Foreword
The mid-term review is an important moment in the life cycle of a project. As explained in section 6.2.3 of the
programme manual, the mid-term review allows the programme to have a qualitative discussion with you on the
project performance before starting phase 2. In particular, the core aim of the review is to prepare the ground for
phase 2 by tackling the following elements:
- What is the state of play of the project in relation to action plan preparation and policy improvement in
each participating region?
1. Preparation
To prepare the meeting, we kindly invite you to complete part 1 of the present document and the excel
table included in annex 1 of the present document. This information will be the basis for discussion during
the mid-term review meeting by providing an overview of the state of play of the project implementation and by
gathering any possible questions on the steps to come. The more details are provided, the more effective the
mid-term meeting will be. Please make sure details are provided not only for you as lead partner but also for each
of the participating regions in your project.
| 1 / 11
The mid-term review is also an opportunity for you to review our performance. You are therefore invited to give
feedback on the different services provided by the programme on the following questionnaire:
Any suggestions are welcome and could help to further simplify, improve and adapt the programme to your
needs.
Part 1 of this document and the excel table included in annex 1 need to be completed and sent back via email to
your project, finance and communication officers at the latest two weeks before the meeting.
2. Meeting
The meeting itself is at the heart of the mid-term review. The checklist provided in section 2 of the present
document is for you to have an overview of the points we plan to cover during the meeting. It does NOT have to
be filled and sent to the JS. Additional points of discussion may of course be included depending on the need.
3. Follow-up
In order to ensure a proper follow-up, the conclusions of the meeting will be laid down in a short report including
the steps to be taken by the LP and/or JS. It will be sent to you shortly after the meeting.
Please summarise where each region stands with its action plan. For each region, does the action plan
exclusively focus on the initial policy instrument addressed or are other policy instruments targeted? When will
the action plans be available at the earliest?
Lodzkie Region
The Action Plan for the Lodzkie Region is under development and will be ready at the end of the 6 th semester,
March 2019. It is focused on the policy instrument chosen at the beginning of the project, the ERDF Regional
Operational Programme for the Lodzkie Region 2014-2020.
For each region, please briefly explain the main actions envisaged. What are the chances to see the actions
supported in the different regions? Is there any pilot action included in these actions? If yes, please briefly explain
the nature of this pilot action
Lodzkie Region
The Action Plan for the Lodzkie Region considers in particular 2 Good Practices that were recognised in the
general discussion with the stakeholders as the most interesting ones. They are: 'Bicomponent spunbond
nonwovens' presented by CETI and "Manucoat: Photocatalyctic self-cleaning textile' presented by INCDTP.
The Plan will point out the financial sources and 2 new project proposals aiming at promoting innovative textile
in the framework of the Regional Operational Programme for Lodzkie Region 2014-2020, in collaboration with
3 stakeholder: Lodz University of Technology; Institute of Security Technologies MORATEX and Institute of
Biopolymers and Chemical Fibres. These 2 projects are very valuable for the Managing Authority because it
is very difficult to spend our allocation (50,9 mln EUR) for the Priority Axis I, Measure 1.1 (Investment Priority
The main actions envisaged are the implementation of an R&D platform dedicated to the recycling of textile
wastes and post-consumer garments and its use for collaborative projects. As it concern the R&D platform,
main activities are the construction of the pilot plant for mechanical up-cycling of fibers and a trials campaign
with different textiles: wastes of production, post consumers textiles, etc.
As it regards the use of the platform for collaborative projects, the main activity will be the manufacturing of
several demonstrators/prototypes.
Presently, we have 2 collaborative projects already accepted for funding: the REACT H2020 project on the up-
cycling of acrylic fabrics and the REWIND ADEME project on the up-cycling of cotton. The background of these
actions is the GP presented in the first reset seminar by the Prato ASM named “Textile waste management in
the Prato district”.
CETI is also very interested in the GP “The World’s only Natural Fire Resistant (FR) System” presented by
TCOE during the 5th RESET seminar: “Eco-creativity, natural fibres and short value chains” held in Lodz. This
GP could become the background for a collaborative project about the use of nettle bast fibres in the textile
chain.
Based on the results of phase 1, how do you envisage to carry out phase 2 activities? Is the planning of the action
plan implementation and monitoring clear for all partners? How do you plan to ensure this? If any changes are
proposed to the pre-defined activities of phase 2, please justify them.
The process of drafting the action plans by the partners has been supported by the LP through dedicated
meetings (Steering Group meetings + dedicated meeting in Lille in Sept. 2018), exchanges and review sessions
of the APs' contents and structure. All partners have presented their APs to the others and to the LP, and that
has ensured that all of them have correctly understood the nature of this document and the activities needed
to deliver it during Phase 2.
Monitoring will be based on regularly (three-monthly on the average) checking the advancement of the
partners’ APs through remote exchanges (emails, phone call, skype calls) with the LP and the provision of
support to achieve milestones and objectives. Updates and news about the APs progress will be regularly
published on the project website. More formal monitoring will be achieved through the meetings and reports
planned in Phase 2.
The mid-term review meeting is also an opportunity to reflect on the indicators of the project performance. Please
answer the following questions. If relevant, please indicate any remarks here below:
The mid-term review meeting is also an opportunity to update the programme on the current state of play of the
budget spending. The excel table “annex 1 – budget spending” should give an overview of the spending
situation of the project, broken down by partner. It shows the expenditure
Please fill in the excel table included in annex 1 and return it to your project and finance officers via email together
with part 1 of the present document at the latest two weeks before the meeting.
If any project partner is facing some underspending or overspending at this stage, please explain below the
reasons for this. For partners facing underspending, please indicate what measures will be put in place to
catch up with it (before the end of phase 1) and/or which amounts could be returned to the programme (to be
reallocated to other projects/calls).
Three out of ten partners, namely PP3 Lodz Region, PP4 CLUTEX and PP10 CETI, are facing consistent
underspending in phase 1. The amount of this underspending is around 190.000. The efforts made by the LP
in monitoring and planning the expenditures declared by the partners have avoid a bigger under-spending. In
fact, other partners, such as PP5 Textile Research Institute - AITEX, PP8 Technological Centre for Textile and
Clothing of Portugal (CITEVE) and PP9 National Research & Development Institute for Textiles and Leather
will have very slight under-spending ranging from 3.000 Euro to 8.000 Euro.
Despite the underspending, the project will be able to meet the approved financial plan by using the flexibility
rule (distribution of the budget between partners up to 20%) and by using unused resources to implement a
pilot action in Phase 2 of the project. In particular, partners such as LP Municipality of Prato, PP2 Next
Technology Tecnotessile and PP6 Textile Center of Excellence will report higher expenditures with respect to
their planned budget for an indicative amount of 92.000 Euro at the end of Phase 1. In addition, a pilot action
will be introduced in the action plan that is being jointly prepared by the LP Municipality of Prato and PP2 Next
Technology Tecnotessile. The planned budget for this pilot action will indicatively be around 80.000 Euro. As
a result, the overall underspending in phase 1 will come down to around 10.000 Euro.
Date/time: ________________________
Participants: _____________________________________________________________________________
N.B. THIS CHECKLIST FOR YOUR INFORMATION AND PREPARATION PURPOSES ONLY. IT DOES NOT
HAVE TO BE SENT TO JS. It gives you an overview which points will be covered during the meeting.
Yes No Comments
4 Management
4.1 Is the project management and coordination
smooth? If not (e.g. delays in implementation,
poor quality of reporting, poor project
management, non-compliance with reporting
deadlines), are proper measures undertaken?
5 Additional measures to improve action
plans implementation
5.1 If measures are proposed, is it justified and
are they in line with the programme’s
requirements?
It will have to be filled by JS after the meeting based on the discussion taken place. It is shared with project
afterwards.
Further steps to be taken on both sides (JS and LP) where applicable: