Short Circuit Current Calculation and Performance
Requirement of HVDC Breakers for MMC-MTDC Systems
Zheren Zhang㸨Non-member, Zheng Xu㸨a) Non-member
(Manuscript received Jan. 00, 20XX, revised May 00, 20XX)

Abstract: To evaluate the performance requirement of HVDC breakers for MMC-MTDC systems with high efficiency, the
equivalent model for calculating the maximum short circuit current are presented in this paper. Firstly, the short circuit current is
decomposed into the steady-state component and the fault component according to its physical dynamics. Secondly, the
steady-state component can be determined by solving the DC network; the fault component can be calculated by an equivalent
network, in which the converters are replaced by a reactance, a resistance and a capacitance in series. Then, the complete
procedure for evaluating the performance requirement of HVDC breakers is described based on short circuit current calculating.
The verifications have been carried out based on a 3-terminal 3000 MW/±500 kV bipolar MMC-MTDC system. The results show
that the proposed methodology is efficient and effective. Lastly, based on the same system, the performance requirement of
HVDC breakers and the influence by the sub-module (SM) capacitance and the smoothing reactor have been studied with the
proposed methodology.

Keywords : modular multilevel converter (MMC), multi-terminal HVDC (MTDC), short circuit current, performance requirement,
HVDC breaker

For a specified MMC-MTDC system, the performance


1. Introduction
requirement of HVDC breakers should be evaluated in the design
In recent years, the growing demands for energy, combined stage, which checks whether the HVDC breakers could break the
with limited fossil energy resources result in the increasing fault current for all possible DC faults and all possible operation
utilization of renewable energies, and multi-terminal high voltage conditions. Up till now, there have been few researches on this
direct current (MTDC) systems are considered to be one of the topic. Among all the factors, short circuit current calculation is the
best solutions for renewable energy integration [1]. basis for evaluating the performance requirement of HVDC
Among the existed high voltage direct current (HVDC) breakers. [13] analyzes the short circuit current based on a
topologies, voltage source converter based HVDC (VSC-HVDC) 3-terminal bipolar 2-level VSC-MTDC system, and the short
is perfectly suited to MTDC systems, because DC power flow can circuit current is decomposed into 3 parts, namely the component
be reversed by the reversal of current direction instead of voltage from the dc capacitor, the component from the DC cable and the
polarity [2–5]. This capability means that the power can be component from the other converter stations. However, calculation
reversed independently without voltage polarity reverse. On in this method must be carried on a detailed digital simulation
high-power and high-voltage occasions, modular multilevel model, which is time consuming. Most importantly, with this
converter (MMC) based topology is a preferred choice for an method, the physical meaning of the simulated fault current is
MTDC system, for its combination of low power losses with elusive, and it is hard to explain the influence by the operation
excellent output waveform [6–9]. conditions, the fault location, and etc. In the determination of the
One significant factor that limits the application of VSC-MTDC most severe short circuit current and the performance requirement
systems with overhead lines is the drawbacks in DC line fault of the HVDC breakers, these uncertainties would inevitably cause
clearance methods. In consideration of the economy and the additional simulations.
technology maturity, existing commercial VSC-HVDC projects To overcome the aforementioned shortcomings and to make a
trip AC circuit breakers to clear DC line faults. However, this better understanding of the short circuit current in MMC-MTDC
method is not suitable for VSC-MTDC systems, because the systems, this paper presents the complete procedure for efficiently
response of mechanical switches is slow [10], which will cause calculating the short circuit current passing through the HVDC
transient AC voltage drop, and may influence the stability of the breakers and evaluates the performance requirement of HVDC
connected AC systems. To minimize the impact on the AC/DC breakers. Based on a bipolar MMC-MTDC system with overhead
system, DC fault has to be isolated fast and selectively before it lines, this paper focuses on the pole-to-ground fault, because it
affects the DC voltage in other parts of the grid. The most efficient occurs more frequently [14], and the pole-to-pole fault is
way so far is to install HVDC breakers at the terminations of all equivalent to the pole-to-ground faults at both the positive pole
transmission lines, but its application in high power transmission and the negative pole.
is still under test [11–12]. The outline of this paper is as follows: Section 2 introduces the
preliminary information of the MMC, the transmission lines and
a) Correspondence to: Zheng Xu. E-mail: xuzheng007@zju.edu.cn the HVDC circuit breakers. Section 3 presents the methodology

College of Electrical Engineering, Zhejiang University,
for calculating the short circuit current based on the equivalent
Hangzhou 310027, China