Documente Academic
Documente Profesional
Documente Cultură
hÌêÏ/Dist.PRAKASHAM
............. ........... søMðü¯þ ¯ðþºÆæÿ/TOKEN No. ...................................
MéÆéÅËÄèÿ ¼ËÏ ¯ðþºÆæÿ/D.D.O's T.B.R. No. .............. K^èþÆæÿ ¯ðþºÆæÿ/VOUCHER No................................
ò³Mæü Ðèþsìüt¯èþ¨
Sd/-B.Venkata Raju,09.01.18
Executive Engineer
Éyé ^óþõÜ A¬MéÇ
Drainage Division, Chirala
TECHNICAL OFFICER
çßø§é ..............................................................................................
MéÆéÅËÄèÿ ........................................................................................
DRAINAGE DIVISION, CHIRALA
FILE No.DDC-AB0LAA(GPFL)/1/2019-SA2(DDC)-ICGNT,Dt:09.01.18
ÐèþlÆæÿ ¯ðþºÆæÿ, ôþ© .............................................................................
EXECUTIVE ENGINEER, DRAIANGE DIVISION, CHIRALA
ÐèþlÆæÿ ^óþõÜ A¬MéÇ çßø§é ......................................................................
(ÐèþlÆæÿ Eèþ¢ÆæÿÓ Éç³ fèþ ç³ÆéaÍ)
AyéÓ¯èþÞ ò³Mæü Ææÿ. ....................................
Rs.5,00,000/- (AæþÆéË ....................................................................
FIVE LAKSH RUPEES ONLY
CERTIFICATES
The claimed amount in the bill has not been drawn and paid previously.
The sanction order of the competent authority is enclosed
calculation sheet for arriving at the balance of the credit of the subscriber is enclOSED.
The sanctions are within the limits prescribed under Rule 14 and 15 of APGPF Rules for the temporary advance and
part-final withdrawal respectively
The Appendix-I/Appendix-O- is enclosed
Sd/-B.Venkata Raju,09.01.18
Executive Engineer
Drainage Division, Chirala
Éyé^óþõÜ A¬MéÇ
ºyðþjsü ÑÐèþÆéË