EEI CORPORATION

JG SUMMIT NAPHTHA CRACKER PLANT PROJECT


JOB NO. 7100 / 7105
SAFETY, HEALTH, ENVIRONMENT AND SECURITY DEPARTMENT
JOB HAZARD AND RISK ASSESSMENT

PROJECT NAME: DATE:


JG SUMMIT NAPHTHA CRACKER PLANT PROJECT 17 Oct 2012
LOCATION: DOC NO:
REVISION:
BO. SIMLONG, BATANGAS CITY 0
JGS-RA-102-12
JOB DESCRIPTION: □ Routine activities
PRE-COMMISSIONING WORKS – AIR BLOWING OF PIPING SYSTEM □ Non-routine activities
PREPARED BY: REVIEWED BY: APPROVED BY:

Please refer to attached JHRA Meeting


Attendance Salustiano . S. Arevalo Simon Elmer D. San Miguel
Safety in Charge AVP – Project Director
REMARKS:

RISK RATING / EVALUATION

LIKELIHOOD RATING SEVERITY RATING RISK RATING


Very unlikely to happen =1 Delay =1 Risk Rating = Likelihood Rating X Severity
Unlikely to happen =2 Minor injury requiring first aid only =2 Rating
Likely to happen =3 Injury/illness requiring hospital treatment =3
Rating 1 – 10 : Controllable
Very likely to happen =4 Major injury/illness resulting in disability =4
Certain to happen =5 Death / Fatality =5 Rating 11-25 : Uncontrollable
JOB DESCRIPTION:
PRE-COMMISSIONING WORKS – AIR BLOWING OF PIPING SYSTEM
JOB HAZARD AND RISK ASSESSMENT Doc No Revision Page
JGS-RA-102-12 0 2 of 6
Of
Risk
Job Steps / Tasks Hazard Possible Consequence Risk Control / Mitigation L S Rating

1. Survey work area. 1.1. Works at heights. Open 1.1 Fall from height. 1.1.1Use approved scaffold/ work platform. 2 5 10
Perform line check, holes on elevated platforms. Musculo- skeletal injury. 1.1.2 Safe ladder usage and approved access.
confirm and verify piping Unprotected elevated platform Fatality. 1.1.3 Secure work platform gratings/flooring.
system and connections. edges. 1.1.4Ensure floor openings and penetration boxes
Identify filling and are covered.
discharge point/s. 1.1.5 Ensure guardrails on elevated platform
edges.
1.1.6 Use safety harness and approved lifeline.

1.2. Error in identification of 1.2 Damage to other piping 1.2.1 Ensure competent personnel for line 2 3 6
piping system, connection system. Failure of air checking verification.
points, isolation points. Failure blowing. Possible injury to 1.2.2 Confer with area QC and/or field engineer.
in line checking and other personnel. 1.2.3 Ensure reference to updated drawing, water
verification. flushing plan/ procedure.

1.3 Poor weather condition. 1.3 Slip/trip/fall caused by 1.3.1 Discontinue work area survey/line check on 1 5 5
Heavy rain and/or high winds. wet slippery areas and poor poor weather condition..
Poor visibility. visibility. Fall from height. 1.3.2 No work area survey/line check for purpose
Musculo-skeletal injury. of water flushing shall be done at night unless
Fatality. illumination is of acceptable level.

2. Mobilize equipment 2.1 Vehicle movement 2.1 Vehicle collision. 2.1.1 Banks man to direct vehicle/equipment 1 5 5
and materials to location Property damage. Personnel movement at all times.
(air compressor/s, hose, struck by/hit by moving 2.1.2 Barricade, install adequate signage and clear
blinds, blanks, etc) vehicle/equipment – serious mobilization area of unauthorized personnel.
injury to fatality.

2.2. Offloading/ Mechanical 2.2 Failure of lifting gear/ 2.2.1 Barricade, install adequate and clear area of 1 5 5
Lifting Activity equipment. Property damage. unauthorized personnel.
Personnel struck by/hit by 2.2.2 Ensure lifting gears (slings, shackles, chain
load – serious injury to blocks, etc. ) are inspected and in good condition
fatality. before use. Discard/destroy in defective.
2.2.3 Ensure lifting appliance (crane, boomtruck,
JOB DESCRIPTION:
PRE-COMMISSIONING WORKS – AIR BLOWING OF PIPING SYSTEM
JOB HAZARD AND RISK ASSESSMENT Doc No Revision Page
JGS-RA-102-12 0 3 of 6
Of
Risk
Job Steps / Tasks Hazard Possible Consequence Risk Control / Mitigation L S Rating
etc.) are inspected and in good condition before
use.
2.2.4 Rigging by authorized and approved
personnel.
2.2.5 Authorized and approved signalman to direct
lifting appliance movement.
2,2,6 Secure loads/equipment once offloaded.

2.3 Manual handling of 2.3 Over-exertion resulting to 2.3.1 Use mechanical aids whenever applicable. 2 3 6
materials. back pain and musculo- 2.3.2 Ask co-worker/s for assistance on heavy
skeletal injuries. Sharp edges and/or bulky loads. Observe proper lifting
and pinch points. procedure.
2.3.3 Identify and be aware of pinch points and
sharp edges. Use proper hand gloves.

3. Prepare piping system 3.1. Works at heights. Open 3.1 Fall from height. Falling 3.1.1Use approved scaffold/ work platform. 2 5 10
for air blowing. holes on elevated platforms. objects/materials. Musculo- 3.1.2 Secure work platform gratings/flooring.
Installation of blinds and Unprotected elevated platform skeletal injury. Fatality. 3.1.3Ensure floor openings and penetration boxes
fittings. Tighten flange edges. are covered.
connections. Connect 3.1.4 Ensure guardrails on elevated platform
hose to filling point/s. edges.
Install strainer/s at 3.1.5 Secure all tools and materials when working
discharge point/s. on elevated areas.
3.1.5 Use safety harness and approved lifeline.

3.2 Manual handling materials. 3.2 Over-exertion resulting to 3.2.1 Use mechanical aids (trolleys, carriage, etc) 2 3 6
back pain and musculo- whenever applicable.
skeletal injuries. Sharp edges 3.2.2 Ask co-worker/s for assistance on heavy
and pinch points. and/or bulky loads. Observe proper lifting
procedure.
3.3.3 Identifiy and be aware of pinchpoints and
JOB DESCRIPTION:
PRE-COMMISSIONING WORKS – AIR BLOWING OF PIPING SYSTEM
JOB HAZARD AND RISK ASSESSMENT Doc No Revision Page
JGS-RA-102-12 0 4 of 6
Of
Risk
Job Steps / Tasks Hazard Possible Consequence Risk Control / Mitigation L S Rating
sharp edges. Use proper hand gloves.

3.3 Use of hand tools 3.3 Defective tools. Improper 3.3.1 Inspect handtools before use. Discard if 2 4 8
usage resulting to moderate defective.
to serious injury. 3.3.2 Use right tools for the job. Makeshift / shop-
fabricated tools shall not be allowed.
3.3.3 Secure handtools with lanyard whenever
working at height.

4. Operate air compressor 4.1 High noise level 4.1 Noise-induced Deafness 4.1.1 Sufficient and suitable warning signs and 1 4 4
and gradually pump air to barricade
piping system. 4.1.2 Dampers/Mufflers on compressor
4.1.2 Use of hearing protection for all personel in
proximity.

5. Operate air compressor 5.1 Failure of hose and fittings 5.1 Whiplash, struck by/hit 5.1.1 Hose and fittings shall be of approved type 2 4 8
to required flow rate/ air by hose or fittings – moderate and make.
pressure and duration. to serious injury 5.1.2 Inspect hose and fittings before use. Discard
if defective.
5.1.3 Secure hose connections with whiplash
preventer/arrestor or similar device.
5.1.4 Barricade work-area, install adequate signage
and clear area of unauthorized personnel.
5.1.5 Watchmen to be deployed in strategic
locations.

5.2 Debris discharge 5.2 Hit by/struck by debris 5.2.1 Barricade discharge point/s and suitable 2 3 6
discharge. Physical injury. signages.
Eye injury. 5.2.2 Suitable eye protection. (Safety glass, safety
goggles)
5.3 Failure/absence of 5.3 PRV failure may result to 5.3.1 Ensure inspection of compressor before use. 2 5 10
JOB DESCRIPTION:
PRE-COMMISSIONING WORKS – AIR BLOWING OF PIPING SYSTEM
JOB HAZARD AND RISK ASSESSMENT Doc No Revision Page
JGS-RA-102-12 0 5 of 6
Of
Risk
Job Steps / Tasks Hazard Possible Consequence Risk Control / Mitigation L S Rating
compressor pressure relief overpressure leading to 5.3.2 Only approved competent person to operate
valve/mechanism. rupture of compression compressor.
chamber and/or explosion. 5.3.3 Check/Test PRV before use.
5.3.4 Barricade work area.

6. Completion. Remove 6.1. Works at heights. Open 6.1 Fall from height. 6.1.1Use approved scaffold/ work platform. 2 5 10
temporary fittings and holes on elevated platforms. Musculo- skeletal injury. 6.1.2 Secure work platform gratings/flooring.
connections. Unprotected elevated platform Fatality. 6.1.3Ensure floor openings and penetration boxes
Reinstatement of piping edges. are covered.
system. Demobilization. 6.1.4 Ensure guardrails on elevated platform
edges.
6.1.5 Secure all tools and materials when working
on elevated areas.
6.1.5 Use safety harness and approved lifeline.

6.2 Vehicle movement 6.2 Vehicle collision. 6.2.1 Banksman to direct vehicle/equipment 1 5 5
Property damage. Personnel movement at all times.
struck by/hit by moving 6.2.1 Barricade and clear mobilization area of
vehicle/equipment – serious unauthorized personnel.
injury to fatality.

6.3. Loading/ Mechanical 6.3 Failure of lifting gear/ 6.3.1 Barricade and clear area of unauthorized 1 5 5
Lifting Activity equipment. Property damage. personnel.
Personnel struck by/hit by 6.3.2 Ensure lifting gears (slings, shackles, chain
load – serious injury to blocks, etc. ) are inspected and in good condition
fatality. before use. Discard/destroy in defective.
6.3.3 Ensure lifting appliance (crane, boomtruck,
etc.) are inspected and in good condition before
use.
6.3.4 Rigging by authorized and approved
personnel.
6.3.5 Authorized and approved signalman to direct
lifting appliance movement.
JOB DESCRIPTION:
PRE-COMMISSIONING WORKS – AIR BLOWING OF PIPING SYSTEM
JOB HAZARD AND RISK ASSESSMENT Doc No Revision Page
JGS-RA-102-12 0 6 of 6
Of
Risk
Job Steps / Tasks Hazard Possible Consequence Risk Control / Mitigation L S Rating
6.3.6 Secure loads/equipment once offloaded.

6.4 Manual handling of 6.4 Over-exertion resulting to 6.4.1 Use mechanical aids (trolleys, carriage, etc) 2 3 6
materials. backpain and musculo- whenever applicable.
skeletal injuries. Sharp edges 6.4.2 Ask co-worker/s for assistance on heavy
and pinchpoints. and/or bulky loads. Observe proper lifting
procedure.
6.4.3 Identifiy and be aware of pinchpoints and
sharp edges. Use proper hand gloves.