instance: organization TST:M1.
Right-click item CM66321 and select Exceptions > Detail.
Note how often the messages occur.
Note the date of the first exception message.
Copyright © Oracle Corporation, 2011. All rights reserved.
Tasks
Instance:Organization = TST:M1
1. Navigate to the Planner Workbench window.
Instance:Organization = TST:M1
1. Navigate to the Planner Workbench window.
(N) Supply Chain Plan > Workbench
2. Select plan XX_Unconst.
Expand the Plans directory
Click on the XX_Unconst plan.
Tasks
Instance:Organization = TST:M1
1. View the constrained plan options.
Instance:Organization = TST:M1
1. View the constrained plan options.
(N) Supply Chain Plan > Names
Select plan Const-Cap.
Notes:
Notes:
Assumptions
• Log on using the seeded Advance Supply Chain Planner responsibility.
• Your instructor will provide login information.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Instance:Organization = TST:M1
1. View instance/organization codes.
(N) Other > Change Instance/Organization
Assumptions
• Log on using the seeded Advance Supply Chain Planner responsibility.
• Your instructor will provide login information.
Tasks
3. Create a personal order query named XX_Order with the following criteria:
Criteria Condition From
Order type Equals Purchase order
Supplier Equals Advanced Network Devices
Suggested Dock Date Days From Today 10
Exception Name Equals Orders to be rescheduled in
Planner Equals J. Smith
5. Specify the Queries tabbed pane to be the default tab for the Planner Workbench.
Instance:Organization = TST:M1
1. View instance/organization codes.
(N) Other > Change Instance/Organization
Tasks
Tasks
Instance:Organization = TST:M1
1. After the instructor re-runs the plan, check the effect on the plan of your exception
Instance:Organization = TST:M1
1. After the instructor re-runs the plan, check the effect on the plan of your exception
resolutions for item CM66321, your exception resolution for resource CHIPMOUNT1, and
your implemented recommendations.
Tasks
Instance:Organization = TST:M1
Responsibility: Inventory
Instance:Organization = TST:M1
6. View item substitutes.
Instance:Organization = TST:M1
7. View an alternate bill of material/routing pair for item SB66328 in organization S1.
8. View substitute and alternate exception messages.
Notes:
Notes:
Tasks
Instance:Organization = TST:M1
Instance:Organization = TST:M1
Tasks
Instance:Organization = TST:M1
Instance:Organization = TST:M1
Tasks