Sunteți pe pagina 1din 5
oF SHREENATHJI-UDAIPUR TOLLWAY PRIVATE LIMITED Ret. No: SUTPLIUDR-NH-S/IE/14/1554 The Team Leader Mea arvee Associates Architects Engineers & Consultants Pvt. Lia House No. 52, Jain Colony, - See eaae New Bhopalpura, Behind Nataji Temple, Udaipur ~ 313 001, Rajasathan Date: 28" February 2014 Sub: Typical Cross Section of Tunnel (RHS) Ref: 1. Our Letter No. SUTPLUDR-NH-8/IE/14/1507 dated 17.02.2014 2. Your Letter No. AA/UDRINH-8/SUTPL/14/851 dated 26,02 2074 Dear Sir, With reference to your letter under reference, our point wise reply as under: 1. Complied. ~The profile for portal zone is made 15600 to maintain the finished dia. of 14500, Incorporated in drawing as note no. 3 and enclosed herewith ne, Steel tb withthe tke rods are provided in portal zone, as per design, 3.15 mm thick MS lagging will be used in portal zone. Incorporated in drawing and enclosed herewith, The drain width 2.50 m is provided suitably on one side as per design and the camber is also provided on one side, ‘The care shall be taken while fabricating the steel ribs, however we do not foresee it Dimension details and reinforcement details of side drain and pedestrian railing, Pavement details and tunnel false portal will be dealt separately. Nogaen oe Thanking You, Tollway Private Limited Project Manager Encl.: as above Copy to (i) Project Director, NHAI, PIU, 10-A, Panchwati, Udaipur (without enclosure) ii) Shri P.K. Dosi, Director (T), HO (ti) M/s Consulting Engineers Group Ltd., Jaipur. \ ber Office file vevmunzor AR Sadbhav Sirccnli as uaway ey i eee Site Office : Vilage - Negadla, N.H-8, Regd Office :*Sacbhav House", Opp. Law Garden Police Chowk, Ki, 237, Teh, Nathdvera, tebe, armedabed-s00006, Sst. Relsarand Pejotnon Pin315202 1:91 79 26463384 F +91 79 26400210 E : sex@sadbhavong.com Mab. +81 e003062621 (Cie) 32mm dia, Forpoles spaced at about 0.5m o/c of lerigth 6m with an overlap of “ly overed Drain d 5 Bee ee i | | 4 = PORTAL ZONE / ZONE WITH STEEL RIB i i : [! 10.500, 2.50: Sr. No.fortal Zone : Sequence of suppor Support |Remarks i 14,500. 15,600 + 1} SERS(M.25) | 50mm Thick Sealing Invert Level Prima 25mm dia, 4.5m | Primary au i 2 Rock bots | tong at 1.5mx|_ lining. eae 1.5m spacing Bronte | L i | 1. ALL DIMENSION ARE IN METER UNLESS OTHERWISE SPECIFIED a SFRS (4-25) ion ee 2. ISHB 200 SPACED AT 5 CM AND SHALL BE EMBEDDED WITH CONCRETE Spacing - 0.75 m 9. THE GAP BETWEEN THE STEEL RIB AND SFRS SHALL BE FILLED WITH MeO GRADE CONCRETE (BACKFILL) 4 | ISHB 200 : including 4. THE SUPPORT SYSTEM SHOWN SHALL BE PROVIDED FOR INITIAL 15M LENGTH & ee PSS oO FURTHER MAY BE EXTENDED AS PER GEOLOGICAL CONDITION Laggings & aad ae 5. ROCKBOLTING ON SIDE WALLS MAY BE CARRIED OUT AS. PER SITE CONDITION . 5 - break 6.PAVEMENT CRUST DETAILS AS PER PAVEMENT DESIGN Conereting 6 CC (M-25) | 350mm Thick : ne : Dane nae To we & St ong a wes | som | ee Sth dade BS mown ante ne sree hare xa seein | _muuann muse ‘ 7 a saceceeee scauragae, | omtumamn, |S g tin [LONE RE Za we | PE IO "ay Line (100 mm) | SERS M-25 ! TUNNEL ZONE | T \ Tunnel Zone (Q = 0.2 to 1.0) | Sr. No. Sequence of supports Support | Remarks 1 SFRS (M-25) | 50mm Thick Sealing | 25mm dia, 45m | mY mm dia, m2 lint or linin, | 2 | Rockbots fiongat Lsmx| 7" /fullcotumm i wores. Tada routed | 1. ALL DIMENSION ARE IN METER UNLESS OTHERWISE SPECIFIED K 2m Spacing ®. ROCK CATEGORY AND SUPPORT MEASURES THEREOF TO ADJUSTED AND 7 DECIDED AS PER GEOLOGICAL CONDITIONS ENCOUNTERED DURING TUNNELING os SFRS (M-25) | 120 mm Thick 3.ROCKBOLTING ON SIDE WALLS MAY BE CARRIED OUT AS PER SITE CONDITION 4.PAVEMENT CRUST DETAILS AS PER PAVEMENT DESIGN Seconda: 4 | CC(M-25) | 300mm Thick |Secondary | Lining as a SRT RT RO ea a | ee “1 ro nal ina fame ea sam a TREES SHESELTy [AREER | RR ES ae NEN | Ree ace ett ame | «|

S-ar putea să vă placă și