LOG DATE : I
ELEC
IN COMM. NO : E I&C
W
A APPROVED PROCESS
B APPROVED AS NOTED D
CONTRACTOR
C NOT APPROVED I RECORD
S
I INFORMATION T PLN PUSMANKON
R PLN UIP NUSRA
APPROVAL DOES NOT RELIEVE CONTRACTOR I
FROM RESPONSIBILITY FOR ERRORS OR B
DEVIATIONS FROM CONTRACT REQUIREMENTS U
T
BY : DATE: I
O
LOG DATE : N
OUT COMM. No. :

0 FA 03 NOV 2017 For Approval WHY RIM GS


REV STATUS DATE PEVISION AND RECORD OF ISSUE PREPARED CHECKED REVIEW APPROVED

PT. PLN (PERSERO)


LOMBOK GECC POWER PLANT (PEAKER) 130 – 150 MW

PT. PLN (PERSERO) PUSENLIS


PLN DWG NO.

CONTRACTOR

CONSULTANT

LOMBOK GECC POWER PLANT PROJECT TYPE DOC REV

(PEAKER) 130 – 150 MW 17-12318 CALCULATION 0


DOC NUMBER
CODE

GLPP-000200-SGA-S1-CS-004 AREA
JOB NO : 17-12318

FIRE WATER DOC. NO. : GLPP-000200-SGA-S1-CS-004


HYDRAULIC CALCULATION
REV :0

PAGE : 2 of 8

REVISION HISTORICAL SHEET

Rev. No. Date Description


0 03-November-2017 For Approval

DISTRIBUTION LIST

PP PLN

Project Manager Project Manager


Project Control Manager Engineering Manager
Procurement Manager
Construction Manager
QC-SHE Manager
Admin & Finance Manager
Engineering Manager
Project Engineer
Mechanical Lead Engineer
Piping Lead Engineer
Process Lead Engineer
Civil Lead Engineer
Electrical Lead Engineer
Instrument Lead Engineer
JOB NO : 17-12318

FIRE WATER DOC. NO. : GLPP-000200-SGA-S1-CS-004


HYDRAULIC CALCULATION
REV :0

PAGE : 3 of 8

COMMENT HISTORICAL SHEET

Rev. No. Date Description


JOB NO : 17-12318

FIRE WATER DOC. NO. : GLPP-000200-SGA-S1-CS-004


HYDRAULIC CALCULATION
REV :0

PAGE : 4 of 8

TABLE OF CONTENT

Section Page

1. PURPOSE ........................................................................................................ 5
2. REFERENCE ................................................................................................... 5
3. DESIGN INPUT ................................................................................................ 5
4. METHODOLOGY ............................................................................................. 6
5. RESULT ........................................................................................................... 7
JOB NO : 17-12318

FIRE WATER DOC. NO. : GLPP-000200-SGA-S1-CS-004


HYDRAULIC CALCULATION
REV :0

PAGE : 5 of 8

1. PURPOSE
This document is prepared as Process Hydraulic Calculation for Fire Water System of the project scope
of work defined in Lombok GECC/GTCC Power Plant (Peaker) 130 – 150 MW . The purpose of this
study is to calculate the pressure drop in the fire water lines and to ensure the pressure in the process is
enough to flow the fluid to its destination.

2. REFERENCE
The following documents are used as references for Hydraulic Calculation:
• Contract Document “Lombok GECC/GTCC Power Plant (Peaker) 130 – 150 MW”.
• Basic Engineering Design Data, GLPP-000200-ZEN-P1-BE-001 Rev 0.
• Process Design Basis, GLPP-000200-ZEN-P1-BR-001 Rev 0.
• Piping and Instrumentation Diagram for Fire Water System, GLPP-000200-SGA-S1-EF-001 Rev 0.
• Layout Fire Fighting Equipment, GLPP-000200-SGA-S1-GA-001.
• General Plot Layout, GLPP-000500-ZEN-GO-PP-001.
• Fire Water Pump Data Sheet, GLPP-000200-SGA-S1-DS-002.
• Jockey Pump Data Sheet, GLPP-000200-SGA-S1-DS-001.

3. DESIGN INPUT
a. Discharge Fire Water Pump
Table 1. Design Input for Hydraulic Calculation of Discharge Pump
Variable (unit) Value Remark
o
Temperature ( C) 27.4 BEDD
2 Discharge Pressure Fire
Initial Pressure (kg/cm g) 8.5
Water Pump
Flowrate (m3/hour) 283.9 Pump Datasheet
Density (kg/m3) 1006 HYSYS
Viscosity (cP) 0.8437 HYSYS
Pipe Diameter (mm) 200 Line Sizing
Elevation Change (m) - assume
Pipe Length (m) 68.7 Piping Layout (Assume)
Fitting: Assume
Swing Check Valve 1
Butterfly Valve 1
Elbow 90o 3
Tee as Elbow 2
.
b. Distribution Ring 1
Table 2. Design Input for Hydraulic Calculation of Distribution Ring 1

Variable (unit) Value Remark


o
Temperature ( C) 27.4 BEDD
Density (kg/m3) 1006 HYSYS
Viscosity (cP) 0.8437 HYSYS
Pipe Diameter (mm) 200 Line Sizing
Elevation Change (m) - assume
Pipe Length (m) 351.3 Piping Layout (Assume)
Fitting: Assume
o
Elbow 45 8
JOB NO : 17-12318

FIRE WATER DOC. NO. : GLPP-000200-SGA-S1-CS-004


HYDRAULIC CALCULATION
REV :0

PAGE : 6 of 8

Variable (unit) Value Remark


o
Elbow 90 7
Tee as Branch 2
Tee as Elbow 2

c. Distribution Ring 2
Table 3. Design Input for Hydraulic Calculation of Distribution Ring 2

Variable (unit) Value Remark


o
Temperature ( C) 27.4 BEDD
Density (kg/m3) 1006 HYSYS
Viscosity (cP) 0.8437 HYSYS
Pipe Diameter (mm) 200 Line Sizing
Pipe Length (m) 338.6
Elevation Change (m) - assume
Fitting: Assume
Elbow 45o 8
o
Elbow 90 8
Tee as Branch 5
Tee as Elbow 2

d. Farthest Hydrant
Table 4. Design Input for Hydraulic Calculation to Farthest Hydrant

Variable (unit) Value Remark


o
Temperature ( C) 27.4 BEDD
2 Farthest hydrant pressure
Destination Pressure (kg/cm g) 7
requirement
Flowrate (m3/hour) 283.9
Density (kg/m3) 1006 HYSYS
Viscosity (cP) 0.8437 HYSYS
Pipe Diameter (mm) 200 Line Sizing
Elevation Change (m) 1 assume
Pipe Length (m) 3.75 Assume
Fitting: Assume
o
Elbow 90 1
Tee as Elbow 1
Gate Valve 1

4. METHODOLOGY
Hydraulic Calculation will be simulated by using software ASPEN HYSYS ver 8.8. HYSYS calculate
pressure drop on pipe which is caused by elevation change, fitting and pipe length. Pipe Diameter,
Properties of fluid, and fitting are used as data input for the simulation.
JOB NO : 17-12318

FIRE WATER DOC. NO. : GLPP-000200-SGA-S1-CS-004


HYDRAULIC CALCULATION
REV :0

PAGE : 7 of 8

5. RESULT
Table below indicates the summary of hydraulic calculation result:
No. Description Quantity Initial Residual Min. Destination Remarks
(m3/hr) Pressure Pressure Pressure
(kg/cm2g) (kg/cm2g) (kg/cm2a)
1 Discharge Fire Water 283.9 8.5 8.2 - OK
Pump
2 Distribution Ring 1 142.2 8.2 7.9 - OK
3 Distribution Ring 2 141.7 8.2 7.9 - OK
4 Farthest Hydrant 283.9 7.9 7.7 7.0 OK