Installation of the solar power plant is becoming more popular nowadays. Most of the state government is
subsidizing to the residential to promote solar. The government has plans to replace the thermal power
with solar power. The Central Government has its own subsidy and the State Government also provides
additional subsidy to promote solar. The Jharkhand government (JREDA-Jharkhand Renewable Energy
Development Authority) is providing 50% solar subsidy in Jharkhand directly to the residential consumer
through approved local channel partners by JREDA.
Why you should read this article: If you plan to set up a solar power plant at your home, then this article
will really help you to know about the complete process of setting up a solar power plant.
Now institutions and social sector consumer can get the 30% subsidy in On-Grid(grid-tied) solar power
plant. Under this MNRE solar subsidy scheme consumer can avail the subsidy from Jharkhand govt.
Institutional School, colleges, Medical colleges, Health Club, Health Institute, Hospital,
educational Institute, universities, etc.
Charitable trust, Old Age Homes, community centers, Welfare Homes, Trust,
NGO, Voluntary Organization, Training Institutes, Orphanages, any centers or
Social Sector organization for common public welfare.
Solar subsidy in Jharkhand: Data Chart of solar Power plant subsidy scheme
by JREDA
SUBSIDY
SUBSIDY FOR SUBSIDY FOR
PLANT FOR SOCIAL
RATE(INR/KWP) RESIDENTIAL INDUSTRIAL/COMMERCIAL
CAPACITY SECTOR
CONSUMER CONSUMER
CONSUMER
WITHOUT BATTERY
INR
1 to 10 KWp 54300 INR 27,150/KWp INR 5,430/KWp
16,290/KWp
INR
>100 KWp 44000 INR 22,000/KWp INR 4,400/KWp
13,200/KWp
INR
1 to 10 KWp 80,000 INR 27,150/KWp INR 5,430/KWp
16,290/KWp
INR
>100 KWp 70,000 INR 22,000/KWp INR 4,400/KWp
13,200/KWp
INR
1 to 10 KWp 1,00,000 INR 27,150/KWp INR 5,430/KWp
16,290/KWp
INR
>100 KWp 90,000 INR 22,000/KWp INR 4,400/KWp
13,200/KWp
INR
1 to 10 KWp 1,17,000 INR 27,150/KWp INR 5,430/KWp
16,290/KWp
INR
>100 KWp 1,05,000 INR 22,000/KWp INR 4,400/KWp
13,200/KWp
If you are getting a subsidy by the government, why
should you install a solar power plant?
Regular Electricity supply in India is unreliable. Most cities of India do not have regular electricity supply.
Using diesel generator is also a little expensive. Even if you have regular electricity but due to the rising cost
of electricity bills you should plan to install a solar power plant.
The Jharkhand government is paying half of the cost so that consumers can install solar power plants at
their home. JREDA announce a 50 percent subsidy this year to the entire residential consumer.
Cost of thermal power production is high to provide subsidizes rate to the consumer. Let say, if power
production cost is 25-30 Rupees/Unit but we are getting electricity at 4-7 rupees. Thermal power is
expensive as compared to solar. This is why the government is offering subsidy in solar so that they can
minimize the thermal load.
Under the Jharkhand Government scheme by the JREDA, you will avail 1 KW of solar power plant project in
just Rs.27150. Total cost would be 54300 where the consumer needs to pay only 27150 plus 5 year CMC
included on the same cost. How to apply solar subsidy in Jharkhand?
If you want to avail solar subsidy in Jharkhand, either you can fill online form for a solar subsidy through
AHAsolar.in or you can contact your local channel partners who are approved by JREDA or who can help to
get the subsidy from JREDA. If you want to install solar power plant you may contact t us for more
information: +91 9304532758 / 6202627265 / 7979874602.
Ans. No, subsidize solar power plant only be installed by the approved channel partners or who has
authority to install solar power plant.
Ans. Once you submit all the necessary documents. Your local channel partner will let you know how much
time will it take to process to get the subsidy.
Ans. There could be charge applicable Rs. 250/- for upto 50 kW/ 63 kVA Connected Load is paid to JBVNL and
Rs. 750/- for above 50 kW/ 63 kVA Connected Load. For the changes better you can contact your local
channel partners or call us will assist you.
Ans: you can visit the JREDA official website to get this information or call us for more information. We will
happy to assist you.
Ans: if your solar power plant capacity is less than 10KW it required my minimal maintenance. If you have
solar power plant is more than 10KW then it may require regular maintenance for good performance. You
can go for AMC which may be somewhere around 2-5% of the total cost of the project. For charges, you may
contact to the solar service provider.
Share this:
9
Like this:
Like
Be the first to like this.
Related
Zero Investment solar power Installing solar power plant for Best Electrical Services in
plant installation for You business - A better option for free Jamshedpur
April 4, 2018 electricity November 29, 2018
In “Blogs” May 15, 2018 Similar post
In “Blogs”
Leave A Reply
Your email address will not be published. Required fields are marked *
Comment
Name * Email * Website
POST COMMENT
SEARCH …
Recent Posts
Hurry up! Get 50% Solar Subsidy In Jharkhand By JREDA and 5 Years CMC Free
Installing solar power plant for business – A better option for free electricity
Follow Us
RECENT POST
Email Address
Subscribe
OUR ADDRESS
Email: contact@loofal.com
Loofal Protech Solution | Copyright © 2017-2018 | About Us | Privacy Policy | Disclaimer | Powered By Indiavent - Update
Yourself Online